APPROVED ENG Traffic Control PlanRECEIVED
JUA 127 202t
DEVELOPMENT SO ICE
COUNT'
PARKING STALLS
ON SUNSET. CLOSE
PARKING STALLS
DURING LANE
SHIFT'()
\IV
P
PEDESTRIAN PATH
SHALL REMAIN OPEN.
ENGINEERING DIVISION
Applicant shall repair/replace all "DTED
damage to utilities or frontage
improvements InCity
Ig t-" "y per city standards that is 'caused or
occurs during the permitted project, 7/06/2022
OWNER/CONTRACTOR IS RESPONSIBLE FOR
EROSION CONTROL AND DRAINAGE
OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING
ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY
UT,L TIES MAY REQUIRE A SEPERATE PERMIT