Loading...
ENG2020-0461 REVISION 2RIGHT OF WAY EUC PERMIT PERMIT NUMBER] City of Edmonds 0461 www.cityofedmonds.gov 777 Description: PUD-PHASE 2 OF 4 TO CONVERT & REMOVE 6 POLES & WIRES ISSUED: 08/05/2021 Address: 102 MAIN ST EDMONDS WA 98020-3132 EXPIRES 8/05/2022 rmit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 00454800300700 i NAME TYPE NAME ADDRESS PHONE APPLICANT SNOHOMISH COUNTY PUD P.O. BOX 1107, EVERETT WA 98206 (425)670-3216 CONTRACTOR SNOHOMISH COUNTY PUD P.O. BOX 1107, EVERETT WA 98206 (425)670-3216 OWNER TRINITY UNITED GROUP LLC PO BOX 84325, SEATTLE WA 98124 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $0.00 ENGINEERING INSPECTION FEE $110.00 $0.00 ENGINEERING REVISION REVIEW FEE $110.00 $0.00 RIGHT OF WAY STANDARD - EUC PERMIT FEE $330.00 $0.00 • REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. VAIAA-34:1all ]'1 THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW ENGINEERING DIVISION ..,7TED p( 6-KV 16/10/2022 08/05/2021 DATE REVISION 2 EXCLUDES TRENCHING INTO VAULT IN SHORELINE AREA. Printed: Thursday, August 05, 2021 1:02:09 PM 1 of 2 Y. -RWOF WAY EUC PERMIT PERMIT NUMBER City of Edmonds f 121 5th Ave N, Edmonds WA 98020 ENG2020-0461 --- - www.cityofedmonds.gov / 425.771.0220 CONDITIONS _ INSPECTIONS INSPECTION • DATECOMPLETE®� in X-2 ENGINEERING FINAL" .; START E-7 CONCRETE SIDEWALK E-7 CURB GUTTER Printed: Thursday, August 05, 2021 1:02:09 PM 2 of 2 0 \:L L?,11(7. ANC. 1 s`) u PROJECT NAME: PUD WO #100061120 - PHASE 2 RECEIVED 11/5/20 ROW PERMIT NO.: ENG 2020-0461 ISSUE DATE: 8/5/21 RIGHT-OF-WAY CONSTRUCTION PERMIT APPLICATION Phase 2 - OH to UG CONTRACTOR: SNOPUD Mailing Address: 1802 75th St SW, MS 02 PO Box 1107, Everett 98206 State License #: City Business License #: CONTACT: Richard Dumo Phone #: 425-783-5110 Fax #: Email #: rsdumo@snopud.com ❑ Liability Insurance ❑ Bonded ADDRESS OR INTERSECTION OF CONSTRUCTION: 102 Main St. & Sunset Ave, Edmonds WA 98020 ROW WORK ASSOCIATED WITH THE FOLLOWING TYPE OF PROJECT: ❑ Commercial ❑ Subdivision ❑ City Project ❑ Traffic Control (Only) ❑ Multi -Family ❑ Single Family K EUC (PUD, VERIZON, PSE, COMCAST, OVWSD): Is this permit part of a blanket permit? ANY ASSOCIATED PERMITS? ❑ Other ❑ Yes X❑ No BLD# ENG# DESCRIPTION OF PROPOSED WORK (Be Specific) : This is Phase 2 of 4 to convert and remove (6) Poles & Wires at Railroad Street. Phase 2 Scope: Bore conduits across Maint St., Install junction vault, 3phase transformer, primary and secondary cables and secondary pedestals. Also includes Tree removal at the intersection of Main St. and Sunset Avenue. (Please see attached drawing.) WAS STREET OVERLAYED WITHIN THE LAST FIVE 5 YEARS? YES ❑ NO ❑X Year: Approx. Total: 60 Sq. Ft. (Includes Bore Pits and Vault & Ped installation on concrete sidewalk and pavement) PAVEMENT CUT: ® Yes ❑ No If yes, indicate size of cut: x CONCRETE CUT: N Yes ❑ No If yes, indicate size of cut: x RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (NUMBER OF MONTHS) Sidewalk 48 Hrs + 5 LF X 5 LF 25 SF 0 month Alley 72 Hrs + 3 LF X 4 LF 12 SF 0 month Parking 72 Hrs + LF X LF SF APPLICANT TO READ AND SIGN *Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by (WAC) 296-155-305 and must have certification verifying completion of the required training in their possession. *Restoration is to be in accordance with City codes and Standards. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday — NO EXCEPTIONS. Indemnity: The Applicant has signed an application which states he/she hold the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including defense costs and attorney fees by reason of granting this permit. I have read the above statements and understand the permit requirements and acknowledge that I must follow all requirements in order for the permit to be valid. SIGNATURE �� Z�)Um'& DATE 11 /5/2020 Contractor or Agent NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE REVISION 2 DAYTIME TRAFFIC CONTROL PLAN (EDMONDS LANDING) W20-1 ROAD RORR ANUD I W20-4 e W3-OPREPIREO 10 STOP REVISE TAPER A 7A SUCH THAT W20-.x VEHICLES CAN STILL USE RIGHT TURN LANE TO TURN INTO PARK. (FERRY LOADING/UNLOADING LANES) h h A RDeD YIXVR AXEAD BE W20_1 PREPARED ro sTOP W3-4 IR 0 Z z "1+41"IH :It — SCHEDULE ALL INSPECTION THROUGH MYBUILDINGPERMIT.COM - RESTORATION TO BE DETERMINED BY CITY INSPECTOR N NORTH W20-4 W20-7A W3-4 i W20-1 • A *E, RµOAD SIDENLR CLOSED YEeD PARKING LANE f vMAIN ST. v — — f — — MAIN ST. y — y y � - IHIHIHIHIHIHI1111111111111 IIIIIIIIIIIIIIIIIII/- — �� FERRY WAITING °A _ /1 AREA o o ZO O CI I (PARKING AREA) W20-4 \\ 1 7 20-70 W3-4 A RE PREPARED : TO STOP � a W200ROAp EORe � 1NFAD 1 1 1 1 OW20-7A I RW20-1 OAR ERR AXE17 AD PARKING LANE 1 2 3 SPEED SIGN SPACING BUFFER LIMIT A, B, C (FT) (FT) 25 200 55 30 200 85 35 350 120 OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE NOTE: FLAGGERS REQUIRED TO CONTROL TRAFFIC WHENEVER THE CREW MUST INTERRUPT TRAFFIC FLOW TO ACCESS THE WORK SITE WITH MATERIALS OR EQUIPMENT. FLAGGERS TO ASSIST PEDESTRIANS CROSSING THE ROAD BACK AND FORTH DURING CONSTRUCTION. WORK HOURS: 7AM TO 5PM MONDAY TO THURSDAY LEGEND: O CONE OR CHANNELIZING DEVICE ®® SERVICE TRUCK/EQUIPMENT WORK AREA OT FLAGGER Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. ENGINEERING DIVISION APPROVED AS NOTED % a (,i/Q.i��08/03/2021 PEDESTRIAN ROUTE OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY UTILITIES MAY REQUIRE A SEPERATE PERMIT. RESUB May 03 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM NOT SEWER LINE - THIS ISgCURB DOWNTOWN ALLIANCE BOUNDARY MAIN ST. A-53758 'q PROP LINE \ \ it S IEET'[ GHT PLI 368 ---------- -- SID WALK \ EXISTING PLI TO BE REMOVED wM O ` L 5------ - - - -- -- � - S-i------- __S____ --- TREE TO BE ->---_______ REMOVED III LLI i I \ / Q MAIN ST. I s W 0------W--7------i-----W---------------W- ------------- W- - - -- S D I � �PROP 2(4") , , - � CONDUIT BORE , , ' ^ UJ VAULT DETAIL ATTACHED FC�FNF: ------T------- - ------G------- ------W------- - ------SD---------- — ------5------- EXISTING TELICOMM EXISTING GAS EXISTING WATER EXISTING STORMDRAIN EXISTING SEWER PROPOSED BORE ROUTE EXISTING POWER IN CONDUIT OWNER/CONTRACTOR IS RESPONSIBLE FOR • - POTHOLE LOCATIONS EROSION CONTROL AND DRAINAGE so, WSDOT FORCE MAIN SHALL BE LOCATED PRIOR TO BORING PL[ 369 _ PIPI4L I ` CURB EXISTING ,-' J-VAULT / \I A-29045� Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. MINIMUM CLEARANCE FROM UTILITIES: (REFER TO TABLE FOR OTHER UTILITY) HORIZONTAL - AT LEAST 5 FEET REVISION VERTICAL = AT LEAST 12" DISTANCE FROM OTHER APPURTENANCES = 10' FEB 17 2022 / i f - ° ENGINEERING INSPECTOR TO DETERMINE RESTORATION LIMITS 4 = ���� MIN OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING I J ' / ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY TIE-IN TO EXISTING VAULT TOE, �� UTILITIES MAY REQUIRE A SEPERATE PERMIT / I COMPLETED UNDER SEPAR�4 h \ PHASE 3 OF PROJECT AFTER \ • / APPROVAL OF COE SHORELINE / / PERMIT (SEE ATTACHED �C 1 / ~0 I L� II l I / m F NEW TR I /\G- - �i� A A-53757 537� 7� � ­ TY DISTRICT CONDUIT CLEARANCE CIDEVOELOPMEENTS FROM OTHER UTILITIES SERVICES DEPARTMENT VERT SEP (CROSSING) HORIZ SEPARATION TYPE OF UTILITY LINE ELECT PRIM ELECT SEC MAIN ELECT SEC SERV (300V MAX) ELECT PRIM ELECT SEC MAIN ELECT SEC SERV (300V MAX) COMMUNICATION 6" 6" 6" 0" 0" 0" COMMUNICATION SERVICE 3'' 31' 3 011 0 OII HIGH PRESSURE GAS 12 12 2' >= >=31 6' >=36" LOW PRESSURE GAS 6' 6 6" 12" 12' 12" GAS SERVICE 6" 6" 6" 12" 12" 12" LIGHTING & ELECTRIC SUPPLY 6" 6" 6" 0" 0" 0" TRENCHING PORTION (PHASE 3) TO BE COMPLETED ONCE SHORELINE PERMIT IS APPROVED. From: Dumo, Richard <RSDumo@SNOPUD.com> Sent: Wednesday, June 8, 2022 2:56 PM To: Edmonds Engineering Permits Cc: Burke, Erin; Flaherty, Andra; Joint Use; Griggs, Natalie; Whatmore, Jeff Subject: Request to exclude Trench portion from existing ENG2020-0461 Categories: Red category Request: - Exclude the trenched portion (below in green) of project from ENG2020-0461. - To designate this to be Phase 3 in addition to Phase 2 (ENG2020-0461) and Phase 1 (ENG2020-0460) - A Shoreline permit for this trenched portion. Richard Dumo Distribution Engineering Services 1802 75" St. SW, Everett, WA 98206 Office: 425-783-5110 From: Griggs, Natalie <Natalie.Griggs@edmondswa.gov> Sent: Tuesday, June 7, 2022 4:38 PM To: Dumo, Richard <RSDumo@SNOPUD.com>; Whatmore, Jeff <Jeff.Whatmore@edmondswa.gov> Cc: Burke, Erin <EFBurke@SNOPUD.com>; Flaherty, Andra <ALFlaherty@snopud.com>; Joint Use <JointUse@SNOPUD.com> Subject: RE: Shoreline Permit required for Phase 2 work at Main St (ENG2020-0461) Hi Richard, Thank you for clarifying that PUD can do the trenching portion of the work at a later date. Can you please send a separate email to engineeringpermits@edmondswa.gov to request that the trenching portion be excluded from the issued permit ENG2020-0461? Please include the figure that you marked in the email below in the request. This portion of the work will need to be completed as a separate