Loading...
Building PermitType: DEMO Subtype: RES PRIMARY STRUCTURE DEMO I Status: ISSUED Parcel No: 27043200200100 Subdivision: Fire Sprinklers: Valuation: $0.00 Code Edition: 0 Site Address: 23511 74TH AVE W EDMONDS,WA 98026-8500 Lot: 0 Lot Area: Zoning: Occupancy Type: Construction Type: No. Stories: 0 # of Dwelling Units: 0 Scope of Work: DUFFY- DEMO REMAINING STRUCTURE (leaving foundation) Applied: 7/20/2022 Issued:7/21/2022 Final: Expiration Date: 1/17/2023 Issued by: NED I WA State Contractor L & I #: ENCORCL857K6 I CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT NANCY DUFFY 23511 74TH AVE W, EDMONDS (425)830-1046 NANCYLDUFFY@GMAIL.COM WA 98026 6100 219TH ST SW, PUGET SOUND PLANNING, lee.michaelis@pugetsoundplanning.c CONTACT MOUNTLAKE TERRACE WA (425)830-1046 LLC 98043 om CONTRACTOR ENCORE CONSTRUCTION 7910 123RD AVE NE, LK (425)359-9896 DLOKHMATOV@GMAIL.COM STEVENS WA 98258 23511 74TH AVE W, EDMONDS OWNER BRIAN F & NANCY DUFFY WA 98026-8500 •' • "$40.00 DESCRIPTION 7PFR CCOUNT 7001.00(o. AMOUNT PAID PAID DATE RECEIPT# ECHNOLOGY FEE CHARGED 321.99.100.00 $40.00 7/21/22 R21842 ERMIT DEMO - SUB RES BLDG PERMIT FEE 001.000.322.10.000.00 $100.00 $100.00 7/21/22 R21842 DEMO - SUB RES BLDG PLAN 001.000.345.83.000.00 $50.00 $50.00 7/21/22 R21842 REVIEW FEE DEMO - SUB RES ENG INSP FEE 001.000.341.82.000.00 $100.00 $100.00 7/21/22 R21842 DEMO - SUB RES ENG REVIEW FEE 001.000.341.82.000.00 $50.00 j $50.00 7/21/22 R21842 TOTALS: $340.00 $340.00 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Thursday, July 21, 2022 11:23:21 AM 1 of 2 DEMO PerCity mit • • • - •:� i 1 1 • www.edmondswa.gov • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. It is the owner's responsibility to repair/replace all damage of utilities or frontage DAMAGE TO FRONTAGE FOR improvements in City right of Ways or Easements to City Standards caused by or IMPROVEMENTS INFORMATION occurring during the permitted project. Pre -inspection required. Street to be cleaned of debris. Side sewer must be capped at DEMOLITION REQUIREMENTS O property line. Water Service must be disconnected from Water Meter and or hose bib INFORMATION with AVB installed. Dump at approved dump site only. ESC REQUIREMENTS FOR MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD INFORMATION REQUIREMENTS. FOR All utilities shall be located prior to any excavation. New locates shall be called for if at UTILITY LOCATES INFORMATION time of excavation, original locates are no longer identifiable. ' •NS - Schedule •https://Inspection.MvBuildingPermit.com Printed: Thursday, July 21, 2022 11:23:21 AM 2 of 2