Building PermitType: COMMERCIAL BLDG Subtype: NEW TENANT IMPROVEMENT I Status: ISSUED
Parcel No: 27032300413000
Subdivision:
Fire Sprinklers: Yes
Valuation: $215,000.00
Code Edition: 2018
Site Address: 320 5TH AVE S EDMONDS,WA 98020-3401
Lot: 0
Lot Area:
Occupancy Type: B
No. Stories: 0
Zoning: BD2
Construction Type: VB
# of Dwelling Units: 0
Scope of Work: TABLE FOR 12- TENANT IMPROVEMENT (DEMO KITCHEN/RETAIL).
WA State Contractor L & I #: HAIDEC*914DB
Applied: 4/15/2022
Issued:6/17/2022
Final:
Expiration Date: 6/12/2023
Issued by: NED
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
DAVID PELLETIER
26911 98TH DRIVE SUITE B,
(360)629-5375
DPELLETIER@PELLETIERSCHAAR.COM
STANWOOD WA 98292
CONTACT
PELLETIER + SCHAAR
26911 98TH DRIVE SUITE B,
(360)629-5375
dpelletier@pelletierschaar.com
STANWOOD WA 98292
5607 244TH ST SW,
CONTRACTOR
HAIDER CONSTRUCTION
MOUNTLAKE TERRACE WA
(425)771-3515
ron@haiderconstruction.com
98043-
320 5TH AVE, EDMONDS WA
OWNER
VOLTSIS VENTURES LLC
rian@greatergood.com
98020
FEE •' •
DESCRIPTION
ACCOUNT AMOUNT PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00 $40.00 $40.00
4/18/22
R19462
PER PERMIT
COMMERCIAL STATE SURCHARGE
001.000.237.150 $25.00 $25.00
6/17/22
R21016
PERMIT FEE - COMMERCIAL
001.000.322.10.000.00 $2,128.00 $2,128.00
6/17/22
R21016
PLAN REVIEW FEE - COMMERCIAL
001.000.345.83.000.00 $1,808.80 $1,808.80
4/18/22
R19462
TOTALS: $4,001.80 $4,001.80
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Nothing in this permit approval process shall be interpreted
as allowing or permitting the
maintenance of any currently existing illegal, nonconforming
or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is
shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
• •
-. - •
• •- • i •
•'- •
COMPLETED
SEQID INSPECTION TYPE
INSPECTOR
RESULT
NOTES
DATE
X-1 FIRE FINAL
X-3 BUILDING FINAL**
Printed: Friday, June 17, 2022 3:24:26 PM 1 of 2
Printed: Friday, June 17, 2022 3:24:26 PM 2 of 2