Loading...
ENG2022-0351 ROW PERMITRIGHT OF WAY EUC • • City of Edmonds PERMIT NUMBE Elk Description: PSE-INSTALL NEW GAS SERVICE WITH PAVEMENT CUTS ISSUED: 07/18/2022 Address: 23129 74TH AVE W EDMONDS WA 98026-8523 EXPIRES: 01/18/2023 Permit Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: WAITING FOR P CONTACTS NAME TYPE NAME ADDRESS PHONE APPLICANT SUSAN SIDICK 1660 PARK LANE, BURLINGTON WA 98233 (425)457-6353 CONTACT PUGET SOUND ENERGY- CORROSION 1660 PARK LANE, BURLINGTON WA 98233 (425)457-6353 DEPARTMENT CONTRACTOR PSE/INFRASOURCE 1660 PARK LANE, BURLINGTON WA 98233 (425)516-4388 OWNER UNKNOWN UNKNOWN 23129 74TH AVE W, EDMONDS WA 98026 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $40.00 ENGINEERING INSPECTION FEE $110.00 $110.00 RIGHT OF WAY STANDARD - EUC PERMIT FEE $330.00 $330.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. 7- INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED r INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW 07/18/2022 RELEASED BY DATE Printed: Monday, July 18, 2022 2:53:55 PM 1 of 2 QF E ISM RIGHT OF WAY EUC PERMIT PERMIT NUMBER, City of Edmonds AM Edmonds WA 98020 CONDITIONS CONDITION TYPE NOTES ALERT RESIDENTS ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS REQUIREMENTS. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS www.mybuildingpermit.com POTHOLING VERIFY CLEAR BORE CROSSINGS. RESTORE LANDSCAPE Restore landscape to like or better conditions Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on SOUND AND NOISE weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTIONS INSPECTION TYPE DATE RESULT NOTES COMPLETE A-1 JOB START X-2 ENGINEERING FINAL" E-7 RESTOR LIMITS Printed: Monday, July 18, 2022 2:53:55 PM 2 of 2 RECEIVED of EpM04O� /'Vc. i Ba 3 SECTION A RIGHT OF WAY CONSTRUCTION PERMIT APPLICATION Complete and submit this Application in accordance with the Submittal Requirements outlined in Right-of-Wgy permit Handout E6�. J U L 06 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT If any field is not applicable to your project, write "N/A' instead of leaving blank. All fields required. Incomplete Applications will be denied. General • Project Name 1o63868o5 Site Address or if no site address use Property Address at NW corner of project area: 23129 74TH AVE W Associated Permits: BLD PLN ENG X Owner and Entity Holding Franchise (if applicable) Name of Company PSE/Infrasource Franchise Ordinance No: Point of Contact Susan Sid ick Title SR Permit Specialist Address 1660 Park lane city Burlington State WA Zip 98233 Phone 425-457-6353 Email susan.sidickapse.com Contractor and Authorized Agent of Owner Name of Company (see note below) Contractor Contacts During Construction Primary Name PSE/Infrasource Susan Sidick Agent Name PSE/Infrasource Title SR Permit Specialist Title SR Permit Specialist Mobile 425-457-6353 Address 1660 Park lane Email susan.sidick@pse.com City Burlington State WA Zip 98233 Secondary Name Phone 425-457-6353 Title SR Permit Specialist Email susan.sidick@pse.com Mobile City of Edmonds Business License No: Email State License No: INFRASL871 C2 [N Contractor verifies it is currently bonded d( Contractor verifies it currently has general liability insurance NOTE: ECDC 18.6o. o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. ❑ Multifamily residential ❑ Commercial ❑ City project ❑ Single family residential subdivision ixSingle family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? ❑ Other, please specify: ❑ Utility Franchise Work associated with development (check one of the above boxes as welt ❑ Traffic Control Only (no associated development) ❑ Utility Franchise Work (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) To install gas service at approx 2' w of paving & 4' W c/1 of 75th PL W & 3o6' S c/1 of 75th AVE W () 3x5 grass rut and (1) 3x5POVylliacut anticipated RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF I x LF SF Alley 72 hours + LF Ix I LF SF Parking 72 hours + LF Ix I LF SF 1 SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. 1. The work in the right of way is on or for the following type of facilities: ❑ telecommunications ❑ cable ❑ power ❑xgas ❑ water ❑ sewer ❑ storm Details of Work to be Completed 1. Does the utility owner have existing overhead infrastructure in the area of work? Yes No x 2. Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)? x If yes, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? x 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility stem? x 5. Does the work involve proposed additions to an aboveground utility stem? If es: x Are the additions for the purpose of serving new commercial development? x Are the additions for the purpose of serving a single-family residential subdivision? x Details of Work to be Completed Yes No 6. Does your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial development? x If yes, answer the following questions related to project area, i.e. the actual area in which the project is proposed: 6a. Does your project involve wires/cables/lines? If yes: x How many are existing? I I How many are to be added? City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 6b. Does your project involve poles? If yes: x How many poles are existing in the project area? What is the height of the existing poles? How many poles are to be removed? Are additional poles to be laced? How many? I I What is the height of the additionalpoles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: x How many? I I What is the height of the poles after? Describe the modification rebuild: SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. APPLICANT SIGNATURE: Susan Sidick DATE: 06/30/22 APPLICANT PRINTED NAME: Susan Sidick APPLICANT TITLE: SR Permit Specialist NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM RECEIVED J U L 06 2022 Job #: Date: Jurisdiction: ROW Permit: Est. Start Date: Est. Duration: 106386805 5112/22 EDMONDS Yes 7/11 /22 1 Day (8 Hours) Puget Sound Energy Gas Pre -Inspect Form Address: City / Zip: Customer: PM / Inspector: 23129 74TH AVE W EDMONDS, 98026 JOHN TRANG 206-227-1031 Nayeli Torres -Garcia 206-556-5066 Job Description Project Scope: FROM 2" STW MAIN, INSTALL APPROX. 165' OF 1-1/8" PE PLAT SVC AND SET A425 MSA 0/L. New Construction: Yes Utility patches shall be combined and full width or half width overlay will be required depending on the extent of disturbance. Where utility patches fall entirely within Construction Method one travel lane, the overlay shall extend to the centerline of roadway. Where utility patches extend into All Scat / Trenchless both travel lanes then a full width overlay is required. PLAT Map: 166.070 APPROX 800 SQ FT WORKZONE 1 ►1 ► 11 1 11 1 11 ►I`1► ► 11 _ ► ►1 Its _ _ 1-1/4" MPE 23129 ` 2018-E ►� 23135 74TH AVE W 1 1► 75TH PL W 1 Il 1 11 ► 11 1-1/4"MPEI n terUrb an ► Trail Park 1 � r 0 ; r � 1 ► r � h Work Location Size of Cut Surface Type 2' WEST of CL PAV & 306' South of CL 75TH AVE W 3 X 5 X 2 GRS 4' WEST of CL 75TH PL W & 306' South of CL 75TH AVE W 3 X 5 X 2 A of CL & of CL of CL & of CL of CL & of CL Service Information Street Information Job Type Diameter: 1-1/8" PE Flaggers #: 0 Arterial: Yes New Residential Svc EFV: 0 Police #: 0 TCP: Yes Tie -In Fitting Meter: A425 Speed Limit: 30 No Parks #: 0 Steel - 1" Sery x 1/8" PE Outlet (MOP) - 9997039 Meter Loc: 03 - OL Trolley Lines: No Mtr Hoods #: 0 Del Press: 6" W.C. Traffic Signal: Bus Stop: No SNO YRD - Snohomish 0 Bollards: 2.5" # 4" # ADA Ramps #: 0 Route #'s: OWNER/CONTRACTOR IS RESPONSIBLE FOR OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING EROSION CONTROL AND DRAINAGE ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY UTILITIES MAY REQUIRE A SEPERATE PERMIT. CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. ENGINEERING DIVISION APPROVED AS NOTED jdl UlQ✓.,7H.nnp 07/11/2022 PLEASE SCHEDULE WITH DISPATCH @ 800-343-4049 OPTA AND PROVIDE A COPY OF THE APPROVED TRAFFIC CONTROL PLAN K&D Services, as the preparer of this traffic control plan makes no representation as to its' general adequacy or being approved for implementation. Approval must result from the Traffic Engineer or other Public Official having statutory enforcement authority in the jurisdiction. Utilization and implementation of this plan shall be a result of that approval. Ref. MUTCD 2009 6A-01 (10) WORK c O ONE LANE ROAD AHEAD O O N ADJUST CONTROLS AS WORK ZONE CHANGES SWITCH CONTROLS TO OTHER SIDE AS WORK ZONE CHANGES OW DRIVEWAY ACC TO HOMEOWNERS. CHANNELIZATION DEVICE SPACING feet MPH TAPER TANGENT 50/70 40 80 35/45 30 60 25/30 20 40 MINIMUM LANE CLOSURE TAPER LENGTH = L (feet) LANE Posted Speed (mph) WIDTH (feet) 25 30 35 40 45 50 55 60 65 70 10 105 150 205 270 450 500 550 - - - 11 115 165 225 295 495 550 605 660 - 12 125 180 245 320 540 600 660 720 780 840 SIGN SPACING = X (1) FREEWAYS & EXPRESSWAYS 55 / 70 MPH 1500' ± RURAL HIGHWAYS 60 / 65 MPH 800' ± RURAL ROADS 45 / 55 MPH 500' ± RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH 350' ± RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH RESIDENTAL & BUSINESS DISTRICTS 200' ± (2) URBAN STREETS 25 MPH OR LESS 100' ± (2) (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT -GRADE INTERSECTIONS AND DRIVEWAYS. (2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. Legend 1 Cone 0 CW20-4 one lane road ahead Flagger OW20-1 road work ahead W20-7A Flagger Ahead ® Work Area DRIVEWAY Y — CNi-1 pRIVEWP Tk Z r ONE LANE O ROAD AHEAD ROAD WORK R �OD AHEAD qti ;5 ENGINEERING DIVISION APPROVED AS NOTED %R W/_.U,. 442 07/11 /2022 VV RECEIVED JUL 06 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Ion.com N OTWY-E W, FIRE AND POLICE 72 HOURS IN ADVANCE Notes: 1. Maintain ped. access to and through crosswalks 2. Maintain Min. 10' lanes 3. Maintain local access 4. Notify Transit Authority at least 48 hrs. in advance of bus stop closure 5. Traffic control plan and all devices shall comply with MUTCD, PROWAG & WSDOT 6. DEVICE SPACING Flag Taper 20' Signs per WSDOT Tapers per WSDOT 7. 28" Cones 36" Barrels 48" Signs 24" Paddle 8. Adjust to field conditions CUSTOMER: 4 PUGET SOUND ENERGY CONTACT: NAYELI T RRE - R IA 206-556-5066 LOCATION: 23129 74TH AVE W EDMONDS, WA 98026 DATE: W/O # 06/28/22 512889340 K & D SERVICES TRAFFIC MANAGEMENT DES/CNED BY WH/TNEYPATERNO OFFICE: 800-343-4049 DIRECT: 425-374-5826 WATCP@KNDSERVICES.NET WSTCS#012693 RECEIVED CITY OF EDMONDS Right -of -Way Application #1167034-106386805 JUL 06 2022 MyBuildingPermit.corn CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Applicant First Name Last Name Company Name Susan Sidick Puget Sound Energy- Corrosion Department Number Street Apartment or Suite Number E-mail Address 1660 Park Lane susan.sidick@pse.com City State Zip Phone Number Extension Burlington WA 98233 (425) 457-6353 Contractor Company Name PUGET SOUND ENERGY INC Number Street Apartment or Suite Number 1660 Park Lane City State Zip Phone Number Extension Burlington WA 98292 425-457-6353 State License Number License Expiration Date UBI # E-mail Address PUGETSE032J 1 3/20/2024 179n 1 M55 susan.sidick@pse.com Project Location Number Street Floor Number Suite or Room Number 23129 74TH AVE W City Zip Code County Parcel Number EDMONDS 98026 00488800200410 Associated Building Permit Number Tenant Name 106386805 Additional Information (i.e. equipment location or special instructions)_ Work Location Property Owner First Name Last Name or Company Name Unknown Unknown Number Street Apartment or Suite Number 23129 74TH AVE W City State Zip EDMONDS WA 98026 Certification Statement - The applicant states: I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work requires a licensed contractor to perform the work, the information will be provided prior to permit issuance. Date Submitted: 6/30/2022 Submitted By: Susan Sidick Page 1 of 2 CITY OF EDMONDS MyBuildingPermit.com Right -of -Way Application #1167034-106386805 Project Contact Company Name: Puget Sound Energy- Corrosion Department Name: Susan Sidick Email: susan.sidick@pse.com Address: 1660 Park Lane Phone #: (425) 457-6353 Burlington WA 98233 Project Type Activity Type Scope of Work Utility Purveyor Utility Work Disturbance of Surface Project Name: 106386805 Description of Work: To install gas service at approx 2' w of paving & 4' W c/I of 75th PL W & 306' S c/I of 75th AVE W (1) 3x5 grass cut and (1) 3x5 paving cut anticipated Project Details Project Information Job Number 106386805 Page 2 of 2