Building PermitType: RESIDENTIAL BLDG Subtype: ALTERATION OR REMODEL I Status: ISSUED
Parcel No: 00513100008901
Subdivision: 005131, 004616
Fire Sprinklers:
Valuation: $42,000.00
Code Edition: 2018
Site Address: 16411 75TH PL W EDMONDS,WA 98026-4914
Lot: 0
Lot Area:
Occupancy Type: R3
No. Stories: 0
Scope of Work: WALTHER-INTERIOR REMODEL, m incl, p sep
Zoning:
Construction Type: VB
# of Dwelling Units: 1
Applied: 5/31/2022
Issued:6/28/2022
Final:
Expiration Date: 6/23/2023
Issued by: NED
I WA State Contractor L & I #: GASPAC1055BS I
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
TESS JORDAN
300 S. LUCILE ST, SEATTLE WA
(206)324-8199
TESS@GASPARS.COM
98108
CONTACT
GASPARS CONSTRUCTION
300 S. LUCILE ST, SEATTLE WA
(206)324-8199
tess@gaspars.com
98108
CONTRACTOR
GASPAR'S CONSTRUCTION
1406 E PINE ST, SEATTLE WA
(206)324-8199
98112-
GREGORY 1 & DUGAN BET
16411 75TH PL W, EDMONDS
OWNER
WALTHER
WA 98026
•' •
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
1 -BASE FE7E FOR MECHANICAL
001.000.322.10.000.00
$50.00
$50.00
6/27/22
R21184
PERMITS
APPLIANCE VENTS
001.000.322.10.000.00
$15.00
$15.00
6/27/22
R21184
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
5/31/22
R20591
PER PERMIT
FURNACE OR FIREPLACE
001.000.322.10.000.00
$60.00
$60.00
6/27/22
R21184
GAS PIPING - NEW OR LOCATED
001.000.322.10.000.00
$30.00
$30.00
6/27/22
R21184
PERMIT FEE - RESIDENTIAL
001.000.322.10.000.00
$670.00
$670.00
6/27/22
R21184
PLAN REVIEW FEE - RESIDENTIAL
001.000.345.83.000.00
$569.50
$569.50
5/31/22
R20591
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$6.50
6/27/22
R21184
TOTALS: $1,441.00
$1,441.00
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Tuesday, June 28, 2022 9:13:54 AM 1 of 3
'RESIDENTIAL
BLDG PermitCity
• • • • -
EL
98020 1 1
. •. •
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
As required by Ord 3632 the geotechnical engineer of record shall monitor this site during
construction for compliance with the recommendations in the geotechnical report
including site excavation, shoring, soil support for foundation, including piles, soil bearing
capacity, sub drainage installation, soil compactions, and other geotechnical aspects of
the construction. Specific recommendations contained in the approved geotechnical
report must be implemented by the owner. The geotechnical engineer shall make
written dated reports on the progress of the construction and submit the report to the
City on a weekly basis until all site grading, drainage, foundation and associated ground
work is complete. Omissions or deviations from the approved geotechnical report and or
approved plans or specs shall be highlighted and immediately submitted in a separate
letter to the City for review. The City shall be advised in writing of work stoppages of
FOR
more than one week. In addition to the geotechnical monitoring special inspections
ESLHA REPORTS
INFORMATION
based on the provisions of IBC Section 1704 are required when specified. Other special
inspections may also be required by the geotechnical engineer, architect, or structural
engineer of record. At the completion of final site grading and all permitted structures a
final geo technical report prepared by the geotechnical engineer shall be submitted to
the City. This report shall contain a statement that, based upon his/her professional
opinion, site observations, and testing during the monitoring of the construction, the
completed development substantially complies with the recommendations in the
geotechnical report and with all geotechnical related requirements. Any deviations or
omissions in the report, plans, or specifications that occurred during construction shall be
addressed separately. Occupancy, final approval, or release of the bond for the project
shall not be granted until the report has been reviewed and accepted by the Building
Official.
GAS PIPE TEST
FOR
Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted
NFORMATION
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
Printed: Tuesday, June 28, 2022 9:13:54 AM 2 of 3
: Permit
-
LM
City •Edmonds
98020 1 1
www.edmondswa.gov
Sound or noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
FOR
7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding
SOUND AND NOISE
INFORMATION
Sundays and Federal Holidays. At all other times the noise originating from construction
sites and activities must comply with the noise limits of Chapter 5.30, unless a variance
has been granted pursuant to ECC 5.30.120.
•
-• •
• •- •
C • •'- •
COMPLETED
RESULT
SEQID
INSPECTION TYPE
INSPECTOR
DATE
A-1 BUILDING PRECON
B-3 GAS PIPING TEST
B-3 MECH ROUGH IN
B-4 FRAMING
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL**
Printed: Tuesday, June 28, 2022 9:13:54 AM 3 of 3