Building PermitType: RESIDENTIAL BLDG Subtype: ALTERATION OR REMODEL I Status: ISSUED
Parcel No: 00670800000600
Subdivision: 006708, 005489
Fire Sprinklers:
Valuation: $10,000.00
Code Edition: 0
Site Address: 960 VIEWMOOR PL EDMONDS,WA 98020-2624
Lot: 0
Lot Area: Zoning:
Occupancy Type: Construction Type:
No. Stories: 0 # of Dwelling Units: 0
Scope of Work: SWIRES-2 BATHROOM REMODELS
Applied: 6/20/2022
Issued:7/18/2022
Final:
Expiration Date: 7/13/2023
Issued by: NED
I WA State Contractor L & I #: JCCONCL872JD I
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
MIKE SWIRES
960 VIEWMOOR PL, EDMONDS
(425)772-6704
MUCKLEBUCKLE@GMAIL.COM
WA 98020
CONTACT
MIKE SWIRES
960 VIEWMOOR PL, EDMONDS
(425)772-6704
Mucklebuckle@gmail.com
WA 98020
CONTRACTOR
J&C CONTRACTORS, LLC
16619 LARCH WAY APT K105,
(425)407-3652
jandccontractors@outlook.com
LYNWOOD WA 98037
960 VIEWMOOR PL, EDMONDS
OWNER
MICHAEL L SWIRES
WA 98020-2624
•- •
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
1 -BASE FEE FOR MECHANICAL
001.000.322.10.000.00
$50.00
$50.00
7/18/22
R21702
PERMITS
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
6/21/22
R21045
PER PERMIT
FAN CONNECTED TO SINGLE DUCT
001.000.322.10.000.00
$30.00
$30.00
7/18/22
R21702
PERMIT FEE - RESIDENTIAL
001.000.322.10.000.00
$287.00
$287.00
7/18/22
R21702
PLAN REVIEW FEE - RESIDENTIAL
001.000.345.83.000.00
$243.95
$243.95
6/21/22
R21045
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$6.50
7/18/22
R21702
TOTALS: $657.45
$657.45
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Monday, July 18, 2022 9:21:23 AM 1 of 2
'RESIDENTIAL
BLDG PermitCity
• • • • -
EL
98020 1 1:1
www.edmondswa.gov•
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
Sound or noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
FOR
7:OOam to 6:OOpm on weekdays and 10:00am and 6:OOpm on Saturdays, excluding
SOUND AND NOISE
INFORMATION
Sundays and Federal Holidays. At all other times the noise originating from construction
sites and activities must comply with the noise limits of Chapter 5.30, unless a variance
has been granted pursuant to ECC 5.30.120.
INSPECTIONS
- Schedule
Online at: https://Inspection.MVBuildingPermit.com
Printed: Monday, July 18, 2022 9:21:23 AM 2 of 2