Loading...
Building PermitType: RESIDENTIAL BLDG Subtype: ALTERATION OR REMODEL I Status: ISSUED Parcel No: 00513100008901 Subdivision: 005131, 004616 Fire Sprinklers: Valuation: $42,000.00 Code Edition: 2018 Site Address: 16411 75TH PL W EDMONDS,WA 98026-4914 Lot: 0 Lot Area: Occupancy Type: R3 No. Stories: 0 Scope of Work: WALTHER-INTERIOR REMODEL, m incl, p sep Zoning: Construction Type: VB # of Dwelling Units: 1 Applied: 5/31/2022 Issued:6/28/2022 Final: Expiration Date: 6/23/2023 Issued by: NED I WA State Contractor L & I #: GASPAC1055BS I CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT TESS JORDAN 300 S. LUCILE ST, SEATTLE WA (206)324-8199 TESS@GASPARS.COM 98108 CONTACT GASPARS CONSTRUCTION 300 S. LUCILE ST, SEATTLE WA (206)324-8199 tess@gaspars.com 98108 CONTRACTOR GASPAR'S CONSTRUCTION 1406 E PINE ST, SEATTLE WA (206)324-8199 98112- GREGORY 1 & DUGAN BET 16411 75TH PL W, EDMONDS OWNER WALTHER WA 98026 •' • DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # 1 -BASE FE7E FOR MECHANICAL 001.000.322.10.000.00 $50.00 $50.00 6/27/22 R21184 PERMITS APPLIANCE VENTS 001.000.322.10.000.00 $15.00 $15.00 6/27/22 R21184 CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 5/31/22 R20591 PER PERMIT FURNACE OR FIREPLACE 001.000.322.10.000.00 $60.00 $60.00 6/27/22 R21184 GAS PIPING - NEW OR LOCATED 001.000.322.10.000.00 $30.00 $30.00 6/27/22 R21184 PERMIT FEE - RESIDENTIAL 001.000.322.10.000.00 $670.00 $670.00 6/27/22 R21184 PLAN REVIEW FEE - RESIDENTIAL 001.000.345.83.000.00 $569.50 $569.50 5/31/22 R20591 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 6/27/22 R21184 TOTALS: $1,441.00 $1,441.00 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Tuesday, June 28, 2022 9:13:54 AM 1 of 3 'RESIDENTIAL BLDG PermitCity • • • • - EL 98020 1 1 . •. • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION As required by Ord 3632 the geotechnical engineer of record shall monitor this site during construction for compliance with the recommendations in the geotechnical report including site excavation, shoring, soil support for foundation, including piles, soil bearing capacity, sub drainage installation, soil compactions, and other geotechnical aspects of the construction. Specific recommendations contained in the approved geotechnical report must be implemented by the owner. The geotechnical engineer shall make written dated reports on the progress of the construction and submit the report to the City on a weekly basis until all site grading, drainage, foundation and associated ground work is complete. Omissions or deviations from the approved geotechnical report and or approved plans or specs shall be highlighted and immediately submitted in a separate letter to the City for review. The City shall be advised in writing of work stoppages of FOR more than one week. In addition to the geotechnical monitoring special inspections ESLHA REPORTS INFORMATION based on the provisions of IBC Section 1704 are required when specified. Other special inspections may also be required by the geotechnical engineer, architect, or structural engineer of record. At the completion of final site grading and all permitted structures a final geo technical report prepared by the geotechnical engineer shall be submitted to the City. This report shall contain a statement that, based upon his/her professional opinion, site observations, and testing during the monitoring of the construction, the completed development substantially complies with the recommendations in the geotechnical report and with all geotechnical related requirements. Any deviations or omissions in the report, plans, or specifications that occurred during construction shall be addressed separately. Occupancy, final approval, or release of the bond for the project shall not be granted until the report has been reviewed and accepted by the Building Official. GAS PIPE TEST FOR Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted NFORMATION Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Printed: Tuesday, June 28, 2022 9:13:54 AM 2 of 3 : Permit - LM City •Edmonds 98020 1 1 www.edmondswa.gov Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding SOUND AND NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. • -• • • •- • C • •'- • COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR DATE A-1 BUILDING PRECON B-3 GAS PIPING TEST B-3 MECH ROUGH IN B-4 FRAMING B-7 BUILDING OTHER INSP X-3 BUILDING FINAL** Printed: Tuesday, June 28, 2022 9:13:54 AM 3 of 3