Building PermitType: RESIDENTIAL BLDG Subtype: ADDITION I Status: ISSUED
Parcel No: 00434209201900 Site Address: 752 WALNUT ST EDMONDS,WA 98020-3422
Subdivision: 004845, SP 5-22-76, 004342 Lot: 0
Fire Sprinklers: Lot Area: Zoning: RS-6
Valuation: $200,000.00 Occupancy Type: Construction Type:
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0
Scope of Work: KUNKEL- REMODEL, DECKS & SMALL ADDITION M INCL P SEP
Applied: 5/10/2022
Issued:6/27/2022
Final:
Expiration Date: 6/22/2023
Issued by: NED
I WA State Contractor L & I #: MARTICN882CN I
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
HEIDI HELGESON
23020 EDMONDS WAY 113,
(206)542-3734
HEIDI@H2DARCHITECTS.COM
EDMONDS WA 98020
CONTACT
H2D ARCHITECTURE
+ DESIGN
23020 EDMONDS WAY 113,
(206)542-3734
heidi@h2darchitects.com
EDMONDS WA 98020
CONTRACTOR
MARTINE CONSTRUCTION
19112 40TH AVE W,
(425)409-4616
aaron@martineconstruction.com
NW LLC
LYNNWOOD WA 98036
BRIAN JAMES & NICOLE
752 WALNUT ST, EDMONDS WA
OWNER
KUNKEL
98020
•' •
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
1 -BASE FEE FOR MECHANICAL
001.000.322.10.000.00
$50.00
$50.00
6/27/22
R21174
PERMITS
APPLIANCE VENTS
001.000.322.10.000.00
$30.00
$30.00
6/27/22
R21174
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
5/11/22
R20143
PER PERMIT
FAN CONNECTED TO SINGLE DUCT
001.000.322.10.000.00
$45.00
$45.00
6/27/22
R21174
GAS PIPING - NEW OR LOCATED
001.000.322.10.000.00
$30.00
$30.00
6/27/22
R21174
PERMIT FEE - RESIDENTIAL
001.000.322.10.000.00
$1,700.00
$1,700.00
6/27/22
R21174
PLAN REVIEW FEE - RESIDENTIAL
001.000.345.83.000.00
$1,445.00
$1,445.00
5/11/22
R20143
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$6.50
6/27/22
R21174
TOTALS: $3,346.50
$3,346.50
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Monday, June 27, 2022 11:41:13 AM 1 of 3
'RESIDENTIAL
BLDG PermitCity
• • • • -
EL
98020 1 1.
www.edmondswa.gov•
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
Pre -inspection required. Street to be cleaned of debris. Side sewer must be capped at
DEMOLITION REQUIREMENTS
FOR
property line. Water Service must be disconnected from Water Meter and or hose bib
INFORMATION
with AVB installed. Dump at approved dump site only.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
GAS PIPE TEST
FOR
Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted
NFORMATION
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
Sound or noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
FOR
7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding
SOUND AND NOISE
INFORMATION
Sundays and Federal Holidays. At all other times the noise originating from construction
sites and activities must comply with the noise limits of Chapter 5.30, unless a variance
has been granted pursuant to ECC 5.30.120.
INSPECTIONS
- Schedule Online
at: https://Inspection.MyBuildingPermit.com
COMPLETED
SEQID
INSPECTION TYPE
INSPECTOR
RESULT NOTES
DATE
B-2 FOOTINGS
B-3 EXTERIOR INSULATION
B-3 GAS PIPING TEST
B-3 MECH ROUGH IN
B-3 ROOF SHEATHING
B-4 DRYWALL FASTENING
B-4 FRAMING
Printed: Monday, June 27, 2022 11:41:13 AM 2 of 3
RESIDENTIAL BLDG Permit
PERMIT NUM
j City of Edmonds
121 5th Ave N, Edmonds WA 98020 BLD2022-0616
IL
www.edmondswa.gov / 425.771.0220
AAL jarn. A&L
-''
SHOWERPAN
--
B-5 INSULATION ENERGY
-
:-7 BUILDING OTHER INSP--
X-3 BUILDING FINAL"
'-1 BUILDING PRECONFOUNDATION
WAL--
Printed: Monday, June 27, 2022 11:41:13 AM 3 of 3