Loading...
Plumbing Permit BLD2022-0770 (2)Type: PLUMBING Subtype: COMMERCIAL PLUMBING I Status: ISSUED Parcel No: 01018500010100 Site Address: 520 MAPLE ST 101 EDMONDS,WA 98020-3442 Subdivision: 007289, 010185, 004342 Lot: 0 Fire Sprinklers: Lot Area: Zoning: Valuation: $0.00 Occupancy Type: Construction Type: Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Scope of Work: MILLTOWN CONDOMINIUMS -PLUMBING, RELACE WATER SERVICE LINE Applied: 6/13/2022 Issued:6/14/2022 Final: Expiration Date: 12/14/2022 Issued by: BAC WA State Contractor L & I #: - Plumbing License #: DURNIP1901 DZ CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL OR LICENSE # APPLICANT JAMES DURNIN 23701 102 PLACE WEST, (206)546-4940 JAMES.DURNIN@FRONTIER.COM EDMONDS WA 98020 CONTACT DURNIN PLUMBING INC 23701 102 PLACE WEST, (206)546-4940 james.durnin@frontier.com EDMONDS WA 98020 23701 102 PLACE WEST, james.durnin@frontier.com CONTRACTOR DURNIN PLUMBING INC (206)546-4940 EDMONDS WA 98020 DURNIP1901DZ 23701 102ND PL W, EDMONDS james.durnin@frontier.com CONTRACTOR 2 DURNIN PLUMBING (206)546-4940 WA 98020 DURNIP1901DZ 520 MAPLE ST, EDMONDS WA OWNER MILLTOWN CONDOMINIUMS 98020 •' � • DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT# 1 - BASE FEE FOR PLUMBING 001.000.322.10.000.00 $50.00 $50.00 6/13/22 R20900 PERMITS CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 6/13/22 R20900 PER PERMIT WATER SERVICE LINE - REPAIR OR 001.000.322.10.000.00 $15.00 $15.00 6/13/22 R20900 REPLACEMENT TOTALS: $105.00 $105.00 CONDITION TYPE STATUS NOTES Printed: Tuesday, June 14, 2022 9:30:12 AM 1 of 2 PLUMBING Permit - City of • • • •:� i 1 1 1 www.edmondswa.gov • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. WATER LINE ASBUILT FOR Owner/Contractor to provide water service line asbuilt at final inspection. NFORMATION CITY APPROVED PLASTIC PIPING MAY BE USED IN WATER SERVICE PIPING PROVIDED THAT WHERE METAL WATER SERVICE PIPING IS USED FOR ELECTRICAL GROUNDING FOR PURPOSES, REPLACEMENT PIPING SHALL BE OF LIKE MATERIALS PER UPC 604.8. A STATE WATER SERVICE PIPING INFORMATION ELECTRICAL PERMIT AND INSPECTION IS REQUIRED IF ELECTRICAL GROUNDING IS ALTERED, REMOVED, IMPROVED, OR ADDED. CONTACT STATE DEPT. OF LABOR & INDUSTRIES ELECTRICAL DIVISION AT 425-290-1309. FOR Pursuant to UPC 605.2 a water service shutoff shall be installed on the water line as it WATER SERVICE SHUTOFF INFORMATION enters the building. • • -. • • •- • i • •'� • COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE B-3 PLUMB ROUGH IN X-0 PLUMBING FINAL** Printed: Tuesday, June 14, 2022 9:30:12 AM 2 of 2