Loading...
Building PermitType: PLUMBING Subtype: COMMERCIAL PLUMBING I Status: ISSUED Parcel No: 00580700002500 Site Address: 21601 76TH AVE W 210 EDMONDS,WA 98026-7507 Subdivision: 005012, 005013, 005807, BLA AFN 199909155005 Lot: 0 Fire Sprinklers: Lot Area: Zoning: Valuation: $0.00 Occupancy Type: Construction Type: Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Scope of Work: SMC ENDOSCOPY MEDIVATOR ADD- PLUMBING Applied: 2/23/2022 Issued:7/18/2022 Final: Expiration Date: 1/14/2023 Issued by: NED I WA State Contractor L & I #: MACDOFS798P9 I CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT AMANDA MOORE 7717 DETROIT AVE SW, SEATTLE (206)867-4133 PERMITS@MACMILLER.COM WA 98106 CONTACT MACDONALD MILLER 7717 DETROIT AVE SW, SEATTLE (206)867-4133 permits@macmiller.com FACILITY SOLUTIONS WA 98106 CONTRACTOR MACDONALD-MILLER 7717 DETROIT AVE SW, SEATTLE (206)768-4278 PERMITS@MACMILLER.COM WA 98106 PUBLIC HOSPITAL DISTRICT 2 4710 196TH ST SW, LYNNWOOD OWNER SNOHOMISH CO WA 98036-5517 10 •' • DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # T #1 - BASE FEE FOR PLUMBING 001.000.322.10.000.00 $50.00 $0.00 PERMITS BACKFLOW - 2 INCH 001.000.322.10.000.00 $140.00 $0.00 CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $0.00 PER PERMIT EACH PLUMBING FIXTURE ON ONE 001.000.322.10.000.00 $30.00 $0.00 TRAP PLUMBING - PLAN REVIEW FEE 001.000.322.10.000.00 $165.00 $0.00 HOURS TOTALS: $425.00 $0.00 111 • R • CONDITION TYPE STATUS NOTES Printed: Monday, July 18, 2022 7:46:14 AM 1 of 2 Permit City of Edmonds PERMIT NUM EdmondsPLUMBING 980i 1 1 1 www.edmondswa.gov • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Nothing in this permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming or unpermitted building, FOR structure or site condition which is outside the scope of the permit application, regardless NONCONFORMING DISCLAIMER INFORMATION of whether such building, structure or condition is shown on the site plan or drawing. Such building, structure or condition may be the subject of a separate enforcement action. The issuance of this permit in no way constitutes approval from any other agencies REGULATING AGENCIES FOR having regulatory authority over the facility and this construction activity. It is the INFORMATION responsibility of the property owner to obtain any and all such required approvals. INSPECTIONSSchedule •https://Inspection.MvBuildingPermit.com Printed: Monday, July 18, 2022 7:46:14 AM 2 of 2