Loading...
Permit_1158560CITY OF EDMONDS Building Permit My6uildingPermitxom Permit Information Permit Number RI f17f177_n77A Issued Date 6/14/2022 Expiration Date 12/11/2022 Job Address 7306 164TH PL SW Fee Paid $146.50 EDMONDS, 98026 Order Confirmation 1151956 Floor Related Permit# Suite Application ID 1158560 Contact Information Contact Name BRYAN ZADOW Contractor AMERICAN RELIABLE ROOFING LLC Phone Number 12063754430 Property Owner Venkatesha Murthy LNI License# AMERIRR805B3 Address 7306 164TH PL SW EDMONDS, WA Phone# 12063754430 City Bus. License # 604-498-896 Property Owner Phone Tenant Name Job Description A (Single Family Residential) (Re -Roof Replacement - Roofing & Sheathing) Residence project involving ( The height of the building is not increasing.) Conditions - Post Permit on site. Do not cover until inspected. Do not start any work until the preconstruction meeting is completed. Certification Statement - The applicant states: I certify that I am the owner of this property or the owner's authorized agent, including an appropriately licensed contractor. I have furnished true and correct information. I will comply with all provisions of law and ordinances governing this type of construction work, whether specific herein or not. By submitting this application I give the jurisdiction permission to enter the property to perform inspections. I understand that failure to comply with the above may result in revocation of the permit. Applicant: Bryan Zadow Page 1 of 2 t °F EDAf 0 1893 CITY OF EDMONDS Building Permit My6uildingPermitxom Permit Information Permit Number RI n9n99_(177d Issued Date 6/14/2022 Expiration Date 12/11 /2022 Job Address 7306 164TH PL SW Fee Paid $146.50 EDMONDS, 98026 Order Confirmation 1151956 Floor Related Permit# Suite Application ID 1158560 Inspections Inspection IVR Inspector Date Inspection IVR Inspector Date Tear Off or Sheathing Building Final Inspection Scheduling The issuance of this permit in no way constitutes approval from any other agencies having regulatory authority over the facility and this construction activity. It is the responsibility of the property owner to obtain any and all such required approvals. Page 2 of 2