Building Permit(246)Type: MECHANICAL Subtype: RESIDENTIAL MECHANICAL I Status: ISSUED
Parcel No: 00619401000401 Site Address: 1136 8TH AVE S EDMONDS,WA 98020-6636 Applied: 5/18/2022
Subdivision: 006194 Lot: 0 Issued: 6/9/2022
Fire Sprinklers: Lot Area: Zoning: Final:
Valuation: $0.00 Occupancy Type: Construction Type: Expiration Date: 12/6/2022
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: NED
Scope of Work: MECHANICAL -BOILER REPLACEMENT
WA State Contractor L & I #: 1627i
NORTHM*799CA
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
NW MECHANICAL
3204 NE 145TH STREET,
(206)486-3559
PERMIT@NWMECHANICAL.COM
SHORELINE WA 98155
CONTACT
NW MECHANICAL
3204 NE 145TH STREET,
(206)486-3559
Permit@nwmechanical.com
SHORELINE WA 98155
CONTRACTOR
NORTHWEST MECHANICAL
3204 NE 145TH ST, SHORELINE
(206)267-4328
INC
WA 98155
1136 8TH AVE S, EDMONDS WA
OWNER
LARA DITTOE DITTOE
98020
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
1 -BASE FEE FOR MECHANICAL
001.000.322.10.000.00
$50.00
$50.00
6/8/22
R20770
PERMITS
BOILER OR COMPRESSOR - 50HP OR
001.000.322.10.000.00
$50.00
$50.00
6/8/22
R20770
LESS
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
6/8/22
R20770
PER PERMIT
TOTALS: $140.00
$140.00
IN
CONDITION TYPE
STATUS I
NOTES
Printed: Thursday, June 09, 2022 8:48:52 AM 1 of 2
MECHANICAL Permit
• -
PERMIT
City of • • •
Pr
47
www.edmondswa.gov/425.771n77MMML
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
\r\n2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.\r\n3- SOUND OR NOISE - Sound/Noise originating from temporary
FOR
construction sites as a result of construction activity are exempt from the noise limits of
ALL BUILDING PERMITS
INFORMATION
ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am
to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the
noise originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.\r\n4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. \r\n5 - PLUMBING - Plumbing contractor license laws are regulated by
Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the
risks and potential monetary liability for work performed by unlicensed plumbing
contractors. For more information contact L&I Department of Licensing at 1-800-647-
0982.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
The issuance of this permit in no way constitutes approval from any other agencies
REGULATING AGENCIES
FOR
having regulatory authority over the facility and this construction activity. It is the
INFORMATION
responsibility of the property owner to obtain any and all such required approvals.
' •NS - Schedule •nline
at: https://Inspection.MvBuildingPermit.co
COMPLETED RESULT
SEQID INSPECTION TYPE INSPECTOR
NOTES
DATE
X-0 MECH FINAL"
B-3 MECH ROUGH IN
Printed: Thursday, June 09, 2022 8:48:52 AM 2 of 2