Loading...
Building PermitType: COMMERCIAL BLDG Subtype: COM ALTERATION OR REPAIR I Status: ISSUED Parcel No: 01070900010500 Site Address: 505 5TH AVE S 105 EDMONDS,WA 98020-3459 Subdivision: 010709, 007945, 004342 Lot: 0 Fire Sprinklers: Lot Area: Zoning: Valuation: $61,085.00 Occupancy Type: Construction Type: Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Scope of Work: MARCEAU- SEWER BACKUP REPAIR TO ALL WALLS. P SEP. Applied: 6/30/2022 Issued:7/22/2022 Final: Expiration Date: 7/17/2023 Issued by: NED I WA State Contractor L & I #: MCLEOCL951DD I CONTACTSId NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT KAYLIE KLEMP 1115 N 140TH ST, SEATTLE WA (206)665-5300 KKLEMP@MCLEODCONSTRUCTION.0 98133 OM CONTACT MCLEOD CONSTRUCTION 1115 N 140TH ST, SEATTLE WA (206)665-5300 kklemp@mcleodconstruction.com 98133 1115 N 140TH ST, SEATTLE WA KKLEMP@MCLEODCONSTRUCTION.0 CONTRACTOR MCLEOD CONSTRUCTION LLC (206)545-7837 98133 OM JOSEPH ARTHUR & HELGA 505 5TH AVE S 105, EDMONDS OWNER (425)275-7541 MARCEAU WA 98020-3459 •' • DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 7/1/22 R21281 PER PERMIT COMMERCIAL STATE SURCHARGE 001.000.237.150 $25.00 $25.00 7/22/22 R21871 PERMIT FEE - COMMERCIAL 001.000.322.10.000.00 $980.80 $980.80 7/22/22 R21871 PLAN REVIEW FEE - COMMERCIAL 001.000.345.83.000.00 $833.68 $833.68 7/1/22 R21281 TOTALS: $1,879.48 $1,879.48 CONDITION TYPE STATUS NOTES Printed: Friday, July 22, 2022 12:26:09 PM 1 of 2 •MERCIAL BLDG PermitCity • • • • - •:0iBLD2022-0856 www.edmondswa.gov • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION FOR In addition to the required pressure relief valve an approved listed expansion tank shall EXPANSION TANK INFORMATION be installed on all hot water tanks per UPC 608. Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:OOam to 6:OOpm on weekdays and 10:OOam and 6:OOpm on Saturdays, excluding SOUND AND NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. • •NS - Schedule •nline at: htti)s://Insi)ection.MvBuildingPermit.co Printed: Friday, July 22, 2022 12:26:09 PM 2 of 2