Building PermitType: COMMERCIAL BLDG Subtype: COM ALTERATION OR REPAIR I Status: ISSUED
Parcel No: 01022603121400 Site Address: 31 PINE ST 214 EDMONDS,WA 98020
Subdivision: 010226, 005362, BLA AFN 200202145001, SP S-98-018 Lot: 0
Fire Sprinklers: Lot Area: Zoning:
Valuation: $17,500.00 Occupancy Type: Construction Type:
Code Edition: 2018 No. Stories: 0 # of Dwelling Units: 0
Scope of Work: BITTNER- WATER DAMAGE REPAIR FROM SKY BRIDGE
Applied: 6/9/2022
Issued:6/19/2022
Final:
Expiration Date: 6/14/2023
Issued by: NED
I WA State Contractor L & I #: MCLEOCL951DD I
ad CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
CHRIS BACUS
2150 N. 107TH ST. 320, SEATTLE
(206)281-7500
CBACUS@PACENGTECH.COM
WA 98133
CONTACT
PACIFIC ENGINEERING
2150 N. 107TH ST. 320, SEATTLE
(206)281-7500
cbacus@pacengtech.com
TECHNOLOGIES
WA 98133
CONTRACTOR
MCLEOD CONSTRUCTION LLC
1115 N 140TH ST, SEATTLE WA
(206)545-7837
MAX@MCLEODCONSTRUCTION.COM
98133
31 PINE ST 214, EDMONDS WA
OWNER
NANCY BITTNER
98020
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
6/10/22
R20872
PER PERMIT
COMMERCIAL STATE SURCHARGE
001.000.237.150
$25.00
$25.00
6/17/22
R21019
PERMIT FEE - COMMERCIAL
001.000.322.10.000.00
$458.80
$458.80
6/17/22
R21019
PLAN REVIEW FEE - COMMERCIAL
001.000.345.83.000.00
$389.98
$389.98
6/10/22
R20872
TOTALS: $913.78
$913.78
CONDITION TYPE
STATUS
NOTES
Printed: Sunday, June 19, 2022 1:15:47 PM 1 of 3
•MERCIAL BLDG PermitCity
• • • • -
•:0iBLD2022-0755
www.edmondswa.gov •
ak�
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
FOR
officials, employees, and agents from any and all claims for damages of whatever nature,
HOLD HARMLESS
INFORMATION
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
•
-. •1111wam
• •- •
C •In•'- •
COMPLETED RESULT
SEQID INSPECTION TYPE
INSPECTOR
DATE
B-4 DRYWALL FASTENING
B-4 FIRESTOPPING
B-4 FRAMING
B-5 INSULATION ENERGY
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
A-1 BUILDING PRECON
Printed: Sunday, June 19, 2022 1:15:47 PM 2 of 3
Printed: Sunday, June 19, 2022 1:15:47 PM 3 of 3