Loading...
Building PermitType: FILL GRADE Subtype: COMMERCIAL AND GRADE I Status: ISSUED Parcel No: 27032300415800 Subdivision: Fire Sprinklers: Valuation: $0.00 Code Edition: 0 Site Address: 471 ADMIRAL WAY EDMONDS,WA 98020-4128 Lot: 0 Lot Area: Zoning: Occupancy Type: Construction Type: No. Stories: 0 # of Dwelling Units: 0 Scope of Work: PORT OF EDMONDS- NEW ADMIN BUILDING FILL/GRADE Applied: 10/7/2021 Issued:6/29/2022 Final: Expiration Date: 6/24/2023 Issued by: NED I WA State Contractor L & I #: SPEEWCC101MF I CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT JARED UNDERBRINK 250 4TH AVE S, EDMONDS WA (425)778-8500 JAREDU@CGENGINEERING.COM 98020 CONTACT CG ENGINEERING 250 4TH AVE S, EDMONDS WA (425)778-8500 jaredu@cgengineering.com 98020 CONTRACTOR SPEE WEST CONSTRUCTION 307 BELL STREET, EDMONDS (206)284-7733 scottb@mithun.com CO WA 98020 OWNER PORT OF EDMONDS 336 ADMIRAL WAY, EDMONDS (425)775-4588 WA 98020 •' • DESCRIPTION 7PER ACCOUNT AMOUNT PAID PAID DATE RECEIPT # TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 11/2/21 R15650 PERMIT ENGINEERING INSPECTION FEE 3.3 001.000.341.82.000.00 $8,049.63 $8,049.63 6/29/22 R21251 PERCENT GRADING - PLAN REVIEW FEE 001.000.345.83.000.00 $55.00 $55.00 11/2/21 R15650 GRADING PERMIT BASE FEE 001.000.322.10.000.00 $35.00 $35.00 6/29/22 R21251 GRADING PERMIT FEE - CUBIC 001.000.322.10.000.00 $110.00 $110.00 6/29/22 R21251 YARDS TOTALS: $8,289.63 $8,289.63 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Wednesday, June 29, 2022 11:34:13 AM 1 of 3 .." 1 "... City of Edmonds ' - Edmonds 98020 1 :: www.edmondswa.gov• MML 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:OOpm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. \r\n2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable.\r\n3- SOUND OR NOISE - Sound/Noise originating from temporary ALL BUILDING PERMITS FOR construction sites as a result of construction activity are exempt from the noise limits of INFORMATION ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:OOam to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.\r\n4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. \r\n5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647- 0982. Pre -inspection required. Street to be cleaned of debris. Side sewer must be capped at DEMOLITION REQUIREMENTS FOR Property line. Water Service must be disconnected from Water Meter and or hose bib INFORMATION with AVB installed. Dump at approved dump site only. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its FOR officials, employees, and agents from any and all claims for damages of whatever nature, HOLD HARMLESS INFORMATION arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. INSPECTIONS - Schedule Online at: https://Inspection.MVBuildingPermit.com Printed: Wednesday, June 29, 2022 11:34:13 AM 2 of 3 GRADEFILL Permit EdmondsCity of Edmonds PERMIT NUM 98020BLD2021-13814 www.edmondswa.gov SEQID INSPECTION TYPE INSPECTOR COMPLETED DATE X-3 BUILDING FINAL" A-1 ENGINEERING PRECON A-1 TESC AND MOBILIZE E-3 STRM CONVEYANCE E-3 STRM FOOTING DRAIN E-3 STRM MGMT FACILITY E-3 STRM TIGHTLINE E-4 RPBA AND HOTBOX E-4 WATER SERVICE LINE E-5 TRASH ENCLOSURE E-9 COMPOST AMEND E-9 PARKING STRIPING E-9 PROJECT ASBUILTS X-0 TRASH ENCLOSURE FINAL X-2 ENGINEERING FINAL E-8 BOND RELEASE Printed: Wednesday, June 29, 2022 11:34:13 AM 3 of 3