Loading...
BLD2022-0770_Supplementals_Plumbing_Fixture_Counts_6.13.2022_12.14.56_PM_2928314MyBuildingPermit.com Jurisdiction: Edmonds Project Name: Milltown Condos Application ID: 1157910 Supplemental Name: Plumbing Fixture Counts Enter the # of plumbing fixtures being - installed, altered, repaired, added or relocated Water Heater - Specify GAS or ELECTRIC - QTY # Plumbing fixture on 1 trap or set of fixtures on 1 trap - Include sinks, toilets, tubs, showers, etc. - QTY # Drains w/in footprint of building - Rainwater systems, roof deck drains, etc. - QTY # Re -pipe - Drain, vent, or water piping for each fixture served - QTY # Water service line - Replacement or repair -QTY# Water service line - New - QTY # 1 Water treating equipment (water softener) - QTY # Backflow protective device - 2" and smaller - QTY # Backflow protective device - Over 2" -QTY# Graywater or reclaimed water system - In addition to fixtures - QTY # Non -grease waste pre-treatment interceptor - Oil/water separator - QTY # Medical gas piping system - QTY # Grease trap - HGI inside building - QTY # Gravity grease interceptor - GGI -QTY# Gas piping outlets - QTY #