Loading...
BLD2022-0961_Site_Plan_7.19.2022_12.02.25_PM_2998244Equipment Summary Modules: (25) Solaria 40OW Inverter(s): (1) SolarEdge 760OH-US Racking: Ironridge XR100 Table of Contents: Cover Page Al Site Overview A2 Roof Layout E1 Single Line E2 Electrical Calculations G1 Roof As Built G2 Electrician As -Built G3 Micro/optimizer map G4 Placards GS Equipment BOM General Notes: Additional Electrical Work: 4 Site Net Meter A&RSOLAR 3211 Martin Luther King Jr Way S. Seattle, WA 98144 (206)707-9937 THIS DRAWING CONSTITUTES THE CONFIDENTIAL INFORMATION OF A&R SOLAR AND ITS RECEPTOR. POSSESSION DOES NOT CONFER ANY RIGHT IN OR LICENSE TO USE IT OR THE INFORMATION DISCLOSED HEREIN NOR ANY RIGHT TO REPRODUCE THIS DRAWING OR ANY PART HEREIN WITHOUT THE WRITTEN CONSENT OF A&R SOLAR. OQ O (A Z� N _ p00 f M(/)00 "o (V Q) 0r ON �In>a ��Q o � � N No Q � n _0 Cc O N O O -0 L. O LV a � REVISIONS Rev. #: IDate: Designed by: Thomas N Project Manager: Arthur Eith (612) 298-1795 Current Date:Jul 07, 2022 Cover Page Modules not to exceed height of existing ridge Inverter, AC Disconnect, Customer Owned Production Meter N Net Meter 0 MS Attachment Detail Side View (Portrait) FLASHING AS REQUIRED TO SEAL ROOF MINIMUM (1) 5/16 X 4.75 LAC BOLT EMBEDDED 2" MINIMUM CENTER ON ROOF FRAMINC PV MODULE, BY OTHERS IRONRIDGE RAIL (E) COMPOSITION SHINGLE ROOF IRONRIDGE FLASHFOOT2 (E) ROOF FRAMING — — — — — — — — — — — — — — — — — — — — — — 116" Building height I Manufactured trusses, 24" O.C. (sample) Attachment point layout for array. 48" OC Max. A&RSOLAR 3211 Martin Luther King Jr Way S. Seattle, WA 98144 (206)707-9937 THIS DRAWING CONSTITUTES THE CONFIDENTIAL INFORMATION OF A&R SOLAR AND ITS RECEPTOR. POSSESSION DOES NOT CONFER ANY RIGHT IN OR LICENSE TO USE IT OR THE INFORMATION DISCLOSED HEREIN NOR ANY RIGHT TO REPRODUCE THIS DRAWING OR ANY PART HEREIN WITHOUT THE WRITTEN CONSENT OF A&R SOLAR. OQ O (/i > N _ 0��000 � 0 U>(V Q)0r ON CIn>a Ewa o � � N No Q � ^ -0 ru O N p .O in- E o 'N -o L. 01 LU aT--1 REVISIONS Rev. #: I Date: Designed by: Thomas N Project Manager: Arthur Eith (612)298-1795 Current Date:3ul 07, 2022 Al Site Overview Required Setbacks from Ridge: 18., Maximum Mount Spacing: 48^ Roof Type: Membrane Roof Slope: 100 Array Tilt : Flush Array Azimuth(s): 900,2700 Roof Area: 3278ft2 Array Area 533ft2 Array to Roof Coverage 16% ***Roof Attachments/ Fastners; see pg. G5 Equip. BOM * * * "All 'B" Net Meter Module and Rail Selection Guide Solaria 40OR-PM 47.4 x 64.72 Clamp Zone "A" 0-10.98" Clamp Zone "B" 10.98-16.97" Mods per Row Rail typel+ rail type2 (6)Portrait, (2)rows (2)14', (2)14' (5)Portrait, (2)rows (2)14', (2)split 14' (2)Portrait, (1)row (2)14', (1)Portrait, (1)row (2)split 14', _ I A&RSOLAR 3211 Martin Luther King Jr Way S. Seattle, WA 98144 (206)707-9937 THIS DRAWING CONSTITUTES THE CONFIDENTIAL INFORMATION OF A&R SOLAR AND ITS RECEPTOR. POSSESSION DOES NOT CONFER ANY RIGHT IN OR LICENSE TO USE IT OR THE INFORMATION DISCLOSED HEREIN NOR ANY RIGHT TO REPRODUCE THIS DRAWING OR ANY PART HEREIN WITHOUT THE WRITTEN CONSENT OF A&R SOLAR. OQ O (/i > N O to N Q) a) O s=M Ewa >a o � � N Q � No -v 3z O N p .O 6 �O E O -0 L. O LV aT-4 REVISIONS Rev. #: I Date: Designed by: Thomas N Project Manager: Arthur Eith (612)298-1795 Current Date:3ul 07. 2022 A2 Roof Layout I I I Line 0 String 1 — +�XDX, 13 modules + z o V ------------------- ---- Load String 2 � U o 12 modules + 5 � I — — 0 0 Ac Co -Located with Net Meter Customer Owned (less than 10' away) Production Meter 0 Equipment Schedule Ref. Category Equipment QTY 1 Modules Solaria 40OR-PM 25 2 Optimizers S440 SolarEdge Optimizer 25 3 Jbox Jbox 3 4 Inverters Solar Edge SE7600H 1 5 Disconnect 60A 600V 2 Pole I Heavy Duty, No Fuse, Lockable 1 6 MeterBase MeterBase-125A 4 Jaw w/ 3.5" AWCAP 1 Meter Landis Gyr EA110000-OP29 240V 1 Monitoring SolarEdge Integrated (inverter) Monitoring 1 0 1conductor Schedule ■=A&RScope `„I' = Existing or A&RSOLAR Others Scope 3211 Martin Luther King Jr Way S. Seattle, WA 98144 (206)707-9937 (Existing) Main Service Panel (lph 240V Service) Main Breaker: 200A Bus Rating:200A Solar OCPD: 2p40A I nverter Specs Watts Lw—1 Output LAI AC Voltage # of Inverters OCPD Solar Edge SE7600H 7600 32 240 1 40 ****N/A**** 0 0 0 0 0 ****N/A**** 0 0 0 0 0 Module Specs Watts w Imp Vmp Voc Isc Solaria 40OR-PM 400 9.41 42.4 51.1 9.82 Temp. Adjusted 1 0 1 0 1 36.8 55.8 0 Summary Distance (ft) Current @125% Operating Voltage Voltage Drop Volt. Drop (total) A (2)#10 CU, (1)#6 EGC, PV Wire 60OV, AIR 50 18.75A 400V 0.40% 1.22% B (4)#10 CU, (1)#10 EGC, THWN-2, 0.75"EMT(min) 50 18.75A 400V 0.40% C (2)#8 CU, (1)#8 N, (1)#10 EGC, THWN-2, 0.75"EMT(min) 10 40A 240V 0.21% D (2)#8 CU, (1)#8 N, (1)#10 EGC, THWN-2, 0.75"EMT(min) 10 40A 240V 0.21% General Notes: O THIS DRAWING CONSTITUTES THE CONFIDENTIAL INFORMATION OF A&R SOLAR AND ITS RECEPTOR. POSSESSION DOES NOT CONFER ANY RIGHT IN OR LICENSE TO USE IT OR THE INFORMATION DISCLOSED HEREIN NOR ANY RIGHT TO REPRODUCE THIS DRAWING OR ANY PART HEREIN WITHOUT THE WRITTEN CONSENT OF A&R SOLAR. O¢ O COrqU)CO �_ cn N (L) O C M ol� E06< 3: o N = U 0� N a- ru O N p .O i_I N "D E o -a L. O W IL REVISIONS Rev. #: I Date: Utility: Snohomish PUD IDesigned by: Thomas N 1. EGC Where exposed to physical damage will be #6AWG Project Manager: Bare CU Arthur Eith 2. If installing conduit on the roof, maintain greater than 7/8" (612) 298-1795 above the surface 3. NEC 690.12: Rapid Shutdown initiated by loss of Grid or AC Current Date:3ul 07, 2022 Disconnect 4. For supply side taps, a #6 GEC (min.) will be run separately from the disconnect and connected to the grounding electrode E1 Single Line with an irreversible crimp PV Electrical Calculations Inverter Specs Watts Output AC Voltage # of Inverters OCPD Total AC Comb. EGC AC W (A) out.(A) OCPD Solar Edge SE7600H 7600 32.00 240 1 40 32.0 40 #10 f Ampe ****N/A**** 0 0.00 0 0 0 ****N/A**** 0 0.00 0 0 0 Module Specs Wats Imp Vmp Voc Isc Temp. Coef V(oc) pC Volt Solaria 40OR-PM 400 9.41 42.4 51.1 9.82 -0.29 #10 Max V( Max Temp. Adjusted 7­136.8 55.8 Optimizer? S440 SolarEdge Optimizer Max current output: 15A, Max Voltage: 480V Equipment Solar Edge SE7600H ****N/A**** ****N/A**** Mppt Input 1 1 2 1 3 1 1 2 1 3 1 1 2 3 Module Solaria 40OR-PM ****SELECT**** ****SELECT**** # Modules per String 13 12 0 0 0 0 0 0 0 # Strings 1 1 0 0 0 0 0 0 0 # of Mods per group 13 12 0 0 0 0 0 0 0 # of Mods/inverter 25 0 0 # of Inverters 1 0 0 Total # of Modules 25 Ref. Conductor Description Distance AL CU ft A String to Jbox 50 Cu B Jbox to Inverter 50 Cu C Inverter to Disconnect 10 Cu D Disco. to Interconnect 10 Cu E F G H Array Specs (Adjusted for Temperature) Inverter Solar EdgeSE7600H ****N/A**** ****N/A**** ilppt Input 1 2 3 1 2 3 1 2 3 -age (Imp) 13.00 12.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 �11 1 �11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 iltage(DC) 480.0 480.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 kmps (DC) 15.00 15.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Max Array Power(STC): 10 kW DC Max Continuous AC Power: 7.6kW AC Interconnection Calcs Main Breaker 200 Bus Bar 200 Max PV OCD AI lowed 40 PV OCPD Device Used 40 Tap or Breaker? Breaker Site Conditions ASHRAE Site: Seattle Low Temp (°F) 19 High 2%Temp (°F) 84 High 0.4%Temp (°F) 91 Wire Gauge (QTY) Phase Neutral Neutral EGC (AWG) Wire Type Conduit Min. Conduit 90°C Rating Temp Correct. Fill Derate Derated 75°C Rating Current Operating Voltage Conductors AWG (QTY) Type Ampacity @125% Voltage Drop #10 2 N/A N/A #6 PV Wire 600V AIR N/A 40 1 100% 40.00 35 18.8 400 0.40% #10 4 N/A N/A #10 THWN-2 EMT 0.751I 40 1 80% 32.00 35 18.8 400 0.40% #8 2 #8 1 #10 THWN-2 EMT 0.751' 55 1 100% 55.00 50 40.0 240 0.21% #8 2 #8 1 #10 THWN-2 EMT 0.75" 55 1 100% 55.00 50 40.0 240 0.21% A&RSOLAR 3211 Martin Luther King Jr Way S. Seattle, WA 98144 (206)707-9937 THIS DRAWING CONSTITUTES THE CONFIDENTIAL INFORMATION OF A&R SOLAR AND ITS RECEPTOR. POSSESSION DOES NOT CONFER ANY RIGHT IN OR LICENSE TO USE IT OR THE INFORMATION DISCLOSED HEREIN NOR ANY RIGHT TO REPRODUCE THIS DRAWING OR ANY PART HEREIN WITHOUT THE WRITTEN CONSENT OF A&R SOLAR. QO z o��00 l0 cnN C I 00 O� << U N N ,-. = 4-1 N 70 V O o ru O N p E -O L a� O LV REVISIONS Rev. #: I Date: Designed by: Thomas N Project Manager: Total Voltage Drop: 1.22% Arthur Eith (612) 298-1795 Current Date:Jul 07, 2022 E2 Electrical Calculations Typical Placards A) NEC 2020 690.13 & 691.15 B) NEC 2020 705.12 (13)(3)(2) C) Utility Requirement D) Utility Requirement (Commercial Only) D) A&R Solar Requirement (Residential Customer -Owned) E) A&R Solar Requirement * if combiner used F) NEC 2020 690.13 (B) I) NEC 2020 690.31 (D)(2) K) NEC 2020 690.13 (B) SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SOLARAELS PV PANELS SHUTDOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY L) NEC 2020 690.56 (C) *Used with Micro Inverters or DC Optimizers O) A&R Solar Requirement * if multiple inverters IAWARNING DUAL POWER SOURCE] SECOND SOURCE IS PHOTOVOLTAIC SYSTEM P) NEC 2020 705.12(C) & 690.59 R) AHJ Requirement * if combiner used S) NEC 2020 230.85(1) T) NEC 2020 230.85(3) Custom Placards &*1.PA� A&RSOLAR 3211 Martin Luther King Jr Way S. PLACARD S , _ C S U.T ` Seattle, WA 98144 (206)707-9937 NEC 690.54 AX Letter Height: 1/8" . Inverter Backfeed Maintain 1/4" border 1 Breaker Red / White NEC 690.53 NEC 690.54 Letter Height: 1/8" THIS DRAWING CONSTITUTES THE CONFIDENTIAL INFORMATION OF A&R SOLAR Maintain 1/4" border 1 Solar Edge SE76WH AND RECEPTOR.NOT CONF RSANY RIGHT INOSSESSION OR LICENSE TOE USE T OR THE INFORMATION DISCLOSED HEREIN Red / White NOR ANY RIGHT TO REPRODUCE THIS DRAWING OR ANY PART HEREIN WITHOUT THE WRITTEN CONSENT OF A&R SOLAR. Letter Height: 1/8" (1) for each Maintain 1/4" border 1 Disconnect or upstream Red / White loadcenters. CAUTION: POWER TO THIS SERVICE IS ALSO SUPPLIED FROM SOLAR PV SOURCES WITH DISCONNECTS LOCATED AS SHOWN: METER FOR MAIN HOUSE (NO SOLAR) Site Directory Placard Quantity: 2 )LAR AC CONNECT NET METER N O N C 00 O O M (f) 00 cnN Q)a) C M -� a oO _r N 3: N n N C l0 N _0 ru O N p o N `° E W REVISIONS Rev. #: I Date: Designed by: Thomas N Project Manager: Arthur Eith (612) 298-1795 Current Date:Jul 07, 2022 G4 Placards J) NEC 2020 690.56 (C)(2) Category Equipment QTY Notes Solar Equipment Modules Solaria 40OR-PM 25 Optimizers S440SolarEdge Optimizer 25 Inverters Solar Edge SE7600H 1 Monitoring SolarEdge Integrated (inverter) Monitoring 1 Electrical Equipment Disconnect 60A 600V 2 Pole ( Heavy Duty, No Fuse, Lockable MeterBase MeterBase-125A 4 Jaw w/ 3.5" AWCAP Meter Landis Gyr EA 110000-OP 29 240V Solar Racking Iron Ridge Racking BOM Description XR100 BIack,17' XR100 BIack,14' Kit, XR100 Bonded Splice BOSS Universal Module Clamp, Black Stopper Sleeve 40mm Grounding Lug, Low Profile Square -Bolt Bonding Attachment Hardware 1/4 x 3/4 Microinverter Bonding Hardware, T-Bolt End Caps, 10 sets(package) XR100 U-Anchor 2400, Mill (Spacing: 48") Fastener: #14 x 2-8" DF-#14 PH3 (8 /mount) L-Feet, Black System Weights Racking Weight(lbs) Total Weight(lbs) Weight/Attachme nt(lbs) DeadLoad(PSF) QTY 1 DH262URK 1 1 0 17 8 62 24 6 68 25 2 68 544 68 266 1416 20.8 2.66 &xl�I�i A&RSOLAR 3211 Martin Luther King Jr Way S. Seattle, WA 98144 (206)707-9937 THIS DRAWING CONSTITUTES THE CONFIDENTIAL INFORMATION OF A&R SOLAR AND ITS RECEPTOR. POSSESSION DOES NOT CONFER ANY RIGHT IN OR LICENSE TO USE IT OR THE INFORMATION DISCLOSED HEREIN NOR ANY RIGHT TO REPRODUCE THIS DRAWING OR ANY PART HEREIN WITHOUT THE WRITTEN CONSENT OF A&R SOLAR. O¢ O _ 0rqU)000 0 cn N (L) M o� CM E06< o 3: U 0� N = No 0 N 4-1 • N �-. _0 ru O N p .O Ea o - L 0 W IL REVISIONS Rev. #: I Date: Designed by: Thomas N Project Manager: Arthur Eith (612)298-1795 Current Date:3ul 07. 2022 G5 Equipment BOM