Building PermitType: COMMERCIAL BLDG Subtype: NEW COMMERCIAL BLDG I Status: ISSUED
Parcel No: 27032300415800 Site Address: 471 ADMIRAL WAY EDMONDS,WA 98020-4128 Applied: 10/6/2021
Subdivision: Lot: 0 Issued: 6/29/2022
Fire Sprinklers: Yes Lot Area: Zoning: Final:
Occupancy Type: Mixed M, B
Valuation: $1,624,660.71 and S1 Construction Type: IIB Expiration Date: 6/24/2023
Code Edition: 2018 No. Stories: 2 # of Dwelling Units: 0 Issued by: NED
Scope of Work: PORT OF EDMONDS - NEW ADMIN BUILDING
I WA State Contractor L & I #: SPEEWCC101MF I
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
MEGHAN CRAIG
311 1ST AVENUE SOUTH,
(209)910-4353
MEGHAN.CRAIG@JACKSONMAIN.CO
SEATTLE WA 98199
M
CONTACT
JACKSON MAIN
311 1ST AVENUE SOUTH,
(209)910-4353
MEGHAN.CRAIG@JACKSONMAIN.CO
ARCHITECTURE
SEATTLE WA 98199
M
CONTRACTOR
SPEE WEST CONSTRUCTION
307 BELL STREET, EDMONDS
(206)284-7733
scottb@mithun.com
CO
WA 98020
OWNER
EDMONDS PORT OF
471 ADMIRAL WAY, EDMONDS
(425)774-0549
WA 98020
FEE INFORMATION
DESCRIPTION
ACCOUNT AMOUNT
PAID
PAID DATE
RECEIPT #
2020 TRANSPORTATION IMPACT
112.502.345.86.000.00
$100,077.49
$100,077.49
6/29/22
R21251
FEE
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
10/14/21
R15309
PER PERMIT
COMMERCIAL STATE SURCHARGE
001.000.237.150
$25.00
$25.00
6/29/22
R21251
PARK IMPACT FEE - COM ADMIN
001.000.322.10.000.00
$100.00
$100.00
6/29/22
R21251
PARK IMPACT FEE - NON
332.100.345.85.000.00
$15,494.42
$15,494.42
6/29/22
R21251
RESIDENTIAL SQFT
PERMIT FEE - COMMERCIAL
001.000.322.10.000.00
$10,180.00
$10,180.00
6/29/22
R21251
PLAN REVIEW FEE - COMMERCIAL
001.000.345.83.000.00
$7,057.72
$7,057.72
10/14/21
R15309
TRANSPORTATION ENGINEER
001.000.341.82.000.00
$65.00
$65.00
6/29/22
R21251
REVIEW FEE
TRANSPORTATION IMPACT ADMIN
001.000.341.82.000.00
$100.00
$100.00
6/29/22
R21251
FEE - MF COMM
TOTALS: $133,139.63
$133,139.63
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Wednesday, June 29, 2022 10:51:53 AM 1 of 4
•M MERCIAL BLDG Permit
of Edmonds PERMIT NUM
IF
EdmondsCity
121 5th Ave N, 98020BLD2021-13i985
www.edmondswa.gov•
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
FOR
INFORMATION
MANUAL ENTRY
The project site is located in Special Flood Zone AE with a BFE of 12. A preliminary
BUILDING CONDITIONS
Elevation Certificate prepared by a surveyor will be required to establish compliance
FOR
Prior to placement of first floor slab, and a final Elevation Certificate will be required
INFORMATION
based on completed construction prior to final occupancy. As per ECDC 19.00.025P, the
minimum elevation of the lowest floor is 2 feet higher than the BFE of 12.
FOR
MANUAL ENTRY
INFORMATION
This project lies within a special flood hazard area which will require an Elevation
BUILDING CONDITIONS
FOR
certificate:
INFORMATION
1) At the establishment of the first floor elevation or prior to the vertical construction
2) At final Inspection
FOR
MANUAL ENTRY
INFORMATION
There are Deferred Submittals for this project and they are as follows:
BUILDING OTHER
Fire Alarm
FOR
Fire Sprinkler
INFORMATION
Steel Stairs
Building Signage
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
Installation, use and maintenance of equipment and components shall be per
EQUIPMENT USAGE
FOR
manufacturer's specifications, installation instructions, and applicable state codes.
INFORMATION
provide manufacture's installation instructions on site for Building Inspector.
FOR
Maintain erosion and sedimentation control per City and SWMMW standard
ESC REQ
INFORMATION
requirements.
EXIT SIGNAGE AND EMERGENCY
FOR
Final locations of illuminated exit signs and emergency lighting subject to field inspection
LIGHTING
INFORMATION
by the Fire Marshal.
FIRE FINAL INSPECTION
FOR
Request final Fire Department Inspection 425-775-7720.
NFORMATION
Printed: Wednesday, June 29, 2022 10:51:53 AM 2 of 4
r '-
-
• • • •d S U Ll I 10 U I I DI S
Approval of this foundation design is conditional subject to inspection of existing site soil
FOR
conditions. Retaining walls must be designed and constructed to resist the lateral
FOUNDATION BEARING
INFORMATION
pressure of the retained material. Provisions must be made for the control and drainage
of surface water around buildings.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
FOR
officials, employees, and agents from any and all claims for damages of whatever nature,
HOLD HARMLESS
INFORMATION
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
INSP PRIOR TO BACKFILL
FOR
Call for all required inspections. All work shall be inspected prior to backfill.
NFORMATION
LOT LINES STAKED
O
Lot line stakes must be in place at the time of foundation setback inspection.
ORMATION
MAINTENANCE BONDS
FOR
Maintenance Bond(s) required at FINAL.
NFORMATION
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
Maximum Height 25 feet. The agent or contractor shall set up the equipment; establish
the datum point and the point of average grade. Call for inspections to verify. These
MAXIMUM HEIGHT
FOR
items must be consistent with the approved plan. If the proposed height of a building is
INFORMATION
within 12 inches of the maximum height permitted for the zone an elevation survey is
required.
Final approval on a project or final occupancy approval must be granted by the Building
OCCUPANCY
FOR
Official prior to use or occupancy of the building or structure. Check the job card for all
INFORMATION
required City inspections including final project approval and final occupancy inspections.
REQUIRED SPECIAL
FOR
INSPECTIONS
INFORMATION
FOR
Separate Permit Required For: Photo voltaic system, Plumbing, Mechanical, and Tenant
SEPARATE PERMIT REQUIRED
INFORMATION
Improvement.
Sound/Noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
FOR
7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding
SOUND OR NOISE
INFORMATION
Sundays and Federal Holidays. At all other times the noise originating from construction
sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has
been granted pursuant to ECC 5.30.120.
Special inspections have been called for on this project and are noted on the approved
SPECIAL INSPECTION BUILDING
FOR
construction plans. It is the owner and or contractors responsibility to ensure that reports
DIVISION
INFORMATION
are provided to the City on a weekly basis.
SPECIAL INSPECTION REPORTS
FOR
Submit all special inspection reports to the City Building Official on a weekly basis.
NFORMATION
FOR
All utilities shall be located prior to any excavation. New locates shall be called for if at
UTILITY LOCATES
INFORMATION
time of excavation, original locates are no longer identifiable.
City approved plastic piping may be used in water service piping provided that where
FOR
metal water service piping is used for electrical grounding purposes, replacement piping
WATER SERVICE PIPING
INFORMATION
shall be of like materials (UPC 604.8) a state electrical permit and inspection is required if
electrical grounding is altered or removed.
FOR
Pursuant to UPC 605.2 a water service shutoff shall be installed on the water line as it
WATER SERVICE SHUTOFF
INFORMATION
Ienters the building.
COMPLETED
Printed: Wednesday, June 29, 2022 10:51:53 AM 3 of 4
rMERCIAL BLDG Permit
EdmondsCity of Edmonds PERMIT NUM
98020BLD2021-13815
www.edmondswa.gov
SEQID INSPECTION TYPE INSPECTOR DATE
B-1SETBACKS
B-2 FOUNDATION WALL
B-2 SLAB INSULATION
B-3 EXT WALL SHEATHING
B-3 FINISHED FLOOR FLOOD
ELEVATION CERT
B-3 ROOF SHEATHING
B-4 DRYWALL FASTENING
B-4 FIRESTOPPING
B-4 FRAMING
B-4 HEIGHT VERIFICATION
B-4TRASH ENCLOSURE
B-5 BLDG SPECIAL
INSPECTION
B-5 INSULATION ENERGY
B-7 BUILDING OTHER INSP
B-3 EXTERIOR INSULATION
X-1 FIRE FINAL
A-1 TESC AND MOBILIZE
E-3 STRM FOOTING DRAIN
E-3 STRM TIGHTLINE
X-2 ENGINEERING FINAL
A-1 BUILDING PRECON
B-2 FOOTINGS
X-3 BUILDING FINAL"
Printed: Wednesday, June 29, 2022 10:51:53 AM 4 of 4