Building PermitType: FILL GRADE Subtype: COMMERCIAL AND GRADE I Status: ISSUED
Parcel No: 27032300415800
Subdivision:
Fire Sprinklers:
Valuation: $0.00
Code Edition: 0
Site Address: 471 ADMIRAL WAY EDMONDS,WA 98020-4128
Lot: 0
Lot Area: Zoning:
Occupancy Type: Construction Type:
No. Stories: 0 # of Dwelling Units: 0
Scope of Work: PORT OF EDMONDS- NEW ADMIN BUILDING FILL/GRADE
Applied: 10/7/2021
Issued:6/29/2022
Final:
Expiration Date: 6/24/2023
Issued by: NED
I WA State Contractor L & I #: SPEEWCC101MF I
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
JARED UNDERBRINK
250 4TH AVE S, EDMONDS WA
(425)778-8500
JAREDU@CGENGINEERING.COM
98020
CONTACT
CG ENGINEERING
250 4TH AVE S, EDMONDS WA
(425)778-8500
jaredu@cgengineering.com
98020
CONTRACTOR
SPEE WEST CONSTRUCTION
307 BELL STREET, EDMONDS
(206)284-7733
scottb@mithun.com
CO
WA 98020
OWNER
PORT OF EDMONDS
336 ADMIRAL WAY, EDMONDS
(425)775-4588
WA 98020
•' •
DESCRIPTION
7PER
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
11/2/21
R15650
PERMIT
ENGINEERING INSPECTION FEE 3.3
001.000.341.82.000.00
$8,049.63
$8,049.63
6/29/22
R21251
PERCENT
GRADING - PLAN REVIEW FEE
001.000.345.83.000.00
$55.00
$55.00
11/2/21
R15650
GRADING PERMIT BASE FEE
001.000.322.10.000.00
$35.00
$35.00
6/29/22
R21251
GRADING PERMIT FEE - CUBIC
001.000.322.10.000.00
$110.00
$110.00
6/29/22
R21251
YARDS
TOTALS: $8,289.63
$8,289.63
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Wednesday, June 29, 2022 11:34:13 AM 1 of 3
.."
1 "...
City of Edmonds ' -
Edmonds 98020 1 ::
www.edmondswa.gov•
MML
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:OOpm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
\r\n2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.\r\n3- SOUND OR NOISE - Sound/Noise originating from temporary
ALL BUILDING PERMITS
FOR
construction sites as a result of construction activity are exempt from the noise limits of
INFORMATION
ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:OOam
to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the
noise originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.\r\n4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. \r\n5 - PLUMBING - Plumbing contractor license laws are regulated by
Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the
risks and potential monetary liability for work performed by unlicensed plumbing
contractors. For more information contact L&I Department of Licensing at 1-800-647-
0982.
Pre -inspection required. Street to be cleaned of debris. Side sewer must be capped at
DEMOLITION REQUIREMENTS
FOR
Property line. Water Service must be disconnected from Water Meter and or hose bib
INFORMATION
with AVB installed. Dump at approved dump site only.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
FOR
officials, employees, and agents from any and all claims for damages of whatever nature,
HOLD HARMLESS
INFORMATION
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
INSPECTIONS - Schedule Online at: https://Inspection.MVBuildingPermit.com
Printed: Wednesday, June 29, 2022 11:34:13 AM 2 of 3
GRADEFILL Permit
EdmondsCity of Edmonds PERMIT NUM
98020BLD2021-13814
www.edmondswa.gov
SEQID INSPECTION TYPE INSPECTOR COMPLETED
DATE
X-3 BUILDING FINAL"
A-1 ENGINEERING PRECON
A-1 TESC AND MOBILIZE
E-3 STRM CONVEYANCE
E-3 STRM FOOTING DRAIN
E-3 STRM MGMT FACILITY
E-3 STRM TIGHTLINE
E-4 RPBA AND HOTBOX
E-4 WATER SERVICE LINE
E-5 TRASH ENCLOSURE
E-9 COMPOST AMEND
E-9 PARKING STRIPING
E-9 PROJECT ASBUILTS
X-0 TRASH ENCLOSURE FINAL
X-2 ENGINEERING FINAL
E-8 BOND RELEASE
Printed: Wednesday, June 29, 2022 11:34:13 AM 3 of 3