Loading...
BLD2017-0545-k QIV EDAf 2 vo CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 PHONE: (42S) 771-0220 - FAX: (42S) 771-0221 STATUS: ISSUED 04/27/2018 Pemiit#: BLD20170545 Expiration Date: 0-4127-�M9 Project Address: 514 8TH AVE N, EDMONDS Parcel No: 27032400225200 err PROPERTYOWNER APPLICANT CONTRACTOR THUESEN CUSTOM HOMES LLC ERIC THUESEN CUSTOM HOMES LLC ERIC THUESEN CUSTOM HOMES 509 9TH AVE N 509 9TH AVE N C/O ERIC THUESEN EDMONDS, WA 98020-3038 EDMONDS, WA 98020-3038 18225 85TH PL W EDMONDS, WA 98026 (425) 772-9401 (425) 772-940 1 LICENSE EXP: JOB DESCRIPTION NEW SINGLE FAMILY RESIDENCE - PLUMBINGAND MECHANICAL INCLUDED. VALUATION: $451,574 % Neo PORW7 PERMIT TYPE: Residential PERMIT GROUP: 64 - Single Family Residence New GRADING N CYDS: 0 TYPE OF CONSTRUCTION� RETAINING WALL ROCKERY: OCCUPAN GROUP: R-3/U OCCUPANT OAD: FENCE: 0 X 0 FT.) CODE: 2015 OTHER: ------- OT HER DESC: ZONE: RS- 12 INUMBER OF STORIES: I —[VLEST ED DATE: INUMBER OF DWELLINGUNITS- 2 ILOT #- EXIS17INGAREA BASEMENT: 0 1 ST FLOOR 0 2ND FLOOR: 0 PROPOSED ARIA ASEMEN 1: 1930 1 ST FLOOR: 2327 2ND FLOOR:-O 3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 F3RD FLOOR 0 GARAGE: 570 DECK� 275 OTHER: 0 BEDROOMS: 0 BATHROOMS: 0 1 BEDROOMS: 4 BATHROOMS: 5 FRONTSErBACK SIDESETBACK REARSElFBACK rQUIRED: 10 PROPOSED� I I QUIRED: 10 PROPOSED: 16 IREQUIRED: 10 PROPOSED: 17 HEIGHT ALLOWED:O PROPOSED:O IREQUIRED: 10 PROPOSED: 12 SETBACK NOTES: Setbacks: N, S, E, W PERMIT APPROVAL I I AGREETO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THEWORK AUTHORIZED THEREBY, NO PERSON WILL BE [EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DEPUTY AND ALL FEES ARE PAID. Er4,Th,-,zAJ L-� A-u�— 01112-71,1-cle Signature Print Name Ud Le Released By// Date ATTENTION IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL ORA CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC]09/ IBCI 101 IRCI 10. = FIRE = APPLICANT = ASSESSOR liji CITY STATUS: ISSUED BLD20170545 CONDITIONS • Lot line stakes must be in place at the time of foundation/setback inspection. • All new, extended, re -built or relocated electrical utility and/or service shall be placed underground. • Approval of this foundation design is conditional subject to inspection of existing site soil conditions. 0 Retaining Walls must be designed and constructed to resist the lateral pressure ofthe retained material. • Provisions must be made for the control and drainage of surface water around buildings. • Installer shall provide the manufacturer's installation, operating instructions, and a whole house ventilation system operation description. A label shall be affixe-d to the whole house timer control that reads "Whole House Ventilation" (see operating instructions). • MaximumHeight 25 feet. The agent/contractor shall set up the equipment; establish the datumpoint and the point of average grade. Call for inspection to verify. These items must be consistent with the approved plan. If the proposed height of a building (as shown on the plans) is within 12 inches Gf the maximurn height permitted for the zone an elevation survey is required. • Special inspections have been called for on this project and are noted on the approved construction plans and building permit. It is the owner and/or contractors responsibility to assure that reports are provided to the City on a weekly basis. Be advised — if special inspection reports are not forthcoming, the Building Official may issue a "Stop Work" and no City inspections will be provided until such time as the reporting agency has complied and reports are reviewed and approved by the City. • Hose Bibbs (exterior faucets) are required to have a permanently affixed anti -siphon device installed. • In addition to the required pressure/relief valve, an approved listed expansion tank shall be installed on all hot water tanks. Per UPC 608. 1 • Type B or L vent �onnectors required on fuel-bummig appliances passing through unheated spaces. Per IMC 803.2 • Obtain Electrical Permit from State Department of Labor & Industries. 425-290-1309 • Pursuant to UPC 605.2 a water service shutoff shall be installed on the water fine as it enters the building. • City approved plastic piping may be used in water service piping provided that where metal water service piping is used for electrical grounding purposes, replacement piping shall be of like materials (UPC 604.8). A state electrical pen -nit and inspection is required if electrical grounding is altered, removed, improved, or added. Contact State Dept. of Labor & Industries Electrical Division at 425-290-1309. • Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check thejob card for all required City inspections including final project approval and final occupancy inspections. 0 Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances orpolicies must be specifically requested in writing and be called out and identified. Processing fees forsuch request shall be established by Council and shall be paid upon submittal and are non-refundable. • Approval of any plat or plan containing provisions which do not comply with city code and forwhich a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. • Pursuant to UPC 608 a pressure regulator valve (PR'g, shall be installed near the water shutoff. • Sound/Noise originating fromtemporary construction sites as a result of construction activity are exempt fi-omthe noise limits of ECC Cbapter 5.30 only during the hours of 7:00amto 6:00pmon weekdays and 10:00amand 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 530, unless a variance has been granted pursuant to ECC 5.30.120. • Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to inderrinify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. • Accessory Dwelling Unit is not approved with the building plans. Should subsequent owner wish to use the residence as an ADU, a land use permit for an ADU will be required • Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per City standards that is caused by or occurs during the permitted project. I INSPECTIONS THIS PERMFFAUTHORIZES ONLY THE WORK NOTED. THIS PERMITCOVERS WORK TO BE DONE ON PRN/ATEPROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDB/VALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6) I TO SCHEDULE INS PECUONS I BUILDING ENGINEERING (425) 771-0220 EXT. 1326 1. Go to: www.edmondswa.gov Building Department Inspections 2. Then: SenAces are now scheduled online. If you FIRE (425) 775-7720 3. Then: Perm its/De\elopment have difficulties, please call the 4. Then: Online Pen -nit Info Building Department front desk for PUBLIC WORKS (425) 771-0236 5: If you don't have one already, create a assistance during office hours. login (upper right hand comer) (425) 771-0220 RECYCLING (425) 275-4801 6: Schedule your inspection When calling for an inspection please lea\e the following information: Permit Number, Job Site Address, Type of Inspection being requested, Contact Name and Phone Number, Date Preferred, and whether you prefer morning or afternoon. . E-Eng Pre -Con Meeting Required 0 EErosion Control/Mobilization . EStorm Tightline . E-Storin Connect to Stub . E-Footing Drain TL Conveyance 0 E-Water Service Line . E-Driveway Form & Slope Ver. 0 E-Access Slope & Width Verification . B-Preconstruction meeting 0 13- Special Insp Pin Piles e B-Setbacks 0 B-Footings 0 B-Foundation Wall 0 B-Foundation Drainage . 13-Isolated Footings/Piers . 13-Retaining Wall . B-Slab Insulation 0 B-Plumb Ground Work 0 B-Firs t Floor Framing 0 B-Plumb Rough In * B-Gas Test/Pipe * B-Mechanical Rough In 0 13-Exterior Wall Sheathing 9 B-Roof Sheathing . B-Window Flashing . B-ShearNailing . B-Height Verification . B-Framing . B-Wall Insulation/Caulk 0 B-Insulation/Energy . B-SheetrockNail . E-Tightline Drain Connection . 13-0ther . E-Engineering Final . B-Building Final E b4f CITY OF EDMONDS 1215TH AVENUE NORTH -EDMONDS, WA 98020 PHONE: (425) 771-0220 - FAX: (42-5) 771-0221 PERMIT MUST BE POSTED ONJOBSF FE* STATUS: ISSUED ENG20180174 IT (I -Single Family) Permit Number: ENG20180174 Expiration Date: 04/27/201 9 Job Address: 514 8TI I AVE N. EDMONDS Location: APPLICANT CONTRACTOR TITE77 CUSTOM HOMES LL.0 ERIC T I 11JESEN CUSI-OM HOMES1.1-C I RIC 509 9TI I A WN 509 91-11 AXT N FDMO\'DS. WA 98020-30338 EDMONDS. WA 98020-3038 (425) 772-9401 HCENSFN: FXP. R11111 114 1911 cil Access paving, Utility connection, in conjunction with building permit bld20170545 L_ DISRUPTION INFORMA'HON ASSFISSH) VAIAT $000 PROPERTY ARLA 0 Slf)i:\k'A[.K ( 0X0 I DURATION IN MONTI-IS 0 FFF $0 00 STRFFT DISRUPTION TRE ' NCH CUT X PARKING: I OXO I DURATION IN MONTHS. 0 FLE. $0.00 YE'AR 01: OVERLAY: 0 ITE $0 00 A[ LEY I ov) DURATION IN MONTHS 0 FLE $0 00 I.-NDFAINITY- 1he. Ipplicani hassigne(I an UP1)1iCU1i017 ichichsiales he she huhis the City (?1'Edn7ofids hurn7lessfi-oln iiijuries, cicinicigesorel(iiin.vof'cin.i-kil7doi-desci-iptioi7ii-h(ii.�oel,c,i-,,Ibl,eseenoi-i(n i-eseei7,lhalti?aj,beniadeag(linsilhe('i�l-(�fl,.'dliio17tiVOI- all-1, oj'ils depai-Iments oi- emplo ' rees, including but not limited to the defense oj'unv legul pi-oceedings including defimse costs ancl allorneYfi,es bl' IVIUS017 ofgi-anting 1hispernfil. IIIECONTRACIOR IS RESPONSIBLE FOR AVORKNIANS111PAND MATERIALS FOR A PERIOD OFON'EN'FkR FO LLONVINGIIIE FINAL INSIW ]IONAND ACCFTI-ANCEOFIIIENVORK. • Traffic Control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flap-er must be trained as required by (WAC) 296-155-305 and must have certification verifying completion ofthe required training in their possesion. • Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday- NO EXCEPTIONS. • Three sets of construction drawings of proposed work are required with the permit application. CALL DIAL -A -DIG (1 -800-424-5555) BEFORE ANN F-XCAVA-nON CALL FOR INSPECTION (425) 771-0220 F.XT. 1326 24 11OUR NOTICEREQUIRED FOR ALL INSPFX'-nON REQUESIN '111 IS WPLICATION IS NOT A 1117.11MITUN111, SIGNEDRYTH F CIT)' ENGINT"FA OR I I IS I IER DEPUTY ANDFFES ARF PAID. 'ANDRECEIPT IS ACKNONN LEDO E DIN SI-VT PROVIDED RELEASED 4 1 `V h DATE Printed: Fridav, Amil 27. 201 ARLF COPY F� INSPECTORCOPY F-] APPLICANT COPY STATUS: ISSUED ENG20180174 • Restore ROW to City standards • Restore Landscape to like or better conditions. • Call for locates ofunderground utilities prior to any excavation. • Alen affected residents andlor businesses prior to wo-k stall. • Conform to approved working drawings and Traffic Control plan. • Public utilities maintain 5'separation fi-orri City Utilities. • Utility patch restoration to be in accordance with Fdn-k)nds Standard detail E2.3 • Maintain erosion & sedimentation control. Keep street clean. • Call IZ)r required inspections as noted, • Traffic Control per approved plan and MUTCD. Refer Lo City of Edmonds traffic control requirements. • Applicant shall repair replace all darnage to utilities or fi-ontage improvements in City right-of-way per City standards that is caused by or occurs during the perrnitted project. • Sound'Noise originating from temporary construction sites as a result ofconstruction activity are exempt fi-orn the noise linlits ofECCChapter 5.30 only during the hours of 7:00arn to 6:00pni oil weekdays and 10:00am an� 6:00pm oil Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating frorn construction sites �activities Must C0111ply with tile noise limits of Chapter 5.30, unless a variance has been granted pursuant to FCC 5.30.120. • -\pplicant. oil behall'of his or her spouse, heirs. ass igns, and successors in interests. agrees to indemnify- defend and hold liamiless the City oftdmonds, Washington, its officials, employees, and agents from an), and all claims for darnages of" whatever nature, arisin- directly or indirectly fi-orn tile issuance of this permit. Issuance of this pen -nit shall not be deerned to modif�'. waive or reduce any requirements ol'any City ordinance not limit in any way the City's ability to enforce any ordinance provision. a I -'z Frall'ic Control • I-'-Dri\ ewa) Forrn & Slope Ver. • F�Paverncnt Suborade t� • F-Mailbox Location, Pre-histall PA RTI AL INSPEMON-1 DATE: IN 11 A L: NOTFS:—.— PA RTIA 1. INSPF,(TION DA TE:—..— INITIAL-- — NOTES:— FINA 1. INSPI-ITION' A PPROWD DATE: INITIAL: o E ),If PHONE: (425) 771-0220 - FAX: (425) 771-0221 CITY OF EDMONDS 1215TH AW-N'UE NORTH - EDMONDS, WA Q80220 *PERMIT MUST BE POSTED ON JOBSITE* STATUS: ISSUED ENG20180175 I SIDE SEWER PERMIT (1-Single Fanily) Perink Number: ENG20180175 FxpiratiOn Date.- 04/27/2019 Job Address: 514 8114 AVE N. EDMONDS APPLICANT CONTRACTOR 5 0 9 9T1 1 A VF N' EDMONDS \VA 98020-3038 509 91-11 AVE N EDMONDS. WA 98020-3038 (425 1772-9401 LICENSE #- I -AP. N —d"GRINDERPUMP JOB DESCRIPTION REPAIR N PROPOSE TO REUSE LATERAL LIDNIUMBER: 'N PROPOSE TO REUSE SIDE SEWER F-N71 DRAINAGE H, Access paving. Utility connection. in conjunction with building permit W20170545 W5.1 11011 DON d 1012:81 19,75 F-,Vd I rol �PR 0 �FCT OJ FCT CROSSES OTHER PRIVA TE PROPERTY NN N FICA VERI FICA TIONOF RECORDED FA SE.MFN'TS COM PLFTE LVDF-UNITY. The. Ipplicant has signed tin apl7lication it-hich states he she holds the 01Y olFdinonds harmless fi-om in ' ' .1111-les. daiiicigesoi-c-laii?i,vofa,�i-kiiidoi-tiesci-ipli(,,nit-halsoel,c,,I-,Jbi-(,seenoi-iinfoi-e.veen.ihali?iayheniodea,-ainsilhe('ilj�(�ll-.'dl?201761,�01- an - v ofilstl(,I)ai-iineiiisoi-eniploj-ees, including hut not lilnitedlo the del�nse ofaiij-legall)i-oceetliii.-sii7c-ludiiig d�/�nse cosis ai?d affornev kes hr reason of-f-anfing this permit. CALL DIAGA-DIG (1-800-424-5555) BEFORE ANYEXCAVATION CALL FOR INSPECTION (425) 771-0220 EXT. 1326 24 HOUR NO110EREQUIRED FORA Lt. INSPEC-11ON RFQUESTS APPLICATION APPROVAL 'n I I S A ITI - I C, %'110 N I S N 07-N P I- RVIT IN T11, S 10 N F D B) "1111 -. CITY 1:1 N G I N F 1: R 0 R I I I S I I E R D 1: P U7Y ND FI: E S k R E P. \ I D N D R F CE 11) ' I I S A K \ 0 N\ ' I . E 1) ( i I : I ) I N SP VT PRMIDED. Printed: Friday, April 27. 2019 RELEASED BY DATE 6� FILECOPV n 1NSPF('TORCOPN/ [—] APPLICAN'TCOM' STATUS: ISSUED ENG20180175 • Call ibr locates ofunderground utilities prior to any excavation. • Maintain erosion & sedimentation control. Keep street clean. • A 6" cleanOLIt with 12" locking cast iron larnphole cover is required at the property line. • OwneuVontractor to provide Side Sewer asbuilt at final inspection. See City Standards for requirements. 0 F-Sanitary Side Sewer Inspection PA RTI A L INSPE(7 ION' DATE: INITIAL NOTES: PAR'I-IAI.lNSPF'.(`TION DATi,:— INITIAL NOTFS:— FINA 1. INSPE.CHON A PPROVED DATE: INITIAL: 4t M "ESUS APeter Chopelas, PE APR 10 2018 Engineering & Design Services 307 N. Olympic Ave, Suite 208 84MMMUff Arlington, WA 98223 (360) 653-4615; Chopelasandassociates@gmail.com Geotechnical Report August 6, 2017 Eric Thuesen -40PY 509-9a'Avenue N. CITY 0� Edmonds WA 98020 Ericthuesen(a)frontier.com 1-425-772-9401 Subject: Lot 2 514 8th Ave. N. Edmonds # BLD2017-0545 SUNEMLARY A geotechnical investigation of the above property was performed to address slope stability, erosion control and drainage issues. This site has been extensively altered due to previous construction activities on the slope above and below the site, which have been returned to the approximate original grade. A new proposed residence and garage are proposed for the center lot on the midpoint of the slope on a terrace. The investigation consisted of a site inspection to examine soils and site conditions and to take measurements on the sites, and prior exploratory pile driving to explore soil depth. A review of published material from the USDA Soil Survey of Snohomish County, and a review of the geotechnical. report done by Dennis Bruce PE, dated Jan 13'h, 2005 for this site, and a report done by this office for this site in 2012 and 2016. The investigation found that the proposed site on the slope can be used without hazard to the structure or the slope, if deep pile footings are used and certain precautions are observed. There is an existing site drainage system, including yard drains, for the hillside, and a conveyance system that transports all roof and driveway run-off to the base of the hill to prevent erosion. A previous inspections found the filled slope used appropriate fill sGil and was properly compacted. The fill is stable for landscaping features on the hillside. The home should be built on foundations that use a deep pile and grade beam foundation. This will allow the proposed development with a generous slope safety factor of over 2.0 or greater. These measures will reduce risk of landslides, increase slope stability and will not increase surface water discharge, sedimentation or erosion on downstream sites. This development will not increase surface water discharge, and it will not decrease slope stability but rather increase stability and it will not adversely impact other critical areas. C Oe Peter Chopelas PE Project Description The building site is a residential building lot of approximately 0.2 acres served by a municipal sewer and a public water supply, and with an existing residence, cabana and garage built on a terrace above the site. There is a proposed residence with integral garage for the ter -race on the slope. These are Allowed Activities for Geologically hazardous areas per 23.80.040. B (1). Project Site Plan The recommendations for the proposed project will result in long term slope stability. Recommendations include a deep pile foundation, a 4 ft high wall integral to the foundation of the garage, protecting and maintaining the vegetation on the slope, and to minimize unnecessary site disturbances. No compensation for impact to wetlands, frequently flooded areas, and fish and wildlife habitat conservation areas are required since none are disturbed. Monitoring the hazard will be done during the construction since the soil conditions have to be inspected prior to placing the footings, and during the construction to verify design conditions are met. Design adjustments may be made to minimize any hazards. Site Conditions The middle lot slopes to the west at about 35 percent grade, with a terrace near the center of the lot at the building site at about 20 percent grade, and the toe of the slope near the west edge of the property. The slope has existing lawn and landscaping and there is mix of grasses and landscaping shrubs and small to medium trees on the slope. There is no significant surface drainage on the site, and no seepage found on the site or the slope. There is an existing drainage and conveyance system from the adjoining parcels, that transports surface discharge from the roof tops and driveway above to the base of the slope to the west. Local Geology The subject site lies along a slope forming the edge of the highland plateau of the Edmonds area. The general stratigraphy (soil layering) of the area is characterized by fluvial and glacio-fluvial sediments from sea level to around 200 feet, with glacial till and sand deposit plains that make up the surficial sediments on most of the plateau. The USDA Soil Survey of Snohomish County maps the soil as Everett gravelly sandy loam and Alderwood gravelly sandy loam. The Everett soil is deep excessively drained soil on terraces and outwash plains. It is formed in glacial out wash. The sub -soil is dark brown gravelly sandy loam down to about 60 inches, with increasing gravel at the deeper depths. The Alderwood gravelly sandy loam is moderately well drained soil on till plans, moderately deep over a hardpan, and formed in glacial fill. Both of these soils are very stable and suitable for building site development. This soil has good strength and is not prone to slumps or landslides. It is subject to surface erosion when exposed to the weather and measures are required to prevent erosion. This soil is not prone to liquefaction. The site shows no evidence of landslides or deep soil instability. There were some minor tension cracks in the soil near the top of the slope, but this upper the slope was reinforced with the addition of the new structures. On the lot to the, west it was found below the surface soft and very wet peat soil to a depth of up 70 ft deep. This is due to an old depression that harbored an ancient lake, this developed into deep organic soils, but were subsequently buried by erosion from the slope to the east. During a test drive on the lower part of the subject lot in Dec 2016 it was found the soft soil extends under this site, at least on the lower edge. This soil is liquefaction prone and not competent to carry foundation loads. If it can be determine that the eastern edge of the home is not over the ancient peat lake, than conventional foundations may be used on the east half of the home, however deep piles and grade beam foundation are necessary on the western half of the properly, and possibly all of the site as well. There is no flooding risk on this property. There are no wetlands or surface water on the slope nor on the property. Geotechnies Surface soils have been inspected over most of the site and on the slopes by visual inspections. The underlying undisturbed soil on the subject site is deep silty sand, this is old alluvial outwash. The surface soil on the slope is quality, clean, well draining granular sandy fill placed at about I to 4 feet deep, from the previous site excavations. It is a mix of clean sand and gravel. Pervious soils explorations of the underling soil on the upper slop found the following. Soil log 1 Soil log 2 Soil log 3 Soil log 4 0-12" mixed fill 0-36" mixed fill 0-48"+ mixed fill 0-18" fill 12"+ sandy loam 36"+ sandy loam 18"+ sandy loam Soil log table Slope stability: Analysis of the natural grade of the steeper parts of the site using the Singh diagrams (shown below) indicates that the slope shows a Factor of Safety of 2.0. This reduces to about 1.8 for dynamic seismic conditions. This indicates a stable slope with a large safety factor over the 1.5 and 1.2 minimum requirements respectively. The upper filled slope is also currently stable. This is acceptable for landscaping features The soil properties of the undisturbed Everett soil is as follows: density (gamma)= 130 PCF; Cohesion (C)= 100 PSF, height of the slope is 45 feet. Site Soils 2 Nk�fvr fir sdtty. IS. 'Vemird 11115 hC1110111ul Erosion: All of the slopes over 30 percent on and above this site are subject to severe erosion if the soil is exposed. Minimize disturbing any vegetation on the slope in the areas that are not altered. Any exposed soil on the site must have deep rooting ground cover installed as soon as practical, avoid concentrated surface flows on the slopes, and to transport by tight -line roof and driveway runoff to the base of the slope through the existing drainage system. Subject Site ..... . . loc. _41 Nora, (from Snohomish County GIS data base) ECDC 23.80.070 Development standards. The recommendations in the following section will achieve the following: 1. Buffer Requirement. The generous slope stability factor and the use of a. retaining wall at the toe will safely allow a reduction in the set -back to 5 ft. The residence with an up hill side retaining wall is at no foreseeable risk from the slope. 2. Alterations. The proposed alteration of the retaining wall anchors the toe of the slope and reduces the surface grades, reducing the risk of erosion. The proposed development does not increase the surface water discharge to above predevelopment conditions. Slope stability on adjacent properties is not affected, and no other critical areas are affected by the proposed changes. 3. Design Standards. a) The slope safety factor is conservatively calculated to be 2.0 or greater; erosion hazard is reduced with the reduced slope and by installing vegetative cover d) the proposed structure is supported on deep piles that will unload and stabilize the slope. c) The proposed contours are consistent with the original natural grade long before any of the site in the subdivision was developed, which had been over steepened with uncontrolled fill and old construction debris had been deposited on the slope. d) the site is returned to a more natural and stable state after the proposed development and re -vegetation with native plant species. e) the is no greater risk, and buffers can be reduced, to adjoining properties, because the actual risk is reduced from the site's previous condition. d) a proposed retaining wall is used to stabilize the slope, and reduced the slope angles above the home to reduced the erosion hazard. Recommendations The proposed building location can be used with a reasonable assurance of long term slope stability and safety to the building if the following recommendations are followed: 1. Deep driven pile foundations, driven to refusal, shall be used for all pemianent building structures according to the following table. No slope setbacks are required for pile supported structures. Refusal is reached when the pile is driven less than 1 inch per minute at the listed rates below: PILE DIA 2 INCH 3 INCH 4 INCH 6 INCH Load Limit 6,000 lb 12,000 lb 20,000 lb 30,000 lb Pipe wall Sch 80 Sch 40 Sch 40 Sch 40 Driven rate 60 sec/in 15 sec/in 16 sec/in 15 sec/in Blows/min 1200 1000 900 600 Hammer size 90 lb 650 lb 850 lb 2700 lb Hammer type Pneumatic jack Hydraulic TB225 Hydraulic TB325 Hydraulic TB725 Table of Piles size and capacities Note: A 4" pile driven vertically has a calculated lateral bearing capacity of about 1500 lb (1000 lbs working load). For lateral capacity larger than the cumulative total, use batter piles with the lateral capacity assumed to be the sine of the batter angle times the table listed axial capacity. 2. Conventional footings may be used if it can be determine that there is competent soil within 6 to 10 ft of the soil (from exploratory pile driving). If competent soil is found, placed conventional foundations a minimum of 12" into the original undisturbed sub -soil below any fill. Bearing capacity is 2000 PSF. Equivalent fluid pressure of 35 PCF for retaining walls for drained on -site back fill. Coefficient of friction for the soil is 0.55 and passive soil (lateral bearing) pressure of 350 PCF. All bearing soil should be inspected by the engineer before concrete is poured. For foundations on fill a grade beam and pile foundation should be used. The proposed 4' retaining wall integral with the foundation can be designed to tie into the grade beam with 8" thick walls, vertical #4 rebar 16" on -center hooked into the grade beam reinforcement, with horizontal #4 bar at 10" spacing. The vertical bars should be no more than 3" from the backfill side of the wall. The excavated soil must be back filled and compacted over and around these footings up to grade. A footing drain should be installed along the length of the wall, back fills should be free draining sandy soil free of clay and silty fines. . I 1 9 4. Roof run-off from any up slope structures should be directed to a catch basin in the existing conveyance system and tight -lined to the base of the slope. No drains or concentrated flows should discharge over the ground or on the slope. 5. A silt fence should be placed on the downhill side of the construction site to attenuate silt - laden run-off if necessary. Silt fences should be placed around catch basin inlets. Soil that is to be removed and reused around the site should be kept away from the top of the slope. Soils not to be reused on the site should be hauled off site to an approved location. 6. The vegetation on the steep slopes should be replaced as soon as practical after construction. Any disturbed soil in the area of the slope should be protected with jute matte or straw and replanted with native vegetation. After final grading any disturbed or exposed soil needs to have topsoil spread and compacted and planted with vegetation that will retard erosion and stabilize the upper soil layers. Grass seed mixture based on soil type, used for erosion control, should be as follows: Common Name Perennial ryegrass Annual ryegrass Red Fescue Percent by Weight 40 20 40 This should be applied at a hydro -seed rate of I LB per 1000 sq. ft. (or 60 LB. per acre); or a hand seed rate for 2 LB. per 1000 sq. ft. (or 87 LB. per acre). Fertilizer shall be 10-20-20, applied at the rare of 10 LB. per 1,000 sq. ft. (or 400 LB. per acre). The following native vegetation are acceptable for permanent plantings on disturbed slopes and buffers: Trees*( 34' size; plant 6' o.c.) Shrubs*(to be 1-3' size; plant 2 foot O.C.) Vine Maple Kinnick-kinnick Big leaf le Salal Nobles fir SnowberTy Grand fir Vinca Minor Oregon Grape I Red current Other native species as recommended by qualified landscape professional knowledgeable in soil stabilization may also be used. where temporary access with heavy equipment is required on any of the steep slope of the site, compacted temporary fill slopes can stand at 2 to 1 and the surface be stabilized with quarry spalls and crushed rock. During periods of inclement weather, all exposed soil should be covered with mulch, straw, jute mat or weighted plastic sheet. Under no circumstances should concentrated surface drainage be allowed to discharge over the slopes. These temporary access roads must be removed by the completion of construction, all grades on the slope must be restored to the original natural grade contours (before the old existing fill) of no more than 2 to 1, all surface soils machine compacted, and top soil spread with mulch and jute mate used to temporary hold top soil in place until vegetation is established. Plants from the above list must be installed on all disturbed areas on the slope. of EL)4.f 0 SPECUL INSPECTION AND TESTING AGREEAIENT Permit #: BLD2017-6545 Project: — 514 WhAVEN N DU Prior to issuance of a permit, thisform must be completed in its entirety and returned to the Cityfor approval 77ke completedform must have signatures of acknowledgment by aflpardes. DUTUS AND RESPONSIBIELITIES Special InsiDection Firm and Special Insipectors: The Special Inspection firm of 6-- perform special _J will inspection for the following types of work separate forriNs must be submitted if more than one firm is to be employed): Pin piles Structural concrete All individual inspectors to be employed on this project will be WABO certified for the type of work they are to inspect. If inspection is for work that is not covered by the WABO categories, or the inspector is not WABO certified, a detailed resume of the inspector and firm must be submitted. The resume must show that the inspector and the firni are qualified by education and experience to perform the work and testing required by the proj ect design and specifications. The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions and addenda sheets will not be used for inspection, unless they have been approved by the City. Inspection records shall include: A daily record to be maintained on site, itemizing the inspections performed. Any nonconformin work V, 9 shall be brought to the immediate attention of the contractor for resolution. A weekly report shall be submitted to the City, detailing the inspections and testing performed, listing any nonconforming work and resolution of nonconforming items. A final report shall be submifted to the building department prior to the Certificate of Occupancy being issued. This report will indicate that -inspection and testing was completed in conformance with the approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must be detailed in the final report. Contractor: The contractor shall provide the special inspector or agency adequate notification of work requiring inspection. The City approved planand specifications must be made available, at thejobsite for the use of the special inspector and the City inspector. The contractor shall maintain all daily inspection reports, on site, for review by all parties. The special inspection functions are considered to be in addition to the normal inspections performed by the City and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be poured or other work covered until approval is given by the City inspector. BtObwDwartment: The building 4W"tmm, shO review any rovisions and addenda. The CAY MSPCdDr Will monitor the q=W inspection firactions for compliance with the agrement and the approvedplans. The City inspactor shall be responsible forapproving,,arious Maps of conovcfion to be.covered and for work to proceed. P—CsiAm tr—of"Xioulds: . - The atchitect and/or engineer will clearl i . ndicate on the plans and spec- cationsth y Ifi e specific types of special ftMection requiied and shall include a schedule for inspection and testing. The architect analor aiginem Will VoontmWc their revision and addenda process m smh a way as to ensure that all rvquurd City approvz&�am obtained, Prior to work Shown on the revisions being performed in the field. Own&: The. project owner, or the arcbjtw of engineer I wing as the owners agem, shall employ the special inspecio� or agency. ENFORCEMENT A Wure of the special inspectoror firm to perform in keeping with the rquirements of the IBC, the approved Plans �nd this document, may void this agMement and the Building Official's approval of the special inspector. In such a case a new spc(,W 'ns!WOr au&Or fm WOWd ncM I'D be proposed for apprmaL A failure of the 4design and/ot construction parties to perf�rnx in accordance with this agreement may result in a STOP WORK notice being posted on the project until -nonconfornung item& have been resolved ACKNOWLEDGMENTS I have read and agrme, to comply with the timm and conditions of thjs agreement, owner: s -e-J Cl-,v ko y" Signature Date Vill C-= C. Contractor- i ture, Date, AirhAn , Z4 PI/- C h 00 1 "Si ture Date:. Special .0r. Special Insp. Agtncy I WIR ACCEPTED^ THE CITY OF EDMONDS BUELDING DEPT. ql BY, . Date: 1.51 V C.-�L',.;ms\Adinin'AppDatzeJ.=al'�Temp%BLD2017-0545 ItucsmSFJL4w4II M2018 No EXCISE TAX REOUIRED APR 2 4 2018 KIRKE SIEVER6, wornish c=W Nwer By KIRKE SIEVERS After Recording Return to: City Clerk City of Edmonds 121 5�h Avenue N Edmonds, WA 98020 11 1E 1[� 1111 K180424Y1058 4 PGS 01;2412018 9 My $7 N.- C HOMT ISH �',.HTY 1� V 4, , "HINGTO.., NOTICE OF PRESENCE OF CRITICAL AREAS AND/OR CRITICAL AREAS BUFFERS ON PROPERTY GRANTOR: Eric Thuesen Custom Homes LLC GRANTEE: City of Edmonds, a Washington municipal corporation Legal Description: Abbreviated Form: Section 24 Township 27 Range 03 Quarter NW - LOT 2 OF CITY OF EDM SP NO S-07-76 REC AFN 201111145006 BEING A PTN SE 1/4 NW 1/4 Additional Legal is on Exhibit A attached to document Assessor's Tax Parcel ID No.: 27032400225200 Reference Number(s) of Related Documents(s): n/a ,4-AW".S -L01g0q?-0o)-S1 NOTICE OF PRESENCE OF CRITICAL AREA(S) AND/OR CRITICAL AREA BUFFER(S) ON PROPERTY C4-- NOTICE IS HEREBY GIVEN this At day of O� 20 1!4 by Eric Thuesen Custom Homes LLC ("Grantor"), as required by Grantee, City of Edmonds, pursuant to Edmonds Community Development Code (ECDC) 23.40.270.B, that at least one type of critical area and/or critical areas buffer has been found through field verification to be present on the Property described in Exhibit A hereto. This notice is being recorded as a condition of issuance for a development permit related to the property. As part of the permit application review process it was determined that the following type(s) of critical area and/or critical area buffer(s) were found to be present on the property: Slopes on and adjacent to the subject property exceed 40%. The steepness of these slopes classifies the site as a potential landslide hazard area pursuant to Chapter 23.80 ECDC. The City of Edmonds has adopted ordinances that regulate this type of critical area and/or buffer. Prospective purchasers are advised hereby that these regulations may limit the type and/or location of development or other use that may occur on the property. Please contact the City of Edmonds for specific information about the applicable critical area regulations. This notice shall remain on the title records of Snohomish County until released by the City of Edmonds, which shall only occur if the owner is able to submit a critical areas report to demonstrate to the City of Edmonds that the critical area designation no longer applies to the Property. Any release of this notice shall be subject to applicable procedural provisions of the ECDC. GRANTOR(S): By: 6- "-f� Name: L> 64,e 1FK&c-7K"e'W-J Title (if applicable): L4- V- Exhibit A LEGAL DESCRIPTION OF PROPERTY Section 24 Township 27 Range 03 Quarter NW - LOT 2 OF CITY OF EDM SP NO S-07-76 REC AFN 201111145006 BEING A PTN SE1/4 NW1/4. STATE OFWA411 Mkn � j ) ss. COUNTY OF "Q� QMj SV-\ I certify that I know or have satisfactory evidence that ep'tc' -mur-ejehl — is the person who appeared before me, and said person acknowledged that he/she signed this instrument, on oath stated that he/she was authorized to execute the instrument and acknowledged it as his/her ftee and voluntary act for the uses and purposes mentioned in the instrument. Dated: LI 7-'4 1 s Notary Public Print Name My commission expires 4/910 (Use ST TE OF ss. COUNTY 4�0 U HO MCISE TAX REOUIRED Return Name & Address APR 2 0- 2019 C-- iLk C TKU-� 4 — - KIRKE SIEVERS, Snohom'ish Cw� Treaw :To q C, `,� A-",3 & . A). 1-��%clvny%-O tj I) C \0 /k- - 9 (,A Luz By. KIRKE SIEVERS A 4 S WSH TINGTO11 Document Title(s) 0 GV,4A ej AA C,"k," Reference Number(s) of Related Document(s) 0 Grantor(s) Grantee(s) Additional Reference #'s on Pagq- Additional Grantors on Page IL Additional Grantees on Page_ Legal Description (abbreviated form: le Lot/Block/Plat or Section/Township/Range) os Complete Legal on Page Assessor's Property Tax ParcellAccount Number 210324 022,520b Additional Parcel #'s on Page _ The Auditor/Recorder will rely on the information provided on this form. The responsibility for the accuracy of the indexing information is.that of the document preparer. I am requesting an emergency nonstandard recording for an additional fee as provided in RCW36.18.010. I understand that the recording process requirements may cover up or otherwise obscure some part of the text of the original document. Authorized Signature of Requesting Party NOTICE OF PRESENCE OF CRITICAL AREA(S) AND/OR CRITICAL AREA BUFFER(S) ON PROPERTY NOTICE IS HEREBY GIVEN this - Ig dayof Av,&l , 20164 by Eric Thuesen Custom Homes LLC ("Grantor"), as required by Grantee, City of Edmonds, pursuant to Edmonds Community Development Code (ECDC) 23.40.270.B, that at least one type of critical area and/or critical areas buffer has been found through field verification to be present on the Property described in Exhibit A hereto. This notice is being recorded as a condition of issuance for a development permit related to the property. As part of the permit application review process it was determined that the following type(s) of critical area and/or critical area buffer(s) were found to be present on the property: Slopes on and adjacent to the subject property exceed 40%. The steepness of these slopes classifies the site as a potential landslide hazard area pursuant to Chapter 23.80 ECDC. The City of Edmonds has adopted ordinances that regulate this type of critical area and/or buffer. Prospective purchasers are advised hereby that these regulations may limit the type and/or location of development or other use that may occur on the property. Please contact the City of Edmonds for specific information about the applicable critical area regulations. This notice shall remain on the title records of Snohomish County until released by the City of Edmonds, which shall only occur if the owner is able to submit a critical areas report to demonstrate to the City of Edmonds that the critical area designation no longer applies to the Property. Any release of this notice shall be subject to applicable procedural provisions of the ECDC. GRANTOR(S): e By: Name: c- Title (if applicable): 1P &1-1 KA --S N A-Q_J., XL,% VU e Exhibit A LEGAL DESCRIPTION OF PROPERTY Section 24 Township 27 Range 03 Quarter NW - LOT 2 OF CITY OF EDM SP NO S-07-76 REC AFN 201111145006 BEING A PTN SE 1/4 NW 1/4. STATEOF 4)A%0 )ss. COUNTY OF I certify that I know or have satisfactory evidence that alb �nA�- is the person who appeared before me, and said person acknowledged that he/she signed this instrument, on oath stated that he/she was authorized to execute the instrument and acknowledged it as his/her free and voluntary act for the uses and purposes mentioned in the instrument. Dated: PJ STATE OF COUNTY OF 'All t 41 �p --- --- Notary Public )A4 KA- J--', Print Name —,I)e VA, be — My commission expires — ss -2- August 28, 2018 City of Edmonds Building Department 121 5hAve N. Edmonds WA 98020 Re; Permit BLD 20170545 Revision. 514 81 Ave. N. Please find the foundation revision replacing the rear foundation wall with 5'6" & 7'6" retaining walls with sloping fill. The wall heights either 7' 6" or 5' 6 "will be built according to grades found in the field. Soil bearing per Geotech Consultants, Inc Report 6/28/18 2000psf. Eric Thuesen ericthuesen(a)frontier.com 425-772-9401 a7LY C(:)?y AUG 2 8 ?01.j R7 bu September 5, 2018 Leif Bjorback Building Official City of Edmonds Letter of Understanding Construction Revision 514 e Ave. N. A foundation wall revision, retaining wall without the bump out was submitted to the City for review. I understand that there maybe subsequent impacts to the design to the rest of this structure that I will be proceeding at my own risks, knowing that the revised plan does not include the bump out. These impacts include, but are not limited to the revising of all plan sheets impacted by the bump out changes, including the site plan and subsequent City review and approval. Further there will be a limit placed on the progress made to construction, such as not allowing any work under the permit beyond that needed to install the foundation and the related site work. Eric1huesen Custom Homes No framing will be allowed prior to the (bump out) 6�� C1-3 —&—� revisions discussed above being reviewed and Eric B Thuesen approved by the City. Date ? /,s-/ /-8 IPV CITY Cox x qjpj�'C;�ON sp o', OF EDMONf)� DAILY FIELD REPORT TRAVEIJPREP 11ME JOB N MBER GEOTECH 1 hr. ea (ind report) 18345 CONSULTANTS, INC. TIME ON SITE DATE 3:00 6/28/18 A TIME OFF SITE DAYOFWEEK-- Thursday 2401 — 10th Avenue East 425-747-5618 (0) 425-747-8561(F) HOURSCHARGED WEATHER SeatHe, WA 98102 www.GootechNW.com 2.0 Clear SITE LOCATION CLIENTIOWNER 614 8th AVE N, Edmonds Eric Thuesen Construction GENERAL CONTRACTOR CONTRACTOR SU ERINTENDENT MILES IT NUMBER Eric Thuesen 35 BLD2017-0545 GRADING CONTRACTOR GRADING SUPERINTENDENT MSITORS PAGE OF 1 Of 1 Onsite to meet with Eric and observe the excavation for the new house foundation. The foundation excavation has extended awroximately 4 ft to 8 ft below the original grades and steps down the slope to the northwest. The base of the excavation has exposed medium -dense to dense native sands that are acceptable for 2000 Psf allowable bearing. The northwest end of the house daylights from the hill and is in an area with deeper fill and possibly some oeat soils. As such the plan is to drive 3- and 4-inch pin Piles for that NW area of the structure per the structural engineer's layout below. This layout is acceptable from a geotechnical Perspective based on the soils exposed in the excavation. -gas-- ct We will be called to the site to observe the installation of the Pipe Piles. J I 17 "L. C/Ty ClAny Vr c I i Re -T, AUG 28 2018 Z,--2 —7� COPYTO SRiN—ATURE James H Str�ige,,.7 DAILY FIELD REPORT TRAVEUPREP TIME JOB NUMBER GEOTECH 1 hr. ea (incl report) 18345 CONSULTANTS, INC. TIME ON SITE DATE 4 TIME OFF SITE no DAY OF WEEK 8/6/18 Monday 2401 — 101h Avenue East 425-747-5618 (0) 425-747-8561(F) HOURS CHAR ED I WEATHER Seattle, WA 98102 m4w.GeotechNW.corn 2.0 Clear SITE LOCATION CLIENTIOWNER 514 8th AVE N, Edmonds Eric Thuesen Construction GENERAL CONTRACTOR CONTRACTOR SUPERINTENDENT MILES PERMIT NUMBER Eric Thuesen 35 BLD2017-0545 GRADING CONTRACTOR GRADING SUPERINTENDENT VISITORS PAGE OF I of 1 Onsite to meet with Eric and observe the excavation for the new house foundation. There is some concern about the stability of the cuts along the eastern end of the house along the slope. This cut is about 10 to 12 feet overall and consists of a 4 foot lower cut with a 4 foot wide bench with sioped soil —2-3 feet up and then a 4 to 6 foot upper cut. All of cuts are in medium -dense sands. The cuts have dried and have begun to ravel. Due to the granular make up of the of the cuts and the benching, it does not appear that the cuts pose a safety risk to workers. We do recommend that the bottom cut be shored up where it has ravelled to maintain the bench with plywood and fence post staking. We also recommend that the entire cut be covered with weighted plastic sheeting to keep the soils from drying out and keep any ravelled soils contained next to the bank. There is also an area in the northeast corner of the lower excavation with a higher bank, and this should be trimmed back and covered with plastic sheeting. Once this is completed, the excavation would be considered safe for workers in Our opinion.The uts should be observed daily bV the crews to look for any movement (anV movement should result in crews getting out of the excavation area and contacting Geotech fol further instructions), but the cuts and slough protection appear stable at this time. SIGN S2�4 X0 3SD94 T 8/6/18 -COPYTO SIGNATUR James 59— 699 & T— 699 Ketainino walle with 51opino backfill for 514 8t' Ave N, E61rmondo- Lot 2 Eric Thueren Thuceen Custom Homeo 509 9th Ave N Edmorldo, WA,98020 (425) 772-9401 Retaining Wall Summaries Retaining Wall Calculations REVISiON August 22, 2018 AUG 2 8 2018 BUbFPOC�PE 1j: Job # 30227 Peoioti builcl Servicco, Itic. Eneineerlrie & Gonotruction Mana0erment Fhoric /Fax: (360) 793-9659 28119 -120t;h St. 5.E., Monroe, WA 9b272 E-Mail: rheldcOdbornonroozorn Cantilever Retainine Wall R. ID. Heide, P.E. Thuesen Lot 2 2-1 Backslope Desfen 5ullcl Services, Inc. 1/1 1 (360) IC33-1365C3 8121115 1 CONCRETE Fc=2500pel REINFORCING STEEL rp40ksl BACKPILL SAMD OR GRAVEL LI ti 114,m 10" o.r-. HOR. or 05 im 1511 o.c:. A VERT. 11 CLEAR IV ff1 A --1 L) w LJ 6 z uj -.1 C4 L) (Y C 5ars t w/ hook 5.5' wall 4 04 LONG77 17PRAIN REQ. 135,HOOK DARS Wall Section No Scale "I E�ar 5pacine (O.C.) t1l H t2 U L2 L3 A E3 C, all 5.51 loll 2011 loll 30" #5 ia 12 " #5 a) 12 11 #5 @ 12 all -1.5' ]111 3111 1211 30" #5 -0 12 " *S 6 12 11 #5 61211 AgOR&I E V S AUG 2m ULTIMATE STRENGTH LOAD COMBINATIONS (Concrete Design): ------------------------------------ 1. 4D + 1. 4H 1.2D + 1.6L + 1.6H + 0.5R 1.2D + 1.6R + 1.6H + 1.OL 1.2D + 1.6R + 1.6H + 0.5W 1.2D + 1-OW + 1.0L + 0.5R 1.2D + 1.OE + 1.OL + 1.6H + 0.2R OAD + 1.OW + 1.6H 0.9D + 1.OE + 1.6H WORKING STRESS LOAD COMBINATIONS (Stability Checks and Masonry Design): ------------------------------------ D + L + R + H D + L + 0. 6W + H D + L + 0.6W + 0.5R + H D + L + R + 0.3W + H D + L + R + E/1.4 + H D + E/1.4 + H FF"I"EV1,910N Mr. 8 812212018 9:10 AM 2 of 8 RETAINING WALL RESISTING FORCES: ------------------------------------ Allowable Soil Pressure = 2,000 psf. Passive Equivalent Fluid Press. = 300.00 pcf. Passive Soil Height 0.00 ft. Coefficient of Friction 0.50 cohesion 500 psf. Use Vertical Surcharge as Resisting Wt.? = Yes Overturning Safety Factor 1.50 Sliding Safety Factor 1.50 Limit Reaction to Mid 1/3? No MATERIAL DATA: ------------------------------------ Concrete Strength, f1c 2.50 ksi. Steel Yield Strength, Fy 60.00 ksi. Concrete Unit Weight = 150.00 pcf, Soil Unit Weight = 110.00 Pcf. Fence Weight = 10.00 Psf. REINFORCING STEEL DATA: Concrete cover to center of steel: Wall Inside Face = 2.25 in. Footing Heel (Top Face) = 2.25 in. Footing Toe (Bottom Face) = 3.25 in. Minimum Ratios for Shrinkage and Temperature Reinf: Vertical Stem Reinf. = 0.0018 Horizontal Stem Reinf. = 0.0020 Footing Reinforcement = 0.0018 REVISION AUG 2 8 2018 8/22/2018 9:10 AM 3 of 8 S T A B I L I T Y A N A L Y S I S R E P 0 R T -------------------------------------------------------------------------------- Stability Analysis: Governing Combination = D + L + R + H ---------- RESISTING FORCES --------- --------- OVERTURNING FORCES --------- Element Weight x Arm = Moment Element Force x Arm = Moment Soil 2,170 6,494 R at Top Ftg. 584 2.12 1,240 R at Bot. Stem 750 1.33 1,000 Horiz. EFP 1,483 3.07 4,552 Vert Sur Vert Sur Vert EFP Horiz Sur Toe Sur. Wind Fence Wt. Horiz line V. line -------- Vert. line Sum WT -------------------------------------------------------------------------------- 3,504 MR -------- 8,734 -------- Sum F 1,483 MOT -------- 4,552 Friction Force 1,752 Lb F.O.S. Sliding RF / F = 2.47 Passive Pressure 126 Lb F.O.S. Overturn. MR / MOT = 1.92 Cohesion 1,790 Lb -------- Coef. Vert. Surcharge or Line Load Resist. Force, Sum RF 3,668 Lb to Horiz. = EFP / Soil Dens. = 0.318 Resultant Loc From Toe, X = (MR MOT) / Sum WT Eccentricity From Ftg. C.L., e = (B 2) - X Soil Pressure @ Toe Soil Pressure @ Heel (2 * WT) X) 1.19 ft. 0.93 ft. 1 —957 psf. 0 psf. AV% I R Un D AUG 2 8 2018 C�. 8/22/2018 9:10 AM 5 of 8 D E T A I L E D D E S I G N R E P 0 R T -------------------------------------------------------------------------------- STEM DESIGN: Steel Design Comb = 1.2D + 1.6L + 1.6H + 0.5R Shr Strength @ Base, Phi Vn = 5.18 kip Dist From d Mu VU As Flex. As Min. As T+S As Reqd Comb Top (ft) (in.) (ft-k) (kip) (in^2) (in�2) (in^2) (in�2) 0.75 5.75 0.03 0.07 0.001 0.002 0.173 0.173 2 1.50 5.75 0.11 0.15 0.004 0.006 0.173 0.173 2 2.25 5.75 0.26 0.26 0.010 0.014 0.173 0.173 2 3.00 5.75 0.51 0.40 0.020 0.026 0.173 0.173 2 3.75 5.75 0.87 0.58 0.034 0.045 0.173 0.173 2 4.50 5.75 1.38 0.78 0.054 0.072 0.173 0.173 2 5.25 5.75 2.06 1.02 0.081 0.108 0.173 0.173 2 6.00 5.75 2.92 1.29 0.116 0.154 0.173 0.173 2 6.75 5.75 4.00 1.59 0.160 0.213 0.173 0.213 2 7.50 -------------------------------------------------------------------------------- 5.75 5.32 1.92 0.215 0.230 0.229 0.230 2 Vertical Stem Reinforcement: Shear -Friction Steel Added at Stem Base (ACI 11 11.6), Avf 0.056 in A 2 Available Length for Hook Embedment into Footing 8.25 in. Available Length for Straight Embedment into Stem 88.00 in. Development Length Straight Hook Percent Spac. 50% Cut Off (in.) (in.) Develop. (in.) (in.) #4 14.40 8.40 98.21 10.25 90.00 #5 18.00 10.50 78.57 12.71 90.00 C' #6 21.60 12.60 65.48 15.03 90.00 U 31.50 14.70 56.12 17.57 90.0 #8 40.00 16.80 49.11 18.00 90.00 #9 50.90 18.95 43.53 18.00 90.0c #10 64.52 21.34 38.67 18.00 90.00 #11 79.52 23.69 34.83 18.00 90.00 -------------------------------------------------------------------------------- Horizontal Stem Reinforcement: Area of steel for Shrinkage and Temp. Reinforcement = 0.192 in^2 Spacing, I. F. Only #4 12.50 #5 18.00 #6 18.00 #7 18.00 #8 18.00 #9 18.00 #10 18.00 #11 18.00 in ------ ------ Total Bars ------ EA. Face I.F. Only EA. Face 18.00 8.00 6.00 18.00 6.00 6.00 18.00 6.00 6.00 18.00 6.00 6.00 18.00 6.00 6.00 18.00 6.00 6.00 18.00 6.00 6.00 18.00 6.00 6.00 AUG 2 8 2013 8/22/2018 9:10 AM 6 of 8 TOE DESIGN: • Steel Design Comb. = 0.9D + 1-OW + 1.6H • Thickness Design Comb. = 0.9D + 1.OW + 1.6H • Available Length for Hook Embedment into Stem = 6.25 in. • Available Length for Straight Embed. into Toe = 10.00 in. --------------------- ----- -------- d Mu ------------------------------------------- Phi Vn s Flex. As Min. As T+S As Req'd (in.) ""I, (ft-k (kip) (kip) (in^2) (in^2) (in^2) (in^2) 7.75 2.51 2.71 0.073 0.097 0.238 0.238 -------------------------------------------------------------------------------- Development Length Straight Hook (in.) (in.) Percent �-- Spac. Deye of' (in.) #4 14.40 8.40 7.01 #5 18.00 10.50 55.56 8.70 #6 21.60 1 . 0 46.30 10.29 #7 31.50 -14.70 31.75 9.62 #8 36.0 16.80 27.78 11.08 #9 4_0-�61 18.95 24.63 12.44 #10 �,---45.72 21.34 21.87 14.03 # 55.06 23.69 18.16 14.31 -------------------------------------------------------------------- HEEL DESIGN: • Steel Design Comb. = 1.2D + 1.6L + 1.6H + 0.5R • Thickness Design Comb. = 1.2D + 1.6L + 1.6H + 0.5R • Available Length for Straight Embedment into Toe = 18.00 in. • Available Length for Straight Embedment into Heel = 28.96 in. d Mu Vu Phi Vn As Flex. As Min. As T+S As Req'c (in.) (ft-k) (kip) (kip) (in^2) (in�2) (in�2) (in^2) 8.75 3.94 2.72 7.88 0.101 0.135 0.238 0.238 -------------------------------------------------------------------------------- Development Length Straight Hook Percent Spac. (in.) (in.) Develop. (in.) #4 14.40 8.40 100.00 10.10 O'C' #5 18.00 10.50 100.00 15. 66�.� #6 21.60 12.60 83.33 18.00 #7 31.50 14.70 57.14 17.32 #8 40.00 16.80 45.00 17.95 #9 50.90 18.95 35.37 17.86 #10 64.52 21.34 27.90 17.90 #11 79.52 23.69 22.63 17.83 AUG 2 8 2011 G EDFRARWF:1� 8/22/2018 9:10 AM 7 of 8 LONGITUDINAL FOOTING REINFORCEMENT (TEMP & SHRINK ONLY): --------------------------------------------------------------------------- Spacing (in. ) # 4 10.10 # 5 15.66 # 6 22.22 # 7 30.30 # 8 39.90 # 9 50.51 #10 64.14 #11 78.79 R s N AUG 2 8 20118 RTWF-"I-r 8/22/2018 9:10 AM 8 of 8 S U M M A R Y 0 F R E S U L T S -------------------------------------------------------------------------------- DIMENSIONS: Stem Height = 7.50 ft. Stem Thick. @ Top = 8.00 in. Stem Thick. @ Base = 8.00 in. Footing Thickness = 11.00 in. ------------------------------------------- ANALYSIS RESULTS: Max Brg Press. @ Toe 1,957 psf. @ Heel 0 psf. Allowable Brg. Press. 2,000 psf. Heel Length = 2.58 ft. Toe Length = 1.00 ft. Total Ftg. Width, B = 4.25 ft. Key Depth = 0.00 ft. Key Width ----------------------------------- = 0.00 ft. Sliding Force 1,483 Lb Resisting Force = 3,668 Lb F.O.S. = 2.47 Resultant Loc From C.L.= 0.93 ft. Overturn. Moment = 4,552 ft-lb Kern Point Loc., B/6 = 0.71 ft. Resisting Moment = 8,734 ft-lb Limit Resultant To Mid 1/3? = No F.O.S. = 1.92 -------------------------------------------------------------------------------- DESIGN RESULTS: Design Method, Stem: USD, ACI 318-11 (Concrete) Ftg.: Ultimate Strength ACI 318-11 d Mu Vu Phi Vn As Flex. As Min. As T+S (in.) (ft-k) (kip) (kip) (in^2) (in^2) (inA2) Stem 5.75 5.32 1.92 5.18 0.215 0.230 0.229 Toe 7.75 2.51 2.71 6.98 0.073 0.097 0.238 Heel 8.75 3.94 2.72 7.88 0.101 0.135 0.238 Key 0.00 0.00 0.00 0.00 0.000 0.000 0.000 Notes: 1. Stem moments are positive if they cause tension on the soil face. Negative if they cause tension on the outside face. Stem shear is positive to the left as measured on a section cut below the top of wall. 2. Heel moments are positive if they cause tension in the top of the footing. Heel shear is positive up as measured on a section cut to the right of the end of the heel. RIEVI.SIC)a N IV 41G 2 8 2018 After Recording Return to: City Clerk City of Edmonds 121 5th Avenue N Edmonds, WA 98020 NOTICE OF PRESENCE OF CRITICAL AREAS AND/OR CRITICAL AREAS BUFFERS ON PROPERTY GRANTOR: Eric Thuesen Custom Homes LLC GRANTEE: City of Edmonds, a Washington municipal corporation Legal Description: Abbreviated Form: Section 24 Township 27 Range 03 Quarter NW - LOT 2 OF CITY OF EDM SP NO S-07-76 REC AFN 201111145006 BEING A PTN SEI/4 NWI/4 Additional Legal is on Exhibit A attached to document Assessor's Tax Parcel ID No.: 27032400225200 Reference Number(s) of Related Documents(s): n/a APR 10 20% - 71-1- M. - -;; I M R � STATEMENT ON ACCESSORY DVVELLING UNITS DEVELOPMENT SERVICES DEPARTMENT 121 5d' Avenue N, Edmonds, WA 98020 Phone 425.771.0220 2 Fax 425.771.0221 Property Address (Street, City, State, Zip): 814 — 8h Avenue North Parcel #: 27032400225200 I have read the requirements for Accessory Dwelling Units contained in Chapter 20.21 of the Edmonds Community Development Code (ECDC)'and understand that an Accessory Dwelling Unit (ADU) as defined in ECDC Section 21.05.015 is prohibited until the required ADU permit(s) are approved and any required inspections are finalized. Lalso understand that an ADU permit cannot be approved unless all the criteria in Chapter 20.21 are met, and all the necessary items are submitted, including an affidavit of occupancy and a covenant to be filed with the Snohomish County regarding the regulations imposed on ADUs. I am not requesting to establish an Accessory Dwelling Unit on my property as part of the subjeli building permit application (File No. BLD20170545), and I will obtain all applicable ADU permits if I choose to establish an ADU in the future prior to establishing such ADU. I understand that the city's review of the subject building permit application does not imply any future approval of an ADU. I declare under penalty ofpeilury laws that the above information is true, correct and complete, and that I am the owner of the above describedproperly. Print Name: iE mA Signature: C� , Date: 71115 Revised on 712312013 ADUStatement Page I of I CONSTRUCTION SEQUENCE NOTES APR 10 2018 1 - SCHEDULE A PRE -CONSTRUCTION MEETING WITH CITY ENGINEERING DIVISION AT 425-771-0220, EXT. 1326. TWO DAY (48 HR) NOTICE IS REQUIRED. aLfl&"?B;no;u8r 2. REVIEW TEMPORARY EROSION AND SEDIMENT CONTROLNOTES. 3. CALL FOR UTILITY LOCATES. 4. INSTALL TESC MEASURES AND MAINTAIN DUST CONTROL WHILE PREVENTING DISTURBANCE OF ANY AREAS OF VEGETATIONOUTSIDE THE CONSTRUCTION ZONE. 5. HAVE EROSION CONTROL MEASURES INSPECTED BY CITY OF EDMONDS CITY ENGINEERING INSPECTOR. ALL TEMPORARY SEDIMENTATION AND EROSION CONTROL MEASURES MUST BE IN PLACE AND INSPECTED PRIOR TO ANY CONSTRUCTION OR SITE CLEARING. EROSION AND SEDIMENTATION CONTROL PRACTICES AND/OR DEVICES SHALL BE MAINTAINED UNTIL PERMANENT VEGETATION IS ESTABLISHED. 6. DEMOLISH EXISTING STRUCTURES 7, ROUGH GRADE SITE AS REQUIRED TO INSTALL DRAINAGE FEATURES. 8. CLEAR, GRUB & ROUGH GRADE SITE. REVEGETATE DISTURBED AREAS NOT SUBJECT TO ADDITIONAL SURFACE DISTURBANCE IMAIEDIATELY AFTER ROUGH GRADING. (OTHER EXPOSED AREAS SHALL BE STABILIZED PER EROSION CONTROL NOTES BELOW) 9. INSTALL UTILITIES AND OTHER SITE IMPROVEMENTS, INCLUDING FRONTAGE IMPROVEMENTS. 13. STABILIZE AND COMPOST AMEND ALL EXPOSED SOILS PRIOR TO REVEGETATTON OF ENTIRE SITE. 14. ESTABLISH LANDSCAPING AND PERNLANENT VEGETATION. ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED UPON FINAL SITE STABILIZATION AND APPROVAL BY CITY INSPECTOR. Revised 11/30/2012 DEVELOPMENT SERVICES RESIDENTIAL BUILDING PERMIT APPLICATION 1215 1h Avenue N, Edmonds, WA 98020 Phone 425.771.0220 ft Fax 425.771.0221 City of Edmonds PLEASE REFER TO THE RESIDENTIAL BUILDING CHECKLIST FOR SUBMITTAL REQUIREMENTS PROJECT ADDRESS (Street, Suite City State, Zip): SPY S_ e- N, 6 Xn�.)A 9*;&; Parcel #: A '7 0 7 OC) �_LS� Subdivision/Lot #: 05 Project Valuation: $ 1�rlo APPLICANT: i;� aw-,_ -7-k,.ke_s-e,4 Phone: 4 rr 7_--QL(_0 I Fax: 41-f- 7-7(,­17-4-(� Address (Street, City, State, Zip): 6r 10 'ri Ck 4' A-V�i iJ 6; 41 V./ F\ - E-Mail Address: Q�D-_Ai w� PROPERTY OWNER: e"c_ T�\L,,e�zj Photie: uk &,a- I Fax: Address (Street, City, State, Zip): '�Anqe_ AS Afa-A/Q_ E-Mail Address: 5. A -7 e— LENDING AGENCY: 0 Phone: Fax: Address (Street, City, State, Zip): E-Mail A ress: CONTRACTOR:* Phone: Fax: Address (Street, City, State, Zip): S AA1 e- V% g y!� 0 -j E-Mail Addre<ss: *Contractor must have a valid City of Edmonds business license prior to doing work in the City. Contact the City Clerk's Office at 425.775.2525 WA State License #/Exp. Date: ifif E IU " T-F r- Y� 4 3 4 vv% Cit Bu;iness License #/Exp. Date: IL (9 09 0 J> b DETAIL THE SCOPE OF WORK: ry 0- yl Aj Ae ,I r-e— W./P_q\A Ay)�A . PROPOSED NEW SQUARE FOOTAGE FOR THIS PROJECT: Basement: P-4 0 9 (1 IJC.L- P 0 �A !�-"sq. ft. Select Basement Type: Finished M Unfinished I" Floor: J 2) sq. ft. Garage/Carport: E!�! 0 sq. ft. 2 d Floor: - sq. ft. Deck/Cvrd Porch/Patio: Bedrooms# 4 _ J _ Full-3/4 Bath # 't Half -Bath # Other: —sq. ft. Fire Sprinklers: Yes W No 7 Retaining Wall: Yes No Lj Grading: Cut 7 /v cu. yds. Fill 3L,,LL cu.yds. Cut/Fill in Critical Area: Yes L] No L_] I declare under penalty ofperjury laws that the information I have provided on this formlapplication is true, correct and complete, and that I am the property owner or duly authorized agent of the property owner to submit a permit application to the City of Edmonds. Print Name: -T'h Owner Agent/OtherEl (specify): Signature: Date: -L- FORM A LABuilding New Folder 201000NE & x-ferred to L-Building-New drive\Form A2014.docx Updated: 1/17/2014 0,V EDAI 0 10 DEVELOPMENT SERVICES RESIDENTIAL BUILDING PERMIT APPLICATION FORM A 9 121 5h Avenue N, Edmonds, WA 98020 City of Edmonds Phone 425.771.0220!t Fax 425.771.0221 Equipment Type MECHANICAL Appliance/Equipment Information (new and relocated) Total# Furnace Gas #_)�_Elec #—Other:— # BTUs: <100k— >100k— Location(s) Air Handier / VAV (circle selected) Gas #—Elec JL_0ther: # CFM: <10k— >10k— Location(s) AC / Compressor Boiler / Heat Pump Gas #—Elec #—Other:— #_ BTUs:—<100k, 100k-500k, —500k-lMil Roof Top Unit HP: <3,3-15,15-30 Location(s) (circle selected) Hydronic Heating Gas #—Elec #—In-Floor —Wall Radiant— Boiler BTUs: Location Exhaust Fans (single f__ Bath 'I' " 1-tchen # ( Laundry # # duct) --- — _X_0ther: Fireplace Gas# &Elec #—Other:— #_ Location(s) Dryer Duct NJ Appliance Type FUEL GAS Appliance/Equipment Information (new and relocated) Total # AC Unit BI Us: Location(s): Furnace I I BT Us: t962,oan_ Location(s):- Water Heater I BTUs: :1.20 ax, Location(s): Boiler BTUs: Location(s): Other: BTUs: Location(s): Fireplace/Insert 3 BTUs: t.S�. O-C Location(s): k;_� 0A--"L_ Stove/Range/Oven Dryer Outdoor BBQ TOTAL OUTLETS PLUMBING FIXTURE COUNT xture Type (new and relocated) Total # Fixture Type (new and relocated) Total Water Closet (Toilet) Ayl Pressure Reduction Valve/Pressure Regulator Sink(kitchen, laundry, lavatory, bar, eye wash, etc.) Water Service Line Tub/Shower __7k Drinking Fountain Dishwasher Clothes Washer Hose Bib Backilow Prevention Device(e.g. RBPA, DCDA, AVB) Water Heater Tankless? Yes[—] No Hydronic Heat in: Floor E] WalIE] Floor Drain/Floor Sink Other: Refrigerator water supply (forwaterfice dispenser) Other: FORM A LABuilding New FoldeT 201 0\130NE & x-ferred to LBuilding-New driveTorm A2014.docx Updated: 1/17/2014 Lateral & 5tructural Emoincering & Fin File peoign for the Reoidence at 510 bth Ave N, Edrnondo- Lot 2 Eric Thucoon Thueoem Cuotom Homeo 509 9th Ave N Edmonda, WA 9b02O (425) 772-9401 Lateral Summaries Lateral Calculations Structural Summaries Structural Calculations April 20, 2017 Job #30227 �11T. Z", Dcoioti build Servicco, hic, Erigiricerine & CotiotruGtloti Management Phone IFax: (360) mmu m-D 28119 - 120th 5t. 5. E, Monroe, WA 98272' E-Mail: rhelde@61bornonroc.c. APR 2 4 2017 DEVELOPMENT SERVicEs cTFL CITY OF EDVO;qD$ Design Code 2015 IRC/lBC .r Residential Design Loads Gravit Roof Dead Load 15 psf Snow Load 25 psf Floor Dead Load 12 psf Live Load 40 psf Deck Dead Load 10 psf Live Load 60 psf Soil Bearing Pressure 2000 psf (Assumed per Table 401.4.1) Lateral Wind 110 mph Exposure B KZT 1 Seismic Wood Shear Panel 0.10 W R 6.5 Soil Profile D Seismic Design Category D2 Peoien build Servicco, Itic.. Eneltiecring & CoriotrUGVOr1 Mariaoerncrit Phone /Fax: (360) 793-9659 2&119 -120th St. 5.E., Monroe, WA 9b272 E-Mail: rheldcgdl�ornonroczorn 510 8th Ave N - Lot 2 R. D. Heide, P.E. 1/18 510 Oth Ave N, Edmonds, WA 138020 Design Build Services, Inc. Job 0 30221 Thuesen Custom Homes (3(00) 193-13659 3/30/11 Basement Floor Plan (m) Thuesen Custom Homes-510 8th Ave Nx 20' F— Aspect Ratios 10' 3B: I 2,W L-t ro-1 1.61' Upper Floor Plan (u) 17- I L h 45 4B 145 — — 2,0 31L — — — — 14.0 —' r-j- j— SIP L-3:8r — — — — — -j XI X2 Design Code = 2015 IRC/15C Wind Loads (IlOmph - Risk Gat 11, Exposure 5, Kzt 1) Seismic Load - v = 0.10 * W Selsmir- Load - Roof $now load 25 par X3 W Y3 —Y2 X4 Yi Y.3 Y2 Yi 510 ath Ave N - Lot 2 R. ED. Heide, P.E. 2/18 510 ath Ave N, Edmonds, WA e8020 Desi!@n Build 6ervices, Inc. Job 0 3022-1 Thueeen Custom Homes (3(00) 1133-136513 3/30/11 Basement Floor Plan (m) -- A, L11- 17r-AALI= Y3 -Y2 DTT2Z Inside 4 Outside to deck jolat/blocking with P threaded rod between L — — — — "\ "* i rH -�MSTA36 STRAP8 REQ'D TOP '�D 4 BOTTOM OF: OPENING Upper Floor Plan (u) 51-6 61-6 xi KEY $ - 6THD14 Y3 re! Y2 yi ""'IN X2 A .0/s /0 3/30/11 E>10 ath Ave N - Lot 2 R. D. Heide, P.E. 3/18 510 ath Ave N, Edmonds, WA 95020 Design Build Services, Inc. Job 41 30221 Thuesen Custom Homes (3roo) 193-965S 3/30/11 Seismic Controls Shear Wall Distribution Front Elevation (No 6ca le) 133,10 M 1 -1 '13(00 B3(0 Shear Wall Distribution Right Elevation Seismic Controls 1331 S4&w 1263 1683W k-1 16-12 1 503 113 Concrete Wa I Is X2 X3 '33-1 1 —21ro-1 21ro-1 111?�T 1 -1�-34 S34 Concrete Walls Y2 Y3 X4 3/30/2017 Michael Leachman P.E. Pagj5,/1 8 =Pcoion build Servicxq, InG. Engineering and Conctruction Management 28119 -120th St. 5.E., Monroe, WA 95272 Phone/Fax (360) 793-9659 ............ .... Lot 2 Wind Load Calculationo 2015 I[3C A,5CE 7-10 Duildinoo Figure 28.6-1 MWFK5 (Envelope Procedure) Method 2 - EnGloccd 5imple Diaphragm Low-Kice Dulldinoo Check Low R15c Definition H/L<=l 0.31076 0.4-5693 If Over 1 Can't Uoc Envelope ProcCCJL Deoign Calculation Load Combination 2.4.1 - 0.6W adjuoted for Lamda and Kzt; Wind 5peed MPH Rick Category Expooure Category kzt; Eave Height 13uildino Length - 5 (long Jimenolon a 8.27 Mean Roof height ft Lambda Height Factor Figure 25.6-1 page 305 Roof Pitch 23 degreec, Zone, factor W*0.6(Kzt)(Lambda) A 13 C D Roof Pitch 5 :12 15.1 -0.3 10.5 0.5 Corner Diotance 2a 16-54 ft Note if negative ueie 0 ,51de Elevation Zone factor W*0.(5-(Kzr,)(LambJa) A 13 C 1) Roof Pitch 5 :12 15.1 -0.3 10.5 0.5 Corner Diotance 2a 11.2 ft Note if negative uf5c 0 3/30/2017 Michael Leachman P.E. Pag�/l 8 Te,!5ion build ScrviGeo, [tic,. Engineering and Conotruction Management 28119 - 120th Ot. 5.E., Monroe, WA 98272 Phone/Fax (360) 793-9659 L ot2 A Wind Load Caloulationo 2015 IDC A5CE 7-10 buildinp Figure 28.6-1 MWFK5 (Envelope Prooedure) Method 2 - Enolooed 5imple Dlaphraem Low-Kjoe buildinoo Front Peoign Olde dcolp Zone Front Area Zone Load Minimum 10 pof A/C 5 pof DO 51de Area Zone Load Minimum 10 pof A/C 5 pof 13/0 2a remainder 16.5 66.16 11.2 44.8 A 13 C D .... .......... 5020 2620 0 2271 129 1740 560 21050 1275 A b C 1) . ... . . . .. ....... . . . .. ... 7 . . ....... . .. . .......... . .... . .... .... ..... .. 6424 2545 . 0 3753 .............. 1265 1690 290 3570 1250 510 Sth Ave N - Lot 2 Wind Areas 5 112 SF D 255 SF A114SF C216SF 1e� r� XI I X2 I X3 6 58 SF D 250 SF A Ifo9 SF G 351 5F 112 X4 1 Y3 1 Y2 171 J �i 00 3/30/2017 Michael Leachman P.E. Page 8/18 -Peoiori 13061 5crvioeo, 1t1G. Engincerime and Conotrurstion Mana0ement 28119 - 120th 5t, 5.E., Monroe, WA 9&272 Fhomc/Fax (360) 793-9659 * -- :. .", -i�6W ---:�0mrZ- Thiu66;ein: Cu -,CH, 016-�511 A A.) Lateral Demand, 5hear Wall Detailing 13.) Gr000 Loadino 13.1) 5eiornic Load f3.2) Wind 1C 13.2.1) Front 511 66001, 1� 13.2.2) 5ide C.) 5hear Wall Loado, WIND C.1) Front X-X Plotribution Fartoro Diotribution Diaph. between A [of] Preesure Load [lb] Xin X(i+l)n Xin X(i+l)n X1u - X2u 0 710.0 0.50 - 050 356 355 0 5 305.0 -0.6 65 107 198 Total 462 553 X2u - Ou 113 0 1130.0�'- 0.66), b.50- 566 565 5, 1000.0:-�' b(O -o rOOO 400 Total 1165 965 Ou - X4U 1o3 16 1030.0 0. 25 6 76 258 '773 Totalo Total Xlu X2u x3u X4u x1m X2m x3m X4m '.' 5 255.0 d2b` 0.75' 64 191 710.0 -0.65 "-�035 462 249 175.0 105 70 10� 320.0, 0.96 0.10 288 32 :.!5 100.0: aep 90 10 12(o 1324� V. p] Wall Lenotho. [ft;] V, [plf] 5rhedluled Shear Wall 461.5 14.9 31.0 �eii� 1718.3 .3-, (52.9 2230.b 101.9 1324.3 16;7, 79.3 51 461.5 ComL-'W'1llb 171b.3 'Conc; WAII!5� 2230.8 . wal* 1324.3 .60 . H . 0. 7a , Ils 3/30/2017 Michael Leachman P.E. Page 9/18 Peoigm build S&vicco, Itic,. Enoincerime and Comotruction Manaeoment 2&119 -120th 5t. 5.E., Monroe, WA 98272 Phone/Fax (360) 793-9659 C.2) 51de Y-Y Di9tribution Fartom Di9tribution — Diaph. between A [4] Preroure Load [ID] Yin Y(i+l)n Yin Y(1+1)n Ylu - Y2u 36": ....10 360.0 5 75.0 10: 7,50.0 5 5bO.O Total Y2u - Y3u :10: 470.0 43 215.0 77 10, 770.0 670.0: 0 Total Ylm - Y2m ro �A &60.0:.. '0 202 0.0 Total Totalo V, [lb] Wall Lengtho, [ft] Ylu 946.5 Y2u 2017.3 35.2 y3u 957.3 45.& y1m 2628,5 Y2m 3214.3 y3m 957.3 Conc, wallo 0IQ 324 36 .0.1.0: rob 8 551 429 2,03 377 946 850 94 376 32 1b3 0.30� 5,39 231 '025 503 16b 1168 957 774 86 909 1111 V. IpIf] 5cheiuled 5hear Wall 57.3 20.9 121.7 3/30/2017 Michael Leachman P.E. PIZ/1 8 �J- Peoion 13061 5erviceo, Inc. Enolneering and Conctruction Manaoernemt 28119 -120t;h5t.5.E., Momroe, WA 98272 Phone/Fax #(360) 793-9659 2015 113C A5CE 7-10 Chapter 11 & 12 Eart;hquake Loado From: http://earthquake.usgs.gov/research/hazmaps/design H torh� om 10�:fthW Edmoh lot 2 ,yq!�qji. c up, Lat 47.8i-39� Long i-11,22�369; Ss '273: Fa S1 OA99.1. Fv Assume Soil Profile D Sms=Fa*Ss 1.273 Sml=Fv*Sl 0.749 Seismic Design Category Sds=2/3(Sms) 0.849 D2 SdI 0.499 To seismic Load Roof Snow Load psf 0 psf ASCE Section 12.14 Simplified Analysis V=F*Sds*W/R F= 1. 1 Two Story Cs R v Wood Shear Panels 6.5 V= 0. 14 *W 0.131 Section 12.14.3.1.3 Load Combination for Allowable Stress Design Va=0.7*V Factor Wood Shear Panels V= 0.10 *W 1 Loads W E Roof Roof Snow walls 2PQQ� .. .. .. .. . .. .; � Load to Roof 61750 6208 walls 06� Floor 117250': Walls :.;.�10850; Load to upper floor 54500 5479 E - Building 116250 11687 11/18 510 8th Ave N - Lot 2 Seismic Areas r I L r- — — --I FLOOR 1125 Sf WALLS 217 LF ROOF 3535 SF WALLS 528 LF —Y3 58a — Y2 1131 —Yl Y3 2468 —Y2 forol L-- - - - - -j L- - - - __j Yl X2 1 X3 1 X4 3/30/2017 Michael Leachman P.E. Pale 2/18 Peoioti build 5crviceo, InG. Enoincerino anti Conotruction Manaocrnent 26119 -120th 5t. 5.E., Monroe, WA 9&272 Phone/Fax (360) 793-9659 D) Seismic Roof Area Floor Area 5.; sf N) Front X-X Diaph. between A [of] Load [117] Xlu - X2u 1872.1 X2u - Ou ��t 30,39.9 Ou - X4u 04: 1296.0 Totab V. [I b] Xlu X2u Ou X4u X1rn X2rn x3m X4m P.2) 5i6le Y-Y 936.0 2304.0 2255.2 712.8 93CO.0 2304.0 2256.2 712.& Redundancy(p)-D.3 Seismic Shear 2-08" 6208�, Seismic Shear 5479� Plotribution Factom Meitribution Xin X(i+l)tl Xin X(W)" 0.,50 936 936 6� 1365 1672 �D,55� 583 713 Wall Lengths, Ift) V. IpIf] 5choduled Shear Wall 14.9 ro2.& z�` 27.3 84.4 21.9 103.0 16.7 42.7 Conc. Wallo Coric, Wallo Conc, wallE5 Conc. Wallo Diotribution Factore Di9tribution Plaph. Detween A [of] Load [lb] Yin Y(W)" Yin Y(1+1)m Ylu - Y2u -7; 100 1873.8 _0 50 0.50 937 937 Y2u - Y3u 4534.2 .0 16.56': 2167 21057 Y1rn - Y2m 2526.3 .0-50: 1263 1263 Y2rfl - Y3m 586: 934 934 Totalo V. [lb] Wall Lonotho, [ft] V. [plf] 5cheduled 5hear Wall Ylu 936.9 Y2u 3104.0 y3u 2167.1 y1m 2200.0 Y2m 5300.9 y3m 3100.9 13.6 35.2 bb.2 45.8 47.3 21.6 101.9 Conc. wallo Conc. wallo Michael Leachman P.E. Peoioti build 5ervice,!5, Itic. Emoineerino and Construction Management 25119 -120th 5t, 5.E., Monroe, WA 98272 Phome/Fax (360) 793-9659 E.) Shear Wall Aspect Ratio Adjustrncnt� (5DPW5-2015, TaMe-4.3.4 and *4.5.3.4.1 Exception 1) Thucoem Custom Horrice-510 bth Ave N, Lot2 E.1) Grid X - X Second Floor Geometry First Floor Geometry h= h= 0.00:� ft h/1.5= 6.67 ft h/1.5= 0.67 ft h/2= 5.00 ft; h/2= 5.00 ft h/3,5= 2.56 ft h/3.5= 2.86 ft Are there any 9hear walls on Xim Oridlimeo with an apect; ratio between 2 and 5.5:1? :YE5. Now wall Lengvi_ Wind Seismic *Factor Wind Seismic Scheduled Shear Wall Adjusted Shear Wall Grid Line, v If] V. 1pff) h/(2*bi5) V. IpIf] V. [Elf] Wind Seismic Wind Seismic X1u 31.0 02.5 I.zz �5140_ 51-6 x3u 69.0 103.0 0.00 0.0 0.0 F-.Z) &rid Y - Y H= 10,00 ft h= 10.00 ft h/1.5= 0.67 ft h/1.5= 6.67 ft h/2= 5.00 ft h/2= E5.00 ft h/3.5= 2.86 ft h/3.5= 2.86 ft Are there any shear walls on Yin Oridlimeo with an apect ratio I;ctwecm 2 and 3.5:1? YE5� New Wall Leng-mi. -.:Wind Seismic *Factor Wind Seismic Scheduled Shear Wall Adjusted Shear Wall Grid Line V. [plf] V. [plf] hl(2*1�o) V, 10f] V, IF,f] Wind Seismic Wind Seismic Ylu 3 UU 0&.b 06.19 I'b I I I O.V 114J5 �bILZI (0- 51-6 Ylm 3.&0' 121.7 101.9 1.32 160.1 134.061� 00 Michael Leachman P.E. 14/18 Peoion 15061 5crvicco, Itic. Emoincerino and Conetructlom Management 2&119 -120th 5t.O.E., Monroe, WA 9&272 Phone/Fax (360) 793-9659 F.) Hold DOWn CaIGUlatiOM6 Thueoen Curtom Homeo-510 bth Ave N, Lot2 Wind selormic, Grid Line v, [plf] V, IpIf] X1u 31.0 62.& X2u 62.9 84.4 Ou 101.9 103.0 X4u 79.3 42.7 x1m X2m a 1161'! Cr n m� W. x3m ZZ. 5ccond Floor Height 10.00 ft Firot Floor Height 10.00 ft Wind 56iomic Grid Line v, 1p,f] V. 1p,f] Ylu 69.5 65.9 Y2u 57.3 W.2 Y5U 20.9 47.3 y1m 121,7 101.9 �,j Y2m a y3m F Uplift Force Tables Grid Line Pw [11b] Ps [Ib] X1u 309.9 628.2 Ylu X2u 629.4 844.0 Y2u 0 u 1018.6 1029.8 Y3U X4u 793.0 426.8 x1m Ylm X2m Ito Y2m x3m y5m 695.2 688.9 573.1 881.8 209.0 473.2 1216.9 1018.5 C -WaII6..:!-,--, A Peoign build 5erviGeo , Inc.. Etiolnecrine & Conotruction Mana0ement Fhone /Fax: (360) 793-9659 28119 -120t;h St. 5.E., Monroe, WA 98272 E-Mail: rhcldeQ6lb9rnorwoC.GOr1 13lorked Wall Peolon Client; �Thuc5en 6uotorfi Honie6�6110 btfi AvqN' LOG3VOM of blockei Walt rn�. Wall Length (L) F Win i Shear lb/ft; Wall Height (H) �10 FT Sciornic Shear lb/ft Wall 5ection 1 (wol) _2.5,� FT Wall 5ert;ion 2 (w!52) c FT Heloht; of Section 2 (hr,2) Hcioht of opcnine(Ho) FT Tranoorn FT Calculated Wind V 60b.5 # Calculated rho I Calculated 5eirmic V 505'T # Calculate the Loadr, 5elornic. Vw .14(L)(H)(1/2)(12)= 118 # Peolon Oelornic 627 # Controling Peoion 627 # 5e4ornic Cortro6 CF = V + Vw = Calo V + Vw 627 # Gr000 Shear 45 #/FT F1 = F(w5l/(woll +wo2)) 314 # F2 = F(wq2/(wr,1+wq2) 314 # Determine the Wall InUrlor Loadr, T = C=(Fl+F2)*H/L 448 # vF1 = Fl/well 125 #/FT Cl = (F1H-T(we1))/hr,2 960 # vF2 = F2/wc,2 125 #/FT T2 = (F2H - C(wo2))/hr,2 960 # vV3=V3/(H-Ho) 112 #/FT VI = (Twr21-F1(H-hc,2))/h52 -64(b # Y2 = (Cwr22-F2(H-hr,2))/hr,2 -64rb # M5TA56 5TP 2050 # V3 = (F1h-C1(hr,2))/wr,1 448 # M5T37 4605 # V4 = C1 + T2 = 1920 # Dead Load Roof Walls Floor P", I& 10 10 12 DL= (DL'.6)/2= CI... ".�Qh (H) v it N., ".6ght W.11 630 lb 1400 lb 1680 lb 3710 lb 1113 lb Uplift Calculation Uplift Wind 435 lb 1113 lb -678 lb Uplift Seismic 364 lb 1113 lb -749 lb Uolift.�;500..I,bs-'NOti6ldDo.wn.,Req'd- 15/18 16/18 EXTENT OF HEADER — 2 0 0 C) X Rig 11 - 11 . *VARIES (SEE PLAN) 11611 MIjq- 2X4 TOP PLATE OR PONY WALL ABOVE GARAGE DOOR HDR. MIN. 3x11.25 (SEE FRMG. PLAN FOR SIZE) LSTA24 VERTICAL STRAP IM—P OPPOSITE OF SHEETING NAIL O.S.B. TO HDR W/8d @ 3" O.0 OR 15g STPLS @ 2,�" O.C. TYP. ROWS 2-20 STUDS MIN 16D @ 3' 0,C, NAIL @ A�,,[_ PLTS, HDRS, & STUDS 8d @ 3 O,C. TYF, OR W/15g STAPLES @ 2.5" O.C. TV. 2-20 AT AV O,S,B. JOINT 16D@3"o.c. IN MIDDLE 24 OF PANEL 7/16" O.S.B. (5/8" T1-11 @ TLRP) -STHD14 OR PLAN NOTE CALL —OUT. INSTALL PER MANF. RECOMMENDATION. CONTINUO — 2-20 PLATES, NAIL SHTG. w/STEM 12" w/2 #4 MIN TO EA. PLATE — SEE NOTE BELOW AT OPENIN ANCHQR LAG BOLTS W1 3x� WASHER MIN 7 6BEDMENT (1-5/8 x12 AB MIN) Note: oftere yPanel i ron a Krimjoist the sheeting must lop the rim which could take the place of the second plate. Log bolts are to replace anchor bolts into 4x @ RIM. The STHID14's are to be replaced with STHD14RJ's or added to with MST 60's at a pony wall, MST 60's are to replace STHD14's at a second floor application. G _� LATERAL RESTRAINT PANEL "LRP9' 1,J TLRP SIMILAR (REF: APA TT-100) 17/18 Ref: AFPA SDPWS Section 4.3,5.2 Design for Force Transfer Blocking at All Panel Edges Req'd 48" 48" Full Panel Width Full Panel Vidth will! 1 M �-2 x 4 (min. pictte) 'Sheeting To Be Continuous 2-2x Continuous or Strapped Rim Over Rim Joist Perforated Shear -Wall Similar. No Horizontal Straps or blocking . required. Wall to be sheeted then openings cut and all edges nailed per schedule. AFPA SDPWS Section 4.3.5.3 BLOCKED WINDOW SHEAR WALL DETAIL 18/18 Design l3ulld -Ser.vlces, Inc (360) 1133-5655 - Shear Wall Schedule - Rev 8a - 7/2/2016 SHEATHING NAILING END STUDS (MIN) PLATE NAILING 12d A35/RBC @TOP PL. 1,12" A.B. SPACING UNBLOCKED BLOCKED G1-7 1/2" Sheetrack 5d Wallboard @7" o.c._ (1) 2X4 I Row @ 14" 3'-6"o.c. 1/2" @ 6' 100 125 G1-4 1/2" Sheetrock 5d Wallboard @ 4!' o.c. (1) 2X4 1 Row @ 11" 31-o"o.c. 1/2-0 6' 125 150 01-4+ 5/8" Sheetrack 6d Wallboard @ 4" o.c. (1) 2X4 .1 Row @ 9" 2'_6"o.c. 1/2" @ 6' 145 175 G2-7 1/2" Sheetrock 5d Wallboard @ 7" o.c._ (1) 2X4 I I ROW @ 7" 1 V-9-o.c. 1/2' @ 6' 20G f 250 G2-4 1/2" Sheetrock Wallboard @ 4" o.c. 2-2X4/1-2X61 _F_ I Row @ 5" � 1 �- o.c. 1/2" @ 4' 250 - 1 300 LRP 16" LATERAL RESTRAINT PANEL - Max Ratio 6:1 w/min. 4x Header 600 Lb TOTAL REF 2'-0" or wider LATERAL RESTRAINT PANEL 515 Lb/ ft. APA TT-100 Based on APA T20011-56 & Draft 156 dated June 17, 1994- higher values are allowed based on H.D. design. ALL WALLS BLOCKED Edge Nailing HF Spacing HF TYP HF WIND S1-6 7/16" OSB 8d 06"o.c. or 16g Staple @4!' 2-2X4/1-2X6 1 Row @7" 2'-O"o.c. 1/2' @ 6' 215 300 S1-4 7 16" OSB 8d @4"o.c. or 16g Staple 02.5" 2 2X4/2X6 1 Row @5" 1'-5"o.c. 1/2" 0 4! 310 434 S1-3 7 16" OSB Eld 03"o.c. 2-2X6/3-2X4 1 Row @,V' 1'-O"o.c. 5/8" @ 1.7' 400 560 S1-2 7/16" OSB 10d @2"o.c. 1-DF#2-4x4 2 Row @2.5" B"o.c. 5/8" @ 2.5'** 544. 763 S2-6 7/16" OSB 8d @6"o.c. or 16g staple 04" 3-2x4/2-2x6 1 Row @3" 12"o.c. .5/8" @ 1.5' 430 600 S2-4 7/16" OSB 8d Wo.c. or 16g staple 02.5" 4-2x4/3-2x6 2 Row @5" 5/8 :: 0 2.7'** 620 868 S2-3 7/16" OSB Bd 03"o.c. 4-2x6/1-4x4. 2 Row @3.5" _8�� Co.c. 15/8 @ 2'** 800 1120 S2-2 7/16" OSEI 10d 02"o.r. 1-DF#2-4x6 2 Row @2" 4"o.c. 15/8* @ 1.3'** 1088 1525 .Hold Down Schedule - Simpson or Equal Tension WIhd Seismic Cracked A35 A35 - Detail 4 In Simpson Catalog 6bO 600 lb @ 1.6 H1 H1 - Truss to top plate lateral 415 415 lb @ 1.6 LSDTHB LSDTHO/LSDTH8RJ-6- wall @0.5"-12"+ f. outside corner 1690 1220 jib @ 1.6 LSDTH8 LSDTH8/LSDTH8RJ-8" wall 00.5"-12"+ f. outside corner 2230 1610 lb @ 1.6 LSDTH8 LSDTH8/LSDTH8RJ-8" wall @12"+ from corner '3115 2250 Ib @ 1.6 STHD10 STHDIO/STHD10RJ-6" wall 00.5"-15"+ f. outside corner 2050 1435- lb @ 1.6 STHD10 STHD10/STHD10RJ-8" wall @0.5"-15"+ f. outside corner 3145 2175 lb @ 1.6 STHD10 STHDIO/STHD10)?J-8" wall @15"+ f. outside comer 4755 3400 lb 0 1.6 STHD14/STHD14RJ-6" wall 00.5"-21"+ f. outside corner 3200 2685 lb @ 1.6 STHD14 STHD14/STHD14Rj-8" wall @0.5"-21"+ f. outside corner 4165 3500 lb @ 1.6 JSTHD14 STHD14 STHD14/STHD14RJ-8" wall @21"+ from comer 5345 3815 11) @ 1.6 HDU5 HDU5 w/ 5/8' SST1324 6" Wall Min 5" from Endwall 4470 3325 lb A.B./DF H U5 DU5 HDU5 w/ 5/8" SSTB24 6" Wall Min 42" from Endwall 5025 3740 lb A.B./DF HDUB HDU8 w/ 7/8" SSTB28 8" Wall Min 5" from Endwall 7615 6395 lb A.B./DF HDU8 HDU8 w/ 7/8- SSTB28 8" Wall Min 50" from Endwall 7870 7870 lb w-4,5DF ST24 ST 6224 to lolst - MST37 w/ rim 2540 2540 lb @ 1.60 ST3E; ST 6236 to joist - MST 48 w/ rim 3695 3695 lb @ 1.60 ST60 MST60 0 rim 4830 4830 lb 01.60 ST72 MST72 no rim 6730 1 673O__ Ilb 01.60 NOTES: Based on 2015 IBC and Industry Standards assume HF for wood material u.n.o. xl-x wall is sheeted an one side. x2-x Is sheeted both sides. Hold-downs are based on 2011 Timpson HemFIr Values UNG. Toenail use 0 rim to top plate requires 207. more nails than plate nailing values given 0 top plate. Toenails @ Gl-7/4 only, Hails to be'. 81) 0.13lx2.5' IOD 0.1480" 12D 0.1480.25 16D 0.135x3.5* Per AFPA SDPwS H.W ratio 2:1 max for sheetrock walls. All sheetrock wall sections iy/H:W ratio of 1.51 to be blocked. Sheetrock walls not allowed in seismic zone E Anchor bolts for Hold downs are to be A307 bolts or threaded rod with 2 nuts (lammed). Mh Embedment length to be 12" In the footing. Simpson SSTB bolts can be subsituted per the Catalog call -outs, Rebar Is to be within f above and to the side of the head of the bolt and Simpson Strop Hold-downs. Gypsum Wall Ndiling Is for all supporting members & wall to he unblocked unless noted otherwime, All 0SB/Plywd walls to be blocked and have Min field nailing @ff o.c. if panels ore over jr thick or stud spacing less than 24" o.c.. *A35 @ top plate only required if Rim Joist Is Hush With Sheathing or 0 Interior wall & cannot be toe -nailed. ** 3x Mudsill Required. 3x wall plates are required if sheeting is spliced on the plate. If spliced on rim double rim required for 1 1/2' nail penetration. Note mudsill shear can be different than the wall above, see calculation summary sheet. All wolls with shears over 350#/ft require 3x studs or blocking at panel )oInts. Double studs can be substituted when nailed together at shear wall nailing with 10d nails. All anchor bolt spacing between 350#/ft and BDO#/ft has been reduced by 50% to allow use of 2x plate. If 3x plate is used bolt spoving can be doubled In these cases, ALL ANCHOR BOLTS ON SHEAR WALL LINES TO HAVE YXSX229" WASHERS 2308.3.2, �' From Mudsill edge on side with OSB/Plywood if shear over 200 PLF per SDPWS 4.3.6.4.3- unless hold-downs provided at wall ends per exception. Mar. 31, 2017 13:28:35 6" 61' 54'-6" 52' 51- Vol X 48' 46' -6-- 44�-6-- 10 43'-6" b33 b32 40' b33 F 35 b34 F1 2 25- 460 4 � �W gt2 b86 8- -2 XZO 7 37' 7 !Wb52 2 T 35' gtio it :11 it �11 b83 23�. 33' 13 32' gt3. 4 29' 12- r 27- 2, 1 T". 26 . 12b51V, 24- 30 VP; : ! : b6-1 -7— 2a 29- gt4 - - 'T 34- 21 - - - - - - - I - - - - 18' gt .4 14�1 61� -t- -,,- . 16 9t 13! ! *: Z;t, t4, --I�j2— - -1'" 12' - - - - - - - - - - 11, 3 iYe, 9 - Z: z z z z C E: z z z z 7 7 , 7 7 7 14- - - - - - - - - - - --- 7- 39- - 5! b46b is- - 40- — — 2 - - - - - - - - - - : ; : � I ! I - - --I- -;'- -!-' - - - - - - - - - - - - - - - - - - - - - - - -- - 01 AT T A AQV KV)APkL%KL U MARYF3 AGX N AJ Ai6AHz C A�` - AM H AO (AN E3 R S1 G AC ADkB AAAF JAE Cr 2' 4' 6'7'8'9' 11' 13' 16 2U-6* 24' 26 32' 34' 36 39-6' 42' 44' 47'-6" 50' 52' 54'-6" 59, 65'.6" 7a 74' 86, 90'-6" 10' 12l 17' 1910' 26 27'-g' 31' 3T 38' 46' 48' 54' 73! 8T-6" 91'-T 1-1 Wood`Works(g) Sizer SOFTWARE FOR WOOD DESIGN i Thuesen-510 8th Ave N WoodWorksil) Sizer 11.0 Concept Mode: Beam View Roof: 211 16- 37- 28- 24- 26- 32-- 33-- 44h "in WoodWorks@ Sizer SOFTWARE FOR WOOD DESIGN Thuesen-51 0 8th Ave N WoodWorksg)Sizerll.0 Mar. 31, 2017 13:28:47 Concept Mode; Beam View Floor 2: 111 . . . ....... 63- 3 Y 61, L .1 28'- J b1d, r.0. 7� T . . ........ 59, 44.. 24- 44p 26- 5 32- . ......... 52- 33 4e 0,0 IN 4 : 4V 46-6. b. 38:'- -'z z b6 10- 2. MV 7 . r 40 19 01 2."; 2- 37' 27- 17- 36 36 b27 -,bi - - - - - - -%13 23. blebV: 33' 71r V/ 2/0 R., 7 11. 3 3Z 7 b5"': 6i8 4- 29' 12-- 27' k;6 26 17; T 2W 30- 2 -T- - - -r r 20' - - - - - - --- b19 b19b - - 349-: 21- 111-1-1"bllb- -lb381 -lb2O 19. I r - r -- - - - - - - - - - - - 19 $8 - - - - - - 15' 25, 9 20. - 0) 13' 11. b2--:��: 12- V 17 ,:..b42 3- !�b21- - WTW -,-b3 -2m_: 1:7 % ik-; 7 7 . 7 :Z 7..::7 7 7.-�:: 7 14 7- q 016b 7j, f " vl� 40- 2' z 18- 0. AT T AO.VKIAAP;'LkKL U IVARYF:) Ab� N AJ Ai rAmz C A�' AM H AC 'AN B R S1 G AC E ADkB AAAF JAE 0' 2' 4' 6'7'8'9' 11' 13' 16 2V-g' 24' 26' 32' 3,W 36' 3V-6" 42' 44' 47'-6" 50' 52' 54'-6' 59, 65-6" 70' 74� 86' 901-61, 10' 12' 17' 19V 26 27'-6'* 31' 3S 38' 46' 46' 541 73' 87'-6*' 91'-6" N3 N-1 F] Thuesen-51 0 8th Ave N.wwa WoodWorks@ Sizer Concept Mode: Beam View Floor 1: 11 16 WoodWorksO Sizer 11.0 SOFTWARE FOR WOOD DESIGN Apr. 12, 2017 14:16:12 48' 46'-6" 3 10 43'-6" -5. 2 V-1j. cr 29 A k P -.-: I 27 a --- 17 23 13 4 12 2- 30 29 34- PIC 2 20 11 L 3 36— — :-.-'-PC2 14 39 15 40 AT t A AbV K%k�kUj�V. 0' 2' 4' 6'7'8'9' 11' 13' 10' 12'-6" P N. PL 112 x ro" DIA OR SQ 4/47 12" 04 RE5AR-----_. FOR UPLIFT WHERE SHOWN CUT FROM WELD ON CAP PIPE 3" OR 4" PIPE PER PLAN SHEARWALL -SEE GEOTECH POP, PIPE SPEC: PER PLAN PIN PILE CAP DETAIL NOT TO SCALE ANCHOR BOLTS PER FLA 4 STIRRUPS I'lh F IN. G R. —2-05 6 Top and PER DETAI zi L 04a 18" oc WORIZ 3V 1*4 tv 15" or- VERT CORNER BARS (2) #4 GR- 60 TOP 4 TO MATCH -7\ BOTTOM, LAP BARS REINFORCEMENT 26" AT SPLICES LA -.3 STIRRUPS Q &"o. x 24" 14' REINFORCEMENTJ— BEGIN FIRST TIE AT EA SIDE OF PILE AT--,--" PER DETAIL W1 1/2 REQUIRED CORNERS, 36" IN CENTER OF GRADE BEAM. HOOK e END SPACING FILE CAF PER DETAIL EV-- CLR PIN PILES PER PLAN 12-1 PERIMETER GRADE BEAM NOT TO SCALE CORNER REINFORCEMENT NTS CORNER BARS — TO MATCH REINFORCEMENT STIRRUPS I PER DETAIL REINFORCEMENT--,\4 11 11 111 \- BEGIN FIRST TIE AT PER DETAIL 1/2 REQUIRED 1\1 I I I SPACING TEE REINFORCEMENT NTS . 7 Thuesen-510 Sth Ave N WoodWorks@ Sizer Concept Mode: Reactions at Base -of StructUre View Floor 2: 111 'WoodWorks,b Sizer I i.0 SOFTWARE FOR WOOD DESIGN Mar. 31, 2017 12:53:56 16- _CI 38 __pgl w93-cIO7 C90 cl 39 a —98S -80 Le S 9a S m - - - - 63' 37 V25 60 D 75SI D 60 D w96 4� 61, 70 D . . . . . . - - - - - - - - - 28 ... f2s .� .1 11.1 ! 225S 221 037 c141 135() w94 13 _�_cl 17' W16a ------ 0'. 69 7 S, 350 L —4 12 36 L - - - - - - 59, 68 L 123 30 L —1045S 72G6 s-2m s 84S 156S 70 464 D 1009 464 700S 71958S 8S D . 647 D 125 D 125 D 115S 2841S 2 230 D 628 628 D i 74D 1853 D 50D 1249 D 51 D tk C59 24 S, IL 1 4 - - 56 26 9D 133 6�9 S 396 D 54� 48U j w16 /Zn, 108! 133 S 32- 33- 591 S, *22C12 91 D 52' 5% D 551S 3 D 9 126 7 17 V I - - T T 137S 48! 1161 _C86Wq c87 -A 6.. 684 D 7S 75B S —464 S 250 L7 40 : D - - - 46--g- , ; S 6 38- - 10 j j 64 D -283 D206 S. D .- - - _ - _" - -:, , - - - " - " -!- __ - - ... -_ L_ - -_ -_ - E J J. 44'.6" -212 D c 9, 7 7 351 10.- 650S 434, CM-) 'I.; 1lqA WjLt67 '005 1 c68 I c39 99 D. C53 .5-. . .. . .. _. 22- 59 L­ L S Al, 50S 525 L' -52.5 L­ - —�-22 S- S*_ _7A03 S 161 D .2 1 1 1 . CM 41 -13 D. - -45 D- - -13 D�. 4J - - - ` ' i :_53 4U 2.5- 330 D 05 E) -103 S - D Zis S 143 D -36 Lh -12OU -36 ut -164 U 1724 D 37 S 664S 396 D 839 It . P 083 cl 27. _C56 '19 c57 c63 8 T 37' 27 c - 6816 317 S� 26 S___ 117S. 17 024 D 190 D I D J 11958 S. 88 36 t 31 D 167 73 D 12490 51 D —357 L —381 L 51S 36 �,! 60 L 2 1 119D 1250 19 D 31 D 23 7 let 2 L 13- b t;4 L &P - - - 33 08 32' 1 Sze 05S D 66-C22 __6924 4 Xtc I' I cI0 c73 C18 w7 F2 TO! 0 L I ZZU L' - 179 L 400 L 49 L 29' L 19 D 19 D :471 D OS D 12 -, ... I 874S 144 D 04732 S —C23C2 _Wt 471 4xl: ii­ - - ' _. : .. .. 27' 1 3e — C _c 2 248 D 9 u SWD 1.14068 D a -r,104 8 _71025 L I r'-953 L 26! 2� 121BoD 1 '312 U8 L _124 8D 2,64 D -14 S! 38S 190,' --168 U -,'MD mo .- 30 7 24' A05 U 29 34- 1A 2(Y 14 j 19, 21 '7 072 L 2188 L 4578S 10443S j 7066 D 9257 D 19 - .. . . .. ....... .. .. .... 16 4 2C 12' 1A P6 . . .. .... 7 3 IU2L 36 16�C - 1i I t . T 'P2 8515 L J;2942 L L L WO PS 1776S UP8�5 S 9 P 6187 D 659DFZ­�­ — 72 0 2087 L \j 2469 L �3631 L 68B2 L 1551S 0 1 ?-! 495 L 1358S 14 3238 D 6291 D - - �;567 S 840S ;2435 S 224 D , , " , : - --- .. . . ­ � . . . . . ..I , 7' -:2998 D 5029 D i4547 D 39 &93 1 1 5 c 6 3 Wie 2C2'5 2 3 1 4 7 12 2 ' J.57, w8j, 19M 55' 33' [.82 905 '18 4 H 4 ki .1 2.' P U, UP13 P12 V-1 . .. ­ - - - .- .. - - -I- -- - - .- .- r 3' 40 '_...1800L... K:.2434 L.... . ..... ..;61�.2486L L . ..... 2' 949S 949S 1914 D 2445 D 3600 D r 0 AT T A AQ V K W AP AL A!Av_ U M AR YF6 AG X N AJ AVV Al 0 AH Z C ASD AM AU H AO �AN B R S1 6 AC E ADAB AA AF J AE 0, 2' 4' 6' 7' 6' 91 19 11,12'13' 17'18'19'20'21' 2X 26 26' 27'.6" 31 32' 3T 34' 36' 38'-6" 42'43'44' 46' 47',G" so, 52' 54*-6" 59 W-6, RY 73! 74' 86,87'.6" 90'.6" - 12'-6" 20'-6" 2V-6' 38' 48' 54' 91..5�. Pcoitp build 5crvicco, Itic,. Engineering and Conotruction Management 2,5119 -120th5t.5.E., Monroe, WA 96272 Flhoric/Fax #(360) 793-9659 ProjcGt Information: T uesen N, Foundation Analysis Allowable Bearing Pressure 2000 psf Design Design DL+ Live Load Load Area Footing Size Column Footing DL LL SL DL+LL DL+SL .75(LL+SL) (lb) (lb) A -'976'.' 434 2 --'�949. 3409 1924 3512 2537 3512 1.8 18 in Round -1.27 'A 60 190 507 428 317 507 0.3 18 in Round c: 32 60 OJ 698 105 555 603 698 0.3 18 in Round %Q 9 1 0 3697 1009 3025 2688 3697 1-8 18 in Round Strip width Stem Height (up from ground) Strip Footings in Load Area Min. Footing Length 7 .9, 86 4360 2695 4438 2732 4438 2.2 2.2 ft long :c 134 '2 4230 1941 3957 2887 4230 2.1 2.1 ft long 18 '8 2101 1760 2453 1567 2453 1.2 1.2 ft long 6.5 J- ;j 820 161 655 659 820 0.4 0.4 ft long 63 22562 3677 6179 6111 3617 6179 3.1 3.1 ft long 2556 6953 5854 4397 6953 3.5 3.5 ft long 626 430 1058 1328 1476 848 1476 0.7 0.7 ft long 1838 26 1863 4681 3989 2843 4681 2.3 2.3 ft long '67 9 21- 1292 3250 2761 1958 3250 1.6 1.6 ft long 54 6 1546 4387 3677 2841 4387 2.2 2.2 ft long DL+ Wall, DL Wall, LL Wall, SL DL+LL DL+SL .75(LL+SL) Strip Footing w/Wall c2' 155 4 t'l 6' 248 J. '666 153,;'� '21"3 3 213'', -2 528. C67' 73 580 324 601 903 422 850 882 634 820 910 250 745 366 286 413 3.2 366 286 413 789 467 812 572 1002 993 73 190 161 53 137 116 Design Live Load Wall Load Combined Pressure Strip Width (lb) (plf) (Psf) DCR Min. Strip Widtl 446 601 1283.6 0.6 7.7 in. 616 903 1624.8 0.8 9.7 in. 248 882 1273.7 0.6 7.6 in. 660 910 1074.8 0.5 6.4 in. 260 413 1316.8 0.7 7.9 in. 260 413 1511.8 0.8 9.1 in. 551 812 1023.4 0.5 6.1 in. 626 1002 17128 09 103 in 117 190 679.5 0.3 4.1 in. 84 137 847.3 0.4 5.1 in. M NI Pile Analysis 21' 3" 4" Pile Capacities 000,: �12,000 20, '0. 0..] lb Design Design DL+ Live Load Load Pile Column Footing # DL ILL SL WL DL+LL DL+SL LL+SL+WL) (lb) (lb) Dia P� 1 k57 M8` 1044& 11445 19700 18730 10443 19700 4 in 3515�� 20,871.; 155f 5602 5066 6244 2729 6244 3 in 67,41 8033. 14774 8244 13893 8033 14774 4 in 3U8: 2469 1358' 5997 4886 6398 2870 6398 3 in P5 27 6 '2942 .938 5648 3644 5616 2942 5648 3 in P& 6584, `S515 15099 8360 14302 8515 15099 4 in P.7 2894� '2942 1:195' 5836 4089 5997 3103 5997 3 in P& .3279' 3646 6925 3846 6439 3646 6925 3 in 5400 6926%;, 12326 6240 11225 6926 12326 4 in Pit 4944 3216i,,% .,,.':2419 8160 7363 9170 4226 9170 3 in 244& 4245 3394 4507 2062 4507 3 in P1.2' 0' '2434 049. 6034 4549 6137 2537 6137 3 in 3 -J. 4400 1914 3779 2486 4400 3 in R .,;759 5 3276;:;,,- 10871 13488 14472 6877 14472 4 in Pile Cap Analysis V (lb) M (ft.lb) Pol 11763 12753 PC2 9274 10888 PC4 8036 13299 PC6 5080 10474 PC7 8489 14734 COMPANY Design Build Services, Inc. PROJECT 510 Sth Ave N - Lot 2 28119 - 120th St. S.E. 510 8th Ave N WoodWorks' Monroe. WA 98272 Edmonds, WA 98020 PH: 36D-793-9659 Thuesen Custom Homes Mar. 31, 2017 09:48 bl SOFTIVARE rOR WOOD DESIGN Design Check Calculation Sheet WoodWorks Slizer 11.0 Loads: Load Type Distribution Pat- tern Location (ft] Start End Magnitude start End Unit !_J25 Dead Partial UDL IT. 0.02 2.02 155.2 155.2 ' -p7f- 2_ ' 25 Live Parti:l UDL Yes 0.02 1.02 424.7 424.7 plf 3321 Dead P.rti 1 UDL 11. 1 02 5.02 155 155.2 plf 4_J26 Li a Partial DL U Yes 1 02 5.0 2 :2 421 7 124:7 plf 5 , 27 Dead partial UDL ?To 1.02 g.02 155 . 2 15 5 2 plf 6_1 27 Live Partial UDL Ye, 5.02 9.02 424 . 7 424 . 7 plf 7_j28 Dead Partial UDL 11. 9.02 10.02 155.2 155.2 plf o J2 !_igh, liv- Partial UDL Yes 9.02 10.02 424.7 424.7 plf ,.,;t I .. - Full UDL 1 110 1 1 6.0 plf Maximum Reactions (lbs) and Bearing Lengths (in) : 19-0.6' Unf red; D:.t. ad 302 1007 30' .L"e F ct.red: 92' - 2654 9 2'�!? B.Total at Ing : 1231 - 3662 1231, Length 0 56 0.56 Mi2 a '=d .r 0:56 3 0.111 Maximum reaction on at least one support Is from a different foad comWinatlon than the critical one for bearing design. shown here, due to Cd factor. See Analysis results for reaction from critIcal load oombinaflon. bl Lumber -soft, D.Fir-L, No.2,4x8 (3-1/2"x7-1/4") Supports: At] - Timber -soft Column, D.Fir-L No.2 Total length: W-0.6"; volume = 1.8 cu.ft.; Lateral support: top= fall, bottom= at all supports: Analysis vs. Allowable Stress and Deflection using NOS 2015: Criterion Analysis Value Des n �Lalue Unit A111,1jE IlIgn She- f� 06 F_�g; v 185 psi _7 v v4DZ �tl Bending(+I flo 5045 Eb: 1170 psi fb/Fb' 0.43 Bending(-) Eb 717 Fb 1162 pei fb/Fbl 0.62 D, Id Defl'n 0. ol �L/' go 'IV. Da".. ..02 �L/999 0.17 L/360 1. 0.14 Total Defl'n OoO3 <L/999 0625 L/240 in Do13 Additional Data: FACTORS: FIE(P.I)CD CM Ct CL CF Cfu Cr Cfrt Ci C. LC# Ev. 180 1.00 1�00 1�00 - - - - 1.00 1.00 I.DO 2 rb:+ 900 1.000 1.00 1 00 1.000 1 300 1 00 1 00 I.DO 1.00 3 Fb 900 1. 0 1.00 1:00 0.993 1:300 1:00 1:00 1 .00 1.00 2 F 2 00 6 1: - - - - 1.00 1.00 - .6 million 1.00 1 00 1.00 1�00 3 Evda, D.58 million 1.00 1.00 1.00 1.00 3 CRITICAL LOAD COMBINATIONS: Sheet : Lc #2 D+L, V ma. - 1831, V d..ig. 1448 lb. Bamdi.=+�: LC #3 DIL (part-.: L I, M = 1294 lbs-ft - Bending - ! LC #2 D-L, M - 1831 lbs-ft Deflection: LC #3 (live) LC 93 (total) D=dead L=Iiw S='now W-ind I=irpact Lr=roof live L-concentrated E=earthqu.ke All LC s are , i.t.d In the Analysis output Load Patterns: s=S/2, X=L+S or L+L., pattern load in this span Load combinations: ASCE 7-10 / IBC 2015 CALCULATIONS: �ezflectionz EI = 178eO6 lb-in2 ive - d, fl action - Deflection from all non -dead load, (live, wind, -o-) Total Deflection - 1.50(Dead Load Deflection) + Live Load Deflection. ,,, te-1 stability(-). Lu - 51 Le - 91-11.56" RB - 8.4; Lu based on full span Design Notes: '. WoodWorks analysis and design are In accordance with the [CC International Building Code (IBC 2015), the National Design Specification (NOS 2015), and NDS Design Supplement 2 Please verify that the default deflection limits are appropriate for your application. 3 C nrinuous or Cardifevered Beams: NOS Clause 4.2.5.5 requires that normal grading provisions be extended to the middle 213 of 2 span beams and to the full length of cantilevers and other spans. 4. S= lumbar bending members shall be laterally supported according to the provisions of NDS Clause 4.4.1. COMPANY Design Build Services, Inc, 28119 - 120th St. S.E. WoodWorkso Monroe, WA 98272 PH: 360-793-9659 SOFnVARf FOR WOOD DESIGN Mar. 31, 2017 09:48 Design Check Calculation Sheet WoodWorks Sizer 11.0 Loads: Load Type Distribution Pat- tern Location (ft) Start End Magnitude Start End Unit 77�_ 320 __ 5ead Full UDL 147.2 plf 2_j2O Live Full UDL 360.0 plf 3_jI2O Dead Full UDL 46.6 plf 4_j12O Live Full UDL 240.0 plf Self -weight Dead Full UDL 7.7 plf Maximum Reactions (lbs) and Bearing Lengths (in) : L-Affillil PROJECT 510 8th Ave N - Lot 2 510 8th Ave N Edmonds, WA 98020 Thuesen Custom Homes b2 Unfacto red: Dead 613 613 Live Factored: 1828 - 1828 Total Bearing: 2441 - - 2441 Length 1.12 - 1.12 Min reg'd 1.12 1.12 b2 Lumber -soft, D.Fir-L, No.2,4x10 (3-1112"xg-114") Supports: All - Timber -soft Column, D.Fir-L No.2 Total length: VAX% volume = 1.4 cu.ft.; Lateral support: top= full, bottom= at supports; nalysis vs. Allowable Stress and Deflection using NDS 2016: Criterion Analysis Value Desig Value Unit Analysis/Design Shear fV = 81 Fv1 = 180 psi fv/Fv' = 0.45 Bending(+) fb = 867 Fb' = 1080 psi fb/Fbl = 0.80 Dead De fl'n 0.02 = <L/999 Live Defl'n 0.05 = <L/999 0.20 = L/360 in 0.24 Total Deflln 0.07 = <L/999 0.30 = L/240 in 0.24 Additional Data: FACTORS: F/E(psi)CD CM Ct CL Cr Cfu Cr Cfrt Ci Ca LC# Fv:+ ISO 1.00 1.00 1.00 - - - - 1.00 1.00 1.00 2 Fb 900 1.00 1.00 1.00 1.000 1.200 1.00 1.00 1 00 1.00 - 2 Fop 625 - 1.00 1.00 - - - - 1:00 1.00 - - E' 1.6 million 1.00 1.00 - - - - 1.00 1.00 - 2 Emin' 0.58 million 1.00 1.00 - - - - 1.00 1.00 - 2 CRITICAL LOAD COMBINATIONS: Shear � : LC #2 - D+L, V max = 2404, V design = 1749 Jos B nding(+): LC #2 = D+L, 14 = 3607 lbs-ft Deflection: LC #2 = D+L (live) LC #2 = D+L (total) D=dead L=Iive S=snow 11-­wind.I=impact Lr=roof live Lc=concentrated E=earthquake All LC . a are listed in the Analysis output Load combinations: ASCE 7-10 / IBC 2015 CALCULATIONS: Deflection: El = 369eO6 lb-in2 "Live" deflection = Deflection from all non -dead loads (live, wind, snow I Total Deflection = 1.50(Dead Load Deflection) + Live Load Deflection. Design Notes: 1. WoodWorks analysis and design are in accordance with the ]CC International Building Code (IBC 2015), the National Design Specification (NDS 2015), and NDS Design Supplement, 2. Please verify that the default deflection limits are appropriate for your application. 3. Sawn lumber banding members shall be laterally supported according to the provisions of NDS Clause 4.4.1. COMPANY 0 M PROJECT WoodWorks Design Build Services, Inc. 28119 - 120th St. S.E. 510 8th Ave N - Lot 2 510 8th Ave N Monroe, WA 98272 Edmonds, WA 9B020 SOMVARtFOR WOOD DESIGt4 PH: 360-793-9659 Mar. 31, 2017 09:50 Thuesen Custom Homes W Design Check Calculation Sheet WoodWorks Sizer 11.0 Loads: -Load �e Distribution Pat- Location Ift] Magnitude Unit I tern Start E2d ��art End 2 _131 DeTd Live Partral UDL 0 07 ,7 221 7 221.7 Tif _J31 LJ32 Dead Partial UDL 0:07 5.57 616:0 616.0 pif 4_J32 Live Partial UDL 5.57 9.07 98.4 98.4 plf 5 b9 Partial UDL 5.57 9.07 373.3 373.3 plf - 6_�bq Dead Point 5.57 213 lbs Live Dead Point Full r1nT. 5.57 608 lbs Maximum Reactions (lbs) and Bearing Lengths (in) 0. �nf..t.x.d: Dead 1029 Live 2843 812 Factored: - 2459 Total 3872 - Bearing: - 3272 Length 1.70 - Min rel'd 1.70 1.44 W Glulann-Unbal., West Species, 24F-V4 DF, 3-1/2"xg" 6 laminations, 3-1/2" maximum vAdth, Supports: All - Timber -soft Column, D.Fir-L No.2 Total length: volume= 2.Ocu.ft.; Lateral support: top= full, bottom= at supports; Analysis vs. Allowable Stress and Deflection using NDS 2015 riterion An2l sis Value Design t;�� lr 2 Value Fv1 = 265 Unit Anal Ysig�esipi" Bending(+) fb = 2253 Fb' = 2400 psi psi rv/FV fb/Fbl 0.94 Dead Deflln 0.09 = <L/999 Live Defl1n 0.25 = L/439 0.30 = L/360 in 0.82 Total Deflin 0*38 = L/287 0.45 = L/240 in 0.83 Additional Data: FACTORS: F/E(psi)CD C14 Ct CL Cv Cfu Cr Cfrt Notes Cn-Cvr LC# Fv' 265 1.00 1.00 1.00 - - - - Fbl+ 2400 1-00 1.00 1.00 2 Fcp' 650 1-00 1-00 1-00 1 . 000 1-000 1-00 1-00 1.00 1.00 - , 2 1.00 1.00 - - - - 1.00 - - - E' 1.8 million 1.00 1.00 - - - - 1.00 - - Eminy, 0.85 million 1.00 1.00 - - 2 CRITICAL LOAD COMBINATIONS: - - 1.00 - - 2 Shear : LC #2 = D+L, V max = 3872, V design - 3193 lbs Bending(+): LC #2 = D+L, 24 - 8873 lbs-ft Deflection: LC #2 = D+L (live) LC §2 = D+L (total) D=dead L-live S-snow PI -wind 1-impact Lr=roof live Lc -concentrated E=earthquake All We are listed in the Analysis output Load combinations: ASCE 7-10 / IBC 2015 CALCULATIONS: Deflection: El 383eO6 lb-in2 "Live" deflection Deflection from all non -dead loads (live, wind, snow Total Deflection 1.50(Dead Load Deflection) + Live Load Deflection. Design Notes: 1. WoodWorks analysis and design are in accordance %vith the [CC International Building Code (IBC 2015), the National Design Specification (NDS 2015), and NDS Design Supplement. 2. Please verify that the default deflection limits are appropriate for your application. 3. Glularn design values are for materials conforming to ANSI 117-2010 and manufactured in accordance vAth ANSI A190.1-2007 4. GLULAM: bxd = actual breadth x actual depth. S. Glularn Beams shall be laterally supported according to the provisions of NDS Clause 3.3.3. 6. GLULAM: bearing length based on smaller of Fcp(tension), Fcp(comp�n). W11 -De sign kitsuft, C6 . . .... gomjbl� on Member Reaction (lbs) 1013 @ 2 1/2" 2267 (2.25") Passed (45%) 1,00 1.0 D + 1.0 L (All Spans) Shear (Ibs) 1000 @ 3 1/2" 3310 Passed (30%) 1.00 1.0 D + 1.0 L (All Spans) Moment (Ft-lbs) 5268 @ 9' 7590 Passed (69%) 1.00 1.0 D + 1.0 L (All Spans) Uve Load Defl. (in) 0.388 @ 9'8 11/16" 0.479 Passed (L/592) 1.0 D + 1.0 L (All Spans) Total Load Defl. (in) 0.523 @ 9'8 3/4" 0.958 Passed (L/440) 1.0 D + 1.0 L (All Spans) TI-Prol- Rating 49 40 Passed uenecoon cmena: LL (L/4bU) anct I L (LIL40). Top Edge Bracing (Lu), Top compression edge must be braced at 41 611 o/c unless detailed otherwise. Bottom Edge Bracing (Lu). Bottom compression edge must be braced at 19' 5" o/c unless detailed otherwise. A structural analysis of the deck has not been performed. - Deflection analysis Is based on composite action with a single layer of 23/32" Weyerhaeuser Edge- Panel (24" Span Rating) that is glued and nalled down. Additional considerations for the TI-Prol" Rating Include: None .Supports: Loa to s6boo Acce#'DF '3 Tow., !"ulre.d,� 1 Dead T11 Total 1 - Stud wall - SPF 3.50" 2.25" 1.75" 830 1609 2439 11/4" Rim Board 2 - Stud wall - SPF 3.SO" 2.2S' 1.75- 248 723 971 11/4" Rim Board KIM boaro is assumea to carry all loaas applieLl directly above it� bypassing the member being designed. Loads Localtiorilslaw, Sp4c, n§ DeaA.,,- 77 L(0190), Floor Live 1.00 J ) ' Comm In I - Uniform (PSF) 0 to 19'7" 16" 12.0 40.0 Residential - Living Areas 2 - Point (lb) 5. N/A 64 1 3 - Point (lb) 91 N/A 64 160 4 - Point (lb) 14' N/A 64 122 5 - Point (lb) 0 NIA 573 846 ye Weyerhaeuser warrants that the sizing of Its products will be In accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Refer to current Weyerhaeuser literature for Installation details. (www.woDdbywy.com) Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Use of this software Is not Intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer Is responsible to assure that this calculation Is compatible with the overall project. Products manufactured at Weyerhaeuser facilities are third -party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested In accordance with applicable ASTM standards. For current code evaluation reports refer to http://www.woodbywy.com/servjcp-s/s�-CodeReports.aspx. The product application, input design loads, dimensions and support information have been provided by Forte Software Operator 1M, System : Floor Member Type : Joist Building Use : Residential Building Code : IBC 201S Design Methodology: &SD 0 SUSTAINABLE FORESTR`( INITIATIVE Forte Software Operator 3/31/2017 11:27:43 AM Forte v5.2, Design Engine: V6.6.0.14 Thuesen-510 8th Ave N.4te Page I of I Job Notes Michael Leachman P.E. Design Build Services (360) 793-9659 MLeachman@dbsmonroe.com 0 mA 1c�d: Member Reaction (lbs) 1361 @ 2 1/2" 2267 (2.25") Passed (60%) 1.00 1.0 D + 1.0 L (All Spans) Shear (lbs) 1348 @ 3 1/2" 3310 Passed (41%) 1.00 1.0 D + 1.0 L (All Spans) Moment (Ft-lbs) 5137 @ 79 1/16" 7590 Passed (68%) 1.00 1.0 D + 1.0 L (All Spans) Live Load Defl. (in) 0,267 @ 7- 8 1/8" 0.379 Passed (L/682) 1.0 D + 1.0 L (All Spans) Total Load Defl. (in) 0.331 @ 77 7/8" 0.758 Passed (L/SSO) 1.0 D + 1.0 L (All Spans) TJ-ProT" Rating 58 40 1passed Deflection criteria: LL (1/480) and TL (1.1240). Top Edge Bracing (Lu)- Top compression edge must be braced at 4'6" o1c unless detailed otherwise. Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 151 S" o/c unless detailed otherwise. A structural analysis of the deck has not been performed. Deflection analysis is based on composite action with a single layer of 23/32" Weyerhaeuser Edge'" Panel (24" Span Rating) that Is glued and nailed down. Additional considerations for the TJ-Prol" Rating Include: None 0 Its PO Beadrid Lehith' wr "s- _.Loa s to SU00 Acoiissorfes pba:, . ,Ava,1,1,ab1,e equ"d.., Ive' Total I - Stud wall - SPF 3.50" 2.25" 1.75"- 287 1081 1368 11/4" Rim Board 2 - Stud wall - SPF 3.50" 2.25" 1.75" 195 798 993 11/4" Rim Board - Rim Board Is assumed to carry all loads applied directly above It, bypassing the member being designed. Locad on (Side, ead Floor Live. !Porrimpa I -Uniform (PSF) 0 to 15' 7" 16" 12.0 40.0 Residential - Living Areas 2 - Tapered (PLF) 6- to 8- 6" NIA 27.0 to 27.0 84.0 to 84.0 3 - Point (lb) V N/A - 25 4 - Point (lb) 8-6- N/A 17 350 aeuser Nq'te; s--- Weyerh . . . . ........ Weyerhaeuser warrants that the sizing of Its products will be In accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Refer to current Weyerhaeuser literature for Installation details. (www.woodbywy.com) Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Use of this software Is not Intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer Is responsible to assure that this calculation Is compatible with the overall project. Products manufactured at Weyerhaeuser facilities are thlrd-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by 1CC ES under technical reports ESR-1 153 and ESR-1387 and/or tested In accordance with applicable ASTIVI standards. For current code evaluation reports refer to http://www.woodbywy.com/seMces/s�-CadeReports.aspx, The product application, input design loads, dimensions and support information have been provided by Forte Software Operator 1 WfID System : Floor Member Type : Joist Building Use : Residential' Building Gode : IBC 2015 Design Methodology : ASD SUSTAINABLE FORESTRY INITIATIVE Forte Software Operator 3/31/2017 10:50:42 AM Forte v5.2, Design Engine: V6.6.0.14 Thuesen-510 8th Ave N. 4te Page 1 of I Job Notes Michael Leachman P.E. Design Build Semces (360) 793-9659 MLeachman@dbsmonroe.com �r�FO R T E` MEMBER REPORT Level, b I I 2 piece(s) 117/8" TJI@ 210 @ 16" OC 0 0 Overall Length: 19'7" 77,77 F, 17' All locations are measured from the outside face of left support (or left cantilever end).All dimensions are hor1writal. 0 Design Result� �_:Actpal @ Location AlldweA_-- -I Rdsult., 11) Member Reaction (lbs) 1019 @ 2 1/2" 2267 (2.25") Passed (45%) 1.00 1.0 D + 1.0 L (Alt Spans) Shear (lbs) 1116 @ 173 1/2" 3641 Passed (31%) 1.00 1.0 D + 1.0 L (All Spans) Moment (Ft-lbs) 5781 @ 8' 7590 Passed (76%) 1.00 1.0 D + 1.0 L (Alt Spans) Live Load Defl. (In) 0.355 @ 8' 10 3/8" 0.431 Passed (L/582) 1.0 D + 1.0 L (Alt Spans) Total Load Defl, (In) -0. 150 @ 19' 7" 0.215 Passed (2L/344) LO D + 1.0 L (Alt Spans) TJ-Prol- Rating 53 40 Pas ed Deflection criteria: LL (L/480) and TL (L/240). Overhang deflection criteria: LL (2L/480) and TIL (21.1240). Top Edge Bracing (Lu): Top compression edge must be braced at 4'3" o1c unless detailed otherwise. Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 8' 8" o/c unless detailed otherwise. A structural analysis of the deck has not been performed. Deflection analysis is based on composite action with a single layer of 23/32" Weyerhaeuser Edge- Panel (24" Span Rating) that Is glued and nailed down. Additional considerations for the T3-Pro" Rating Include: None S _061ft Load Q :Acce s .1 e!, 0 riles Total Re4 d Dei Snow I I - Stud wall - SPF 3.SO" 2.25" 1.75" 229 7981-2 -29 1027/-31 1 1/4" Rim Board 2 - Stud wall - SPF 3.50" 3.50" 3.50'__ 486 994 270 Blocking RIM Board is assumed to carry all loads applied directly above It, bypassing the member being designed. Blocking Panels are assumed to carry no loads applied directly above them and the full load Is applied to the member being designed. Loads. . . L�calll on,(Side) ' ead-'­ M'9 V., 6, gar. vei.. (Loo 4 t now,-' -Uniform (PS F) 0 to 19'7' 16" 12.0 40.0 Residential - Uving Areas 2 - Point (lb) 81 N/A 157 470 3- Point (lb) 13' N/A 88 270 4 - Point (lb) 19, V, N/A 157 241 Weyerhaeuger'Notok. Weyerhaeuser warrants that the sizing of Its products will be In accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Refer to current Weyerhaeuser literature for installation delalls. (www.woodbywy.com) Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Use of this software is not Intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer Is responsible to assure that this calculation is compatible with the overall project. Products manufactured at Weyerhaeuser facilities are third -party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-11.53 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports refer to http://www.woodbywy.comlservicW!�-CodeReports,aspx. The product application, input design loads, dimensions and support Information have been provided by Forte Software Operator I 1 3"Iff ED System : Floor Member Type : Joist Building Use : Residential Building Code : IBC 2015 Design Methodology: ASO SUSTAINABLE FORESTRY INITIATIVE I Forte Software Operator I Job Notes I Michael Leachman P.E. Design Build Services (360) 793-9659 MLeachman@dbsmonrce.com 3/31/2017 10:59:35 AM Forte v5.2, Design Engine: V13.6.0.14 Thuesen-510 8th Atee N.4te Page I of 1 V*� COMPANY Design Build Servires, Inc. PROJECT 510 81h Ave N- Lot 2 28119 - 120th St. S.E, Monroe, WA 98272 510 81h Ave N Edmonds, WA 98020 WoodWorks' PH: 360-793-9559 Thuesen Custom Homes Mar. 31, 2017 11:29 1516B SOFTVVARf)'OR WOOD DESIGN Design Check Calculation Sheet WoodWorks Sizer 11.0 Loads: Load Type Distribution P t:t- rn Location ift) Start End 14a nitude 9 Start End unit l_cl29 Dead Point 0.05 699 lb: 2e129 s... Po i nt 0.05 949 lb 3_cl3 I Dead point 15.05 689 lb. 4_cl3B Snow Point 15.05 949 lbe 5j 11: Dead Partial UDL 0.05 5.05 46.6 46.6 plf 6 I Li '. Partial UDL 0.05 S.D5 240.0 240.0 plf _jl 7 - J120 Dead Partial UDL 5.05 11.05 46.6 46.6 plf 8 J120 Live Partial UDL 5.05 11.05 240.0 240.0 plf - 9- 1 121 Dead Partial UDL 11.05 is.05 46.6 46.6 plf 10j 121 a L!' Partial UDL 11.05 15.05 240-0 240.0 plE Self- .eight ad Full UL 0.5 Plf I Maximum Reactions (lbs) and Bearing Lengths (in) : itoft UnEactored: D. ad 2102 11�:2 Live 1800 le 0 a... P.­d: 141 949 Total Be r . ; 3164 3164 Mg'1? 1.28 - 1.2: req'd .28 1.2 reaction on at feast aria suppon is from a different load GUMbInation than [lie critical one for bearing design, shown here, due to Cd factor. See Analysis results for reaction from critical load combination. b1 6a Glulaint-Unbal., West Species, 24F-V4 DF, 3412"xiO.1/2" 7 laminations, 34W maAmum width, Supports. All - Timber-soff Column, D.Fir-L No.2 Total length: 1V-1.3*; volume= 3.9cu.ft.; Lateral support: top= full, bottom= at supports; Analysis vs. Allowable Stress and Deflection using Nos 2016: C,rit trio' i An� - Value Des gn Value Unit e An'! M she- - 79 265 - psi H37LIv ;"9!.!3B Bending f+j fb 1548 Fb' - 2400 psi fb/Fb- = 0.65 Dead Bell 'n 0.10 �L/999 Live D.fl,. 0.45 L/400 0.50 = L/360 in 0.90 otal Defl-n 0.60 L/297 0.75 - L/240 in 0.81 Additional Data: FACTORS: F/ E (psi)CD CM Ct CL CV cfu C. Cfzt Note, Cn-Cvr LC# F�, 265 1 00 1.00 1 00 - - - 1. 00 , .00 1.00 2 It' 2400 1:00 1 00 1:00 1.000 1.000 1 00 1 00 1 00 1 00 - 2 F P� 650 1:00 1 . 00 - - 1:00 E ' 1.8 mill ion I . 00 1. 0 0 1.00 2 E.iny' 0 .0 5 million 1.00 1.00 1.00 2 I( CRIT CAL LOAD COMBINATIONS: Shear t LC #2 D+L, V max - 2213, V design 1939 Its Bending(+): LC 12 D+L, M - 8290 lbs-ft Be f lectio- LC #2 D+L (live) LC #2 D+L (total) D=dead -It- S=snow f7-ind I=ipact Lr L-concentrated E=earthquake live A, 1 ted , , ,t;roof 1 LC re is . the Analys ut Load ­sbin.ti ... ASCE 7-10 / IBC 2015 CALCULATIONS: Defl eeti": El - 608e06 lb-in2 "Live - defleCtion Deflection from all non -dead loads (live, wind, sa-) Total Deflection 1.50(Dead Load Deflection) + Live Load Deflection. Design Notes: 1. WoodWorks analysis and design are In accordance with the ICC International Building Code QBC 2015), the National Design Specification INDS 2015), and NDS Design Supplement, 2. Please verify that 'he default deflection limits are appropriate foryour application. 3. Glulam design values are for materials conforming to ANSI 117-2010 and manufactured In acrordaAcowith ANSI A190.1-2DO7 t 4. GLULAM: bxd = actual tweadth x actual depth. S. Glularn Beams shah be laterally supported according to the provisions of NDS Clause 3.3.3. 6. GLULAM: beafing length based on smaller of Fcp(tension), Fcp(comft). V COMPANY Design Build Services, PROJECT 610 8th Ave N - Lot 2 28119 - 120th St. S.E. 510 8th Ave N WoodWorkso Monroe, WA 98272 Edmonds. WA 98020 PH: 360-793-9659 Thue an Custom Homes Man 31, 2017 11;31 b16b' SOFTWARE FOR WOOD DESIGN Design Check Calculation Sheet WoodWorks Sizer 11.0 Loads: Load Type Distribution P t- t:rn Location (ft) Start End Magnitude start End Unit T779 I Dead Partial UDL 110 0 02 14.02 21.6 21.6 PIE 2 - .91 Live Partial UDL Yes 0:02 14.02 1 20.0 1 20.0 PIE 3 122 Dead partial UDL 11. 14.02 18.02 80.0 80.0 plf 4: i 122 Live Partial UDL Yes 14.02 18.02 360.0 360.0 plf Self -weight D e&d Full UDL 110 8.5 plf Maximum Reactions (lbs) and Bearing Lengths (in) : 18'-0.3" Unf n:ctored: ad 160 615 Live Fact red: 840 - 2486 Uplift 46 T,t11 Ite:ringt 10DO - 3101 L ngth 0.50: 1.10 Min req 'd 0.50 1.10-- i�a ';u-1'r'e-d Ztth of the supporting member. Maximum medion on at least one Support is from a different load combination than the critical one (or hearing design, shown hem, due to Cd factor, See Analysis mulls for reaction from critical load combination. b16b Glularn-Untial., West Species, 24F.V4 DF, 3-1112N10-1/2" 7 laminations, 34/2* maximum width, Supports: All ' Timber -soft Column, D.Fir-L No.2 Total length: 18'43% volume = 4.6 cu.ft.; Lateral support: top= full, bottom= at supports: Analysis vs. Allowable Stress and Deflection using NDS 2016: _Criterion �.lu. L Design Value Unit An&! WIDelln S Tear f; 58 Fv: 265 P..i V �v �2 B n i g(+) fb 621 Fb 2400 P i fb/Fb' 0.26 d ng(-) fb - 669 Fb' 1788 psi fb/Fb' 0.37 Deflection: 0.02 <L/999 ,n to rior Dead Li V. 0:17 L/98 4 0.47 L/360 in 0,37 Total 0 20 L/8419 0.70 L/240 in 0.28 Cantil. Dead 0.01 �16/999 Live ' I' /2 L " ':27 L ii'. 0 70 Total :1 , 0 .0 L1245 D Ll�':O� 0 49 Additional Data: FACTORSt F/E(p.i)CD CH Ct CL Cv Cfu Cr Cfrt Notes Cn'Cvr LC# FV' 265 1.00 1.00 1.00 - - - - 1.00 1.00 1.01) 2 Eb:+ 2400 1 '.coo .Do , Do '.00 1.00 - ".D.0 3 0,.,906,6 000 1.00 1:00 1.00 1.00 Fb leso 1:'000 :O..o 1. 1:00 2 650 - 1 00 - P I I - E' 1.8 million 1.00 1.00 1:00 3 Eminy, 0.85 million 1.00 1.00 1.00 3 If CRIT CAL LOAD COMBINATIONS - Shear LC #2 D+L, V max = 1794, V design 1428 lbs BendinV+:; LC #3 D+L (pattern: L I, M = 3331 lbs-ft - sending _ : LC 42 D+L, H = 3568 lb-ft Deflection; LC #3 (live) LC #3 (total) D=d.ad L=IiVe S=shov 11-Ind 1-impact L-roof live L-concentrated E-earthquake All LC's are listed in the Analysis output Load Patternst s-5/2, X-L+S or L+Lr, _-no pattern load in this span Load combinations, ASCE 7-10 " 18C 2015 CALCULATIONS: �eflecti­ El - 608.06 lb-i.2 ,ive' deflection = Deflection from all non -dead loads (live, wind, snow-) Total Deflection - 1.50(Dead Load Deflection) + Live Load Deflection. Lateral stability(-): Lu = 14' Le = 22-9.44" RE - 15.3; LU based on full span Design Notes: I WoodWorks an :Iysis and design ate In accordance with the ICC international Building Code QBC 2015), the National Design Specification (NDS 2015). and Nos Design Supplement. 2 Please verify th t the default deflection limits are appropriate for your application. 3 Glularn design values am for materials conforming to ANSI 117-2010 and manufactured in accordance With ANSI At 90.1-2007 4 Grades with equal bending capacity In the, top and bottom edges of the beam cross-section am recommended for Continuous beams. 5. GLULAM; bxd = actual breadth x actual depth. 6. Glularn Beams shall be laterally supported according to the provisions of Nos Clause 3.3.3. 7. GLULAM: hearing length based on smaller of Fcp(tension), Fcp(mmp*n). 8. The crilical deflection value has been determined using maximum back -span deflection. Cantilever deflections do not govern design. V/ F 0 R T E` MEMBER REPORT Level, bl9b 2 piece(s) 117/8" TJI@ 210 @ 16" OC Overall Length: 21'7" ED .... .. . ... 4- 2' All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal. 191 ,Design It6sull Actua R.esulll� ILDIF - _Load_:_b_*0fnAion 0*0467 Member Reaction Qbs) 1826 @ 19' 5 I/V 4290 (3.50") Passed (43%) 1.00 1.0 D + 1.0 L (All Spans) Shear (lbs) 1044 @ 19' 7" 3310 Passed (32%) 1.00 1.0 D + 1.0 L (All Spans) Moment (Ft-lbs) -2826 @ V 2 13/16- 7590 Passed (37%) 1.00 1.0 D + 1.0 L (Alt Spans) live Load Defl. (in) 0.251 @ 9'9 7/8-1 0.481 Passed (L/919) 1.0 D + LO L (Alt Spans) Total Load Defl. (In) -0.071 @ 21'7" 0.215 Passed (2L/730) 1.0 D + 1.0 L (Alt Spans) In -pro- Rating 49 40 111passed Deflection criteria: U. (1.1480) and 71 (1.1240). Overhang deflection criteria: U. (21.1481)) and TL (2L/240). Top Edge Bracing (Lu), Top compression edge must be braced at 6'3" o/c unless detailed otherwise. Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 7' 5" o/c unless detailed otherwise. A structural analysis of the deck has not been performed. Deflection analysis Is based on composite action with a single layer of 23/32" Weyerhaeuser Edge" Panel (24" Span Rating) that Is glued and nailed down. Additional considerations for the T3-ProTN Rating Include- None 't Aboessorl lei: otil Ai4allab 4a� Floor T 1 - Stud wall - SPF 3.50" 2.2S" 1.75" 117 524/-59 641/-59 11/4" Rim Board 2 - Stud wall - SPF 3.50" 3.SO" 3.50" 590 1236 1826 Blocking Rim Board is assumed to carry all loads applied directly above it, bypassing the member being designed. Blocking Panels are assumed to carry no loads applied directly above them and the full load is applied to the member being designed. lead, 0iodr 11yei 4061d' _5- 141;460 id On .. 0�00Y. 9 I - Uniform (PSF) 0 to 21'7' 16" 12.0 40.0 Residential - Living Areas 2 - Point (lb) 21'6" N/A 361 544 Weyerhaeuser warrants that the sizing of Its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Refer to current Weyerhaeuser literature for installation details. (www.woodbywy.com) Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Use of this software Is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer Is responsible to assure that this calculation Is compatible with the overall project. Products manufactured at Weyerhaeuser facilities are third -party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested In accordance with applicable ASTM standards. For current code evaluation reports refer to httP://www.woc-dbywy.com/servicesls-CodeReports.aspx. The product application, Input design loads, dimensions and support Information have been provided by Forte Software Operator 1 &W D System : Floor Member Type: Joist Building Use : Residential Building Code: IBC 2015 Deslgn Methodology : ASD SUSTAINABLE FORESTRY INITIAOTIVE Forte Software Operator I Job Notes I Michas Leachman P.E. I I Design Build Services (360) 793-9659 MLeachman@dbsmonroe.com 3/31/2017 11:13:05 AM Forte v5.2, Design Engine: V6.6.0.14 Thuesen-510 8th Ave N.4te Page 1 of 1 V F 0 R T E MEMBER REPORT Level, b20 2 piece(s) 117/8" T31@ 210 @ 16" OC 0 Overall Length: 19'7" ......... . .... .... ...... . 17' 2' All locations are measured from the outside face of left support (or left cantilever end),All dimensions are horizontal. 0 SU sign -Re ts�' A#U4.0 1:1 1, - 10 . W� 6 lk !tz'� -;1z' '-"W. 4- Member Reaction (lbs) 2083 @ 17' 5 1/4" 4290 (3.50") Passed (49%) 1.00 1.0 D + 1.0 L (All Spans) Shear (lbs) 1478 @ 15' 3310 Passed (45%) 1.00 1.0 D + 1.0 L (All Spans) Moment (R-lbs) 4142 @ 11' 111/16" 7S90 Passed (55%) 1.00 1.0 D + 1.0 L (Alt Spans) Uve Load Defl. (in) 0.255 @ 9- 2 13/16" 0.431 Passid (1.1810) -- 1.0 D + 1.0 L (Alt Spans) Total Load Defl. (In) - .140 @ 19' 7" 0.215 Passed (2L/366) 1.0 D + 1.0 L (Alt Spans) TJ-Pro- Pating 53 40 IPassed iienecuon cnieria: LL (L/qt%u) aria I L (L/241)). Overhang deflection criteria: LL (2L/480) and TL (2L/240). Top Edge Bracing (W)* Top compression edge must be braced at 5' 1" o/c unless detailed otherwise. BottDm Edge Bracing (Lu): Bottom compression edge must be braced at 8' 8" o/c unless detailed otherwise. A structural analysis of the deck has riot been performed. Deflection analysis Is based on composite action with a single layer of 23/32" Weyerhaeuser Edge- Panel (24" Span Rating) that Is glued and nailed down. Additional considerations for the T'J-Pro" Rating Include: None 1 ., . 'j— -- , supports Bear h§ Le'n'jth 9 d .... 1 1--11 - - Oq' suppiorts sories ��Pc ­ LL Re4 Dea Floor ... Live Tota I - Stud wall - SPF 3.SO" 2.25" 1.75" 194 578/-33 772/-33 11/4" Rim Board 2 - Stud wall - SPF 3.50" 3.50" 3.50" SS9 1S24 2083 Blocking Kim Hoara is assumea to carry all loads applied directly above it bypassing the member being designed. Blocking Panels are assumed to catty no loads applied directly above them and the full load Is applied to the member being designed. LoadS- Location (Side) I 'Spacirig Dwd: M§iil� Floor (1.061):'-. Co is inff"911, I - Uniform (PSF) 0 to 19' 7" 16" 12.0 40.0 Residential - Living 2 - Point (lb) is, N/A 414 758 —reas 3 - Point (lb) IT 6" N/A 26 261 We yerhaeuser Notes:.--�,, .... ..... . . Weyerhaeuser warrants that thesizing of Its products will be In accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Refer to current Weyerhaeuser literature for Installation details. (www.woodbywy.com) Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Use of this software is not Intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer Is responsible to assure that this calculation is compatible with the overall project. Products manufactured at Weyerhaeuser facilities are thlrd-party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports refer to http://www.woodbywy.com/servicesl!�-CodeReports.aspx. The product application, input design loads, dimensions and support Information have been provided by Forte Software Operator 11M, System : Floor MemberType : Joist Building Use : Residential Building Code ; IBC 2015 Design Methodology : ASI) 0 SUSTAINABLE FORESTRY INITIATIVE FA Forte Software Operator I Job Notes I Michael Leachman P.E. Design Build Services (360) 793-9659 MLeachman@dbsmonroe.com 3131/2017 11:07:22 AM Forte v5.2, Design Engine: V6.6.0.14 Thuesen-510 8th Ave N. 4te Page I of 1 F 0 R T E ` MEMBER REPORT Level, b27 1 piece(s) 117/8" T3I@ 210 @ 16" OC 0 Overall Length: 7'7" k 7- 0 2' All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal. 0 "A� f Upi Ica i6", in mikipunr(PattAlm Me ber Reaction (lbs) 1778 @ 2' 13/4" 2145 (3.50") Passed (83%) 1.00 1.0 D + 1.0 L (All Spans) Shear (lbs) 799 @ 2' 1655 Passed (48%) 1.00 1.0 D + 1.0 L (All Spans) Moment (Ft-lbs) -1576 @ 2' 13/4" 3795 Passed (42%) 1.00 1.0 D + 1.0 L (All Spans) Uve Load Defl. (in) 0.041 @ 0 0.200 Passed (2U999+) 1.0 D + 1.0 L (Alt Spans) Total Load Defl, (in) 0.062 @ 0 0.215 Passed (2L/836) 0 D + 1.0 L (Alt Spans) TI-Pror- Rating 71 40. Passed uenection Criteria: LL (L/qM) ana TL (L/Z4U). Overhang deflection criteria: LL (0.2) and TL (2V240). Top Edge Bracing (Lu); Top compression edge must be braced at 7' 6" o/c unless detailed otherwise. Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 5' 11" o/c unless detailed otherwise. A structural analysis of the deck has not been performed. Deflection analysis Is based on composite action with a single layer of 23/32" Weyerhaeuser Edge" Panel (24" Span Rating) that Is glued and nailed down. Additional considerations for the TJ-Pro" Rating Include: None Supp orts 136ari ng Lengith J -Loads to Supocirts qps kcMiso-ries: - .. . Total Availa Riiqvi . ired Dead F1 I! 'ra 0 pliv L TO, 1 - Stud wall - SPF 3.50" 3.50" 3.50" 1741 1208 1 1710 4659 Blocking, Squash Blocks 2 - Stud wall - SPF 3.50" 2.25" 1.75" 59 599/-174 11/4" Rim Board Rim Board Is assumed to Carry all loads applied directly above lt� bypassing the member being designed. Squash Blocks are assumed to carry all loads applied directly above them, bypassing the member being designed, Blocking Panels are assumed to carry no loads applied directly above them and the full load is applied to the member being designed. Ldaids" .1 1 .. - t '-d Deal Floor Live I -Uniform (PSF) 0 to P 7" 16' 12.0 40.0 ResidenUal - Living Areas 2 - Point (lb) 0 N/A 260 400 3 - Point (lb) 2' 1 13116" N/A 1171 - 1710 4 - Uniform (PLF) 1 2' 113/16- to 7' r' N/A 46.0 140.0 h aeusti Notest Weyerhaeuser warrants that the sizing of its products will be In accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warrandes related to the software. Refer to current Weyerhaeuser literature for installation details. (www,woodbywy.com) Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Use of this software Is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer Is responsible to assure that this calculation Is compatible with the overall project. Products manufactured at Weyerhaeuser facilities are third -party Certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESP-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports refer to http://www.woodbywy.com/services/i�--CodeReport.aspx. The product application, Input design loads, dimensions and support Information have been provided by Forte Software Operator 1 V IM D System : Floor Member Type : Joist Building Use : Residendal Building Code : IBC 2015 Design Methodology : ASD SUSTAINABLE FORESTRY INITIATIVE Forte Software Operator I Job Notes I Michael Leachman P.E. Design Build SerAces (360) 793-9659 MLeachman@dbsmonroe.com 3/31/2017 12:09:58 PM Forte v5.2, Design Engine: V6.6.0.14 Thuesen-510 8th Ave TV.4te Page 1 of 1 / COMPANY PROJECT Design Build Services, Inc. 510 8th Ave N - Lot 2 28119 - 120th St. S.E. 510 8th Ave N Monroe, WA 98272 Edmonds, WA 98020 WoodWorks' PH: 360-793-9659 Thuesen Custom Homes SOFIRVAREFOR WOOD DESIGN Mar. 31, 2017 09:22 b28 Design Check Calculation Sheet WoodWorks Sizer 11.0 Loads: Load Type - - - Distribution Pat- tern Location [ft] Start End- magnitude Stazt End Unit I J42 5ead Trapezoidal 14.52 16.02 --f2-.541.2 plf 2 J42 Snow Trapezoidal 14.52 16.02 84.0 66.7 plf 3_j43 Dead Partial UDL 1.52 14.52 52.5 52.5 plf 4_j43 Snow Partial UDL 1.52 14.52 84.0 84.0 plf 5_j44 Dead Trapezoidal 0.02 1.52 41.2 52.5 plf i5j44 Snow Trapezoidal 0.02 1.52 66.7 84.0 plf Self -weight Wead Full UDL 9.4 plf Maximum Reactions (lbs) and Bearing Lengths (in) : 19-051, Unfactored: Dead 486 486 Snow Factored: 659 - 659 Total Bearing: 1146 - 1146 Length 0.52 0.52 in reqld 0.52 0.52 b28 Lumber -soft, D.Fir-L, No.2,4xl2 (3-1/2"x11-114") Supports: All - Timber -soft Column, D.Fir-L No.2 Total length: W-0.6% volume = 4.4 cu.ft.; Lateral support: top= full, bottom= at supports; Analysis vs. Allowable Stress and Deflection using NDS 2015: Criterion Analysis Value DesjgLi Y�lue Unit Anajy2j,� esig,,,_,_ Shear fV = 39 Fv, = 201 psi = g fvj,v4E Bending(+) Z = 157 Fb1 = 1138 psi fb/Fb1 = 0.66 Dead Defl1n 0.14 = .L/999 Live Defl'n D.19 - <L/999 0.53 = L/360 in 0.35 Total Defltn 0.39 = L/490 0.80 = L/240 in 0.49 Additional Data: FACTORS: F/E(psi)CD CM Ct CL CF Cfu Cr Cfrt Ci Cn LC# Fv:, 180 1.15 1.00 1.00 - - - - 1.00 1.00 1.00 2 Fb 900 1.15 1.00 1.00 1.000 1.100 1.00 1.00 1.00 1.00 - 2 Fcpl 625 - 1.00 1.00 - - - - 1.00 1.00 - - E' 1.6 million 1.00 1.00 - - - - 1.00 1.00 - 2 Emin' 0.50 million 1.00 1.00 - - - - 1.00 1.00 - 2 CRITICAL LOAD COMBINATIONS: Shear : LC 02 = D+S, V max = 1146, V design = 1024 lbs Bending(+)-. LC #2 = D+S, M - 4657 lbs-ft Deflection: LC 02 = D+S (live) LC #2 = D+S (total) D=dead L=li've S=snow 111-=wind 1=impact Lr=roof live Lc=concentrated E=earthquake All LCIs are listed in the Analysis output Load combinations: ASCE 7-10 / IBC 2015 CALCULATIONS: �eflection- El 664eO6 lb-in2 Live" deflection = Deflection from all non -dead loads (live, wind, snow-) Total Deflection = 1.50(Dead Load Deflection) + Live Load Deflection. Design Notes: 1. WoodWorks analysis and design are in accordance with the ICC International Building Code (IBC 2015). the National Design Specification (NDS 2015), and NDS Design Supplement. 2. Please verify that the default deflection limits are appropriate for your application. 3. Sawn lumber bending members shall be laterally supported according to the provisions of NDS Clause 4.4.1. V" COMPANY Design Build Services, Inc. PROJECT 5106thAv N-Lot2 28110-120111SLSZ. 610 8111 Av: N WoodWorks' Monroe, WA 98272 Edmonds, WA 98020 PH: 360-793-9659 Thuesen Custom Homes Mar. 31, 2017 09:20 b3O SOFMAREFOR WOOD DESIGN Design Check Calculation Sheet WoodWorks Sitar 11.0 I Loads: Load Type Distribution P t:t- .n Loc' tion Ift) start End Maritude S t zt End Unit TJ49 Trapezoidal 1 11 5 '0 70.6 138.2 Rif 2J49 Saw Trapezoidal 4 55 11 2 (16*3 187.5 plf 3J50 Dead Trapezoidal 11:05 17*5'55 1 38.2 70.6 plf 4_j50 S... Trapezoidal 11.05 17.55 187.5 106.3 plf 5J51 Dead Partial UDL 4.55 17.55 102.4 102.4 plf 6j5l Saw Partial UDL 4.55 17.55 150.0 150.0 plf 7��. b37 Dead Point 4.55 2 lb. 8_b37 Snam Point 4,55 231 lb. 9_bltl Dead Point 4.55 222 lb. 10_b3l Snow Point 4.55 552 lb. 11�1,32 Dead point 17.55 220 lbs 12_1,32 Snow Point 17.55 321 lba 13 1,33 Dead Pat. t 17.55 120 lbs 141_b33 Snon,r point 17.55 191 lba Self-ight, -Dead lFull UDL 20.9 Maximum Reactions (lbs) and Bearing Lengths (in): 22'-1.2' Unf t zed: D:ad 1823 Sno. Factored: 2656 215h; S.Total .zing 4480 1313 Length 1.25 1 l.23 Min eq'd 1.25 1 2� 1: b30 Glulam-Unbal., West Species, 24F-V4 DF, 5.1/2"x16-1/2" I I laminations, 5-11W ma)dmum width, Supports: All ' TImber-soft Column, D.Fir-L No.2 Total length: 2Z-1.2"; volume = 13.9 cu.A.; Lateral support: top= full, bottom= at supports; I Analysis vs. Allowable Stress and Deflection using NDS 2016: C.itizi.. Ana si3 Value Design Value Unit Ana Sh.. f�� ' q psi f WE V7FVN"1'n1.1 .ending fb 15 0 7 Fb: = 2360425 psi fb/Fb' = 0.57 .ad D.fl'n 0.30 L/868 Live, D f :nn 0.42 L 626 0.73 = L/360 in 0.57 ota D:f11 0 .88 L//300 1.10 - L/240 in 0.80 Additional Data: FACTORS: F/E(psi)C CM Ct CL CV Cfu Cr Cfrt Notes C.-Cv, LCO Fv' 265 1 .15 1.00 1.00 - - - - 1.00 1.00 1�00 2 Fb 2400 1 15 1 00 1.00 1.000 0.957 1.00 1.00 1.00 1.00 - 2 r 650 1 : I - 00 - - - - 1.00 - - '7 1. 8 million 1.0000 1.00 1.00 2 Erairty, 0.85 million 1.00 1.00 1.00 2 I( CRIT CAL LOAD COMBINATIONS: Shear LC #2 D+S, V max - 4480, V design 4450 lbs Bending(+): LC #2 D+S, M = 31348 lbs-ft Do f laction: LC #2 D+S (li�) LC 02 D+S (total) D=dead,�-live S-s- W-wind 1=impact Lr=roof live L-concentrated E-sarthquake Al I a in the Analysis output Load�oTrbinmatlonsae:dASCE 1-10 / IBC 2015 CALCULATIONS: Deflection: ZI - 3706.06 lb-i.2 -Live" de flection - Deflection from all non -dead loads (live, wind, sna-1 Total Deflection = 1.50(Dead Load Deflection) + Live Load Deflection. Design Notes. I WoodWorks analysis and design ore in accordance Mth the ICC International Building Code (IBC 2015), the National Design Specification (NDS 2015), and NOS Design Supplement. 2 Please verify that the default deflection limits are appropriate for your application. 3 Glularn design values are for materials conforming to ANSI 117-2010 and manufactured in accordance with ANSI A19DA-2007 4. GLULAM: bxd = actual breadth x actual depth. 5 . Glularn Beams shall be laterally supported according to the provisions of NOS Clause 3.3.3. 6. GLULAM: bearing length based on smaller of Fcp(tonsion), Fcp(compn). COMPANY Design Build Services, Inc. 2811119 - 120th St. S.E. PROJECT 510 Bth Ave N - Lot 2 510 8th Ave N WoodWorks' Monroe, WA 98272 Edmonds, WA 98020 PH: 360-793-9659 Thuesen Custom Homes SOMVAREFOR WOOD DESIGN Mar. 31, 2017 09:31 b3lb Design Check Calculation Sheet WoodWorks Sizer 11.0 Loads: Load Type Distribution Pat- tern Location (ft] Start End Magnitude Start End Unit 1_]39 Dead Full UDL 33.4 plf 2_j39 Snow Full UDL 53.5 plf 3 b36 Dead Point 12.04 102 lbs 4 b36 Snow Point 12.04 158 lbs 5_b37 Dead Point 0.04 2 lbs 6 b37 Snow Point 0.04 231 lbs Coad7 Dead Full UDL 12.0 plf Load Live Full UDL 90.0 plf Se lf!,.,.ig,t Dead Full UDL 5.7 plf Maximum Reactions (lbs) and Bearing Lengths (in): 117-0.9" Unfactored: ,lead 310 411 Live 483 483 Snow Factored* 553 4e3 Tot. 1 Bearing- 1088 - - 113:3 Length 0.90 - 0.93 in req'd 0.90, 1 0. 93j b3l b Lumber in -ply, Hem -Fir, No.2,2x10, 2-ply (Y'xS-114") Supports: All - Lumber -soft Beam, D.Fir-L No.2 Floorjoist spaced at 16.0" c/c; Total length: 17-0.9"', volume = 2.3 cu.fL; Lateral support: top= full, bottom= at supports; Repetitive factor. applied where permitted (refer to online help): Analysis vs. Allowable Stress and Deflection using Nos 2016: Criterion - Value Design Value Unit Analysis/Design fv = 37 Fv1 = 150 - psi fv/Fv' - 0.25 Be,d tA1.1alysis fb = 764 FbI = 1237 psi fb/Fb' = 0.62 Dead Defl1n 0.09 = <L/999 Live Defl1n 0.18 = L/793 0.40 = L/360 in 0.45 Total Defln 0.32 = L/448 0.60 = L/240 I in 0.53 Additional Data: FACTORS: F/E(psi)CD CM Ct CL CF Cfu Cr Cfrt Ci Cn LC# F'V:+ 150 1.00 1.00 1.00 - - - - 1.00 1.00 1.00 2 Fb 850 1.15 1.00 1.00 1.000 1.100 1.00 1.15 1.00 1.00 - 3 Fcp' 405 - 1.00 1.00 - - - - 1.00 1.00 - - E' 1.3 million 1.00 1.00 - - - - 1.00 1.00 - 3 Emin' 0.47 million 1.00 1.00 - - - - 1.00 1.00 - 3 CRITICAL LOAD COMBINATIONS: Shear . LC #2 = D+L, V max = 787, V design = 681 lbs B nding(+): LC 63 = D+.75(L+S), M = 2723 lbs-ft Deflection: LC #3 = D+.75(L+S) (live) LC 43 = D+.75(L+S) itotal) D dead L=live S=snow W=wind I=impact Lr=roof live Lc=concentrated E=earthquake A:l LC's are listed in the Analysis output Load combinations: ASCE 7-10 / IBC 2015 CALCULATIONS: �eflection: El 129eD6 lb-in2/ply Live" deflection = Deflection from all non -dead loads (live, wind, snow I Total Deflection = 1.50(Dead Load Deflection) + Live Load Deflection. Design Notes: 1. WoodWorks analysis and design are in accordance with the ICC International Building Code (IBC 2015). the National Design Specification (NDS 2015), and NOS Design Supplement. 2. Please verify that the default deflection limits are appropriate for your application. 3. Sawn lumber bending members shall be laterally supported according to the provisions of NDS Clause 4.4. 1. I/ COMPANY U61 PROJECT WoodWorks Design Build Services, Inc. 28119 - 120th St. S. E. 510 8th Ave N - Lot 2 510 8th Ave N Monroe, WA 98272 Edmonds, WA 98020 SOMWRE FOR WOOD DESIGN PH: 360-793-9659 Mar. 31, 2017 09:34 Thuesen Custom Homes b33 Design Check Calculation Sheet WoodWorks Sizer 11.0 Fads: Lo Load _i:)_48_1Ye_a_d_P_ar_tia1 Type Distribution Pat- tern Location (ft) Start End Magnitude Start End Unit UDL 7.53 8.53 35.T_ 3-5.5 _�j -f 2_j4S Snow Partial UDL 7.53 8.53 56.3 56.3 plf 3_j52 Dead Partial UDL 4.53 7.53 28.1 28.1 plf 4_j52 Snow Partial UDL 4.53 7.53 45.1 45.1 plf 5_b34 Dead Point 4.53 55 lbs 6_b34 Snow Point 4.53 84 lbs Load7 Dead Full UDL 12.0 plf L11ad8 Live Full UDL 80.0 plf .Sel,_wei"t , Dead IFUII UDL 1 2.9 1pif I Maximum Reactions (lbs) and Bearing Lengths (in): V-6.9" Unfactored: 0 D ad ? 116 L Ive 343 186 Snow 83 343 Factored: - 193 Total 459 - .ear.ing: - 588 Length 0.76 - i Min req1d 1 0.761 0.97 7 b33 Lumber -soft, Hem -Fir, No.2,2x10 (11-112"xlil-11/4") Supports: 1 - Timber -soft Column, D. Fir-L No.2; 2 - Lumber -soft Beam, D.Fir-L No.2; Total length: 6-6.9"; volume = 0.8 cu.ft.: Lateral support: top= full, bottom= at supports; Analysis vs. Allowable Stress and Deflection using NDS 2015: Criterion -Th-ear An�l�sis If lue _ Design Value Unit Ana .9 1"7 fV 4� 9 FV1 -;;7 -150 psi _ Wpe-gigLi IV 0. 30 Bending(+) fb = 612 Fb' = 935 psi fb/-Fb' 0. S Dead DeflIn 0.03 = <L/999 = Live DeflIn 0.08 = <L/999 0.28 - L/360 in 0. 2 2 Total DeflIn 0.13 = L1772 0.42 = L/240 in �.31 Additional Data: FACTORS: F/E(psi)CD Cm cit CL CF Cfu Cr Cfrt Ci Cn LC# Fv1 ISO 1.00 1.00 1.00 - - - - 1.00 1.00 1.00 2 FbI, 850 1�00 1.00 1.00 1 . 000 1.100 1.00 1.00 1.00 1.00 - 2 Fcpl 405 - 1.00 1.00 - - - - 1.00 1.00 - - E, 1.3 million 1.00 1.00 - - - - 1.00 1.00 - 3 Emin' 0.47 million 1.00 1.00 - - - - 1.00 1.00 - 3 CRITICAL LOAD COMBINATIONS: Shear ' LC #2 = D+L, V max = 525, V design = 421 lbs Bending(+): LC #2 = D+L, 14 = 1091 lbs-ft Deflection: LC #3 = D+.75(L+S) (live) LC #3 = D+.75(L+S) (total) D--dead L=Iive S=snow W=wind I=impact Lr=roof live Lc=concentrated E"earthquake All LC's are Ii 5ted in the Analysis output Load combinations: ASCE 7-10 / IBC 2015 CALCULATIONS: Deflection: EI = 129eO6 lb-in2 "Live" deflection Deflection from all non -dead loads (live, wind, snow Total Deflection 1.50(Dead Load Deflection) + Live Load Deflection. Design Notes: 1. WoodWorks analysis and design are in accordance with the ICC International Building Code (IBC 2015), the National Design Specification (NDS 2015), and NDS Design Supplement. 2. Please verify that the default deflection limits are appropriate for your application. 3. Sawn lumber bending members shall be laterally supported according to the provisions of NDS Clause 4.4.1. F MEMBER REPORT Level, b42 ra-FORTE' 1 piece(s) 117/811 TJI@ 210 @ 16" OC 2 §MD Overall Length: 8'7" . ... .... T + bosign ftesults, Aci�ual 0 ii� n-- Allo Result,, LO �oanl 6� f 6 Pattia Member Reaction (lbs) 1339 @ 6' 5 1/4" 2467 (3.50") Passed (54%) 1.15 1.0 D + 0.75 L + 0.75 S (All Spans) Shear (I bs) 937 @ 6'7" 1903 Passed (49%) 1.15 1.0 D + 1.0 S (All Spans) Moment (Ft-lbs) -1903 @ 6' 5 1/4" 4364 Passed (44%)-- 1.15 1.0 D + 1.0 S (All Spans) Uve Load Defl. (in) 0,050 @ 8'7" 0.200 Passed (2U999+) 1.0 D + 1.0 S (All Spans) !Total Load Defl. (in) 0.083 @ 8' 7" 0.215 Passed QL/618) [1.0 D + 1.0 S (All Spans) I TI-Pro- Rating 69 40 Passed I __ WC1 I MUVI I Lfl LeH d; LL t 14 'MV) artO I L k L4 Z'W). Overhang deflection criteria: LL (0.2") and TL (2L/240). Top Edge Bracing (Lu): Top compression edge must be braced at S'6" o/c unless detailed otherwise. Bottom Edge Bracing (Lu): Bottom compression edge must be braced at S' 4" o/c unless detailed otherwise. -252 lbs uplift at support 11/4". Strapping or other restraint may be required. A structural analysis of the deck has not been performed. Deflection analysis Is based on composite action with a single layer of 23132" Weyerhaeuser Edge" Panel (24" Span Rating) that Is glued and nailed down. Additional considerations for the TI-Pro'" Rating Include: None Bearing' Leng Lo if a to �46qrft (Il L Accessories:f Total:. Re 'quirred I Pealq; � F, Snow. " 11 , _ Tobliz :.z- 1 - Stud wall - SPF 3.50" 2.25" __:,, 1.75" - -72 1771-14 -180 177/-266 11/4"RimBoard 2 - Stud wall - SPF 3.50" 3�50" 3.50" 571 300 724 1595 Blocking KI In ociaru is assumeri uo carry air toaas appneCl alreCtly above 1 � bypassing the member being designed. Blocking Panels are assumed to carr)rno loads applied directly above them and the full load is applied to the member being designed. D_ad_'�. P Floor Llve�� snow Lowis Location i e :Sparc ng 0.90 I - Uniform (PSF) 0 to 8'7" 16" 12.0 40.0 - Residential - Living Areas 2 - Point (lb) 8' 6" N/A 361 - 544 Note Weyerhaeuser warrants that the sizing of Its products will be In accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Refer to current Weyerhaeuser literature for Installation details. (www.woodbywy,com) Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Use of this software Is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer Is responsible to assure that this calculation Is compatible with the overall project. Products manufactured at Weyerhaeuser facilities are third -party certified to sustainable forestry standards, Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESP-1387 and/or tested in accordance with applicable ASTM standards. For current code evaluation reports refer to http://www.woodbywy.com/services/s�-GDdeReports.aspx. ,The product applicadon, Input design loads, dimensions and support Information have been provided by Forte Software Operator System : Floor Member Type : Joist Building Use : Residential Building code : IBC 2015 Design Methodology: Aso 7 1 SUSTAINABI.E FORESTRY 1141TIATIVE Forte Software Operator Job Notes Michael Leachman P.E. Design Build Services (360) 793-9659 MLeachman@dbsmonroe.com 3/3112017 11:41:52 AM Forte v5.2, Design Engine: V6.6.0.14 Thuesen-510 8th Ave IV.4te Page 1 of I I/ F 0 R T E �� MEMBER REPORT Level, b43 2 piece(s) 117/8" TJI@ 210 @ 16" OC This product failed due to an excessive uplift of -644 lbs at support located at 11/4". 0 Overall Length: 8'7" 5 6- N 9 All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal. 0 Design Results; Lotillii� n 7,:�:Alf"ed.' Resu t_-, I ILDIF - dom Member Reaction (lbs) 2869 6' 5 1/4" 4934 (3.50") Passed (58%) 1.15 1.09 + 1.0 S (All Spans) Shear (Ibs) 2120 @ 6' T' 3807 Passed (56%) 1.15 1.0 D + 1.0 S (All Spans) Moment (Ft-lbs) -4343 @ 6' 5 1/4" 8729 Passed (50%) 1.15 1.0 D + 1.0 S (All Spans) Live Load Defl. (in) 0.063 @ 8' 7" 0.200 Passed (2L/822) -- 1.0 D + 1.0 S (All Spans) Total Load Defl. (in) 0.101 @ 8'7" 0.215 Passed (2L/512) 1.0 D + 1.0 S (All Spans) TI-Pro" Rating 72 40�Qassecl Defection criteria: UL (L/480) and TL (L/240). Overhang deflection criteria: LL (0.2") and TL (21.1240). Top Edge Bracing (Lu): Top compression edge must be braced at 8' 6" o/c unless detailed otherwise. Bottom Edge Bracing (Lu): Bottom compression edge must be braced at S'o/c unless detailed otherwise. A structural analysis of the deck has not been performed. Deflection analysis Is based on composite action with a single layer of 23/32" Weyerhaeuser Edg(F" Panel (24" Span Rating) that is glued and nalled down. Additional considerations for the T3-Prol" Rating Include: None siupports:_' ring �error , . .. -, ::� .: --' 1: — .­., LbadIN , - Acc6ssorles Total Available Rf;quir4'. Dead for F1 va - S noW Tatair, 1 - Stud wall - SPF 3.50" 2.25" 1.75- -214 177/-14 -430 17YI-658 1 1 1/4" Rim Board 2 - Stud wall - SPF 3.50" 3.5V 3.50" 1139 300 1730 3169 Blocking Rim Board Is assumed to cany all loads applied directly above it bypassing the member being designed. Blocking Panels are assumed to carry no loads applied directly above them and the full load is applied to the member being designed. --'-Dead floor Ll Sri Loads Locaticm (Si S hig: '(0. (;IL�.00 Comments- _5 1 -Uniform (PSF) 0 to 8' 7- 16" 12.0 40.0 - Residential - Living Areas 2 - Point (lb) 8' 6" N/A 788 - 1300 Weyerhaeuser Noes J,: Weyerhaeuser warrants that the sizing of Its products will be In accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Refer to current Weyerhaeuser literature for Installation details. (www.woodbywy.com) Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Use of this software is not Intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation Is compatible with the overall project. Products manufactured at Weyerhaeuser facilities are third -party certified to sustainable forestry standards, Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested In accordance with applicable ASTM standards. For current code evaluation reports refer to httP://www.woodbywy.com/service.s/sLCodeRepoftaspx. The product application, Input design loads, dimensions and support information have been provided by Forte Software Operator 2T'M D System : Floor MemberType : Joist Building Use : Residential Building Code : IBC 2015 Design Methodology: ASO SUSTAINABLE FORESTRY INITIATIVE I Forte Software Operator I Job Notes I Michael Leachman P.E. Design Build Services (360) 793-9659 MLeachman@dbsmonroe.com 3/31/2017 11:37A5 AM Forte v5.2, Design Engine: V6.6.0.14 Thuesen-510 8th Ave N.4te Page I of I COMPANY Design Build Services, Inc. PROJECT 510 81h Ave N - Lot 2 28119 - 1201h St. S.E. 510 8111 Ave N WoodWorks' Monroe, WA 98272 Edmonds, WA 98020 PH; 360-793_9659 Thuesen Custom Homes Mar. 31, 2017 08:21 b45 SOMS'AREFOR WOOD DESIGN Design Check Calculation Sheet WoodWGrks Sizer 11.0 Loads: Load Type Dis!xibution P t:t- rn Location [ftj Start End Magnitude Start End Unit I - j107 Dead Trapezoidal 11. 5.02 10.02 101.6 65.1 plf 2-ji 07 Live Trapezoidal Y.. 5.02 10.02 156.3 1 04.2 plf 3�_ J112 Dead Trap zoidal No 0.02, 4.02 70.3 101.8 plf 4_1112 Live Trap: Z.idal Yes 0.02 4.02 112.5 156.3 plf 51 113 Dead P:.ti:l UDL 11 4.02 5:02 101 101 plf �j 113 Live P rti I UDL Yo. . 4.02 5 02 1561� 15613 plf Sol f-eight Dead Full UDL VO 6.0 plf Maximum Reactions (lbs) and Bearing Lengths (in) : 101-0.6" Unf ,:cto-d: ad 165 609 1 Live F.,t*r* d : 282 685 256(: B.T.tal .ring: 441 - 1494 4 12 Length D.5D- 0.53 - 0.5 - Mi. ..q-d 0.50- 0.50' -Mininnum bearing length governed by the required vAdth of the supporting member, Maximum reaction on at least one support is from a different load combination than the critical one forbearing design, shom here, due to Cd factor. See Analysis results far reaction from critical load combination. b45 Lumber -soft, D.Fir-L, No' 2, 4x8 (3-111TW-114") Supports: All - TImber-soll Column, D.Fir-L No.2 Total length: W-0.5% volume = 1.8 cu.fL; Lateral support: top= full, bottom= at all supports: Analysis vs. Allowable Stress and Deflection ushm Nos 2016: Criterion - AnW. slue !is �L DnOn Lalue Unit Allj�5iN­i,2 She,, ZV 36 ISO psi ...di.g(+) fb 193 Fb- 1170 psi fb/Fb1 0.17 Bending(-) fb 282 Fhl 1162 psi fb/Fb' 0.24 ce�ad Defl1n O.OD <L/999 Live D.fl'n 0.01 <L/999 0.17 L/360 in 0.05 Total Defl'n 0.01 <L/999 0.25 L/240 in D.05 Additional Data: FACTORS: F/E(p.i)CD CH Ct CL CF Cfu Cr Cfrt Ci Cn LCO Irv. I So 1 - 1.00 1 .00 1.00 2 Fbl+, 9. l:'.*. 0 '. 1:000 .S�c l 00 , oc 1.00 1 00 - 3 Fb'- 900 .Do i.e. 01�-9`o 93 1.300 1:00 1:00 1.00 1:00 2 FIP f12 5 1-00 1-01) 1.00 1.00 - E, 1 .11 0. '* 1.00 1.00 3 ;6 E.in a .111i.n 1.00 1 00 1:00 1.00 1.00 3 CRITICAL LOAD COMBINATIONS. Shear : LC #2 D+L, V wx - 764, V design 601 lbs Bending(+)t LC #3 D+L (pattern: L_), M = 493 lbs-ft B ndin I-): L #2 D+L' M - 720 lb.-ft D: fl .(ti.n_- LCC # 3 (live) LC #3 (total) D-de,d -live S-­ W�ind r�impact Lr-roof live Lc-concenttated E=earthquake All LC re l isted in tho Analysis -tput Load Fatte rns: s.sj�, .=L+S or L+Lr, - �no pattern load in this span Load combinations; ASCE 7-10 / IBC 2015 CALCULATIONS; �eflection: Ej . 178eO6 lb-in2 Live " deflection Deflection fr- all non -dead loads (live, �ind, Tot .1 Deflection Load Deflection) + Live Load Deflection. Lateral stability(-): Lu - 5' Le - 9-11.5611 RD � 8.4; Lu based on full span Design Notes: i. WoodWorks analysis and design are in accordance with the IGC International Building Code (18C 2015), the National Design Specification (Nos 2015). and Nos Design Supplement. 2. Please verify that the default deflection limits are appropriate for your application. 3. Continuous or Cantilaverad Beams: No$ Clause 4.2.5.5 requires that normal grading provisions be extended to the middle 213 of 2 span beams and to the full length of cantilevers and other spans. 4. Sam lumber bending members shall be laterally supported according to the provisions of Nos Clause 4-4.1. I/ COMPANY Design Build Services, Inc. 28119 - 120th SL S.E. PROJECT 510 8th Ave N - Lot 2 510 81h Ave N WoodWorkso Monroe, WA 98272 Edmonds, WA 98020 PH: 360-793-9659 Thuesen Custom Homes sotnVARE FOR WOOD DESIGN Mar. 31, 2017 09:06 We Design Check Calculation Sheet WoodWorks Sizer 1 1.o Loads: Load Type Distribution _��_IIUDL Pat- tern Location [ft] Start End Magnitude Start End Unit 3100 Ve - ad 65.2 Plf 2_J100 Snow Full UDL 100.0 Plf 3_j103 Dead Full UDL 64.1 Plf 4_J103 Snow Full UDL 98.4 Plf Self -weight Dead Full UDL 6.0 plf Maximum Reactions (lbs) and Bearing Lengths (in): 9-0.7" Unfactored: Dead 613 61-.1 Snow Factored: 899 - 899 Total Bearing: 1511 - 1511 Length 0.69 0.69 in req1d 0.69 0.69 1646a Lumber -soft, D.Fir-L, No.2,4x8 (3-1/2'W-114") Supports: All - Timber -soft Column, D.Fir-L No.2 Total length: V-0.7"; volume = 1.6 cu.ft.; Lateral support: top= full. bottom= at supports; Analysis vs. Allowable Stress and Deflection using NDS 2015: Criterion An%ly.,sis E!ilue -Design Value U.�t y2is�Dcs iF S hear f .76 1 = FV 207 psi , I FV 0.37 Bending(+) fb 1323 M 1345 psi fb/Eb' = 0.98 Dead Defl:n 0.11 L/961 Liv Defl n 0.16 L/655 0.30 = L/360 in 0.55 Total Defl1n 0.33 L/324 0.45 = L/240 in 0.74 Additional Data: FAC ORS: FIE (psi) CD 0.1 Ct CL CF Cfu Cr Cfrt Ci Cn LC# FvT 180 1.15 1.00 1.00 - - - - 1.00 1.00 1.00 2 Fb-+ 900 1.15 1.00 1.00 1.000 1.300 1.00 1.00 1.00 1.00 - 2 Fcpl 625 - 1.00 1.00 - - - - 1.00 1.00 - - El 1.6 million 1.00 1.00 - - - - 1.00 1.00 - 2 Emin' 0.58 million 1.00 1.00 - - - - 1.00 1.00 - 2 CRITICAL LOAD COMBINATIONS: Shear : LC #2 = D+S, V max = 1502, V design = 1291 lbs Bending(+): LC 92 = D+S, 14 = 3380 lbs-ft Deflection: LC #2 - D+S (live) LC #2 = D+S (total) D=dead,L--live S=snow WA-zind I=impact Lr=roof live Lc=concentrated E=earthquake All LC s are listed in the Analysis output Load combinations: ASCE 7-10 1 IBC 2015 CALCULATIONS: �eflection: EI = 178e06 lb-in2 Live" deflection = Deflection from all non -dead loads (live, wind, snow I Total Deflection = 1.50(Dead Load Deflection) + Live Load Deflection. Design Notes: 1. WoodWorks analysis anddesignarein accordanrewith the )CC International Building Code (IBC 2015), the National Design Specification (NDS 2015), and NDS Design Supplement. 2. Please verify that the default deflection limits are appropriate for your application. 3. Sawn lumber bending members shall be laterally supported according to the provisions of NDS Clause 4.4.1. COMPANY Design Build Services, Inc. 28119 - 120th St. S. E� PROJECT 510 81h Ave N - Lot 2 510 8th Ave N WoodWorks' Monroe, WA 98272 Edmonds, WA 98020 PH: 360-793-9659 Thuesen Custom Homes SDMVAREFOR WOOD DOSIGN Mar. 31, 2017 09:07 b46b Design Check Calculation Sheet WoodWorks Sizer 11.0 Loads: Load Type Distribution Pat- tern Location [ft] Start End Magnitude Start End Unit j 102 Partial UDL 0 03 3.03 82.5 -EF2-.5 plf 2_j102 Snow Partial UDL 0:03 3.03 126.6 126.6 plf 3_jlO3 Dead Partial UDL 3 . 03 12.03 62.5 82.5 plf 4_j103 Snow Partial UDL 3.03 12.03 126.6 126.6 plf 5JI14 Dead Partial UDL 12.03 15.03 82.5 82.5 plf 6_j114 Snow Partial UDL 12.03 15.03 126.6 126.6 plf ,Self -weight Dead Full UDL . 9.4 plf Maximum Reactions (lbs) and Bearing Lengths (in) : 16-0.7" Unfactored: Dead 689 689 Snow Factored: 949 - 949 To"l Bearing: 1638 - - 1638 Length 0.75 - 0.75 Min reqld 0.75 0.75 b46b Lumber -soft, D.Fir-L, No.2, 4x12 (3-1/2"xi 1-1/4") Supports: All - Timber -soft Column, D.Fir-L No.2 Total length: 15'-0.7"; volume = 4.1 cu.ft.; Lateral support: top= full, bottom= at supports; Analysis vs. Allowable Stress and Deflection using NOS 2015: Criterion alysis Value Design Value Unit Anajy2 Shear tv = 54 Fv1 = 207 psi fv/�i4Des'gn - 0.26 Bending(4) fb = 998 FbI = 1138 psi fb/Fbl = 0.88 Dead De fl1n 0.16 = <L/999 Live Defl'n 0.22 = L/829 0.50 = L/360 in 0.43 Total Defl1n_ 0.45 = L/397 0.75 = L/240 in 0.60 Additional Data: FACTORS: F/E(psi)CD C14 Ct CL CF Cfu Cr Cfrt Ci Cn LCO Fv:, 180 1.15 1.00 1.00 - - - - 1.00 1.00 1,00 2 Fb 900 1.15 1.00 1.00 1.000 1.100 1.00 1.00 1.00 1.00 - 2 Fcpl 625 - 1.00 1.00 - - - - 1.00 1.00 - - E, 1.6 million 1.00 1.00 - - - - 1.00 1.00 - 2 Emin' 0.58 million 1.00 1.00 - - - - 1.00 1.00 - 2 CRITICAL LOAD COMBINATIONS: Shear : LC #2 = D+S, V max - 1638, V design = 1426 lbs Bending(+): LC 42 - D+5, M = 6142 lbs-ft Deflection; LC #2 = D+S (live) LC #2 - D+S (total) D=dead L=live S-snow W=Wind I=impact Lr=roof live Lc=concentrated E-earthquake All LC's are listed in the Analysis output Load combinations; ASCE 7-10 / IBC 2015 CALCULATIONS: �eflection:,CEI = 664eO6 lb-in2 Live" defl tion = Deflection from all non -dead loads (live, wind, snow-) Total Deflection = 1.50(Dead Load Deflection) + Live Load Deflection. Design Notes: 1. WoodWorks analysis and design are in accordance %vith the ICC International Building Code (IBG 2015), the National Design Specification (NDS 2015), and NOS Design Supplement. 2. Please verify that the default deflection limits are appropriate for your application. 3. Sawn lumber bending members shall be laterally supported according to the provisions of NOS Clause 4.4.1. V Z8/4 COMPANY Design Build Services, Inc. 281 `19 - 120th St. S. E. PROJECT 510 81h Ave N - Lot 2 510 8th Ave N WoodWorks`v Monroe, WA 98272 Edmonds, WA 90020 PH: 360-793-9659 Thuesen Custom Homes SOFTIVARE FOR WOOD DEStGN Mar. 31, 2017 08:23 b47 Design Check Calculation Sheet WoodWorks SIzer 11.0 Loads: Load Type Distribution Pat- tern Location (ft) Start End Magnitude Start End Unit I_jq5 Dead Trapezoidal 5.52 9.02 84.3 63.3 plf 2_j95 Live Trapezoidal 5.52 9.02 133.3 101.3 plf 3_J96 Dead Partial UDL 3.52 5.52 84.3 84.3 plf 4_j96 Live Partial UDL 3.52 5.52 133.3 133.3 plf 5_j97 Dead Trapezoidal 0.02 3.52 63.3 84.3 plf 6_j97 Live Trapezoidal 0.02 3.52 101.3 133.3 plE Self -weight Dead Full UDL . 6.0 plf Maximum Reactions (lbs) and Bearing Lengths (in): V-0.5" Unfactored: Dead 370 370 Live Factored: 544 544 Total Bearing: - 913 913 Length - 0.50. - 0.50 Min req'd 0.50- 0.50: *Minimum bearing length setting used: 1/2" for end supports b47 Lumber -soft, D.Fir-L, No.2,4x8 (3-1/2"x7-1/4") Supports: AN - Timber -soft Column, D.Fir-L No.2 Total length: 9-0.5"; volume = 1.6 cu.ft.; Lateral support: top= full, bottom= at supports; Analysis vs. Allowable Stress and Deflection using NDS 2015: Criterion alysis Value Design Value Unit 11-ajX5 sign Shear fv = 48 1 = 180 psi V7�4D= Bending(+) fb = 844 FbI = 1170 psi fb/Fb' = 0.72 Dead Defl1n 0.07 = <L/999 Live Defl1n 0.10 = <L/999 0.30 = L/360 in 0.35 Total Defl'n 0.21 = L/511 0.45 = L/240 in 0.47 Additional Data: FACTORS: F/E(psi)CD C14 Ct CL CF Cfu Cr Cfrt Ci Cn LC# Fv:, 180 1.00 1.00 1.00 - - - - 1.00 1.00 1.00 2 ,b 900 1.00 1.00 1.00 1.000 1.300 1.00 1.00 1.00 1.00 - 2 Fcp1 625 - 1.00 1.00 - - - - 1.00 1.00 - - E' 1.6 million 1.00 1.00 - - - - 1.00 1.00 - 2 Emin' 0.58 million 1.00 1.00 - - - - 1.00 1.00 - 2 CRITICAL LOAD COMBINATIONS: Shear : LC #2 = D+L, V max = 913, V design = 804 lbs Bending(+): LC #2 = D+L, M = 2155 lbs-ft Deflection: LC #2 = D+L (live) LC #2 = D+L (total) D=d,ad L=live S=snow 11--wind I=impact Lr=roof live Lc=concentrated E=earthquake All LC , s are listed in the Analysis output Load combinations: ASCE 7-10 / IBC 2015 CALCULATIONS: �eflection: EI 171306 lb-in2 Live" deflection = Deflection from all non -dead loads (live, wind, snow I Total Deflection = 1.50(Dead Load Deflection) + Live Load Deflection. Design Notes: 1. WoodWorks analysis and design are in accordance with the ICC International Building Code (IBC 2015), the National Design Specification (NDS 2015), and NOS Design Supplement. 2. Please verify that the default deflection limits are appropriate for your application. 3. Sawn lumber bending members shall be laterally supported according to the provisions of NDS Clause 4.4.1. COMPANY Design Build Services, Inc, 28119 - 120th St. S.E. PROJECT 510 8th Ave N - Lot 2 510 8th Ave N WoodWorkso Monroe, WA 98272 Edmonds, WA 98020 PH: 360-793-9659 Thuesen Custom Homes sornVAREFOR WOODDENGN Mar. 31, 2017 08:29 b50 Design Check Calculation Sheet WoodWorks Sizer 11.0 Loads: Load Type Distribution Pat- tern Location [ftj Start End Magnitude Start End Unit 1-jgl Dead T'a-rtial UDL 2.02 ---4-.T2-- --1-67.7167.7 pif 2_j9l Live Partial UDL 2.02 4.52 228.6 228.6 plf 3_J92 Dead Trapezoidal 0.02 2.02 62.5 84.3 plf 4_j92 Live Trapezoidal 0.02 2.02 100.0 133.3 plf 5_qt9 Dead Point 2.02 72 lbs 6_gt9 Live Point 2.02 236 lbs Self -weight Dead Full UDL 6.0 plf Maximum Reactions (lbs) and Bearing Lengths (in): il 4'-6.5" Unfactored: Dead 283 383 Live Factored: 469 - 57'2 Total Bearing: 751 - 954. Length 0.50. - 0.50 in reqld 0.50- 0.50: -M.MUTA �alloig saut9th 66tiirtU used. V2 for end 5upporis b60 Lumber -soft, D.Fir-L, No.2, 4x8 (3-1/2"x7-114") Supports: All - Timber -soft Column, D.Fir-L N0.2 Total length: 4�-63% volume = 0.8 cu.ft.; Lateral support: top= full, bottom= at supports; Analysis vs. Allowable Stress and Deflection using NDS 2016: Criterion Analysis Value Design Value unit Analysis/Design Shear fv = 42 Fv, = 160 psi fv/Fv' = 0.23 Bending(+) fb = 443 FbI = 1170 psi tb/Fbl = 0,38 Dead DeflIn 0.01 = <L/999 Live DeflIn 0.01 = <L/999 0.15 = L/360 in 0.09 Total Defl1n 0.03 = <L/999 0.23 = L/240 in 0.12 Additional Data: FACTORS: F/E(psi)CD CM Ct CL CF Cfu Cr Cfrt Ci Cn LC# FV' 100 1.00 1.00 1.00 - - - - 1.00 1.00 1.00 2 FbI+ 900 1.00 1.00 1.00 1.000 1.300 1.00 l.DO 1.00 1.00 - 2 Fcpl 625 - 1.00 1.00 - - - - 1.00 1.00 - - E' 1.6 million 1.00 1.00 - - - - 1.00 1.00 - 2 Kmin' 0.58 million 1.00 1.00 - - 1.00 1.00 - 2 CRITICAL LOAD COM13INATIONS: Shear : LC 02 = D+L, V max = 954, V design 713 lbs Bending(+): LC #2 = D+L, 1.1 = 1132 lbs-ft Deflection: LC 112 - D+L (live) LC 02 = D+L (total) D=dead L=live S=snow W-�ind I=impact Lr=roof live Lc=concentrated E=earthquake All LC's are listed in the Analysis output Load combinations: ASCE 7-10 / IBC 2015 CALCULATIONS: Deflection: EI = 178e06 lb-in2 "Live" deflection = Deflection from all non -dead loads (live, wind, snow Total Deflection = 1.50(Dead Load Deflection) + L3-ve Load Deflection. Design Notes: 1. WoodWorks analysis and design are in accordance with the ICC International Building Code (IBC 2015), the National Design Specification INDS 2015), and NDS Design Supplement. 2. Please verify that the default deflection limits are appropriate for your application. 3. Sawn lumber bending members shall be laterally supported according to the provisions of NDS Clause 4.4. 1. COMPANY Design Build Services, Inc. 28119 - 120th St. S. E. WoodWorks' Monroe, WA 98272 PH: 360-793-9659 SOFrWARrfoR WOOD DESIGN Mar. Z1, 2017 09:10 Design Check Calculation Sheet WoodWorks Sizer 11.0 Loads: Load Type Dist ibution Pat- Location [ft) Magnitude Unidt tern St art End Start End l-j86 Dead Full UDL 390.0 P_" 2j 86 Snow Full UDL 650.0 T Self-weigbt Dead Full UDL 6.0 pl, Maximum Reactions (lbs) and Bearing Lengths (in) : IVA 11 a PROJECT 510 8th Ave N - Lot 2 510 8th Ave N Edmonds, WA 98020 Thuesen Cuslcm Homes b5l Unfactored: Dead 808 808 Snow Factored: 1326 1326 To t al Bear.ing: 2134 - 2134 Length 0.98 0.98 in recild 0.98 0.98 b5l Lumber -soft, D.Fir-L, No.2,4x8 (3-112'W-1/4") Supports: All - Timber -soft Column, D.Fir-L No.2 Total length: 4'-11.01% volume = 0.7 cuft; Lateral support: top= full. bottom= at supports; Analysis vs. Allowable Stress and Deflection using NDS 2016: Criterion Analysis Value Design Value Unit Analysis/Design Shear fv = 84 Fv1 = 207 _ psi fv/Fv: = 0.40 Bending(+) fb = 819 Fb' = 1345 psi fb/Fb = 0.61 Dead Defl:n 0.01 = <L/999 Live e fl n 0.02 - <L/999 0.13 = L/360 in 0.16 _Total Defl1n 0.04 = <L/999 0.20 = L/240 in 0.20 Additional Data: FACTORS: F/E(psi)CD CM Ct CL CF Cfu Cr Cfrt Ci Cn LC# Fv:, 180 1.15 1.00 1.00 - - - - 1.00 1.00 1.00 2 Fb 900 1.15 1.00 1.00 1.000 1.300 1.00 1.00 1.00 1.00 - 2 Fcp' 625 - 1.00 1.00 - - - - 1.00 1.00 - - E, 1.6 million 1.00 1.00 - - - - 1.00 1.00 - 2 Emin' 0.58 million 1.00 1.00 - - - - 1.00 1.00 - 2 CRITICAL LOAD COMBINATIONS: Shear : LC #2 = D+S, V max - 2092, V design = 1418 lbs Bending(+): LC 12 = D+S, M = 2092 lbs-ft Deflection: LC #2 = D+S (live) LC #2 = D+S (total) D=dead L=live S=snow N=wind I=impact Lr=roof live Lc=concentrated E-earthquake All LC's are listed in the Analysis output Load combinations: ASCE 7-10 / IBC 2015 CALCULATIONS: Deflection. El 17806 lb-in2 "Live" deflection = Deflection from all non -dead loads (live, wind, snow I Total Deflection = 1.50(Dead Load Deflection) + Live Load Deflection. Design Notes: 1. WoodWorks analysis and design are in accordance Nvith the ICC International Building Code (IBC 2015), the National Design Specification INDS 2015), and NDS Design Supplement. 2. Please verify that the default deflection limits are appropriate for your application. 3. Sawn lumber bending members shall be laterally supported according to the provisions of NOS Clause 4.4.1. COMPANY Design Build Services, Inc. 28119 - 120th St. S.E. PROJECT 510 8th Ave N - Lot 2 51 0 8th Ave N WoodWorks' Monroe, WA 98272 Edmonds, WA 98020 PH: 360-793-9659 Thuesen Custcm Homes SOFTIVAREFOR WOOD DESICN Mar. 31, 2017 09:37 b52 Design Check Calculation Sheet WoodWorks Sizer 11.0 Loads: Load Type Distribution Pat- tern Location [ft) Start End Magnitude Start End Unit 3�jI15 Dead Full UDL 172.5 plf 2_jll5 Snow Full UDL 287�5 plf 3 b84 Dead Point 2.03 2 lbs 4 b84 Snow Point 2.03 117 lbs 5 b85 Dead Point 2.03 2 lbs 6 b85 Snow Point 2.03 117 lbs -Self-weight Dead Full UDL 6.0 Pit Maximum Reactions (lbs) and Bearing Lengths (in) : U-0.7" Unfactored: Dead 543 542 Snow 1027 949 Factored: Total - 1571 - 1490 - Bearing: Length - 0.72 0.68 Min req'd 0.72 0.60 bS2 Lumber -soft, D.Fir-L, No.2,4x8 (3-1/2"x7-1/4") Supports: AM - Timber -soft Column, D.Fir-L No.2 Total length: G-0.7"; volume = 1.1 cu.R.: Lateral support: top= full, bottom= at supports; Analysis vs. Allowable Stress and Deflection using NDS 2016: Criterion Analysis Value Design Value Unit Analysis/D sign Shear fv 75 , = 207 psi fv/Fv' = 0.36 Bending(+) fb 917 Fb' = 1345 psi fb/Fb' - 0.68 Dead Defl'n 0.03 <L/999 Live Defl1n 0.06 <L/999 0.20 = L/360 in 0.28 Total Defl1n 0.10 L/720 0.3D = L/240 in 0.33 Additional Data: FACTORS: F/E(psi)CD CM Ct CL CF Cfu Cr Cfrt Ci Cn LC# Fv:+ 180 1.15 1.00 1.00 - - - - 1.00 1.00 1.00 2 Eb 900 1.15 1.00 1.00 1.000 1.300 1.00 1.00 1.00 1.00 - 2 Fcp1 625 - 1.00 1.00 - - - - 1.00 1.00 - - E' 1.6 million 1.00 1.00 - - - - 1.00 1.00 - 2 Emin' 0.58 million 1.00 1.00 - - - - 1.00 1.00 - 2 CRITICAL LOAD COMBINATIONS: Shear : LC #2 = D+S, V max = 1557, V design = 1261 lbs Bending(+), LC #2 = D+S, M = 2342 lbs-ft Deflection: LC 02 = D+S (live) LC #2 - D+S (total) D=dead L=live S=snow W=wind I=impact Lr=roof live Lc=concentrated E=earthquake All LC's are listed in the Analysis output Load combinations: ASCE 7-10 / IBC 2015 CALCULATIONS: �eflection: El 17806 lb-in2 Live" deflection = Deflection from all non -dead loads (live, wind, snow I Total Deflection = 1.50(Dead Load Deflection) + Live Load Deflection. Design Notes: 1. WoodWorks analysis and design are in accordance vidth the ICC International Building Code (IBC 2015), the National Design Specification (NDS 2015), and NDS Design Supplement. 2. Please verify that the default deflection limits are appropriate for your application. 3. Sawn lumber bending members shall be laterally supported according to the provisions of NDS Clause 4.4.1. COMPANY Design Build Services, Inc. 28119 - 120th St. S.E. PROJECT 610 8th Ave N - Lot 2 610 8th Ave N 12) Wood"Works' Monroe, WA 98272 Edmonds, WA 98020 PH: 360-793-9659 Thuesen Custom Homes SOMMITFOR WOOD DESIGN Mar. 31, 20W 09:12 b53 Design Check Calculation Sheet WoodWorks Sizer 11.0 Loads: Load Type Distribution Pat- tern Location [ft] Start End Magnitude Start End Unit 1_j71 Dead Par UDL 4.54 5.04 299.3 299.3 plf 2_j7l Snow Partial UDL 4.54 5.04 496.8 498.8 plf 3_J72 Dead Partial UDL 3.54 4.54 330.0 330.0 plf 4_j72 Snow Partial UDL 3.54 4.54 550.0 550.0 plf 5_J73 Dead Partial UDL 1.54 3.54 330.0 330.0 plf 6_j73 Snow Partial UDL 1.54 3.54 550.0 550.0 plf 7_J74 Dead Partial UDL 1.04 1.54 330.0 330.0 plf 8_j74 Snow Partial UDL 1.04 1.54 550.0 550.0 plf 9_j75 Dead Partial UDL 0.04 1.04 330.8 330.8 plf 10_j75 Snow Partial UDL 0.04 1.04 551.3 551.3 plf [Self -weight IDead [Full UDL 1 1 6.0 1plf Maximum Reactions (lbs) and Bearing Lengths (in): 51-1.. il Unfactored: Dead 840 826 Snow 1375 1351 Factored: To�al Bearing: - 2215 2176 Length - 1.01 - - 0.99 in reqld 1.01 0.99 b53 Lumber -soft, D.Fir-L, No.2,4x8 (3-1112"V4/4") Supports: AF -rimber-soft Column, D.Fir-L No.2 Total length: 6-1.0", volume = 0.9 cu.ft.; Lateral support: top= full, bottom= at supports; Analysis vs. Allowable Stress and Deflection using NDS 2015: Criterion An lysis Value Design Value Unit Analysis/D sign Shear fv = 97 Fv' = 207 psi fv/Fv' = 0.47 Bending(+) fb = 1062 FbI = 1345 psi fb/Fb1 = 0.80 Dead Defl1n 0.03 � <L/999 Live Defl'n 0.04 = <L/999 0.17 = L/360 in 0.26 Total Defl1n 0.08 = L/721 0.25 = L/240 in 0.33 Additional Data: FACTORS: F/E(psi)CD Cm Ct CL Cr Cfu Cr Cfrt Ci Cn LC# 180 1 15 1.00 1.00 - - FFbV:4 - - 1.00 1.00 1.00 2 9 0 0 1:15 1.00 1.00 1.000 1.300 1.00 1.00 1,00 1.00 - 2 Fcpl 625 - 1.00 1.00 - - - - 1.00 1.00 - - E' 1.6 million 1.00 1.00 - - - - 1.00 1.00 - 2 Emin, 0.58 million 1.00 1.00 - - - - 1.00 1.00 - 2 CRITICAL LOAD COMBINATIONS: Shear , LC 02 = D+S, V max = 2176, V design = 1643 lbs Bending(+).* LC #2 - D+S, 14 2764 lbs-ft Deflection. LC 02 = D+S (live) LC #2 = D+S (total) D=dead L=live S=snow W=wind I=impact Lr=roof live Lc=concentrated E=earthquake All We are listed in the Analysis output Load combinations: ASCE 7-10 / IBC 2015 CALCULATIONS: Deflection: El 178eO6 lb-in2 "Live" deflection = Deflection from all non -dead loads (live, wind, snow Total Deflection = 1.50(Dead Load Deflection) + Live Load Deflection. Design Notes: 1. WoodWorks analysis and design are in accordance m6th the ICC International Building Code (IBC 2015), the National Design Specification (NDS 2016), and NDS Design Supplement. 2. Please verify that the default deflection limits are appropriate for your application. 3. Sawn lumber bending members shall be laterally supported according to the provisions of NDS Clause 4.4A. V COMPANY Design Build Services, Inc. 28119 - 120th St. S.E. PROJECT 510 8th Ave N - Lot 2 a 510 8th AV ' N WoodWorks' Monroe, WA 98272 Edmonds, WA 98020 PH: 360-793-9659 Thuesen Custom Homes SOrnVARCFOR MOD DESIGN Mar. 31. 2017 09:14 b54 Design Check Calculation Sheet WoodWorks Sizer 11.0 Loads: Load Type Distribution Pat- tern Location [ft) Start End Magnitude Start End Unit l_j62 Dead Partial UDL 0.02 2.52 140.3 140.3 plf 2_J62 Snow Partial UDL 0.02 2.52 206.3 206.3 plf 3_j63 Dead Partial UDL 2.52 5.02 140.3 140.3 plf 4_j63 Snow Partial UDL 2.52 5.02 206.3 206.3 plf Self -weight Dead Full UDL 6.0 -plf Maximum Reactions (lbs) and Bearing Lengths (in): 51-0.61 Unfactored: Dead 366 366 Snow Factored: 516 516 Total - 681 - eel Bearing: Length - 0.50. - 0.50. Min reg-d 0.50* 0.50. *Minimum bearing length setting used: 1/2" for end supports b54 Lumber -soft, D.Fir-L, No.2, U8 (3-112'W-114") Supports: All - Timber -soft Column, D.Fir-L No.2 Total length: V-0.5"; volume = 0.9 cu.ft.; Lateral support: top= full. bottom= at supports; Analysis vs. Allowable Stress and Deflection using Nos 2015: Criterion Analysis Value Design Value Unit Analy D sign WD Shear fv = 39 Fv­' = 207 psi t = 0. 19 Bending(+) fb = 431 FbI = 1345 psi fb/Fb1 - 0.32 Dead Defl'n 0.01 = <L/999 Live Defl'n 0.02 = <L/999 0.17 = L/360 in 0.10 Total DeflIn 0.03 = <L/999 0.25 = L/240 in O�13 Additional Data: FACTORS: F/E(psi)CD 04 Ct CL CF Cfu Cr Cfrt Ci Cn LC# Fv:+ 180 1.15 1.00 1.00 - - - - 1,00 1.00 1.00 2 Fb 900 1.15 1,00 1.00 1.000 1.300 1.00 1.00 1.00 1.00 - 2 Fcp' 625 - 1.00 1.00 - - - - 1.00 1.00 - - E, 1.6 million 1.00 1.00 - - - - 1.00 1.00 - 2 Emin' 0.58 million 1.00 1.00 - - - 1.00 1.00 - 2 CRITICAL LOAD COMBINATIONS: Shear : LC #2 - D+S, V max = 681, V design 661 lbs Bending(+): LC 02 = D+S, 1.1 = 1102 lbs-ft Deflection: LC 02 = D+S (live) LC 42 = D+S (total) D-dead L=live S=snow w=wind I=impact Lr=roof live Lc=concentrated E=earthquake All LC's are listed in the Analysis output Load combinations: ASCE 7-10 / IBC 2015 CALCULATIONS: �eflection- El = 17806 lb-in2 Live" deflection = Deflection fro. all non -dead loads (live, wind, snow I Total Deflection = 1.50(Dead Load Deflection) + Live Load Deflection. Design Notes: 1. WoodWorks analysis and design are in accordance Vith the ICC International Building Code (IBC 2015), the National Design Specification (NDS 2015), and NDS Design Supplement. 2. Please verify that the default deflection limits are appropriate for your application. 3. Sawn lumber bending members shall be laterally supported according to the provisions of NDS Clause 4.4.1. COMPANY Design Build Services, Inc, PROJECT $108thAv N-Lot2 28119 - 120th Bi- S-E. 510 Bills Av: N WoodWorks' Monme, WA 95272 Edmonds, WA 98020 PH: 360-793-9659 This Son Custom Homes Mar. 31, 2017 09:15 b5Bo SOFTWARE FOR WOOD DESIGN Design Check Calculation Sheet WoodWorks Sister 11.0 Loads Lead Type Distribution Pat- ter. Loc:tion [ftl S t xt End Magnitude Start EjUnit 1-2-66 T�_.d Trape2oidal no 0.02 4.02 65.1 92.5 pif 2 - J66 S... Trape2oidal Yes 0.02 4.02 104.2 144.6 plf 3_ j 67 D, ad Trape2oidal Ito 4.02 5.02 92.5 101.8 pif 4_j67 s..W T..pe2.id.1 Yes 4.02 5,02 144.6 156.3 plf 5 -1 6: Dead Partial UDL Ito 5.02 8.02 330.8 330.8 plf 6351 Snow Partial UDL Yes 5.02 8.02 551,3 551.3 pif 7_gt Dead Point Ito 5.02 885 lb. 1 "o' point Yes 5.02 1397 lb. D.ad Full sm, , ". Maximum Reactions (lbs) and Bearing Lengths (In) W-0.7" U.f -t ad: D:.d 1646 S. . Pact .. d: D7 - 2591 1169553 .P.,t 138 Total 8 1 423B Bea 'ingt 1852 L.ngt 0 5D: 1 56 Min rh.qld 0:50 1:56 0 .Minimum beer nn!ennIh sefthecused: j12*forrend.'. rt. Misximum mactionon 81 least one support IS from a different load combination than the critical one for beating design, shown here, due to Cd factor, See Analysis results for reaction from Critical load C40mbInation. b58 Lumber -soft, D.Fir-L, No. 2, W (3.1/2'W-114") Supports: All - Timber -Soft Column, D.Fir-L No.2 Total length: 8�0,r; volume = 1.4 cu.fl.; Lateral support: top= full, bottons= at all supports; Analysis vs. Allowable Stress and Deflection using Nos 2016: Criterion Analysis Value Design Value Unit Shear 1; � T_ 67 Fv: P:i 7v7N Sanding(+) fb 756 Eb 1207 345 P i fb/Fb' 0.56 .ending(-) fb 676 Fb' 1337 psi fb/Fb' 0.51 Dead D:fl:n 0.01 <L/999 L, " D fl n 0:12 <L/191�9: 0.13 L/360 in 0.14 T.t.l.-Defl'n 0 04 <L/ . 0.20 L/240 in 0.18 Additional Data: FACT RS: F/E(P-i)CD C" Ct CL CF Cfu Cx� Cfxt Ci Cn LCO TV:+ 180 1 5 1 ... 1.00 - - - - 1.00 1.00 1.00 2 Fb 900 1:115 1 1.000 300 1 00 1.00 1 00 1.00 - " 4 900 1. 15 1110 Fb . 1:.. 0.994 1 1:300 1 00 1.00 1 00 1.00 2 F-p 625 1-00 1:000 - - 1.00 1.00 - r. 1.6 1 11 is. 1 0 1.00 1.00 ..l-on 4 Emin' 0.58 saillions 1.00 1,00 1.00 1.00 4 CRITICAL LOAD COMBINATIONS: Shear ! L' #2 : -.,,V m:,-, 3365, V d.signo=,,.3166 Its ...dln,,,.,; LC #4 D+S patt n as), M - 193 -ft Bandinq(-): LC 02 D-S, M - 1728 lb-ft D.flc.ti..: LC #4 (it-) Lc 04 (total) D�dead L�live S=snov S-tind 1-impact L-roof live L-Concentrated E-earthquake All LC'. axe listed in the Analysis output Lo six, Patterns: S-S/2, X-L+S or L+Lr, -no pattern lead in this; Pa. Load conibinations: AscE 7-jo / xac 2ols7 CALCULATIONS: �ezflectiont Er - 17806 lb-in2 ive " deflection - Deflection frm all non -dead loads (live, wind, snow-) Total De f I action = 1.50(Dead Load Deflection) + Live Load Deflection. Lateral stability(-): Lu - 4' Le = 81-2.88" RB - 7.6; Lu based on full span Design Notes: -I I WoodWorksaglysl and design am in accordance with the ICC International Building Code OBC 2015). the National Design Specification (NDS2015). and NOS Design Supplement. 2 Please verify th I she default deflection limits are appropriate for your application. 3 Continuous or Canillovered Beams: Nos Clause 4.2.6.6 requires that normal grading pmvlsions be iudended to the middle 213 of 2 span beams and to the full length of cantilevers and other spans. 4. awn (umber bending members shall be laterally supported according to the provisions of NOS Clause 4.4.1. V COMPANY Design Build Services, Inc. 28119 - 120th St. S.E. PROJECT 510 8th Ave N - Lot 2 51 0 8th Ave IN WoodWorks& Monroe, WA 98272 Edmonds, WA 98020 PH: 360-793-9659 Thuesen Custom Homes SOFTIVARE FOR WOOD DESIGN Mar. 31, 2017 09:18 1:160 Design Check Calculation Sheet WoodWarks Sizer I i.0 Loads: Load Type Distrib tion Pat- Location [ft] Magnitude Unit tern Start End Start End 1_jll7 Dead Full UDL 62.5 plf 2_jll7 Snow Full UDL 100.0 fd E Self -weight Dead Full UDL 6.0 Maximum Reactions (lbs) and Bearing Lengths (in): 51-0.5.1 il Unfactored- Dead 173 173 Snow Factored: 252 - 252 Total Bearing: 425 - - 425 Length 0.50. - 0.50. Min reqld 0.50- 0.50. Minimum bearing length setting used: 1/2" for and supports b6O Lumber -soft, D.Fir-L, No.2, 4x8 (3-112'W-1/4") Supports: All - Timber -soft Column, D.Fir-L No.2 Total length: 6-0.6% volume = 0.9 cu.ft.; Lateral support: top= full, bottom= at supports; Analysis vs. Allowable Stress and Deflection using NDS 2015: Criterion Analysis Val e Design Value Unit Analysis/Design Shear fv = 19 Fv1 - 207 - psi - fvj_FV1 = 0.09 Bending(+) fb = 206 FbI = 1345 psi fb/Fbl = 0.15 Dead DeflIn 0.01 = <L/999 Live Deflln 0.01 = <L/999 0.17 = L/360 in 0.05 otal Defl1n 0.02 = <L/999 0.25 = L/240 in 0.06 Additional Data: FACTORS; F/E(psi)CD CM Ct CL CF CfU Cr Cfrt Ci Cn LC# F" 100 1.15 1.00 1.00 - - - - 1.00 1.00 1.00 2 Fb1+ 900 1.15 1.00 1.00 1.000 1.300 1.00 1.00 1.00 1.00 - 2 FcP1 625 - 1.00 1.00 - - - - 1.00 1.00 - - E' 1.6 million 1.00 1.00 - - - - 1.00 1.00 - 2 Emin' 0.58 million 1.00 1.00 - - - - 1.00 1.00 - 2 CRITICAL LOAD COMBINATIONS: Shear ; LC 92 = D+S, V max = 421, V design - 316 lbs B ndingf+): LC 02 = D+S, M = 527 lbs-ft Deflection: LC #2 = D+S (live) LC #2 = D+S (total) D-clead L=live S=snow W-wind 1-impact Lr-roof live Lc=concentrated E-earthquake All LC's are listed in the Analysis output Load combinations: ASCE 7-10 / IBC 2015 CALCULATIONS: �eflection: El = 178e06 lb-in2 Live" deflection = Deflection from all non -dead loads (live, wind, snow I Total Deflection = 1.50(Dead Load Deflection) + Live Load Deflection. Design Notes: 1. WoodWorks analysis and design are in accordance vAth the ICC International Building Code (IBC: 2015), the National Design Specification (NDS 2015), and NDS Design Supplement. 2. Please verify that the default deflection limits are appropriate for your application. 3. Sawn lumber banding members shall be laterally supported according to the provisions of NDS Clause 4.4.1. COMPANY Design Build Services, Inc. PROJECT 510 811h Ave N - Lot 2 28119 ' 120th St. S.E. Monroe. WA 9 7 2 510 8111h Ave N Edmonds, WA 98020 WoodWorks' 3_9:2 PH: 360-79 59 Thus n Custom Home� se Mar. 31. 2017 09:16 W SOFFIVARE FOR WOOD DESIGN Design Check Calculation Sheet WoodWorks Sizer 11.0 Loads: Load Type Distribution P:t- t Location, [ft) St. rt Fnd M-gimitud., St. ft od Unit Dead Partial UDL 0.07 1.07 299.3 299.3 pit 2 75 _ I S Par i:I UDL 0.07 1 07 49: 8 498.8 pif 3J76 D':' . d Parti 1 UDL t 1. 0 7 4 07 29 3 299.3 P if 4 J76 S . Part .1 U L 1 07 4 07 498.8 498.8 plf - 5 1 77 D'e.d 1-11.1 "IDIL 4:07 8:07 160.2 160.2 PIE 6:J77 S'o' Partial UDL 4.07 8.07 212.5 212.5 plf 7 1117 Dead Full UDL 0.0 plf 8:1 117 Snow Full UDL 0.0 PIf 9_gt2 Dead Point 4.07 783 1 . lo�_91:2 S... point 4.07 1 1 4 8 lb. LS.Lf-weight IDead lFull UDL I 1 1 7.3 1pif j Maximum Reactions (lbs) and Bearing Lengths (in): Unfactor,d: D, ad 1478 12 S no Factored 2 3 2B 17N : To t " ...... 3761 2913. g : Lan,1h 1. 1 2E .In ..,'d 1.65 1:2E_ b64 Glulam-Unbal., West Species, 24F-V4 DF, 3-1/2"x9" Buglaminations, 3-11r maximum vAdth, Its: All - Timber -soft Column, D.Fir-L No.2 Total length: 8'-1.5*; volume = 1.8 cu.ft.; Lateral support: top= full, bottom- at supports; Analysis vs. Allowable Stress and Deflection using NDS 2016; Criterion An is Veto. Do. - - Ina iq� Unit Amalvsis4DS1ip She* I ily, s Tv 14 v. 365 p- .e.ding(+) fb 2185 Fb' = 2760 psi fb/Fb' 0.79 Dead De fl:,n 0.1049 <L/:899 1 Live Deft 0. L/ 1 0.27 = L/360 in 0.53 Total Defl'n 0.28 L/339 0.40 - 1,1240 in 0.71 Additional Data: FACTORS: FIE(PSL)CD CK ct CL CV Cfu Cr Cfrt notes Cn-Cvr LC# rv, 265 1.15 1.00 1.00 - - - - 1.00 1.00 1.00 2 Fb'� 2400 1 15 1 " -Do 1.000 1.000 1.00 1.00 1.00 1.00 - 2 F­ 650 1 :00 1' .0 - - - 1.00 - - 1.8 million 1.00 1-00 1.00 2 Eminy' 0.85 million 1.00 2.00 1.00 2 CRITICAL LOAD COMBINATIONS: She,, : LC #2 D+S, V max. - 3761, V design 3120 lbs .e..n"., : I.0 42 D+S, It = 8603 lb.-ft Deflection: LC 02 D+S (live) LC #2 D+S (t*tal) D=d'ad,�Ii'%S-8 now 11-ind 1-impact Lr=roof live L-concentrated E-earthquake All LC are i.ted in the Analysis output Load -binati ... AscE 7-10 / Sac: 2015 CALCULATIONS: �eflaction: ET = 36306 lb-inZ Live- deflection Deflection from all non -dead loads (live, wind, Total Defl oc tion 1.50(Dead Load Deflection) + Live Load Deflection. Design Notes: I- WoodWorks analysis and design are In accordance Ydth the ICC International Building Code (IBC 2015), the National Design Specification (Nos 2015). and Nos Design Supplement. Please verify 'hat the default deflection limits am appropriate for your application. 3 Glulam design values are for materials conforming to ANSI 117-2010and manufactured In accurdancewith ANSI A190.1.2007 4 GLULAM; hxd = actual breadth x actual depth. 5 Glulam Beams shelf be laterally supported according to the provisions of Nos Clause 3.3.3. 6. GLULAM: bearing length based an smaller of Fcp(teosjon), Fcp(wm#n). 1_/ COMPANY PROJECT Design Build Services, Inc. 28119 - 1201h St. S.E. 510 8�h Ave N - Lot 2 51 0 8 h Ave N WoodWorks' Monroe, WA 98272 Edmonds, WA 98020 SOFnVAREfOR WOOD DESIGN PH: 360-793-9659 Mar. 31, 2017 09:19 Thuesen Custom Homes b72 Design Check Calculation Sheet WoodWorks Sizer 11.0 Loads Load Type Distribution Pat- tern Location (ft] Start End Mag itude n n'.tu Start End Unit _J90 Ye-ad-Ra-rtial UDL 0.02 J.0Z 160.2 1610.2 plf 2_j9O Snow Partial UDL 0.02 3.02 212.5 212.5 plf 3_jl08 Dead Trapezoidal 3.02 5.02 65.2 47.4 plf 4_jl0B Snow Trapezoidal 3.02 5.02 100.0 75.0 plf 5_jllB Dead Full UDL 0.0 plf 6 _jll8 Snow Full UDL 0.0 0 plf 7-gt8 Dead Point 3.02 99 lbs "ta Point 3.02 523 its Self -weight .Snow ad Full UDL 6.0 'Plf Maximum Reactions (lbs) and Bearing Lengths (in) Tn-f.cto.ed- - Dead 415 Snow 692 30 -71 ractored: - 64, Total 1107 Bearing: - 951 Length 0.51 Min rgQd o.5i O.So. *Minimu arinalenothiia-Hin.n.-V 1191-f--i-n-,i� b72 Lumber -soft D.Fir-L, No.2,4x8 (3-1/2"x7-1/411) Supports.'AJI - Timber -soft Column, D. Fir-L No.2 Total length: V-0.6% volume = 0.9 cu.ft.; Lateral Support top= full, bottom= at supports; Analysis vs. Allowable Stress and Deflection using Nos 2015; Criterion Analvais Value I Desian Val- Tin i t- Shear fv - 52 - FV' = 207 psi .ending(+) fb = 633 Fb1 = 1345 psi fb/Fbl = 0.47 Dead Defl1n 0.01 = <L/999 I Live Defl1n 0.03 = <L/999 0.17 = L/360 in 0.16 Total Defl1n. 0.05 = <L/999 0.25 = L/240 in 0.18 Additional Data: FAC ORS: F/E(psi)CD CM Ct CL CF CfU Cr Cfrt Ci Cn LC* 'T 180 1.15 1.00 1.00 - - - - 1.00 1.00 1.00 2 Fb1+ 900 1.15 1.00 1.00 1.000 1.300 1.00 1.00 1.00 1.00 - 2 FCP1 62,5 - 1.00 1.00 - - - - 1.00 1.00 - - E. 1.6 million 1.00 1.00 - - - - 1.00 1.00 - 2 Emin' 0.58 million 1.00 1.00 - - - - 1.00 1.00 - 2 CRITICAL LOAD COMBINATIONS: Shear : LC #2 = D+S, V max - 1107, V design = 880 lbs Bending(+): LC #2 = D+S, 14 - 1617 lbs-ft Deflection: LC #2 = D+5 (live) LC #2 = D+S (total) D=dead L=live S=snow W=wind I=impact Lr=roof live Lc -concentrated E-earthquake All LC's are listed in the Analysis output Load Combinations; ASCE 7-10 / IBC 2015 CALCULATIONS: Deflection: El 178e06 lb-in2 "Live" deflection - Deflection from all non -dead loads (live, wind, Snow...) Total Deflection - 1.50(Dead Load Deflection) + Live Load Deflection. Design Notes: -I 1. WoodWorks analysis and design are In accordance vvith the [CC International Building Code (IBC 2015), the National Design Specification (NDS 2015). and NDS Design Supplement. 2. Please verify that the default deflection limits are appropriate for your application. 3. Sawn lumber bending members shall be laterally supported according to the provisions of NDS Clause 4-4.1 COMPANY Design eultd 8elvIce" Inc. PROJECT 510 Ave N - Lot 2 28119 1201h I E :th 51 0 th AV N Wood"Works Monroe, WA 98272 Edmonds, WeA 98020 (360) 793-9659 Thuesen Custom Homes Apr. 12,2017 13:47 b89.wwb SOFTIVAREFOR WOOD DESIGN Design Check Calculation Sheet WoodWorks Bizet 11.0 Loads: Load Type Distribution P r:.t-n Location Iftl Start End Magnitude Start End Unit 1 J32 D. of Partial UDL 11, 0 00 3.50 27.6 27.6 if 2- 32 Live Partial UDL Yes 0:00 3.50 66.7 66.7 pif 3_3 33 Dead Partial UDL ?To 3.50 6.00 27.6 27.6 plf 4_5 33 Live Partial UDL Yes 3.50 6.00 66.7 66:7 plf Sj 33 Partial UDL Yes 3.50 6.00 -33.8 -33 8 plf 6__j 1 22 Dead Partial UDL if. 6.00 10 .0 a . plf Live Partial UDL Ye a 6.00 10:0000 38600.0 360.0 0 0 plf 17JI22 Solf-weight lDe.d lFull UDL 11. 7.0 olf Maximum Reactions (lbs) and Bearing Lengths (in): 10' 51-11 R* Unfact' red: Dead 12 568 Live 201 2121 S, ,act red: -18 - -67 Uplift 493 Total Beari ng: lee 2689 Length 0.50: 3.75 1 Kin req'd -Mi I—- ­­ 0.50 I ... ".ed 3.75 .a zupp� G M�;im­'Jm­ re-a-c'U"on on at least one support Is from a different load cornbinatio n in a n the Critical one for bearing design, shown here, due to Cd (actor. See Analysis results for reaction rrom critical load combination. b89 Lumber n-ply, Hem -Fir, No.2,U12,2-ply (21"Al-114") Supports: Ali - Lumber -soft Beam, D.Flr.L No.2 Total length: I&; volume = 2.3 cu.fl.: Service: wet: Lateral support: top= full, bottom= full; Repetitive factor. applied where permitted (refer to online help): Analysis vs. Allowable Stress and Deflection using NDS 2016; C�it.rion An! sis Klu, D;Zlgn yalue, Unit AnejX i54L-illa Sh .at _ f�� 61 116 -F.-I V fv5r 0 .52 Bending fla 32 Fb: 680 psi fb/Eb: 0.05 Pending Eh 678 Fb 680 psi fb/Fb 1.00 -0.00 <L/999 Interl. r Dead Live -0 .03 <L/999 0.20 L/360 in 0.14 To ta, -0. 03 <L/999 0 .30 L/240 in 0.11 Cantil. Dead 0.03 <L/999 Live 0.15 L/ 318 0 27 L/180 in 0.56 Total D .10 L/264 �40 L/120 in 0.45 Additional Data: FACTORS: F/E(psi)CD C14 ct CL CF Cfu C� cf.t Ci CR LCII Fv. 150 1-00 0-91 1-00 - - - - 1.00 0.00 1.00 2 Fbl+ a 50 1, go 1 00 1.00 1.000 1 000 1.00 1.00 1.00 0.80 - 5 Eb'- 8 So 1 00 1:00 1 00 1.000 1:000 1.00 1.00 1.00 0.80 2 Fcp' 4 0 5 : 0, 6,1 1:00 - - - - 1.00 1.00 - E. 1.3 million 0.90 1.00 1.00 0.95 6 E.in' 0.47 million 0.90 1.00 1.00 0.95 6 CRMCAL LOAD COMBINATIONS: She- : LC #2 D+L, V max = 1788, V design 1365 lbs ...dingf+): LC #5 D+L (pattern; L I, tl m 171 lb.-ft Br.ding(-): LC 92 D+L, K - 3576 Ib­ft Deflection: LC #6 (It-) LC total) D-dead L=live S!:n,.= Vl­(ind Imimpact L-roof live Le -concentrated E-earthquake All I'C 'a are listed in the Ana lys , s output Load Patterns: S-S/2, X�L+S or L+Lr, _-no pattern load in this span Load ombiriations. ASCE 7-10 / ISC 2015 CALCULATIONS: �eflection: El = 231e06 lb-in2/ply Lill" deflection = el�..Ii­ from all non-d,ad loads (live, viitd, sno­) Total Deflection = 1.00(Dead Load Deflection) + Live Load Deflection. Design Notes: I WoodWDrks analysi and design am In accordance with the ICC International Building Code QBC 2015). the National Design Specification (NDS 2015), and NDS Design Supplement. 2 Please verify that the default deflection limits are appropriate for your application. 3 Continuous or Cantilevered Beams: NDS Clause 4.2.5.5 requires that no"all grading provisions be extended to the middle 2/3 of 2 span beams and to the full length of cantilevers and other spans. 4 Sawn lumber bending members shall be laterally supported according to the previsions of NDS Clause 4A.l. 5. BUILT-UP BEAMS: it Is assumed that each ply Is a single continuous member (that Is, no butt joints are present) and that each ply Is equally top4oaded. Where beams are side�loaded, special fastening de�its may be required. 6. The critical deflection value has been determined using maximum b2ck-span deflection. Cantilever deflections do not govern design. 39/47 WoodWorkso SOFTWARE FOR WOOD DESIGN COMPANY PROJECT esign Build 'Servic 'e, D 11,12,,,,tE S'loo, 610 :th Ave N - Lot 2 21 510 IhAveN Monroe, WA 98272 Edroonds, WA 96020 (360) 793-9659 Thuesen Custom Homes Apr. 17, 2017 15:35 blOO.wwb Design Check Calculation Sheet Woodworks Sizer 11.0 Loads Load Type Distribution Pat- tern Location Iftl Start End Magnitude Start End Unit I 1130 Dead Full U L 11. 25.2 PIE - 2_jI3O Live Full U L Yes 80.0 plf 3 - 1131 e Di�ld Part,al UDL I Ila 0.00 2.00 136.3 136.3 plf 43131 L a Pa rt .1 UDL Yes 0.00 2.00 350.0 350.0 plf 5 J146 Dead Partial UDL Ila 2.00 5.50 136.3 136.3 PIE iijI46 Live Partial UDL Yes 2.00 5.50 350.0 350.0 PIE IJI47 Dead Partial UDL Ila 5.50 9.00 136�3 1345.3 plf 8 j 147 Li ­ Partial UDL Yes 5.50 9.00 350 0 350.0 plf Dead Partial UDL Ila 9.00 10.00 136.3 136.3 Elf -JI48 lo-JI48 Live Partial UDL Yes 9.00 10.00 350.0 350.0 pit 1S.If-.eiqht Dead -Flull UDL ]to 6.0 If Plf Maximum Reactions (lbs) and Bearing Lengths (in): Illy A" Unt crazed: Mal 317 ID42 '117 .v. Factored: 946 - 2675 5146 Total Beari 1263 - 3717 - 1263 ag: Length O.S: 1 32 - 0 ': a reg'd 0.5 1:32 0:5 ma ion on a least one support is tram a different toad Combination Inan Ute CnRCOl One for bearing design, shown here, due to C4 factor. See Analysis results for reaction from critical load combination. b100 Lumber -soft, D.Fir-L, No.2, W (3-1/2"x7-1/4") Supports: All - Timber -soft Column, D.Fir-L No.2 Total length: 10'; volume = 1.8 cu.fL; Lateral support: top= full, bottom= at all supports; � nalysis vs. Allowable Stress and Deflection using NDS 2015: C, teri- i Anal is Value n Design Value Unit 'i 'W ­4 k h; ; fv 07 Fv' IOU Pat fv� = .24. Bond fl, = 511 rb: 1170 psi 1b/Fb: 0 ' i=�: ll..d'ng - fb 724 Fb 1162 psi fb/Fb 0 6 :'2 Dead D.fl'i, 0.0 1 <L/999 Live Defl'. 0.02 �16/999 0.17 L/360 in 0.14 'lot at Dafl'a 0�03 <L/ 999 0.25 L/240 In 0.12 Additional Data: FAC ORS% F/E(p.i)C C14 Ct CL CF Cfa cr Cf�t Ci Cn Lc# FVT ISO 1.00 1.00 1.00 - - - - 1.00 1.00 1.00 2 Fb:+ 900 1.000 1.00 1 00 1.000 1.300 1.00 1 00 1 00 1.00 - 3 Ph - 900 1. 0 1.0. 1:00 0.993 1.300 1.00 1:00 1:00 1.00 2 FcP. 625 - 1,00 1.00 - - - - 1 00 1.00 - 1. mill on 00 1�0� 1. 1:00 1.00 3 Emi., 01;15 million 1.00 1.00 1.00 3 CRITICAL LOAD COMBINATION$: She ar : LC #2 D+L, V max = 1650, V design 1467 lbe Sending�+�z LC 43 D+L (pattern: L I, it - 1305 lb-ft ridi.g - : LC 02 D.L, 14 - 1849 lb-ft MB lection: LC 113 (live) LC 03 (total) D=de d L�live S=snow W-wi,d 1-impact Lr-roof live L-concentrat.d Em-thquake Al 1 22'. a.. listed In the Analysis output Load P.tt-­ a-S/2, X-L+S or L+Lr, _-no pattern load in this span Load ­mbi.atl... ASCE 7-10 / ZSC 2015 CALCULATIONS: Deflection: Er - 17OeO6 lb-i.2 'Livn� defl action Deflection from all non -dead loads (live, wind, sno-) .r.ta, De flection I.00(Dead Load Deflection) + Live Load Deflection. L.t ... I stability(-)! L. - 41­11�69" L- - RB - 8.4, 1. based an full pan Design Notes: I WoodWorks analysis and design are In accordance wth the ICC International Building Code (IBC 2ai 5), the National Design Specification (NDS 2015). and NOS Design Supplement, 2 Please verify that the default deflection limits am appropriate for your application. 3 Continuous or Canfilevered Beams: NOS Clause 4.2.5.5 requires that normal grading provisions be eAended to the middle 2/3 of 2 span beams and to [he tufl length of c;m1flevers and other spans. 4. Sawn lumber bending members shall be laterally supported according to the provisions of NOS Clause 4.41. ��C,701FO R T E" MEMBER REPORT Level, b89 1 piece(s) 117/8" TJ1@ 210 @ 16" OC . ..... .. 6' Overall Length: 10' 10 1/2" 4- N 9 9 All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal. pislifn Results . A 0 Res 4 t d: -mblirfati Member Reaction (lbs) 1715 @ 6' 5 1/4" 2145 (3.50") Passed (80%) 1.00 1.0 D + 1.0 L (All Spans) Shear (lbs) 891 @ 6' 7" 1821 Passed (49%) 1.00 1.0 D + 1.0 L (All Spans) Moment (Ft-lbs) -822 @ 6' 5 1/4" 3795 Passed (22%) 1.00 1.0 D + 1.0 L (All Spans) Live Load Defl. (in) 0.020 @ 8' 7 3/8" 0.106 Passed (L/999+) -- 1.0 D + 1.0 L (Alt Spans) I Total Load Defl. (in) 0.023 @ 8'7 11/16" 0.211 1 Passed (L/999+) 1.0 D + 1.0 L (Alt Spans) I TI-Pro"' Rating 70 40 1 Passed UCI IM110n Lfllend; LL t 14 -ttiu) anu I L k I/ &1U). Top Edge Bracing (Lu): Top compression edge must be braced at 8' 8" o/c unless detailed otherwise. Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 8'3" o/c unless detailed otherwise. A structural analysis of the deck has not been performed. Deflection analysis Is based on composite action with a single layer of 23/32" Weyerhaeuser Edge'" Panel (24' Span Rating) that Is glued and nalled down. Additional considerations for the TJ-PrW" Rating Include: None Su pooft- Accessories-: -Taltal �Amallable.z Requked DeAd Live Total I - Stud wall - SPF 3.50" 2.25" 1.75" 103 306/-41 409/-41 11/4" Rim Board 2 - Stud wall - SPF 3.50" 3.50" 3.50" 368 1346 1714 None 3 - Stud wall - SPF 3.50" 2.25" 1.75" 138 744/-51 E Board - Kim voaru is assumea Eo carry an ioans appiiea airectly above it, bypassing the member being designed. Loads on (S] die) Spacin I g D t d (6-90) Floorl-ive 9):. torifinents, - I -Tapered (PILF) 0 to 6 6" N/A 12.0 to 12.0 40.0 to 40.0 R 'Idential - Uving Areas 2 - Uniform (PLF) 0 to 66" N/A 28.0 67.0 3 - Uniform (PILF) 66" to 10' 10" N/A 80.0 360.0 W� rhaieui r Notbi.,_, Y0 Weyerhaeuser warrants that the sizing of its products will be In accordance with Weyerhaeuser product design criteria and putil Ished design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Refer to current Weyerhaeuser literature for Installation details. (www.wGodbywy.com) Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software' Use of this software Is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer Is responsible to assure that this calculation is compatible with the overall project. Products manufactured at Weyerhaeuser facilities are third -party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested In accordance with applicable ASTM standards. For current code evaluation reports refer to http://www.woodbywy.com/services/sLCodeReports.aspx. The product application, Input design loads, dimensions and support Information have been provided by Forte Software Operator 4 Vni ' System : Floor Member Type: Joist Building Use : Residential Building Code � IBC 2015 Design Methodology : ASC, SUSTAINABLE FORESTRY INITIATIVE Forte Software Operator I Job Notes I Michael Leachman P.E. Design Build Services (360) 793-9659 MLeachman@dbsmonroe.com 3/31/2017 11:58:53 AM Forte v5.2, Design Engine: V6.6.0.14 Thuesen-510 8th Ave N.4te Page I of 1 F 0 R T E " MEMBER REPORT Level, j29 1 piece(s) 117/8" TX@ 210 @ 16" OC 0 All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal. Ddsi6nllteiiiults:� A !4 Lo'-iiiiiii, "it �100: Com Member Reaction (lbs) 1254 @ 17' 5 1/4" 2145 (3.50") Passed (58%) 1.00 1.0 D + 1.0 L (All Spans) Shear (lbs) 584 @ 17'7" 1655 Passed (35%) 1.00 1.0 D + 1.0 L (All Spans) Moment (Ft-lbs) 2386 0 8'6 1/16" 3795 Passed (63%) 1.00 1.0 D + 1.0 L (Alt Spans) Live Load Defl. (in) 0.309 @ 8- 9 7/8" 0.431 Passed (1.1670) 1.0 D + 1.0 L (Alt Spans) Total Load Defl. (in) -0.111 @ 19'7" 0.215 Passed (2L/464) 1.0 D + 1.0 L (Alt Spans) TJ-PrW- Rating 42 40 Passed Deflection criteria: LL (1.1480) and TL (1.1240). Overhang deflection criteria: UL (2L/480) and TL (2L/240). Top Edge Bracing (Lu): Top compression edge must be braced at 4' 9" o/c unless detailed otherwise. Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 7' 2" o/c unless detailed otherwise. A structural analysis of the deck has not been performed, Deflection analysis Is based on composite action with a single layer of 23/32" Weyerhaeuser Edge'" Panel (24" Span Rating) that Is glued and nailed down. Additionaf considerations for the T3-Pro'" Rating Include: None Suppoll. .6 nq Len L S:��u Acceisories; Total- Ag��allable,, Re ul d 4 Ire Dea� 066 k., L7,vd T6 I - Stud wall - SPF 3.50" 2.25, 1.75" 119 471/-35 590/-35 11/4" Rim Board 2 - Stud wall - SPF 3.50" 3.50" 3.50" 361 892 1253 Blocking Rim Board Is assumed to carry all loads applied directly above IL bypassing the member being designed. Blocking Panels are assumed to carry no loads applied direcdy above them and the full load Is applied to the member being designed. 0loor-Live�` Loads" ti n L .4-0 (Sloe)- Soacirfg;, td.110), JI 013).,� Comm6its 1 -Uniform (PSF) 0 to 19`7' 16" 12.0 40.0 Residential - Living Areas 2 - Point (lb) IV 6" NIA 167 278 W� rhaledi-41iott", Weyerhaeuser warrants that the sifing of its products will be In accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Refer to current Weyerhaeuser literature for Installation details. (www.woodbyvvy.com) Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Use of this software Is not Intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation Is compatible with the overall project Products manufactured at Weyerhaeuser facilities are third -party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested In accordance with applicable ASTM standards. For current code evaluation reports refer to http://www.woodbywy.com/services/s�,�deReports.aspx. The product application, Input design loads, dimensions and support Information have been provided by Forte Software Operator ME 4 T' system : Floor MemberType : 3olst Building Use : Residential Building Code : IBC 2015 Design Methodology: ASD 0 SUSTAINABLE FORESTRY INITLATIVE Forte Software Operator Job Notes Michael Leachman P.E. Design Build Services (360) 793-9659 MLeachman@dbsmonroo.com 3131/2017 10:16:27 AM Forte v5.2, Design Engine: V6.6.0.14 Thuesen-510 8th Ave, N.4ta Page I of I V MEMBER REPORT Level, j31 at 12" aFORTE' I plece(s) 117/8" TJI@ 210 @ 12" OC 0 Overall Length: 21'7" 'I f 19, 2' All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal. P. A19wO. R"11 ll%�, laRF" _:-Co Member Reaction (lbs) 501 @ 2 1/2" 1134 (2,25") Passed (44%) 1.00 1. 0 D + 1.0 L (Alt Spans) Shear (lbs) 491 @ 3 1/2" 1655 Passed (30%) 1.00 1. 0 D + 1.0 L (Alt Spans) Moment (Ft-lbs) 2360 @ 9' 8 13/16" 3795 Passed (62%) 1.00 1.0 D + 1.0 L (Alt Spans) Live Load Defl. (in) 0.362 @ 9'9 7/8" 0.481 Passed (L/637) 1.0 D + 1.0 L (Alt Spans) I Total Load Defl. (in) -0.145 @ 21' 7" 0.215 Passed (2L/356) 1.0 D + 1.0 L (Alt Spans) I TJ-Pro- Rating 41 40 Passed Deflection criteria: LL (L/480) and TIL (L/240). Overhang deflection criterix U. (21.1480) and TIL (21.1240). Top Edge Bracing (Lu): Top compression edge must be braced at 4'9" o/c unless detailed otherwise. Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 8'8" o/c unless detailed otherwise. A structural analysis of the deck has not been performed. Deflection analysis Is based on composite action with a single layer of 23/32" Weyerhaeuser Edge" Panel (24" Span Rating) that is glued and nailed down. Additional considerations for the TI-Pre" Rating include: None suppq :.. , _: � i- ': ,, :.' : , - �"ds-to Supports (Ibs). '4t:c�s es Total 0 equlr4 Dead�:� Floor Total I - Stud wall - SPF 3.50" 2.�5- 1.75" 113 393/-18 506/-18 11/4" Rim Board 2 - Stud wall - SPF 3.50" 3.50" 3.50" 175 652 827 Blocking • Rim Board is assumed to carry all loads applied directly above It, bypassing the member being designed. • Blocking Panels are assumed to carry no loads applied directly above them and the full load Is applied to the member being designed. "..Deid,': "Floo' U r ivet'. Loads Locatlow(!514e�_::.: Spacing (600i (:t.00). � Co ents' TM , I -Uniform (PSF) 0 to 21'7" 12" 12.0 40.0 Residential - Living Areas 2 - Point (lb) 21' 6" NIA 29 160 e euser,'Note-i'�­: Weyerhaeuser warrants that thesizing of its products will be in accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software. Refer to current Weyerhaeuser literature for installation details. (www.woodbywy.com) Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software, Use of this software Is not intended to circumvent the need for a design professional as determined by the authority having jurisdiction, The designer of record, builder or framer Is responsible to assure that this calculation Is compatible with the overall project Products manufactured at Weyerhaeuser facilities are third-parLy certified to sust3inable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-11S3 and ESR-1387 and/or tested In accordance with applicable ASTM standards. For current code evaluation reports refer to ht4)://www.woodbywy.com/serAces/s�-GodeReports.aspx. The product application, inputriesign loads, dimensions and support Information have been provided by Forte Software Operator 4 YIfi ' System: Floor Member Type: Joist Building Use : Residential Building Code ; IBC 2015 Design Methodology : ASO SUSTAINABLE FORESTRY INITIATIVE Forte Software Operator I Job Notes I Michael Leachman P.E. Design Build Services (360) 793-9659 MLeachman@dbsmonroe.com 313112017 10:18:30 AM Forte v5.2, Design Engine: V6.13.0.14 Thuesen-510 8th Ave N.4te Page I of 1 aFORTF MEMBER REPORT Level, j31 I piece(s) 117/8" TJI@ 560 @ 16" OC Overall Length: 217' 0 .... .... .. ..... .. . 2- All locations are measured from the outside face of left support (or left cantilever end).All dimensions are horizontal. 0 ,Design 1116sults-. -Actua 016catlori IdWed "�u lt��: I . ..... .... Member Reaction (lbs) 669 @ 2 1/2" 1396 (2.25") Passed (480%) 1.00 1.0 D + 1.0 L (Alt Spans) Shear (lbs) 656 @ 3 1/2" 2050 Passed (32%) 1.00 1.0 D + 1.0 L (Alt Spans) Moment (Ft-lbs) 3156 @ 9' 9" 9500 Passed (33%) 1.0D 1.0 D + 1.0 L (Alt Spans) Uve Load Defl. (in) 0.265 @ 9' 9 7/8" _ 0.481 Passed (L/869) 1.0 D + 1.0 L (Alt Spans) Total Load Defl. (in) -0.101 @ 21' 7" 0.215 Passed (2L/512) 1.0 D + 1.0 L (Alt Spans) TJ-Prol- Rating 47 40 JPassed Deflection criteria: U. (1.1480) and TL (L/240). Overhang deflection cdteda: LL (2L/480) and TL (2L/240). Top Edge Bracing (Lu): Top compression edge must be braced at 10'o/c unless detailed otherwise. Bottom Edge Bracing (Lu): Bottom compression edge must be braced at 14'7" o/c unless detailed otherwise. A structural analysis of the deck has not been performed. Deflection analysis Is based on composite action with a single layer of 23/32" Weyerhaeuser Edge— Panel (24" Span Rating) that Is glued and nailed down. Additional considerations for the TJ-Pro— Rating Include: None Blearing.. th 0a sbc . �S 0 0ports_CIM)_­.­_- A ccessories' lReqbIred D"d z Floor ve�. I - Stud wall - SPF 3.50" 2.25" 1.75" 152 524/-18 676/-18 11/4- Rim Board 2 - Stud wall - SPF 3.50" 3.50" 3.50" 222 811 1033 Blocking Win Hoard Is assumed to carry all loads applied directly above lt� bypassing the member being designed. Blocking Panels are assumed bD carry no loads applied directly above them and the full load is applied to the member being designed. '.be , ad F oor LIve Loads L tilibril(Side)- ��_s adnii _ , ) (R-K - ORT9 nts 1 -Uniform (PSF) 0 to 21'7" 16" 12.0 40.0 Residential - Living Areas 2 - Point (lb) 21- 6" N/A 29 160 Weyerhaiidier Noteis:,I'..�.-:,. Weyerhaeuser warrants that the sizing of Its products will be In accordance with Weyerhaeuser product design criteria and published design values. Weyerhaeuser expressly disclaims any other warranties related to the software, Refer to current Weyerhaeuser literature for installation details. (www.woodbywy.com) Accessories (Rim Board, Blocking Panels and Squash Blocks) are not designed by this software. Use of this software Is not Intended to circumvent the need for a design professional as determined by the authority having jurisdiction. The designer of record, builder or framer is responsible to assure that this calculation Is compatible with the overall project. Products manufactured at Weyerhaeuser facilities are third -party certified to sustainable forestry standards. Weyerhaeuser Engineered Lumber Products have been evaluated by ICC ES under technical reports ESR-1153 and ESR-1387 and/or tested in accordance with applicable ASTIVI standards. For current code evaluation reports refer to http://www.woodbywy.com/services/sLCodeReports.aspx. The product application, Input design loads, dimensions and support Information have been provided by Forte Software Operator 4300ED System ; Floor MemberType : Joist Building Use : Residential Building Code : IBC 2015 Design Methodology: ASD SUSTAINABLE FORESTRY INITtATIVE Forte Software Operator I Job Notes I Michael Lelchman P.E. Design Build Services (360) 793-9659 MLeachman@dbsmonroe.com 3/31/2017 10:07:04 AM Forte v5.2, Design Engine: V6.6.0.14 Thuesen-510 8th Ave N.4te PagE� 1 Of I/ COMPANY Design Build Services, Inc. PROJECT 510 81h Ave N - Lot 2 28119 - 120th St. S.E. 610 Ifth Ave N WoodWorks' Monme, WA 98272 Edmonds, WA 98020 PH: 360-793-9659 Thuesen Custom Homes Mar. 31. 2017 13:48 J39 SOFTWAREFOR WOOD DESIGN Design Check Calculation Sheet. WoodWorks Sizer 11.0 Loads: Load Type at L.. t Nagai tud.rrull Uni 1, - t t:tion I rt E d Sta UDL Y1.1 P �t Lo d2 jL1:dI..i'h' ISn" D d :,ad 1"ull Full UDL N. I plf se, f- Full UDL To Pli Maximum Reactions (lbs) and Bearing Lengths (in) : V-AI.T Unf red: p:ct' ad 127 13 'n" Factored: - 166 2 BaT.t.2 . ring: - 293 195 Langt 0 50. 0.50. Min rheq I d 0:50 0.50. *Mi ..-Onnum AIL� settina used: 1/2' for end upparls nd IIX for Interior supports 1. ­.­ -11. ­­­ ­­ . .1.. ­ _". ". -, '." .. - 1 -1 .... W. _­.'u ­­ ­­, - to � iauur. - -ty5is resuns ror macuon Trom cmicat mao canuaDalum. J39 Lumber -soft, Hem -Fir, No.2,2x6 (1-1/2"x6-112") Supports: All - Non -wood Roofjolst Spaced at 24.0' CID; Total length: 6*-1 J,3-; Volume = OA WA.; Pitch: 8/12: Lateral support: top= full, bottom= at supports; Repetitive tactar: applied where permitted (refer to online help); Analysis vs. Allowable Stress and Deflection usina Nos 2016: Criterion A..Iy�i. Value Design Value Unit An" 'WR"i' S .. tv n Fv� 1 T2_ -F. -i 1�7 ON, Bond in,,,, flo 329 Fb: 1461 psi fb/Fb' 0.23 13.nding(-) Deflection: b 70 Fb 1342 psi fb/Fb' 0.05 Interior Dead 0.02 <L/999 ':" IL/999 0:27 L/240 in 0.09 'Live ot." . 05 <L/999 0 36 L/180 in 0.13 Cantil. Dead -0.01 �L/999 Live :0 2 L/930 G. 11 W110 in 0 13 For., .:0 .3 L/466 0.16 L/90 1. 0:19 Additional Data: FACTORS: FYEip.i)CD 04 ct CL CF Cfu Cr Cfrt C1 Cn LC# Fv' 150 1.15 140 1.00 - - - - 1.00 1. 0 0 1. Do 2 Fb:+ so 1.15 1.00 1.00 1.000 1�300 1.00 1.15 1.00 1.00 4 Fb . 1,15 1�00 1.00 0.918 1.300 1.00 1.15 1.00 1.00 2 Pep 405 - 1.00 1.00 - - - - 1.00 1.00 - E' 1, 3 mill ion 1.00 1. 0 0 1.00 1.00 4 E.W 0.4 7 million 1.00 1.00 1.00 1.00 4 CRITICAL LOAD COMBINATIONS: Shear ; LC #2 D+S, V max = 173, V design 144 lea Bending(+); LC 44 D+S (pattern: S), M - 208 lb-ft B ending( - 1: LC #2 D�S, M - 44 lb.-ft Deflection- LC #4 �liv.) LC #4 total) D-dead,L-linS=an.. W=.i.d I-L.Pact Lz=roof live Lc -concentrated E-earthquake Al I LC a are isted in the Analysis output Load Patterns: 3:S/2, X=�+S or L+Lr, -no pattern load in this span Load combin.ti an ASCE 7-10 / t9C 2015 CALCULATIONS: �Lflection: EI 27.OeO6 lb-in2 ive� deflecti n - Deflection from all non -dead load. (live, ind, To ta I Defl. cti.. 1.50(Dead Load Deflection) + Live Load Deflection. Bearing: Allowabl a bearing at an angle F'theta calculated tor each support as p r DDS 3.10.3 Lateral stability(-): Lu - 5-4.88' Le - 9--l.94- RB = 16.4; Lu based on full span Design Notes* I WoodWorks analysis and design are In accordance with the [CC International Building Code (IBC 2015), the National Design Specification (NDS 2015), and NDS Design Supplement. 2 Please verity that The default deflection limits am appropriate for your application. 3 Continuous orCantilevered Beams: NOS Clause 4.2.5.5 requires that normal gmdlng provisions be extended to the middle 2/3 of 2 span beams and to the full length of cantilevers and o1her spans. 4 Sawn lumber banding members shall be laterally supported according to the provisions of NDS Clause 4.4.1. 6 SLOPED BEAMS: level bearing Is required for all sloped beams, 6. The vilicall deflection value has been determined using maximum back -span deflection. Cantilever deflections do not govern design. WoodWorks COMPANY Design Build Services, Inc. 28119 - 120th St. S.E� PROJECT 510 8th Ave IN - Lot 2 510 8th Ave N Monroe, WA 98272 Edmonds, WA 98020 sornVARF FOP? WOOD OESIGN PH: 360-793-9659 Thuesen Custom Homes Mar. 31, 2017 09:41 j51 Design Check Calculation Sheet WoodWorks Sizer 11.0 Loads: Load Type I DistributionlPat-1 I Location [ftIl M.!nitud.." Unit tprn- Rt-n rt- Loadl Snow FU 33.3 plf Load2 Dead IDead Fi: IFU J 20.0 plf Se f-weight .1 2.9 plf Maximum Reactions (lbs) and Bearing Lengths (in): 12'-0,6" Unfactored; Dead 138 Snow 201 138 Factored: 201 Total 338 Bearing: 338 Length 0.56 in req'd 0.56 0.56 n ;r j5l Lumber -soft, Hem -Fir, No.2, WO (11-112"xg-11/4") Supports: Ail - Non -wood Floor joist spaced at 16.0" c1c; Total length: 12'-0.6"; volume = 1.2 cu-ft.; Lateral support: top= full, bottom= at supports; Repetitive factor: applied where permitted (refer to online help); Analysis vs. Allowable Stress and Deflection using Nos 2015: Criterion - An2ly�is Y Design Val u8_ Unit Ana I s�Oesign Shear fV 3!lue Fv' = 172 psi s! V ; PY,7F 0.18 Bending(+) fb = 567 Fb' = 1237 psi fb/Eb' = 0.46 Dead Defl1n 0.08 = <L/999 Live DeflIn 0.12 = <L/999 0.40 = L/360 in 0.30 T tal Deflln 0.25 = L/586 0.60 = L/240 in 0.41 Additional Data: FACTORS: F/E(psi)CD Cm Ct CL CF Cfu Cr Cfrt Ci Cn LC# Fv' ISO 1.15 1.00 1.00 - - - - 1.00 1.00 1.00 2 Fbl+ 850 1.15 1.00 1.00 1.000 1.100 1.00 1.15 1.00 1.00 - 2 Fcp' 405 - 1.00 1.00 - - - - 1.00 1.00 - - El 1.3 million 1.00 1.00 - - - - 1.00 1.00 - 2 Emin' 0.47 million 1.00 1.00 - - - - 1.00 1.00 - 2 CRITICAL LOAD COMBINATIONS: Shear : LC 02 = D+S, V max = 337, V design = 293 lbs Bending(+): LC #2 = D+S, M = 1012 lbs-f-t Deflection: LC #2 = D+S (live) LC #2 = D+S (total) D=dead L=live �=snow W=wind I=impact Lr=roof live L.c=concentrated E=earthquake All LC's are I Is ted in the Analysis output Load combinations: ASCE 7-10 / IBC 2015 CALCULATION& Deflection: EI 129eO6 lb-in2 "Live" deflection = Deflection from all non -dead loads (live, wind, snow Total Deflection = 1.50(Dead Load Deflection) + Live Load Deflection. Design Notes: 1. WoodWorks analysis and design are in accordance with the ICC International Building Code (IBC 2015), the National Design Specification (NDS 2015), and NDS Design Supplement. 2. Please verify that the default deflection limits are appropriate for your application. 3. Sawn lumber bending members shall be laterally supported according to the provisions of NDS Clause 4.4.1. I/ COMPANY Design Build Services, Inc. PROJECT 511081hAv N�W2 28119 - 120th St. S.E. Monroe, WA 98272 510 81h Av: N Edmonds, WA 98020 WoodWorakso PH: 300-793-9669 Thuesen Custom Homes Mar. 31, 2017 09:42 J103 SOFTWAREFOR WOOD DESIGN Design Check Calculation Sheet WoodWorks Sizer 11.0 Loads Load Type IDi.�irilbuli.rilt:tj L.11still I1tjj ..gmI1�deEnjU.it r 't � d ". Et Lo:- D., �esj 0 boo: L d2 1S.0- .'I IFUI I U D Ito I 3 0 1p1f plif Self -weight Dead Full UDL Ito 2.2 pif Maximum Reactions (lbs) and Bearing Lengths (in): W-0.3' t Unf ored: :1.1 D r, 163 12 Snow' Fact di 253 20� .. Total Bee 416 327 ring: Length - 0.50; 0.51� III n req'd 0.3 0."'1 -minimum murnigrunguriserung u5cu: ii, iormaeriorsuppons Maximum reaction on at least one support is from a different load Combination than the critical one for bearing design, shown hem, due to Cd factor. See Analysis results for reaction from critiral load combination. J103 Lumber -soft, Hem -Fir, No.2, W [11-112'W-1/4") Supports: Al - Nonwood Roofjolst spaced at 24.0' dc; Total length: 0.0.3'; volume = 03 cuk; Lateral support top= full, bottom= at supports: Repetitive factor. applied where permitted (refer to online help); Analysis vs. Allowable Stress and Deflection using Nos 2015: Criterion An��zis �Lalue nesign Value Unit An" . "" _ Shear f 39 rr, 172 psi F. .ending(.) fl, 58 Eb' 1349 psi fb/Fb' 0.44 Ilendi-gl-1 be I fb 3: Fb' 970 psi fb/Fb' 0.04 ectiont Interior Dead 0.05 <L/999 Live 0.07 <L/999 0.40 L/240 in 0118 Total 0.1 4 L/674 0.53 L/180 in 0.27 Cantil. Dead -0.02 L/670 .. 7 L/"2 0:1 In 0:229 L'V' Total 013 L .:0 01, Ll�l� 10 . 3 L/T , in 0 4 Additional Data: FACTORS: F/E(p.i)CD Cm Ct CL CIF CfU Cr Cfrt C1 Cn LCH F�, ISO 1.15 1.00 1.00 - - - - 1.00 1.00 1.00 2 Flil. 8 50 1.15 1.00 1.00 1. 000 1.200 1.00 1.15 1.00 1.00 - 4 Ili- 850 1.15 1.00 1.00 0.719 1.200 1.00 1.15 1.00 1.00 2 Fcpl 405 - - - 1.00 1.00 - E 1.3 1 1.00 11.0 - nuill on 1.10 1 0 I.Do 1.00 4 E.i .47 ..1 1.. l .00 1 ..0 1.00 1. 00 4 CRIT CAL LOAD COMBINATIONS: It shear LC #2 D+S, V max - 334, V de sign 283 lb, B:nclin,fl+�: LC 94 D'S,(pattern - 6 , 4 lbs- f t H ndi q - : LC #2 D+S M - 41 1 - t Da, lection, LC 94 (live) LC #4 (total) D-dead L=Iiv. S-sn-w ?I ­wind I=impact Lr-roof live L-concentrated E=earthquak. All LC 's a re 1 Isted In the Analysis output Load Patterns: ­S/2, X-L+S or L+Lr, _-no pattern load in this span Load combinations: ASCE 7-10 / IBC 2015 CALCULATIONS, �Leflection: El - 61.9eO6 Ib-in2 ive� deflection = Deflection from all non -dead loads (live, wind, no-) Total Defl eti.. - 1.50(Dead Load Deflectionl, + Live Load Deflection. Lateral stabilityi-): Lu = 0' Le = 13-4.00" RB = 22.71 Lu based on full span Design Notes: I WoodWorks analysis and design am In accordance with the ICC International Building Code (IBC 2015), the National Design Specification (Nos 2015), and Nos Design Supplement. 2 Please verify that the default deflection limits are appropriate for your application. 3 Continuous or Cantilevered Beams: NDS Clause 4.2.6.5 requires that normal grading provisions be extended to the middle 2J3 of 2 span beams and to the full length of caitilevers and other spans. 4' Sawn lumber banding members shall be laterally supported according to the provisions of NOS Clause 4.4.1, 5. The critical deflection value has been determined using maximum back-spian deflection. Cantilever deflections do not govern design. V WoodWorks SOPnVARE FOR 1V0G9DE5fGN COMPANY Design Build Services, Inc. 28119 - 120th St. S. E. Monroe, WA 98272 PH: 360-793-9659 Mar. 31, 2017 14:17 PROJECT 510 8thAve N - Lot 2 5108thAveN Edmonds, WA 98020 Thuesen Custom Homes j122 Design Check Calculation Sheet WoodWorks Sizer 11.0 Loads: Load Type Distribution tion Ift) Magnitude Unit -fo-adl End Start End Live full A­UDL 80.0 plf Load2 Live Full UDL 40.0 plf Load3 Dead Full UDL 20.0 plf S elf -weight Dead Full UDL 3.5 plf Maximum Reactions (lbs) and Bearing Lengths (in): 12'-1.4" 7�.-f .Ct.r.d- - Dead 142 Live 727 142 Factored- - 72-1 Total 869 - Bearing; - B69 Length 1.43 M n recild 1.43, 1.4- _ 1 1.4 1 j122 Lumber -soft, Hem -Fir, No.2, 2x12 (1-1/2"xl 1-1/4") Supports: All - Non -wood Floor joist spaced at 16.0" c/o; Total length: volume = 1.4 cu.ft.; Lateral support: top= full, bottom- at supports; Repetitive factor. applied where permitted (refer to online help); Analysis vs. Allowable Stress and Deflection using NDS 2015: Criterion Analysis Value I DARign V�1­ I Tj.i� I Shear fv 641 rv, = 150 psi f;/F'v' = 0.43 Bending(+) tb 960 Fb1 = 977 psi fb/Fbl = 1.00 Dead Defl1n 0.05 <L/999 Live Defl1n 0.24 L/595 0.40 = L/360 in 0.60 Total Deflln 0.31 L/460 0.60 = L/240 in 0.52 Additional Data: FAC ORS- F/E(psi)CD C14 Ct CL CF CfU Cr Cfrt Ci Cn' LC# 'T ISO 1.00 1.00 1.00 - - - - 1.00 1.00 1. 0 0 2 Flo', 850 1.00 1.00 1.00 1.000 1.000 1.00 1.15 1.00 1.0o - 2 FcP1 405 - 1.00 1.00 - - - - 1.00 1.00 - - E' 1.3 million 1.00 1.00 - - - - 1.00 1.00 - 2 Emin' 0.47 million 1.00 1.00 - - - - 1.00 1.00 - 2 CRITICAL LOAD COMBINATIONS: Shear : LC #2 = D+L, V max = 861, V design 716 lba Bending(+)* LC 92 = D+L, M = 2583 lbs-ft Deflection: LC 92 = D+L (live) LC 42 = D+L (total) D=dead L--live S=snow W=wind I=impact Lr=roof live Lc -concentrated E=earthquake All LC's are listed in the Analysis output Load combinations! ASCE 7-10 / IBC 2015 CALCULATIONS: Deflection: EI = 23leO6 lb-in2 "Live" deflection = Deflection from all non -dead loads (live, wind, snow Total Deflection = 1.50(Dead Load Deflection) + Live Load Deflection. Design Notes: -I 1. WoodWorks analysis and design are in accordance with the ICC International Building Code (IBC 2015), the National Design Specification (NDS 2015), and NDS Design Supplement. 2. Please verify that the default deflection limits are appropriate for your application. 3. Sawn lumber bending members shall be laterally supported according to the provisions of NDS Clause 4.4A. COMPANY Design Build Services, Inc. PROJECT 51011thAv N-LO12 28119 1201h St SE $11) 81h Av: N WoodWorks' Monroe, WA 98272 Edmonds. WA 98020 (360) 793-9659 Thuesen Custorn Homes Apr. 12,2017 13:14 PCI.%vwb SOFnVARE FOR WOOD DESIGN Design Check Calculation Sheet WoodWorks Sizer 11.0 Loads: Load Type DistributionlP:t- t rn Location [ftl Start End Magnitude Start End Unit 1�cqii Teed point ZI:a L5 758 lbs 2_c96 Snow point Y 000 15: a 1 252 1 bs 3c97 Dead Point N. 11.00 758 lbs 4.97 Snow Point Yes 11.00 1252 lbs s-ells Dead Point If. 10.00 871 lb. 6_c115 an.. Point Yea 10.00 1375 lb. 7-y3e Dead Partial UDL fro 4.00 18.00 375.7 375.7 plf 8_W38 Live Partial UDL Yes 4.00 18.00 180.0 180.0 plf 5r_w38 Show Partial UDL Yes 4.00 18.00 626.1 626.1 plf 10�_cl`? Dead Point NO 18.00 1428 lb. ll-cl7 5.0. Point Yea le.00 2252 lb. 1205 Dead point ff. 4.00 501 lb. 13_c35 Live Point Yea 4.00 120 lb. 1405 Snow Point Yes 4.00 634 lb. 15�_.36 Dead Point IT. 0.00 154 lbs IiS_06 S ... Point Yea 0.00 746 lb. 17_.40 Dead point 11. 9.00 521 lb. le-.40 Live Point Yea 9.00 320 lb. 19-c4o Snow Point Yea 9.00 692 lb. L..d20 Dead Full UDL If. 250.0 plif -Self-ight -Dead lFull UDL no 42.3 1plf Maximum Reactions (lbs) and Bearing Lengths (in) 18, Unfactored: Dead 1403 9753 Live 241 2180 4:52 ';15 111, 1311 10406 P. c.radt 5618 Total 2790 20160 - .... ng : 9970 Length 0.50, 2.43 - Kin req'd 0.50- 2.43 1.39 Wintmurn hearing leng selling used: 1/2' for end su rts 1 39 PPO Maximum reaction an 8 least one support Is from a different load Combination than the Critical one for hearing design, shom hem, due to Cd factor- See Analysis results for feaction from critical load combInation. PCI Timber -soft, D.Fir-L, No.2,12x16 (11-1/2"MIS-1/2") Supports: All - 71mber-soll Column, D.Fsr-L No.2 Total length: IW; volume = 22.3 CUM.; Beam and stringer. Lateral support: top= full, bottom= at all supports; Analysis vs. Allowable Stress and Deflection using NOS 2016: Criterion 11-1" I n9i q!=2 �-W' A_a'4' 414"2n. Shear --1' - Pit �.i 1; 7 ...d 9 11 �+; fb 332 Eb - 975 P:i fb/Fb: - 0.34 Bending - fb 410 Eb: = 975 p i fb/Fb � 0.42 Dead Defl'n 0.0 1 'L 9 Live DeflIn D. " 2 /9:9 L/9 0.30 = L/360 in 0.07 Total DeflIn 0.03 <L/999 0.45 = L/240 in 0.08 The effect of point loads within a distance d or the support has been included as per JUDS 3.4.3.1 Additional Data: FACTORS: F/E(p.i)CD CH Ct CL CF Cfu Cr Cfrt Ci C. LC# Fv, 170 1 .1 5 1. 0 0 3. ' 00 - - - - 1.00 1.00 1.00 '4 Eb:+ 875 1.15 1.00 1.00 1.000 0.969 1.00 1.00 1.00 1.00 - 9 Flo - 875 1.15 1.00 1.00 1.000 0.969 1.00 1.00 1.00 1.00 4 Fcp' 62 1 - 1 00 1.00 - - - - 1.00 1.00 - E' 1 .3 million 1:00 1.00 - 1.00 1.00 9 CRITICAL LOAD COMBINATIONS: shear : LC #4 WS, V max - 11763, V design- 9261 lbs Bending(+): LC #9 D+S (pattexn: as), 14 - 12753 lbs-ft B..dinq(-): LC 04 D+S, M = 15744 lb-ft Deflection: LC #9 :livel LC #9 total) D'd,,d -live 1­­ -I.d I-1-P--t L-00f live L-concentrated E=carthquaks, Al I L.'� a re 1 1 s red in the Analysis output Load Patterns: ­512, X-L+S or L+L., pattern load in this span Load combinations: ASCE 7-10 / IBC 2015 CALCULATIONS: F �zflection: 'l 4639.06 lb-inZ i" deflection - Deflection, from all o-de.d leads (live, wind, sno-) Total nefle ction - 1.01)(Dead Load Deflection) + Live Load Deflection. Design Notes: I WoOdWorks on:lysls and design are in accordance YAM the ICC International Building Code (IBC 2015), the National Design Specification (NOS 2015), and NDS Design Supplement. 2 Please verify th t the default deflection limits am appropriate for your application. 3 Continuous or Cantilevered Beams: Nos Clause 4.2.5.5 requires that nonnal grading Provisions be extended to the middle 2J3 of 2 span beams and to [tie full length of cantilevers and other spans. 4' Sa%vn lumber bending members shall be laterally supported according to the previsions of Nos Clause 4.4.1. 1 F] PCI.wwb Snow Live Dead I WoodWorks@ Sizer SOFTWARE FOR WOOD DESIGN I WoodWorks@ Sizer 11.0 Apr. 12, 2DI7 14;23:26 01 4- 9. 10, Ill 15, 18' /017 6: W-00, 625.7 --250 1� 0 plf 1-1 E PC1.wwb Critical Results WoodWorks@ Sizer SOFTWARE FOR WOOD DESIGN WoodWorks@Slzer11.0 ANALYSIS DIAGRAMS (known section - includes self -weight) Apr. 12, 2017 13:14:00 REACTION (lbsl maximum... Uplift: 0 Bearing: 20160 T, 90 T9170 0� SHEAR [lbs] Load Combination 0 +V max: 11763 -V max: - 7183 V design: 9261 261 8'-9.3- IT-6.5" Design shear < maximum due to notching or loads: ignored within distance "d" of supports without notches. BENDING (lbs-ft) Load Combination # +M max: 12753 Load Combination 9 -M max: -15744 12753 0 Z�, 15744 01 54.2" &-9.3" 14'-8.1 17'-6.5" TOTAL DEFLECTION (in] Load Combination # Total = 0.00 x Dead + Live (all others) Critical Li�e: 0.02 Critical Total: 0.03 -0 0-00 0.00 0.01 .01 0.02 0.03 0, W-9.3" 4/17 Concrete Beam Design Report Page 1 Concrete Beam Design Job: 30227 Designed By: RDH PE Beam ID: PCI-2 Checked By: Date: 4/12/2017 3:05:12 PM Program: Concrete Beam Design 4.0 Description: Grade Beam Code ACI (2011) Design Method Ultimate Strength Member Type Beam Cross Section Shape Ledger Beam Sn.qn Data - Main Span Length 10.000 Ft Left End Support Fixed Right End Support Fixed Left Support Width 4.000 In Right Support Width 4.000 In Left Haunch Start Location Not Present Right Haunch Start Location Not Present Cross Section Data: Total Depth at Mid -Span 22.000 In Top WiTth at Mid -Span 8,000 In Flange Height at Mid -Span 12.000 In Bottom Width at Mid -Span 12.000 In Ed Mntp.riAl T)nfn! fe 2.500 K/In' Flexural Reinforcing fy 60.000 W Concrete Density 144.000 Lb/Fe Shear Reinforcing fyy 60.000 KlIn2 Concrete Tensile Strength 0.420 Win' Stress Block, Beta 0.850 Dmian Crifi-.rin- Bottom Cover to Stirrup 3.000 In Top Cover to Stirrup 1.500 In Side Cover to Stirrup 1.500 In Total Load Deflection Limit U240.00 Live Load Deflection Limit U360.00 AHow Cuts in Tension Zone N Check Crack Control Provisions Y ECHO OF LOAD INPUT DEAD LOAD LIVE LOAD WIND LOAD EARTHQUAKE LOAD ROOFLOAD Check Deflection: Yes Main Span I Concentrated Load: -0.760 K -1.252 K Distance: 6.000 Ft 6.000 Ft I Uniform Load: �_Distance -0.626 K /Ft -0.626 K /Ft to Begin: 0.000 Ft 0.000 Ft I Distance to End: 10.000 Ft 10.000 Ft CRITICAL SHEARS & MOMENTS Load Combination Dead Load: 1.400 x Dead Load Load Combination # 1: 1.200 x Dead Load + 1.600 x L + 0.500 x R Load Combination 9 2: 1.200 x Dead Load + 1.000 x L + 1.600 x R Load Combination # 3: 1.200 x Dead Load + 0.800 x W + 1.600 x R Load Combination # 4: 1.200 x Dead Load + 1.000 x L + 1.600 x W + 0.500 x R DEAD LOAD LOAD COMB I LOAD COMB 2 LOADCOMB3 LOAD CONVIB 4 Shear Left End: 4.757 K 9.790 K ' 7.648 K 4.077 K 7.648 K Moment Left End: -8325 K -Ft -17.405 K -Ft -13.554 K -Ft -7336 K -Ft -13.554 K -Ft Shear Right End: -5.071 K -10.653 K -8.288 K -4.347 K -8.288 K Moment Right End: -8.835 K -Ft -18.805 K -Ft -14.593 K -Ft -7.573 K -Ft -14.593 K -Ft Maximum Moment 4.583 K -Ft 9.936 K -Ft 7.680 K -Ft 3.928 K -Ft 7.680 K -Ft Located at: 5.427 Ft 5.585 Ft 5.55 5.427 Ft 5.553 Ft Max Deflection -0.001 In -0.003 In -0.003 In -0.001 In -0.003 In Located at: 5.094 Ft 5.117 Ft 5,117 Ft 5.094 Ft 5.117 Ft L: Project FilesCustom HomeslO 8th Ave N, Edmonds- Lot 4/12/2017 3:05:12 PM 28th Ave N - PC1-2.rtf 5/17 Concrete Beam Design Report Page 2 Dead Part: -0.001-1-n- -0.001 In -0.001 In -0.001 In Inflection Points: 2.193 Ft 2.218 Ft 2.213 Ft 2.193 Ft 2.213 Ft 7.863 Ft 7.857 Ft 7.858 Ft 7.863 Ft 7.858 Ft Reaction Left End; 4.757 K 9,790 K 7.648 K 4.077 K 7.648 K Reaction Right End: 5.071 K 10.653 K 8.288 K 4.347 K 8.288 K Load Combination # 5: 1.200 x Dead Load + 1.000 x L + 1.400 x E + 0.200 x R Load Combination # 6: 0.900 x Dead Load + 1.600 x W Load Combination # 7: 0.900 x Dead Load + 1A00 x E Load Combination # 8: 1.200 x Dead Load -. 0.800 x W + 1.600 x R Load Combination 4 9: 1.200 x Dead Load + 1.000 x L - 1.600 x W + 0.500 x R Shear Left End: LOAD COTVEB 5 7.648 K LOAD COMB 6 3,058 K LOAD COMB 7 3.058 K LOAD COMB 8 4.077 K LOAD COM11 9 7.648 K Moment Shear Left End: Right End: -13.554 -8.288 K -Ft K -5.352 -3. 0 K -Ft K -5.352 -3.260 K -Ft K -7.136 4.347 K -Ft K --1-3.554K -8.288 TF K Moment Right End: -14.593 K -Ft -5.680 K -Ft -5.680 K -Ft -7.573 K -Ft -14.593 K -Ft Maximum Moment 7.680 -Ft 2.946 K -Ft 1946 K -Ft 3,928 K -Ft 7.680 K -Ft Located at: 5.553 Ft 5.427 Ft 5.427 Ft 5.427 Ft 5.553 Ft Max Deflection -0.003 In -0.001 In -0.001 in -0.001 In -0.003 In Located at: 5.117 Ft 5.094 Ft 5.094 Ft 5.094 Ft 5.117 Ft Dead Part: -0,001 In -0.001 in -0.001 In -0.001 In -0.001 in Inflection Points: 2.213 Ft 2.193 Ft 2.193 Ft 2.193 Ft 2.213 Ft Reaction Reaction Left End: Right End: 7.858 7.648 8.288 Ft K K 7.863 3.058-Z-- 3.260 Ft K 7.863 3.058 3.260 Ft K K 7.863 4.077 4.347 Ft K K 7.858 7.648 8.288 Ft - K - K - Load Combination # 10: 1.200xDead Load+ 1.00OxL- 1.400 xE+0.200xR Load Combination 4 11: 0.900 x Dead Load - 1.600 x W I LORd Combination # 12: 0.900 x Dead Load - 1A00 x E Shear Left End: LOAD CONIEB 10 7.648 K LOAD COMB 11 T058 _K LOAD COMB 12 3.058 K LOAD COMB 13 LOAD COMB 14 Moment Left End: -13.554 T _-Ft -5.352 K -Ft- -5.352 K -Ft - Shear Right End: -8.288 K -3.260 K -3.260 K Moment RightEnd: -14.593 K -Ft -5.680 K -Ft -5.680 K -Ft Maximum Moment 7.680 K -Ft 2.946 K -Ft 2.946 K -Ft Located at: 5.553 Ft 5.427 Ft 5.427 Ft Max Deflection -0.003 In -0.001 In -0.001 In Located at: 5.117 Ft 5.094 Ft 5.094 Ft Dead Part: -0.001 In -0.001 In -0.001 In Inflection Points: 2.213 Ft 2.193 Ft 2.193 R - 1 7.858 Ft 7.863 Ft 7.863 Ft Reaction Left End: 7.648 K 3.058 K 3.058 K Reaction Right End: 8.288 K_ 1 3.260 K 3.260 K SECTION DESIGN INFORMATION SECTION FLEXURAL DESIGN Mid -Span Region: Cross -Section Information: Total Depth 22.000 In Distance to Centroid As: 18.38 In Top Width: 8.000 In Distance to Centroid A's: 2.13 In Flange or Recess Depth: 12.000 In Bottom Width : 12.000 In For Design Moment, Mu: 9.936 K -Ft Required As: 0.340 In(p:0.002) Required Rs 0.000 In'(p:0.000) Provided As 0.400 ln2 (p : UO3) Provided A's: 0.000 In' (p: 0.000) Reduction Factor, Phi: 0.90 L:Project FilesCustom Homes 10 8th Ave N, Edmonds- Lot 28th Ave N - PCI-2.rtf 4/12/2017 3:05:12 PM Concrete Beam Design Report 6/17 Page 3 Moment Capacity, *Mn: 31.804 K -Ft Gross Area: 216,000 In' Gross Moment of Inertia: 8,605.333 In' Neutral Axis Location: 9.89 In N (Es/Ec) 10.17 Modulus, Ec: 2,851.20 K V Cracked Moment of inertia: 1,010.523 In2 Neutral Axis Location: 18.16 In CrackingMoment: 27.194 K -Ft I I At Left Support: Cro.-R-Section Infnrmqtinn- Total Depth 22.000 In Distance to Centroid As: 19.81 In Top Width: 8.000 In Distance to Centroid Rs 2.19 In Flange or Recess Depth 12.000 In Bottom Width: 12.000 In For Design Moment, Mu: -15.798 K-Ft Required As: 0.528 In2 (p: 0.002) Required A's: 0.000 In 2 (p : 0.000) Provided As: 0.620 In' (p: 0.003) Provided A's 0.000 hl� (p: 0.000) Reduction Factor, Phi : 0.90 Moment Capacity, *Mn: -53.242 K -Ft Gross Area: 216.000 In2 Gross Moment of Inertia: 8,605.333 In' Neutral Axis Location: 12. 11 In N (Es/Ec) 10.17 Modulus, Ec: 2,851.20 K/In' Cracked Moment of Inertia: 1,832.498 In2 Neutral Axis Location: 17.93 In Cracking Moment: 22.204 K -Ft At Right Support: Crosq-Sectinn Infnrmatinn- Total Depth 22.000 In Distance to Centroid As: 19.81 In Top Width: 8.000 In Distance to Centroid Xs 2.19 In Flange or Recess Depth 12.000 In Bottom Width: 12.000 In For Design Moment, Mu - -17.053 K -Ft Required As: 0.528 1 (p: 0.002 Required A!s ; 0.000 In' (2: 0.000) Provided As: Provided A!s 0,000 In'(p:0.000) Reduction Factor, Phi : 0.90 Moment Capacity, *Mn -53.242 K -Ft Gross Area: 216.000 In 2 Gross Moment of Inertia: 8,605.333 In2 Neutral Axis Location: 12.11 In — N (Es/Ec) 10.17 Modulus, Ec: 2,851.20 K /Inz — Cracked Moment of Inertia: 1,832.498 In' Neutral Axis Location 17.93 In — Cracking Moment: 22.204 K -Ft — * Indicates That Nominal Resistance Includes Appropriate Phi Factor BOTTOM BARS Mid -Span Region: Design Moment, Mu 9.94 K-Ft As Required 0.340 In' As Provided _A 0.400 in' d Bar Size #4 Number of Layers I I I Layer Spacing 0.00 hi Number of Bars 2 Bars in Lower Layer 1 2 1 Ld 14.40 In At Left Support: Percent of Bars Continuing into Support 100 Suggested Bar Cutoff (from Centerline of Support) 0.00 in At Right Support: Percent of Bars Continning into Support Suggested Bar Cutoff (from Centerline of Support) F-0 00 1. L: Project FilesCustom Homes10 8th Ave N, Edmonds- Lot 28th Ave N - PC1-2.rtf 4/12/2017 3:05:12 PbI 7/17 Concrete Beam Design Report TOP BARS - LEFT SUPPORT Page 4 J Design Moment, Mu -15.80 K-Ft I As Required 1 0.528 In' As Provided 0.620 in' d 19.813 In--J Bar Size 45 Number of Layers I Layer Spacing 0.00 In Number of Bars 2 Bars in Lower Layer 2 Ld F- 23.401- Suggested Bar Cutoff 46.50 In TOP BARS - RIGHT SUPPORT Design Moment, Mu 17.05 K-Ft I As Required 0.528 ln2 As Provided 7 0.620 In' d 19.813 In= Bar Size #5 Number of Layers 1 Layer Spacing 0.00 In Number of Bars 2 Bars in Lower Layer 2 Ld 23.40 in Suggested Bar Cutoff 45.75 In 7- MAXIMUM DEFLECTIONS Span Load Comb Short Total Long Total Max Allow Short Live Load Max Allow leffective In In In In In MAIN Dead 4001 0.500 OK 8,605.33 1 -0.003 -0.005 0.500 OK -0.002 0.333 OK 8,605.33 2 -0.003 -0.005 0.500 OK -0.002 0.333 OK 8,605.33 3 -0.001 -0.003 0.500 OK 0.000 0.333 OK 8,605.33 4 -0.003 -0.005 0.500 OK -0.002 0.333 OK 8,605.33 5 -0.003 -0.005 0.500 OK -0.002 0333 OK 8,605.33 6 -0.001 -0,003 0.500 OK 0.000 0.333 OK 8,605.33 7 -0.001 -0.003 0.500 OK 0.000 0.333 OK 8,605.33 8 -0.001 -0.003 0.500 OK 0.000 0.333 OK 8,605.33 9 -0.003 -0.005 0.500 OK -0.002 0.333 OK 8,605.33 10 -0.003 '0.005 0.500 OK 4002 0.333 OK 8,605.33 11 -0.001 -0.003 0.500 OK 0.000 0.333 OK 8,605.33 12 -0.001 -0.003 0.500 OK 0.000 0.333 OK 8-605.33 SHEAR DESIGN - MAIN SPAN --------------------- Left Side --------------------- --------------------- Right Side - -------------- - --- Number @ Spacing Al Number @ Spacing Al Spacing starts from face of support .... @ 1.750 In J @ 1.750 In 3 (§ 9.000 In 4 @ 9.000 1 Beyond 2.396 Ft From Face None Required Beyond 3.146 Ft From Face None Required Use 43 Stirrups - 2 Vertical Legs L: Project FilesCustom Homes10 8th Ave N, Edmonds- Lot 28th Ave N - PC1-2.rtf 4/12/2017 3:05:12 PM COMPANY Design Build Services. Inc. PROJECT 510 8th Ave IN - Lot 2 28119 120th St BE 510 8th Ave IN Monme, WA 98272 Edmonds. WA 98020 WoodWorks' (360) 793-9659 Thuesen C stom Homes Apr. 12.2017 13:14 PC2.wwb SOFTIVARE FOR WOOD DESICN Design Check Calculation Sheet WoodWorksSlzeril.0 Loads: Load Type Distribution P. t- tern Loeatich [ftl Start End Magnitude Start End Unit Dead Partial UDL Ito 0.00 4.00 57.7 57.7 plf 2_w2l Live Partial (101, Yes 0.00 4.00 180.0 180.0 plf 3_�.21 Sno, Partial UDL Yes 0.00 4.00 168.6 168.8 pit 4_.22 Dead Partial UDL )To 14.00 17.00 155.2 155.2 plf 5�_.22 Live Partial UDL Y� 14.00 17.00 424.7 424.7 plf 6_y22 show Partial UDL Yea 14.00 17.00 116.4 116.4 plf 7.34 Z* ad point no 17 00 429 lb: S_c34 so.w Point Ye . 17:00 9 60 ib 9_cl Dead Point 11. 4 . 00 5 78 lb. 10 .1 Li ve Point Yes 4.00 1224 lb. li�.l Snow Point Yes 4.00 115 lb . 12 c2 Dead point Uo 9.00 1706 lb. 13C2 Live Point Yea 9.00 2654 lb. 14_.2 Sn" Point Yea 9.00 989 lba 1S_c3 .. ad P.i. t IT. 14.00 492 lb: 16_c3 Live Point Ye 14.00 796 lb 17�r:3 Snow point Yea 14.00 244 lb. Ill - J141 D ad Ful IT No 107 2 Plf 19 1 141 Live Full UDL' Ye s 340:0 plf L*;d2D D " Full UDL He 250 . 0 Plf Ise tf_w.",t D:.d Full UDL IT. '2�3 Maximum Reactions (lbs) and Bearing Lengths (in): ir !!�Y! 4" unf ed� 2or D cl 1595 6751 2; 45 Live 2321 8010 21:12 s.11 Fact I red t 113 l499 1383 T.,.' ll­ing� 3016 14760 5,192 Length 0,54 1.83 0 72 Min r.a 'd __a_ 0 1 5 4 gig 1 . 83.. 0:72 I IT _21,11ii ... g Maximum reaction an at least one support is from a different load combination than the critical one for bearing design, shown hem. due to Cd factor. See Analysis results for reaclion from critical load -mbination. PC2 Timber -soft, D.Fir-L, No.2,12xlS (11-1/2"x16-1112") Supports: All - Timber -soft Column, O.Fir-L No.2 Total length: 17% volume = 211.0 cu.ft-: Beam and stringer, Lateral support: top= full, bottom= at all supports; I Analysis vs. Allowable Stress and Deflection using NDS 2015; Crite I'll Analysis Value Desiqn Value Unit AnEl /Design kbelx f W; 5- - Fv, 170 ��i fvW 0.27 IT ndin gg fb 211 Fb: 847 psi fb/Fb- 0.25 :.d . L fb 284 Fb 841 Psi fb/Fb' 0.33 Dead Deft :n 0.01 <L/ 999 Li ve Defl n 0.01 <L/999 0.28 L/360 in 0.04 Total Defl'n 0.02 <L/999 0.42 L/240 in 0.04 ... ..... . p-C � ... s -hrn a T.r.".. a -t the 3upport has be.. inel.ded as pax IlDS 3.4.3.1 Additional Data: FACTORS: F/E(p.i)CD CH Ct CL CE Cfu Cr Cfrt Ci Cn LCil F1' 170 1 100 1.00 1.00 - - - - 1.00 1.00 1.00 2 Fb:4 875 1.00 1100 1.00 1 000 0.969 1�00 1 00 1 o' 1.00 - 6 Fb 075 1 OD 1.00 1. 00 1:000 0.96 9 1.00 1:00 1:.0 1.00 F-p 625 1 , 1. 00 - - - - 1.00 1.00 F' 1.3 illi.n 1:00. 1. 00 - 1.00 1.00 6 CRITICAL LOAD COMBINATIONS: Shea, : LC 92 D+L, V Trax - 9274, V design- $375 lb. .an dingr(+i: LC #6 D+L (patt�n: H - 8113 lb.-ft _Lj, Bending!-l: LC #2 D+L, H = 10868 lb-ft Defl e.tion: LC 06 (live) LC " t '." ' D-dead live S=­. w- ind T=irspaet L-roof live L-cancentrated E--eazthquake Al LC, I d e LI,t:ll.li:t S'21h r'2L+A"a1ry5L+i5Lx"tP-unto pattern load in this pan P " : � Lead -binations: ASCE 7-10 / IBC 2015- CALCULATIONS: Dail El - 4639eO6 lb-in2 "Li1:ctdionfl:1,ti,n - Deflection fr- all n.n-d..d lead. (live, wind, T.'.' De 'lect ion _ I . 0 OlDead Load Deflectionl + Live Load Defl-tion. Design Notes: 1 WoodWorks an alysis and design are in accordance with the ICC International Building Code (IBC 2015), the National Design Specification (NDS 2016), and Nos Design Supplement. 2 Please verify that the default deflection limits are appropriate for your application. 3 Continuous or Cantilevered Beams: NOS Clause 4.2.5.5 requires that normal grading provisions be extended to the middle W of 2 span beams and to the full length ofeantilevers and other spans. 4. Sawn lumber bending members shall be laterally supported according to the pnevislons of NDS Clause 4.4.1. COMPANY Design Build Services, Inc, PROJECT 510 8tb Ave N - Lot 2 28119 12DIh St SE 510 8th Ave N WoodWorks' Monroe, WA 911272 Edmonds, WA 98020 1[360) 7934659 Thuesen Custom Homes Apr. U, 2017 13:23 PC4.wwb SOFFIVAREFOR WOOD DESIGN Design Check Calculation Sheet WoodWorks Bizet 11.0 Loads: Load Type DistributionIP:t-I t - Locat, on rftl B t. rt End Magnitude Start End unit I-c7l be ad Pei t 21. 3.00 607 lb: 2_c7l B.. Point Yes 3.00 13 1b 302 Dead point 11. 1 2.0 0 :07 lbs 4_.72 S... Point Yes 12.00 893 lb. 5_.24 Dead Partial UDL Ila 0.00 5.00 323.1 323.1 plf 15­.24 live Partial UDL Yes 0.00 5.00 600.0 600.0 plf 7_w24 P trial UDL Yes 0.00 5.00 198.4 19B.4 plf S_y25 Dead P:rtial UDL Ila 11.00 15.00 323.1 323.1 plf 9_.25 Live P-tiel UDL Yes IIAO 15.00 600.0 600.0 plf 10_y2S Snow Partial UDL Yes 11.00 15.00 198.4 198.4 plf 1102 Dead Point 21. 15.00 237 lb. 12c32 Sri.. Point Yes 15.00 337 lb. 1L�4 Dead Point No 5.00 601 1 . 14_c4 Live Poinr Y's a 5.00 1800 lb. 15_c5 De ad Point il 11.00 601 lb. 16-cs Live Point Yes 11.00 1800 lbs 17JI42 Dead Full UDL Ila 122.2 plf 18J142 Live Full UDL Yes 360.0 Plf L.adl9 Dead Full Up L :"a 2 ":3 Pi f S alf-welqht -Dead .Full UDL ' 12 11,11 1 Maximum Reactions (lbs) and Bearing Lengths (in) : IV U.f.cr red: c!!he rt! Dead 2431 6727 Live 3 4 40 8469 2619 so, 1 004 1 762 3494 ..,:..ad: - 1272 To a 1 ..-L,g: 5871 - 15196 6193 Le .gth 012 1.89 - Min req'd 0. 2 1. 89 0.05 "miftim"m -Ing 1­1h n-v�rned hy Lite uIred vy!d!h b 0. a 5 F­ ; .. Maximum reaction on at least one support is from a different load combination than the critical one for bearing design. shown hem, due to Cd factor. See Analysis results for reaclion from critical load wmbination. PC4 Timber -soft, 1D.Fir-L, No.2,12x16 (11-1/2"x16-112") Supports: All - Timber -soft Column, D.FIr-L No.2 Total length: IS'; volume = 18.6 w.ft.; Beam and stringer. Lateral support: top= full, bottom= at all supports: I Analysis vs. Allowable Stress and Deflection using NDS 2015: critirion AnSlysis Value Desiqn Value Unit Anli 1i;14Re Sheet f, so Ev, 17 0 p.i txw V PIP. Banding(+) flo 25S Fb' 847 Psi fb/fb' 0.30 Bending(-) fb Fb' 847 psi Eb/Fb' 0.41 Da. d Defl 0.0 I �347 L/999 Live D.fl-n 0.0 1 �L/999 0.25 L/360 in 0.05 Total D.fl'n 0.02 L/999 0.37 L/240 i o 0.05 Additional Data: FAC ORS: F/E(psi)CD CH Ct CL CF Cf. Cr Cfrt Ci Cn LC# PVT 170 1 .00 1.00 1.00 - - - - 1.00 1.00 1.00 2 Fb:. 875 1.00 1.000 1.000 1.0000 0 96: 1.00 1.00 1.00 1:00 - 5 Fbp- a 75 1:00 1.00 1 .00 1. 00 0:96 1 00 1 00 1 00 1.00 2 PC 6 25 1, Q I - - 1:00 1 00 - I million 0 1:0 E 3 1. 0 00 - 1.00 1.00 5 CRITICAL LOAD COMBINATIONS: 'hear LC 92 D+L, V mx - 00345, V design 6871 lbs Imodiog LC 95 D+L (pattern: ll� 1, 14 - 9780 lbs-ft Bending LC 02 D+L, H - 13299 _ lbs-ft Deflection: LC #5 :live) t-t-lj I*de,d L-Iiv�C.1-'! ' ow 11=w1nal I �!,.Pact Lr-rcof live L-C.neent-ted E--rzhq,,k, All LC .. at. li sted i o the Analysis output Load "'tt" I- ­S11, X=L-1 or L+Lr, _-no pattern load in this span .ad .inbio ati ns: ASCE 7-10 / IBC 2015 CALCULATIONS� Defle�ti.­ EI = 4639eO6 lb-In2 'Li ve d flectiOn - Deflection froia all non -dead loads (live, wind, snow-) Total Deflection = 1.00(Dead Load Deflection) + Live Load Deflection. Design Notes: I WoodWorks analysis and design are in accordance with the ICC International Building Code (IBC 2015), the National Design Specification (NDS 2015). and Nos Design Supplement. 2 Please verify that the default deflection limits are appropriate for your application- 3 C ritinuous or Cantilevered Beamr. NDS Clause 4.2.5.5 requires that nomnal grading provisions be extended to the middle 213 of 2 span beams and to the full length ofcantilevers and otherspans. 4*. Saown lumber bending members shall be laterally supported according to the provislions of Nos Clause 4.4.1. 1 COMPANY Design Build Services, Inc. PROJECT 5108thAv N�W2 28119 120th St SE 5`10 81h Av: N Monroe, WA 98272 Edmonds, INA 9801' 20 WoodWorkso (360) 793-9659 Thuesen Custom .me, Apr. 12,2017 13:24 PC6vwb SOFFIVARE FOR WOOD DESIGN Design Check Calculation Sheet WoodWarks Sizer 11.0 Loads Load Type Distribution Pat- tern Location fftj Start End Magnitude start End Unit I_.27 Wed Partial UDL 11 0.00 2.50 221.7 222,7 plf 2_y27 Live Partial UDL Y s 0*00 2.50 616.0 61 .0 plf 3_.27 a .. Partial UDL Y:. 0.00 2.50 111.4 1116.4 plf 4_.2B D' ad Partial UDL ff. 11.50 14.00 98.4 98.4 plf S-.28 Live Pa trial UDL Yes 1 1 .50 14.00 373.3 373.3 plf 6_.w2B S .. Partial UDL Yea 11.50 14.00 135.0 135.0 plf 7_c6 Dead Point no 2.50 1420 lb. B-c6 Live point Yes 2.50 2887 Ilia 9-cs a- point Yes 2.50 598 lbs 10_,c7 Dead Point 11. 11.50 1243 Its 110 Live point Yes 11.50 2528 lbs 12_c7 Sn'w Point Yea 11.50 725 lb. 13_cS Dead Point 11. 14.00 286 lb. 14�.8 an.. Point Yea 14.00 870 lb. 15 1 143 Dead Partial UDL fro 0.00 8.00 143.6 143.6 plf 1673 14 3 Live - Partial UDL Yes 0.00 8.00 400.0 400.0 plf 17 - J144 Dead Partial UDL 110 0.00 14.00 143.6 143.6 plf 18 - '144 Live par ti&l UDL Yes 8.00 14.00 400:0 400.0 plf Lead 19 d D:a Full UDL flo 250 0 plf S lf a weight D ad Full UDL . 11. 42.3 Plf � Maximum Reactions (lbs) and Bearing Lengths (in): 14' ia�fll 2, Unfacto red: Dead 22:59 5355 2206 Liva, 40 6871 3401 sn" E.N .. d: 524 - 031 Isla T., " Saari '9: 6374 12226 $995 Length 01: 0�7: Mn W9 0. 5 D.7 pporung a.-, east one support is from a different load combination than the critical one for bearing design. shown here, due to Cd factor. See Analysis results for reaction from critical load combination. M.-dnR;Z.Z'a'n'o"n"a'f 1, u-'-d i" ih� .qi,.d 'ridii, ui ih. .. PC6 Timber -soft, D.Fir-L, No.2,12xl6 (11-112"x15.1/2") Supports� All - Timber -soft Column, D.Fir-L No.2 Total length: 14% volume = 17.3 ofift.; Beam and stringer, Lateral support: toV- full, bolfom� at all supports: nalysis vs. Allowable Stress and Deflection using NOS 2016: Criterion An!l siz Value _ Design Value Unit A, De "4 'IyFF, ", Sh.. f v�. 43 F­v' 170 psi . Dan le.ding�l Eb 273 Fb: 847 p.i Fb Fb: 0.32 Bendi og - fb 270 Fb 847 psi fb I Fb 0.32 Dead De fl :. O.DO �L/999 Live Defl n 0.01 <L/999 0.23 L/3 60 1 0.04 Total Defl'n 0.01 'L/999 0 .35 L/240 in 0.04 Additional Data: FACTORS: F/E(p.i)CD CH Ct CL CF CfU C. Cfrt Ci Cn LC# FV' 170 1 ." ':.0.0 ':.00 - - - - I. 'M " oil '.()n , Fb:+ 8 75 '100 1 1 0 1 0 0 0.9969 1.00 I.ao 1.00 1.00 5 Fb - 8 75 1 00 1... I..p 1:0000 0. 69 1.00 1. 'o 1.00 1.00 2 F p 625 1.00 1.00 - - - - 1.00 1.00 - E' 1.3 million 1.00 1.00 - 1.00 1.00 5 CRITICAL LOAD COMBINATIONS: Shear : LC #2 D+L, V mas � 5080, V design 5080 lbs Sending(fl: tc #5 D+L (pattern. 1-), 14 - 10474 lbs-ft Be.ding(-): LC #2 D+L, M - 10356 lb-ft Deflection: LC #5 4, -) LC #5 (total I Dlda-d Iliv. W-.i.d I-impsct Lr=roof live Le -concentrated E=e.rthq..ke Al 1 LC 's are listed In the Analysis _tP.t Load Patterns: '_S/2' X-L+S or L+Lr, -no pattern lead in thia span Load o-bi..ti na: ASCE 7-10 / 15C 201s- CALCULATIONS: Dafl 'ti": El . 4639ao" lb-in2 "Live- d.fl..ti.n - Deflection ft.. all non -dead lead. (live, wind, Total Deflection - 1.00IDead Load Deflection) + Live Load Deflection. Design Notes: 1 WoodWorks an:lysis and design am in accordance with the ICC International Building Code (IBC 2015), the National Design Specification (Nos 20ili). and Nos Design Supplement. 2 Please verify In i the default deflection limits am appropriate for your application. 3 Continuous or Cantilevered Beams: NOS Clause 4.2.5.5 requires that normal grading provisions be extended to the middle 2/3 of 2 span beams and to the full length of cantlevers and other spans. 4.S.'.. lumber bending members shall be laterally supported according to the provisions of Nos Clause 4.4.1. Loads: WoodWorkso COMPANY Design Build Services, Inc. 28119 12M St BE Monroe, WA 98272 (360) 793-9659 jApr. 12, 2017 13:56 PROJECT 510 Sth Ave N - Lot 2 510 fith Ave N Edmonds, WA 95020 Thuesen Custom Homes PC7.wwb SOFfWAREFOR WOOD DESIGN Design Check Calculation Sheet WoodWorks Bizet 11 -0 Load Type Distribution Pat- Location Ift) Ma(jnitUde Unit -D.-.7- r t"n S%lt St -r' d 2 .29 .7-tL­ mL 1=0 g.F U9 201� 0 152:9 is if 3_.29 Live Partial UDL Yes 6.00 20.00 213 3 2132:39 plf 4-c3l Partial UDL Yes 6.OD 20.00 133.3 233.3 plf Dead Point It. 20.00 2SS6 lb. 5-c3l son. Point Yes 20.00 4397 lb. D-d point 11. 3.00 1 lb. S.- Point Yes 3.00 -170 lb. 8_00 Dead Point ?to 6.00 2814 Its 9.30 Li- Point Yes 6.00 2120 lb 10_c30 s... Point Yes 6.00 363 3 lb. li�.80 Dead Point ]to 1 1100 228 lbs 12.80 L, " Point Yes 11.00 160 lb. 13-cBO ..o' Point Y. 11.00 267 Its 14-cel .ad Point If., 15.00 228 lb. ls�cfll Liv. Point Yes 15.00 160 lb. ... Point Yes 15.00 267 lbs ID ad UD'L 24520-0 If d . I ". ;I Maximum Reactions (lbs) and Bearing Lengths (in): 20' Unfactored: Dead 1916 Live 762 7769 .Sc*w 1012 4063 41:284 Factored; - 4571 101 4922 total Be:ring: 3247 - 14244 9050 L ngth Min zeqld 0.50. 0.50- - 1 61 _r ;Tre-ngth raw s Tpons 1.26 !6 oili uunrummioaa combination thOnthecrtricaloneforbeadngd�ign. shon he,, d,,to Cd factor. SeeAnalysis results for reaction from crilicalload combination. PC7 Timber -soft, D.Fir-L, 140.2,IU16 (11-1/2"xIS-1/2") Supports.- All - Timber-saft Column, D.Fir-L No.2 Total length: 20'; volume = 24.6 cu.ft.; Beam and stringer. Lateral support: top= full, bottom= at all supports; Analysis vs. Allowable Stress and Deflection using NOS 2015 criteri on She a f B o e ding Bcnclinq�-*� Dead Dail - .1- I An,tv,i, �VLal fy 64 64 379 �311 L/999 Dg��n �Lajuo 19 Fb' 975 Fb' 975 onit psi p 1 Z .1 ' ' "12 -71! fy, TUA F:i, fb/Fb: 0 39 fb/Fb 0:39 Live DeflIn Total DeflIn 0.02 �L/999 0.33 L/360 in 0.07 Additional Data: FAC RS: F/Eipsi)C 0 CL CF cf. C. cfrt ci C. LC# ,To 5 IC14 lct 170 1. 1 .00 .00 - - - - 1.00 1-00 1 00 Fb: 3 + 975 1- 5 1 1 1. 00 0. 69 1 00 1 - 00 I.Do 1.00 - 1010 1-00 1.0000 o.s'9 i:oo �..o 1.00 I.Do Ph 875 :1. lis I 3 625 1:00 00 `p 1:00 0 00 1.3 illi.n 1.00 1.00 1.00 1.00 CRITICAC LOAD COMBINATIONS: 11 Shear : LC #3 D+.75(L+S), V =x - 8489, V design 7571 lbs B.ndi.g(+): LC Oil D+.75(L+Sl (p.tt,crn: X.), M = 14538 lb-ft 'Mding!-)z LC #31 D+.75(L+S), M - 14734 lbs-ft De 'le.tionz Lc #1 (live) LC #11 (total) D=dead live S-snow W-Wind I=impact L-roof live L-Ineentrated E=e.rthqak. JU I '�=a LC - listed In the Analysis output Lead Patterns: a-S/2, X-L+S or L+Lr, -no Pattern load in this span Load combinations: ASCE 7-10 / IBC 2015- CALCULATIONS,, Defl El - 4639eO6 lb-in2 v:ction: "Li deflection = Dell.cli.n It.. .11 non -dead loads (live, wind, snow,-) "e'lettion = 1.00(Dead Load Deflection) + Live Load Deflection, Design Notes: I - WOOdWorks In e h:lysis and d sign ate in accordance with the ICC International Building Code QBC 20j5)' the National Design Specification (NDS 2015). and NDS Design Supplement. I Pleaseverfly, I the default deflection 11MAS am appropriate for your application. 3' Continuous orCantilevered Beams: NDS Clause 4.2.5.6 requires that normal grading provisions be codended to the middle 213 of2 span beams and to the full length ofcantilevem and other spans. 4. Sawn lumber bending members $hall be laterally supported according to the provisions of Nos Clause 4.4.1. I WoodWorks@ Sizer SOFTWARE FOR WOOD DESIGN —,4' . I WoodWorks@ Sizer 11.0 4 F1 PC7.wwb Snow Dead Apr. 12, 2017 14:25:01 lbs 133.3 2113.3, 402.9 --250 It s --o Plf 1-1 E PC7.wwb Critical Results REACTION ilbs) Maximum_ Uplift: 0 Bearing: 14244 ly SHEAR [lbsJ Load Combination # +V max: 5755 -V ma X: -8489 V design: -7571 WoodWorks@ Sizer SOFTWARE FOR WOOD DESIGN 0. Desi2D shear < maximum due BENDING [lbs-ft) Load Combination # +M max: 14538 Load Combination # -M max: -14734 WoodWorks@Sizer 11.0 ANALYSIS DIAGRAMS (known section - includes self -weight) loads 538 114244 1 9'9.2" 7 5 7 1 distance "d" of s 0 tW4734 8;�33" 9�-9.2" TOTAL DEFLECTION finj Load Combination # Total,= 0.00 x Dead + Live (all others) .... ... Criti al Live: 0.02 Critical Total: 0.04 wi thout IT-7.114'-7.3" --0.01 _Mo -0.00 Apr. 12, 2017 13W:26 T9050 i M-6.5" W-6.6' W-6.5" 01 4'-11.9" I Concrete Beam Design Report Concrete Beam Design Job: 30227 Designed By: RDH PE Beam ID: PC4-J Checked By: Date: 4/12/2017 2:42:43 PM Program: Concrete Beam Design 4.0 Grade Beam ,qn.qn Dntn! 14/17 Page I Main Span Length 10,000 Ft Left End Support Fixed Right End Support Fixed Left Support Width 4.000 In Right Support Width 4.000 In Left Haunch Start Location Not Present Right Haunch Start Location Rn--t Present Cross Section Mnfiwinl Dafa- fc 2.500 K/In' Flexural Reinforcing fy 60.000 K/In2 - Concrete Density 144.000 Ll inforcing fyy 60.000 K/In2- Concrete Tensile Stren gt17 0.420 K/In' Stress Block, Beta 0.850 Dp..tiun C.rifAr;n- Bottom Cover t Stirrup 3.000 In Top Cover to Stirrup 1.500 In . Side Cover to Stirrup 1.500 In Total Load Deflection Limit L/240.00 Live Load Deflection Limit L/360.00 Allow Cuts in Tension Zone N Check Crack Control Provisions Y ECHO OF LOAD INPUT DEAD LOAD LIVE LOAD WIND LOAD EARTHQUAKE LOAD ROOFLOAD Check Deflection: Yes Main Span # 1 Concentrated Load: -2.814 K 4.315 K Distance: 6.000 Ft 6.000 Ft # niforni Load: -0.250 K /Ft -0.260 K Tt- Distance to Begin: 6.000 Ft 6.000 Ft ...... Distance to End: 10.000 Ft 10.000 Ft CRITICAL SHEARS & MOMENTS Load Combination Dead Load: 1.400 x Dead Load - Load Combination # 1: 1.200 x Dead Load + 1.600 x L + 0.500 x R - Load Combination # 2: 1.200 x Dead Load + 1.000 x L + 1.600 x R - Load Combination # 3: 1.200 x Dead Load + 0.800 x W + 1.600 x R - Load Combination # 4: 1.200 x Dead Load + 1.000 x L + 1.600 x W + 0.500 x R Shear Left End: DE AD LOAD 1.566 K LOAD COMB 1 3.985 K LOAD COMB 2 2 994 K LOAD COMB 3 1.342 K LOAD COMB 4 2.994 K Moment Left End: -4.305 K -Ft -10.939 K -Ft -8.220 K -Ft -3.690 K -Ft -8.220 K -Ft- Shear Right End: -3.774 K -9.159 K -6.938 K -3.235 K -6.938 K Moment Right End: -7.204 K -Ft -17.936 K -Ft -13.525 -IC---Ft - -6.175 K -Ft -13.5.25 K -Ft' Maximum Moment 5.091 K -Ft -T 12.974 K -Ft 9.745 K -Ft 4.364 K -Ft 9.745 K -Ft Located at: 6.000 Ft 6.000 Ft 6.000 Ft 6.000 Ft 6.000 Ft Max Deflection -0.001 In -0.003 In -6.003 In -0.001 In -0.003 In Located at: 5.498 Ft 5.490 Ft 5.490 Ft 5.498 Ft 5.490 Ft L: Project FilesCustorn HomeslO 8th Ave N, Edmonds- Lot 28th Ave N - PC1.rtf 4/12/2017 2:42:43 PM Concrete Beam Design Report 15,117 Page 2 Dead Part: -0.001 In -0.001 In -0.001 In -0.001 In Inflection Points: 2.749 Ft 2.745 Ft 2.745 Ft 2.749 Ft 2.745 Ft 7.883 Ft 7.863 Ft 7.867 Ft 7.883 Ft 7.867 Ft Reaction Left End: 1.566 K 3,985 K 2.994 K 1.342 K 2.994 K Reaction Right End: 3.774 K 9.159 K 6.938 K 3.235 K 6.938 K Load Combination # 5: 1.200 x Dead Load + 1.000 x L + 1.400 x E + 0.200 x R Load Combination # 6: 0.900 x Dead Load + 1.600 x W Load Combination # 7: 0.900 x Dead Load + 1.400 x E Load Combination # 8: 1.200 x Dead Load - 0.800 x W + 1.600 x R Load Combination # 9: 1.200 x Dead Load + 1.000 x L - 1.600 x W + 0.500 x R LOAD COAl1B 5 LOAD COMB 6 LOAD COMB 7 LOAD COMB 8 LOAD COIVIB 9 Shear Left End: 2.994 K 1.007 K 1.007 K 1.342 K 2.994 K Moment Left End: -8.220 K -Ft -2.767 K -Ft -2.767 K -Ft -3.690 K -Ft -8.220 K .-Ft Shear Right End: -6.938 K -2.426 K -2.426 K -3.235 K -6.938 K Moment Right End: -13.525 K -Ft 4.631 K -Ft 4.631 K -Ft -6.175 K -Ft -13.525 K -Ft Maximum Moment 9.745 K -Ft 3.273 K -Ft 3.273 K -Ft 4.364 K -Ft 9.745 K Tt Located at: 6.000 Ft 6.000 Ft 6.000 Ft 6.000 Ft 6.000 Ft Max Deflection -0.003 In -0.001 In -0.001 In -0.001 In -0.003 In Located at: 5.490 Ft 5.498 Ft 5.498 Ft 5.498 Ft 5.490 Ft Dead Part: -0.001 In -0.001 In -0.001 In -0.001 In -0.001 In Inflection Points: 2.745 Ft 2.749 Ft 2.749 Ft 2.749 Ft 2.745 Ft 7.867 Ft 7.883 Ft 7.883 Ft 7.883 Ft 7.867 Ft Reaction Left End: 2.994 K 1.007 K 1.007 K 1.342 K 2.994 K Reaction Right End: 6.938 K 2.426 K 2.426 K 3.235 K 6.938 K Load Combin tion # 10: 1.200 x Dead Load + 1.000 x L - 1.400 x E + 0.200 x R Load Combination# 11: 0.900 x Dead Load - 1.600 x W Load Combination ft 12: 0.900xDeadLofld-I.400xE LOAD COMB 10 LOAD COMB 11 LOAD COMB 12 LOAD COMB 13 LOAD comB74- Shear Left End: 2.994 K 1.007 K 1.007 K Moment Left End: -8.220 K -Ft -2.767 K -Ft -2.767 K -Ft Shear Right End: -6.938 K -2.426 K -2.426 K Moment Right End: -13.525 K -Ft 4.631 K -Ft 4.631 K -Ft Maximum Moment 9.745 K -Ft 3.273 K -Ft 3.273 K -Ft Located at: 6.000 Ft 6.000 Ft 6.000 Ft Max Deflection -0.003 In -0.001 In -0.001 In Located at: 5.490 Ft 5.498 Ft 5.498 Ft Dead Part: -0.001 In -0.001 In -0.001 In Inflection Points: 2.745 Ft 2.749 Ft .2,749 Ft 7.867 t 7.883 Ft 7.883 Ft Reaction Left End: 2.994 K 1.007 K 1.007 K Reaction Right End: 6.938 K 2,426 K 2.426 K SECTION DESIGN INFORMATION SECTION FLEXURAL DESIGN Mid -Span Region - Cross -Section Information: Total Depth 22.000 In Distance to Centroid As: 18.38 In Top Width: 8.000 In Distance to Centroid A's: 2.13 In Flange or Recess Depth 12.000 In Bottom Width: 12.000 In For Design Moment, Mu 12.974 K -Ft Required As 0.340 In2 (p 0.002) Required A's 0.000 In' (p 0.000) Provided As: 0.400 In' (p 0.003) Provided A's: 0.000 ln2 (p 0.000) Reduction Factor, Phi : 0.90 L: Project FilesCustom HomeslO 8th Ave N, Edmonds- Lot 4/12/2017 2:42:43 PM 26th Ave N - PC1.rtf Concrete Beam Design Report 16/17 Page 3 Moment Capacity, *Mn 31.804 K -Ft Gross Area : 216.000 In2 Gross Moment of Inertia: 8,605.333 In' Neutral Axis Location: 9.89 In N (Es/Ec): 10.17 Modulus, Ec: 2,851.20 K /In2 Cracked Moment of Inertia: 1,010.523 In' Neutral Axis Location 18.16 In Cracking Moment: 27.194 K -Ft At Left Support: Cross -Section Information: Total Depth 22.000 In Distance to Centroid As: 19.88 In Top Width: 8.000 In Distance to Centroid A's: 2.13 In Flange or Recess Depth: 12.000 In Bottom Width: 12.000 In For Design Moment Mu: -10.275 K -Ft Required As 0.530 In 2 (p : 0.002) Required A's 0.000 In 2 (p: 0.000) Provided As 0.600 In' ( : 0.003) Provided A's: 0.000 In' (p: 0.000) Reduction Factor, Phi : 0.90 Moment Capacity, *Mn: -51.757 K -Ft Gross Area : 216.000 In' Gross Moment of Inertia - 8,605.333 ln2 Neutral Axis Location: 12.11 In N (Es/Ec) 10.17 Modulus, Ec: 2,851.20 K/Inz Cracked Moment of Inertia: 1,793.960 In2 Neutral Axis Location - 17.98 In Cracking Moment: 22.204 K -Ft At Right Support: Cross -Section Information: Total Depth 22.000 In Distance to Centroid As: 19.88 hi Top Width: 8.000 In Distance to Centroid A's: 2.13 In Flange or Recess Depth 12.000 In Bottom Width : 12.000 In For Design Moment, Mu: -16.419 K-Ft Required As: 0.530 In 2 (p 0.002) Required Xs : 0.000 In' (P 0.000) Provided As: 0.600 In' (p 0. 003) Provided Xs 0.000 In' (p: 0.000) Reduction Factor, Phi: 0.90 Moment Capacity, *Mn -51.757 K -Ft Gross Area: 216.000 In' Gross Moment of Inertia: 8,605.333 h12 Neutral Axis Location: 12.11 In N (Es/Ec): 10.17 Modulus, Ec: 2,851.20 K /In 2 Cracked Moment of Inertia: 1,793.960 In' Neutral Axis Location: 17.98 In Cracking Moment: 22.204 K -Ft * Indicates That Nominal Resistance Includes Appropriate Phi Factor BOTTOM BARS Mid -Span Region: Design Moment, Mu 12.97 K-Ft I As Required 0.340 In 2 As Provided = 0.400 In' d 18.375 In Bar Size 44 Number of Layers I Layer Spacing 0.00 In Number of Bars 2 Bars in Lower Layer 2 Ld 14.40 In At Left Support: Percent ofBars Continuing into Support 100 Suggested Bar Cutoff (from Centerline of Support) 0.00 In :J At Right Support: Percent of Bars Continuing into Support 100 Suggested Bar Cutoff (from Centerline of Support) 0.00 In L: Project FilesCustom Homes10 8th Ave N, Edmonds- Lot 28th Ave N - PCI.rtf 4/12/2017 2:42:43 PM Concrete Beam Design Report TOP BARS - LEFT SUPPORT 17/13 Page 4 Design Moment, Mu -10,27K-Ft/ I As Requkired 0.530 In' As Provided 0.600 In' rd 19-875 In--] 141 1 Bar Size J#4' I Number of Layers Layer Spacing 0.00 In Number of Bars 3 Bars in Lower Layer 3 Ld 18.72 In Suggested Bar Cutoff 53.00 In F- TOP BARS - RIGHT SUPPORT Design Moment, Mu 16.42 lf Ft As Required 0.530 In' As Provided 0,600 In 2 --Fd 19.875 In= Bar Size #4 �Number of Layers I Eyer Spacing 0.00 In Number of Bars 3 Bars in Lower Layer 3 Ld 18.72 Tn Suggested Bar Cutoff 45.75 In MAXU14UM DEFLECTIONS Span Load Comb Short Total Long Total Max Allow Short Live Load Max Allow leffective In in In In In -Ift4 MAIN Dead -0.001 0.500 OK 8,605.33 1 -0.003 -0.005 0.500 OK -0.002 0.333 OK 8,605.33 2 -0.003 -0.005 0.500 OK -0.002 0.333 OK 8,605.33 3 -0.001 -0.002 0.500 OK 0.000 0.333 OK 8,605.33 4 -0.003 -0.005 0.500 OK -0.002 0.333 OK 8,605.33 5 -0.003 -0.005 0.500 OK -0.002 0.333 OK 8,605.33 6 -0.001 -0.002 0.500 OK 0.000 0.333 OK 8,605.33 7 -0.001 -0.002 0.500 OK 0.000 0.333 OK 8,605.33 8 -0.001 -0.002 0.500 OK 0.000 0.333 OK 8,605.33 9 -0.003 -0.005 0.500 OK -0.002 0.333 OK 8,605.33 10 -0.003 -0.005 0.500 OK -0.002 0.333 OK 8,605.33 I 1 -0.001 -0.002 0.500 OK 0.000 0.333 OK 8,605.33 12 -0.001 -0.002 0.500 OK 0.000 0.333 OK 8,605.33 SHEAR DESIGN - MAIN SPAN ------ - ------------- Left Side --------------------- --------------------- Right Side - ------------------- Number @ Spacing Al N ,@, acing -amber 5p At In' 2 In Spacing starts from face of support .... None Required 1.750,fn 4 1 5 @ 9.000 In I I Bgond 3,8�6 Ft From Face None i�equired Use #3 Stirrups - 2 Vertical Legs L: Project FilesCustom Homes10 8th Ave N, Edmonds- Lot 28th Ave N - PC1.rtf 4/12/2017 2:42:43 PM Illy, WON CONSTRUCTION SEQUENCE NOTES 1 �"fjH 10 2018 ,V$&ftmw 1 - SCHEDULE A PRE -CONSTRUCTION MEETING WITH CITY ENGINEERING DIVISION AT 425-771-0220, EXT. 1326. TWO DAY (48 HR) NOTICE IS REQUIRED. 2. REVIEW TENTORARY EROSION AND SEDIMENT CONTROLNOTES. 3. CALL FOR UTILITY LOCATES. 4. INSTALL TESC MEASURES AND MAINTAIN DUST CONTROL WHILE PREVENTING DISTURBANCE OF ANY AREAS OF VEGETATIONOUTSIDE THE CONSTRUCTION ZONE. 5. HAVE EROSION CONTROL MEASURES INSPECTED BY CITY OF EDMONDS CITY ENGINEERING INSPECTOR. ALL TEWORARY SEDIMENTATION AND EROSION CONTROL MEASURES MUST BE IN PLACE AND INSPECTED PRIOR TO ANY CONSTRUCTION OR SITE CLEARING. EROSION AND SEDIMENTATION CONTROL PRACTICES AND/OR DEVICES SHALL BE MAINTAINED UNTIL PERMANENT VEGETATION IS ESTABLISHED. 6. DEMOLISH EXISTING STRUCTURES 7. ROUGH GRADE SITE AS REQUIRED TO INSTALL DRAINAGE FEATURES. 8. CLEAR, GRUB & ROUGH GRADE SITE. REVEGETATE DISTURBED AREAS NOT SUBJECT TO ADDITIONAL SURFACE DISTURBANCE MlfvMDIATELY AFTER ROUGH GRADING. (OTHER EXPOSED AREAS SHALL BE STABILIZED PER EROSION CONTROL NOTES BELOW) 9. INSTALL UTILITIES AND OTHER SITE EMPROVEMENTS, INCLUDING FRONTAGE IMPROVEMENTS. 13. STABILIZE AND CONTOST AMEND ALL EXPOSED SOILS PRIOR TO REVEGETATION OF ENTIRE SITE. 14. ESTABLISH LANDSCAPING AND PERMANENT VEGETATION. ALL TEWORARY EROSION CONTROL MEASURES SHALL BE REMOVED UPON FINAL SITE STABILIZATION AND APPROVAL BY CITY INSPECTOR. Revised 11/30/2012 APPROVED PLANS MUST BE ON JOB SITE W(- 0 /1-T 'T D]A­FR'1A­ �T T_ T=� iA -A /.A\.-TRI- H.-Ifi 11.-AI-1- 1-1 GA-131] . i ALL WORK SUBJECT CITY OF EDMONDS TO FIELD I BUILDING DIVISION INSPECTION FOR CODE COMPLIANCE APPROVED PLAP 05/28/2020 Eric Carter APPROVED BY PLANNING M.� 26 202D U=,== T 2 L EX� 1�,"T� M H L= AM-11F.-AI-M.- -1 �.;.0 -Lt I I N LP- 11� -FLOOR LA p I -=V, +7 T ..'TMT T, R .-.1 1- -7. A- iut -,DA!rioN mi CRAM 1. SPACT. E MINE. CU 7a Cu 0 0 0 �D Z > 00 -t SION 4;e., R -D mlmmmmmm�l MOMMI Immmm MEMMI IMMMM mmmmi Immmm MMMMMMI MIMIMINOIM m ------- --- - -- Elm== m IN I 0 ZI m ---------- m m m m Fm 7mmTm Fm- 0 mmm M, I ME MI ME MI II- � � I � i i CRAV­LSl-kCE ir z Z TZ ==1 I I I kill BEDROOM 2 6T AIX LIXING un 6 6 ADUGARAGE AWBEDROOM I --------- t�-t\NN V3 .1. E. LDWER rt�k En SCALE 1:4' 1171' 00 Lf) REVISION RESUB RINISM ffi-M 3 ......... . ... . ..... . . .... BDR 2 BDR 3 DEN :)EN a I)R%I Al. DINING BELOW j vx. III ING R�Il NIAqrF.R M, :1. BEDR�Xl DINING M%w �-Co DECK t j I t I L PPIJZ 11.01IR d F 4' IfT RESUB �3�1 4 =2 0 "I w a) (U 103's, C) 7j 0 0 0 E- CA Z > cc E- U1) REVISION "',v, 4 �10� R—SED M�-W20 4 1. FOLTNDA71ON CRAWL SPACE, �=I-NOTRS CONSTRUCTION SEQUMCE NOTES ALLOW 18' MINIMUM CLEARANCE UNDER FLOOR JOISTS AND 12' MINIMUM 20151sameratirmalResiderrial Cod, (IRC) 1. SCHEDULE A PRE -CONSTRUCTION MEETING WITH CITY UNDER GIRDER BEAMS. 1/2"MIN SPACE ATGIRDER ENDS AT CONCEPTS. 2015 Imemetweal Bradlee Cod, (IBC) ENGIN BRING DIVISION AT 425-771-02W, TEXT. 1326. TWO DAY (48 MR) PROVIDE AN UNDER FLOOR ACCESS WITH IS".24MINIMUM OPENING 2. VAPOR BARRIER: 2015 WA Sts. Eergy Cod. (WSEQ NOTICE IS REQUIRED. � MIT. BLACK POLYETHYLENE GROUND COVER IN CRAWL SPACE TO BE PROVIDED. LAP JOINTS IT AND EXTEND UP FOUNDATIONWALL. GENERAL 2. REVIEWTEMPORARY EROSION ANDSEDIMENT CONTROINOTES. 3. FOUNDATIONVENTILATION: PROVIDE I SQ. Yr. (144 SO, TN.) OF NE3` FREE THE CONTRACTOR SHALL INSPECT UNDER -FLOOR VENTILATION FOR EACH 150 SQ Fr. OF UNDER -FLOOR AREA THE SITE AND SOIL CONDITIONS AND 3. CALL FOR U1ILrrY LOCATES. 4. ROOF DRAINAGE SYSTEM. VER ITY SITE AND BUILDING CONNECT DOWNSPOUTS TO 4"DIA. RIGID, NON -PERFORATED DRAIN PIPE. DIMENSIONS BEFORE C MENCrNGWORK. 4. INSTALLTESC MEASURES AND MAINIAM DUST CONTROL WHILE ROUTE SYSTEM INDEPENDENTLY FROM FOOTING DRAIN SYSTEM. PROW E TEMPORARY BRACING AS PREVENTING DISTURBANCE OF ANY AREAS OFVEGETATIONOITTSIDE S. FOOTING DRAIN SYSTEM! REQUIRED D RING ERECTION. THE CONSTRUCTION ZONE 4- OR 6* DIA, RIG D, PERFORATED PVC DRAINPIPE. COVER WITH MINIMUM 11 VERIFY SIZE AND LOCA71ON OF ALL OF 4- WASHED ROCK ON ALL SIDES USING 3/4' MINIMUM ROCK. COVER OPENINGS IN FLOOR. ROOF AND ROCK WITH APPROVED SILT BARRIER. BOTTOM OF DRAIN PIPE ID BE AT WALLS wnw MECHANICAL & ELECTRICAL WORK. 5. HAVE EROSION CONTROL MEASURES INSPECTED BY CITY OF OR BELOW BOTTOM OF FOOTING. PREFABRICATE TfRMSSHALLBE EDMONDS CITY ENGINEERING INSPECDOR AILTEMPORARY 6 HOUSEIGARAGE SEPA ON. HANDLED AND INSTALLED PER SEDIMENTATION AND EROSION CONTROL MEASURES MUST BE IN WALLS BETWEEN HOUSE AND GARAGE SHALL BE MINIMUM 117 GWB ON MANUFACTURE 'S RECOMMENDATION. PLACE AND INSPECTED PRIOR TO ANY CONSTIL . UCTION OR SITE GARAGE SIDE WITH 1 aW SOLID WOOD DOOR OR 20-MMM DOOR WHERE FOUNDAII NS; CLEARING. EROSION AND SEDIMENTATION CONTROL PRACTICES ANDI A LIVING AREA IS ABOVE THE GARAGE, THE CEILING SHALL BE 5/8. TYPE X 1. EXTEND ALL FOOTINGS DOWN TO OR DEVICES SHALL BE MAINTAINED LRML PERMANENT VEGETATION GWEI AND ALL SUPPORTING AND POSTS MUST BE FIRE PROTECTED WITH I FIRMUNDISTURBE SOIL18INCHES HOURASSEMBLY. BELOW ADJACENT GRADE. IS ESTABLISHED. 7. EGRESS WINDCW-. 2. CENTER FOOTINGS ON COLUMNS EVERY SLEEPING ROOM SHALL BE PROVIDED WITH A DOD OR &WALLS EXCEPTWHEN DIM IONEDOTHERWISE. 6. DEMOLISH EXISTING STRUCTURES EMERGENCY EGRESS WINDOW. NET CLEAR OPENING SIZE TO BE A MINIMUM 3. WIDEN FOUNDATION AND FOOTINGS OF 5.7 SQ FT. OPENABIE AREASHALLBE 24- MINIMUM INHEIGHTAND20' 41NCHESTOSUP RTMASONRY 7. ROUGH GRADE SITE AS REQUIREDTO INSTALL DRAINAGE FEATURES, MINIMUM IN WIDTH. OPENING SILL HEIGHT TO BEA MAXIMUM OF 44- ABOVE VFNEERWH EAPPLICABLEVERITYLOCA71IONS. THE FLOOR. CONCRM- 8. CLEAR, GRUB & ROUGH GRADE SITE. REVEGETATE DISTURBED 8. SMOKE DETECTORS: 1. CONCRETE DESIGN SHALL BE 5 AREAS NOT SUBJECT TO ADDITIONAL SURFACE DISTURBANCE PROVIDE INTERCONNECTED SMOKE DETECTORS IN EACH SLEEPING AREA, SACK MIX 2500 PSI AT 28 DAYS IMMEDIATELY AFTER ROUGH GRAV.NG. (OTHER EXPOSED AREAS OUTSIDE EACH SLEEPING AREA IN IMMEDIATE VICINITY OF BEDROOMS AND ON EACH STORY OF DWELLING. WERE DIRECT TO POWER SUPPLY WITH UNO. TO BE AIR -ENTRAINED (5% - 7%) 3000 PSI AT 28 DAYS WHERE SHALLBE STABILIZED PER EROSIONCUNTROL NOTES BELOW) BATTERY BACK-UP. EXPOSED TO WEATHER FOR DURABILITY. 9. CARBON MONOXIDEALARMS: 2. SLAB ON GRADE (HEATED 9. INSTALL UTILITIES AND OTHER SITE IMPROVEMENTS, INCLUDING AL,RMSARE REQUIRED AND MUST BE LOCATED OUTSIDE OF EACH SPACES) 4' CONCRETE SLAB WITH FRONTAGEIMPROVEMENTS. SEPERATE SLEEPING AREA, IN THE IMMEDIATE VICINITY Oil THE BEDROOM. IA 6.6 W. W. MESH. 1" SAND OVER 6 10. ATTIC VENITILAnON.- MIL VAPOR BARRIER OVER V' 13. STABILIZE AND COMPOST AMEND Al.t. EXPOSED SOILS PRIOR TO PROVIDE I So, Yr. OF NET FREE CROSS VENTILATION FOR EACH 150 SQ Fr. COARSE GRADE GRAVEL FILL R-10 REVEGETATION OF ENTIRE SITE. OF ATTIC AREA OR 1/300 IF 50% OF VENTING IS 3 Fr. ABOVE EAVE. USE A . 24- RIGID INSULATION AT PERIMETER COMBINATION OF RIDGE. ROOF AND EAVE VENTS AS REAZIRRED. COVER WHERE SLABISLESSTHAN TBELOWGRADE OPENINGS WITH 1/4' NON- RROSIVEMESIL STEEI. 14. ESTABLISH LANDSCAPING AND PERMANENT VEGETATION. AM. 11. TURSHOWERAREAS: SHALL BE FINISHED WITH A SMOOTH, HARD FINISH TO A HEIGHT OF 72 IN. 1. REINFORCING STEEL SHALL BE #4, GRADE 40. ALL BARS SHALL BE TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED UPON FINAL SITE STABILIZATION AND APPROVAL By CITY INSPRaPOR ABOVE DRAIN. CLEAN,DRYAND JEDINPLACE. 12 ' GYPSUM WALLBOARD: LAP SPLICES 15 INCHES MINIMUM. A. Ilr GWO TYPICAL AT WALLS AND CEILING, EXCEPT WHERE INDICATED 2. ANCHOR BOLTS SHALL BE 1/2" OTHERWISE. DIA. x Irr WITH 0.22T X 3"X 3' B. 5W TYPE X' GWII WHERE I HOUR FIRE SEPARATION IS REQUIRED. SQUARE PLATE WASHERS. SPAC C. WATER RESISTANT TYPE GWB AT TUB /SHOWER ENCLOSURES. AT 12- MAXIMUM AND 7 BOLT D. FIRE -RATED WALLS IN GARAGE SHALL BE FIRE TAPED. DIAMETERS MINIMUM FROM 13. STAIRWAYS: CORNERS, SPLICES AND PLATE STAIRS SHALL BE CONSTRUCTED PERPLANS AND BUILDING CODE R311-7. ENDS SPACEANCHORBOLTSAT6 MIN TREAD DEPTH 10 ' AND MAX RISE 7 3/4. HANDRAILS SHALLBE FELT 0. C. FOR SINGLE STORY AND 34'-38-ABOVETREAD NOSING WITH ENDS RETURNED To WALLS. HANDGRIP 4FMO.C.FORTWOSTORY. SEE 2015-VVW,-:. SHALLBE 1 IN'-2' DIA. SHEAR SCHEDULE FOR GAT INSULATION AND FENESTRATION RZQ�Jl M.11NIS BY COMPCNENT(�) STAIR CONSTRUCTION. SHEAR WALLS. ANCHOR BOLTS SHALL HAVE 7' MINIMUM EMBEDMENT 5/8"THREADED ROD, CLIMATE ZONE 5 AND MARINE 4 2.12 STRINGERS 16" 0. C. MAX. :5/4 12TREAD ISPDXIEDA IMMUMOF4"INTO FENESTRATION U-FACFOR(b,' 0.30 1.8 RISERS CONCRE178, OR 112"STRONG BOLT SKYUGHT(b) U-FACTOR (150 2.4 FIRESTOP WIT114'EMBEDMENTCANITE GLAZED TINESTRATION SHGC(b), (el NR 112"GWB SUBSTITUTED FOR CAST IN PLACE ANCHOR BOLTS CEILING R-VALUE(k) 49 STAIRS HANDRAIL PER R311.73 WOODFRAMING WOOD FRAME WALL(g). R-VALUE 2 1. 14. UNDER STAIR SPACE: DFIL#2 4./6.13EAMS, HEADERS. POSTS Mass Wall R-V.I..(i) MI ENCLOSED USABLE SPACE UNDER STAIRS SHALL HAVE 1/2* GWR HE #2 EXTERIOR AND BEARING STUDS, FLOOR R-VALUE 30 15. GUARDRAILS: PLATE% JOISTS, RAFrERS AND LIGHT FRAMING. BELOW-GRADE(r), (.) WALL R-VALJR 10/15/21 im.TB SMALL NOT BE LESS THAN 36"IMIGH WITH MAXIMUM OPENING OF LESS T14AN 4". HFSTD. NON-BEAIUNG , INTERIOR STUDS, PLATES. GLUED LAMINATED MEMBERS: SLAB(d) R-VALTM & DEPTH 10,2ft 16. MASON FIREPLACES: GLU-LAM MEMBERS SHALL BE A.I.T.C. CERTIFIED. MASONRY FIREPLACES AND CHIMNEYS SHALL BE CONSTRUCTED AND DF/DF-24F-V4 OR SIMPLE SPAN BEAMS. 11, 51. 1 liot � 304.8 mat ci = am on ame, mmladre, m t - i-rasedi- Immme REINFORCED PER IRCCHAPTER 10. DF/DF 24F-V8 FOR CANTILEVERED R-losserammuseners. U-Ac--dSHGC-m-umms Whea-adkrme 17.FACPORY-BUT FIREPLACES; BRAMSANDCONTINUO SSPANS SMALL BE LISTED AND INSTALLED IN ACCORDANCE WITH THE W11ERENOTED ONTHE PLANS. k 1- th- the 1, W or dedg, ahkk ... efheireulstim. the cmup-t[R-1- MANUFACTURERS INSTRUCTIONS AND IRC CHAPEER 10. APPLY ONE COAT OF END SEALER flhemudmas Im. ULFACTCRY-ITUI CHIMNEYS. IMMEDIATELY AFTER TRIMMING SHEATHING. Appsadi� Tkhd� A191. 4.h.Lt - be L-hm, he R-,alm,,qedBd j. the .25k. SHALL BE LISTED AND INSTALLED IN ACCORDANCE WITH THE MANUFACTURERS INSTRUCTI S. ROOF AND WALL SHEATHING SHALL b Th. fissarmass, U Actor C.1-m -),d. skyllgh. Th. SHGC -Ims. ppbe, 19. CHI YS/FLUES: BE 7/16- APA RATED SHEATHING roallt]-dii-dou. MAIL PROJECT MINIMUM 2 Yr. ABOVE ANY PORTION OF ROOF OR BUILDING TING. MAIL WITH 8d @ 6- 0. C. @ c '14,75121 �TB'-- R-10 comimme, i-selallm, - he -d- f1he -14 WITHIN 10 FT HORIZONTA EDGES, 12- 0. C . @ FIELD. FLOOR A-15-mrsomr-haso. 20. SAFETY GLAZING R308A SHEATHfNGSHA BES/4-NOMINAL ou the maejo-fthe Paff, m-R-21 cav*imulauraplus a Messes] bmak ALLGLASS IN DOORS, TUB/SHOWER ENCLADSURES� WITHIN 24' OF A DOOR, T8,G APA RATED SHEATHING GLUED &-theshb-dobe LESETHAN IS* FLOOR OR OTHER HAZARDOUS LOCATION SUBJECT AND NAILED WITH Ed 6' 01 C. @ 0 Istsemeat ,flat the Inuenor ofth, '14`75121 TB',hff be IMABOVE TOHUMAN PACTSHALL BE SAFETY GLAZING ' SAFETY GLAZING AND TEMPERED GLASS SHALL BE FACTORY LABELED F�Elt BUILDING CODE. EDGES, 12' 0- C. AT FIELD. SUPPORT PANEL EDGES PER ALA RECOMMENDATIONS. Permitted . be aset akh 21. EXHAUST FANS: PREFABRICATED JOISTS / TRUSSES: R-13 ca �ky meakdo. - the maemr ",/,. hammeal -11jults R-5 caud.... RANGE, CLOTHES DRYER AND MECHANICAL EXHAUST FANS SMALL BE PREFAB JOISTS AND TRUSSES SHALL i .. brear - ch-samirs- VENTED TO THE OUTSLYE WITH APPROVED DUCTS AND EQUIPPED WITH SEDESIGNEDBYTHE er-m�,ofth� -ff. 'TB'- rhm- b-k be.- B-,,Ib..d BACK -DRAFT DAMPERS. MANUFACTURER. ENGINEERED SHOP hs-em-ail. 22. VIENUI ONSYSTEM: DRAWINGS AND LAYOUT SHALL BE aIR-10-dameari .. hdan A mquked del heated db - gmde B- S- 'OVIDEWHOLEHOU"' VEN77LA77ONSYSTEM. SU13MNTED FOR APPROVAL. R402.29. 1. A 50 CFM SPOT FAN VTO. B I00CFM[SPCTFANVT0 BRACING AND CONNECTIONS SHALL BE DESIGNED & DETAILED BY MANUFA RE. Men, SHGC.Vke..ms in d, Afsi- Zoee, C 100 CFM WHOLE HOUSE FAN WITH 24 HOUR TIMER AND SWITCH. 1.5 SONES TRUSS LOADING SHALL TAKE LIVE fRe-d MAX. R-4 DUCT INSULATION VTID. LOADI G SPECIFIED INTABLE gAese-d 23.APPLIANCES: R301 1 5 INTO ACCOUNTFOR BOTTOM h Rere-ed. APPLIANCES INSTALLED IN GAP AGES SHALL BE PROTECTED FROM CHORD LIVE LOADING FOR ATTICS i 7he -ma!R-Ara ppN,, W- un-h.. lalfhe M-bures 1, on he DAMAGE INSTALLED ON AN 18'HIGH PLATFORM. HOT WATER HEATER W17HOUTORWITHLI ITEDSTORAGE. immi-fthemasonafl. SHALL BE INSTALLED VqTH ISMIC STRAPS LOCATED ON THE UPPER AND HANGERS/FASTENERS: jRere-d. LOWERTHIRDS OFTHE APPLIANCE. THE LOWER STRAP SHALL BEAT LEAST 4- ABOVE THE APPLIANCE CONTROLS. PRESSURE RELIEF LINE SHALL BE A HANGERS AND FRAMING ANCHORS ARE TO BE SIMPSON OR kF- dUk mfis, -jok-Paulted -?`jWs, the muslation may be mduccd to PLUMBED TO OUTSIDE. ELECTRIC WATER HEATERS IN UNHEATED SPACES OR EQUAL ALL METAL IN CONTACT WITH B-39 ON CONCRETE FLOORS SHALL BE PLACED ON AN INCOMPRESSIBLE, PRESSURE TREATED WOOD ARE TO lReee-ed INSULATED SURFACE R-10 OR GREATER. BE ZMAK, HDG(GI85), STAINLESS as It. (in - abse, fmiao den - -admd Jimeb" 16 !-he, ,kh 24. ELECTRICALUGHTING STEEL, OR MEET ASTM A 153 OR A hsd-j..hM uEch. THE ELECTRICAL CONTRACTOR SHALL PROVIDE LAYOUT INDICATING 653 STANDARDS. REFER IND IRC ammiumar, afR-10-trissom OUTLETS, LIGHTING, SWITCHES, TV, ETC. FOR APPROVAL PRIOR TO INSTALLATION TH ELECTRICAL AND LIGIFUNG WHEN SHOWN ON PLANS IS R3173.1 ORIBC 2304.93.1. nLrgnd,&iddbsr SUGGESTED ONLY. APPROVED PROJECT GENERAL NOTES OWNER. �i PLANS MUSt BE Thu"en Custom Homes 510 8th Ave N Edmonds, WA ON JOB SITE 425-772-9401 Eric Thuesen LEGAL DESCRIMON. Section 24 Township 27 Range 03 Qymmes, NW - LOT 3 OF CITY OF REIM SP NO S-07-76 REC AFN 201111145006 BEING A PIN SEI/4 NW1/4 PROPERTYIM. 27032400225300 ALL WORK SUBJECT EDMONDS MINING: FIELD RS-12 TO lorsim* INSPECTION FOR 12,034 S.F. BIPERVIOUS'. CODE COMPLIANCE HOUSE - 2.998 (24.9%) W.P. DECK - 225 (1.9%) DRIVE - 1192(9.9%) WALK - 245 (2.0%) TOTAL - 4,660 (38.7%) DESIGNLOADS-. ROOF LIVE LOAD: 25pef Approved. A resl fire sprinlder 'Ystem is ROOF TOTAL LOAD: 40psf A recommended flow -through design FLOOR LIVE LOAD: 40pef required. meet specifications and reduce equipment FLOOR TOTAL LOAD: 50psf will requirements. WIND SPEED: 85roph WIND EXPOSURE: B and continuing maintenance FCDC19-05.020B2. Provide a Minimum SNOW LOAD: 25psf combination water se" 1. of one inch (1-) SEISMIC CAT. D2 one and one half (11/2.) service line, meter and or show that domestic End fire protection need, can be met with a smaller service. '�o Qpd,m 2c ITS) AIR LEAKAGE CONTROL AND EFFICIENT VENTILKIION k: Compliance based ou S-io, R402A.1.2: Rdre,a the mersd I, leakage to 1.5 ai,,hags per ham, suraderma and All whole h-. vrmilmi.. q.tresummum dmenamed W Serdm M15G7.3 of the Irs-tional Residemml Code shall be mat ,Alb a hen -my vrmilstim, system with remanum semible heat recovery efficieucy of 0.85. HIGH EFFICIENCY HVAC EQUIPMENT 3-; Gas, pmp,,e or ofl-firad finarce with minimum AFUE f94%, .1 Gas, Prop ... otmled-fired Imiler irh let .. APUEf92% Option 5a a EFFICIENT WATER HEATING 5.: All.h-erh..d..d kih-.ik famers Installed i-he home d.11 be rated., 1.75 GPM or 1- All orl- 1-1my far-. ,hall be led at 1.0 GPM or less. Opfl- 5h (1.01 EFFICIENT WATER HENTING 5b-. Watc, hrmmgyaam,lmII loclude the folloAring; RESUB Gas, pmpa- -oil water hearm �Uh a trial- EF of 0.74 APR 19 2018 SINGLE STAGE GAS FURNACE 607.5 Sq Fr GLAZING / 3734 Sq Fr Living = 16.2% " 5 "we slao-% CITY COPY CITY OF EDMONDS BUILDING DEPARTMENT WORK C-� ADDRESS -A K1 OWNER ft, xs-15;E)� -� APPROVED DAT'E 11 71DI 13LDG. OFFICIAL =Z PERrAIT NUMBER I �5an-L�a�LA � - A 15-H � '0' " cu Cd CA Q) 00 Lr) 11-26-2016 REVISED 04-25-2017 GENERAL NOTES I E. GRADE 98.22 P. GRADE 102.5 SLAB 103 E. C 120 P. c 114. 5:12 PITCH TYPICAL NON-STRUCTURAL POSTS AESTHETICS ONLY EAST ELEVATION SCALE 1/4" = 1FT 'UPPERFLOOR PLf-HT 10--0- =4"H H UPPER FLOOR RA 12 '1", LOWER FLOOR PLT HT 10'-0" E. GRADE LOWER FLOOR 120.95 4" CONCRETE P. GRADE SLAB 114.0 E. GRADE NORTH ELEVATION SCALE 1/8" 1FT 98.22 P. GRADE MAX RIDGE 134.59 — 102.5 ACTUAL RIDGE 131.45 EXISTING - AVG GRADE 109.59 SLAB AT 103 - (12) AF50 ROOF VENTS REQUIRED SOUTH ELEVATION SCALE 1/8" � 1FT WEST ELEVATION SCALE 1/8" = IFT RADE )5 1ADE 114.0 16x8 GARAGE DOOR E. GRADE 111.45 P. GRADE 108 SLAB 108 E-4 (11)FOUNDATION E.GRADE VENTS REQUIRED 120 P. GRADE 114.3 �D u Z RESUB �D Z E- OC) c:> APR 10 2018 ��Tdmwfr APPROXIMATE FOOTAGE SUMMARY 11-26-2016 REVISED LOWER FLOOR 1407 04-25-2017 (INCLUDES ADD WITH 523) UPPER FLOOR 2327 TOTAL LIVING 3734 GARAGEARFA 570 COVERED PORCH 32 50'-6 112" 16'-0' W-0— F NOW= CRAWL SPACE op".. S. H A HIGH EFFICIENCY UVAC EQUIPMENT 3,: MI 7.4 G s. p,,pm or oil -fired fisrsom with miimum 2 PERMANENT OPENINGS A=94%,or SHALL BE CONSTRUCTED, Goa,pt.pa.—il.d-fired b-i's""Ith ONE 12'OF CEILING ' IT MWITHIN �,fiaimumAFUJE,f92% ANDWONE 12' OF FLOOR Qptbm 5, f0.5 M1307. EFFICIENT WATER HEATING 5.: 2 STRAP AT UPPER AND All sh—thead and kitche ik firucers \-i", LOWER THIRD, WITH - IM i,stalledinth,h— ilbenW,tl.75GPM I CLEARANCE OF CONTROLS s cor I— All .,her I— my fis.—hall be .,ad M1307.3 at 1.0 GPM or less. IGNITTO SOURCETOBE 5b (I MIN IS- OFF FLOOR Q,kId— EFFICIENT WATER HEATING 5b- Water h"aigy— shall fisdude 1h fiell.wintI: F tL- 1, rat� Gas, P'p .. —il—torha. th, asinhours EF fO.74 I R4DS MIN I— CRAWL R303.7 INTE ORSTAIRWAYS SHALL HAVE ARTIFICIAL LIGHT SOURCE NOT LESS 6069 SPACE ACCESS. THAN I FOOT-CANDLE AT THE CENTER T-10- OFTREADS DLANDINGSWTTHWAUL SWITCH AT EACH FLOOR LEVEL BONUS ROOM —12'-101/12'— BDR 4 .14 @ R114 @ R"o -15 EGRESSWINDOW 4.10DF#2 M1507.4 50 CF FAMILY ROOM ZERO CLEARANCE GAS FIR LACE. INSTALL PER MFG SPECS ADU'CA W/ ;R� SHUTOFF 'CADET"WALLHE 'R ATE W/ THERMOSTAT �E�m I >< VT IT 7 Z Oao -x Ix - AMNGjLED A�CROSS-HATCI CA�MR INDI CATE S ADU =AREA N 22 0 R 0 Q01 A 9060TS 6'-0. — 72'-6"7V4)' 2'-6- X-4 14'-0"— MSTA36 STRAPS REQUIRED AT TOP AND BOTTOM OF OPENING --------------- -------------- ---------------------------- A -W112GLIB­, 3V2.101/2GLB LOWER FLOOR SCALE 1/4" = IFT TABLE M1507.3.3(l) ADU NUMBEROFBEDROO S FLOOR AREA 0-1 2-3 4-5 6-7 �7 (aq— f-,) Aa— I. CFM -u '1'500 45 60 75 90 m 1,501-3,00 45 60 75 90 105 0 3,001� 5' 4:0 60 75 90 105 120 3' 4,501-6 - 1 7' - 1- 120 TE 6,W.-75M 90 105 120 135 150 ONM ,7500 105 120 135 150 165 TABLE M1507.3,3(2) RUN TIME % OF 4 HOUR SEGMENT 25 33 66 75 100 FACTOR 4 3 1.5 1.3 1 In WI DOWSCH7DU1r QTY FLOOR SIZE DESCRIEJON AREA, STAN D (SO Fn 2 1 41JbQ�H I eIlNcil � HUNG 27.0 1 1 50"OR5 RIGMT 5L 0 1 1 9060TS TRIPLE SLIDING 5 !0 2 2 1080FX FIXED GLASS 8.0 7 2 2020FX FIXED GLASS 4.0 1 2 20506H SINGLE HUNG 12.0 2 2 26608H SINGLE HUNG 15.0 4 2 3660SH SINGLE HUNG 21.0 1 2 4040OU GARDEN 16.0 3 2 4680SH SINGLE HUNG 27.0 1 2 503ORS RIGHT SLIDING 15.0 1 2 5046RS RIGHT SLIDING 22,5 FX FIXED GLASE 12.0 1 12 1606ORS RIGHT SLIDING 36.0 2 2 1111-IS TRIPLE SLIDING 140 4..RS RIGHTSLIDING 16.0 2_OFX FIXED GLASS 4" 0 TOTAL A�u p. 0 0 0 z P4 �D 00 0 11-26-2016 REVISED BUS 04-25-2017 APR 10 2018 2 IT-10" R310 EGRESSWINDOW BDR 3 R314 BDR 2 13'4 11r 7 B314 21 6 4069 12'-10 R807 MIN 22,30 ATTIC ACCESS 5�6' 2'.6-1 T-0— 6 OPEN TO R314 BELOW R315 Fe 77 M1507.4 50 CFM VTO 2'-11)' E) 246 4 6--l- 71 T-2 IMIT-e 507.4 50 CFM 6-31/2"- 2468 L 5068 EXTERI.R.EADERSTO BE4.8DF#2U.N.O. R314 LIVING RO( MASTER BEDROOM R310 EGRESSWINDOW 4660SH 4660SH 4.12DF*2 3'-4- M1507.3 Iffiffi. WHOLE HOUSE R302.6 FAN TO RIJN 2 OUT OF V2"GYPSUM BOARD ON GARAGE EVEW'4 HOURS SIDE OF WARM WALLS, ATTIC AREA M1507.4 AND SUPPORTING WAILS , 50 CFM VTO W7YP XGWBUNDERANY HABITABLE ROOMS R302.5.1 S IF CLOSING 61 T-31/2' T-6— '-6 1/ SOLID OR HO-- STEEL DOOR, OR 2D MIN. FIRE RATED DOOR 4'-11/2" 211. -4�53�0(rR�� 2'-91/2' )EN 10'-61/2" GARAGE W. 9 c'J PORCH: ENTRY 110'-91/2' Ivy C) 7:1 TABLE M1507.3.3(l) DWELLING UNIT NU 0 0_1 2_3 SMB R OF BEDROOMS FLOOR AREA -1 11 ...CIFM �1'sw 30 45 6D 75 90 0 1,501-3 0 45 60 75 90 105 .00 3'001 4,500 60 7' M) 105 20 4.501-61000 75 90 105 120 135 6,001-71500 10 115 120 135 150 2'-W� � 7,500 105 120 135 150 165 TABLEM1507.3.3 (2) RUN TIME % OF 4 HOUR SEGMENT 25 33 66 75 100 FACTOR 4 3 1 .5 1.3 1 cn 'cl DINING b RESUB �j oo 906US FI UPPER FLOOR SCALE 1/4,, = 1FT WINDOWSCHEDULE OTY FLO R SIZE D RIULIOM AREA STANDARD (SQ Fn I 4680SH S-Nl- � HUNG 27.0 1 1 QRS 36.0 1 1 9NOTS TRIPLE SLIDING 54.0 2 2 1080FX FIXED GLASS 8.0 7 2 2020FX FIXED G S 4.0 1 2 2 SH SINGLE HUNG 12.0 2 2 2 SH SINGLE HUNG 15.0 4 2 3660SH SINGLE HUNG 21.0 1 2 4040CU GARDEN 16.0 3 2 4660SH SINGLE HUNG 27.0 1 2- 503ORS RIGHT SLIDING 15.0 1 2 5046RS RIGHTSLIDING 225 1 12 R020FX FIXED GLASS 12.0 1�:::�2 6 RIGHT SLIDING 2 90BOTS TRIPLE SLIDING 0 ..- _12 - ----- RIGHTSLIDING 15 116.0 FIXED GLASS 14.0 1624.5 AM 10 2018 I`-LI —I Ln WAS 11-26-2016 REVISED cc LU 04-25-2017 0 ku 34 rl 61 T . 11 ofl-+ F-1 r-- - - — — — — — — — — — — — --- 6* . 18' DIA. CONCRETE 4XB4DF #2 ON 4X4 POSTS PADSTyPICAt — — — — — — — — — — — — — — — — OR X6 POSTS AT SPLICES WON 20`6 --------- r ------------------ t --------------------- — — — — — — — — — — — — — — — — F2'_w R 11,2 4 NET FREE VENTING AREA TO BE 5. -V 5. 1/150 OF AREA VENTED. ONE VENT WITHIN 3FT OF CORNER R317.1 SX16 VENT PROVIDES 70 SO, IN. NFV [(AREA�144)/1501170 JOISTS MIN 18' ABOVE GRADE GIRDERS MIN 12"ABOVE GRADE (H)VENTSREQUIRED APPROX. myr LOCATION R408 4 MIN 18.24 CRAWL SPACE ACCESS ABOVEWALL 6 MIL BLACK POLYErHYLEME GROUND COVER OVERLAPPED MIN 12 THROUGHOUT CRAWL SPACE ------------- HATCHED FOUNDATION WALLS TO /'F BE 6' WITH 12' FOOTINGS PER E 0 R ALL OTHER FOUNDIATIONWALLS TO BE 8"WITH 16'FOC...S P.B..... — — — — — — — — — — — — — — — — — — — — — — - — — — — — — — — — — — — — — — — — — — — - - I ------ ----------------- NS —INS -4INS INS —INS INS — INS — INS I" THICKENED 1-11 11 .11EI.14 AT BOTTOM ST. RS WSEC R402.1.1 Sib-m-gmd, iee�hti,, (R-10),hfl be plm 6. ­ide f he f—d.d— " — the imid, fth, fmd,ti,, �11. The Ib .h.fl —d de—e—M Rem the top f the s E., di.... f 24 i-h... INS — INS INS — INS INS INSINS — — — — — — — — — — 4 - — — — — — — — — — — — — — — — — — — — L------------------ F--------------------- 16'-6 U2' R4..2 NEP—VENTINGA A -BE 1/150OFAREA VENTED. ONE VENT WITHIN 3FT OF CORNER 8X16 VENT PROVIDES 70 SO, IN. NFV [(AREA.144Y150VO (II)VENnRECILTIRED -APPROX. VENT LOCATION R317.1 JOISTS MIN IW ABOVE GRADE GIRDERS MIN 12"ABOVE GRADE R4.4 MIN 11,24 CRAWL SPACE ACCE INWALL -- Fjp3 — — — — — — — — — — UM4 b6m I L- - - - - - - — - - - - - - - - - - - - - - - - - - -- - - - - - 6 MIL BLACK POLYETHYLENE GROUND THROUGHOUT CRAWL PACE COVER OVERLAPPED YIN 12' L------------------- �Jjr L - - - - - - - - - - - - - - - GRADE BEAMS PER E.O.R. DETAILS ON PAGE 8 WITH 12" I I - - - - - - - - - - - - --- - - - - - =3* PILE LOCATION 4' PILE LOCATION FOUNDATION SCALE 1/4" = 1F'r R309.1 S, R506 e CONCRETE SLAB AT GARAGE 5R9A%A_Sl"*j OW Ls - APR 10 2018 I-wwlmnffff 11, 0_01_011 �M n M� AlYZ11 NETFREEVENIINGAREATORE 1_/I50,0FARRA VENTED. ONE VENT WITHIN 3Fr OF CORNER EX16 VENT PROVIDES 70 SO, IN. NFV [(AREAxI44Yl50Y70 (11) VENTS REQUIRED LOCATION 6 IML BLACK POLYETHYLENE GROUND COVER OVERLAPPED MIN 12' THROUGHOUT CRAWL SPACE F- - - - - - - - - - - - I , \ HATCHED FOUNDATION wALIS To r BE 6' V11TH 12' FOOTINGS PER B.O.R. R408 1 MIN 18.24 CRAWL ALL OTHERFOUNDATION WALLS TO SPACE ACCESS BE I WITH 16� FOOTINGS . E.0 �11_ B`?Y'LwAlj� . . . . . . . . . . Iw_6 tir L - - - - - - - - - - - - - - - - L - - - - - - - - - - - - - r- - - - - - - - - - - - - -- - - - - - - - - - - - - - - - --- - - - - - - - - - - - - - - - - - - rm -INS -INs -m -w --ms -INS -ms W/(2).4ATBOTTOM 'ERSTADS, WSECR402-1.1 Slb---gd. (R-10) d.B b imid,,f th, fm.&ti,. �ML T� i� 12"' dfl-.dd­d tb..p. I I i V_w 2 �INS -INS --INS -INS -INS -j 1 11 [INS _IM -,S - - - - - - - - - - I - - - - - - - - - - - - - - IL--- - - - - - - - - - - - - - - - - -------------------- - - - - - - - - - - - - - - - - - - - - - - - I- 23�5112' R408.2 NET FREE VENTING AREA TO BE 1/150 OFAREA VENTED. ONE VENT WrrH]N3Fr OF CORNER 8XII VENT PROVIDE' 10 50, IN. NFV I(AREA.144YISOY70 (11) VENTS REQUIRIED APPROX VENT LOCATION R317.1 4- - 4­4 JOISTS MIN 18 ABOVE GRADE GIRDERS MIN Ir ABOVE GRADE I-N.-CE 6 NUL BUCK POLYETHYLENE GROUND RE LA F -------- jWg:�4A - - - - - - - - - - COVER OVERLAPPED MIN 12" T nM OU HROUGHrOUT CRAWL SPACE LL - - - - - - - - - - - - - - - - - L - - - - - - - - 9 - - - - - - - - - ji F Z, L N *ON JOOm:W :j" I I . T I a PIUS WITH ir GRADE REAMS PER E.0 R. DETAILS ON PAGE 8 T M =3'PILEIIOCALTION EU -4'PJLEL0CATION FOUNDATTON SCALE 1/4"= lFr MC19- &R506 Ir CO SLAB AT GARAGE REVISED PLAN APPROVED CIIT OF EDMONDS BUILDING DIVISION PLANS DATE 0, rA �p cd CU A7PX !(OV !E!D! fBYPL NNING cn 0 0 0 0' 5145 E-1 cu 11TY COPY Z V3 IWO REVISPON AUG 2 8 2010 In "br,ft �r.AOQWT 11-26-2016 REVISED 08-29-2018 CROSS SECTION SCALE 1/4" = 1FT D D.. WA CC LU 0 34 Ts NAL [INS INS INS - - - - - - - - - - --- - - - - - - - - - - - - - - - - - ---------------------- - ------------- ----------------------- ------------------------- :L - - - - - - - - ------------------------------ LRDGERTOFOO WALL RETE FLOOR JOISTS TO BE 117/8' TJI-210 AT 16" O.C. UN.O. RIM TO BE PROVIDED BY 0 AND INSTALLED PER MFG SPECS. ..... ..... ..... .. 7 �.G F - - - - - --- - - - - - - - - - - �R L .... - -- ----- --- --- ----- -- - ---- ------ ------ LN 2: 7 CANTILEVERE FLOOR JOISTS FLOOR FRAMING SCALE 1/4"= 1FT APR 10 2018 11-26-2016 REVISED 04-25-2017 5 R502.7 SOLID BLOCKING ]R T R317.1 JOISTS MIN Ir ABOVE GRADE E-11WIME =I SEEN NAWWAMAI W Wiwi NJ m ...... ... . --- ----- LIVA, WIS, 19, m 00 11 R502.7 w OWN SOLID "NG ----------- I -------------------------------- OVER mill -------------------------------------------------- F 0 START FRAMING LAYOUT HERE ------------------- (u ECS. 0 0 0 cn �D u u z W cn rSIDE w CKING RESUB �p D ROD APR 10 2018 8%L SMM- A LOCIR FRAMING SCALE IN = lFr 11-26-2016 REVISED 04-25-2017 6 TYPICAL OVERHANG AT GABLES: 12" 0 H 0. �,� � j�il M -ROOF VENT WAN T-O" VERTICALLYOF RIDGE TYPICALOVERH G AT EAVES. 18" ROOF FRAMING SCALE 1/4" = 1FT R806.2 TOTAL NET FREB VENTILATING AREA TO BE lrM OF THE AREA OF SPACE VENTILATED IF 40-50% OF VENTS ARE NO MORE THAN 3._(r (VERTICALLY) BELOW RIDGE AND REMAINDER OF VENTING IS PROVIDED By RAVE VENTS. AF50 VENTS PROVIDE 50 SQ. IN. NFV GABLE END VENTS PROVIDE 75 Sq. IN. NFV. 2' HOLE IN BIRD BLOCKS PROVIDE 3.14 SC� IN NFV (3 HOLES PER BIRD BLOCK) (34%312) Sq­ (1151) Sq­ m�h­f­dg qi�.d Requi-ts m. by: (12 (61�AF50V... Bird Bl.&. RESUB APR 10 2018 3uAlamm" COVERED DECK ROOF TO BE 2,61 FIF #2 RA RS AT24'O.C. 2:12 PITCH TYPICAL i;T-CM SHEATHING ------ EE i WALL RIM LEDGER JOIST DECK FLOO JO J\y JOM�T DIST J%CK 0ST 'I. LARIOI R.. D'12 -THRU DTT2-THRU ROD AT EACH END ROD AT EACH END OF DECK LEDGER OF DECK LEDGER F--o,-- _ERS�HAL]L I- -.' ..ITS NOT OVERLA DTTI FROM FLOOR JOISITTO DECK JOIST AT EACH END OF LEDGE SEE DETAIL D3 ABOVE R507.2.1 PT 2.8 LEDGER BOLTED TO RIM WITH 1/2* LAG BOLTS STAGGERED IS* O.C. AND MIN 2FROM TOP, MIN We FROM BOTTOM, YMAX SPACING VERTICALLY AND MIN 2"FROM END R312 3 1'6­� 4" SPHERE MAY NOT DyTrT2 I ' PASS THOUGH RAIL PARALLEL 2.4 Top RAIT.Wl LAYOUT 1. EACH A FITE.DICIRAR 'ICEXT I poSTS LAYOUT .4 _��IF TO E MAX &-O-O.C. F 1/4""LAG BOLTS LA DECK DETAILS PER R507 F L 7 ADECK POST FOOTINGS PERIMETER GRADE BEAM NOT TO 8CALE ­­NJ6� �.M 6 OF H. PIN CAP DETAIL MENT R Q__ _O E C.N. CORNER REINFORCEMENT N.ENT N� TEE REINFORCEMENT L [ATTIC __G I 3/8' - 112' ..1' SB NAILEDEdAT6"O.0 AND 12* O.C. FIELD - HURRICANECLIP RAFTER 1 -1 RAFTERS AND TRUSSSES PER PLAN ORTRUSS MFG VAULTED (RAFTER) CEILING TO HAVE R-38 BATTS CEILING TO HAVE R-49 BLOWN IN INSULATION TOENAIL (3) 16d BOX 3/8' I1r WALL OBB IL-'�'-�INSUIATED WALLS TO BE NAILED 8d AT 6"O.C. EDGE 2.6 FIF #2 AT 16' O.0 AND 12� 0. C. FIELD - WITH R-21 RAM [ALL CONNECTIONS PER TA13LE R602.3(l LE.O.R GRADE BEAM DETAILS I LA TRUSS OR RAFTER IA14' - I- IAA. ITRHANDRAIL C PLYWCOD F-.R DIAT'll GLUED NAI EDW` H '?'M 0 L I , � :� AT 16 OC SOLE I�N or PING SCRLEWSHANKTM F 16d AT 16' O.C. SOLE PLYWOOD FLOOR DIAPHRAGM] REQUIRED ON AT LEAST Z ONE SIDE AND To BE ZZ DOUBLE JOIST BETWEEN34"AND38" ISC CONNECTOR ATTOPOF VERTICA ABOVE ST, OREQUAL AIRS TREADS MIN 1/2. GWB JZ STRING.. STRINGER WITH �KA WITH 2x4 SPACER R31L7. -RISER SHALL BE NO MORE THAN 7.75" -TREAD SHALL BE NO MORE THAN 10' -GREATEST RISER OR TREAD �HALL NOT EXCEED THE SMALLEST BY MORE THAN 3/9" �L [TA.BL. O.C. FROM SC BLOCKINGTOBEAM OR GLUE ANDNAILED PLATE TO JOISTS OR 12.5 g. (0.0"') SHANK DIA. BLOCKING - RING OR SCREW SHANK MIN BLOCKING - -ENDNAIL(2)16d 12.5 ga (0.0991) SHANK DIA. -ENDNAIL(2)16d SOLEPLATE SOLEPLATE . TO EACH STUD TO EACH STUI) FLOORJOISTS SOFFIT BOARD PER PLAN Wt R-3wo T RAIC DOUBLE TOP PLATE WITH (�2)16.d TO EACH STUD OR MUD SILL WITH (3) Ed TOENAILED EACH JOIST RIM JOIST TOE NAILED To Top PLATE WITH BdATIS"O.C.' FLO-OR JOISTS PER PLAN S BARWALL SHEATHING LAPS DOUBLE TOP PLATE RIMJOIST' Wrjr`H (2) 16d TO .�l _ EACH STUD' I I A, WALLS TO FLOOR . __1 EATED SILL PLATE R403.1.6.1 1/2* CASTAN-PLACE ANCHOR DOLT r WALL R404.1.4.2- -96"MAX WALL HT WITH UNRALANC DBACKFILLNOT TO EXCEED 49" :014 HORIZONTAL IN UPPER IT 1. UNDER 54"OR BY TA R404 .1.2(2), OTHERWISERES I B AND E P1405 LAB SYSTEM ER AFN 10 ...... EC R402.1. . I PROTECTBOTTO WSEC TABLE 402A.1.1 DRAINAG VAPOR BARM GI OF POSTS WITH CLASS I BLACKVAPOR TYPIAL FOUNDATION SYSTEM D RIO INSULATION FOOTING 901b FELT BARRIER THROUGH- WALLANDFOOTING' FOOTING EXTEND DOWN MI 24' R403.1.1 R403 1.1 ORTOFROSTLJNE 19 R,IIG. .4 OUT CRAWL SPACE MIN&12(IMRY)&15(2SMRY)&M(3MRY)�NCM. MR16.12 (I STOF�) ftl6(2 STORY) ftl9(3STORY)..mw , MR11 'BEMWUNDISTURMDSOIL WITH APEDOVERLAP R03.13 R403.1.3 OR FROSTUNE (WHICHEVER IS DEEPER) AT JOINTS (1) WITH N. 4. ODNITNUDIJS MIN Y - e FROM BOTTOM OF FIG (I)W N04.0ONTINUOUSMINY-eFROMBOTTOMOFFIG R463.1A R40.IA MUM 12-BELOWUNDISTURBEDSOILORFROSTUN7 MMMITEIRLOWUNDISTURBEDSOILORFROSTLINE L /\�(AICREVER ISS DREIER) Z�7IQIEVEEIIDEEPERI I LA INTERIOR BEARING IN CRAWL SPACE I LA FLOOR AND WALL AT GARAGE. [Lt2�, FOUNDATION WITH SLAB FLOOR] FOUNDATION WITH CRAWL SPAC� 4.IODF#2BEAMI i A,, TYPICAL STAIRS i iA,) TYPICAL CANTILEVER INSULATED WALLS TO BE PLYWOOD FLOOR DIAPHRA M r2,lHl*lATIl'O_ FR,3,1 GLUED AND NAILED WITH I -Ilr [TABLE 602.31 WITH R-21 BATTS C I N.. 4 BAR NOT RING OR SCREWSHANKM_ - TOENAIL (3) Ed EACH MORETHAN 41 O-C 12.5 ga (0.0991 SHANK DIA. jOlSTTOlILL* THEVERICALRAR _I.AT�6- O.C. SOLE PLYWOOD FLOOR SHALL EXTEND TO THE FLOOR joisTs PLATE TO JOISTS OR DIA HRAGM GLUED ANT) 130TTOM OF FOOTING, PERPLANWITH BLOCKING - NAILED WITH 1-1/2"RING WITH STANDARD HO R-30 BATTS -ENDNAIL(2)16d ORSCREW SHANK MIN EXTENDING MIN 14' OK SOLE PLATE 12.5 g. (0.099*) SHANK DIA. INTO STEM WALL. 2.4 GUSSET EACH SIDE OF TO EACH STUD POST NAILED WITH (3) 10d TO EACH MEMBER R403.1.3 (WALL) R317 TREATED SILL PLATE -(1)#4 HOR. IN R3 7 JOISTS PER UPPER12" PT 4.4 POSTS OR 4_�6 TYPIAL SLAB PLAN WITH R-30 BATTS AT SPLIT N RAMS W R317 TREATED S'LL PLATE R4:03(lj)3N, R403.1.3.1 TABLE R403.1.6.1 M .4 BARNOT -1/2' CAST -IN -PLACE MORE THAN 48' O.C. ANCHOR BOLT 7' INTO THE VERICAL BAR CONCRETE MAX 72' O.C. SHALL EXTEND TO THE R506.3 BOTTOM OF FOOTING, C CONCRETE SLAB WITH STANDARD HOOK EXTENDING MIN 14' R506.2 INTO STEM WALL MIN 4" BASE COURSE AND 6.. VAPOR RETARDER BETWEEN R405 BASE AND DRAINAGE INRIL PIECE OF SEATING MUST up TO & DOGEM PUTS TO (HEIRS SHEAR Is TRANCERRED. NAL PER LOWER SHDR WALL CAU.HJT 'SIMP DN" STRAP HE PER RUN. SEE 's PSON' I All. REQU REMENTS SHEAR LAN DEL M CIS Is PsLAMSTS P �m SON, UND . EA. E., 3.5 PSL ll� �D �p 'i" ps� ED EA. END (4) TOTAL' IST RUDGKING SHEAR WALL 'R IAN AkIlt T-V I SOLD LOCKING (GLUE) (0 MISTS PERPENDI- CW�AR 70 SHE A-35 PER coL 6 MIELE XIST OR BLOOKS WH�E DOUBUS PLATE NAIING RED D GREAR ... N-22, DO IN TOE NAILS. SEA. TO TOP PUT TOONAL EA. SHE 6 sr O.C. STAGGERED SHEAR HALL BEYOND 0 (i) 0 SUIld -i-, I� (36D) ­­X� Sh., ­1 Sh,d,l, R,, 8. 7/2/2016 o DO A Gl- d I- 0A Ad w il !2 9: 1 p W. M IT _RX X­IP .1, LAIRAL 11-T P111 - - T-1- � �1.11 E­ ALL WALUX N­ M� Al _­ I Hm *7 - - . 0 6' ­1 r 0 imr LXT.,2ffAR,WALL TRANSFER o S LNT�R.l R TRAP TIE — INTERIOZ LEAR WALLS TO T SHEAR TRANSFER TO FLUSH BEAM H2 AC� ER FLOOR 'S P U_ 7AR WALL TO FLOOR GGAM) F_0OR BE W LO _2 OSD Id 1. 2 N.. R� I 2 K.. a N �ES ER R11EATHI I DOF 2X4 LOOKS (-) X n2 4 IA E (3) Ed(TYR) 'Lo .. .. SH A WAL _Us F SE MAX 4' G C 45 ON OU's HER E A HED. AR W . SO I 11 DITEffif SHEAl$A1_1_'T-DSL TOP PUT (2) ETHOS PER ME "'n-G"' ST6236 ITIAI 1111 WN I (40) IN �G Ra a A KC.R �, I. UOHEIE OR PLAN (2) SHICS PER NOT HOLDS EWED NAIL PLYWOOD TO DRL $TJI) (TYP). REM OF (SEE RUN) 2X4 TOP RUE OF PMY WALL ABO� GARAGE DOOR NOR. MIR 3.11.25 F (SEE FINE. PLAN FOR sm) a 3. NAL ..&G. TO -DREY& Na.S -OR 15, GIRLS a E 1-214 STUDI MIN SHRAP IM ."SHETING HONG -NAL G A� 8LSd PAPn3 1 So a PR WM59 T 0 215TO.C. TYR. A - AMy gNT INDRIT.. RIM Oft 7/1G -11 0 UP) COG. (5/8' Tl STHD14 OR PLAN NOE CAL,_,ATw -2"TX4�41A'TEGIAR."�' , MENGAI ll!�_IEM MANN) RAW th. �hl h -Id ­W I. ��ppj��d..�hh,Eb­ i­ 4. . HIM. 1. ETH.w. - 1. it THD.Nl H, WHI, MST GO', I I P­ MST �G.� RPI � IN- SGDHM�. t . I- IT.. Rlf. AFPA GORE S�H. 4.3.5.2 ­g. k, Ill.w,g �t kI P-1 Edp. Rq'd NO P,"�'lll Width FlIl PZ MR, T.- - - - - - - UA " -T�HL� ' ffl HE` -�:EM�_ H�W 2- 11 b I ­b b Z7 1 c.u...X 2-� SRpp� %, 'UN I ' t w.1 SWd PRIf-ld Sh" " snl." N. k,tIdHx RAI 1. b. A�,K,d h,. p.(,g, t , d EM, APRA SOP. sILU .3.53 MID SIRD, . _ 2 4/1-11111 Ell ­11 1 -d. O&H, lb I.II b I I ,b I Ib RDIPl4oTH­R" -5 .11 lb . 1.� b 16 bA R 111- 1111 1- 111 1� 12- P-0 - 1-W, A' .11 .. 6' .1X -733-.- - lb AP lb ­0 X .11PRI3 W .11 .1� �W 7­ lb ,.D Qi 0 '01 2 - TIM 02 LU 1,1,i - MPT17 ST 6235 t. NO - NAT 46 ME, V. I III, R V-2 . 1,11) �OTES: hIld 2D15 IBC Id h&M, S WX jl�l Apl',111.11 UNLT�,I�FN III LINES TO HAVE 3XnO.22V WASHERS 2308,3.2, r,. Wd,111 �9, Md, Alb ,E/ R GO IF F,, SGPWS 4.3.6.4.a. Nm h.ld-d.., prAdld d nil ,d, I,, LRU S DIAPHRAM ERIOR STRAP TIE e LAlftAL ffSTRAINT PANEL "LRP" BLOCKED WINDOW SHEAR ("T K,7 TO PERPENDICULAR ROOF TRUSSES) 1. HEAR AlL AIR.. UPPER 7707)' P .. L AR (REF: APA TT-100) I WALL DETAIL 400F SHEATHING. IN IN Us To TRIESES 6 Id" D.Q -ROOr TRUSSES ,(2]HOWE IN NA S 0 S* GO, 3/4' PLYWOOD TO OR PUT 2. OR 2M E, W Ed 'NUS 4 WALLIS IN HAI 0 6' O.C. TO ON CHORD IN KAI 0 6' O.C. PLYWOOD TR - HALER SHEAR WALL PER RUN L ATE M PLAN ROKI' SHEATHING REG OVER SHEAR WALI_S DR. RARE S P m TOR, OR COLUMN 6 ROWN' sHEATHING 3-16D TOENAIL EACH TRUSS EDGE NAILING 2 . CST I.c MsTS OR TRUSS BOTTOM CROWD BIRD BLOCKS BY Simpsm's HI muss 4 SEISMI 71ES Q 48" D.C. U.N.O. SH A7HING ON No FACE PER COL. ISOF SH AR EDGE RAILING WA L NODULE (TYP.) RE COL 3 OF IF REQUIRED W "' AR "A"' SCHEDULE (TYP.) 16d NAILING TO BOTTOM GPLA E PER COL. 5 OF T HEAR — SCHEDULE ALT RIM P AM NAL FISH DETAIL COL 3 �5 PER COL 6 WHERE SHEATHING DOSCON"Nuous.. 16 ENE NAJUNG SIDE DETAL A ROAR * RIM TO TOP CONTINUOUS REQUIRMENIRE SIMPSO A35 PLUMS . 1G," FRAMING ANCHOR POR ML 6 OF 8 OWING AT ALL SHEA WALL �ERDULE PANEL EDGES SHEATHING OR IsT FA PER .1 , I OF sHEAR _UU (;;) PER AND N­0ME2ULE WALL SCHEDULEIIIEWM CONTINUOUS SKEETHNG FROM , P A_T HIM WH UM To DO BLUE RIM ME BETAL DOUR HOW UDGLL. NAIL MUDSUL D UT 0AJ_ PER COL. 3 FOR MAN P PL 'LS UL FLOOR, NEAR WAmUA CALLOUT R SON X PER A SHE. X PER SNE:F INISON An FONOTNOT SORE (GO WS ANC OR DOLTS FRAWIN. A"I"' PER COL. 6 PER P R COL. 7 OF A. S, SHEAR LU SCHEDULE CRAWL SPACE SHEAR WALL A sC*EDUl.E PLYWOOD 2 - 2 TOP PLATES NAL4 �.GGGE X 'I PLYWOOD P G__U E NG-51 2 X MIN. MUD-G_G� OR BLOCKIRI AT EDGE IN AT BKO A ON , 0 ,I ONE �GC KHOO SHILE SE�RMN END ff�P_ NEG�LE RIGS REOGENAILINGAT PLmGG EDGEs PLAIRE NAILING — (2) SRADS PER NKUD.m *SIMPSM' MS748 STRAP _(�') IWT2�1/;/NAILS. FILL ALL N_ w/ HAL& 11 PER RUN. BUICK AT STRAP P 2-1/2-.V SMPSON STRONG DOLTS 11 1 -mP_ INTO M F To �'-EASRNG FOUNDATION IRU ��S DIAPHRAM SHE;R ALL TO PARAILLEL ROOF IRUGGES) RECESS STRAR GOT MIER OR LAST BLOCK & NAI� MAX 1/4-. BLOCKING OF ... END a TYPICAL SHEAR WALL NAILING X"'K. H r 0" "'U" "A- -A. - "'T"ED Up "'I WUl 11 111LER III I THAIISI KOWOWN 70 BE — TK ORP, PLW,, , UPPIT HHE§INIJT,,NA *)AU. ,,,p Kr C, S" ", 11 MIAMIUA - �, ON . �Zl. .1 WTANDARD NOT. TO ME RIED U..A.. 1. .1-1 TO EXISTING FOUNDATION ___��AP 8d 0 6' D.C. ROOF BOUNDARY UNDARY CLIP (REE) Q 2e R C, 0 e D.C. OR SHR SCH SHR SER Ed 0 6" D.C. C HH CLIP EA HI CLIP @EA. RAF TR 'S RAFT/ TRU T 6 Ur 2� d 2- 6d SOS 16" o, RESUS ,ER BIRD BLOC LEDGER/BLOCKS TIT WA To WALL STUDS APR 10 2018 "D DISCONTINUITY OF DIAPHRAM/ (D E-ENTRANT CORNER �ALL SHEATHIN END TUNOS Do oM PI HIT NAILED IT LATE ED END STUDS OLT DIAMETER PER HGLD D 1414 ARCHo RAG KAH W/ PLA SCHEDUNUE AT T, s ON BOTTOM HIMPS no RD (3,3x OLD N '-PLATE 3/: SEE PLAN FOR HD15 5.5x /8 1-3 0 DOWN TO BEAM CONNECTIaN n�.�L SHEAR WALL AILING WALL TO FLOOR S�,AP.AT tONY WALL - CONTINUTY ALS .7A L TO ROOF TO WALL SHEAR TRANSFER %et 61 of l_j ..T�GALE ALE TL TO SCALE (T-6- RETAINUNG WALL) NET FREE VENTING AREA TO BE 'OF VI-50 AREA VENTED. ONE VENT WITHIN 3FT OF CORNER SK16 VENT PROVIDES 70 SQ. IN. NFV [(AREA.144)1150YM (11) VENTS REQUIRED APPROX. VKNT LOCATION R408 NUN 18x24 CRAWL SPACE ACCESS ABOVEWALL ------------- rINS — INS INS — INS — INS IT THICKENED SLAB W/ (2) *4 AT BOTTOM aDE STAIRS (5--e RETABMG WALL) 6 MIL BLACK POLYETHYLENE GROUND COVER OVERLAPPED AIIN IT THROUGHOUrCRAWL SPACE F-- — — — — — — — — — — — — — — HA DID 10 A;�=.7Z F RET , WITH=. ALL OTHER FOUNDATIONWAUS TO BE S'WnH 16'FOOTINGS PER E.O.R. . . . . . . . . . . . . . . . . . . ----_j i—INS —INS — Im _mS _wS I — — — — — — — — — — L--- ------------ ir— — — — — — — — — — — — — — — — — — — — — R408.2 NETFREE—ARFATOBE 1/150 OF AREA VENTED. ONE VENT WITHIN 3FT OF CORNER W6 VENT PROVIDES 70 SQ. IN. NFV l(AREA.I44Y1501/70 (II)VENTSREQUI APPROX. VENT LOCATION R317.1 JO]STS MIN 18 ABOVE GRADE GIRDERS MIN ITABOVE GRADE ..4 MIN IW4 CRAWL SPACEAC SS INWALL FgT _pg�m — — — — I ---------- - — — — — — — — — — — — — — — — — — — — j — ----------------- -INS —INS —INS— WSECR402.1.1 Slab­gmde xt�twn (R-10),hA be pl, ed ­ the mui& f tI, fo=&ti,, m m the —I& f d. f.—&-. -At Th. b..b— .hall --d d.--d fi— ft� p fh. db fl­�—di­­FZ4 1-l"'. — INS — INS INS ------------------ I L- - - - - - - ---- - - - - - - - - - - - - - - - - - - - 23`5 IM 6 MIL BLACK POLYETHYLENE GROUND IT CUM OVERLAPPED WN 12' L— — — — — — — — — — — — — — — — DECK GRADE REAM PER KO.R. DETAILS ON PAGE 8 3"PRE LOCATION 4Pn.E LOCATION FOUNDATION SCALE IN= 1Fr �J & R506 4'CONCRETE SLABATGARAGE EFREM= 6-6" and Wall Detafl C1W OF EDMONDS BUUI;WG PLANS EXAMDWR DATE Lis 5, K, 7-/ 0 0 0 F2Q>701-7- 05L45 CITY Copy ER Ev 18 i DIN �D 00 AUG 2 8 2016, ­LI "WI-ITIRK-ow- Ln WA 11-26-2016 REVISED 08-28-2018 is ;L W NAL &..d S.�,J_t I. D-8. IY_ I Flo- A —. m_ R� Me A —al L-d 25 Pf ND STRUCTUIII NOTES Applicable codso; 205 It—d-141 �Aldwtlll �dl (IRC� 20 5 M-11-1 15WIdim 0 d. (IBC) 20� 5 WA Stats rwgg C,d, (WSECU GENERAL: THE C TRACTOR SHALL INSPECT THE SIM AND SOIL CONDITIONS AMID VERIFY SITE AND BUILDING DIMEI BEFORE C.MMMNCfNC, PROVIDE TEMPORARY 15RACING AS REQUIRED DURING ERECTION. VERFY SIZE AND LOCATION OF ALL OPFI IN FLOOR, ROOF AND WALLS WITH MECHANICAL AND ELECTRICAL WI PREFABRICATED ITEMS SHALL BE HANDLED AND INSTALLED PER MANUFACTURERS RECOMMENDATION. FOUNDATIONS: 1. EXTEND ALL FOOTINGS DOWN TO FIRM UNDISTURBED WIL IS INCHES BELOW ADJACENT GRACE. 2. CENTER FOOTINGS ON COLUMNS AND WALLS EXCEPT WHEN DMEN61ONED OTHERWISE. , WIDEN FOUNDATION AMID FOOTINGS 4 INCHES TO SUPPORT MASONRY VENEER WWI APPLICABLE. VERIFY LOCATIONS. CONCRETE: I. CONCRETE DESIGN BASED ON 25W F-51 NO SPECIAL N5 CTIM RECUIRED. SUPPLIED CONCRETE TO BE SHALL 159 5.5 SACK MIX, 3000 P61 AT 28 DAYS UNO. TO 50 AIR-11INTRAINED ?6% - 1%� 30M PS, AT 20 DAYS WHERE EXPOSED TO MATHER FOR DURABILITY. 2.6LA5 ON GRADE (HEATED 61-AC 5) 4" COMCRETE SLAIS WITH I� S,& A W MESH. I.. SAND OVER & MIL VAPOR BARRIER OVER *' WARSE RACE GRAVELPILL. R-10 K 24" RIGID INSULATION AT PERIMETER WHERE ISLAS �6 LESS THAN 2'5ELOW GRADE. STEEL: 1. INFDF=� STEEL SHALL ISE -4, GRADE 40, ALL MARE SHALL BE CLEAN , DRY AND TIED IN PLACE. LAP 5PLICE8 IS, INCHES M NIMUM. 2. ANCHOR SOLT$ $14A, L BE W' VIA 1 10" WITH 022S�� X 3" X 3" SQUARE LATE WASHERS. SPACE AT V MAXIMUM AND 1 SOLT DIAMETERS MINIMUM FROM CORNERS, SPLICES AND PLATE ENDS. $PAC ANCHOR SOLT$ AT & FEET 0. SINGLE STORY AND 4 Per 0. a FOR TWO STORY. SEE SHEAR SCHEDULE FOR SPACING AT SWAR WALLS. ANCHOR BOLTS SHALL HAVE 7 M NIMUM EMBEDMENT. I" THREADED ROD, EPDXIED A MINIMUM OF *� INTO CONCRETE, OR j- STRZNG SOLT WITH *'EMECIOMENT CAN BE SUBSTITUTED FOSt CAST IN PLACE ANCHOR IEI S. STRUCTURAL STEEL PLATE 15 TO 59 ASS LIND AND FOR SEAMS 16 TO BE A512C-50 UNO WOOD FRAMING: 1,F/L n 4� 6. BEAMS, WrADERS, POSM w n EXTERIOR AMID MAKING STUDS, MATES, JOISTS, RAFTER5 AMID LIGHT FRAMING, LF STV. NCN�SEARING, INTERIOR STUDS, PLATES. GLUED LAMINATED MEMBERS, GLU-L MEMBERS SMALL BE AILT� CERTIFIED. PF/P -24F-V4 OR SIMPLE $PAN SEAMS. OF/DF 24P V8 FOR CANTILEvTifM0 MEAM6 AND CONTINUOUS $PANS LWfoe NOTED ON THE PLANS. AF'PLY ONE COAT OF END SEALER IMMEDIATELY AFTER TRIMMING ENGINEERED LUMBER: LSL TO BE IBM LINO LVL TO ME ME OR BE TER UNO PSL TO SE 2Zr OR BETTER LIND SWEAT14ING: ROOF ND WALL SWATHING SHALL BE IA&" APA RATED 614EAT ING UNO. MAIL WITH Sd - &'� O� 0. - EDGE!6 ' FIEL , FLOOR SHEATHING SHALL BE 5/*� NOMINAL TIC, APA RATED SWATHING GLUED AND NAILED XITH Sd - W 0. C, - MPGr6, 12- 0. C. AT FIELD. SUPPORT PANEL EDGES PER APA RECOMMENDATIONS. FREF:A5RiOATED JOISTS / TRUSSES; PREFAB JOISTS AND TRUSSES SHALL ME DESIGNED BY THE MANUFAC . TURER ENGIN ERED SHOP DRAWINGS AND LAYOUT 84ALL BE SUBMITTED FOR APPRCVAL� BRACING AND CONNECTIONS SHALL BE DESIGNED AND DETAILED 15Y T14E MANUFACTURER TRUSO LOADING SHALL TAKE LIVE LOADING SPECFED IN TABLE -0.5 INTO ACCOUNT FOR BOTTOM CHORD _IVE LOADING OF 20 PSF. IF TRUSSES RE DESIGNED FOR ATTI� WITHOUT STORAGE, OR DO N T MEET THE LIMITED STORAGE REQUIREMENTS, THE BOTTOM CHORD CAN BE PrOIrNSP FOR 10 PSF. PANGER6/rA6TENER5: ALL HANCE" AM FRAMING, ANCHORS ARE TO 59 SIMPSON OR EQUAL. LL METAL IN CONTACT WITH PRESSURE TREATED WOOD ARE TO BE 2MAK MIDG(GI55). STAINLESS STEEL, OR MEET ASTM A 55 OR A 653 STANDARDS. REFER TO IRC R3113.1 OR SC 2304.S5.1. (2)-4 r> (�) FOUNDATION STEII DETAIL V IAR _ZXLE T- WALL HOUSE FOUNDATION DETAIL — _.FL�sy.TEm.LBFSRm_ — 1. VILL 1-- A. . -1 - I I, MN. 2� MAIL. . — I SEAM .1 ,M' POST MIN. 4 r A- -AR �ILL 5 - APE - SIM .1U- 1� F" 7 -T GARAI.EISLAB FOZATION PETAIL FORY ABOVE Z�,IONAI L= -4 1& — HOR. — EZI �—A VERT. A-11 CRAIN MAT OR, CLEAR ED=- 111ILL WOLIREP LI— L2 L------- P06. I-- RE.. 4 LONG, L. — EARSZ .. h.11, I .� — IF— 14- NO — — FIEFS L—MR TMAN . T4 BE - 11. . CRAWL BEAM DETAIL COMDREM REINFORCI TBIfPf � IA. &�d. 40 Md Lag., G-1. 0­53� L.� A.",. —1 P,­. . P.1 (�) 5OUNDATION STEM WALL OVER 4'TALL A -- ILL _TT NAW_ FL__ I.EE F­ —1 _E. L ;� LAI V ­21--TAIL. HOUSE rOUNDATION DETAIL DECK GRADE BEAM AND POST DETAIL IAI;B L TABLE "C" SPECIAL E613N REOUIRED Pw�-Zvzr DESIGN C:RITERIA M _r BASEMENT FOU14DATION UZC_UTAIL BASEMENT rOUNDATION WALL TABLES (�� -R--R —E -- PI E_ �r PFI 1-1 EIN PILE cAP DETAIL T­ Al CORNE S NEQsQEtjr;NT NINE RESUB APR 10 2M z 0 'u, Q) U) Q) 0 cf) ffiset 5-2 oi 2 INSTALL AND MAINTAIN ALL TESC MEASURES ACCORDING TO APPROVED PLANS, CITY OF EDMONDS STANDARD DETAILS, AND ALL OTHER MEASURES THAT MAY BE REQUIRED DURING CONSTRUCTION N ml EDMONDS ZONING RS-12 FILTER FENCE BETWEEN LOTS 2 AND 3 TO BE INSTALLED AFTER lot L-t--,, 25'MAX HEIGHT FINALGRA INGANDSTORM eh'ci-� C'R Pwcp- 0'� 35% MAX IMPERVIOUS DRAINAGE IS COMPLETE. 94.19' N90.E SEE EDMONDS DETAIL FL1 El A LOT SIZE: 12,034 IMPERVIOUS: ------------------- -- --- -- ------ ---- 0. & HOUSE - 2,998 (24.9%) 4). W.P. DECK - 225 (1.9%) tF FILTRATION SOCK ON U DRIVE %) -1503 (12.5- CB ON LOT 3 ell 4F/l WALK - 245 (2.0%) INV 92.75' C; TOTAL - 4,971 (41.3%) RIM 95.25' / 46., FILTRATION SOCKS ON ANY DOWNSTREAM CATCH BASINS. SEE EDMONDS DETAIL EI.3 COVER SOIL STOCK PILE WITHIN 24 HOURS 24'UTILITY EASEMENT D< 00 THROUGHLOT3TO SOIL FILTRATION SOCK ON PROPERTY LINE OF LOT 2 STOCK CRUSHED ROCK SD EX CB, #2 CONSTRUCTION ENTRANCE TOP 101.9' ILE SEE EDMONDS DETAIL E1.2 INV 98.00 -�'�14.30' �N89 51'53" E -- - - - - - - - -J 17 ------ e---- PRIVATE INGRESS & EGRESS EASEMENT THROUGH LOT 3 PER P SHORT PLAT EXTENDED INTO LOT 2 110.00 ...... fit EG:130 # 02.0 TW S8 9- 51' 53"W EG: 1 121 FG.. 119 113+/- TW EG I DATUM PT 96.0 TW 97.0 EG I0I.0EG+/- 10 FG: 14 RIMTOP 94.0 EG +/ 108.0 FG 11 TW:120 SS MANHOLE 2 100.OTW EG+/- 2 FG 9L '(91�7 EIG +/- RETAINING 105.0 EG 95.5 BEGIN WEST WALL I I BEGIN EAST WALL 121.0 EG+/- WCUMG GRADE-CA10 ON 8th Ave 94.0 TW 98.0 TW -ISTING 107.0 +/- FG 1 15.0 TW EG+/- 112.0 FG 94.0 EG+/- 109.0 FG A: 97.53 122 0 EG +/- B: 121.70 WALL END WEST WALL ALI. DISTURBED EXISTING 112'.OFG C: 120.06 It 1 Soils TO RETAINING BE COMPOST WALL PLANNING D, 99.0 AMENDED A?ROVEI) 6� 0 438.37 / 4 = 109.59 = AVG GRADE PER BMP T5.13 134-59 MAX RIDGE 28.45 RIDGE ABOVE SLAB Zone �S- D- Conte, _j1_Fl.g_L 0 Setbgcks Reguired Actual SLAB AT 103 RIDGE AT 131.45 Front 0 Re. C) "I Other vJ RESUB F-4 APR 10 2018 CITY COPY -1101amm- SCALE LEGAL DESCRIPTION 1" = 15ft Section 24 Township 27 Range �D 00 -me co t� OWNER 03 Quarter NW - LOT 3 OF Ln gq� Thuesen CITY OF EDM S NO S Custom Homes REC AFN 2011 14� -04 �ING 514 8th Ave N A PTN SEI/4 NW1 ov "'qSION RESUB Edmonds, WA PROPERTYID 16 2018 As No -D ate 425-772-9401 27032400225300 CITY OF EDMONDS CITY OF EDMONDS CITYOFEDMONDS \j I Eric Thuesen EDMONDS ZONIN TESC, EXIST.� RS-12 GRADES PIPE USE, SIZE AND MATERIAL EDMONDS ZONING RS-12 FILTRATION SOCK ON WATER - I 1/2"20OPSI POLY 25'MAX HEIGHT CB ON LOT 3 102' 94.19' 10T 106' 108' 110. SEWER - 6" SEWER PIPE 35% MAX IMPERVIOUS INV 92.75' - STORM\ RIM 95.25' SIMTEENCE - - - - - - I — - - - - - - NOT -__CB #4 FOOTING DRAINS - 4"SCH 40 pVC LOT SIZE: 12,034 A__Y INV 100.0, STORM WATER RIM 103.0' TIGHTLINES / ------------ IMPERVIOUS: 20-6" SW STUB Z 112' A.0 HOUSE - 2,998 (24.9%) S=2.00% W.P. DECK - 225 (1.9%) INV=101.5 IF RIM TO INVERT 61" DRIVE - 1192 (9.9%) ELEVATION 114' CB #3 WALK - 245 (2.00/6) MINIMUM TOF HORIZONTAL EXCEEDS 5% TYPE II INV 109.0 MANHOLE WILL BE TOTAL - 4,660 (38.7%) SEPARATION BETWEEN WATER SERVICE AND DRY UTILITIES. RIM 106.0 REQUIRED. MIN 10'H. SEP. BETWEEN d WATER AND SEWER -MIN TH. SEP B��EEN CB #2 WATER AND S�O M 116' INV 108.5' 2TUTILITY EASEMENT B RIM I 11.0' 6' CLEANOUT W/I THROUGH LOT 3Mr TOF HOUSE CB #1 PROPERTY LINE OF LOT 2 6LQLEA,��S INV 110.0' V) 1"WATER METER IN SS It= RIM 1125 SIDE SEWER CITY R.O.W. WITH -s 20'-6"SS STU 111 /.� , . .... 00 1 1/2"WATER SUPPLY B PATIO METER AZTAQHED wr S=2.00% LINE TO HOUSE TO BE FIL11SRAT "IOSPOICM G PAD IT -T& PROPERTY LINE 200 PSI POLY WITH X INV=98.76 �AT 107.5' \SD EX CB #2 TRACER)VIRE Top 10 9 7 �4�SLOPE TOP 1019 UTILITY PEDESTAL '7� 9, ,0 Ell 94' 43P CV, Cd co 895V!5� CABLE DATA N8951'53"E GAS zZ7_ �GAS.' ELECTRICAL/ W PRIVATE INGRESS, EGRESS & CURBI� SHE)Rff P"T OT 3 STORM* STORM SEWER MANHOLE DATUM PT i . ....... ... ........... ......... S99'51'53"W 9/, 1 102' 104' 106' 110- 112- lIV 116' RIM TOP: 95.5 6 00 -Fa 00 Zon J11q5-(P 100 30'DRIV 25'DRIVEWAY GR�D SSH #2 DES -106 GRADES 1 6-108 GRADES 108-108 SEWER (10'17ROMW)� SEWER 6" CLEANOUT AT P/L ll%SLOP 7% SLOPE 2% SLOPE MANHOLE W/ 12" CAST IRON LAMPHOLE ON 8th AVE COVER WITH 1/2" HEXBOLTS W A: 10 (0 it STORM WATER TIGHT LINE AND FOOTING B, 116.1 INV 98.00 (102- FROM HOUSE IS 3.4% SLOPE) (1'/ F* or DRAINS DIRECTED TO STORMI WATER STUB C: 113.9 FOR L07 3 INSTEAD OF ACROSS LOT 2. D: 1 STORMWATERDUEENIM BY DON FIEM M70M 108 '98 GRADE Refer to 05-05-2009 discharge directly into 133.98 MAXRI E regioml detention facility just West of site MINIMUMOF'T FC VERI REQUIRED FCR ALL PIPES LOCATED UNDER which discharges directly into Puget Sound. DRIVRABLE SURFACES AND 'OF COVER UNDER LANDSCAPE AREAS. 28.45 RIDGE ABOVE SLAB ENGW42-FRING L-AVISiON CIVE AS NOTED SLAB AT 103 RIDGE AT 131.45 0 '0 0 0 F11 "Drou'Ntl d%rzck4 THE CITY OF EDMCRF_, FINAL RESTORATION SHAU BE COMPLETED BY THE CONTRACTOR, NOT 4hrAliq GCi)C1Aa1f_ 'Czo� n� 'Al FiNkL SOIL- Vc,1,t0T2p,"t)tq *JAv_ WkseTW9 6t*"tAZb TC-13 APR 10 2018 �D draill L;nt- 0 NWAAWfe- is 4MD BMW U Z 4, ib-D 1�ne_ 5tv" wak,- SCALE LEGAL DESCRIPTION EDMONDS ZONI TKM t�w� tvtl� b'p- one- m6fcaa 1" = 15ft Section 24 Township 27 Range RS-12 RESUB 00 ti,00"'U") L;vv6.+C, OWNER 03 Quarter NW - LOT 3 OF LOT SIZE PR 1 2018 I Ji �Ij Thuesen CITY OF EDM SP NO S-07-76 12,034 S.F. ONX Custom Homes REC AFN 201111145006 BEING IMPERRVTC) !M OUS� pfc-cow ktyiird 514 8th Ave N A PTN SE1/4 NW1/4 HOUST 2,998 ( . 11-16-1116 4-d dt`c�ckm C",Ayouhbn Edmonds, WA PROPERTYID W.P. DECK - 225 (1.9%) 425-772-9401 27032400225300 DRIVE - 1192 (9.9%) REVISED 04-04-2018 Eric Thuesen SCANNED EDMONDS ZONING JUN 0 12820 WALK - 245 (2.0%) DRAINAGE UTILITY RS-12 TOTAL - 4,660 (38.7%) AND FINAL GRADING IN SE1/4, NW1/4, SECTION 24, T.27N., R.3E., W.M. 0+15.71; 147.14 1 RT T0P=1Ee.5:b(AT GRADE) 101.50(AB) NV=91-89, B"SW-OUT 92.11(AB) NV=94-9G-8-N-IN 92.21(AB) PER CITY STD DETAIL #E6.1-SEE SHT 4 Lovell—Sauerland & Associates, Inc. E..in­/Su­q/PI­­ oulte 6u Lyn..d, WA 98036 phone: (425)775-1591 fax: (425)672-7998 e-mail: info@lsaengineering.com web: Isaengineering.com o 1� . vF _j C) R Z _j y _j 0 BY < LL_ Z) LLJ :5i Lij _j U) Lj_j P� 7 Of 0 0 V) Cf) < 0 LLJ 0 F: LL- (-) 0 0 LLJ 0 C'r) 0 0 LLJ U) Z I SCALE AS SHO SCANNED M27 JO "d CHECKED JO SHEET jDRAWN DATE F.B.465.P.34 RECEN 4.05 490,P.21 CITY APR PFN S-05-09 24 29 DEVELOPMENT SERVIC 7-- JS20AM7 No 4288 1 or CITY OFFnUnn � ' FATERTAT, EDMONDS ZONING RS-12 FILTRATION SOCK ON WATER - 1 1/2"20OPSI POLY 25'MAX HEIGHT CB ON LOT 3 9 102' 94.19' 104' 1 106' 108' 110, FENCE CB #4 STORM RIM 95.25' a SEWER - 6"SEWER PIPE 35% MAX IMPERVIOUS INV 92.75' FOOTING DRAINS - 4"SCH 40 PVC LOT SIZE: 12,034 S.F. Y INV 100 0, TIGHTLINES/ IMPERVIOUS STORMWATER RIM 103.0' 13 BUILDING - 3,360 (27.9%) 2&-6" SW STUB 112' -2 0* W.P. DECK - 225 (1.9%) S=2.00% N IF RIM TO INVERT DRIVE - 1,337 (11.1%) INV=101.5 WALK - 254 (2.60/6) ELEVATION TOTAL - 5,176 (43.0%) - MINIMUM TOF HORIZONTAL 114� CB #3 EXCEEDS 5', TYPE U SEPARATION BETWEEN WATE MANHOLEWILLBE SERVICE AND DRY UTILITIES. INV 109.0' REQUIRED. 6 RIM 106.0- - MIN IO'H. SEP. BETWEEN WATER AND SEWER - MIN TH. SEP. BETWEEN PROPOSED CB #2 WATER AND STORM STRUCTURE 116' INV 117.0' 24'UrILITY EASEMENT RIM 118.5' ff CLEAANOUT W/1 Z THROUGH LOT 3 TO 0) PROPERTY LINE OF LOT 2 TOF HOUSE CB #1 6"CLEANOUT BETWEEN BENDS INV 115.01 I"WATER METER IN Ss 141-�. RIM 116.5' CITY R.O.W. WITH SIDE SEWER 101.5, 1 1/2'WATER SUPPLY 20'-6SS STUB PATIO. METERATTACHED LINE TO HOUSE TO BE S=2.00% TO PROPERTY LINE FILTRATION SOCK ON 200 PSI POLY WITH SD EX CB #2 INV--98.76 TRACER WIRE TOP 101.91 UTILITY PEDESTAL INV 98. CB#3 EB - \ D W 14.30' PROPOSE CABLE DATA\, \1 .11yrt 1+ GARAGE cgg —N8951'53"E-4 66-23 GAS ---- - — ELECTR[CAL/ /1�6'PRIVATE INGRESS, EGRESS & ILITY EASEMENT THROUGH Un C� �o STORM SEWER N 3 PER SHORT PLAT LOT 3 MANHOLE z PT DATUM RIM TOP: 95.5 961 100, 104' IW SW5]'53W 110' 112' 114' 116' 100'DRIVEWAY 30'DRIVEWAY 25'DRIVEWAY SSH #2 SEWER (10'FROM W) GRADES 96-106 GRADES 106-108 GRADES 108-108 SEWER 6" CLEANOUT AT P/L II%SLOPE 7% SLOPE 2% SLOPE MANHOLE W/ 12" CAST IRON LAMPHOLE ON 8th AVE COVER WITH 1/2'HEXBOLTS INV 98.00 (102'FROM HOUSE IS 3.4% SLOPE) STORIM WIATER TIGHT LINE AND FOOTING IM C [DRA:IM DIRECTED TO STORM WATER STUB ofAJ)A a IN STORM WATER DETENTION WAIVER FOR LOT 731NSTEAD OF ACROSS LOT 2. RY DON FIENT 07/1712007 Refer to 05-05-2009 discharge directly into regional detention facility just West ofaite MINIMUM OF TOF COVER IS REQUIRED FOR ALL PIPES LOCATED UNDER which discharges directly into Puget Sound. DRIVEABLE SURFACES AND POF COVER UNDER LANDSCAPE AREAS. 0 0 0 IFINAL RESTORATION SHALL BE COMPLETED BY THE CONTRACTOR, NOT THE CITY OF EDMOND 7S. E- z cu Z SCALE TEGAT, DESCRIPTION EDMONDS ZONING 1" = 15ft Section 24 Township 27 Range RS-12 00 OMMER 03 Quarter NW - LOT 3 OF LOT SIZE Thuesen CITY OF EDM SP NO S-07-76 12,034 S.F. feli'Ll 13 2021't-q Custom Homes REC AFN 201111145006 BEING IWERX401JS 514 8th Ave N A PTN SEI/4 NWI/4 BUILDING - 3,360 (27.9%) Edmonds, WA PROPERIM W.P. DECK - 225 (1.9%) 11-26-2016 REVISED 425-772-9401 27032400225300 DRIVE - 1,337 (11.1%) 03-W2020 DRAINAGE Eric Thuesen EDMONDS ZONING WALK - 254 (2.6%) UTILITY RS-12 TOTAL - 5,176 (43.0%) AND, FINAL GRADING INSTALL AND MAINTAIN ALL TESC MEASURES ACCORDING TO APPROVED PLANS, CITY OF EDMONDS STANDARD DETAILS, AND ALL OTHER MEASURES THAT MAY BE REQUIRED DURING CONSTRUCTION N 00 EDMONDS ZONING RS-12 FILTER FENCE BETWEEN LOTS 2AND3TOBEINSTALLRDAFTER 25'MAX HEIGI-rr FINAL GRADING AND STORM 94.19' 35% MAX IMPERVIOUS DRAINAGE IS COWLETE. -N9OoE SEE EDMONDS DETAIL ELI El LOT SIZE: 12,034 S.F. A IMPERVIOUS --------------- -- -------- --------------------------- --------------- BUILDING - 3,360 (27.9%) 0' W.P. DECK - 225 (1.9%) DRIVE - 1,337 (11.1%) WALK - 254 (2.6%) FILTRATION SOCK ON CB ON LOT 3 TOTAL - 5,176 (43.00%) INV 92.75' RIM 95.25' FILTRATION SOCKS ON ANY DOWNSTREAM CATCH BASINS. SEE EDMONDS DETAIL E13 COVER SOIL STOCK PILE VATHIN 24 HOURS 24'UTILITY EASEMENT D P no. THROUGH LOT 3 TO SOIL FILTRATION SOCK ON PROPERTY LINE OF LOT 2 STOCK CRUSHED ROCK SD EX CB #2 TOP 101.91 CONSTRUCTION ENTRANCE PROPOSEDF SEE EDMONDS DETAIL E1.2 INV 98.00 EE GARAGE �4W 9 51'53" E N �16'PRIVATE INGRESS & EGRESS ao EASEMENT THROUGH LOT 3 PER SHORT PLAT EXTENDED INTO LOT 2 SS MANHOLE #2 100.0 TW DATUM PT 96.0 97.0 EG RIM TOP 94.0 95.5 EGIN WEST WALL ON 8th Ave 94.0 TW 98.0 TW EXISTING 94.0 EG+/- 94.7 EG +/- RETAIIIIING WALL CITY OF EDMONDS 102.0 TW 107.5+/- TW 101.0 EG+/- 105.0 EG BEGIN EAST WALL 107.0 +/- FG 105.0 EG END WEST WALL ALL DISTURBED Soils TO BE CDMPOST AMENDED PER SMP 15.13 W- lb, = WPM ft 1114, PROPOSED STRUCTURE cu EXISTING GR ADR CAICS - HOT ISE CU EG.130 S89- 51- 53-W 0 1 A. 97.2 121.0 TW EG,/- EG., 121 FG.- 119 B: 11&75 112.0 FG FG. 114 TWJ25 C: 117.5 - 109.0 FG TW.120 D-982 121 * 0 EG+/- 431.7 / 4 = 107.93 = AVG GRADE 115.017W EG+l- 112.0 FG 132-93 MAX RIDGE 109.0 FG 122.0 EG +/- PROPOSED RIDGE AT 130-75 EXIS�TNG 112.0 FG SLAB AT 103 RETAINING 27.75 RIDGE ABOVE SLAB WALL '0 z- Z SCALF, LEGAL DESCRIPTION 1" = 15ft Section 24 Township 27 Range 00 CIAMNER 03 Quarter NW - LOT 3 OF z F-4 -14 V-q Thuesen CITY OF EDM SP NO S-07-76 Custom Homes REC AFN 201111145006 BEING 514 8th Ave N A PTN SEI/4 NW1/4 Edmonds, WA PROPERTYM 11-26-2016 REVISED 0 4 425-772-9401 27032400225300 RevialfA103-04-2020 Eric Thuesen 'EDMONDS 70WING P 7 011F SITE / PLCrr RS-12 hAR 13 202g TESC, MST. cu;,_M� ci,.YRAM GRADES i�.N7 , INSTALL AND MAINTAIN ALL TESC MEASURES ACCORDING TO APPROVED PLANS, CITY OF EDMONDS STANDARD DETAILS, AND ALL OTHER MEASURES THAT MAY BE REQUIRED DURING CONSTRUCTION N 00 CRUSHED ROCK CONSTRUCTION ENTRANCE SEE EDMONDS DETAIL E1.2 SS MAMFIOLE #2 - i - DATUM PT %.OTW RIM TOP 94.0 EG 95.5 ON 8th Ave 94.0 TW 94.0 EG+/- CITY OFEDMONDS -A. -L -C -CE -� rjoN s�rme EDMONDS ZONING RS-12 I IlTER FENCE BETWEEN LOTS k'- C, e �k . &"k 25'MAX HEIGHT 2 NYD 3 TO BE INSTALLED AFTER eclt�"� Au� 35% MAX IMPERVIOUS NNAL GRADING AND STORM !RAINAGETSCOMPLETE. Od'Qt3- LOT SIZE: 12,034 ,1S,E EDMONDS DETAIL E1.1 IMPERVIOUS: 0 HOUSE - 2,998 (24.9%) W.P. DECK - 225 (1.9%) FILTRATION SOCK ON DRIVE - 1503 (12.5%) CB bN LOT 3 WALK - 245 (2.0%) IN\: 92.75' 0 TOTAL - 4,971 (41.3%) FUR 95.25' FILTRATION SOCKS ON ANY DOWNSTREAM CATCH 3ASINS. SEE EDMONDS DETAIL EL3 COVER SOIL STOCK PILE WITHIN 24 HOURS D 2,V UTILITY EASEMENT THROUGH LOT 3 TO FILTRATION SOCK ON SOIL PROPERTY LINE OF LOT 2 STOCK SD EX CB #2 TOP 101.9' ILE INV 98. pro --:r�Z.�-k�'PRIV-ATE -INGR-ESS &-EGRESS EASEMENT THROUGH LOT 3 PER SHORT PLAT EXTENDED INTO LOT 2 97.0 EG +/- BEGIN WEST WALL TW -SrING EG RETAINING WALL rer WO 2.0tl til 460* T- CITYOFEDAIONDS A 14.30' _189 51'53" E ----------- Co "P G 41 L - fjlj7j�/�iW 101.0 EG+/- 105.0 EG BEGIN EAST WALLL 107.0 +/- FG 105.0 EG END WEST WALL ALT, DISTURBED SOILS TO BE cbMPosT AMF,NDED PER BMP T5.13 0/1 0 0,21 T t:L0 rn bjD C's cd 7� - IlU.UU h I EG:13 t S8 9*51'53"W FG: 119 121.0 IW EG +'- - l'W 13+/- TW EG 11 08.0 FG 12'0 FG 1 . � FG: 1 14 TW:120 121 * 0 EG+/- EXL%WG GRADE 1 15.0 TW EG+/- 112.0 FG 109.0 FG A, 97.53 EXISTING 122.0 EG +/- 112.0 FG AR7,0vEfD B)4LANNING B: 121.70 RETAINING C: 120.06 99.08 WALL D, 438.37 4 = 109.59 AVG GRADE Comer fJ FIR&Y 134.59 MAX RIDGE Setbacks RNtfired -A=AL- 28.45 RIDGE ABOVE SLAB Front 10 J( Sides 10 -IL . SLAB AT 103 CITY OF EDMONDS U ac. -?Pe 11W -ar r I ___L2_ Otherv,/ 10 RIDGE AT 131.45 0 0 F.-I EMINEERR40 CAVISION WORRY SUB Cn S NOTEP A%eRO ;2018 SCALE LEGAL DESCRIPTION 1" = 15ft Section 24 Township 27 Range 00 OWNER Quart�r/NW - LOT 3 OF N, MAR OnUU-1 Thuesen CITY OF EDM SP NO S-07-7qulLDlNc' Custom Homes ITYCITEMAUIZ'�* Y 0 REC AFN 2011111a45OON DERAFQTV'j� 514 8th Ave N A PTN SE1/4 NW1/4 Edmonds, WAr PROPERTYID 11-2 016 'Vl' R U8 U8 V PV BE i I RE' r �D D118 425-772-9401 27032400225300 013-11.2 Eric Thuesen APR I EDMONDSZO N 0 %bE PLOT 'OT P RS-12 ST. TES EXIST. I FS RA DES ov CITY OF EDMONDS PLAN REVIEW COMMENTS PLANNING DIVISION SCANNED C. ,%qo 425.771.0220 DEC 19L i 2019 An DATE: August 19, 2019 TO: Eric Thuesen cau eicthuesen@frontier.com DEC 15 2% FROM: Kernen Lien, Environmental Programs Manager W1 0 � Cft%A..WTWW kernen.lien@edmond wa.gov E%kQ RE: REVISION Plan Check BLD201700545 514 — 8t�'Avenue North New Single Family Residence On behalf of the Planning Division, I have reviewed the proposed revisions to the above building permit application. During review of the subject submittal, it was found that the following information, corrections, or clarifications need to be addressed. Please respond to the following items, so that I can complete my review: 1. Height Calculations: �2- a. Pursuant to ECDC 21.40.030.A, height is measured from the average level of the undisturbed soil p)04f the site. For properties that have a subdivision, the contours that existed prior to any site ork is considered the undisturbed soils of the site. The elevations used in the height calculations do not appear to match the contours of the subdivision and note that are the proposed final grade. Please revise the height calculations so the basis of average level is the undisturbed soil prior to any site work associated with the subdivision. ZCalculate each building separately: Since the garage is now proposed to be detached, the I or3 maximum allowable height must be calculated separately for the residence and the garage. q04t4%04 Please update the height calculation providing separate height recta ngles for the residence on ga ra ge. P5 2� Accessory Structure Limited to 15 feet: Please note that a detached garage is an accessory jr)c4,� structure and is limited to a maximum allowable height of 15 feet pursuant to ECDC 16.20.050.8. d. Elevation views: Please update the elevation views showing the 6isting average grade, maximum height and proposed height on both the residence and the detached garage. t--�72. Missing Plan Sheets: The cover sheet for the submitted revisions reference a site plant, Sheets 1, 2, 3, 4, 5, 6, 7, 8, and 9 as well as a retaining wall revision. However, only the site plan, Sheets 3, 4, and 9 where included with the revision. Please submit full size plan sheets for all sheets related to the revision. More comments may follow once all of the revised sheets are provided. I,— P-0 f�t% 3 Garage Living Space: While living space above the garage may be permitted (provided the garage is FtO - within the allowable height); please note the living space cannot be designed or permitted as an (K) ADU under existing code. �bsm I ­­DPER EM-M-f-, 0 0 0 0 0 LA J_ mw- Fg- A F A—MM �?Ar 1; ML ­2 CK DETAILS PER R507 LA LA .MU.M.) aN 4W ..w ATI— N.. mummm-mm —NI LA ILA T­_ ILA FT_ —Al T16— mr, . MIA". I(R Mv-(om—) =w­ ­TlV.K_ �4' MIM.- 'o _%. TM .17 wEcml.l T:y IIIIRII=Al- .T NY c Mil 17, P. LZ�_�,7 FOUNDATION ,LT. J LAM A.....WAC.] CRAWLSPACEi i A 11 �r, 'd cor --6-,WW 11") — 3 u 0 mAR 13 2020 mlomlllbls"T 1 1 MAR 13 2020 'T"p. 7, �,, -,?, - F5 W LPCGZ -El BDR 2 BDR 3 DIN GARAGE 45, DEN MRIIAL DH.NG BELow .DR 2 jpoRCIIH *,>e % UVINGROOM BEDROOM 0 DHWG z DECK UU U z uppm FwoR El Ln I ll-Y,2DI6 REVIM MAR 13 2020 Ci N oms'. -ZE r,,- 774 MAR 93 2020 ---------------------------------- ---------- 0 :F INS H Wi I �o 0;� ow L :Hi IN P .0 JIL---- ---------- --- INS -------------------- ....................... - — — — — — — — — — — -- �J, L — — — — — — — — — THUESEN CUSTOM HOMES 514 8th Ave N, Edmonds, WA Three Naff Desips Residential Drafting & D isk WA 98290 425-512-3M Vj C, HUESEN CUSTOM HOMES ffireenadd-&- 1--j - Three Nail Designs 915 (2.1dd A� S-h�d, WA 98M 514 8th Ave N,.Edmonds, WA Residential Drafting & Design 425-512-3090 MAR 13 2020 -- - -- - --- ------- jii� F ------ -------------------- ------------ J.- -Ji -------------------------- UT! .1K .............. - ------------------- zi RAN - -- - -------------- z ROOF FRAUNG SCAM 11r Wr : L - ---------------------------- --- J L L-n 8 -- - -- - --- ------- jii� F ------ -------------------- ------------ J.- -Ji -------------------------- UT! .1K .............. - ------------------- zi RAN - -- - -------------- z ROOF FRAUNG SCAM 11r Wr : L - ---------------------------- --- J L L-n 8 Ell z up *n BEDROOM FAMILY ROOM UPPER ROOF FRA G SCAIRI/4'=IFT UPPER FLOOR SCALEI/,r=IFT o o z z pli Lr) 11-24 -2019 9 I UPPER FLOOR INFILL PIECE OF SHEATHING UST LAP TOP & BOTTOM PLATES & NAIL TO COMMON MEMBER TO INSURE SHEAR IS TRANSFERRED. NAIL PER LOWER FLOOR SHEAR WALL CALLOUT REFERENCE DEIAIL L FOR CONNECTION HARDWARE ACROSS UPPER FLOOR unc� ran, Ta An" ous InAl KnounD Ta 94 *SIMPSON" STRAP TE PER PLAN. SEE 13IMPSON, NAIL REQUIREMENTS MEAR WALL PER PLAN PLATE PER t! ` LATE ULE DEL JOISTS DBL MISTS OR IS�L SOLD BLOCKING (GLUE) L JOI (0 MST PARALLEL (0 JOISTS PERPENDI- PS p SOLD T SHEAR Wl 'SIMPSON. GO UL) We A� TO SHEAR WA Lgo ?��j STS. A- PER 35 PER CDL 6 0 EA. END BLOCKING BUE�ICIST OR BLOCKS WHERE DOUBLE PLATE NAILING REOD INTERIOR STRAP TIE INTERIOR SHEAR WALLS TO (INT. SHEAR WALL TO FLOOR BEAM) FLOOR BELOW (D Q 0 0 0 (�) 0 (�D Design Ill SarvIesse, no, (360) 193-Sl - Shear Wall Schedule - Rw Be 7/2/2016 WlEAVING NAIUNG END STUDS (All MUND Isd A3S,%BC 1/2, SPACIN"Ge UNS ­ED ;-T-7 112' Sl Minkel 01' Q2 2X4_ LL- je 100 125 -T-4 1/2* Selele, Old W111baced All (1) 125 ISO 5l seftback Ad Wslibeal Or I 2X4 I Re- 0 9" 10 175 32 -7 1/2* sh..bas, ad Wall 0 7' 1 2� I Ru� An no Ilr sh.�_ Wdl 0,V X4 2. 1 R_ As 25D 300 M, 16' UMAL RESTRIUNT PAREL - M. Rul 6:1 as RIF r-U* ., Ids, LATERA. RESTRAINT PANEL all !:t/-k APA IT-1 c Issued sa APA T20011-511 As Daft IM doted sl, 17,1994- hIgh, 111, 11 In" besed as AD, dst[Il Al W. sa-6 7AW M I Ed, Null W M... al, 16ni Stl. All l2l I I Raw 07' HF 0 V HIF TYP 215 IHF WIND 7AW OM N Al. a, 169 Stands All 2 I Raw W* 2: al 2R.' 0 _M-4 7AV OM Ind All Xfi M de- 1*-D!.. 15l 1-7, 7116' OSEI 10d Ill I-DF -4A4 2 R.. Me' al 5 n3 Bl 7116* M ad N,� m 16a val All %2X4/2* �2n4 2-2.5 2 a 1 Raw l 1 W_ - 1 5 01.5, 0 SM W-4 7/16- M Od All w IGg topic Al A-2 0 0 2 now All 05. I 5 AME, 2l 1KIII S2-3 7116! = On All �2.6 1-44 2 ll All 2 - . 21- .-2 led All I-.F -4. 'a 1 5 0 Jesus 525 Had = Wind ni,sal Cracked A35 600 ON Ib 0 1.6 H1 415 415 In 0 1.5 L'OTH'L__" 0 TH we 11-12�1 1 outside me, 2 1690 1220 Ift, 2 -V' LADMOTHM Anal L-ut.d. 22M 1510 A, H. I-SIDT-18 LSO1Hl!/LDVOnJ­5' .11 ell fN- sener slis 5 b§ 0 1.6 STH­ STHDI /OTHDI0RJl .11 W al t .- ewes, 1�5 a 01.6 STHDII 1. -2 sr uld. - As 2175 Ib 1.6 STHDID DjnL§7 .gl3 STHDI as" I. Wall. cares, 4755 sADO 11, 0 LO OTHDIA MD14/SmID­e` was fill L wtl came, 32W 26M 11, 0 1.6 S1HD14 Mm4/!i1HDIQJ­6- wall All f. -I.. a- 4165 .. Is 1.6 ­14 STHD14/STHDI4R�8` wall Al � coms, 5 Be I.. HOUS HDU5 w/ 5/8' S3111324 6' Won us, 5" n"' Eml..Il 4,470 3325 In 9./DF HOUS HUM A/ 5/8' M7824 6- Wn All 42. , Drdwon W25 370 1 -0 1 HMO HM8 �j 71W sMW a- WIn Mr, 5" na, Eadwas .15 62,115 , &fi./DF HDUS HOUB wl 7,W Well All 601 flnum Erd.,AI 7870 7870 1, -4..F ST24 ST 1, 1,.t Ml ./ rlm MAI) 25Q Is, 0 1.60 ­ .99211.2 . en. nusT As W95 W95 Sl MST60 0 rne, 4330 Ouna s, I.. ,9122 .� n. r1s, V30 6730 1- NOTES- B ... d , 2015 ISO and Industry Stal assume HIF for ood material u.n.o. sl uw X11 Wil Al �ttln � 0 M1 � W ­ s­ d ­ h L S"P.M"'U." n r � d u, Is. If 5. w] A al Idu el son. one, ­ G,­. M1 udil du ­.g -- . .1 1. -bl"d W. Al MMrd h b­,1 d h. Ill Md ­g 0 le . N ,.A. 4' uft � w­9 Il 24� ., .1, �- 11 1, sl nt- ­11. t­­ .11l . .10- A .11. . A. A— . -1. � I Ilf d I.- ­ ­1'. An neve Al . I. I— u­ I. I�O, wA,s .. 1. All M_ naft spn0h, ­ My/ft end MIA hes be, � by Nat In all, 11 If b Pan, If h ­ b,J, s. d,es. s ALL r :E OSB= BOL N ARWAUL LINES TO HAVE 3*X3'M.22V WASHERS 2308.3.2, r From MudsIi edge on ',us with if sh�IIO 2 PLIF Iner SDPWS 4.3.6.43.. unless, hold-dowas proMed at wall ends par exceprion. (2) STUDS PER i*MST HOLD-DOWN 'SIMPSON' ST6236 STRAP HOLDOWN 11 (40) 16d x 2-1/r NAILS. FILL ALL HOLES W/ NAILS. JOISTS PER PLAN (2) STUDS PER MST HOUDOWN EDGE NAIL PLYWOOD TO DBL STUD (TYP). /-F'\ EXTERIOR STRAP TIE `,Q� (EXT- SHEAR WALL ACROSS UPPER FLOOR) ROOF SHEATH NG RBC OVER SH WALLS PER COLUMN 6 x RAFTERS OR TRUSS TOP CHORD ROOF SHEATHING 3-16D TOENAIL EACH TRUSS EDGE NAILING 2 x CEILING JOISTS OR TRUSS BOTTOM CHORD BIRD BLOCKS BY SIMPSON'S HI I S RUS SEISMIC 71ES MANU CTURER 0 48* O.C. U.N.O. SHEATHING ON ,__-2ND FACE PER EDGE NAILING PER Ol 3 OF COL I OF HEAR WALL SCHEDULE IF REOUIRED SHEAR WALL SCHEDULE (TYP.) 16d NAILING TO BOTTOM P TE PER COL. 5 OF SHEAR WALL SCHEDULE A T RIM PLATE NAIL PER LA35 PER COL 6 WHERE DETAIL COL 3 Ll 16d TOE NAILING SHEATHING DISCONTINUOUS. To SEE DETAIL A FOR 0 RIM TOP CONTINUOUS REQUIRMENTS. U77 PLATES 0 12" O.C. 'M. F R ' S� C: IMPSON A35 S BLOCKING AT ALL FR MING ANCHOR P PER COL 6 OF ANEL EDGES SHEAR WALL SCHEDULE SHEATHING ON (TYP.) AGE PER "'T F COL 1 .1 SHEAR P NEIL PLATE NAILING WALL SCHEDULE PER COL 5 OF SHEAR AND NOTE 2 WALL SCHEDULE (TYP.) ALT RIM CONTINUOUS SHEETING D UBLE RIM WHERE DETAIL FROM TOP PLATE TO MUDSILL_ NAIL MUDSILL DOUBLE ROW OF PER OL 3 FOR MAIN PLATE NAILS FLOOR SHEAR WALL Rl AFPA SDPWS Section 4Z52 Deses 1b, Fanen Tracts, asking at All Pand Edges All 41r FWD Pond Win / Fol tgk3si MAP (Typ- 4 -se.) -6. f 61.1kim, All U) 5; ,D T. Be 2-b Cantlesse. e, Smaliped Ones o,c, Rise Jcsk P.f.ndwd Sh- Wdl Smils,. N. HaIncetel Sbanc . IA won I, be An, , . In d " r 9. ust on d eng, mnl= an WA WNS �11 4.1.3 BLOCKED WINDOW SHEAR WALL DETAIL ou EXTENT OF -VARIES (SEE PLAN) MIN. HEADER 2X4 TOP PLATE OR PONY WALL ABOVE eARAGE DOOR NOR MIN. 301.25 SEE FRMG. PLAN FOR SIZE) imp 8�11, 4S.B. TO HDR. jWl 0 3 O.C. 1 STPILS @ 2.5 C. TYR Q) ja ROWS 2-2X4 STUDS MIN 16 R 3- D.C.. LSTA24 VERTICAL STRAP In OPPOSITE OF SHEETING -D IV - N NA AIL 0 'LTIS,"IR STUDS . G r - Th OR Al ITAI . C TYP' 0 k&4 6DV... DY IVOWEON' I 7/16- O.S.B. (5/8' T1-11 0 TURP) D14 OR PLAN N07E CALL -OUT. A INSTALL PER MANF. RECOMMENDATION. VITINUO 2-2X4 PLATES, % SHTG. T'E'ni 12 L2 MINI TO EA. PLATE _ E NOTE BE OW L AID Q) z )57 Ill AM 'ROG BOLTS r All OPENI IS EDMENT X12 AS MIN) N U-15", 2k LU or a or a J111t the h g or a or a or a .sUn th. Inn which cal take the 11.. the second plol Log bolts are to replace anchor bolts Into 4x 0 RIM. The STHID14's are to be replaced with STHD14RJs or added to with MST 60's at a pony -11. MST 60'. .. to repI... STHD14!O at a second floor application. /-G'\ LATERAL RESTRAINT PANEL "LRP" TLRP SIMILAR l APA TT-iol VARIES 1,H RU 1011 SHEATHING LLJ /_NIl TO 2X4 BLOCKS (TYP) r: n 2X4 BRACE k, 7Z -"2X4 BLOCKS ABOVE (3) 12d(1YPl _-MFG'D TRUSSES < 0 2e D.C. 45' MAX --,A35 CUPS PER Q� SHEAR WALL SCHED. 11 I41l SHEAl 1--1 TOP PLATE _j CALLOUT ANCHOR Bul r SNAPS N A35 PER COL 7 OF FRAMING ANCHOR SHEAR WALL PER cOL 6 OF SCHEDULE CRAWL SPACE SHEAR WALL SCHEDULE TYPICAL SHEAR WALL NAILING WALL TO FLOOR G NOT TO SCALE TRUSS DIAPHRAM (INT. SHEAR WALL TO PERPENDICULAR ROOF IZZ! .0 C Q Q MAR 13 2020 l rj;-, Ll "I W'd F- All -, 1OF-FiS "-IT -TO .d �.,d. � A-1, PP P 1-- 1 G" NOTES Applicable Codes: 2015 1-11-1 IISPI-1i C,,d, (IRO) 2os 1-t-I -ldmg CI,d, (MC) 205 WA ftl. E-gg CPd. (WIMIC; GENERAL: TIM CONTRAPTOR 514ALL INSPECT THE SIM AND SO11- CONDITIONS � �ERIFY SITE AND BUILDING DrEMONS � cclmrahlc�m � PR0vIPM TmMPoRA BRACING AS REQUIRED CuRING ERECTION, � PY 01= AND LOOATION OF ALL OPM411,136 IN FLOOR, ROOF AND WALL W17H MEC14ANICAL AND MI-MOTRICAl- WORK. PREFABRICATED 11SMS SAALL BE HANDLED � INSTALLED FSQ MANXACTURERS WOO-IMENDATICNi. FOUNDATIONS: 1. 9�TIENP ALL POO13,11alS DOWN TO FIRM WIL 18 No4ms BELOW ADJACENT cm,"DE. 2. CENTER FOOI ON COL AND WALLS E-EPT XLEN DIMMASIoNED of�mwl� . WIDEN PWROATION ANC, FOOT � .4c"Ea TO SJPPPRT MASONRY VENEER �RE APPLICABLE. �RIFY LOCATION& CONCRETE! LCONICRETEDESI BASED CH25- PSI NO SPECIAl- INSPEPTION WWI-. SUPPLIED CONICRETE TO SLALL BE 55 SAoIC MIX BV,�O PSI AT 20 PAYS LNO. TO ME AIR-ENTRAINE. (S� - 1%) 3000 PSI AT 28 DAYS UaFM EXPOSED TO WEAT�MR FOR DURABILITY. 2. SLAB ONI GRAPE (WEA715D SPACES A' CD,41RINTE SI-A35 WIT14 14 S� W. W. M50lL 1. UND �R & MIL VAPOR 5ARRIER OVER 4" COARSH &RADE GRAVEL FILL. M-10 1 2 " RIGID INSULATION AT PERIMETER WERE SLAZ 16 LEW �AN 2- BELOW GRAPE. STEEL; 1. REINFORCING STEEL 51�1- BE 14, GRAPE 40. ALL BARS --HALL BE CLEAN, DRY AND TIED IN PLACE. LAP SPLICES IS INCHES HNIMPt � AN.401lt BOLTS 014ALL. 1"� DIA ' lo" WITW 0229'. X 3" X S=AW PLATE WASHMe. SPACE AT 12- MAXi� ANZ, I WILT .1AMETERS MINIMI'M FROM WILI.E. AND PLATE ENDS. SPACE ANC-401"t BOLTS AT & FEET 0. � FOR, SINGLE STOR, AND 4 FEET 0. C. FOR TWO STORY. SEE SWEAR SPAIEDULE FOR .P-fNG AT �AR WALLS. AN� BOLTS SWAI-L 'AE 'Ll M]N`M`M EMEEDMENT. ii�' TkWAO5D ROD, MPDXED A M1NfMLM OF 4" INTO CONCRETE, OR I" STRONG BOILT WIT 4- EMBEDMIMIT C- ME SI.eSTITLTED FOR PAST IN PLA� AN04OR BOLTS 3. STRJCTU� STEEL PLATE 15 TO ME - NO AND FOR BEAMS 1, S TO BE AeW-W LNO WOOD FRAMING: OFAL I - .. BEAMS. HFADEFe. POSTS wv EXTERIOR AND BEARING STUDS, PLA�71E., IDI.T., RAFTERS, � LIGNT FRAMING. W SIP. INTERIOR SWO6, PLATE.. GLUED LAMINATED MEMIBERS, -U-L MEMBERS SWALL. ME AILTZ. CERTIFIED. 0 4-4 OR SIMPLE SPAN SEAMS. SPANS -MW NOTED ON TLE PLANS. APPLY ONE COAT OF END SEALER �PIATM-Y AFTER TRIMMING ENGINEERED LUMEER: L TOMIS5E" L�TOMI,IIEORM IXG PSL TO ME 2,OE OR DETTERIXO SHEATHING: ROOF � WA-1- 8141E THING 64ALL ME IA&" APA RATED &'O-EPGESIV'O-- FIELD. FI-00K SHEATHING Sl4A- M3/4-NCM1NALT4GAPA RATED �EATHING GLUED AND INAILED WITH � - 6" 0, C. - EDGED, 12" 0. C. AT FIELD. WPPORt PANEL BOOM PER APIA RECOMMENDATION.. PREFAEPICATED JOISTS / TRUSSES: PREFAB JOISTS AND TR.ISSES SHALL ME DESIGNED BY THE MANUFAOTURM, �INEERMD Sl� DRAZI� AND LAY01T 51�1-1- BE BA5MITTEV FOR APPROVAL. BRACING AND CONINECTION5 OHAL ME DESIGNED � DETAILED BY THE TRZ5 LOADING 014AL TA� LIvE LOADIN3 SPECIFIED N TABLE FDO 5 INTO AOO-NT � 50TTOM! O40RD Ll- LOADING OF 2G F15F. IF E5 AM DESIGNED FOR ATTICS WIT� STORAGE, IWMMNTaTLM TYPIM ME OESI�P FOR 1. POP. HANGERS/rASTENER6: ALL HANGERS AND FRAMING AN ARE TO 5r SIMPSON OR S=AL. L METAI- N CONTACT WjT� FWSWRE TREATED WOOP ARE TO ME XMAK NDCI(GIW), STAINLESS STMML� OR MET A07M A 53 OR A 653 STANDARD& ROPER TO IISO PUTIA1 OR ISO 2"4251 (2) (F) FOUNDATION STEP-DOUN DETAIL Ml- NA.- ILA GARAGE/SLAB FOUNDATION DETAIL I I r -11 E I -A PRAN MAY OR FREE 2- PUZA,", BAD0`,IL, RMWIRED POS. ORAN RED. 4 TO 8 CRAUL 5EAM DETAIL .--TE 1.2 WI -I T&P., (�� FOUNDATION STEM WALL OVER 4' TALL r V WILL HOUSE FOUNDATION DETAIL q 14OUSE FOUNDATION DETAIL DECK GRADE 5EAM AND POST DETAIL V= NAFE MR . 4-- i1j, N. Ail 84, al -I t: FE.Z. ; 41 Vtz FowDAI wI IL kf-171113��� p"01 PILE - 17 MX 5 -- BPEMT -CUEN�T �T -INR GRAVE ME PL I 0-ME, .T - PQ P111 PILE CAII OSTAIL MEN F OEM all on 111 oil viol ,$), ap cQ) ::3 (r) 0 E cf) t 'hod 5 MAR 13 210 zUVmNr. r�,InmTmn�ll — — ---- ----- 0 FOUNDATION MAN TO EX rNID. DETAIL CONCRETE F.-2500p.' REINFORCM STEEL -=- PKA FRAMING Lf SACKFILL SAND OR G ABOVE 'I ANCHOR OLT PER SWR SO4 -4 10" HOP. A VERT, V CLEAR j".1 TITIEN 10 MIL C B— In. k- 4 -4 LONG-/Y POS. DRAIN REO- IS 14. BAR. ..Ina I ti 1 14 jt2 ILI c 10. IS" 1.5' 1 11" 1 31' 1 12" 1 30"1 -5 .12' 1 2N 2 Cantilever Rstariinirn!@ Wall Thuesen Lot 2 2--1 l5ack-slops r"� PILE SUPPORTED SLAB C) -- E --. .— NAILIED TO MOSILL MR �R �L �IEDJLE WLD�M*24'-� 1. IS. NAIL. — 31-� LE-1. � �W FAIIA-WEL TO JOIST 2— TOENAILS - I -ST TO 4A� RM MTERA. M MA - SIDE — WP I.- — -4 MA� . W— F—ISL" TO � — EA IN &A. DFSIGN CRITERIA (5) S� —FETE V� FS1 2— ml—"FILEsu� NOTES: &AFAI.M 16 AILE,. A—R�TS, m - DIA. I lo. I �LT .�w IV M11 2 15�76 FER F.- OLITKALL TO DAYI-1007 10' BL95,sment Wall Q) FL� —T. SEE SIZE &.- T— �RIZ�AL � MEBAR wACm s: 2-1 0,�ER Q) Q3 01 cn Ir RSIEAR -SR.Ap �I� RESA. w. mK 0 &MIL -I a) 4 RIBMAR 51wet 5-3-of 3 1 IE77 MAR 13 2020 Mf ro I —=m "i-M MU 1=7 =.T —D M"T =. =V, 49 =TA &I— ID&I_ o I.—. I A-1 A111111 5148�—N —1-1 24—p—�MV­ —D—M(—) P� F /A- 0 0 0 0 LA—I--- -1 F—T.-v= "0 �4 — f. T XT AMI.X­ "17 .E AT.I. WA F—Tm 1-11-01 Iv. LA ...ATG..._] 7m] 5-m-. 7 L[L—, . . JL —JL--- __j Z -AT'P.. I& -2- 1 OTWO P —2- LAD.(XD.TAI]S. — 4T.F. rul- �a-mm". WA T"... LA ...OP =M�; "IOR- 41W MY' 07, ENTRY ELEVAT10N SCALE 1/4" = IFT t Poevisift E- 3 u D WAR 13 MAR 13 2020 9 CTV�T BUILDING DEPA CITY OF EDMRTA6rrtff ON S w m M z W- re z E- Ln rip, A OWER FLOOR z CALE tW = IFr WEE N cn oo -I- Ai7l L L; b U �3 MAR 13 2020 BUILDING DE EMRIg CITY OF E Ow , , g �,r 3m cd Z F, W3 z u z E-, M r�,O�FA� 4il #vcvl,wtol 'I �,, E- 0 u 0 MAR 13 2020 w MAR 13 2020 Bull lric CMp MAR 13 2020 WITIN D,'.-FASi'i iAG?r. Cf iY OLD SCALE 1/4'= IFr I I ,:j MAR 13 2020 W %ll —� --------------------------- Fa I---- �,l=::=V::7::= - - ------ ----- ---- ---------------- L i OR -A !T Orr VfN 77TI ------- ------ ----------- - -------------------------- -------------------- =—F —::::nF::::::: ---------------- , HO rl /00 ----- ------- --- - — -------- X/ ---------- -------------- - ---- ------------ tl' -�, �-mm 41 IJJI 41 MO. G" N I.Q n J-7- x 2 Z.. TYP. 1- - ---------------------- ROOFFRAAENG SCALE 1W lFr -------- — -------------- ........ . ......................... L ------------------------------------------- Ln RW 8 "'M V-W "-V%" vu MAR 13 2020 UPPER ROOF F"AMNG SCALE 1W � lyr UPPER FLOOR SCALEW.IFf V3 Al z Ln r11 EM im y'll4illm- Ei 2 MAR 13 2029 UPPER FLOOR UPPER FLOOR JOISTS PER PLAN OWER FLOOR LAP TOP & BOTTOM PLATES & NAIL TO COMMON MEMBER TO INSURE SHEAR IS TRANSFERRED. NAIL PER LOWER FLOOR SHEAR WALL CALLOUT REFERENCE DETAIL L FOR CONNECTOR HARDWARE ACROSS UPPER FLOOR ra"M o. To lanni- 1. ­1 - rL To ­ __Na_ TER14ATE Q MU Dl��HRAM 'Nr !6 7 ra ­ - _-) PER PLAN. SEE 'SIMPSON' NAIL REQUIREMENTS -SHEAR WALL PER PLAN __-JN '1�;p ---, Gg' PLATE Ch. PER ULE DBIL JOISTS DEL JOSTS OR FED SCUD L T(GWE) (0 JOI (0 JOIST PARAUEL CU)_AR TO SHEAR WALL) PS. JOI STS PERPENDI- ST 'Sim SON' L9 0 EAL 0 'I'M WAL& W A_35 PER ODL 6 0 f, TO SIDE PL SOU A- PER 6 PLA Ar 0 EA. END TAL�-, Ir BLOCK NO GT%BLE JOIST OR BLOCKS WHERE DOUBLE TE NAILING REC`D INTERIOR STRAP TIE INMR'OE HEAR WALLS TO (INT. SHEAR WALL TO FLOOR BEAM) FL-11-R BEILIF (D (D (�) (�) 0 0 0 0 DnrcFn 5ulld Services, la: (360) 1921-13"S - Shear Wall Schedule - Renr ED - 7/2/2016 SHEATHING NAIUNG END STUDS QIIIO PLAIIE NAUNG 12d 12d AN/RBC -P PL 1/2* AS. VACII. "C"a L-m F-_7 1/2* Slietrack ad -11wardl 0 7' a. X4 I U4 1 ft' 0 14' 1 ft. Is 14 1 - Is. i-_4 1 /2* Shss� M Wallboard 0 47 ­ I 2X4 .4 1 Raw 'I. I Raw 0 il- k.4 I- Isp 31�. 51W Shw,�k ad ftubocrd Or 1 20 1-20 1 1 Raw 0 a- U, /2' Sheetack U ftilhowd 07' 1 2X4 2 X I_ 1-240 I as B 1 Raw S* I ,Nd. 42_211t!I;N�:�:'. /rnir. 4. Need, ANT r-W or show LATERAL RIEM�NT PANEL 515 La/ H. ,,Do Beesol on VA 120011-56 & Onat IN datsd &,, V. III Mein, wAns � dowed InIski an H.D. delp ALL WALLS BLOCKED W-6 Z/161 Edge N.Rhq 00l or 16a Steals OC 2-20/1-2M Raw 07* HF Saming 2'-01.. HF - 215 HF IIND 300 1 11 7 /16* ON ad is W&M a, 16 Slo 11 02.5'2 ar 2M/001 Raw W 0 4' alp 1 4u ar_� 7 il-osei ad 2-2101 n4i 1 Raw 04 5 0 I.r a,_s 7 II'M led W", 1-DFn-4" 2 5/9' 0 15­ S'S WO:SBSd a,- ad or... arna. stopl. Ge �W/2-2.61 1 5 "a IN !G�­ 7 Is- M ad _a_ OV1.1 1 169 0,ophl a 171. as S2-3 7 18' M ad 0.3"mm is I am I.S- '.. 11 25 _52-2 d dul. - .D.. or Ecad wind Uerl, Onclaid AM AM - Delos 4 1, Nrpeal catolpe Go. 60 lb 0 1.6 HI H1 - I'm to W oct, lateral 41 415 lb 0 1.0 MITHIS -THIAMIDIBRI-V we] M57-12'. 1. cartud. a-., ilegn IUD lb 0 1.6 I.Salrits LSD`TH8AAP1HaRk6* wou M5`­1 200 1.1. la 0 1.5 MTHB LeallasAM111MIr was 02-1 �,wtedk 3115 U50 lb 0 1.6 0111-6 Idl 1. outside ocriner 2050 14M I.. ff- f. bid. 310 2175 ib 0 1.6 L Wide surn, 4755 340a Ib I.. STHDl4 D!!�E2-Mla -I .a - I carner bed. 3200 2685 lb .6 1- SIDDID14.erflal)InD,W�F + touside own, w,,I: 410 Wool sDa­ i0D _ 4/e 6 4NJ_B. ; i;�� - + �1� co'ns' W45 M5 Ib 0 1.6 NDU5 HDU5 W - 5* End­11 =5 Ib XB./bF .DU5 pUs �/ e% R21 -_ 2- 2 4e one _�M a.5 VQ 1. F HDUB �B r Wou en HDIAB w/ 71W 5" Town Did I W15 1 6395 11, A.B./bF HDU8 HDUS w/ 71W S57925 6' wall MIn ST firani Endne -a D P. _­ ST24 err Gn4 to lonst - MDnIMI I/ dre `�p 5-0 -180 ,,_ ST am - MST a ./ ft W95 W95 111 0 1.20 SjWD__ Nelda 0 %!M �30 111, 0 1.00 Sjn_ MST72 as ft VW I VW jib 0 1.00 NOTES.- Ba ad an 2015 IBC and Industry Standard, assume HF for wood moterfal u.n.. It IM4­,­ MI - Iswsn� M. M 7­1 Is . 1. , 0. ­HW:­j.t­ ­M �AW � d �l N­ aw­ 01. �A d­ h E norn. _ � b. A:� 1- .1 1�.s 1- 1. 24- .1 ­u, ­Ab-dwL I. se s­ Id. t�_ A 7- IVA ani esef/ft I. lo, I. n . On. II I. Ut &N an be esN. I, ALL ANCHOR BOLTS ON SHEAR WALL LINES TO HAVE YXYXO.229w WASHERS 2308.3.2, r From Mudell edge on elde with OSS/Plywoad if shear over 200 PLF per SDPWS 4.3.6.4.3.. unless hold -dons provided at wall ends per exceptlion. _i (2) STUDS PER 4 MST HOLD-DOWN *SIMPSON' ST6236 AP H 'WN/"W/. (40 16d OLD 2� , - Fj� ALL H.L / Al.. JOISTS PER PLAN (2 MSTSTUDS PER HOMAN EDGE NAIL PLYWOOD TO DBL STUD (TYP). /-F"\ EXTERIOR STRAP TIE (EXT. SHEAR WALL ACROSS UPPER FLOOR) ROOF SHEATHING R C OVER SHEAR WALLS x RAFTERS PER COLUMN 6 OR TRUSS TOP CHORD ROOF SHEATHING 3-16D TOENAIL EACH TRUSS EDGE NAILING 2 x CEILING JOISTS OR TRUSS BOTTOM CHORD BIRD BLOCKS By TRUSS SIMPSON'S Hit MANUFACTURER SEISMIC TIES 0 48" D.C. U.N.O. SHEATHING ON 2ND FACE PER EDGE NAI NG COL 1 OF SHEAR PER COL 3 OF WALL SCHEDULE (TYP.) SHEAR WALL IF REQUIRED SCHEDULE (TYP.) 16d HAWING TO BOTTOM PLATE PER COL 5 OF SHEAR WAU. SCHEDULE (TYP-) j PLATE NAIL PER DE L 3 A35 PER COL 6 WHERE SHEATHING DISCONTINUOUS 16d TOE NAILING SEE DETAIL A FOR a RIM To TOP CONTINUOUS REQUIRMENTS. D.C. PLATES 0 12" D.C. 1� �� SIMPSON AM FRIA ING ANCHOR 4G AT ALL PERM GES 6 or ED SHEACOWALL SCHEDULE (TYP.) WALL SCHEDULE (TYP.) PER COL 5 OF SHE AND NOTE 2 WALL SCHEDULE (TY IV CONTINUOUS SHEETING FROM TOP PLATE TO MUDSILL NAIL MUDSILL DOUBLE M WHERE DOUBLE ROW OF PER C L 3 FOR MAIN PLATE NAILS FLOORO SHEAR WALL CALLOUT ANCHOR BOLTS PER COL 7 OF SHEAR WALL SCHEDULE CRAVIIII. SPACE /T"\ TYPICAL SHEAR WALL NAILING WALL TO FLOOR \,L/ NOT TO SCALE Ref APPA WE section t&542 DwIr for Farce T-slo­ acting at At PaaI DIM Rqd 48! 48, Full Pa: Width d e- Full Pard Width 9 (TIP. 4 Loc"ar.) Bildho Ian. \-2,4(orhplat,)�Sh �IUI; To B� a., 2-2. Cwthaic, StroppW Ri, 0- Thin �t P.f- Sh- Wall Mal.. N. Nofl-h.1 siop, � "�Idn Not to be shwei th irg� cut and all WW aid Ps AMA SDPWS �Uan 4.3A3 L CKED IININDOW SHEAR (D NO. DETAIL EXTENT OF 'VARIES (SEE PLAN) MIN. H ADER EAD 2X4 TOP PLATE OR PONY WALL ABOVE GARAGE DOOR iR. MIN. JxIl.25 (SEE FRMO. PLI FOR SIZE) -NAIL O.S.B. &0 gC11S.W6!� V D.C. OR 159 STP �12 ROW 2-2X4 STUDS MIN 16D F, 3. D.C. LSTA24 VERTICAL STRAP @ 13PP13SITE OF SHEETING NAIL 0 A� PrLTS HDRS. & ST D W Ed 3 C 7501C. OFUWS11 , S� ST P� Sb 2 TYP. 16DOY... &NT W�$IMI 71le O.S.B. (5/8' T1-lI 0 TILRP) THD14 OR PLAN NOTE CALL -OUT. INSTALL PER MANF. RECOMMENDATION. 'a 0�_) NI �:---2-2M PLAT NAIL SIATC. PLATES, TO EA. E _ SEE NOTE BELOW 9TE 14 I w 2 MIN C' ' "'T' W/ " r GPENii AN INASHER Q) _�k )57 M A 2 AD MIN) I I. 'r -EEMENT ". S B the rim No a: Whei 1h -Ll.g Ill. I f LU 1,. . c..g whl h amid take the cc, of th a ae. .B b.L mpace anchor bolts Into 4x 0 RIM. The STHD14�9 am to be replaced with STHD14RJ's or added to with MST 150`9 at a pony -11 MST 60'. cure to mi.. STHID14'. at . saccrid IT... .Ppil..tlon. (J� /'G'\ LATERAL RESTRAINT PANEL 'LRP' \,!� TLRP SIMILAR (REF: APA TT-100) VARIES ROOF SWATHING TO 2X4 BLOCKS (TYP) LLJ ,,_-NAIIIIHII 2X4 BRACE 1Z __'2X4 BLOCKS ABOVE (3) 12d(TYP)- --SHEAR WALL --MFG ' D TRUSSE S < 0 24� D.C. 45a MAX '�,AM CUPS PER SHEAR WALL SCHED. LLJ jjIN.jjSHEA ALLT-DBLTDPPITI I /-E'\ TRUSS DIAPHRAM ALT RIM (INT. SHEAR WALL TO PERPENDICULAR ROOF TRUSSE� DETAIL =1: :3 27034 lig AL Akas, L US t4AR 13 2020 GUIMNIN2 TAY N G­d ml� O.-S. WIl f— Fl— All I �S I Mft— � S, No M. 5TRUCTURAL NOTES Applicable cod..: 2.15 ­V-1 -- 1.1 -d. (IRCI 2,0115 �Ildlg C�d. (18C) 205 WA �. ar—ag _d. ewsl GENERAL: THE CONTRACTOR SHALL NSMOT THE SIM AND SOIL CONDITI S AND vERIFT' SIM AND Vl DIMENSI" m —ICS, M"ll- — MR,Cm A. SsOulmlD vu� ERECTION. vER SIZE AND LOCATION OF ALL OPENINGS IN PI ROOF AND WALLS WITH MECHANICAL AND ELECTRICAL WOP`K PREFABRICATED ITEM Sl BE HANDLED AND INSTALLED MR MANLFACTJRER-S RECOMMENDATION. FOUNDATIONS: 1. EXTEND ALL FOOTINGS DOM TO FIRM t,KDiSTJRSED SCIL 1. .�S BELOW ADJACENT GRACE. 2. IE4MR FOOTINGS ON CO. AND WALLIS I�CEFT WHEN DIMENSIONED OTHERWISE. � WIDEN POINDATION AND FOOT 4 INCHES TO WPP-OPT MASONRY �ER WHERE Af'PLICAISLE. VERIFY LOCATIONS. CONCRETE: 1. CONCRETE DESIGN BASED, ON 25SC, ml NO SPECIAL NSPEOVON W=IRED. SUPPLIED CONGIZETE TO BE SHALL BE Sa MIX SPOO ftl AT 29 DA" MO. TO Or AIR-EN17RAINEC, MS - IX) � " AT 26 DAYS LHERE EXFOSEED TO WEATHER FOSt OUFSA511�. 2. AB ON GRACE (HEATED SPACES) 4" CONCRETE SLAS WITH 1.4 *� W. W. MESH. P SAND OVER 6 MIL VAPGR BARRIER O',UR 4� COARSE BRAD GRAVEL FILL. R-10 x 24' RIGID N�ATION AT PERIMETER WHERE SLAB 15 LESS THAN 2' BELOW GRACE. STEEL: IS CLEAR DW AND TIED N MADE L� SPLICES 5 INCHES m ". SQUANE ATE WASHERG SPACE AT 2- MAXIVNN AND I SCILT DIAMETERS MKIMM FROM COFSERS, SPLICES, AND PLATE ENDS. SPACE ANCHOR BOLTS AT 6 POST a a FOR II "`CR` A� 4 MET 0. C. " TWO STORY. E SHEAR SCHEDULE FOR SPACING AT SHEAR UAL S. ANCH� BOLTS SHALL HAVE V MINIMIJN EMBEDMENT. I'- THREADED ROD EFOXED A HNIM" OF 4" INTO CONCRETE, OR J� STRONG BOLT WITH 4- EMBE�T CAN , Wal FOR CAST IN PLACE ANCHOR BOLTS STRUCTWSA_ STEEL FL 15 TO ME AS6 LNO AND FOR ISI IS TO BE ASW.DV NO WOOD IORAMING, DFA. V 4V 6x BEAPS, HEAPIUP21. POSM LIP -2 EXTERIOR AND BEARING STLIPS, PLATES, JOISTS, RAFTERS AND LIGHT PP�1143. HIP STC. NON-129ARINS, NTERIOR 5T.D5, PLATES. GLUED LAMINATED MEM5ERS% GLU-LAM MM49MRS IIHALL BE Ar.T� DF/PF �4F­4 OR SIMPLE SPAN BEAMS. DIPA�P 4F-V9 FOR CANTILrvtFSP ONAMS AND CVNTNWXS SPARS "m NOTED ON THE PLANS. APPLY ONE COAT OF END SEALER IMMEDIATELY AFTEIZ TRIMMM ENGINEERED LUMBER: L L TO BE IME � _- TO OR ISO OR BETTER UNO POL TO BE 2.02 OR BETTER IN0 SPEATHINIS: ROOF AND WALL " HIS $HALL BE I"" APA RATED SHEATHN3 IN . MAIL WITH ad 0 6- 0, C. - 6PGOS, 12' 0. C. 0 FIELD. FLOM SHFA1NING L BE 3- NOMINAL T. APIA RATED SHEATHING GLUED AND RAILEC, WITH - . V- C. a . EC*96, 1V 0. C. AT FIELD. SUPPORT PANEL BOGIES PER APA RECOMMENDATIONS PREFABRICATED JOISTS / TRUSSES: Pjl JOISTS AND TRIBES $WALL BE DESIOl BY THE M�Tuwm ENGINESI SHOP DRAWNGS AND "Y0JT SHALL BE WOMITTED FOR APPFIOVAL. BRACING AND �CTICNS flHALL 13S OESI&MP AND DETAILED BY THE MAPLF4CTURER TRM LOADING SHAL TAil LIvE LOADING SPECIFIED IN TABLE POOLS NTO ACCOI FOR E017014 CHORD LIvE LOADING OF 20 POP. * 6 ARE DESIGNED FOR ATTICS WITHOUT STORAGE, OR 00 NOT MEET THE LIMITED STORAGE REQUIREMENTS, THE BOTTOM CHORD CAN BE DESIGNED FOR w FOR. HANGERS/rASTENEIRS; ALL WANG*RS AND FRAMING ANCHORS Ape To BE SIMPSON OR EQUAL ALL METAL IN CONTACT WITH PRESSURE TREATED WOOD ARE TO 59 ZMAK �GW5), STAINLESS STEEL, OR MET AST-1 A *3 OR A 653 STANDARDS,. REFER To I� ­3.1 OR Ea 2�GSJ. (2) P4 E Su__ c L RE15 C—AVATION CUT 11 _� q,1 FOOTINds eFOUNDATION STEP-DOWN DETAIL GAR4GE/SLA5 FOUNDATION DETAIL 'M L ;t"otf, D-IN MAT _E AN—' �. ­11 FEO. LIS ._ _y 41 nmk_iiwmmmm�� sFOUNPATICN STEM WALL OVER 4' TALL — —KIII—III.-PIPLAN — Eg CRAWL BEAM DETAIL L.1-1 ­P, . F., HOUSE FOUNDATION DETAlL IMMM M_1= ­P, HOUSE FOUNDATION DETAIL 44­ "ECK 02 BEAM AND POST AIL .E. E P 10— P sFOUNPATICN STEM WALL OVER 4' TALL — —KIII—III.-PIPLAN — Eg CRAWL BEAM DETAIL L.1-1 ­P, . F., HOUSE FOUNDATION DETAlL IMMM M_1= ­P, HOUSE FOUNDATION DETAIL 44­ "ECK 02 BEAM AND POST AIL .E. E P 10— P .W ­W" 0 _P PIUM, 117- P­ ­P_ P­ T I—) EERItIETER GRADP BEAM 1/2. 1 - �P l� "IN PILP CA" IP-11 SO PPIII �E AT I RE.P. co`�e EINFoRcEmENT I TAZLE "All L M - M. L Al 5 P mz nmr..­ NOTES: Twit= M-. MAKI - 9 DESIGN CRITERIA 12 e 5AGWIENT Ill ON UMNETAIL BASEMENT FOUNDATION UAIL TABLES Q) Mir— r-D 2 T ,D ::3 U l2 w-t Cn 0 Cf) _�3 6�mt 5-2 or 3 EU7,ou,m, , MAR 13 2020 StnI,P,Y1N'S LEPPRT",17771 C , ( OF LM%1,,,;: FXIOTM FC%=ATI- "16 0 FOUNDATION TIE-IN TO EX FND. DETAIL CONCRETE F-2500rif '- STE REINFORC =EL. TL' FRAMING ACKFILL A.. OR ANCHOR BOL MR SHR SCH! A4 10" -.WOR -A VERT, 12" CLEAR MIL I -XI TITEN /-10 VAPOR - st.ge- .6 �i FEW- R 4-4LONG.-I!1 I POS. DRAIN REO. tI I W V LI I L2 I L3 1[:::A W. 1 5.5-1 I I 20"1 r.1- 1 30"1 �, -12' 1 W. 1B, :01- I- 1 3V 1 12" 1 30" 1 -5 -12" 1 -, -12" 1 -. -12- Cantilever R(stainiri!@ Wall Thussen Lot 2 2.1 5ackslope LILE SUPPORTED SLAB TO SCALE =NTIMUCKA SHESTING HAILED TO ,6IL- FER OWISAR LWLL �1-1! WHO ISLOCKW. 0 24' = .. NATI-. S� ft� mn U�TH � "18T PARALLEL TO WLL W M =18T . W 2.2d TC4MNAILS- �IGT W HAVE RIM MATEFSA. ON EACH 6.9 FCF, CLIP -1. �.. SLAr, , - - "g=LAE, ELLINSLAS DESIGN CRITERIA (a) � -� - t "I 21m, 1 - .RADE .. RM� PSI ..A - SEISMIC (SH, PILE eu�m NOTES: PO � 0-MLL UNTIL K- �THNG 15 _LED -L", PIA . V mN. V SM1,1DmSNT MN. I �" PER - SIL- 1AM MU U' LMA - BAR �I= - -4 4 outFarTMAM 10' 5aeement Wall 0 -6 SIZE SPACNC, LT) I'll mo, —N. HCWWNT4- . A. SPACNd - W 2- C-�M 9" �ATICN LAW- WIDTH Lu 0�14 FWMAR C3 wc-w� -+— Q) WAR W. SI," C-FtEtm L� 0 7D 6i M 6�eet 5-3 of L I -.�00*6 L:� NAR 13 2020 p N ,vakon c 'mm l'WATER METER IN CrIYR.O.W WITH METERATTACHED TO PROPERTY LINE CABLE / STORM SEWER MANHOLE DATUM PT RIM TOP: 95.5 RIEE IJSE- S17F AND MATERIAL EDMONDS ZONING RS-12 FILTRATION SOCK ON WATER - I 1/2'20OPSI POLY 25'MAX HEIGHT CBONLOT3 SEWER - W SEWER PIPE 35% MAX IMPERVIOUS INV 92.75' STORM \ RIM 95.25' FOOTING DRAINS - 4SCH 40 PVC LOT SIZE: 12,034 S.F. TIGHTLINES IMPERVIOUS STORMWATER BUILDING - 3,360 (27.9%) 20-6- SW STUB W.P. DECK - 225 (1.9%) S=2.00% IF RIM TO INVERT DRIVE - 1,337 (11.1%) INV=101.5 ELEVATION WALK - 254 (2.6%) EXCEEDS 5' TYPE 11 TOTAL - 5,176 (43.0%) - MINIMUM TOF HORIZONTAL MANHOLE WILL BE REQUIRED. 24'UTILITY EASEMENT Z THROUGHLOT3TO 4) 5 PROPERTY LINE OF LOT 2 1 1/2"WATER SUPPLY LINE TO HOUSE TO BE 200 PSI POLY WITH TRACER VIM IB SEPARATION BETWEEN WAIT SERVICE AND DRY UTILITIES. - MIN IO'H. SEP. BETWEEN WATER AND SEWER - MIN TH. SEP. BETWEEN WATER AND STORM 6"CLEANOUTW/I TOFHOUSE 6" CLEANOUT BETWEEN BENDS SIDE SEWER 20'-6'SS STUB S=2.00% FILTRATION SOCK ON SD EX CB #2 INV=98.76 TOP 101.91 UTILITY PEDESTAL INV 98. 102' SILTFMCE 0. PROPOSED STRUCTURE SSINLET 1015, PATI�0 14.30' E 1, PROPOSED GARAGE 951'53'E 3 /116'PRIVATE INGRESS, EGRESS & UTILITY EASEMENT THROUGH b LOT 3 PER SHORT PLAT 4/ LOT3STORM! Z 9� 981 100, 102' 104' 106' S89'51'53-W 111 112- 114! 116' 9" SSH #2 100'DRIVEWAY 30, DRIVEWAY 25'DRIVEWAY SEWER SEWER (10'FROM W) GRADES 96-106 GRADES 106-108 GRADES 108-108 M,ANHOLE 6" CLEANOUT AT P/L Il%SLOPE 7% SLOPE 2% SLOPE ON 8th AVE W/ 12"CAST IRON LAMPHOLE COVER WITH 1/2' HEXBOLTS 98-00 (102'FROM HOUSE IS 3.4% SLOPE) STORM WATER TIGHT LINE AND FOOTING DRAINS DIRECTED TO STORM WATER ST� SMRM WATER DETENTION WAIVER FOR LOT 3 INSTEAD OF ACROSS LOT 2, BY DON FEENE (V7/17/2007 Refer to 05-05-2009 discharge directly into regional detention facility just West of site MINIMUM OF TOP COVER IS REQUIRED FOR ALL PIPES LOCATED UNDER which discharges directly into Puget Sound. DRIVFABLE SURFACES AND POF COVER UNDER LANDSCAPE AREAS. 104' lov 108, 110, CB #4 #4 ...... 1 -INV 100.0- 00*0'z I 103.0' 03,0 112' Y 114� CB*3 Y/ INV 109.01 I RIM 106.0' CB #2 116' IN' INV 117.0' RIM 118.5' CB #1 JNV115.0' RIM 116.5' F'NAL RESTORATION SHALL BE COMPLETED BY THE CONTRACTOP, NOT THE Crff OF DM�ONDS. SCALE ill = 15ft LEGAL DESCRIPTION Section 24 Township 27 Range QMEM 03 Quarter NW - LOT 3 OF Thuesen CITY OF EDM SP No S-07-76 Custom Homes REC AFN 201111145006 BEING 514 8th Ave N A PTN SE1/4 NWI/4 Edmonds, WA PROPERTYID 425-772-9401 27032400225300 Eric Thuesen RDMO RS-12 cu co Z C) 0 0 z z r1l EDAiQNniZDMMG RS-12 Revf oo LOT lqTzF 2 � 't I C) U Pq Ln 11-'va'k a.r. MAR 13 20 IMPERVIOUS BUILDING - 3,360 (27.9%) 11-262016 W.P. DECK - 225 (1.9%) REVISED 03-04-2020 DRIVE - 1,337 (11.1%) WALK - 254 (2.6%) -6R-MNAGE TOTAL - 5,176 (43.00/6) UTILITY AM FINAL GRAT)ING INSTALL AND MAINTAIN ALL EDMONDS ZONING RS-12 FILTER FENCE BETWEEN LOTS 2AND3TOBEINSTALLRDAFTER TESC MEASURES ACCORDING TO 25'MAX HEIGFIT 35% MAX IMPERVIOUS FINAL GRADING AND STORM ------ rRAINAGE IS COMPLETL APPROVED PLANS, CITY OF SEE EDMONDS DETAILE1.1 EDMONDS STANDARD DETAILS, LOT SIZE: 12,034 S.F. AND ALL OTHER MEASURES IMPERVIOUS BUILDING - 3,360 (27.9%) THAT MAY BE REQUIRED W.P. DECK - 225 (1.9%) DURING CONSTRUCTION DRIVE - 1,337 (11.1%) FILTRATION SOCK ON WALK - 254 (2.6%) CB; ON LOT 3 N TOTAL - 5,176 (43.0%) INV 92.75' RIM 95.25' FILTRATION SOCKS ON ANY DOWNSTREAM CATCH BASINS. SEE EDMONDS DETAIL E1.3 z COVER SOIL STOCK PILE WITHIN 24 HOURS 2,V UTILITY EASEMENT D 00 FILTRATION SOCK ON THROUGH LOT 3 TO PROPERTY LINE OF LOT 2 S STO 'PATIO CRUSHED ROCK SD EX CB #2 CONSTRUCTION ENTRANCE TOP 101.91 PIL& n PROPOSED SEE EDMONDS DETAIL E1.2 INV 98.00 14.30' GARAGE 951'53'E "�IGPRWATE INGRESS& EGRESS EASEMENT THROUGH LOT 3 PER SHORT PLAT EXTENDED INTO LOT 2 A PROPOSED STRUCTURE VB 40 /z EXISTINGGRADE CALCS- HOUSE '4 EG130 E--q SS MANHOLE #2 S8��51` 53-W N-S FG: 119 A: 97.2 DATUM PT 100.0 TW 102.0 TW 107.5+/- TW 1 121.0 TWI EG+/- EG: 121 TWJ25 B: 118.75 96.0 TW RIM TOP 97.0 EG +/- I 101.OEG+/- 105.0 EG I 113+/- TW EG 112.0 FG FG. 114 C: 117.5 94.0 EG +/- 95.5 BEGINWESTWALL BEGIN EAST WALL 108.0 FG TWA20 121.OEG+/- 431.7 / 4 = 107,93 = AVG GRADE ON 8th Ave 94.0 TW 98.0 TW EXISTING 107.0 +/- FG 115.0 TW EG+/- 112.OFG 132.93 MAX RIDGE 94.0 EG+/- 94.7 EG +/- RETAINING 105.0 EG 109.0 FG WALL ENDWESTWALL ALL DISTURBED 122.0 EG +/- PROPOSED RIDGE AT 130 75 mas6G 112.0 FG SLAB AT 103 SOILS TO RETAINING 27.75 RIDGE ABOVE SLAB pa lb CITY OF EDMONDS BE COMPOST WALL AMENDED PER IMP T5.13 0 7� 9 0 0 �D SCALE LEGAL DESCIRIPTTON P4 I" = 15ft Section 24 Township 27 Range 00 OWNER 03 Quarter NW - LOT 3 OF Thuesen CITY OF EDM SP NO S-07-76 Custom Homes REC AFN 201111145006 BEING 514 8th Ave N A PTN SE1/4 NWI/4 11-26-2016 Edmonds, WA PROPERTY IT) REVISED 03-04-2020 425-772-9401 27032400225300 Eric Thuesen EDMONDS ZONING .:,,sITE I PLOT RS-12 MAR I TESC, EXIST. GRADES EHT INSTALL AND MAINTAIN ALL TESC MEASURES ACCORDING TO APPROVED PLANS, CITY OF EDMONDS STANDARD DETAILS, AND ALL OTHER MEASURES THAT MAY BE REQUIRED DURING CONSTRUCTION N z 00 IXER PENCE BETWEEN LOTS 2NNI)3TOBEINSTALLEDAFTER NAL GRADING AND STORM 94.19' RAINAGE IS COMPLETE. 7: NX EDMONDS DETAIL Ell N901-E El IN 0' �4, FIL'RATION SOCK ON (i CB )N LOT 3 INA 92.75' 0 RIX95.25' FILTRATION SOCKS ON F ANY DOWNSTREAM CATCH 3ASINS.. SEE EDMONDS DETAIL E1.3 4�21 B COVER SOIL STOCK PILE WITHIN 24 HC:URS 24'UTIIJTY EASEMENT D' THROUGHLOT3TO SOIL' FILTRATION SOCK ON PROPERTY LINE OF LOT 2 cr, CRUSHED ROCK SD EX CB #2 PILE CONSTRUCTION ENTRANCE TOP 101.9 SEE EDMONDS DETAIL E1.2 INV 98.00 1,4j�30 4 44 FR 't I P--�- 41 N I'53"E �'/- I . A, I --.- V1, z 76--Q� . ......... . ..... RESS EASEMENT THROUGH LOT 3 PER ,6 PARKING (U SHORT PLAT EXrENDEI) INTO LOT 2 . .5 z EDMONDS ZONING RS- 12 25'MAX HEIGHT 35% MAX IMPERVIOUS LOT SIZE: 12,034 IMPERVIOUS: HOUSE - 2,998 (24.9%) W.P. DECK - 225 (1.9%) DRIVE - 1503 (12,5%) WALK - 245 (2.0%) TOTAL - 4,971 (41.30%) .001- /t h t- / 4 EG: 130 i 11-111 SS MANHOLE *2. Z_---t S�q- 51. "', 11 1 ; ! FG:: 119 I DATUM PT RIM TOP 96.0 �W 97.0 EG 101.0, EG./- 10;'0 EG 1 1 3+/- TW EG 12101 W - 112.0 FG 1 EG./- FG- 114 I - 95.5 94.0 EG BEGIN WEST WALL BEGIN EASTIA1,1L. 108.0 FG TW 120 X ON 8th Ave 94.0 TW 9 OTW EXISTING 107.0 +/- FG 115.0 TW EG+/- 121 ' 0 EG+/- 112.0 FG 94.0 EG+/- 94. RETAINING 94. EG +/- 105.0 EG 109.0 FG WALL END WEST WALL AT T )ISTURBED EXISTING 122,0E'G +/- 112.0 ST R-OIWW�` A: 97.53 B: 121.70 ? SOM TO FG -�AMH5 C: 120.06 BE COMPOST RETAINING WALL 1199.08 AMENDED 438.37 4 109.59 -=.kVG GRADE PER BMP T5.13 IM.59 MAX RIDGE -- cn�OFED N ciffoFED- M- 0-- N-- D-S ST-ARD-1 28.45 RIDGE ABOVE SLAB SLAB AT 103 Row RIDGE AT 131,45 0 0 A u4ftl J- A4jl'lRWETyA-. NOTE' P SCALE LEGAL DESCRIFrI ON 00 I" = 15ft Section 24 Township 27 Range �D OWNER 03 Quarter NvV - LOT 3 OF P E" Ln Thuesen CITY OF EDM SP NO S-07-76 TM Q if. 5D Custom Homes REC AFN 20111114500§-BEING--.�, 514 8th Ave N A PTN SEI/4 NWIA Edmonds, WA PROPERTYID - ---- -------- 425-772-9401 27032400225300 EDMONDS PA, ING , A L PLOT Eric Thuesen EDMONDS ZON !"WING; F:P, SG'EXIST' ITE, RS I RADES i00E) 0 0 MAP 1 1- 21-;12) ; .1 1 - .. - --,! '. i w(Lp'o OV EID L4 H0100,4b�§ CITY OF EDMONbS L PLAN REVIEW COMMENTS ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.go DATE: February 20, 2020 TO: Eric Thuesen Thuesen Custom Homes LLC ericthuesen@frontier.com FROM: Jeanie McConnell jeanie.mcconnell@edmondswa.gov RE: Application #: BLD20170545 — REVISION (garage) Project: Thuesen - Single Family Residence — Lot 2 Project Address: 514 8 th Ave N During review of the above noted application, it was found that the following inforination, corrections, or clarifications are needed. Reviews by other divisions, such as Planning, Building, or Fire may result in additional comments. Please submit two (2) sets of revised plans/documents including a written response to each item below. Resubmittals can be made at the Development Services Department on the 2 d floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon. City of Edmonds handouts, standard details, application and other forms, and development code may be referenced on the City website: www.edmondswa.gov under Services/Permits and Development. ,e Xeb- T h single family residential plans were approved by the City engineering division on April 25, e 2018. This approved set of plans included several red and purple line markups. Please include this markups on the current revision plan set. On the Drainage Utility and Final Grading plan sheet, a plan note stating "Parking Pad" has been located on what appears to be the detached garage. Please move the parking pad note and add a note that clearly indicates the location of the detached garage. Label the width of the proposed concrete driveway which connects the main part of the driveway to the parking pad. Thank you. CITY OF ]EDMONDS PLAN REVIEW COMMENTS PLANNING DIVISION 425.771.0220 DATE: January 13, 2020 TO: Eric Thuesen eicthuesen@frontier.com FROM: Kernen Lien, Environmental Programs Manager kernen.lien@edmondswa.gov RE: REVISION Plan Check BLD2017 0545 514 _ 8th Avenue North New Single Family Residence On behalf of the Planning Division, I have reviewed December 15 1h resubmittal on the proposed revisions to the above building permit application. During review of the subject submittal, it was found that the following information, corrections, or clarifications need to be addressed. Please respond to the following items, so that I can complete my review: New comments are in red. 1. Height Calculations: Partially Addressed. Pursuant to ECDC 21.40.030.A, height is measured from the average level of the undisturbed soil of the site. For properties that have a subdivision, the contours that existed prior to any site work is considered the undisturbed soils of the site. The elevations used in the height calculations do not appear to match the contours of the subdivision and note that are the proposed final grade. Please revise the height calculations so the basis of average level is the undisturbed soil prior to any site work associated with the subdivision. nuary 13, 2020 Comment: The existing grades have been added to the site plan for the height lculations, but the height calculations have not been updated to reflect existing grades. For instance point C of the height rectangle falls between the 115 and 120 foot contour lines while the elevation used for point C in the height calculation is 111.23. All the other corners used in the height calculation similarly do not match the contour lines. Please revise the height calculations so the basis of average level is the undisturbed soil prior to any site work associated with the subdivision. b. Calculate each building separately: Not addressed. Since the garage is now proposed to be detached, the maximum allowable height must be calculated separately for the residence and the garage. Please update the height calculation providing separate height rectangles for the residence on the garage. tco-�January 13, 2020 Comment: The response to this comment suggests the garage is now attached. The plans indicate that a trellis had been added over the patio between the residence and the garage. This does not qualify as being attached pursuant to ECDC 21.40.030.C, which provides: C. Accessory buildings that are attached to the main building by a breezeway, hallway, or other similar connection so that the accessory building is separated by 10 feet or less from the main building shall be considered to be part of the main building for purposes of determining the average level. For the purposes of this section, in orderfor an accessory building to be considered cc�to be attached to and a part of the main building, the connecting structure must have a roof and be constructed of similar materiWs to both the main building and the accessory building so that it appears to be a unified and consistently designed building. The proposed trellis does not have a roof and is not constructed of similar materials as the house and the garage so that it appears to be a unified and consistently designed structure. If the proposal to connect the garage to the residence, the proposed connection must be compliant with ECDC 21.40.030.0 Accessory Structure Limited to 15 feet: Please note that a detached garage is an accessory structure and is limited to a maximum allowable height of 15 feet pursuant to ECDC 16.20.050.13. January 13, 2020: Still a relevant comment unless the garage is connected to the primary structure consistent with ECDC 24.40.030.0 d. Elevation views: Please update the elevation views showing the existing average grade, maximum height and proposed height on both the residence and the detached garage. L,A) 010-� January 13, 2020: Please update the elevation views to reflect the correct height calculations. 2. Missing Plan Sheets: Addressed. 3. Garage Living Space: While living space above the garage may be permitted (provided the garage is within the allowable height); please note the living space cannot be designed or permitted as an ADU under existing code. If you have any questions, feel free to contact me at 425.771.0220 ext. 1223. Please make all submittals to a Development Services Permit Coordinator, Monday, Tuesday, Thursday, and Friday between 8:00 am 4:30 pm or Wednesday 8:30 am to 12:00 pm. GIOMAT. 1. FOUNDATION CRAWLSPACE: STRUCTURAL Applicable Cmd� ALLOW 18' ME91MUM CLEARANCE UNDER FLOOR JOISTS AND IT MINIMUM 2015 ImsmatiaQ R�id­ti,l Code (IRC) UNDERGIRDERBEAMS. I/TMINSPACEATGIRDE ENDSATCONCRETE. 2015 Inmemational Building Code (IBC) PROVIDE AN UNDER FLOOR ACCESS WTTH 18*_-a4"MINIMUM OPENING 2015 WA Som, Fcrgy Code (WSEC) 2. VAPOR BARRIER: 6 MIL BLACK POLYETHYLENE GROUND COVER IN CRAWL SPACE TO BE PROVIDED. LAP JOINTS IT AND EXTEND UP ATION WALL. GENERAL. 3. FOUNDATION VENTILATION. PROVIDE I SQ. Fr. (144 SO, IN.) OFNET FREE THE CONTRACTOR SHALL INSPECT UNDER -FLOOR VENTILATION MR EACH 150 SQ. Fr. OF UNDIER-FLOOR AREA ME SHE AND SOIL CONDITIONS AND 4. ROOF DRAINAGE SYSTEM: VERIFYSHEANDBUI ING CONNECT DOWNSPOUTS TO 4' DIA. RIGID, NON -PERFORATED DRAIN PIPE. DIMENSIONS BEFORE COMMENCING WORK. ROUTE SYSTEM INDEPENDENTLY FROM FOOTING DRAIN SYSTEM- PROVIDE TEMPORARY BRACING AS 5. FOOTING DRAIN SYSTEM RECUBEED D G ERECTION. 4' OR 6'DV- RIGID, PERFORATED PVC DRAINPIPE. COVER WITH MINIMUM VERIFY SIZE AND LOCATION OF ALL OF 4. WASITED ROCK ON ALL SIDES USING atr MINIMUM ROCK. COVER OPENINGS IN FLOOR, ROOF AND ROCK 'A� APPROVED SILT BARRIER. BOTTOM OF DRAIN PIPE TO BE AT WALLS WITH MECHANICAL & ELECTRICAL WORK. OR BELOW BOTTOM OF FOOTING. PREFABRICATED ITEMS SHALL BE 6. HOUSE/G�GE SEPARATION FANIDLED AND INSTALLED PER WALLS BETWEEN HOUSE AND GARAGE SEALL BE MINIMUM 1/2' OWE ON MANUFACTURERS RECOMMENDATION GARAGE SIDE WITH ISM" SOLID WOOD DOOR OR 20- INUTEDOOKWHERE FOUNDATIONS ' A LIVINGAREA IS ABOVE THE GARAGE, THE CEILING STIALL BE 5/8' TYPE X 1. EXTEND ALL FOOTINGS DOWNTO OWE AND ALL SUPPORTING AND POSTS MUST 13E FIRE PROTECTED WITH I FIRM UNDI EDSOMISINCHES HOURASSEMB . BELOW ADJACENT GRADE. 7.EGRESSWINDO 2. CENTER FOOTINGS ONCOLUMNS EVERY SLEEPING ROOM SHALL BE PROVIDED WITH A DOOR OR & WALES EXCEPT WHEN DIMENSIONED OTHERWISE. EMERGENCY EGRESS WINDOW. NET CLEAR OPENING SIZE TO BE A MINIMUM 3. WIDEN FOUNDATION AND FOOTINGS OF53SCSFLOPENABIEAREASHALLBE 24- MINIMUM IN HEIGHT AND 20P 4 INCHES TO SUPPORT MASONRY MINIMUM IN WIDTH. OPENING SILL HEIGHT TO BE A MAXIMUM OF 44' ABOVE VENEER WHERE APPLICABLE. VERIFY LOCATIONS THE FLOOR. CONCRETE: & SMOKE DETECTORS; 1. CONCRETE DESIGN SHALL BE 5 PROVIDE INTERCONNECTED SMOKE DETECMRS IN EACH SLEEPING ARIA, SACK MIX. MOO PSI AT 28 DAYS OUTSIDE EACH SLEEPING AREA IN IMMEDIATE VICINITY OF BEDROOMS AND UNO. TO BE AIR -ENTRAINED (5% - ON EACH STORY OF DWELLING. WIRE DIRECT TO POWER SUPPLY WITH 7%) 3M PSI AT 28 DAYS WHERE RATEERYBACK-UP. EXPOSED TO WEATHER FOR DURABILITY 9.CAREONM 0 DEALARMS. 2. SLAB ON GRADE (HEATED ALARMS ARE REQUIRED AND MUST BE LOCATED OUTSIDE OF EACH SPACES) 4� CONCRETE SLAB WITH SEHRATE SLEEPING AREA, IN THE IMMEDIATE VICINITY OF THE BEDROOM. IA 6.6 W. W. MESH. I"SAND OVER 6 10. ATLI VENTILATION MILVAP RRARRIEROVERV PROVIDE I SQ FT. DENSE FREE CROSSVENTHATION FOREACH 150SO, Fr. COARSE GRADE GRAVEL FELL -10 OFATTIC AREA OR 1/300 IFSOEfi OF VENTINGIS 3 FT ABOVEEAVE.USEA .24� RIGID INSULATION AT PERIMETER COMBINATION OFRIDGE, ROOF AND RAVE VENTS AS REQUIRED. COVER ERE BIBLE OPENINGS WITH 114'NON- DELVE MESH. S . ILTUBISHOWERAREAS.- I G STEEL SHALL BE #4, SHALL BE FINISHED WITH A SMOOTH, HARD FINISH TO A MIGHT OF 72 IN. LL BARS SHALL BE AB DRAIN. CLEAN DRY AND TIED IN PLACE. 12 ' GYPSUM WALLBOARD: LAP SPLICES 15 INCHES MINIMUM A. VT GWB TYPICAL AT WALLS AND CEILING. EXCEPT WHERE INDICATED 2. ANCHOR BOLTS SHALL 13E 1/2" OTHERWISE DIA. . 1(r WITH 0.229- X 3' X 3" B.SWTYP -3r GWB WHERE 1 HOUR FIRE SEPARATION IS REQUIRED. SQUARE PLATE WASHERS. SPACE C. WATER RESISTANT TYPE GWB AT TUB /SHOWER ENCLOSURES. AT IT MAXIMUM AND 7 BOLT D. FIRE -RATED WALES IN GARAGE SHALL BE FIRE TAPED. DIAMETERS MINIMUM FROM 13. STAIRWAY& CORNERS, SPLICES AND PLATE STAIRS SHAIL BE CONSTRUCTED PER PLANS AND BUILDING CODE R311.7. ENDS ' SPACEANCHOR BOLTS AT 6 MINTREAD DEPTH 10' AND MAX ELSE 7 3/4. HANDRAIIS SHALL BE FEET 0' C. FOR SINGLE STORY AND 34'-38- ABOVE TREAD NOSING WITH 04DS RETURNED TO WALLS. HANDGRIP 4FMO.r-FORTWOSTORY. SEE SHALL BE I 114r-TDIA. SHEAR SCHEDULE FOR SPACING AT STAIR CONSTRUCTION SHEAR WALLS. ANCHOR BOLTS SHALL 2s12 STRINGERS 16"0. r- MAX HAVE T MINIMUM EMBEDMENT. SW THRLkDED ROD. 5/4 X 12TREAD EPDXIED A MINIMUM OF f INTO W RISERS CONCRETE OR M� STRONG BOLT 2.4 FIRESTOP WITH P EMBEDMENT CAN BE 1/TGWB SUBSTITUTED FOR CAST IN PLACE ANCHOR BOLTS STAIRS HANDRAI PER R311.7.8 WOOD FfAbl�G: 14. UNDER STAIR SPACE: DF/L.2 � ft BEAMS, HEADERS. POSTS ENCLOSED USABLE SPACE UNDER STAIRS SHALL HAVE 1/2' GWB. HF.2 E)ITERIOR AND BEARINGSTIOM, 15. GUARDRAILS: PLATES, JOISTS, RAFTERS AND EIGHT FRAMING. SHALL NOT BE LESS THAN 36"HIGH WITH MAXIMUM OPENING OF LESS THAN HFSM. NON-BEARINGTNTERIORSTUI)SPLATE§., 41. GLUED LAMINATED MEMBERS. 16. MASONRY FIREPLACES: GLU-LAM MEMBERS SHALL BE A.I.T.C. CERTIFIED. MASONRY RREPLACES AND CHIMNEYS SHALL BE CONSTRUCTED AND DFIDF-24F-V4 OR SIMPLE SPAN BEAMS. REINFORCED P R IRC CHAPTER 10. DFIDF 24F­V8 FOR CANTELEVERED 17.FACTORY-BUI FIREPLACES: BEAMS AND CONTINUO S SPAM BELAU BE LISTED AND INSTALLED IN ACCORDANCE WITH THE WHERE NOTED ONTHE PLANS. MANUFACTURER INSTRUCTIONS AND IRC CHAPTER 10. APPLY ONE COAT OF END SEALER I&FACTORY-BUT CHIMNEYS: IMIMEDIATELYAFTERTRIMMENG SMALL BE LISTED AND INSTALLED IN ACCORDANCE WITH THE SHEATHING MANUFACTURERS INSTRUCTIONS ROOF ANI) WALL SHEATHING SHALL 19. CEH UES: BE 7/16' APA RATED SHEATHING SHALL PROJECT MINIMUM 2 FT. ABOVE ANY PORTION OF ROOF OR BUILDING UNO. NAM WITH Sd @ 6"0. C. Sa WITHIN 10 FF. HORIZONTALLY EDGES, IT 0. C. @ FIELD. FLOOR 2D. S GLAZING R308.+ SHEATHING SHALL BE 3/4'NOMBNAL ALL GLASS IN DOORS, TUB/SHOWIR ENCLOSURES, WITHIN 24' OF A DOOR, T&G APA RATE D SHEATHING LESS THAN IS- ABOVE FLOOR OR OTHER HAZARDOUS LOCATION SUBJECT AND NAMED WITH 8d @ 6' 0. C . @ TO HUMAN IMPACT SHALL BE SAFETY GLAZING. SAFETY GLAZING AND EDGES. IT 0. C. AT HELD. SUPPORT TEMPERED GLASS S ALL BE FACIORY LABELED PER BUIIJ)jNG CODE. PANEL EDGES PER APA RECOMMENDATIONS 21. EXHAUST FANS: PREFABRICATED JOISTS / TRUSSES-. RANGE, CLOTHE DRYER AND MECHANICAL EXHAUST - SMALL M PRETAB JOISTS AND TRUSS S SHALL VENTED TO THE OUTSIDE WITH APPROVED DUCTS AND EQUIPPED WITH BEDESIGNEDBYTHE RACK -DRAFT DAMPERS. MANUFACTURER. ENGINEERED SHOP 22. VENTILATION SYSTEM: DRAWINGS LAYOUTSHALLBE PROVIDE VMOLE NO BE VENTILATION SYSTEM. SUBMITTED FOR APPROVAL A SO CEMSPOT FAN. TO. BRACING AND CONNECTIONS SHALL B IOOCFMSP(YrFANVT0 13E DESIGNED& DETAILED BYAL&NUFACTURE11 C 100 CFM WHOLE HOUSE FAN WITH 24 HOUR TIMER AND SWITCH. 1.5 BONES TRUSS LOADING SHALL TAKE LIVE MAX. R4 DUCT INSULAT ON VTO. LOADING SPECIFIED IN TABLE 23. APPLIANCES: R3015UMACCOUNT RBOTTOM APPLIANCES INSTALLED IN GARAGES SELALLBE PROTECTED FROM CHORD LIVE LOADINGFORATFICS DAMAGE AND INSTALLED ONAN 18"HIGH LATFORM. HOT WATER HEATER WITHOUT OR WITH LIMITED STORAGE. SHALL BE INSTALLED WITH SEISMIC STRAPS LOCATED ON THE UPPER AND HANGERS/FASTENERS: LOWER THIRDS OF THE APPLIANCE. THE LOWER STRAP SHALL BE AT LEAST All HANGERS AND FRAMING eABOVE E APPIJANCE CONTROLS. PRESSURE BELIEF LINE SMALL BE ANCHORS ARE TO BE S MPMN OR PLUMBED TO OUTSIDE. ELECTRIC WATERHEATERS IN IN ATEDSPACESOR EQUAL. ALL METAL IN CONTACrWITH ON CONCRETE FLOORS SHALL BE PLACED ON AN INCOMPRESSIBLE, PRESSURE TREATED WOOD ARE TO INSULATEDSURFACER-IOORGREATER. BE ZMAY HDG(GI85), STAINLESS 24. ELECTRICALUGHTING, STEEL, OR MEET ASTM A 153 ORA THE ELECTRICAL CONTRACTOR SHALL PROVIDE LAYOUTINDICATING 653 STANDARDS. REFER TO IRC OUTLETS, LIGHTING SWITCHES, TV, ETC. MR APPROVAL PRIOR M R317.3.1 OR IBC 2304.95.1. INSTALLATION THE ELECTRICAL AND LIGHTING WHEN sHowNoN PLANS is SUGGESTEDONLY MSETIA7rONANDFMiESTRATIONREQU2MMMIYYCOMPONRU(a) CLIMATE ZONE 5 AND MARINE 4 AIR LEAKAGE CONTROL AND EFFICIENT VENTILATION FENESTRATION U RACTOR(b) 0 30 2c� SKYLIGHT(b) U-FACrOR 030 CornpRimm Insed on Section R402.4.1.2: Redun, the tested air GLAZED FENESTRATION SHGC(b). (a) Nk Ieabg. . 1.5 sir s ps, hoon anommun and An whole CEILING R­VAUUE(k) 49 hons, vemiltuRm "Inne"' usandetenamcdbysectic, WOOD FRAME WALL(g), R-VALUE 2 in, M1507.3,fthT,�tioOR,�d,,tiOCd,,hUbeme Mass Wall R-Value(i) 21/21 with . hent ­­y vemil.donysten, FLOOR R-VALUE 30 with minimum scusiblu heatmooveny efficien,,y 40.85. BELOW-GRADE(c), (m) WALL R -VALUE 10/ 5/21 in, TB SLAB(d) R­VALUF & DEPTH 10,2ft HIGH EFFICIENCY HVAC EQUIPMENT 3.: Gas, pmp-. ot ml-B-I Bounce with minimum AFUE f94%. fen 51, 1 1but - 304.8 man d = onatimemes, J-116m, JIt - intecatI&Is, Jimulng. . R-Itus - bd.- 17-15cum, -dSHGC- mumus. "- jinsubd- Gas, propsm, on ofled-fited boiler with miniumm AFUT of92% 1, m-ffd 1. . cality ahich is 1c. Man he IW - de,4p n&,knass &,he iasddun, the ocapnessad R-ealss EFFICI TER HEATING 5.: of,he'-slatmob- Alllowathe-d and kitchen sink faccets imtH,d I, the house Append& nbl, AIOL 4,hfl nor be lea than the R-,W,,,P-.Md in the mbk. shall be mund at 1.75 GPM on 1- All the, Iwanny launce b The knestmoon U tsom, colson, emludc, AyAghn, The SHGC column applies sbsIl1,mtsdmLOGPMmIcnn .0gla-dfin,eseniva , '10115121 *7V'mcms R-10 c,urd- Imuladba on Me ­16' f1hc waff, EFFICIENT WATER HEATING 5b: R-15cuumummin-hoo. Waten heading Mtemhall include the foliawing: - the in"ou"afnienalf, or R-21 -,* m..7.66. p] .. M-db,,-k Gas, pmpane m, oil wma, hcant, with , minimum BE of 0.74 bn-nchc,kb-d,h� 70115121+T8�sIttlibe pssmths,d.hsm­*h -&-oanbey-im- ­,cfthen,sll '7B'­hc.,Ibnsk6,­B­1,baad bannaso, waU Sce R402.2.9.1. SINGLE STAGE GAS FURNACE e Then, sne no SHGCcqsimmnts in Me Md,, Zone 654.5 Sq R GLAZING 3890 Sq Ft Limg 16.9% fAs-ecd g Rese-d A, Rese-ed 1 7he -od R-1- ppl,., whu. - hn hdfnh­ndo-,, on he mseno, ofth, mass eaff jR,,,-cd k F., ogle afte, -Im. .dd ce&w be imadcm. m.,, be -dia-d R-38. IRe-.d -Iol hesd-ot.d.sed.ft. nummom ofR- -bunst . L., anda.Yd dsube, CONITRUCTION SEQUENCE NOTES PROOMTGENERALNOTES 1. SCHEDULE A PRE -CONSTRUCTION MEEIMINGWITH CITY OVINML SHEATHING --------- �SID LUS ATTIC VENTING -771-0220, EXr. 1326. TWO DAY (48 HR) Thu sen Cost- H­ " FROM MR N( ENGINE G DIVISION AT 425 SET.M.101STAT ._O,__ NOTICE IS REQUIRED, Ave N FET�-'_'x 5148 LEDGER RIM 2 REVIEW TEMPORARY EROSION AND SEDIMENT CONTROINOTES. Edmonds, WA JOIsr RAITIRRSANI)TRUBISE, SEE DETAIL D3 ABOVE .._'RUOp. PER PLAN ORTRUSS MFG 425-772-9401 DECK FLOOR DECK R507.2 I NAMED BdAT6"O.C. EDGE 3 CALL FOR UTILITY LOCATES. Eric Thuesen JOIST JOIST joj�r PT 2"1 LIDGER -IT- RIMWETH LAG - STAGGERED AND ITO.r_ 11-D VAULTED MAPPER) CEILING "' &.AND MIC ' LFRW BOTTOM, 5"MAX TO HAVE R-38 RA77S LECALDESCRWn0N-. SM V.. A _' 4. INSTALL TESC MEASURES AND MAINFAIN DUST CONTROL WHILE Section 24 Township 27 Range 03 Quaxter R312.3 CEILING TO HAVE R-49 PREVENTING DISTURBANCE OF ANY AREAS OF VEGETATIONOUTSIDE NW-LOT30F=OFEDMSPNO R507 DTT2 4'SPHEREMAYNOT HURRICANE CLIP BLOWN IN INSULA17ON THE CONSTRUCTION ZONE. S-07-76 REC AFN 201111145006 BEING A Pr W PASS THOUGH RAIL AT EACH RAFTER TOENAIL (3)16d BOX 5. HAVE EROSION CONTROL MEASURES INSPECTED BY CITY OF PTN SEI/4 NWI/4 LA R507 R507 OR Uld COMMON PROPERTYID DT WEEHTHRU DI72 WITH THRU 1,4 TOP EDMONDS CrrYENGMMRINGINSPECrOR.ALLTEMPORARY ROD AT EACH END ROD AT EACH ;P PARA. EACH TRUSS OR SEDIMENTATION AND EROSION CONTROL MEASURES MUST BE IN 27032400225300 OFDECKLEDGER _I, Dg__jr LAYOUT L RAILW/ RAFTERTOPLATE' PLACE AND INSPECTED PRIORTO ANY CONSTRUCTION OR SITE EDMONDS ZONDIG�. 16d TO EACH HEADERPERPLAN CLEARING. EROSION SEDIMENTATION CONTROL PRACTICES AND/ RS-12 PERPENDICULAR PICKET E�� [��7 318' ITWALL OR DEVICES SHALL BE MAINTAINED UNTIL PERMANENT VEGETATION lar SIZE: 4.4POSTS NAILED Ed 6 EDGE INSULATEDWALISTOBE To 6. DEMOLISH EXISTING STRUCTURES 6'OBE MAX -IF AND IT 0.. 2x6HF#2AT168O.0 IS FSEABLISHED. 12,034 S.F. I.C. WITH R-21 RATES DRUMOUS: 12 HOUSE - 2,281 (19%) 2X2 PICKETS WITH C2) 7. ROUGH GRADE SITE AS REQUIRED TO INSTALL DRAINAGE FEATURES. W.P. DECK - 206 (1.7%) /4"x3" GARAGE /6) 1 LACED L.17 -552(4.60 DECK DETAILS PER R507 8, CLEAR, GRUB & ROUGH GRADE SITE. REVEGETATE DISTURBED DRM - 1240 (10.3%) LA [A TRUSS OR RAFTER AREASNOT SUBJECrTO ADDITIONAL SURFACE DRIEURRANCE WALK - 258 (2 1%) IMMEDIATELY AFTER ROUGH GRADING (OTHER EXPOSED AREAS TOTAL - 4,537 (37.7%) PLYWG�01) FLOOR GM SOLE NU DM S NAILED 1-1,12'] dTATT106" 0 C. PLYWOOD FLOOR DIA 9. INSTALL UTILITIES AND OTHER SITE IMPROVEMENTS, INCLUDING L O.C. SOLE RINGD C= SHALL BE STABILIZED PER EROSION CONTROL NOTES BELOW) DESIGNLOAD& "S 7. ROOF LIVE LOAD: 25psf CO%-.- 2 DEAME. HANDEAL GLUE ONAT 0 SEE 6 G FRONTAGEIMPROVEMENTS. ROOF TOTAL LOAD: 40paf REQUIRED TOLEAST PLATE TO"j?ISTS OR 12.5 g. (0.0991) SHANK DIA. ;LA JOISTS OR GLUED AND NAILED WI -1�/2] FLOOR LIVE LOAD: 40psf ONESIDEAND BE zl- . JOIST BLOCKING BLOCKING RING ORSCREWSHANKMIN WALL To' KR BE OC .Gf'V" FIELD Ia. STABILIZE AND COMPOST AMEND ALL EXPOSED SOILS PRIOR TO FLOOR TOTAL LOAD: 50paf BETWEEN 34' AND 38' ISC CONNECTOR ATTOPOF -ENDWAIL(2)16d -ENDNAIL(2)16d 12.5g.(0.099")SHANKDIA. VAND - 95.ph VERTICALLYABOVE STAIRS SOLE PLATE , SOLE PLATE REVEGETATION OF ENTIRE SHE. SPEED. TREADS �REQUAL MEACHSTUD. TO EACH STUD WM EXPOSURE: B 14. ESTABLISH LANDSCAPING AND PERMANENTVEGLEATION. ALL SNOW LOAD: 25paf TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED SEISMIC CAT. D2 UPON FINAL SITE STABILIZATION AND APPROVAL BY CITY INSPECTOR RIM JOIST T E NAILED TO TOP PLATE WrrjH ORJOISTS 8dATVO.C- R302,7 SOFFIT BOARD V, 117ER PLAN FLOORJOISTS PER PLAN =MEN IT GWIE UNDER STAIRS SHEARWAIL RE 2. GEL Do.. DOUBLE IT. W2STRINGER SHEATHING LAPS DOUBLE TOP PLATE AV.AM2.4SPACER. RIMJOIST' Top PLATE WITH (2)16d TO EACH STUD - H I WITH(2)16dTO R311.7. OR MUD BILLS WITH (3) 8d TOENAMED EACH JOIST EACH STUE)- -RISER SHALL BE NO MORE THAN 7,75" TREAD SHALL BE NO MORE THAN 10' -GREATEST RISER OR TREAD SHALL NOT 1ALL CONNECTIONS PER TABLE R602.3(13 IAIJ. CONNECTIONS PER TABLE R602,303 EXCEED THE SMALLEST BY MORE THAN 3/8' STANW GRADE LADECK POST FOOTINGS LAS TYPICAL STAIRS LA TYPICAL CANTILEVER LAS WALLS TO FLOOR F_.,-:� -1 INSULATED WALIS TO BE 2.5 BF #2 AT 16* 0 WA-� . I ;RX R I. -1 R317 TREATED SILL PLATE R317TRFATEDSI- I LA;� O.0 FROM SOLID G-LUED A-ND-NAMILED= RAM BLOCKING BEAM RING OR SCREW SHANK MEN 0 R SEE 12 ' ��EW 12.5 '0 b' 'HAN (0.099) SHANK DIA. TABLE .1 - TOIENAM3(3) EACH JOIST TO Sin (I N.ARARNUr MORE THAN 48"0. TABLE -.14.1 1/2"CAST-IN-PLACE :Rrji)3N, R,,j 13. 1 R-3 6 BAR NOT - I _PLAC.] MORETHAN48'O.C. g. g' 16dATleO.C.S LE FLOOR THE VERICAL BAR ANCHOR BOLT T INTO ANCHOR BOLT 7' THE VERICAL BAR LOOR JOISTS F FE� I PLATE TO JOISTS OR DIAPHRAGM GLUEL) AND SHALL EXTEND TO THE BOITOMOFFOOTENG,_ - CONC IEMAX7TO.C_' INTO CONCRETE SHALL EXTEND TO THE MAX7TO.G' PER PLAN WITH R-30 BATTS BLOCKING NAILED WITH I -UT RING S -ENDNAIL(2)16d OR SC MIN WITH STANDARD HOD K R506.3 4'CONCRETR B BOTTOMOF OTING, FO WITH STANDARD HOOX 4'AO UP #2 BEAM U.N.O. 2.4 GUSSET EACH SIDE OF PA SOLE PLATE 12.5 g. SHANKDIk TO EACH STUD EXTENDING MEN 1 4' INTO STEM WALL R506.2 EXTENDING NUN 14' INTOSTEMWALL IMOCIAT tRING POSTNAMED (3) 10d MIN 4BASE COURSE AND -96" MAX WALL EYE WITH PCtSrTOPADCCNNECrION TOEACHMEMBER. NNE R317 TREATED SILL PLATE R403.1.3 (WALL) -(H#44IOR. IN 6.. POR UNBALANCEDRACKFILLNOT TO EXCEED 49' A23WITH 1.5W' LAG B-01*115 7 .EST I,_ R3 OST BE 4x4 POSTS OR 4-,,6 TYPIALSLAE ­)OISTS PER UPPER RETARDER BETWEEN :(1)#4 HORIZONTAL IN UPPER 12' R405 6' UNDER 54'ORBYTABLE SPLEE AT SPLIT IN BEAMS AND BASE PLANWITHR-30BATIS R405 BASE AND BEAR DRAINAGE SYSTEM -04.1.2(2, OTHERWISE 73' 7RCT I. IROTECr BOTTOM WSEC TABLE 402.4.1.1 CLASS I BLACKVAPOR OFMSTE EA TYPIAL FOUNDATION DRAINAGE SYSTEM WSBCR402.1.1 RIGID RIO INSULATION u VAPOR BARRIER WITH ._n. _ 9011,FELT BARRIERTHROUG11- WALLANDFOCTING' M_ EXTEND DOWN MIN24� R413.1.4 OUT CRAWL SPACE HGNWIrBELOW WITH TAPED OVERLAP UNDISTURBED SOIL -i", ORTOFROSTLINE MEN .12 R STURY) &15 (2 STORY) ,na (3 MRy) CON, FIG. R403.1.1 MIN fi,12 (I STORY) &16 (2 STORY) 6.19 (3 STORY) CoNa FIG. k4aaIS AT JOINTS .13 H)WEDIN.4.00NIINUOUS�W-CFEOMBOTTOMOFM (1)�N.4.W�OWMMr-4-�OMBO�MOFM INTERIOR BEARING IN CRAWL SPACE LAS FLOOR AND WALL AT GARAGE LAS R403.1.4 FIGMINIrBELOWUNDISTORREDSOMORPROSTLESE R IS DEEPER) FOUNDATION WITH SLAB FLOO! j ft4nMA FIGMWITBELOWUMD[SELIZEDSOMORFROSTIANE Lg1Fm7UNND`AET'n10) N WITH CRAWL SPACE] __1 __] [4!-2� J DEC 15 2019 'UIL!J�NG DEPARTMENT CA OFEDNIONDS RESUB DEC 15 200 BUILDING DEPARTMENT CITYOFEDMONDS f4 o . A NUNN -I 2U bo Cd F-4 NOR& 0 '0� 0 0 4-J 00 REVISED 11-24-2019 1 - - - - - - - - - - --- - - - - - - - - - - - - - - - - - -- IMMIM MO MOM IM MENEM 1 �n MEN 107 A Non. IME ME Nil MEN IM - -------- - ------------ ---------------- SO IM MMUM ON IM IMMEM SM ME ON 01 MIMMMM NO XSE IMIT-- Elm I CRAWL SPACE EFFICIENCY HVAC E(ZLTIPMENT 3,-. M1307.4 G.,V,,p,m, jI­fimdf=,,,,dthmii­ 2 PE OPENINGS AFUE.f94% SHALL BE CONSTRUCTED, G.,p.p­.ikd-fi,�db.i]­ilh ONE Ir OF CEILING — AFUE of92% AND ONE WITHIN 12'OF FLOOR EFFICIENT WATER HEATING 5.: M1301,1 2 STRAPS AT UPPER AND All,hm ,d,,dkithmdk&wu LOWER THIRD, 4" imt.U.d ft� lh� h­.hlI b� —d . 1.75 GPM CLEARANCE OF CONTROLS 1­. A" th�� l—,.,y fa.—h.11 b� —d M1307.3 IGNITIONSOURCETOBE LOGPM.�I­ MIN 18"OFF FLOOR EFFICIENT WATER HEATING 5b. W­ hdg q.,— hff —1.& �h� f.%-i-9 Gw,F%, ­fl�h­vdth, .i.i— EFfO.74 �(�) R4DSA R303.7 INTMERIO STAIRWAYS SHALL HAVE 6068 MIN 18.24 CRAWL ARTIFICIAL UGHT SOURCE NOT LESS SPACE AC —THAN I FOOT-CANDLE AT THE CENTER —V-10" OFTREADS AND LANDINGS WITHWALL SWITCH AT EACH FLOOR LEVEL BONUSROOM BDR4 R314 R314 wl R310 EGRESSWINDOW 9�9 1. T-2—Y-8— 040, , 'Agar leas v )l I //�,UESI SAM REOUIRED AT TOP AND BOTTOM OF OF 10101X (9 201OIX 212OIX ,L3310'0'1—(393"�Z-O"I'T'�W12'-O'126WI2'-0'13"0. T----------- ----------- -------------- -1,V-83/4"- -19-83/4' TABLE M1507.3.3(l) ADU NUMBER OF BEDROOMS FLOOR AREA 0-1 2-3 4-5 6-7 �7 f-) AiHfi— I. CFM 11,500 30 45 60 75 90 IM-3,000 45 60 75 90 '05 3..11,5. 0 75 90 105 LZO 4.501-6,000 75 90 105 120 135 6,(MI-7, SOD 90 105 12D 135 150 ,7= 105 120 135 1 50 165 TABLE M1507.3.3(2) RUN TIM % OF 4 HOUR SEGMENT 25 33 66 75 loo 4 3 1.5 1 LOWER FLOOR SCALE 1/4" = 1FT WINDOWSCHEDULE OTY FLOOR SIZE DESCRIPTION EA. DARD(SQFW 3 4 I 3 --90-50RS UN. 21.0 20.0 1 3 30.0 2 1080FX FIXED GLASS 8.0 s 2 _.- I... .— 4.0 1 2_ 3020—RS RIGHT SLIU... .1 2 2_ 2660SH SINGLE HU—NG T9.0- 2 f— 36605H SINGLE HUNG T, —0 1 4040CU GARDEN ME _0 3 2 �OSH bl—t HUNG T7 _0 2 1 OSH SINGLE HUNG 1 2 5046RS RIGHT SLIDING .5 1 -60SOR-8 FIXED GLASS 2 1 1 Y_ R SLIDI IGHT I La 2 12 Qn6GTS7_ TRIPLE SUDING 64.0 1 4036RE—IRI—GHTSLIDING 14.0 3 TOTALS I — I d .E. Q�Es 4.0 664.5 DEC IS 2QIfj '_AJILDINGO P - NT cl ,% A.11T_ .. N.. RESUB DEC 15 2019 =Tl.lENT E P, RD 4 ISTZ.. t SUNNI CA C13 zal w V) !� C) 0 �D Z PTI �D 00 11-24-2019 3 11J27/1,9 13 1/2 x 111/4 2.OE PSL lwl GX6 Poet ae Located 'j LPCOZ .1 0. 29'-(r—TOP OF RETAINING WALL AT 119.OY WALL AT 117.00- T 7 3T-6"-TOP OF 43'-0" 13�10' K 21-2-- — 81-0— N K —2�7'-r3200RS-TT-5- 30 M15 3 nli�] TORUN20UTOF BY 4 HOURS M1507A b BDR 2 El 50 CFM VTO BDR 3 Y-W DEN ES'o Q� R314 EGRESSWINDOW 14'-1 1 6080 1507.4 CFM R807 N I I �— 8.0. MIN 22,50 ATTIC ACCES GARAGE Q) -6@- :112' 6 E S -6 DEN/ FORMAL DINING OPEN TO R314 BELOW R315 I�o ------------ T-6 W-1 "'X M1507A 50 CFM VTO P 12ft CEILING IN RPORCH:! ENTRY HATCHED AREA '-7 5 101-9 in" L4T-r 44 A2. SOM68 EXTERIORURADERSTO F-D BE4.8DF#2U.N.O. R314 9 Z TABLEM.507311) DWELLING UNIT NUMBER OF BEDROOMS Q FLOORAREA 0-1 2-3 �5 6-7 �7 LIVING ROOM (.q— f—) Aid—i.CFM �1,50() 30 45 0 75 N 1,501-3,000 45 60 75 90 105 1 MASTER SLOB 4,500 60 75 [9 105 120 105 120 35 4.5014,00D 75 90 BEDROOM C�001-7, 90 105 20 135 150 7,500 105 120 135 150 65 TABLE M 5073.3(2) RIJN TIME 91 OF 4 HOUR SEGMENT 15 13 75 1 DINING FACTOR 4 3 1665 1.3 100 0 0 906M WINDOW SCHEDULE 7:1 OTY FLOOR SIZE DESCRIPTION AREA, STANDARD FT) I R_ R310 3 1 4660SH SINGLE LING 27.0 EGRESSVANDOW SMUTS 4 3 40608H SINGLE HUNG 20.0 --1 1 3 605ORS RIGHTSUDING 30.0 2 2 1080FX FIXED GLASS 8.0 DECK 5 2 2020FX FIXEDGLASS 4.0 4660SH 4660SH 1 2 302ORS RIGHT SLIDING 6.0 T 2 2 2MOSH INGLE HUNG 150 2 2 3NUEH UINGLE HUNG 21.0 1 2 4CO40CU —UhN 16.0 4660SH SINGLE HUNG 27.0 4060SH SINGLE HUNG 14-0 4.12 DF 02 T04BR—S RIGHTSLIDING .225 -602-0FX DEC 15 4T!�� 00 FIXED"" UPPER FLOOR QORS R-G:H:T:S�L'-"R 4.1 W-60TS 111LE SLIMING e3UILDING 0�-PARTMEN) 1-6-- G 4-6- 31— —3?-W— —9'0'— 3'-W —2'-6'--g.-V SCALE 1/4"= 1FT 4036RS RIGHTSLIDING 'T4 .0 CITY OF E�,ZIONDS -w 29-(r 2Wj 2020FX FIXED GLASS 14.0 654.5 RESUB DEC 15 2019 BUILDM DEPARTMENT CITYOFEDMONDS V2 V�4 11-26-2016 REVISED 4 ll-Z7-19 /STE... 4 a I . 11 .. . I I . . . . .1 . . � . i . I I II . . I I I . I I : I I I I . I I I . . . . . . 1 . I . I . I . . � � I I . ­ . � I I I . . I I I I I I I � . . I I . . . .: ..:. .. I . : . ..; I . , ... . . - . � � . _. . I . I .. � . .. . . . . . . . . I . ­ 1. .. . � I I .. : .. � .. .. . . , . . I . . . ; I �: . . : . . . . . . .. . .. . �. i . .. � .� . � . . .. : . . - .. . . . . . . . � I . . . .. . . I . a . . . F . . . I . . . . . . . .:a . � . . . . . ;. . ... . * . . I . . ...� .:. . . ... .. . . .. , . . � . � .... .. . ....'. ..... ... :.�_ ''.. . . . . ; . . - . .: , . . : . . � 11 � . . . . :: .: a. - .. . . . '._� . - . . . . . : � , :. . , . . � , , : . , 4p 4. . P. . .. � - . . I . . . . . . I . . I . . . - : . . . 1 . . . , .: ... . . I I . . . � .. ... . , . * -.� . . . I ... I. i . . �..... . . I .. I . I . I . .. , , , . .. . . . . . * ­ . . :.. . . ,. ­ . , . . .. 1. � 1. I . I I ­ I . . , . . I I . � � . I � .. . . . . ; � . I � � � .1 . I 1. . . I � . . . . I . . . I � � .1 I �: � I . . � I I . � . I . I 1. � , . , . I �. � - . . � I ­1 � � .. I . 1. � I . - .- 1. I � . . . . � � I I � I � I I '. . . I . � � I I � I .1. . ­1 : . � . I :, '.. 1. :� I . I I �- . � . I �g �;. . i. I . . . I . I I . I . � I � � I I I I I . I � . � . I I � 1, ; .. - I I . I . . I . . �. . . � . . . : . . .: . . : : - .1 : I . . : . . . . , . . . . � % I : : .. ­ . : - : : . . . ; q � . . � ,� . I . � � . , : � . � . � N I . I .1 � . .... .. . 1. . I . I . . . I � I � . � I � . � � 1 . . I I I I . I I . . . . . I I . . . I . . �. I �. I . �. . I I . I I � I . I � I I � I . I I � . I ,. . . I I � � 11 I � 11 . I I . I I I . I . � . . . - I I . 1. .. . . . ,. ... I I ..: ­­.. . .:.,.: . _ .. I I . . . . . . .: ..: . . ... ..... ..,. :. � . . � . . . I. .. . _.: �. 1: I . .. .. . . . . . Is. � . . . . I � . .. . . I . . . � . . I .. � . . .. . !,:: , .. ..,.. .,.i ... . � - .: .. - . ... . .. I. I ... .. I., . . . : e .. . I. I . . . , � . ..... , I I � .� .. 1. .. ., , .. I . .� . . . ... . � I I � . I � ­:: -ij R 6. �0._� � 9 �i 2 I 1 � . � � . . . . . i ,. � I . I � � � . � I � I I . . � � . � I , . - I - � I I � I I � . I 11 . � � I I � . . � . I � � � � � � I I . I � - � . I . � . I � I � � . 11 I I � I . . . � I I . . I I . I .. I . . I . I � : . . � I � 1. . � I 11 11 . . I � I � I � I I I � � � I . I I . I I . � . : . � � I . � . � � � . I . � I . � . I � � I I I I . � � �.. ­ I . I ,... � . I � . I 1. � . . .11 : . . � I . I . �:1 ­ I I I.. . . � � . I . I � � . � . . .. , .. . : I I . . . . � :.; ` . . I . . . .l. . .:. I .. :6... . - . :� . . - : .. : :, .. , . : .... ... 1: . . � . . . . , . ,. .. � I. . 1. , .. �:�.,., . . �:._ :.: . : I . � . .: ,. . I I . I . .. �, � � :.. . . . . 1. w � I . � :.. . . . . . � . I . . . , . . . : . . : . � !-,:.�.. . . . . . . 1 .� . � ,. .... ,. � . .:� .. . . �: , , . . '. - , .� .� . .. . . . � . . ... .. .. I .1 �: . : .. �:. , - . . I . � . � � . . . - 1. I : . �.. . I . I . , . . . . . I .i . . I � . .. ..­ .1 :: ., . . . : .. . . � .1'' � .. � . I q . I . . . . ... I �: �. � I ;5 I I 19 � . .1 . ; . .� � � � - I 1, .� � . � . �. � . . . I . � � . I . � I .1 � . I . . I � . . . � . . � I � . . � ­ I �� I I .1 � 11 I � I � � . � � . . . . : .1 .. � I I � I ­ I � . . . . . . ... .. I : .. ..: � . .. . . I . I I.". . . ­ � .. �.. . . . �, . . . ..... . - ...; - I I. .�F , � �. I � . .. � � . . . .:. . , . . . . , - 1:.: :, .. : - - .... . ... : . ... . . � � : - . 1 , .....: . : . � . 9z A I . � I . . . . . . . . . � I � � . � I . .. � � � � I . �. . . I . � I . . . .. I . . I . I . ,� I . . . � . � . - � � .. . a � . . I � I I � 1. .1 . . . . � ,. . : I ,: I . , . . : .1 . � � . . . . . . � .. . . . . I : . . � �� .. .1 I . . � .. . . 1. � . I . . . . . I I : . � .. . , .. . . . . 1. . � I . . I . . .: I . � . . . � . I . .., . I . ... . I- � . I I..... ...... ... � ., :, I . I L�� I : . - I *­ . . , I :* -� � i . .. _% :. � � :.. I .... I , . ... . . . � :. � ;.. .. . : . � � . a - . � . . . � . . . . . - I . . � � �_ : � . _ I.. � ,Z.. . � . e I . � . . . . . . . . . . . . . .. I . . ., I . ... � � , . - . . . I . . . � . .: : . . . I . . . . . I . . . I . . . . . . . . . . . I -1. . � I . . . I . . . . I � � I . . . I . . I I . .. I . I . . . . . . . . I .. I .. . 11 I .. . � . I I . . I . .. ... � I . . . . .. . . . . � . . . . . . I � . . . . . . �. . I .. � I � . . . .. . .1 . . . . . � . ,. . I . � I jr,� -1�,�-"-\---""Iz�\--"-,�17,7-\--,-"K'�-',-\-- -7-7-\---,--'Z.7-,7N-,:�,,�-\--,---,�-�%--�--�-,z--,��--"--,Z"Z--\-,---,I-'Z';Z-N--\-.,K-V"-�\--� .. . . � . I . I . . . . ,. . lll�_ , . . I : .. . 1. 1. � � I � . . . . � . . �. . . . T _,_\,�, ... , � : . . , . , ­ . .. . . . I . . :. " , . I � - m. I. . . � .. . , .. . .... ­ . ... , .. . . I - I, � . � . �.. � - . , . : . . . : ...;: . . , , � . . ,\ j �l - : � .. ...q . 1, , . .: , .: . . : . I . , I I . .1 . .:. . . : : � . :: . . . � . I . 1. ... . . ,� : . � I . ­ . � , . , ... - � . �..� � I . ­. .. . - : �.. . . .... ,. . . . . ,% . : . . . .. . . : , . . � . I . ,. . .. . .... : I . . . . . . %, . . I I ; . . - . . .. . � . . I. I ..,: . : I I ... ; _ . .. . . . . . . . . . . , . . .. : . . . � . .. % ... .. . . .. .. � . . . _: . I I I I I . : I � . . . 1� . : . I . ., I � I , � . .. . . . . . . . . . � I - I I 1. I . . ,. . . . . . . . . . . . � . . 1. I I . I . . . . . � I . � . . I . . I . .. I � I I . . . : I I 11 .� I �, I � � - _!�; - - - - - - - - - - - - - - - - - - - - - - - - .. . L - - -1 - - - - - - - - - - - - . . � . - ..* . .: , . . . . .:. . , . I . � __-4 . I . . 2 �. . . .�. I � � . . ­ . ... I . .. . I.. . - . . . 1. . � . . - . , , . . � _. , .% �. , .: I . , , . . . � . ., ­1 . � ... I . . . : : . . � . I . . . � . _. . . . .... ­ - - . . ,. . . I . .,:. .. . . 1. . . . . . . . . : � , . . . . .. � . . : . . : . . I . . . I . .1 . . . . . . ; . . . : .. . .. . .. . . . . � .. ­. I . .. ... _.. . . . - . . . � i I . I I . . I I . I � I 11 . 11 . I . I I . I I I I � I . I I I � I . , I . - --- I . I hv?-r I I aen, . �� . I I . . I I : .1 . . � . .. . . . . �,- .. . - I I . , . . . � . � , / . :.:, . . . : ..... ­., � I I . . .. - .: .. . . . . . . � . . . . . I . . . ..., . . ­ ;,. . . . , . . I . � . � . . . . . I I � . . I I I I I I I .. I I I . . I I . I I . . I � I I . . . I . . . . I . . I �. . I I I I I I � . . I I . . I I I . . I � I . .1 � I R40MUNVENTEDCkNWLSFACE _ . . COVER EXPOSED BARTH WITH A CONTINUOUS CAISS I - . . . . � I . . I 1 . � . . .. .� � . . I . ,. . . � : . I I .1 . . . .. ,: . . ... . . / ­. I . . ., . � I . � . I . . * * . . \ * . . . ... . . . ­1 . . . ... . . :: 1 : � � . . ;,. : . . � , � � � - �.. �. .. � ... .1 . . � . . .. . . � , � � . I . I 1. I I I ­ . . I I I 11 . . .1 . :, I I . . I . VAPOR RETAMER. JOINTS OFTHE VAPOR RETARDER I . . . .1 . . I , I I � . � � . I . � . ... . . . . . . . . . . / \ � . . . �* - I , . . : i .. . �­ . . . . . . I 1. . . I . I . I I I I I I . . I I � . . . I I � I . ­ I . I . I . . I I I . I . � . , I . . I .. . I I I I . I I . I . I I I I . . . I I I I I � I $HALL OVERLAP BY 6 INCHES AND SHALL BE SEALED OR TAPED. THE EDGES SHALLEXPEND NOT LESS THAN . I e UP THE STEM WALL -AND SHALL BE ATTACHED AND ,. . . . . ... I t I I . I . . I I � . I I . I , I � - -�- - . I � .. I . . . .1. I � . .. �. -0 9 � I . ! -; � . �, . I I 1. . .. / - I . . . � . \ .. I : , . . . ,. � . � � . . . . .. ... .. . . . .. .., . . � . I . . . . . � I I I I I . . � . I I � I I . I , . . . . I I . . I � : . I I . . . . . I � . I Z:LLf- , . .. .. - . � ,0111, . . / . \ I . , , I . � . . I . . . . . I � . . . I I . . � . I . . . . I I � : I I I . I I I � . I I . . . . . � I . . I . I I SEALED TO THE STEM WALLORINSULATION. I . . . I . I . I � �,-V I � I , - . . . . � � . . . . \l, / . : _ a - . . . . . . . I . . . . � . . . ., . I � . . . I . i . � . . . . . . I I . . . . . I � � . I . I I . I I I .1 I . I . I I . .1 . � . I I . I I . I � I I . . I I I I . . . . 1. I � . . I 11 I . . I I . I I I I - I . . I I . . � I � � I . . I I I I . I . 1: I I 11 I I I I . I I I . . . I . . I I I I . . . . .1 I . I 1: I 31 I m _1 . I I . 1 I I . _2__ � I III .1 . I 11 I . I . . � . . : .. . . . . � . . .. . 1 . a . . - . ,. � I I.. . . I . .., , , . . � . . , . , . . . . I . . . . � �. 1, � . . , . 1 . , . I I I . . .. . , . . . . .. a , I . �, I . . � . � � I - � . . . . . . I i,Il . I.., . .. I I I . .1 I I � / . ... . . I I . ,� . . . / . . I . . . . . . / . . . I � . / . . - . . . . ,., .� 1. m \ . � . . . ,1;�,� - �__ .-, . .. ; . , . : \ .� .., t , . . . .. 1� �- . . I - \ . : I . - - . . S, R506 * �\ . ... ., . . I . . . � . � : . .. -1 ... . . . � , . . . .. . . .. . . . ..... . . : . � : . ., . . I � . . , I ­ . . . ... .. : . ; . . . . : - . . . .. i . a , . . . . I I . . I . I I I . I I . � . . I I . . I I . I . . I I I � I � I ` I � �\51�,,,A- . I . .1 i .. . . . . I .. . : .. .. . . . . . . . � . - . � . .,. .. . . i � . . .... I! . �., , � [ . . � . . . I . / . . Rk9.1 I .' .: � � , :1 4*6CNCRIIIII,G . . � . , \�� . . . , . � . . . . . I . . : . ; . . . .. .. � : . . . . . I I . ., . . I I . I 1, , . � 11 I I I I . . I j . I . . . I . I . . � I .1 . . . ..� . . I . . .. . .. = � ­...L - L. � i � � . . I / . �.. �__` , - .­­, . . . . . . : I . % .. . 4 . I . . - . . . . . . I � I I I � I . I I I . . . I � . . . I . I I I , I I . I I . . � I I I I I I I I I I I I I I I . . I . � . . .. I . .:..; .. ..... � .... z,:, - _� , F, � ....... e , . I - I __ � I- m - - - - - - 4.4 - . / . : I I , -1 -1; � . ... . I. � . .. . ... . � . . . ..: I . . . . -: . . .. - I . . . . . . � : . � I . - I I , . I .1 . . � . I.. I I I I I I . . I I . I I I � . , I . : I I I I I I I I . I I I I � I . I � . I � , � � � . I . � I . I � - I I I I I I I . I . I I I � I . . . I . I . I . I . . ; . . . .r . ­­ ... .... . . .. .. ..... � ...... I . . ; . . ..... : ..... .. �-; ..... . . . . - � . - _ . � . . , _ - . . . , . - - , � : * � m : . , ___ , -f� ­ - � - T� - . . � / �. : . . . . I . . / . . . . . . . � o" . � . , . : , : . I . . I . I I � , \ - - - , . . � �;. � \ . I � . . ... . . - I . . .. . . . , . . ,. � . . � . . . . . . . . . . � . . . . .1 . . I . . . . rA , � . � I I .1. I I I . � I . I . I . I , . I I I . � . I I I I . . . I � I I . . I I I I . � . 11 I . . I I I I . . : . , , I . � � I . I 1� I � � I � . . : . I . - - . . � I � .. I I R408.4 . � I . . .1 I MINIW4CRAWL . . . . I I I I _� . . I - I I . . . -_ . �_ - --- . .. � , ,; ­_ - - _#,tLF0UNI)ATrONWAiLST0 : F - � 'r. . . . . . . . I . a /� . . ... . .�!: E , �, - . . . ... � . ­ - .: .1 . I . ,.� I . a. . _­ .1. . . . . , I I ;. . . 1. * , . �� . - � . ­ ... ,.-,. � . ,� . I I I �. . . . . . ... . , . . . . . . . . . . I . - : . . . .: . . �. . . . . . . . - I 96;9b . 11 ­ I I . I I � I . I I .l. I . . .1 I I , I I . �. I ... I . . . . . I I ­ . � 1. I � � I I I � I I � . . I . � � I I , � 11 I . � . . SPACE ACCESS � , . I � I* .� � . - . .. . q. . . I I FOOTINGS PERE.O.R. BE 8"WITH 16" 1 I . I I I �: . // ­ . I . , . `P V. �- ,. : , ­ ­ . ;� �. .% "' : : . . I � . .. . ­, * - � . - . � 'P a �fte: 3-0 FT x 3.o FT X 16.0 � Z12 0 IN . ... . . .� . . ; . . .; . . � . \ . . , . ' . ,.. � V . w . . . . . . � � I I I . . . I � � I . I � . I � I I � � I I I . . I I I I .1 � � I . . I � � I . I . I . ABOVE WALL I , I _ � . . . . � I % I- ... I . I I . . � . . . I . . - . . . .. I : - 2212]i ii: I . . ! � � 08.001mac -fl(4),In ' . - f :. \ � . : . . . I * * . . . ... I p r J3 � . . . . . . � I I .. � . I I I � I � � I � I I I I I . � I . .. � . I . . � � I . I � . . I� I _ . I � I I � . I I � , " : I ,. � . . � . . . - -- -X\ � . * � , - * * � . : - 4-.. . . . . \ . . . . . . . . . . . . . \ . (L) J4 . I . . 1 � I 11 ­ � I I I I - I � 1 � I I � I . . . I I I I I � I I I , I . . I I . -1 I r - - - - - - - - - - - - - - - - - . = . . . I/ , . . : I .. .. / . : � /. , %, I . . . t.- �*-. � . �;:_,`,Ys - ; . . �.:� . ....� . . .. . . , � � , .. . . : - \ - Q z 1 1 I I � . . I I I I . . I I . ,� I I . I I . � I I � . . � I � I I . I I I I . .1 . � . I I I � I I I . I ­1 I I I I I . 11 I I I . I I . 1: ­ I I I . . . . � � I I � � I 1 p . I . � I I I - . I I I I I I . ­ I . . I . I I . �. I . I I . . � I . I . . I .1 1� I � I � . I I � � . I I I . - �. - I ' INS F INS 0 INS - . INS - I - . INS -i I - INS � I . . . . I � I . .. . e . . I . , . . . . . . . . � . : . . ..... \ \. - �. : I . ,. ... I .. I . . I * .: \ \ . . . .. ...- .1 - . .. . . __ ... ,� , I . : . : . � . ,k� ., , . .. . . �- : - I _�� we(p P 1-6-Ir w I . , / ..: 5 , 1 6 . . . ) . , . :: . �_ \ 11 T-A-6 t�-:Q16 0 . . . . I .. . ,%. � . . . . ... 7g 4 I � . � I— I I I I . . . I .1 . I I � � . I I I I � I . � . I I . I ,. I . I I I I . ­ : I , . I . ,�� . . I � � I I I � � I . 11 � . I I I I ­ .1 �. � � � I I I I I I I I . I , . I . I � . I 11 . , - .. . . .1 . . � . . . , ... \ \ � ­. . ..:. .1 . - :�: : : \/ ...,. . . - A9W6(_`t . . . . I . . .. , .: �, - I . . z � I . I � I I � I I . I I . . � . � - � I , I . : I . . I � . ... I I . I . I I . . I I ,� � I , . : . I .. . . \ , ... . . - \ - . ­ �� . - ,.�. . . . .. .. : - - . . . . . .. � ,� ­/ 11 0) .1 � I.. � . I � .1. � . . . 1­1 11.1 I � � I I I . . . I . I � I I I . . � I . � I � . . I . . .. 1. � � ,. I I I I . . . . . � � . � .. . I � . . . . � .. � I 1 IT THICKENED SLAB W/ (2) 94 AT BOTTOM I I . . ji N it M : . I . I \ � .._ e ::, �,.. . I I �� . I I :. - .. . . � . . . � . : : ... . . . . � ... .. I . . . .. .. .. : .. . . � . . . . � � . ,:.... I . . . I . . . . � . . . / . / . � cu 0 �w I � , . 1 � I . I � I I . I I . :... . 1.11 . I . I � . . I . . I I . 11 . I . . .� I I I I . � I I .. . I I . . . � I � . I . . � . I . . I I . . . I � I I in I I I I � I � . . I . I . I / ER STAIRS - . . I I WSECR402.1.1 I 2 I I I - I . . � :. * � I I :1. �: . I . % . . I �� I " . 11 - I : . , . . : \ . . � . . . I . . . . . . . . . I .­ I . t. I . ,. . . I � . . . �. . , , .. . . . I . . . . _ I / .6 , . / 41 - : , � 79 .0 � I � I . I I I � . . � I . . I I I I : . . . I � � . .. � I . � . � . I I I I � � .. � I I � I � I � . I � I I I . . 5 - �-E - . SI.h"..-g.d. I.Wai.. (R-�O).h.11 bWl..d I d, I , , � . � I I .. . � I . . .\ � I lir I . . I . . I . I I . I 11 . : . . I \ I . .1 . ,. . . : � .1 � : . . . . . . : : . , . " .. .. I . . .. 1. . . . :.. . . 4 I � I . t I � I � I , . I I .. I . I . .: ­ I . I I . I I I � I . I I I . I . . � � . : . . . I . . . . 1 I , I � . I I . I � I I . I � . � I I I . I . . I I � I . , . I I . � ,. I .. . I � I � I . � I . I I I ' �� - - � , _ - - IT-6` �� ' * I . ..,Y,... .id..fth.fo- - � "' iwfdeafffi,fb=d,tionw,ll.TI I -f.-I.b �h.Il-..dd-...dft-1h.�'b!ffl. I I I I I , I I - I I . � , ''I I . � � I . I : 1. . I ., I .1 1 - � : I - . ... I . I � ... , 11 . ��, . .: : ,�� % : . . . . , - . . ^ ..., I. . . ­ . I , 1% . \ . .. . . . . I . . . 11 I 1 . I. . . � � 11 I � . . . � . � . � . � I : . . : I . I � :1 . . . � � . I I I I � . I I � .. I I I I I � . . � � I : . . I I . � I . � : . . , �� I-,-I,i,-dh....f24 ­s* ' ---------7 J -- � I : , - , . . I . , , . .. \ . ,., : . ;, : � / . � : *.. . .. I ... � . I � . . I . I . _:j I I I . . ,- I . � � I , I . � I . � I . ­ � . � � . I I I , . I ­ 1. � I 11 . � . . .. . I I . . I . I � .1 � �. . . . .1 . .1 . , I . � I � I I I 1. � � . I I 1 -_ " i INS -INS _ I F � ------ - �_ INS . INS I I - - - - - I I L - - - � - - , I .11 - ''. f-- . I ­ . I . % : � N I I ... I . I .. 11 � � I I I . . ... ­1 I . 1. , � . :... .: \ . ��. I . . . I . .. . I , / . .. � 1 . . , � � . . .. I . / :: . I . . � . I I . ,/ , . . I . I , . � '': . . 1. . . . I . : . . . . I z., . � . � .. I I I � I I I � I .1 ... . I A . . . . . I . .. . . I . I I 11 . . . . . I I � I � � . I I , . I I I INS -INS ­` .. - - - - - - - - I � . , - . . . , I . . . . \ � . . I I . I . I I .1 . ..... / � - � I . I I I � � . . . � 11 . ­ ­1 � I � � . . I � I . . . . � � � . .. I .. ,. � � . � . ­ . . . I . . I . . I . I I I _____ I ...... � I F - - - ----- - - - --i I I I � ­ I . I . . � � I . . I . . . ,.. . .1 .. I .... / . . . \ . % I . . . . . � . � . . I . . . I . ­ . . I . . . �. . . . . . . � I . ; 1. � I I I � � . � .. . . . . I . � � . � . . � I . . 1. � . . . � I . . . � . . I . . I I -- - I ; tr I � .% 11 I . � _?v ..... I .,� . I ; .. . . ... �. , . . , . . . .. I. I.- \ I/ 11 . ,� / 5 IV v . ... I . .. ,� . . I . � � �. I .. . . � . . I � . I . I �. . . . . . I I I . I I �.. I ..,... . .. 1. � � . � � � I .1 � . � I . I 1. I � I.. I � � .. I � � �� . .1 � . ; - F - - - - - - - - - - - - - - ---- - - . - - I � --------,,4 . 1. � ,� I IT I-T .1 �.. .... . - I .1. . . :. .. . I. I . . .. . I. \ . � I : .. \ / I � � � � .. . .. . ­ I � . . .... ; ; I . ...�::: , , � . 1. �. � . . . - , . . . � � � . I � � I � . �. I � � . I � � I I I I I � . . ­ I . � � � . . I 16-6 In' I . . I � ,, . 15 . � . I I �. I :1 1. - . . I .. - . , : . , � . . . l.. . ,. I . . . ­ � I I . . ­ .. ... � : . . . . v . . I I I .. I. I ­. . .. . . : ,. . I . , � I . . � . . � : I . 1. i�. . � �, I . � i I I I I . . I I I � I I . . � . . - -.-, . � . . I , ­ � . I . I I I ­ _. - � I � � ll� � I � . . . . . I . I � I - � . I � I 6MILBIACKPOLYRTHYLINEGRO: I . � � . I _11- " ii .I-.--- � .. , . � . . . . . : . ... 1. . : , . , : : - . . . . . . . . : �­ �. ... . . . � : ... I . . . , I I . % : :: I . . . � . . . �. : , I .. � I 1. . I. . � I ,. . " . . . I I � I . .. . 11 ... . . I . . � . . . 11 .. I . . : � . I , I . . � I . , � I I . � . . � 1. . . . . I 1. � I . . I I . I � . . I . I , R408.2 -_ . � . i NETFREEVENTINGARRATOBE . , � � COVEROVERLAPPED MIN IT- THROUGHOUTC9AWL SPACE -_ _jl I ; , 11 � � � . - - . i s w II t�- 3 � ..:* . , . - � 'S .�r I I : , 1 � * � w . . . . . , .. � . , ... :. 1: . I I I : . . . � I . . . . . I . .. . . � - ­. - , . _ I., _�, �, . : � .. - . I I . . . . . I ­ . � � I � I � . I . � ­ . . . . . I . . � . . I 1/1500FAREAVENTEMONE � VENT WITHIN3FT OFCORNSR 1 - . I I I A � . ., 1�� -!;, �f , , k �_ 11 I , -44: , . . .. - -'o,, sk tf,R,)?5 a ,� I . * . .� . . . � , .. . . : - . . . . . . . . . . _� I . . I . 1, .. � . I .1.1. .: . ­ I . . I �. � ; .. . � . I I I � . � � I . . - . � ­ . � . . : 1 I - - - - - - _ _I - _le �� 1, , I , 'I - I - . ,:., . - . .. . I . . .. I . I . I � . , . :: :. . . I , . ,. I , .. li � . . .. � . ,. I . . ; . . ...- I . , . . ­ � . . I � . . I . . . . � I I I . . � . . . � . . I ­ . . � I � . . ... . . � I � I I . I � . I . I � , � I . . . . � I I 8X16VENT PROVIDES 70 SO, IN. NFV . I � [ WM6.144)71501/70 I . . � . . I . . ; � I ,_� IT .1747-1 . . . - _N - .. - .v . % ,�. �r 'I- ­4_r :� 7 �� N . I . IP,&I,As�, . I ­: I � . . , I . �... , . . � I :. . -,:.* I.. .. . ,:..:! .. :. , I .. � . .. ..: ..: . . . . : '... . . � ..,.. � . , �'. ..; .... , : I ,.., : : :*_­ .. . . . . . . I : :1 . . . . . . I . . . . � . I . � I . . . . . . I . . . . . . I . . . I � I . � . I I (9)VENTSRBOTARED I - I � � I . I "-L, . � . , : . � .. . . . � . . , . . . I . , . . . I . . *. * * .. . . . I I . : . . . : : ... . . . . . . . . . . . . I . . . . . � � I I . . � . ... . . . . . . I I . . . . � � . . I . I I . � . . . . . - . . . . . I . � � . : I T . Z - I . . LOCATION EM -APPROX VENT I I .. . ... I I I I I � . _- I :, a � - . . I . . : :;... . . .:: . . . . . I I . . 1. ­ : � . . . . . . : : : I ­ .... . . . , . - . I � . . . . ::,, I . . �.. �,* . � . :. : . I : I . . . : : . I . I ; � I F . I , . . � . ,. . . I � , . � . . . . . ... . � . . .. : . . I . . . 1 : . . � . . . . . . . . � . . .� I % . .1 v) - � I . . . . . . . , . � . . . . . I I I . . . . I . . . . . . 0 . � . . . . . . .. . . . . . . . . . I . I 11" I I . .1 . , I -1 f ;-.,� . . . R317.1 . � . . I I EjAa�� NL_e_,$o??Dv,Tr-_D I I - . .. � . . I .. :". � . 1. :1 ;.. .1 I I I ... . . . . , 1. . . . . . . ... � .. � I � I .. .. 1. � . I ,:,. I.. . . � I � . .. . . ,�. . . . . . .. .1. � � I... �. 11 I . I.., . - �� I . . . . . . . . . .. . ... . ,: I . I . .. . . . . I . . I . . . I I - . . . �l . I . I . .. . . � I I I � I y I I I JOISTS MIN 18 - ABOVE GRADE I I GIRDERS MIN IrABOVEGRADE I I . � . - ,. s I --- I E . I � . .... I . I � . - I : . .. .. � . . � � � . � � , : . . . � 1. .. ­ I I .. . I I., 11 .. I I . . � ... . I . . I I . :.,. I . I I � . � . . �. . .. . . I . . . . I . .. . - I I � . . . . . . I I I . I . � . I � I � � I I . I I , 1 I I I 5L.P't ?ZK uTL 3 - 9) - - - I I - .. . .l.% I . . .... .. I . I . . ; . . I . - . .1 _ ... L - I I .. : , * . : I . . . I.. I ... 11 . . . � . .1 ­ . . 0 's . . I I � . I ''. I . I I � I . ,� .. - I . I I I I I I I . . . I . I . I --- � I R401A , . I I . I . . I �, I n. I : - 1 ... .*. . ... � . ., � . . .. . - . � � . . . . �� . � . .... � . 1 . ,.. .. . 1. : � . : ; . " ., _ I . . I . I . , 1. m "d . � � � � I � I .1. . . I '. , . . ...... . . I I I I . .1 I I . . 11 . - I I I . , I I I I . I . . I . I I . . I I . I . I I I .1 ... . . I I . 1 � . . . 11 ,, I . I I I I I I I MIN 18.24 CRAWL � I I SPACE ACCESS . I I I - I IN WALL - - - .1.11 " I . . . . � I , I � ,. I I . 1. , I 14L__!­ I I I i� - -1 I . . . , I . � I . � . . . � . . .. I I . : . � . I . ... : . - . . . .... . . : . .. . � . . I I � : 1 . . .1 I I .. : . . . I � . . . ­1 � . . . .1 . I a I—, � � . . . . . . � I I I . I I I - . I � : ,. � �. . 11.11 . I I . .. � I . 1. . I �. I . �. . I I . � . I . .1 I � I . , . I I . I . . .11, I I . : ­ . I . I �� I 10 0 . . . . . . I . . . � � I I ; I . I I . .1 11 I I I 1, . . I . I .1 .. I I I I . I I . I . . . . . . I 11 . I I . . . . . I . � _. I . � I I "" - - f - - - - - ____ - . :. ( S � I I I . 1. I � . I 11 - I e I . � 0 - 3- PILE LOCA:IION , , .1 .. � . I .:. . ... .;. ... , . . . .. I . ... . :..*. a . .11 � I :�.. -:� . . . . . � � I I I I � I . . � I � I . . �. I I I . 0 A . I I I . . I I 11 . I . I I .1 . . I I I . I . I . I I I . - . . I ��,---`( I I . 1. ... , I - --ZF- Z:, t, A . -1 lir 4 - - - � - - - - - - - - - - � - - -- f- V-.-�- I ,� . . .. . . . � I I (D-CPILELIOrATION ..: ... . : I I . 1. . . . � . . . � i .... . . I . , . . . . 11 � ..: � . � I 11 I I I I I I . I I I . I . I H � . � I : . . I I I . I .. .11 I I I . . I I I .. I �l . . � I - ­_ - 1501" k�­ 1 3 '/ . - 31 "I __ 430�,? .. - __ o_fAeW IPILE f,EQ'0 ­' .*�? - - . �: , . . I : - .: ... . . . . .. . I .�� : :.. I . I I � I I I I I I n - I . . I I . . . I . I . L .1 . . . I . . I . I . . . . . I . . I . I : . . I I . I I - - - - - - - - - - - - - - - - - - - . I I I __ - ____ . . I I . . ,. ... . : . . . .... . . . . . . . I I I . . - . . . . � I . . I I I I . . , W. . . � ­ I . .1 I . I I I I . . ­ 1. I'll I z I . . . . . .. I . I .. I � . I . I . I I . � . . . I ­. I I I . . .. .. . . . .1 I . . . 1. . I � . ,� I . I : . . . I I I � � I � - -.-------- - ON , : ... 0. . . FOUNDATI I I . . . .�, .: .. , . . I . . . .... .. _ , . . .. . . ... .: . ­... . ... . . . I I . . . .. I . : - . . . . 1. I . I u a) I . � . ­ � 11 . . . . . � I I . . . � . . . I I I . . . . .. . . . . � . , � �- � � I ­ I I . . I I . . I � I . . ­ � I I . . . : I . . . . I . � - -171-W --- .1 i -11.4r I I - . 4W -V : I . -.--- __ ln-� 1 I H I . . � SCALEI '= . . /4' lyr .� , �,: . . I I I : - . . a , _.: *..:. I . : . : : �...... . . . . . . .. . . . . � . ; 1. . . ... . . a - . . . . . . . . . . .. . ... ... % . I I . . I � . . .. � . . . .. ... �. .. I.. I . : 1. : . . . I I I z � - . . . I... . . . . . I I I I I . I ... .. . . . . . .. . . .. . I .. . . . I . "I 11 � I I I I I . .. . . . . I )cay 11 I ii . I � . I .1 ., .. . . ..�. � . .: . :.� . , . .. � ... . . � . I . , I ,: .. I .. � �, .. .:. . ... I � .. .. _!� � . � � . . . ... . . . . . . . � I I I I . I . . . . . I . . . � . . . . i . . I I . . I I I I � I I I . . �: * , . . . I . I . - , � I � I . I . "I IT I 0 - el I SONOTUBE_ ---t:i- I . , I I .- I -",\ I % - . I / � . . � . I I : � �w . . . . : , : j I .. O... .1 , . . ..I.. a � .� . . � : w. ... - . . . . I � � . . .. . . . . . . . . :. - . � . % : . :.: ,. . .% % � . .,� . � �. � � : � . ,. . � � . �. . . . . . � . .; . 1. I . . , . I . . � . . . . . . I I 1. lw tn , � I � . I I I . . . . . I . I I . I I . I I 0 .. . . .. ..:. . . I .. : . . I .. I I � ; � I I . �. . I 11 I . I . . . . . . I � . . . ,.: .. ... 11 I I � . I � � I � I . . I . . . I . , I . I . . ____� L= ------- . _3"PILESWITH FORDBCK= :�: . ; .. .. . ", . I I , . . . . I I I � . . 11 ''. I . . . . . "I . : �_. . . . . :. . . .:. , . - . . . . .. ... .%.. . . . � .: .. . : - . . . . . . I . . . . : . . . . � I- - , ... . .. I , �, ;.) I I I . ��i�).�5z,, �\,. .: . : I .1 . � ,$ 00 I I I . . � . . . . . : I . . . . .. .. . . .1 . . . . . . . . ­ _ . . . . . . . .. . . . .. . . I � � I . . . : : . . . ... . . .. .. . . . .. . . ... . I � , I .1 ... I I ­ . . . . I . I I � I .1 1 3 I . ��_ : IS - --- __ .,- . I .. I I . I . I . I . . 1 11, . . . . %. . . I - . .. I I I � 1. . .. . . �. � .:.. , . .�. . . . . .� . . a I , . . . � . . . . ;. . .. . . . .. . ­ .. . ­ . ... .. � ..: . ". . . ­ I . ­ �� . . _ -, . � , - . . ** 0 . " , k . � - . '. . 11 � OK . � :z v v -A , : I I . . 0 . . . . � ­ �. . . � . I 1. . . � . . . . 1, . . I : I I .1 � I I 11 . ­ � ­ � . ... ... . . � . . . . : . . . . . �l � � 11 11 I I I �. � . . � . 1. 1. , I I . I .:: ­ I � . . . . . . . � . . .. � . � I . � . I . I . 11 . 1. . . .� I � I I I I I . . I I I � I I ­ . I .. ... I . ". I., . I � . I . . , . 1. I GRADE BEAMS PER 11 . � � . � � I I . � . I I . � EO.R I I I I I . � , I I � I 2 . .....: . I � : . . . � I . . . � � - I I �: I %. . . 11 � , _ . . .. :... �.-,. I:.. � % :� - . . � , : - , . . . I I . . . .. . I I I . I : I ­:.. .0 , .., . . : . . - .... : . ­. .: �, - .'.:.;.. : i... . . : . I . ... . . . � ..: . � ..._': . .. � .. . � � �. . .. . .... - . . , � . . . ... � I . . . _. .. - � � ­ . . 1. � . � I . ... 1 . - . . . . I . . ,: . . . 1 . . . . . . �: �. . - :, ­". - ­--j!'�11AFN, � . ,.U)Lol­­� . . . 8Tf OF FDUOND,§. ... �.. ­ I . y . I -, � % . . . . I ., . ­... I 1, 1. . .� . - .. . . .. .1: .., , - : E ­4 Ln. . I � . . I . I , . I I � � I � . . ­ � � I � I I 1. 11 ,. I . . . I � I . I � . - � I I . I I , I I � I I I �� . I . . I I I I . . I �. . . I I . . I � I . I .1 I ­ F. . . ,� I ..111.1, . . . . . . .. . I I I I . . ... . . :. . .. . I . . � � � � . .. .. I . . I I 11 I . � I � � � . �.. � . . � . . .. . . ''I . . � . I ­ . . I - . . . . I .. . I . . I I � I I I � . I .. . . .. . . . . ... . I I .. . ... . - . . - I . .. � l.. . . . . I � 1. - . . . . . .... .. . .m: . .. . . � �, .1 I ... . . . I . . ... , � �.: �. �: . : . , :�. . , : , I , , .� .. . .:.: .1 . ... . . . ... ... . . . . : ­ : . . ... I . . . ... : ;. .'. . .:.� . ..... , I . ..: . . _ . I � : : .... % , �,:: :::� . . . . I : I . . .1. I RESUB . � I I.... I � i . I : I . I . I � I 1. ''I I � I I. .. � I . � � � . . I .1 � . . I . I .... � I . I I . . . .. I I . I I I . ... . . � I I I ,� I., I . � . I � I I . ­ . . . . . . I . . . . � . I . . I � I � . � , I .. 1, .� . . I . . . . . . I I . ... . I % * . I ,� . � I . . . . . . � I .. . . . . . . . . . . I . . . . . . .. . .. . . I :_:..�.... !�*...... _..� ... :.:. . . . : . . � . * . . . ...: %.:.. , �� : :, : - . . a .. .. ... . .: ::, . . .. .. . � . .... ..: . . % . .: I . . . .. ... - . . I .1 I I .1 : I .. .... ,, . .11 ­ . . I . . . . DE 15 1, . 2019 . I : I I . : 1. �� � I . I I I I � I I � I I I I � I I I � , . 11 I I I . I I 11 � � I . . I I I I I � I I . I . . � . . . I I . � . . .. . . I . . . I I . . . � , . . . . . . . . . . .. .. I . 0 I . . . . . . . . . . I. � : . . . .. . . I . � . . .. . . :. . . .. . . .. . . . .. - ­ � � , . . ..: . I � . I. .. I I - .: . . . I . � I . . BUILD" - . I i I I I I I . � .. � . I � . � 11 . � I I � . I . I . I., I I . I . I I � I . . I . . . � I I � . I I � 11 � � ., I . I . 1. I I . . I . . . ..-.-. . . . I � . . . . . � I . . 1. - . . I .1 . . . ... .. . . . m ...:... . . � I . . I . .. . ... . � . � . . . .. ,. 1. ". I . . . . . . . .. . - . . I . .. ... .. ... . I . . :...:: . . � m . I I . . . . ... �, . ... . ... I I . . . . . . m . . :. I . .:..� . � ... . .. . . : :: : .. . -1 ........ ­:. .. . .. . I . I. ... . � . I � . I .11Y.FE4=NT , � � . . I A � � . ­ I I I I � � I ''I 11 1. . � I I I I : � . 1. . . I I �. I 1. � I I . I � � I I 0 � . � I I . I 11 , I � I., 1 I .. I � � I � . . I I � � 1, ,� � I . � � . . . . . . . . I . . . . . . .. . I . � . - . � I . . I � . � I I I .. . .. . 1. . . . . I . . . . I . . . . . .. . . . . .. I ­ � � � .1 . .1 . . . I .., . I . . . I ­ . . . . . * � . . . . .. . .. . .. .: . . a .. ... - . � � - . . . . � . . 1 0 . . . . � . � :i ,.:.. . . . . . , . . ... . .. .. . . . .. .. . . .. � . % .. : . ', . . I .. . . . . I . - . � . . . . p ... . 1. :. : , . � . I . .. .. . . I .. ­ �:. , I : :.. : . . I - . ,� : I I— . �_ " .1 . .. . . .. �, . .1 I I . . . .... . I . . I .. . . I . I . I I � I I I I � I I I . I . .11 I I I I . I I . � � I I � I . I , I I I . � � I - I I I . . I . . I I . I I I I . � � . � I .. . . . . . .. ... . . . . . % - � . .. . . � I . . .. . . . . i . . . .. . . . . , , .. . . ... .. I . . . . . . . I . , . . . . . ...,..: ; - . ... , ..l. . - . ��_ ::.. . .. . - , I I . .: , I : . . . PR ��p �� � � . � . I I . � � I . 11 I I I . I I . . I �� . I I I I I I . I . I � � � I I I : I . . ­ � � � . I I � I I 1. � I I . I I I I . I I � .1 I . I , I . . I . . . � . � . 1. . . I I I 1. � . . . . I 1. . I . . . . . ,. . . . . . . . . . . . � . . I � .. . . . . . . , . .. : . , � � . � *q. * . . ... . - . . .� : .. I. . .. .. . .... . . . .. . . . , , . . . . : e ; :. . .�: . � . . .. I . . F.. :: . I . _:: . �. . ': ; I , . . : : . . - , . . ,� , 1: .� I .. , q� � . - I I I.. . WAS . , : I "' I �_.., I , . I . �. I � 1 I I � . I I . I I I I � . I � � I I � : . . � I .1 I I . I ­ I 11 . � � . I � I . � . � I � � I I 1, �: 1% . : %, , , I - � I I I � I , I � I I . I I I � � 11 I I .1 � I � - .� I I � I � I . I .. I � ­ I . I ,. I . I I I . - . . . ... � I � I � I ., � � � I I . . � I . . . I � . . . I � . I I . . : ­ . 1. I I � 1. I . . . I .. ... . . . % .. . . . . : , . ... .. I i.: .... � .. . . . I . I . . . .. . .. . . I . . : . ... . � . . . ... . . . . . . . . I . . . � . . . I . . . . . . . . 1: I . .. . .. I.. . :...... ...., - . I ,.:....... :... : ­ �.. : , .. %..... .. .. . . . . . . ., q . . . . . .. . . :,. .. . . . ....: . . . ..: -�, .. . . . . . ,. . . . . .:. . I ..:�. - .... : I . , : .1 .: .: . . - r . , . I . . . . .,... . .1, . :.., . . .. . �. , . - . . .. .. I . . . I . . . :..; . ..... :.;� I .1 . I %. . I . . . . .1 .. . . . � . .1 ; I . I * I _. I : 1`11-26-16� REVISED � I I I � . .1 I I . I . . I I . I . . I ,. I I I ­ . � I I � . I . 1. � . . 11 . I . - . . � � � I � ��. . I ­ I . . . I � I � � I � I . I I I . � , I I . I � "I � I . I I I I I I I .� � I I � � I � � � .. � � I ­ I . I . I � I �. I � � . I I I � I . . . I . � � I . � � I I ­ � I .. . . I � . I � � I ­ � . � . 1. I I I I . . � .. �. � I I . I I I � . . .. ... . �. I . .. I . I . � � I I � I . I � I . . . � I � I I I � � ... . ­ � . : I .. � . �� I � � � � . I I .1 . . . I ­ I . . . . . . . . ­ . . . - . . .. .. . ­ .. . . ,. .. % . . .. . . ... . .... .. .. . . .. .. �. . . .. . . . . . . � .. . i I . : ... � : o�.. . , � . I . ­ ... . . .. I : . I I . . . . . . . . .. . . . . I . . : . . . . .. . .. ­ . .. . .. .. . .. . � . .. . . . . . .1 . . . .: .. . -, - : 'I . . .. . .. .. . . . . . . � .. . . . .. . . : . . . . .: . .1 . . ,...:.. . .. , . I . . . :... 1. � . . . I . I ... .. ..... ..... ..... ... , .. I . .. ... 1. .. ... . I . � . .. .. . . . . I I I .. .:. . . - . . .... .,.. _ , . . .. .. . . . .. . . . .­.. . I . . . . I I . .. . m! . . .. � . � ..� 0 I . . . . ": � :­ i.. . . * ,:. .,..,.::"::: _ _ - : ,� ,, , . . , - . :.: ..... : . ... -1 1. ... I. . .. . . : �. : �. : . .:. . . . 11 .. I . * I .l., I., .. ls� - . q: . - I.T..... � � I I .. . - F � . : . �, � . . . ­ : .. . . 11-27-19 : F i f i � I . ! � I 1 . 1. I . . , � . . � . � I I . � . I I I . . �, 1. I . � � . I . . I I : I I I I � . � . I . � - � � I � . I I I I � ,:, � �. � �: . 1. 1. I I . �. . 11.1 ­ � � I 1. ­ I � � � - I .1 I .. � . � I . . . I I- I I I . . 11 I ­ I . � 1. ... I � 11 I � . � . I � �. I.. � ... ... ­ � ­ : . 1. - I . ,::, , � . . - . . ­­ . 4. I � . I .. .; . - .. . . . . . . . . ­1 .. . . .. .. ­ .. I . . . . 7 . 1. . .. . . . ...... I ­ 1. .. �.. ,. ..... . ­ .. . . � I I ­­....., . I .. .. . .. . . . . I I � . . I . . . I ... . .. . .. . .: . . : : .. . . . �., .�,, .. . � .. . .. � ,�. . . .. . . . ­ . . . . . �..... ...71: .... .... -2 ­.:i.; ... . . .. .. ,. _......... 1. �...:-..: . . .. . . ... ... I.... ­:..: I I I . ... .. I : . . . . : � . ,. I �.. . : .. . .1 . . I . . I . . .1 . I I . . . � ...,-.'', ... "I . .. : � I .. . � � I � . � . ... . . . � . . . : . � 1 7il I 9 . . %_ � : . ... ,: 511 . . . . I _. - START FRAMING LAYOUT HERE T�. -------------------- --ri momigx6larli Eel f-v Wo ................. R502.7 SOLID OVER BLOCKING I'M MOORE= mil oil I i I IN 1 IN y 'G SPECS. FLOOR FRAMING SCALE 1/4" = IFT 7-- 3W0!X3 cc fy or El."N"O Nos cd Z IV (U w 0 0 0 z Ins 00 11-27-19 c? TYPICAL OVERHANG AT RAVES: 18" ---------- -------------- -j A--C-K-S- -P-E-E.--- TRUSS MFG. ------------------ j HIPSET GIRDER L TRUSS 8'-O"SETBACK 1p F 7=7ir 2 / \ �' J 21020 SIKYUGHT r ------------ F -------- & ------------------ n n .01 ----------- - ---- -- ------------- E::�\" :. .. i: :: :: :: :: ;: '�k' -,- -bi I ii a u u -------------- ----------- A�- --------- - —7i i L ----- TV - ------------ AT24"O.C. - ------ 4.12 PIT�CR Fq 4 L=L F— N11 I TY7 rr 91\ I--------------- -------- ---- -------------- c 0 R502 11 ---- MFG TRUSSES AT 24� 0 C REDANDDESGNED BY TRUSS MFG AND INSTALLED PER TRUSS MFG SPECS 4:12PITCHTYPICAL 806.2 TOTALNEr FREE VENTILATING AREATO BE 1/300OFTliHARl'AOFSPACEVENTIIATED IF40-50%OFVENISARENOMORETHAN X_O' (VER71CALLY) BELOW RIDGE AND REMAINDER OFVENTING IS PROVIDED, BYEAVEVENTS. 7 ---- 01: r AFSO VEM PROVI 50 SO, IN. NFV GABLEENDVENTSDE SO, IN. NFV. PROVIDE 75 2"HOIE IN BIRD BLOCKS PROVIDE &14 SQ IN NFV (3 HOLM PER BIRD BLOCK) HIPSKr GIRDER -0"SKrBACK �32IIM)I,,�I- q—d 2 - 2 x 4 TYr. Post HIPSET GIRDER R by: TRUSS G-W SETBACK (1? ), MOV_. L—dld (57) BW lld. HIPSET JACKS PER :N C HIPSETJACKSPER. TRUSS MFG. TRUSS MFG. ----------------------- ------------- - E- N: I : I ----- ROOF FRAMING SCALE 1/4" 1FT cu ROOFVENT WAN Y-0- VERT[CALLYOF RIDGE z -------------------------- -------------------------- - ------- P4 �Z) L-k� RrrsuB DEC �D W4*1 11-26-2016 REVISED ll-Z7-19 4 11/27/19 R FLOOR .R FLOOR JOISTS PLAN INFILL PIECE OF SHEATHING MUST LAP TOP & BOTTOM PLATES & NAIL TO COMMON MEMBER TO INSURE SHEAR IS TRANSFERRED. NAIL PER LOWER FLOOR SHEAR WALL CALLOUT REFERENCE DETAIL L FOR CONNECTION HARDWARE EXT. SHEAR WALL TRANSFER ACROSS UPPER FLOOR WS 10d 0 r D.C. R3/4! PLY1 X060FOTRRU2 ;.S'LOcK ill/ 12d NAILS 0 6 20 NAILERS 10d NAILS 0 r O.Q LS * 6' 0 a BTM. CHORD a BTM 101 NAILS 0 6' D.C. PLYWOOD To 2X4 NAILER WALL PER PLAN LIERNATE TRUSS DIAPHRAM (INT. SHEAR WALL TO PARALLEL ROOF TRUSSES) PSL JOISTS _0 "SIMPSON" L90 0 EA. SIDE & 0 EA. END (4) TOTAL. "SIMPSON" STRAP TIE PER PLAN. SEE "SIMPSON" NAIL REQUIREMENTS BLOCKING INTERIOR STRAP TIE (INT. SHEAR WALL TO FLOOR BEAM) (D (�) 0 (D (�) (�) 0 (�) Dessicin eullcl -Services, Inc (360) 193-13(55� - Shear Wall Schedule - Rev 80 7/2/2016 SHEATHING NAILING END STUDS (MIN) Pit. TE NAILING 12d A35/RBC OTOP PL 1/2 A.B. SPACING UNBLOCKED� BLOCKED GI-7 1/2" Sheetrock 5d Wallboard @ 7" o.c. (1) 2X4 1 Raw 0 14" 3'-6"o.c. 1/2" 0 6' 100 125 GI -4 1/2" Sheetrock 5d Wallboard @ 4" o.c. (1) 2X4 1 Row 0 11" 3'-O"o.c. 1/2" 0 6' 1 5 150 GI -4+ 5/8" Sheetrock 6d Wallboard 0 4" o.c. I Row @ 9' 2'-6"a.c. 1/2" @ 6' 145 175 G2-7 1/2" Sheetrock 5d Wallboard 0 7" c. (1) 2X4 I Row 0 7" l'-9"o.c. 1/2" 0 6' 200 250 G2-4 1/2" Sheetrock Wallboard 0 4!' o.c. 2-2X4/1-2X611 Row 0 5" l'-5"o.c. 1/2" 250 300 LRP 16" LATERAL RESTRAINT PANEL - Max Ratio 6:1 w1min. 4x Header 600 Lb TOTAL REF 2'-0" or wider LATERAL RESTRAINT PANEL 515 Ub/ ft. APA Based on APA T20011-56 & Draft 156 dated June 17, 1994- higher �lues are allowed based an H.D. design. ALL WALLS BLOCKED TT-100 Edge Nailing HF Spacing HF TYP lHF WIND S1-6 7/16" OS13 8d @6"o.c. or 16g Staple 04" 2-2X4/1-2X6 1 Row @7" 2'-O"o.c. 1/2" @ 6' 215 300 S1�4 7/16" OSB 8d 04."o.c. or 16Q Staple 02.5" 2 2X4/2X6 Row l'-5"..c. 1/2" @ 4' 310 434 S1�3 7/16" OSB Bid 03"o.c. 2-2X6/3-2X4 1 Row 04" 1'-o"a.c. 5/8" 0 1.7' 400 560 S1�2 7/16" OSB - 10d @Zo.c. 1-DF#2-4x4 Raw .2.5 FRow 8"o.c. 5/8" 0 2.5"' 544 763 S2�6 7/16- OSB - Bid 06"o.c. or 16Q stople 04� 3-2x4/2-2x6 1 Row 03" 12"o.a. 5/8" @ 1.5' 430 t 600 S2�4 7/16" OSB Bid 04"o.c. or 16g staple 02.5" 4-2x4/3-20 2 @5" 8"o.c. 5/8" @ 2.7'** 620 - 868 S2-3 7/16" OSB So 03"o.c. 4-2x6/l-4x4 2 Row 03.5" 6"o.c. 5/8" 0 2'** Boo 1120 S2-2 7/16" OSB 10d 02"o.c. I-DF -4x6 2 Row @2" 4"o.c. 5/8" 0 1.3'** 1088 1525 Hold Down Schedule - Simpson or Equal Tension Wind Seismic Cracked A35 A35 - Detail 4 in Simpson Catalog 600 600 Ho 0 1.6 Hi H1 - Truss to top plate lateral 415 415 lb @ 1.6 LSDTH LSDTH8/LSDTH8RJ-6" wall 00.5"-12"+ 1. outside corner 1690 1220 1�b 2 � 1:is LSDTH8 LSDTH8/LSDTH8RJ-8" wall 00.5"-12"+ 1. outside corner 2230 1610 b @ LSDTH LSDTHB/LSDTH8RJ-8" wall @12"+ from corner 3115 2250 lb @ 1.6 11'.66 STHD10 STHID10/STHWORJ-6� wall @0.5"-15"+ f. outside corner 2050 1435 lb 0 1.6 STHDIO STHD10/STHD10RJ-8" wall 00.5"-15"+ f. outside corner 3145 - 2175 lb 111 1.6 *b@ STHDIOISTHD10/STHD10RJ-8" wall 015'+ f. outside comer 4755 3400 lb 0 1.6 STHD14 STHD14/STHD14 J-6" wall 00.5"-21"+ 1. outside corner 3200 2685 1 STHD14 STHD14/STHD14RJ-8" wall @0.5"-21"+ 1. outside corner 4165 - 3500 lb 01.6 STHD14 STHD14/STHD14RJ-8" wall 021"+ from comer 5345 3815 lb @ 1.6 HDU5 HDU5 ./ 5/8" SSTB24 6" Wall Min 5" from Endwall 4470 3325 lb A.B./DF HDU5 HDU5 w/ 5/8" SSTB24 6* Wall Min 42" from Endwall 5025 3740 A.B./DF HDU8 HDU8 wl 7/8" SSTB28 8" Wall Min 5" from Endwall 15 11to HDU8 HDU8 w/ 7/8" SSTB28 8" Wall Min 50" from Endwall 7870 7870 Ilb w-4.5DF ST24 ST 6224 to loi t - MST37 w/ rim 2540 2540 lb @ 1.60 SI.36 ST 6236 to joist - MST 48 w/ rim 1 3695 3695 Ifla 01.60 ST60 MST60 0 rim IT72 1 4830 4830 lb 01.60 ST72 no rim 1 6730 6730 Ilb @ 1.60 NOTES: Based on 2015 IBC and Industry Standards assume HIF for wood material u.n.o. xI-x wall is sheeted on me side. x2-x is sheeted both sides, Hold-downs am based on 2011 Simpson HemFir Values UNIO. Toenail use @ Hm to op plate requires 20% mom nails than plate nailing wilues giwn 0 top plate. Toenails 0 GI-7/4 arly. Nails to be: 8D 0.13lx2.5' 10D O.l48x3* 12D 0.1486.25 16D 0.135%3.5� Per AFPA SDPWS H:W ratio 2:1 max for sheetrock walls. All shestrack .11 sections /H:W ratio of 1.5:1 to be blocked. Shentrock walls not allowed in seismic zons E Anchor bolts for Hold downs are to be A307 bolts or threaded rod with 2 nuta (jammed). Min. Embedment length to be 12" in the tooting. Simpson SSTB bolts am be subsituted per the Catalog call -outs. Roar Is to be within 2' above and to the side of the hod of the bolt and Simpeon Strop Hold-downs. Gypsum Wall Nailing ils far all supporting membin'S & Wall to be unblocked unless noted otherwise. All OSB/Plywd walls to be blocked and haw Min field nailing 012' - if panels are ower J* thick or stud spacing less than 24* o.c.. A35 @ top plate only required if Rim Joist is flush With Shothing or @ interior wall & cannot be toe -railed. ** 3x Mudsill Required. 3x wall plates am required if Meeting 1, spliced on the phAs. If pliced an In double rim required for 1 1/2" nail penetration. Note mudslil shear am be different than the wall above, ses calculation summary sheet. Al I walls with sheare ow 350#/ft require 3x studs or blocking at panel joints. Ocable studs can be substituted when nailed together at shear wall nailing with 10d rails. All anchor bolt spacing between 350#/ft and 600#/ft has been reduced by 507 to allow use of 2x plate� If 3x plate is used bolt spacing can be doubled in thus cases. ALL ANCHOR BOLTS ON SHEAR WALL LINES TO HAVE 3"X3"XO.229" WASHERS 2308.3.2, J' From Mudsill edge on side with OSB/Plywood if shear over 200 PILF per SDPWS 4.3.6.4.3.. unless hold-downs provided at wall ends per exception. SHEAR WALL PER PLAN NAIL `P.�R PLATE---, ,,--NAILING SEE SCHEDULE DBIL JOISTS R PS�L SOLID BLOCKING N(GLUE) (0 JOIST PARALLEL (@ JOISTS PERPENDI- TO SHEAR WALL� CULAR TO SHEAR WALL) W1 A-35 PER OL 6 W/ A-35 PER COL 6 DOUBLE JOIST OR BLOCKS WHERE DOUBLE PLATE NAILING REQ'D INTERIOR SHEAR WALLS TO FLOOR BELOW (2) STUDS PER MST HOLD-DOWN "SIMPSON" ST6236 STRAP HOLDOWN W/ (40) 16d x 2-1/8" NAILS. FILL ALL HOLES W1 NAILS, JOISTS PER PLAN (2) STUDS PER MST HOLDOWN EDGE NAIL PLYWOOD TO DBL. STUD (TYP). EXTERIOR STRAP TIE (EXT. SHEAR WALL ACROSS UPPER FLOOR) ROOF SHEATHING RBC OVER SHEAR WALLS PER COLUMN 6 ROOF SHEATHING EDGE NAILING BIRD BLOCKS BY TRUSS MANUFACTURER EDGE NAILING - PER COL.3 OF SHEAR WALL SCHEDULE (TYP.) PLATE NAIL PER COL 3 16d TOE NAILING @ RIM TO TOP PLATES 0 12" O.C. SHEATHING ON 1ST FACE PER COL.1 OF SHEAR WALL SCHEDULE (TYP.) AND NOTE 2 CONTINUOUS SHEETING FROM TOP PLATE TO MUDSILL. NAIL MUDSILL PER COL. 3 FOR MAIN FLOOR SHEAR WALL CALLOUT ANCHOR BOLTS PER COL. 7 OF SHEAR WALL SCHEDULE -2 x RAFTERS OR TRUSS TOP CHORD TOENAIL EACH TRUSS 2 x CEILING JOISTS OR TRUSS BOTTOM CHORD SIMPSON'S H1 SEISMIC TIES 0 48" O.C. U.N.O. SHEATHING ON ,*�_-2141) F CE PER COL.1 OF SHEAR WALL SCHEDULE (TYP.) IF REQUIRED �_�.16C d NAILING TO BOTTOM PLATE PER COL. 5 OF SHEAR WALL SCHEDULE (TYP.) ALT RIM DETAIL A35 PER COL WHERE SHEATHING DlSCONTINUOUS. SEE DETAIL A FOR CONTINUOUS REQUIRMENTS. PSON A3 FRAMING ANCHOR BLOCKING AT ALL PER COL. 6 OF M SIM PSI FRAMIl PER C PANEL EDGES SHEAR WALL SCHEDULE ( TY TYP.) PANEL PLATE NAILING PER COL. 5 OF SHEAR 'WALL SCHEDULE (TYP.) ALT RIM DETAIL DOUBLE RIM WHERE DOUBLE ROW OF PLATE NAILS Ref'. AFPA SDPWS Section 4.3.5.2 Design for Force Transfer at All Panel Edges Req'd 48. /locking Full Panel Width Full Panel Vidth 36 STRAP 4 Locations) V) 25 ix� z .7 q4 0 Ln _6Blocking Min. > YIP1 Ld IS '1-2 x 4 (min. plate) Sheeting To Be Continuous 2-2x Continuous or Stropped Rim Over Rml J.I.t Perforated Shear Wall Similar. No Horizontal Straps or blocking required. Wall to be sheeted then openings cut and all edges nolied per schedule. AFPA SDPWS Section 4.3.5.3 BLOCKED WNDOW SHEAR WALL DETAIL '0 0) Y_ < EXTENT OF VARIES (SEE PLAN) t16" MiNt HEADER 2X4 TOP PLATE OR PONY WALL ABOVE GARAGE DOOR HDR. MIN. 3x11.25 (SEE FRMG. PLAN FOR SIZE) 01 NAIL O.S.B. TO HDR.,# Bid 0 3" D.C. �.C. mq OR 15g STPLS @ 2.5 TYP. =2 ROWS 2-20 STUDS MIN 16D :3 31 D.C. LSTA24 VERTICAL STRAP 2 OPPOSITE OF SHEETING 0 LU ::3 -NAIL @ ALL PLTS 3� H STUDS W/8d @ ffRs. T 71 - OR W/115g STAPLES 02.5 D.C. TYP. b 0 - 2-2y:4 AT AkY O.S.B. JOINT 16D03"o.c. IN MIDDLE 24 OF PANEL 7/16' O.S.B. (5/8- TI-11 @ TLRP) t X -u THD14 OR PLAN NOTE CALL -OUT. INSTALL PER MANE RECOMMENDATION. Q) )NTINUO 2-2X4 PLATES, NAIL SHTG. 'STEM 12" w/2 #4 MIN TO EA. PLATE - SEE NOTE BELOW z OPENIN ANCHQR LAG BOLTS W/ 3x� WASHER I MIN 7 6MBEDMENT (1-5/8 x12 AB kN) Note: Where Panel I on a rim joist the sheeting must lap the rim W IL which could take the place of the second plate. Log bolts a. - to replace anchor bolts into 4x 0 RIM. The STHD14's are to be replaced with STHD14RJ's or added to with MST 60's at a pony wall. MST 60's are to replace STFID114's at a second floor application. rG*""`lt LATERAL RESTRAINT PANEL "LRP" Q,J TLRP SIMILAR (REF: APA TT-100) L VARIE NAIL THRU ROOF SHEATHING Li TO 2X4 BLOCKS (TYP) C) 2X4 BRACE (3) 12d(TYP)-<' 2X4 BLOCKS ABOVE .---SHEAR WALL _J ,-MFG'D TRUSSES 0 24" O.C. 45 MAX '__,A35 CLIPS PER SHEAR WALL SCHED. INTER+ SHEAR �ALL DBIL TOP PLATE /'E TRUSS DIAPHRAM \i (INT. SHEAR WALL TO PERPENDICULAR ROOF TRUSSES) L SIMPSON A35 FRAMING ANCHOR PER COL 6 OF SHEAR �AUL SCHEDULE CRAWL SPACE (TYP.) TYPICAL SHEAR WALL NAILING WALL TO FLOOR NOT TO SCALE 5heet 5-1 of 3 DEC 15 200 RESUB DEC 15 2019 BUILDING DEPARTMENT CITY OF EDMONDS Ground Wind Sslsmlc Sul:;Qect to Damage from Winter Ice Barrier Flood Air Mean Snow speed Design Design, UnclarlaSment Hazards Freezing Annual Frost Line Load (MPH) cateGorq Weatherin g Depth I Termite I Deca� Temp � cl 11 ed re u no ndex TerIp 25 per ROOF 110 P Moderate 12 �Sil ghr t. s- NO Min . ,att. EquIvalart Fluid Pro- 35 pcf Unrestrained and ba rO p.F - 1044 �ddd f., R-tr.1n.d WMI. 5TRUCTURAL NOTE6 Applicable Godes; 2015, International Residential Code (IRC) 2015 International Building Code (15C) 2015 WA State Energq Code (WSEC) GENERAL - THE CONTRACTOR 814ALL INSPECT THE SITE AND SOIL CONDITIONS AND VERIFY SITE AND BUILDING DIMENSIONS BEFORE COMMENCING WOW - PROVIDE TEMPORARY SPACING AS REQUIRED DURING ERECTION. VERIFY SIZE AND LOCATION Or ALL OPENINGS IN FLOOR, ROOIB AND WALLS WITH MECHANICAL AND ELECTRICAL WOW - PREFABRICATED ITEMS SHALL BE HANDLED AND INSTALLED PER MANUFACTURER'S RECOMMENDATION. FOUNDATIONS: 1. EXTEND ALL FOOTINGS DOWN TO FIF41 UNDISTURBED SOIL IS INCHES BELOW ADJACENT GRADE. 2. CENTER FOOTINGS ON COLUMNS AND WALLS EXCEPT WHEN DIMENSIONED OTHERWISE. 3, WIDEN FOUNDATION AND FOOTINGS 4 INCHES TO SUPPORT MASONRY VENEER WHERE APPLICABLE. VERIFY LOCATIONS. CONCRETE: 1. CONCRETE DESIGN BASED ON 2500 PSI NO SPECIAL INSPECTION REQUIRED. SUPPLIED CONCRETE TO BE 614ALL BE 5b SACK MIX, 3009) PSI AT 2S DAYS UNO. TO BE AIR -ENTRAINED (59. - 1%) 3000 PSI AT 28 DAYS WHERE EXPOSED TO WEATHER FOR DURABILITY. 2. SLAB ON GRADE (HEATED SPACES) 4" CONCRETE SLAB WITH 1.4 ( x( . W. W. MESH. I" SAND OVER & MIL VAPOR BARRIER OVER 41' COARSE GRADE GRAVEL FILL. R-10 x 24" RIGID INSULATION AT PERIMETER WHERE SLAB 18 LESS THAN 2' BELOW GRADE. 5TEEL: 1. REINFORCING STEEL SHALL BE -4, GRAVE 40. ALL BARS SHALL BE CLEAN, DRY AND TIED IN PLACE. LAP SPLICES IS INCHES MINIMUM. 2, ANCHOR BOLTS SHALL BE 1/2" DIA x 10" WIT44 0.221b" X 3" X 3" SQUARE PLATE WASHERS. SPACE AT 12" MAXIMUM AND I BOLT DIAMETERS MINIMUM FROM CORNERS, SPLICES AND I -LATE ENDS. SPACE ANCHOR BOLTS AT r. FEET 0. C. FOR SINGLE STORY AND 4 FEET 0. C. FOR TWO STORY, SEE SHEAR SCHEDULE FOR SPACING AT SHEAR WALLS. ANCHOR BOLTS SHALL HAVE 1" MINIMUM EMBEDMENT. I" THREADED ROD, EPDXIED A MINIMUM or 411 INTO CONCRETE, OR J,, STRONG BOLT WITH 4,, EMBEDMENT CAN BE SUBSTITUTED FOR CAST IN PLACE ANCHOR BOLTS 3. STRUCTURAL STEEL I -LATE 16 TO BE A3& UNO AND FOR BEAMS 18 TO BE AIRITI2-50 UNO WOOL) FRAMING- DF/L *2 4x/ rox BEAMS, HEADERS, POSTS HF 02 EXTERIOR AND EEARING STUDS, PLATES, JOISTS, RAFTERS AND LIGHT FRAMING. HF STD, NON -SEARING, INTERIOR STUDS, PLATES. GLUED LAMINATED MEM5ER5: GI_U-LAM MEMBERS SHALL BE A.I.T.C. CERTIFIED. OF/DF-24r-V4 OR SIMPLE SPAN BEAMS. DF/DF 24F-V5 FOR CANTILEVERED BEAMS AND CONTINUOUS SPANS WHERE NOTED ON THE PLANS. APPLY ONE COAT Or END SEALER IMMEDIATELY AFTER TRIMMING ENGINEERED LUM5ER: LSL TO BE U55E UNO LVL TO BE LSE OR BETTER UNO P5L TO BE 2.OE OR SETTER UNO SHEAT�41NG: ROOr AND WALL SHEATHING SHALL 5E 1/1( . " APA RATED SHEATHING UNO. NAIL WITH Sol - ro" O� C. 0 EDGES, 12" 0. C. 6 FIELD. FLOOR SHEATHING SHALL 15E 3/4" NOMINAL T4G APA RATED SHEATHING GLUED AND NAILED WITH Ed 0 6" 0. C, - EDGES, 12" 0. C. AT FIELD. SUPPORT PANEL EDGES PER APA RECOMMENDATIONS. FREFA51RICATED JOISTS / TRUSSES: PREFAB JOISTS AND TRUSSES SHALL BE DESIGNED BY THE MANUFACTURER. ENGINEERED SHOP DRAWINGS AND LAYOUT SHALL BE SU5MJTTEr> FOR APPROVAL. SPACING AND CONNECTIONS SHALL BE DESIGNED AND DETAILED BY THE MANUFACTURER TRUSS LOADING SHALL TAKE LIVE LOADING SPECIFIED IN TABLE R301-5 INTO ACCOUNT FOR 50TTOM CHORD LIVE LOADING or 20 PSF. IF TRUSSES ARE DESIGNED FOR ATTICS WITHOUT STORAGE, OR DO NOT MEET THE LIMITED STORA/.E REQUIREMENTS, THE BOTTOM CHORD CAN BE DESIGNED FOR 10 f-SR HANGERS/FASTENEIR,5: ALL HANGERS AND FRAMING ANCHORS ARE TO BE SIMPSON OR EQUAL. ALL METAL IN CONTACT WITH PRESSURE TREATED WOOD ARE TO BE ZMAX, HOG(GISS), STAINLESS STEEL, OR MEET ASTM A 153 OR A 653 STANDARDS, REFER To IRc p3,113,1 OR 15C 2304.eB.I. SIDING FER ELEVATIONS BUILDING. UIRAF-IFAFER SHEATHING - (2)04 E> eFOUNDATION 5TEFD-DOLLN DETAIL 2X STUDS 0 IS" O.C. BEAK SIZE 2X F�R. TR BILL PLATE PER PLAN U.11 1/2'.XIO" AS. 0 48" O.C. 412" FROM ENDS MIN. (SEE SHR SOH) 2. GUSSET UV 4-16d U1 NAILS - POST 4 r BEAM =A. SIDE 18' CONT, -4 HORIZ BAR - IS" 0,C. 4.4 f'OST J11N. F 4" OONC, SLAM, W/ W" WIDE - IBM f- 4" GRANULAR FI1_L SPLICE VERT. WOOK 4, - 2 -4 CONT. BARS - FOOTING. &" ONE STORY WALL 0" Two STORY WALL GARAGr=/SLA5 FOUNDATION C)r=TAIL ;�OF,TIONAL PCNY WALL ABOVE L ti 'i, -4 a 10" I o.. WOR. A VERT. OR FREE , L,- , ELEAR SACKFILL I;EQUIRED LI ­1 , 11 111 1I, d FOS. DRAIN REQ.� 4-4 LIS POOK SARS / B.. R-2151/2" BATT . INSULATION _111- 112'� GYP. SIDING. MR 2X& STUPS IS" or- HE A W L L SHEARWALL R A P E R P PER PLAN L AN zLrvATioNs r 2- - M BILL -ATE BUILDING; W/ 1,2">110" AM, - 48" 0Z. WRAPPAPER 4 12 " FROM ENDS FEF SHEAR SCHEDULE 111611 APA _ 3/4" T&G SUB-FI.R. SHEATHING A N CH ANCHOR BOLTS R OL_ R-30 BATT INSUL. P E PLAN PER PLAN R 2X FLOOR JSTS 'SEE I" PLAN) -4 BAR OR FiN. GR.-\ 2-#05 0 rd #4 18jo0pc HORIZ #4 0 9' . 4 VERT �4 VERT. 140M OAR - 40" Or- (2) #4 GR' BOTTOM. . 60 TOP & .0 LAP BARS 26* MIL. BLACK VAPOR a 7 AT _ES BARRIER LA 12". AMS BE AND UP POK WALL IIISIRUP S to Ld (Z 12" EA [U7Q1:RTAT­-_f S�. OF T NERS, 36- 1 E I. C T�' TE NOTE I"*"ll h0'l`\-2-k4C4HT.BMAFA.FO0TIN3 T_ ONE STORY WALL Two STOW WALL HOUSE FOUNDATION DETAIL INC. PAD f rR Ri_�N MUDSILL NOTE FOR III OLATIED PIERS 24" $a OR LESS WMIN NO REEAR REQ'C> FOR PIERS LARGER THAN 24" Sa THICKNESS 18 TO BE 10" MIN. W/ 4 PEIBAR - S" OZ. EACH WAY LINO. Sr_RAWL BEAM DETAIL CONCRETE r.-2500p.1 REINFORCING STEEL *4 and Lose Grade 40 S and Larger Grade SO 'Zoo' " A.,,,% Lateral Pressure 35 pef I R., A-1- (-) I til H , Garage IUAII H t2 LI L2 I L3 A S V. 4' 1" 4" 7 10" -4 -1211 -4 012" a.. 51 a.. 411 14" 30" -5 -15" -5 Is.. 6. 4' 8" 4" 21" 30" S 614" S-1411 1. 1" sl� 4" 30" 30" IS 610" -16101, a. 61 10.1 7 33" 30" S , a.. S . all B.. el i� 10" 10" 36" 37 -5 - 14" -, - 1" (;�), r-ouNpATION STEM WALL OVIEER 4' TALL 2X M TR. LEDGER 14"X56" STRONG BOLT - 16" OZ. - MIN 2" FROM EDGES 4' CONIC. SLA5 III/ W' GRANULAR FILL SUB-FLR j R-30 BATT INSUL. FLOOR JSTS W1 HANGERS 'r -LAN) (6121E PRI . I BARRIER LAP 12" SEAMS AND UP FDN. WAL.1- 12" REF 1111- - 2 DETAILS HOUSE FOUNDATION DETAIL AL 4" CONC. SLAR, 01, BAR U5E -4 REBAR 8 DECK GRADE IBEAM AND F05T DETAIL .ILL PER J.15" WL P BL=M - 24' e. I.d 0ILS SEE HK �� - j( IST PAR�1_5_ To w .5 Up - 5� .1 E JOIST 24' � - � 6VE I�IdT� to I �16T rlAml E SIDE " CLIP IL I -I T�' �W'�AL RE.AR 5F�m FsR TABLE C. r.v - Tl- A-L UOT. ­- - OVER .4' NOTES: RuVA 18. PIK, mT& mK 7 0106�� USE �� I mT5 I WLT ­12 �SILLM�M�"S`E PIK 1.� LAP sPLION m .120 q TABLE I-VNG 121 D�N T. "AL"'T 13ASEMENT FOUNDATION WALL DETAIL �. ft' - 1-.& CLR PILE CAP PE -'IN FILES PER PLAN DETAIL E.TE ..ND FILE A .11 WDEN BETWEEN ADJACENT PILES WHERE PILES OUT OF LINE (TYP) PERIMETER GRADE BE ' PL 1/2 x 6' DIA OR SO 12" #4 REBAR FOR UPUFT T-0 WHERE SHOWN 3/16 SHOP/FIELD CUT FROM PIPE WZEUD ON CAP 3" OR_4" PIPE PER PLAN _ SEE GEOTECH FOR PIPE SPEC E!IN FILE CAP DETAIL S71RRUPS PER DETAIL 'RrCORNER BARS I TO MATCH REINFORCEMENT k REINFORCEMENT PER� BEGIN nRST PE AT DETAIL W/ HOOK 0 END 1/2 REQUIRED SPACING CORNER REINIFORCEMENT �IUES TYR) TA15LE "A" N01MOTMIM WLTSPA�W. WAUEWI� �INGWIDTW I-rWIDEPT1.1 2 6. Is - Is. TAIBLE "5" M MB� 10' Oa " CRAM 4s TAIBLE "r-11 =TW=M`AT==Ls� ='LL 9:� ­-�- 1 1 .. I rn I . SPECIAL DESIGN REQUIRED WETS WL� 21a4l 0. V-1-0. WBAIR -4 - I.- Oc 4 Is - WETS Oz. W.W. ac WETS fw�_ 4' - TABLE 81M TABLE T 9 'A' F M-E 2 ST� OR TABLE TABLE 4� F � TWAN I ST� SEE TABLE T�E 'A' DESIGN CRITERIA 4s -AR - 1, -1 5ASEMENT FOUNDATION WALL TAIBLIES 3r I ORNER BARS FTO MATCH REINFORCEMENT STIRRUPS I PER DETAIL REINFORCEMENT PN M BEGIN FIRST TIE AT DETAIL /2 REQUIRED 1\1 1-71 'SPACING TEE REINFORCEMENT U) z 2 !2 :3 0 Q) 10 x Q) LU Q) Cn 2!9 C-) 6heet 5-2 of 3 EC 15 2019 RESUB DEC 15 2019 BUILDING DEPARTMENT CITYOFEDMONDS SET_XP EPDXY OR AT ADHESIVE MIN 4" EM5EDMENT - INSTALL PER MANUFACTURER'S INSTRUCTIONS - TYP NEW FOUNDATION REMAR MR PLAN is" MIN 4- 41 EXISTING FOUNDATION -------------- 7 TIE-N NEW FIND WITH 44, MIN 3 - -4 STU15 MAR SFOUNDATION TIE-IN TO Ex FNID. DETAIL CONCRETE Fc=2r200ps1 REINFORCING STEEL I'ScroOksl FRAMING 5ACA<FILL SAND OR GRAVEL A50VE t 1 t ANr-HCOR 5OLT ' , PER 5HR 8CH" 1011 o4. HOR. max or 'S a 15" o.c. J"xl TITEN 10 MIL VAf1OR 61011 O.C. staggered E3ARRIER jd) z C 5ars__[�- I uil hook a 4� .4 LONC 5.r5' wall f-05, C)F�1,41N REGI. La HOOK BARS 5ar pacing (o.c.) tI H t2 1-1 L2 L3, A 5 C all rB- 10" 20" ro" 3o" 05 e1211 05 812" 85 812" a.. 3011 05 cant i lever Feta in ine Wa I I T�iuesen Lot 2 2:1 5aak�&Iope ANCHOR IBOLTS PER PLAN WALL PER -4 -16" OC. �—OMILPLASTIC "ER SLA13 .4 . S., OZ. �4 - 1011 Or- 11 t 11 11L.6 PER Pi -AN f=[L-E SUFFORTED &LA5 CONTINUOUS SHEETING NAILED TO MUDSILL PER SHEAR WALL SCHEDULE SOLID BLOCKING - 24" O.C, e ) 16d NAILS =ACH SLOCK .2�M,N. L,N,.THr,,,I,, JOIST PARALLEL To WALL -A35 CLIP ON EACH SIDE OF IBLOCKING OR JOIST - 16" O.C. - - 2-12d TOENAILS - I JOIST TO HAVE RIM MATERIAL ON EACH SIDE FOR CLIP FINISH GRADE SLA5 - ENTRY -4 5ARS 0 IS" C.C. FROM SLAIB To WALL AND EUI. IN SLA5 DE51GN CRITERIA (5) SACK CONCRETE = r,' PSI 2500 GRADE SO RE5AR - fq PSI 60000 ftl EQ. FLUID PRESS - 40 L55, / 90. FT. SAND/GRAVEL 5ACKrILL 3: SEISMIC (aH) FILE SUPPORTED. Ix NOTE5.1 DO NOT 5ACrFILL UNTIL FLOOR SHSAT14ING IS NAILED. ANCHOR DOLTS, MIN. 1/211 DIA. x 10" UNO� MIN, I" EM5EpMENT USE 311 SQ. WASHERS 4 NUTS I 15OLT WITHIN 1211 Or ENDS MIN. 2 BOLTS PER PIECE or SILL I -LATE, M CE 19 24" LAP - IBAR SPLI_ (�)101 5aeemert Wall Igp. * L_ � JOWITO FOOT W. PRA IN IN OUTIFALI_ TO DAYLIGHT (f) z 0 U) 5; w ir FLOOR JOISTS SEE PLAN FOR SIZE AND SPACING 0) 01 5 0 (2) -4 OONT. 3"-&" FROM TOP OF WALL ANC44OR OLT SPACING In BOLTS HORIZONTAL S REIBAR SPACING - 10" OC. VERTICAL Rrz5AR S 6 12" O.C. 2" CONCRETE COVER 12, x Q) &- FOUNDATION WALL Q) WIDTH z CD r.>OWELS--4 RE15AR i . Is' O.C. W1 HOOK OVE;�AP VERTICAL REBAR 16" MIN, V�2" CONCRrzTE $LA5 I MIL. VISQU7EN 0) -4 REMAR HORIZONTAL (CONT.) Cn DEC 15 20fq RESUB DEC 15 2019 5heet 5-3 of 3 lrl� I"WATER METER IN CITY R.O.W. WITH METERATTACHED TO PROPERTY LINE CABLE / ELECT STORM SEWER MANHOLE DATUM PT RIM TOP: 95.5 9 00 F01111 PIPE USE, SIZE AND MATERIAL EDMONDS ZONING RS-12 WATER - 1 1/2"20OPSI POLY 25'MAX HEIGHT SEWER - 6" SEWER PIPE 35% MAX IMPERVIOUS STORM \ FOOTING DRAINS - 4" SCH 40 PVC LOT SIZE: 12,034 TIGHTLINES IMPERVIOUS: HOUSE - 2,998 (24.9%) IF RIM TO INVERT V­NrA�T�Wj W.P. DECK - 225 (1.9%) DRIVE - 1160 (9.6%) FILTRATION SOCK ON CB ON LOT 3 C. 102' 94.19' INV 92.75' - --------- --_--_----- RIM 95.25' SILT FENCE N90'E Y STORM WATER 20'-6" SW STUB S=2.00% INV=101.5 EXCEEDS 5', TYPE H WALK - 245 (2.0%) - MINIMUM TOF HORIZONTAL TOTAL - 4,628 (38.5%) SEPARATION BETWEEN WATER 1VLft1NnVEE W JJJ, Dr, REQUIRED. 24''UTILITY EASEMENT THROUGH LOT 3 TO PROPERTY LINE OF LOT 2 11/2" WATER SUPPLY LINE TO HOUSE TO BE 200 PSI POLY WITH TRACERWIRE 9 \ 9w 6' SSH #2 SEWER MANHOLE ON 8th AVE SERVICE AND DRY UTILITIES. - MIN IO'H. SEP. BETWEEN WATER AND SEWER - MIN TH. SEP. BETWEEN .4v WATER AND STORM R 6" CLEANOUT W/I TOF HOUSE 6" CLEANOUT BETWEEN BENDS .4 SIDE SEWER 20'-6"SS STUB S=2.00% FILTRATION SOCK ON INV=98.76 0' 4Y /I C" 4:1 / SS MET 1015 PATIO (4 SD EX CB C 22'-0" TOP 101.9' UTILITY PEDESTAL INV 98.00 CB#3 14.30' fTYPE ll+ PROPOSED -2 TLT W_ _N89 51'53" E- 66 GARAGE A-1 I -5p,, ..... . �'�GAS�t� s 16'PRIVATE INGRESS, EGRESS & Cil�C AL — UTILITY EASEMENT THROUGH C. CURB,, q 60 108' LOT 3 PER SHORT PLAT LOT3STORM STORM WATER DETENTION WAIVER BY DON FIFNE 07117/2007 Refer to 05-05-2009 discharge directly into regional detention facility just West of site which discharges directly into Puget Sound. .............. 100, 102' 104' 106' S89'51'53"W 110' 112' 100'DRIVEWAY 30'DRIVEWAY 25'DRIVEWAY SEWER (10'FROM W) GRADES 96-106 GRADES 106-108 GRADES 108-108 6" CLEANOUT AT P/L 11% SLOPE 7% SLOPE 2% SLOPE W/ 12"CAST IRON LAMPHOLE PROPOSED STRUCTURE 114' 116' COVER WITH 1/2" HEXBOLTS * STORM WATER TIGHT LINE AND FOOTING INV 98.00 (102'FROM HOUSE IS 3.4% SLOPE) DRAINS DIRECTED TO STORM WATER STUB FOR LOT 3 INSTEAD OF ACROSS LOT 2. MINIMUM OF TOF COVER IS REQUIRED FOR ALL PIPES LOCATED UNDER DRIVEABLE SURFACES AND l'OF COVER UNDER LANDSCAPE AREAS. Lr) 104' 106' 108' 110, ;7' CB#4 -INV 100.0 0 0 0� QJ C'I 00 - C:' ,RIM 103.0' 9 ' -7 0\ c:- 112' Le) 04 a, 0 Y IlT 114' CB #3 rn INV 109.0' RIM 106.0' C C� B #2 1116' 16' INV 117.0' P RIM 118.5' in C'4 CB #1 INV 115.0' RIM 116.5' FINAL RESTORATION SHALL BE COMPLETED BY THE CONTRACTOR, NOT THE CITY OF E SCALE LEGAL DESCRIPTION V = 15ft Section 24 Township 27 Range OWNER 03 Quarter NW - LOT 3 OF Thuesen CITY OF EDM SP NO S-07-76 Custom Homes REC AFN 201111145006 BEING 514 8th Ave N A PTN SEI/4 NWI/4 Edmonds, WA PROPERTYID 425-772-9401 27032400225300 Eric Thuesen EDMONDS ZONING RS-12 EDMONDS ZONING RS-12 LOT STZF 12,034 S.F. IMPERVIOUS HOUSE - 2,998 (24.9%) W.P. DECK - 225 (1.9%) DRIVE - 1,337 (11.1%) WALK - 310 (2.6%) TOTAL - 4,870 (40.5%) (3) t10 Cd co (3) L 71 V) '!� (D 0 0 �D U Z �D 00 11-26-2016 UTILITY AND FINAL GRADING 0 INSTALL AND MAINTAIN ALL TESC MEASURES ACCORDING TO APPROVED PLANS, CITY OF EDMONDS STANDARD DETAILS, AND ALL OTHER MEASURES THAT MAY BE REQUIRED DURING CONSTRUCTION N 00 EDMONDS ZONING RS-12 FILTER FENCE BETWEEN LOTS 2 AND 3 TO BE INSTALLED AFTER 25'MAX HEIGHT FINAL GRADING AND STORM 35% MAX IMPERVIOUS DRAINAGE IS COMPLETE SEE EDMONDS DETAIL Ell El LOT SIZE: 12,034 ----------- IMPERVIOUS: 0' HOUSE - 2,998 (24.9%) W.P. DECK - 225 (1.9%) FILTRATION SOCK ON DRIVE - 1160 (9.6%) CB ON LOT 3 WALK - 245 (2.0%) INV 92.75' TOTAL - 4,628 (38.5%) RIM 95.25' FILTRATION SOCKS ON ANY DOWNSTREAM CATCH BASINS. SEE EDMONDS DETAIL E13 4 COVER SOIL STOCK PILE WITHIN 24 HOURS 24'UTILITY EASEMENT �PATIO .D 4.... . I 4 THROUGH LOT 3 TO SOIL 4 11 4 PROPERTY LINE OF LOT 2 STOCK CRUSHED ROCK SD EX CB #2 PILE CONSTRUCTION ENTRANCE TOP 101.9' SEE EDMONDS DETAIL E1.2 INV 98.00----__ PROPOSED GARAGE SS MANHOLE #2 DATUM PT RIM TOP 95.5 ON 8th Ave 94.0 TW 94.0 EG+/- �1�16'PRIVATE INGRESS & EGRESS EASEMENT THROUGH LOT 3 PER SHORT PLAT EXTENDED INTO LOT 2 1 100.0 TW 96.0 TW 97.0 EG 94.0 EG +/- BEGIN WEST WALL 98.0 TW MuSlING 94.7 EG RETAINING WALL _2 ---�2 C -2-OR E0PV- Nn -�FACE. 0;;T. T CO- ---R- C= OF EDMONDS LITER FABRIC FENCE FILTRATION SYSTEMS D�GMW�UMONPWOD. - wo.�-. CITY OF EDMONDS STABILIZEDCONSTBUCTIONENTRANCE 14.30' --�N89 51'53" E 4 \4 d ----- 44-1� --- ------ 4 4 C) 0 110.00, S89* 51'53"W 102.0 TW 107.5+/- TW I 101.0 EG+/- 105.0 EG 1130-1 w EG BEGIN EAST WALL 108.0 FG 107.0 +/- FG 115.0 TW E& 105.0 EG 109.0 FG END WEST WALL ATT �TQ�MDV� SOILS TO BE COMPOST AMENDED PER BMP T5.13 MMAPPU=0N ��AT�L�M G ��U�ONI OD. --ONA --.oL CITY OF EDMONDS TaipaFARYsEmma TRAP FOR CATCH BASINS E1.3 A PROPOSED STRUCTURE EG: 121 lz I.0 I W hki+/- FG: 114 112.0 FG TW:120 121.0 EG+/- 112.0 FG 122.0 EG +/- EXIS NG 112.0 FG RETAINING WALL N90'E� 7- --------------------- / ------------------- B ",B A o EXISTING GRADE CALCS - HOUSE EG:130 A: 97.2 FG: 119 B: 118.75 TW:125 C: 11'7.5 D- 98.25 431.7 / 4 = 107.93 = AVG GRADE 132.93 MAX RIDGE PROPOSED RIDGE AT 130-75 SLAB AT 103 27.75 RIDGE ABOVE SLAB SCALE LEGAL DESCRIPTION 1" = 15ft Section 24 Township 27 Range OWNER 03 Quarter NW - LOT 3 OF Thuesen CITY OF EDM SP NO S-07-76 Custom Homes REC AFN 201111145006 BEING 514 8th Ave N A PTN SE1/4 NW1/4 Edmonds, WA PROPERTY TD 425-772-9401 27032400225300 Eric Thuesen EDMONDS ZONING RS-12 P 00 C? Ln M 0 '0 Cyl 0 0 Cn Cid Cz 7j F-1 A) C) 0 ;z) z U Z �14 4-J �D 00 Z -'t 1-4 r---1 Lr) 11-26-2016 REVISED 02-28-2020 SITE / PLOT TESC, EXIST. GRADES V WATER METER IN CITY R.O.W. WITH METER ATTACHED TO PROPERTY LINE CABLE / DATA ELECTRICAL STORM SEWER MANHOLE DATUM PT RIM TOP: 95.5 PIPE USE, SIZE AND MATERIAL EDMONDS ZONING RS-12 FILTRATION SOCK ON WATER - 11/2" 20OPSI POLY 25'MAX HEIGHT CB ON LOT 3 SEWER - 6" SEWER PIPE 35% MAX IMPERVIOUS INV 92.75' STORM \ RIM 95.25' FOOTING DRAINS - 4" SCH 40 PVC LOT SIZE: 12,034 b CD / -- - - - - - - - - - - SILT FENCE STORM WATER TIGHTLINES O.N. IMPERVIOUS: 20-6" SW STUB HOUSE - 2,998 (24.9%) S--2.00% IF RIM TO INVERT W.P. DECK - 225 (1.9%) INV=101.5 ELEVATION DRIVE - 1160 (9.6%) EXCEEDS 5', TYPE II WALK - 245 (2.0%) - MINIMUM TOF HORIZONTAL di - TOTAL SEPARATION BETWEEN WATER MANHOLE WILL BE - 4,628 (38.506) / SERVICE AND DRY UTILITIES REQUIRED. - MIN 10'H. SEP. BETWEEN WATER AND SEWER MIN TH. SEP. BETWEEN WATER AND STORM 24'UTILITY EASEMENT 6" CLEANOUT W/I Z THROUGH LOT 3 TO TOF HOUSE W PROPERTY LINE OF LOT 2 6"CLEANOUT BETWEEN BENDS SIDE SEWER SS INLET 00 11/2" WATER SUPPLY 20' -6"SS STUB S=2.00% 101.5' PATIO LINE TO HOUSE TO BE FILTRATION SOCK ON 1 4 x 200 PSI POLY WITH TRACER WIRE SD EX CB #2 \ INV=98.76 "'\ 0;-'��' 1.. 22'-0"- TOP 101.9' UTILITY PEDESTAL INV 98.00 4/1 'tv I CB#3 --9.4' 14.30' If 11, 11 1 �) . fTYPE ll+ PROP, OSED —N89 51'53" E- 4 GARAGE 66 -2 TLT STB . . . .......... /16'PRIVATE INGRESS, EGRESS & UTILITY EASEMENT THROUGH LOT 3 PER SHORT PLAT cn C I .* . ZI LOT STORM* ' � 108' �4 _z// . I .............. ....................... Y, ............... ............... 1001. 162' 104' 106' S89'51'53"W 110' 112' 96' 100'DRIVEWAY 30'DRIVEWAY 25'DRIVEWAY SSH #2 SEWER (10'FROM W) GRADES 96-106 GRADES 106-108 GRADES 108-108 SEWER 6" CLEANOUT AT P/L 11% SLOPE 7% SLOPE 2% SLOPE MANHOLE W/ 12" CAST IRON LAMPHOLE ON 8th Al 1. 102' PROPOSED STRUCTURE 114' 116' COVER WITH 1/2 HEXBOLTS . STORM WATER TIGHT LINE AND FOOTING INV 98.00 (102'FROM HOUSE IS 3.4% SLOPE) DRAINS DIRECTED TO STORM WATER STUB STORM WATER DETENTION WAIVER FOR LOT 3 INSTEAD OF ACROSS LOT 2. BY DON FIENE 07/17/2007 Refer to 05-05-2009 discharge directly into regional detention facility just West of site MINIMUM OF TOF COVER IS REQUIRED FOR ALL PIPES LOCATED UNDER which discharges directly into Puget Sound. DRIVEABLE SURFACES AND POF COVER UNDER LANDSCAPE AREAS. 104' 106' 108' 110, 94.19 — — — __: -- - — — 7— N90*E CB #4 Q) C-4 1 0.0 00 �INV 0 Ch CD 01 . . .. . ............ -,RIM 103.0' t� S N`� � -7 .......... ..... . . . .... . 112' Ln 0 W Y 114' CB #3 INV 109.0' RIM 106.0' CB #2 116' INV 117.0' RIM 1185 CB #1 INV 115.0' RIM 1165 bio in 86 Cd FINAL RESTORATION SHALL BE COMPLETED BY THE CONTRACTOR, NOT THE CITY OF EDMONDS. SCALE LEGAL DESCRIPTION V = 15ft Section 24 Township 27 Range OAVNER 03 Quarter NW - LOT 3 OF Thuesen CITY OF EDM SP NO S-07-76 Custom Homes REC AFN 201111145006 BEING 514 8th Ave N A PTN SE1/4 NWI/4 Edmonds, WA PROPERTYTD 425-772-9401 27032400225300 Eric Thuesen EDMONDS ZONING RS-12 EDMOND RS-12 LOT SIZE 12,034 S.F. HOUSE - 2,998 (24.9%) W.P. DECK - 225 (1.9%) DRIVE - 1,337 (11.1%) WALK - 310 (2.6%) TOTAL - 4,870 (40.5%) Cn --!� C) 0 �D CU PT4 4- �D 00 Ln 11-26-2016 REVISED 02-28-2020 DRAINAGE UTILITY AND FINAL GRADING INSTALL AND MAINTAIN ALL TESC MEASURES ACCORDING TO APPROVED PLANS, CITY OF EDMONDS STANDARD DETAILS, AND ALL OTHER MEASURES THAT MAY BE REQUIRED DURING CONSTRUCTION N Q z 00 EDMONDS ZONING RS-12 FILTER FENCE BETWEEN LOTS 2 AND 3 TO BE INSTALLED AFTER 25'MAX HEIGHT FINAL GRADING AND STORM 35% MAX IMPERVIOUS DRAINAGE IS COMPLETE. SEE EDMONDS DETAIL E1.1 0 LOT SIZE: 12,034 IMPERVIOUS: ----------- 0' HOUSE - 2,998 (24.9%) W.P. DECK - 225 (1.9%) FILTRATION SOCK ON DRIVE - 1160 (9.6%) CB ON LOT 3 WALK - 245 (2.0%) INV 92.75' 4v TOTAL - 4,628 (38.5%) RIM 95.25' FILTRATION SOCKS ON ANY DOWNSTREAM CATCH BASINS. SEE EDMONDS DETAIL EI.3 4 COVER SOIL STOCK PILE WITHIN 24 HOURS 24'UTILITY EASEMENT PATIO ..4 THROUGHLOT3TO SOIL FILTRATION SOCK ON PROPERTY LINE OF LOT 2 STOCK CRUSHED ROCK SD EX CB #2 CONSTRUCTION ENTRANCE TOP 101.9' 1 PILE, PROPOSED SEE EDMONDS DETAIL E1.2 INV 98.00---____ GARAGE 14.30' 0 SS MANHOLE #2 DATUM PT RIM TOP 95.5 ON 8th Ave 94.0 TW 94.0 EG+/- D--- -- --------------------- -------------- "��16'PRIVATE INGRESS & EGRESS 4 EASEMENT THROUGH LOT 3 PER CD ... I 16 EO 11 � ".1. SHORT PLAT EXTENDED INTO LOT 2 CD z 4 \/C 1 100.0 TW 96.0 TW 97.0 EG +/- 94.0 EG BEGIN WEST WALL 98.0 TW E)CISrING 94.7 EG RETAINING WALL -IJ =E-R­w�o-m= CITY OF EDMONDS a-LTER FABRIC FENCE FILTRATION SYSTEMS D�G-COM.U---. CITY OF EDMONDS i 7,,�MrZEDCONSTRUCTIONENTRANCr 1 __SrABIZED �CONSTRUCTION I A PROPOSED STRUCTURE I INS` I M "d I I S89- 51'53"W �,5 EG: 1 121 102-� Lu/.:)+/- TW 1 121.0 EG+/- 10,.0 G+/- 105.0 EG 113+/- TW EG 112.0 FG FG: 114 BEGIN EAST WALL 108.0 FG TW:120 121.0 EG+/- 107.0 +/- FG 115.0 TW EG+/- 112.0 FG 105.0 EG 109.0 FG 122.0 EG +/- END WEST WALL ALL DISTURBED EXISTING 112.0 FG SOILS TO RETAINING BE COMPOST WALL AMENDED PER BMP T5.13 ��ATAUM D NG RW�R- MMWA�LMUO-�. CITY OF EDMONDS WIMENT TRAP FOR CATCH SCALE 1" = 15ft - - -.-- -­ - . .. - - . - 0 N90-E 0 0 00 C;% a. -------------------- --------------------- - C11 K, Ln u-, ON Cn B 0 EXISTING GE A DE, C A I.CS - HOT JSE EG:130 A: 97.2 FG: 119 B: 118.75 TW:125 C: 117.5 D, 98.25 431.7 / 4 = 107.93 = AVG GRADE 132.03 MAX RIDGE PROPOSED RIDGE AT 130-75 SLAB AT 103 27.75 RIDGE ABOVE SLAB Thuesen Custom Homes 514 8th Ave N Edmonds, WA 425-772-9401 Eric Thuesen LEGAL DESCRIPTION Section 24 Township 27 Range 03 Quarter NW - LOT 3 OF CITY OF EDM SP NO S-07-76 REC AFN 201111145006 BEING A PTN SE1/4 NW1/4 RS-12 bz t4 C) 0 0 0 4--J 00 Ln 11-26-2016 REVISED 02-28-2020 SITE / PLOT TESC, EXIST. GRADES 1 " WATER METER IN CITY R.O.W. WITH METER ATTACHED TO PROPERTY LINE CABLE / STORM SEWER MANHOLE DATUM PT RIM TOP: 95.5 PTPR USK ';TZF AND MATERIAL EDMONDS ZONING RS-12 WATER - 11/2" 20OPSI POLY 25'MAX HEIGHT SEWER - 6" SEWER PIPE 35% MAX IMPERVIOUS STORM \ FOOTING DRAINS - 4" SCH 40 PVC LOT SIZE: 12,034 TIGHTLINES IMPERVIOUS: N HOUSE - 2,998 (24.9%) W.P. DECK - 225 (1.9%) IF RIM TO INVERT ELEVATION DRIVE - 1160 (9.6%) FILTRATION SOCK ON CB ON LOT 3 INV 92.75' RIM 95.25' STORM WATER 20'-6" SW STUB S=2.00% INV=101.5 WALK - 245 (2.0%) - MINIMUM TOF HORIZONTAI EXCEEDS 5', TYPE II TOTAL - 4,628 (38.5%) SEPARATION BETWEEN WATEE MANHOLE WILL BE SERVICE AND DRY UTILITIES. REQUIRED. - MIN 10'H. SEP. BETWEEN WATER AND SEWER MIN 5'H. SEP. BETWEEN WATER AND STORM N" 24'UTILITY EASEMENT 6" CLEANOUT W/I Z THROUGHLOT3TO TOF HOUSE a) PROPERTY LINE OF LOT 2 > 6" CLEANOUT BETWEEN BENDS SIDE SEWER 4-J 00 11/2" WATER SUPPLY 20'-6"SS STUB LINE TO HOUSE TO BE FILTRATION SOCK ON FILTRATIO, S=2.00% INV=98 76 102' SILT FENCE 0 A�. C, SS INLET ;.�/ \ 101.5' X, 4 PATIO 20OPMPOLY W11H SD EX CB #2 22'-0" TRACER WIRE TOP 101.91 UTILITY PEDESTAL PP INV 98.00-1,,,, ":'�B#3 01+ PROPOS [TYPE ll+ GARAGE '53" E- -2 31T _N8951 &'E 66 GAS /16'PRIVATE INGRESS, EGRESS & UTILITY EASEMENT THROUGH LOT 3 PER SHORT PLAT LOT 3 10 1 8' 60 STORAP 96' SSH *2 SEWER MANHOLE ON 8th AVE STORM WATER DETENTION WADM BY DON FIFNE 07/1712007 Refer to 05-05-2009 discharge directly into regional detention facility just West of site which discharges directly into Puget Sound. PROPOSED STRUCTURE 100, 162' 104' 106' S89*51'53"W 110' 112' 114' 116' C11 100'DRIVEWAY 30'DRIVEWAY 25'DRIVEWAY SEWER (10'FROM W) GRADES 96-106 GRADES 106-108 GRADES 108-108 6" CLEANOUT AT P/L 11% SLOPE 7% SLOPE 2% SLOPE W/ 12" CAST IRON LAMPHOLE I COVER WITH 1/2' HEXBOLTS INV 98.00 (102'FROM HOUSE IS 3.4% SLOPE) STORM WATER TIGHT LINE AND FOOTING DRAINS DIRECTED TO STORM WATER STUB FOR LOT 3 INSTEAD OF ACROSS LOT 2. MINIMUM OF TOF COVER IS REQUIRED FOR ALL PIPES LOCATED UNDER DRIVEABLE SURFACES AND POF COVER U14DER LANDSCAPE AREAS. 104' 106' 108' 110, CB *4 7//' ��INV 100.0', RIM 103.0' . ......... - 17 112� 114' 114' CB #3 /-7 INV 109.0' RIM 106.0' CB *2 16- 1116' INV 117.0' RIM 118.5' CB #1 INV 115.0' RIM 1165' / is � 4ev FINAL RESTORATION SHALL BE COMPLETED BY THE CONTRACTOR, NOT THE CITY OF EDMONDS.1 SCALE LEGAL DESCRIPTION 1" = 15ft Section 24 Township 27 Range OWNER 03 Quarter NW - LOT 3 OF Thuesen CITY OF EDM SP NO S-07-76 Custom Homes REC AFN 201111145006 BEING 514 8th Ave N A PTN SEI/4 NW1/4 Edmonds, WA PROPERTYID 425-772-9401 27032400225300 Eric Thuesen EDMONDS ZONING RS-12 12,034 S.F. HOUSE - 2,998 (24.9%) W.P. DECK - 225 (1.9%) DRIVE - 1,337 (11. 1%) WALK - 310 (2.6%) TOTAL - 4,870 (40.5%) 0 C, 0 1 NON Ln cn rA E-1 0 �D Z C/) P4 �D 00 Lr) 11-26-2016 1 UTILITY AND FINAL GRADING INSTALL AND MAINTAIN ALL TESC MEASURES ACCORDING TO APPROVED PLANS, CITY OF EDMONDS STANDARD DETAILS, AND ALL OTHER MEASURES THAT MAY BE REQUIRED DURING CONSTRUCTION N 00 CRUSHED ROCK CONSTRUCTION ENTRANCE SEE EDMONDS DETAIL E1.2 SS MANHOLE #2 DATUM PT RIM TOP 95.5 ON 8th Ave 94.0 TW 94.0 EG+/- EDMONDS ZONING RS-12 FILTER FENCE BETWEEN LOTS 2 AND 3 TO BE INSTALLED AFTER 25'MAX HEIGHT FINAL GRADING AND STORM 35% MAX IMPERVIOUS DRAINAGE IS COMPLETE SEE EDMONDS DETAIL Ell M LOT SIZE: 12,034 IMPERVIOUS: ----------- 0, HOUSE - 2,998 (24.9%) W.P. DECK - 225 (1.9%) FILTRATION SOCK ON DRIVE - 1160 (9.6%) CB ON LOT 3 WALK - 245 (100/6) INV 92.75' TOTAL - 4,628 (38.5%) RIM 95.25' 5�1 FILTRATION SOCKS ON ANY DOWNSTREAM CATCH BASINS. SEE EDMONDS DETAIL E13 4 COVER SOIL STOCK io PILE WITHIN 24 HOURS 4 24'UTILITY EASEMENT �PATIO THROUGH LOT 3 TO SOIL '4 FILTRATION SOCK ON PROPERTY LINE OF LOT 2 STOCK SD EX CB #2 TOP 101.91 1 PILE.. INV 98.00 PROPOSED GARAGE �16PRIVATE INGRESS & EGRESS EASEMENT THROUGH LOT 3 PER SHORT PLAT EXTENDED INTO LOT 2 1 100.0 96.0 TW 97.0 EG 94.0 EG BEGIN WEST WALL 98.0 TW EXISTING 94.7 EG RETAINING WALL U EqUAL ­-. - 7-i-T C k TO-, \rxr- C= OF EDMONDS Z �LTER FABRIC FENCE FILTRATION SYMMS I I 2-q�A CITY OF EDMONDS �IT"ILIZED CONSTRUCTION ENTRANCE 14.30' 4 \4 ---___�89 51'53" E Ll-------- -1 ----------- 4 �0 \0 = I . 4 CD CD z 102.0 TW 107.5+/- TW 101.0 EG+/- 105.0 EG BEGIN EAST WALL 107.0 +/- FG 105.0 EG END WEST WALL ALL DISTURBED SOILS TO BE COMPOST AMENDED PER BMP T5.13 94.19' A PROPOSED STRUCTURE EG.130 FG: 119 S89' 1'53"W 1 121.0 TW EG+/- EG: 121 113+/- TW EG 112.0 FG FG: 114 108.0 FG TWA20 121.0 EG+/- 115.0 TW EG+/- 112.0 FG 109.0 FG 122.0 EG +/- EXISTING 112.0 FG RETAINING WALL SW��L-MMONA .G-- -MA-- C-ONREQ--� CrIy F EDMONDS STAMMM DETAIL =E�TEMFORARY SEDIMENT TRAP FOR CATCH BASINS T-z-� 1 E1.3 SCALE V = 15ft Thuesen Custom Homes 514 8th Ave N Edmonds, WA 425-772-9401 Eric Thuesen �p . cz. 1�� EXIS MNG GRADE CALCS - HOUSE A: 97.2 B: 118.75 C: 117.5 D- 9815 431.7 / 4 = 107.93 = AVG GRADE 132.93 MAX RIDGE PROPOSED RIDGE AT 130-75 SLAB AT 103 27.75 RIDGE ABOVE SLAB LEGAL DESCRIPTION Section 24 Township 27 Range 03 Quarter NW - LOT 3 OF CITY OF EDM SP NO S-07-76 REC AFN 201111145006 BEING A PTN SE 1/4 NW 1/4 27032400225300 RS-12 5 " 0 00 C? Ln lu �SL4 04 Cn 1"' 0 (U W 86 r-) = Cd Cd 4� ,(z3j C) 7j 0 0 0 U Z 4-J �D 00 Lr) 11-26-2016 REVISED 02-28-2020 SITE / PLOT TESC, EXIST. GRADES July 25. 2019 PLAN REVISIONS CHANGES BLD2017-0545 City of Edmonds Building Department 1215 5tht Ave. N. Edmonds WA. 98020 Re; Pen -nit BLD 2017- 0545 Please find following submitted revisions L Planning: 1) Sheet 1, 3, 4, 5, and 6 Two car attached garage was changed a two car garage detached garage. 2) Added living space above garage 3) Garage is less than 10 ft from House. 4). Sheet 3 Bedroom three, bedroom two, laundry room and bathroom revision 5) Sheet Site Plan lot coverage and maximum allowable height recalculated 6) Sheet 4 Addition single car garage for ADU II. Engineering: 1) Sheet Site Plan and 2. Addition of single car garage with driveway. Slope not to exceed 14% 2) Impermeable recalculated. 111. Building: 1) Sheet 2, 3, 5, 6, 7, 8 Redesign ADU floor plan. 2) Sheet 3, 5, 6, 7, 8 Addition single car garage 3) Sheet 3, 4, 5, 6 Redesign attached 2 car garage to detached garage 4) Sheet 9 Add living space above garage 5). Sheet 3, 4, 5, 6 Main floor bedroom 2, 3, common bath and laundry room revision 6). Please see attached north retaining wall revision, which has been built and inspected ericthuesen(a)frontier.com cell 415-772-9401 Eric Thuesen Custom Homes L.L.C. Eric Thuesen 1" WATER METER IN CITY R.O.W. WITH METER ATTACHED TO PROPERTY LINE CABLE/DATA ELECTRICAL STORM SEWER MANHOLE DATUM PT RIM TOP: 95.5 PIPE USE SIZE AND MATERIAL WATER - 11/2" 20OPSI POLY SEWER - 6" SEWER PIPE STORM \ FOOTING DRAINS - 4" SCH 40 PVC TIGHTLINES / N IF RIM TO INVERT ELEVATION EXCEEDS 5', TYPE II MANHOLE WILL BE IREQUIRED. EDMONDS ZONING RS-12 25'MAX HEIGHT 35% MAX IMPERVIOUS LOT SIZE: 12,034 FILTRATION SOCK ON CB ON LOT 3 102' 94.19' 104' 106' 108' 110, INV 92.75' -�ii:T - RIM 95.25' D iE 7�Z-j CB *4 0— -A- —Y INV 100.0' STORM WATER ,!RIM 103.0' 20-6" SW STUB 7 112' S-2.00% INV=101-5 - MINIMUM TOF HORIZONTAL SEPARATION BETWEEN WATER SERVICE AND DRYUTILITIES. - MIN 10'H. SEP. BETWEEN WATER AND SEWER - MIN 5'H. SEP. BETWEEN WATER AND STORM 4 24'UTILITY EASEMENT 6" CLEANOUT W/I THROUGH LOT 3 TO TOF HOUSE PROPERTY LINE OF LOT 2 . ...... . 6" CLEANOUT BETWEEN BENDS SIDE SEWER ssrNLE 4� 1015 PATIO\ 00 1 1/2" WATER SUPPLY 20'-6"SS STUB S=2.00% LINE TO HOUSE TO BE FILTRATION SOCK ON UT W/I N/DS/ 200 PSI POLY WITH INV=98.76 D SD EX CB #2 UTILITY PEDESTAL TRACER WIRE PARKING PAD �V 98-100!' CB#3 Y EH 94' 14.30' TYPE 11+ AT 1075 Y/ —N89 51'53" E- w 6 -2.31T 4% SLOPE -- ------- -- W- 6 -------- --------- -- , zIV L4 STB C� 6'PRIVATE INGRESS, EGRESS & EL ICAU. UTILITY EASEMENT THROUGH b CD CURB '� - , . I --- .. q EO 1 10.8' -k LOT 3 PER SHORT PLAT LOT 3 STOR:M:�� J 114 ! F-7 C 1 60'-119/16" Z 11 . I \�-- 351�-o I R" ' � , > n " 1, '�' -- .--, - i U.00'. 96' 98, N SSH ;2 SEWER MANHOLE ON 8th AVE Refer to 05-05-2009 discharge directly into regional detention facility just West of site which discharges directly into Puget Sound. IMPERVIOUS: HOUSE - 2,265 (18.8%) W.P. DECK - 225 (1.9%) GARAGE - 552 (4.6%) DRIVE - 1198.(9.60/o) WALK - 245 (2.0%) TOTAL - 4,485 (37.3%) 100, 102' 104' 106' 100'DRIVEWAY SEWER (10'FROM W) GRADES 96-106 6" CLEANOUT AT P/L 11% SLOPE W/ 12" CAST IRON LAMPHOLE COVER WITH 1/2" HEXBOLTS INV 98.00 (102' FROM HOUSE IS 3.4% SLOPE) r S89'51'53"W lin, 11-v 30'DRIVEWAY GRADES 106-108 7% SLOPE 25'DRIVEWAY GRADES 108-108 2% SLOPE 114' 116' STORM WATER TIGHT LINE AND FOOTING DRAINS DIRECTED TO STORM WATER STUB FOR LOT 3 INSTEAD OF ACROSS LOT 2. MINIMUM OF TOF COVER IS REQUIRED FOR ALL PIPES LOCATED UNDER DRIVEABLE SURFACES AND l'OF COVER UNDER LANDSCAPE AREAS. FINAL RESTORATION SHALL BE CO tn I#% Clem C JUL 2 9 M9 Y 114' CB #3 INV 109.0' RIM 106.0' e, PROPOSED CB #2 STRUCTURE B INV 108.5' RIM I 11.0' y- CB #1 INV 110.01 RIM 112.5' Comer LC k-1 �uired� Actua, int Sides Reu Other B2A !�'pg Duroal.Nmf 0F=C-DM A: 102.18 B: 112.98 C: 111.23 430.28 / 4 = 107.57 = AVG GRADE 132.57 MAX RIDGE PROPOSED RIDGE AT 1 .11 A SLAB AT 103 28.45 RIDGE ABOVE SLAB NOT THE CITY OF ED SCALE 1 20FT 01N C114 00 01\ U0 C) U -cn (U CU 4-1 Lr) 01� p cle) M I Z r-4 r--q Lr) Lr) C14 TT- --- -- -- -- - - -- � ---1—T I CRAWL SPACE HIGH EFFICIENCY HVAC EQUIPNE- jN11 07.4 AFU:.r,.I%..1 IALL,BFUO -NU�7ED, ON'�N [THIN 12 - OF (TILING AN SIPER" `NENT P-"" FICIEN I WAI ER [ILA [ ING S. 2 STRAPS AT UPPER AND All �h —Ih-d..dki1�h..,i.kf-- LOWER. THIRD, WITH 4- h— �h.11 175 GPNI CLEAUI.ANCEOFCONTROLS IGNI IONSO-CETOBE N N 1 18- OFF FLOOR EFF"IEN'T NVATER H E,—NG5bi IV— h-11 I,— h.11 —I.d. d,. 7 G.,p. 304 R-7 A NTI RIORSTAIRWAYSSHALLHAVE AIDIFICIALLIGHTSOUlo�EN01 LES -E THAN I FOOT-CkNDLE T CENTE A OF TREADS AND LAND'AT HE R cG, m rN w.u.i. S'o ITCHAT EACH FLOOR LE1 El- BONUSROOM BDR4 P 17 R114 ID114 9.-� 11 -- - ------------------- - - T--- 1--(F ��5--I- "to IEH5 — EGRES WINDOW ­2W It U, ��2- 3-8- DF 0 2 IIHIDF�2 1115(E.4 v v ID5S, 5 1 So CFX`I N70 It C- v o.-A 1". 5'., It �06R IE, I C.) -- - — — — — F— ADUAVAU��U-. I EUECTFUCIL PANEL ONIFINNVALL 7 GUEST ROOM Pi n ADO." EF-WALLHEAlE /THER.OSTAT L — — — 96 1 ��, �46o(ISH 3.0 CAN'l [LEV. ABOVE 6� -.1EX 2020EN 2.0EX 2mDFX �,-Sl 2 -o- 2'-D' 2--t)- T-S- T-S-1 2--o- 1 2- 1 4R-f)- -- - - - - - - - - - - - - - - - - - - - - J-1 - - - - - - - - - - - - - - - - - - - - � I 1.� I F 1 2 GLR � 112., IN U� GEN LOWER FLOOR SCALE 1/4' - 1FT 1,115(E.3.3(l) ADU NUXI BM OF BEDROO IS FLOORARE 0-1 2-� 45 157 7 G'.- f-) A"fl.' i. C "I I'soo - M 45 6o 75 11 !I So 45 6S 75 9D I., 7 go I 4 501-6,0" 75 1 35 'o - 12D U15 15o -7.500 to 120 135 1 % 165 TABLEN1150733(2) RUNTI IE % OF 4 HOUR SEG-�7 25 " 75 FACTOR �52o :SS 4 IS 1. 3 LO �E DESCRIPTION All TANOARD (SQ M 3 1 3 4660SH —H SINGLE HUNG SINGLEHLING 27.0 6.0 2L-- �S 3 2 04ORS � 2020FX RIGHT SLIDING —S--- FIXED GLASS 2- B.0 4.0 1 2 2 2 — 2.... RIGHT GLIDING SINGLE HUNG S.S 15.0 3 2 3-.. SINGLE HUNG 21.0 2 2 - u 4— GARDEhl SINGLE HUNG HIS I 27A 2 1 1 2 4066SH— I -SR. -MGLE HUNG RIG-HT-S-LID-ING - - - - -- - 24A F225 2 R. R-H`T 'SUDING 12 �1512�IFX ST. I TRI—LIDING R IGHT SLIDING::�S 1-0 TOTALS I I I IXED GLASS ..0 cmcopy REVISiGM JUL 2 9 200 �;UIUDNG DEPARMEW a'r'(0FEDMCM)6 Ei cu cu CU E- PQ4) ,A: 9P34 F4 0 F. Ln i 4� 00 Lr) REVISED 06-23-2019 3 ") g '-- K"Nom JF C= cx> 9 0 - -- 50, v- 8' 9 la'� 6' LfiL — ­r F I' V 7- 2- 6- -- T� T-6- s--a-- 3' 6---- 3,-6, 5MB UNA SME' -0 390511 660S] 11611111 I' f - - L� --- - -- I I I I I � _: : : - :: --- I - 11 � Z ()CI.EAIANCEGA r:�R �J�p . 'NS'111.1. F@1 N6. 0 0 rl 1 2': 4 -9' G' T-6" 2: 266� 1. F 4'-D' X 5�4' 4'-Io In. T-4" J—) --T Z I PM xff� SP— Flb i 6 6 E1. :IREPLACL UMAIJ. "ILORHALFWALL 1-4 0 3-6— T-4- -----7 LJ —7- -A X 26. 5(7� R308�4 1()8o[!\ 60MIX lftff�� KMs NI) o P��44 N7. I imcl 4-1 v 4N ��4 6' 6' 1/2-1�2'-2'- 9' C w —threenaild Ins. esign 915 Ckvd-d A S- homish, WA 98290 THUESEN CUSTOM HOMES Three Nail D s 514 8th Ave N, Edmonds, WA Residential Drafting & Design 425-512-3090 R502 I MFG TR ��[S AT 24' O.C. GNGINEERE ) AND DESIGNED EVI RU�MF AND INSIALl— PER IRU� NIMSPECS. 5,12 PI PCI III YPICAI. 141 R — 1 O`[`ALNE� FREE V—LATING ARE�� TO BE j/.300 FTHEAREA01'SPACE—AlE F-50%OFVEN7SARENONIDRETHJ�D .4'-U' (k-ERTIC.�L�� BEL— RIDGE W) EF NNIAINDEROF—INGTSPROME) E,lNEvEN— AFSO VEN IS PROVIDE 5D SQ IN, NFV GABLE END — PROVIDE 75 SQ TN. Nf�' 2- HOLE IN BIRD BI-0— PROVIDE 3.14 SQ W NYV (3 HOLES PER BIRD BLOCK) (79 .—) �q— T­h� d—­- (26S) Sq— i-h—f ... 6.g q.—d .,.i— — br� (2) �F5B V_ �:) G. k v— P) B.M Rl�� UPPER ROOF FRAMING SCALE 1/4' = IFF Is "T' DN REVISION JUL 29 2019 c 89=0 I'T bJ0 cu 45 00 E- REVISED 06-23-2019 1 " WATER METER IN CITY R.O.W. WITH METER ATTACHED TO PROPERTY LINE CABLE / DATA ELECTRICAL' STORM SEWER MANHOLE DATUM PT RIM TOP: 95.5 N PIPE I TSF S17F AND MATERIAL WATER - 1 1/2" 20OPSI POLY SEWER - 6" SEWER PIPE STORM \ FOOTING DRAINS - 4" SCH 40 PVC TIGHTLINES / IF RIM TO IN-VERT ELEVATION EXCEEDS 5', TYPE TI MANHOLE WILL BE REQUIRED. EDMONDS ZONING RS-12 25'MAX HEIGHT 35% MAX IMPERVIOUS LOT SIZE: 12,034 IMPERVIOUS: HOUSE - 2,265 (18.8%) W.P. DECK - 225 (1.9%) GARAGE - 552 (4.6%) DRIVE - 1198 (9.6%) WALK - 245 (2.0%) TOTAL - 4,485 (37.3%) FILTRATION SOCK ON CB ON LOT 3 C) C) 102' 94.19' 104' 106' INV 92.75' SILT FENCE -7 - - - - - - CB #4 RIM 95.25' S 0— A- —Y INV 100.0' - RIM 103.0' .. . ..... . . ........... STORM WATER Al 2 -6" SW STUB 0. 0' 0* S=2.00% INV=101.5 X - MINIMUM TOF HORIZONTAL SEPARATION BETWEEN WATER SERVICE AND DRY UTILITIES. - MIN IO'H. SEP. BETWEEN WATER AND SEWER - MIN TH. SEP. BETWEEN Al WATER AND STORM 41 24'UTILITY EASEMENT 6" CLEANOUT W/1 ,4 THROUGHLOT3TO 2' OF HOUSE (1) PROPERTY LINE OF LOT 2 W/1 6" CLEANOUT BETWEEN BENDS SSfNLET SIDE SEWER 1015 PATIO\ 00 1 1/2" WATER SUPPLY 20-6"SS STUB LINE TO HOUSE TO BE S=2.00% FILTRATION SOCK ON 200 PST POLY WITH INV=98.76 D/ 4- SD EX CB #2 N TRACER WIRE 101.91 UTILITY PEDESTAL 98.00' X CB#3 PARKING PAD 94' - 14.30' - ----- I TYPE ll+ AT 1075 w---N895l'53"E-i -2.31T 4% SLOPE .66 98,76 D r L /A --- ------- ------- - ---- --- -- 0 7� GAI STB 16'PRIVATE INGRESS, EGRESS & ELEC UTILITY EASEMENT THROUGH tB 8 CD Cul 108' 6 00 LOT 3 STORM* LOT 3 PER SHORT PLAT CD CD C C) 60'- 119/16" EJ El 96' 98' SSH #2 SEWER MANHOLE ON 8th AVE WORM WATER DE77hMON WAIVER BY DON FMIJE 0711 70M Refer to 05-05-2009 discharge directly into regional detention facility just West of site which discharges directly into Puget Sound. 100, 102' 104' 106' 100'DRIVEWAY SEWER (10- FROM W) GRADES 96-106 6" CLEANOUT AT P/L ll%SLOPE W/ 12" CAST IRON LAMPHOLE COVER WITH 1/2" HEXBOLTS INV 98.00 (102'FROM HOUSE IS 3.4% SLOPE) S89'51'53"W i1n, 119, 30'DRIVEWAY GRADES 106-108 7% SLOPE 25'DRlVEWAY GRADES 108-108 2% SLOPE 108' 110, -4- - - -z - --------- 112' Y 114' CB #3 0— - INV 109.0' RIM 106.0' c5 no PROPOSED CB #2 STRUCTURE 114' 116' * STORM WATER TIGHT LINE AND FOOTING DRAINS DIRECTED TO STORM WATER STUB FOR LOT 3 INSTEAD OF ACROSS LOT 2. B// INV 108.5' RIM 11 Iff /.Y CB #1 INV 110.0' RIM 1125 X, z/1' ZED - Y/ 0,� Y /,Zone _Flag_ ,tjetback 1: Actual ,�F o Front Sides C?. Rear Odier Height PROPCEM FINAL GR ADF CAT A: 102.18 B: 112.98 iD(P C: 111.23 D- 103-99 430.28 / 4 = 107.57 = AVG GRADE 132.57 MAX RIDGE MINIMUM OF TOF COVER IS REQUIRED FOR ALL PIPES LOCATED UNDER '!I DRIVEABLE SURFACES AND FOF COVER UNDER LANDSCAPE AREAS. PROPOSED RIDGE AT 1 -31 -4 SLAB AT 103 28.45 RIDGE ABOVE SLAB FINAL RESTORATION SHALL BE COMPJF9XQaWz-J&JW 'L, TOR, NOT THE CITY OF EDMONDS.1 � N%Ok JUL 2 9 2W 00 0 ,,:� 0 d Cn (U Cd (U 4-J Ln Cn (U rq SCALE 1 If = 20FT R501.11 — mussBS xr 24- CYC E� INCEFDD�NDDESIGNED B 'TRUSS INSTALLED PM TRUSS N FG SPECS. 5 12 PITM TYPICAL R .�2 POIALNRTFREFN�71LATINGAREATOBE 11300 FTHE�kOFSPACEVLMIIAIED F40-5�OF—FSAREN0,XlOREmLA\' 3- -0' (N'LRTH—LN) BELO'B RIDGE AND RE IAICDER OF \�q ING IS PROA ]DID III I�O, E \TN7S. AF5. 'T� PROVIDE 50 SQ IN. NW GARI E m) N`ENTS PROME 7S SQ. IN, NFNI. 21 HOLF IN BIRD BLOU� PRO\1DE 3.14 SQ. W NFV IS DOIBS PER BIRD BLOCK) (71.&12) Sq.- I-- —10—p— (,) Sq.— �—h �' f --,,g R (�q­'-­ -- v I A 1. "... GAk V.— (B Hu,I .— UPPER ROOF FRAMING SCALE 114" = lFr V. 'o, 'o. X u m < - c? E 1:1 r cu r cu cu E- 01 00 Lr) 11-26-2016 REVISED 06-23-2019 9 T-T- Q,d_ , D a) HIGH EFFICIENCY FIVAC EQUIPMENT G' p­-, ..1-fi,.d ­d, AFI�E f 2 PE NIANENIT OPENINGS SHAM. HE CONSTROCTED G-p- 0 WITHIN 12 - OF (,�FILING ...... :AU � .112. ANWD ONT, WITHIN 12' OF FLOOR opm- I IWO M1307.2 EFFICIENT WATER HEATING 5�; 2 ST-M AT UPPER AND All �h­h­d - Li,6- �ml, L,­ LOWER TH RD. WIT] 14' t­ . U,� h. �h�li � -d �, 135 GPNI CLEA�NGE OF CONTROLS I—, U,h.fi �,­d m �, P� 1_ Qpum_%U= IGNIT ON SOUR� TO BF SUN IS'.FFFLOO. EFFICIENI WATERHE%TINGAb: ":F .7 MINIS- IT.I. L2 - — - -------- L__ BDR 4 UP CRAWL SPACE -13,7 INTE OR STAIRWAA S SHALL HAAT ARTIFICIAL EIGHT SOURCE III 'IFOOTCkNDLEATTHECENTE OF T-DS AND LANDINGS WITH WALL SIXITCH AT EACH FLOOR LEA-C BONUSROOM 2 .0 U14 T-W T-2' N,H5 EGRESS WINDOW ­0 DF 12 - El 'I- E-706S CFNI 170 v Nil _o, "'.t Iu ALL EFECTIFICAT, PANEL 'TAI� S.-oFF HIS GUEST ROOM UG W7THER'10-T F�N ­0 L 4GSOSH 4­1H 2020IN 2.2- -DIN cANTILEA'ERAHO r �'2(FX _D� 1 2 -S' I T-S" -0 D. I o 4� 3' 4-6- --JLt7­0' 2' 2 �2'-O'�_ -COWER FLO S _ ALE 1/4' - - - - - - - - - - - - - - - - - - - - - - - - LI - - - - - - - - - - - - - - - - - - - - - 312. ID 1 2 GLB 3 11 - I, GEN TABLEN1151C.13(t) ADu —RER-BEDR00- FLOORA�EA 0-1 2-3 4-5 6-7 "fl- J. am 49 6D 7� 911 1 5-3.0. 45 ' 7' " HIS , 1-,4.5. . 75 . 1. 12. 4.501-6,OW 75 90 HIS 120 135 6.ffll-7 5DD W 105 12D 135 :5D 7'soo 105 12D 135 150 65 -BLEN11507.*i�3(2) RUNII I—F4HOURSEGNIENT 25 13 665 75 FACTOR ;00 4 3 2 1 1 [SD 'FLOOR ­E WNDOWSCHEDULE IDESCRIETIOU ARE STANDARD ED HUNG 2 —H 604D 11S, GLE HUNG RIGHT SLIDING So U 0 1 1 DSoFX MED GLASS _5 ..... 1 �22 2020FX_ 3D20RS FIXEDGLAS8 RIGHT SLIDING 4.D 6D SINGLE HUNG 15D :M2_26-6- I 3 2 7�66�EH 4NOCU 4..H SINGLE HUNG GARDEN SINGLE HUNG 21.G 16o _o 2 1 4DRS.N SINGLE HUNG RIGHT SUDIN. 24.D 22.5 FIXED G 6 12.. 12 SUIX)TS FUG HT SLIDING TRIKE SLIDING 3- S'lD I'l 1�11RS_ RIGHT SLIDING 110 4 ,T,S , T�� 2 2D, REVISION JUL 2 9 2019 BUILDWs qsz�­grw cn-YOFE-cm0f4m E­ m 0 0 0 Go Ln um wr R- -CA=S 2-o. [0 P E N T 0 BELOW I rA-Z9, "I NI Is 2� E-171 .0-11 .1-1111.1-T % 4ss E- T.AZLE,NII5r7-"l) D%� M,L-q NUMBER OF REDROONts F�R AREA 0.1 2� 4-5 6-7 .7 ('—f—) — in aXI '15W 45 W 73 W 1.50::3. 4S 0 75 W 105 ,,M '.'W W 75 CH 105 IN 4.501-6. " w :05 �w �35 6"1-7. 'm W :05 IN 13S ISO 105 20 35 50 6S T.4Z[,E-mIW,33M) RUNTENI %01`41VDURSEGI%1�7 25 M 66 75 F-701, �00 4 3 13 13 UPPER FLOOR SCALE 1/4'= IFF e a- ME 1. &TANDARofsQFT11 3 1 3 �S 1 2 3 fUGHTSLIDING R s &o 5 _Ll—FX 2.� s 4.11 1 2 � S ING Gm 2 3 2 2 NON �H_ W Gt.E HUNG 15.D UNGLE HUNG 1 3 2 4�40CU GANDEN WNGLEHUNG 27.0 2 1 1 2 --t_ �s —N. I NG 1 1 2 2 1�s 120 2 2 IPIE SLIDIN6 — IGHT SLIUNG 14.0 Tcm�s- 12�X I RXED Gl— REVISION JUL 2 9 20A con 0 �D 00 11-26-2016 e,UILONG QEPARTME34T 0TY0FEDt,A01'l0S REVISED '06-23-20191 4_] PIRE USE SIZE ANT) MATERIAL EDMONDS ZONING RS-12 FILTRATION SOCK ON b WATER - 11/2" 20OPSI POLY 25MAX HEIGHT CB ON LOT 3 0 102' 94.19' 104' 106' 108' 110, SEWER - 6" SEWER PIPE 35% MAX IMPERVIOUS INV 92.75' — — — ---------------- -- STORM RIM 95.25' SILT PENCE N90*E ��-CB #4 7� FOOTING DRAINS - 4" SCH 40 PVC LOT SIZE: 12,034 A- Y INV 100.0'," STORM WATER RIM 103.0' TIGHTLINES / — / -- N ........ . . ....... .. . ... .. ------------- - ----- IMPERVIOUS: 20'-6" SW STUB 112' HOUSE - 2,998 (24.9%) S=2.00% W.P. DECK - 225 (1.9%) INV=101.5 IF RIM TO INVERT \x DRIVE - 1160 (9.6%) r ELEVATION WALK - 245 (2.0%) - MINIMUM TOF HORIZONTAL Y 114' CB #3 EXCEEDS 5', TYPE II Azs-' C� INV 109.0' TOTAL - 4,628 (38.5%) SEPARATION BETWEEN WATER MANHOLE WILL BE SERVICE AND DRY UTILITIES. RIM 106.0' REQUIRED. MIN 10'H. SEP. BETWEEN WATER AND SEWER PROPOSED MIN TH. SEP. BETWEEN CB #2 WATER AND STORM STRUCTURE 116' INV 117.0' B RIM 118.5' 24'UTILITY EASEMENT 6" CLEANOUT W/I Z THROUGH LOT 3 TO TOF HOUSE (V PROPERTY LINE OF LOT 2 CB*I > 6" CLEANOUT BETWEEN BENDS 4AX INV 115.0' RIM 116.5' SS INLET 1" WATER METER IN SIDE SEWER NL D I CITY R.O.W. WITH 5 UB 101.5 PATIO 00 11/2" WATER SUPPLY 20'-6"SS A) 7 METER ATTACHED S=2.00% LINE TO HOUSE TO BE FILTRATION SOCK ON C4 x TO PROPERTY LINE 200 PSI POLY WITH SD EX CB #2 INV=98. 22'-0" TRACER WIRE C)�'� TOP 101.9' UTILITY PEDESTAL >/ , I- - CB#3 4 PARKING PAD I CD INV 98 4 14.30' AT 107.5' J Y \fTYPE ll+ cq FH _1 CABLE/DATA C-4 N89 51'53' 4% SLOPE 66-2.3'LT GAS— a=G.AS� ---- - --- ------- ­4 ELECTRICAL/ /46'PRIVATE INGRESS, EGRESS & FZE -__ UTILITY EASEMENT THROUGH CURB/) \ 4 4 LOT 3 S RAP LOT 3 PER SHORT PLAT /%0 CD STORM SEWER 7— MANHOLE a DATUM PT 9/ 98. 104' 106' S89* 51'53"W Ln RIM TOP: 95.5 6- 1001 102' 110' 112' 114' 116' eq SSH #2 SEWER MANHOLE ON 8th AVE STORM WATER DETENTION WAIVER By DON FIENE 07/17/2007 Refer to 05-05-2009 discharge directly into regional detention facility just West of site which discharges directly into Puget Sound. 100'DRIVEWAY 30'DRIVEWAY 25'DRIVEWAY SEWER (10' FROM W) GRADES 96-106 GRADES 106-108 GRADES 108-108 6" CLEANOUT AT P/L ll%SLOPE 7% SLOPE 2% SLOPE W/ 12" CAST IRON LAMPHOLE COVER WITH 1/2" HEXBOLTS INV 98.00 (102'FROM HOUSE IS 3.4% SLOPE) STORM WATER TIGHT LINE AND FOOTING DRAINS DIRECTED TO STORM WATER STUB FOR LOT 3 INSTEAD OF ACROSS LOT 2. MINIMUM OF TOF COVER IS REQUIRED FOR ALL PIPES LOCATED UNDER DRIVEABLE SURFACES AND l'OF COVER UNDER LANDSCAPE AREAS. FINAL RESTORATION SHALL BE COMPLETED BY THE CONTRACTOR, NOT THE CITY OF EDMONDS] SCALE LEGAL DESCRIPTION V = 15ft Section 24 Township 27 Range OWNER 03 Quarter NW - LOT 3 OF Thuesen CITY OF EDM SP NO S-07-76 Custom Homes REC AFN 201111145006 BEING 514 8th Ave N A PTN SEI/4 NW1/4 Edmonds, WA PROPEIRTYID 425-772-9401 27032400225300 Eric Thuesen EDMONDS ZONING RS-12 EDMONDS ZONING RS-12 LOT STZF 12,034 S.F. IMPERVIOUS HOUSE - 2,998 (24.9%) W.P. DECK - 225 (1.9%) DRIVE - 1160 (9.6%) WALK - 245 (2.0%) TOTAL - 4,628 (38.5%) 0 1�1 00 CY, 7:1 (= cn L—n r—J (U cis Z C� W �D 00 Z -'t r--q F-4 Lr) 11-26-2016 REVISED 12-01-2019 DRAINAGE UTILITY AND FINAL GRADING , mt�" cffy COPY B COE C N BUILDING DEPARTIAE CITY OFEDMONDS RESUB DEC 2 6 2019 13UIWING DEPA N CITYOFEDMRTME T ONDS INSTALL AND MAINTAIN ALL TESC MEASURES ACCORDING TO APPROVED PLANS, CITY OF EDMONDS STANDARD DETAILS, AND ALL OTHER MEASURES THAT MAY BE REQUIRED DURING CONSTRUCTION N z 00 EDMONDS ZONING RS-12 FILTER FENCE BETWEEN LOTS 2 AND 3 TO BE INSTALLED AFTER 25'MAX HEIGHT FINAL GRADING AND STORM 35% MAX IMPERVIOUS DRAINAGE IS COMPLETE SEE EDMONDS DETAIL E1.1 LOT SIZE: 12,034 IMPERVIOUS: .HOUSE - 2,998 (24.9%) W.P. DECK - 225 (1.9%) FILTRATION SOCK ON DRIVE - 1160 (9.6%) CBONLOT3 INV 92.75' WALK - 245 (2.0%) ce TOTAL - 4,628 (38.5%) RIM 95.25' FILTRATION SOCKS ON ANY DOWNSTREAM CATCH BASINS.. SEE EDMONDS DETAIL E13 COVER SOIL STOCK PILE WITHIN 24 HOURS q A 24'UTILITY EASEMENT "D THROUGHLOT3TO SOIL FILTRATION SOCK ON PROPERTY LINE OF LOT 2 STOCK CRUSHED ROCK SD EX CB #2 CONSTRUCTION ENTRANCE TOP 101.9' PILE FP SEE EDMONDS DETAIL E1.2 INV 98.00 PROPOSED GARAGE 16'PRIVATE INGRESS & EGRESS EASEMENT THROUGH LOT 3 PER SHORT PLAT EXTENDED INTO LOT 2 SS MANHOLE #2 DATUM PT 96.0 TW RIM TOP 94.0 EG +I- 95.5 ON 8th Ave 94.0 TW 94.0 EG+/- z E Q-- CITY OF EDMONDS 100.0 TW 97.0 EG +/- BEGIN WEST WALL 98.0 TW EXISFING 94.7 EG RETAINING WALL .-AR. DU ---Umo.-. CITY OF EDMONDS STABILJZED CONSTRUCTION ENTRANCE A PROPOSED STRUCTURE ls 102 1 OTW IV I /.Z)+/- I W S8 1 9' 51'53"W 121.0 1 EG+/- EG: 1 121 101.0 EG+/- 105.0 EG 113+/- TW EG 112.0 FG FG: 114 BEGIN EAST WALL 108.0 FG TW:120 121.0 EG+/- 107.0 +/- FG 115.1' T' EG+/- 112.0 FG 105.0 EG 109.0 FG END WEST WALL ALLDISTURBED 122.0 EG +/- EXISTING 112.0 FG SOUS TO RETAINING BE COMPOST WALL AMENDED PER BMP T5.13 B�AMDAT�M G CONMU-N �OB. -N E- ITY OF EDMONDS TEMPO SMIMEW TRAP MR CATCH BASINS SCALE I" = 15ft EG:130 FG: 119 TW:125 MAXIMUM ALLOWABLE FINAL GRADE C.AI.CS A: 102.18' B: 112.98' C: 111.23 D- 10-4-89 430.28 4 107.57 = AVG GRADE + 2THEIGHT = 132.57 MAX ALLOWABLE RIDGE ACTUAL RIDGE AT 130-75 SLAB AT 103 27.75 RIDGE ABOVE SLAB Thuesen Custom Homes 514 8th Ave N Edmonds, WA 425-772-9401 Eric Thuesen LEGAL DESCRIPTION Section, 24 Township 27, Range 03 Quarter NW - LOT 3 OF CITY OF EDM SP NO S-07-76 REC AFN 201111145006 BEING A PTN SE1/4 NW1/4 27032400225300 RS-12 0 :, 0 C7, "A L In L 0 n a, 0 r. 93 016 bo C�j cz CU cu Cn -:� 0 0 �D Z 4-J �D 00 11-26-2016 REVISED 12-01-2019 SITE / PLOT TESC, EXIST GRADES I" WATER METER IN CITY R.O.W. WITH METER ATTACHED TO PROPERTY LINE CABLE / STORM SEWER MANHOLE DATUM PT RIM TOP: 95.5 PTPF USE 9TZE ANT) MATERIAL EDMONDS ZONING RS-12 WATER - 11/2" 20OPSI POLY 25'MAX HEIGHT SEWER - 6" SEWER PIPE 35% MAX IMPERVIOUS STORM \ FOOTING DRAINS - 4" SCH 40 PVC LOT SIZE: 12,034 TIGHTLINES IMPERVIOUS: N HOUSE - 2,998 (24.9%) W.P. DECK - 225 (1.9%) IF RIM TO INVERT ELEVAT N DRIVE - 1160 (9.6%) FILTRATION SOCK ON CB ON LOT 3 INV 92.75' RIM 95.25' STORM WATER 20'-6" SW STUB S=2.00% INV=101.5 WALK - 245 (2.0%) - MINIMUM TOF HORIZONTAL EXCEEDS 5', TYPE 11 TOTAL - 4,628 (38.5%) SEPARATION BETWEEN WATER MANHOLE WILL BE SERVICE AND DRY UTILITIES. REQUIRED. MIN 10'H. SEP. BETWEEN WATER AND SEWER MIN 5'H. SEP. BETWEEN "y WATER AND STORM o 24'UTILITY EASEMENT 6" CLEANOUT W/I Z THROUGHLOT3TO TOF HOUSE (V PROPERTY LINE OF LOT 2 �> -d4. 6" CLEANOUT BETWEEN BENDS 102' 104' 106' 168' 110, ;-4 94.19' N90' E - CB #4 7"— — ly���INV 100 . 01 RIM 103.0' 112' PROPOSED STRUCTURE SIDE SEWER SS INLET D 101.5' PATIO 00 11/2" WATER SUPPLY 20'-6"SS STUB /'- : T'C� 4 S-2.000/( LINE TO HOUSE TO BE FILTRATION SOCK ON 200 PSI POLY WITH INV=98.76 SD EX CB #2 22'-0" TRACER WIRE TOP 101.9' UTILITY PEDESTAL INV 98.00--�, PARKING PAD CB#3 Ell --94' 14.30' ISO lI+ AT 107.5' C4 c14 C,, -N89 51'53" E- '66-2.3'LT 4% SLOPE - - - - - - - -- - /16'PRIVATE INGRESS, EGRESS & L-7- UTILITY EASEMENT THROUGH 108' LOT 3 STORNP LOT 3 PER SHORT PLAT oo C 5/8- 7�- z -10 -//M —/ / A 1� \ 11, / 11 9�1 104' 106' S89'51'53"W in 96' 00 102' 110' 112' 114' 116' C4 100'DRIVEWAY 30'DRIVEWAY 25'DRIVEWAY SSH #2 SEWER (10'FROM W) GRADES 96-106 GRADES 106-108 GRADES 108-108 SEWER 6" CLEANOUT AT P/L 11% SLOPE 7% SLOPE 2% SLOPE MANHOLE W/ 12" CAST IRON LAMPHOLE ON 8th AVE COVER WITH 1/2" HEXBOLTS INV 98.00 (102'FROM HOUSE IS 3.4% SLOPE) STORM WATER TIGHT LINE AND FOOTING STORM WATER DETENTION WAIVER BY DON FIENE 07/17/2007 Refer to 05-05-2009 discharge directly into regional detention facility just West of site which discharges directly into Puget Sound. DRAINS DIRECTED TO STORM WATER STUB FOR LOT 3 INSTEAD OF ACROSS LOT 2. MINIMUM OF TOF COVER IS REQUIRED FOR ALL PIPES LOCATED UNDER DRIVEABLE SURFACES AND l'OF COVER UNDER LANDSCAPE AREAS. SCALE I" = 15ft in Cq IT CB *3 INV 109.0' 4 RIM 106.0' t1114' 6� CB #2 116' INV 117.0' ---�RIM 118.5' CB #1 INV 115.0' RIM 116.5' )RATION SHALL BE COMPLETED BY THE CONTRACTOR, NOT THE CITY OF EDMONDS.� Thuesen Custom Homes 514 8th Ave N Edmonds, WA 425-772-9401 Eric Thuesen LEGAL DESCRIPTION Section 24 Township 27 Range 03 Quarter NW - LOT 3 OF CITY OF EDM SP NO S-07-76 REC AFN 201111145006 BEING A PTN SEI/4 NWI/4 27032400225300 RS-12 EDMONDS ZONING RS-12 LOTS,TZF 12,034 S.F. IMPERVIOUS HOUSE - 2,998 (24.9%) W.P. DECK - 225 (1.9%) DRIVE - 1160 (9.6%) WALK - 245 (2.0%) TOTAL - 4,628 (38.5%) 0 0 Q ON W C4 000, 0 C? 14 004 2 6d tTt Cd Z (D (U 7:1 0 �D Z U �u Z rx� 4-J �D 00 �:! '1' r--q F-q Lr) 11-26-2016 REVISED 12-01-2019 DRAINAGE UTILITY AND FINAL GRADING IDEC 2ri RESUB DEC 2 6 2019 13UILDING DEPARTMENT CITYOFEDMONDS INSTALL AND MAINTAIN ALL TESC MEASURES ACCORDING TO APPROVED PLANS, CITY OF EDMONDS STANDARD DETAILS, AND ALL OTHER MEASURES THAT MAY BE REQUIRED DURING CONSTRUCTION N 00 CRUSHED ROCK CONSTRUCTION ENTRANCE SEE EDMONDS DETAIL E1.2 SS MANHOLE #2 DATUM PT RIMTOP 95.5 ON 8th Ave 94.0 TW 94.0 EG+/- EDMONDS ZONING RS-12 FILTER FENCE BETWEEN LOTS 2 AND 3 TO BE INSTALLED AFTER 25'MAX HEIGHT FINAL GRADING AND STORM 35% MAX IMPERVIOUS DRAINAGE IS COMPLETE. SEE EDMONDS DETAIL E1.1 LOT SIZE: 12,034 A --------------- -- -------- --- IMPERVIOUS: 0' HOUSE - 2,998 (24.9%) W.P. DECK - 225 (1.9%) FILTRATION SOCK ON DRIVE - 1160 (9.6%) CB ON LOT 3 31 WALK - 245 (2.0%) INV 92.75' .6� Ilk" S TOTAL - 4,628 (38.5%) RIM 95.25' FILTRATION SOCKS ON .4� ANY DOVvrNSTREAM CATCH BASINS. SEE EDMONDS DETAIL E13 COVER SOIL STOCK PILE WITHIN 24 HOURS 24'UTILITY EASEMENT PATIO .,D THROUGH LOT 3 TO SOIL FILTRATION SOCK ON PROPERTY LINE OF LOT 2 STOCK SD EX CB #2 PILE TOP 1011.9' D INV 98.00 PROPOSE GARAGE --'Kz�'7�16'PRIVATE INGRESS & EGRESS EASEMENT THROUGH LOT 3 PER SHORT PLAT EXTENDED INTO LOT 2 1 100.0 TW 96.0 TW 97.0 EG +/- 94.0 EG BEGIN WEST WALL 98.0 TW h2usrING 94.7 EG RETAINING WALL EQWALEW T T-. U \rxr- CITY OF EDMONDS TER FAHRIC FENCE FILTRATIONSYSMAS Co�aoR�­YC­UMON�CE DWNG�E�WRUMONPMOD. 7- 7- 77= CITY OF EDMC SrARILIZED COt 102.0 TW 107.5+/- TW` 101.0 EG+/- 105.0 EG BEGIN EAST WALL 107.0 +/- FG 105.0 EG END WEST WALL ALI DISTURBED SOILS TO BE COMPOST AMENDED PER BMP T5.13 PROPOSED STRUCTURE S89* 51'53"W N'll I EG: 1 121 1 121.0 TW EG+/- la+/- rW EG 112.0 FG FG: 114 108.0 FIG TW:120 121.0 EG+/- 115.0 TW` EG+/- 112.0 FG 109.0 FG 122.0 EG +/- EXISTING 112.0 FIG RETAINING WALL ..AT-. SWIN-MALLB �-ONA CITY OF EDMONDS STANDARD DETAIL TEMPORARYSEDIMENT TRAP FOR CATCH BASINS r EG:130 FG: 119 TWA25 MAXIMUM ALLOWABLE FINAL GRADE CALCS A: 102.18' B: 112.98' C: 111.23 1)- 103.89 430.28 / 4 = 107.57 = AVG GRADE + 25'HEIGHT = 132.57 MAX ALLOWABLE RIDGE ACTUAL RIDGE AT 130-79 SLAB AT 103 27.75 RIDGE ABOVE SLAB SCALE LEGAL DESCRIPTION I" = 15ft Section 24 Township 27 Range OWNER 03 Quarter NW - LOT 3 OF Thuesen CITY OF EDM SP NO S-07-76 Custom Homes REC AFN 201111145006 BEING 514 8th Ave N A PTN SE1/4 NW1/4 Edmonds, WA PROPERTY ID 425-772-9401 27032400225300 Eric Thuesen FDMONDS ZONING RS-12 0 0 00 cy, p 'cl !:11 Coll Ln Ile 0 CIO 0 0. Qn Cd 4-1 E--i C) 0 �D Z 4-) �D 00 Lr) 11-26-2016 REVISED 12-01-2019 SITE / PLOT TESC, EXIST GRADES