Loading...
Building PermitType: COMMERCIAL BLDG Subtype: NEW TENANT IMPROVEMENT I Status: ISSUED Parcel No: 27032300413000 Subdivision: Fire Sprinklers: Yes Valuation: $215,000.00 Code Edition: 2018 Site Address: 320 5TH AVE S EDMONDS,WA 98020-3401 Lot: 0 Lot Area: Occupancy Type: B No. Stories: 0 Zoning: BD2 Construction Type: VB # of Dwelling Units: 0 Scope of Work: TABLE FOR 12- TENANT IMPROVEMENT (DEMO KITCHEN/RETAIL). WA State Contractor L & I #: HAIDEC*914DB Applied: 4/15/2022 Issued:6/17/2022 Final: Expiration Date: 6/12/2023 Issued by: NED CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT DAVID PELLETIER 26911 98TH DRIVE SUITE B, (360)629-5375 DPELLETIER@PELLETIERSCHAAR.COM STANWOOD WA 98292 CONTACT PELLETIER + SCHAAR 26911 98TH DRIVE SUITE B, (360)629-5375 dpelletier@pelletierschaar.com STANWOOD WA 98292 5607 244TH ST SW, CONTRACTOR HAIDER CONSTRUCTION MOUNTLAKE TERRACE WA (425)771-3515 ron@haiderconstruction.com 98043- 320 5TH AVE, EDMONDS WA OWNER VOLTSIS VENTURES LLC rian@greatergood.com 98020 FEE •' • DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 4/18/22 R19462 PER PERMIT COMMERCIAL STATE SURCHARGE 001.000.237.150 $25.00 $25.00 6/17/22 R21016 PERMIT FEE - COMMERCIAL 001.000.322.10.000.00 $2,128.00 $2,128.00 6/17/22 R21016 PLAN REVIEW FEE - COMMERCIAL 001.000.345.83.000.00 $1,808.80 $1,808.80 4/18/22 R19462 TOTALS: $4,001.80 $4,001.80 CONDITIONS CONDITION TYPE STATUS NOTES Nothing in this permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming or unpermitted building, FOR structure or site condition which is outside the scope of the permit application, regardless NONCONFORMING DISCLAIMER INFORMATION of whether such building, structure or condition is shown on the site plan or drawing. Such building, structure or condition may be the subject of a separate enforcement action. • • -. - • • •- • i • •'- • COMPLETED SEQID INSPECTION TYPE INSPECTOR RESULT NOTES DATE X-1 FIRE FINAL X-3 BUILDING FINAL** Printed: Friday, June 17, 2022 3:24:26 PM 1 of 2 Printed: Friday, June 17, 2022 3:24:26 PM 2 of 2