BLD2019-0116Type: RESIDENTIAL BLDG
Subtype: NEW SINGLE FAMILY
Status: ISSUED
Parcel No: 00434600007901 Site
Address: 9527 190TH PIL SW EDMONDS,WA 98020
Applied: 1/30/2019
Subdivision: 005319, 004346, BLA
AFN 201211210469 Lot:
Issued: 1/22/2020 NED
Fire Sprinklers: No Lot Area: 35 Zoning: RS-12
Final:
Valuation: $384,592.24 Occupancy
Type: SFR IRC Construction Type: VB
Expiration Date: 1�/p r2021
NED
Code Edition: 2015 No.
Stories: 1 # of Dwelling Units: 1
WORK DESCRIPTION: NEW SFR, PLUMBING AND MECHANICAL INCLUDED
14UM
FIRE SPRINKLER UNDER SEPARATE
PERMIT
CONTACTS
NAME TYPE NAME
ADDRESS PHONE
EMAIL
APPLICANT
STROBL DESIGN
PO BOX 20764, SEATTLE WA
(206)661-3622
JACOB@STROBLDESIGN.COM
98102
CONTRACTOR
PETERSON CUSTOM
2114 120TH PIL SW, EVERETT
(206)351-7255
PCHBUILDER@MSN.COM
HOMES
WA 98204
OWNER
CHAK AND EVA AW
I
114 N 200TH ST, SHORELINE
(425)785-203qCHAKAW63@GMAIL.COM
WA 98133
Contractor License Information:
WA State Contractor L & I #:PETERCH968JH City of Edmonds Business License #: 602454996-001-
0001
FEE INFORMATION
DESCRIPTION
ACCOUNT AMOUNT PAID
DATE '";"RECEIPT4
B-BUILDING PERMIT FEE
001.000.322.10.000.00
$2,810.00
B-BUILDING PLAN REVIEW FEE
001.000.345.83.000.00
$2,304.00
$2,304.00
1/31/19
REC07539S
B-GRADING PERMIT FEE
001.000.322.10.000.00
$370.00
B-MECHANICAL PERMIT FEE
001.000.322.10.000.00
$170.00
B-PLUMBING PERMIT FEE
001.000.322.10.000.00
$340.00
B-STATE BUILDING CODE
001.000.237.150
$6.50
SURCHARGE
ENGINEERING INSPECTION FEE
001.000.341.82.000.00
$100.00
ENGINEERING INSPECTION FEE
001.000.341.82.000.00
$800.00
ENGINEERING REVIEW FEE
001.000.341.82.000.00
$240.00
PARK IMPACT ADMIN FEE
001.000.322.10.000.00
$50.00
PARK IMPACT FEE
332.100.345.85.000.00
$2,734.05
STORMWATER GENERAL
422.000.379.00.000.00
$1,328.20
FACILITY CHARGE COM/MF
TRAFFIC IMPACT ADMIN FEE
001.000.341.82.000.00
$50.00
TRANSPORTATION IMPACT FEE
112.502.345.86.000.00
$4,561.37
X-RECORDING FEE
001.000.345.89.030.00
$204.50
$204.50
7/5/19
REC076849
X-TECHNOLOGY FEE
001.000.321.99.100.00
$35.00
4000P
0z
Printed: Tuesday, January 21, 2020 9:32:41 AM 1 of 5
,e�
1,e,o
TOTALS: $16,103.62 $2,508.50
CONDITIONS
CONDITIONTY STATUS - NOTES
48 Hrs Notice-ENGR Final
48 hours notice is required when requesting your FINAL Engineering Inspection.
425-771-0220, ext.1326.
Applicant shall repair/replace all damage to utilities or frontage improvements in
Damage to Frontage
City right-of-way per City standards that is caused by or occurs during the
Improvments
permitted project.
Electrical Permit
Obtain Electrical Permit from State Department of Labor & Industries. 425-290-
1309
ESC Required
Maintain erosion & sedimentation control per city standards.
In addition to the required pressure/relief valve, an approved listed expansion
Expansion Tank
tank shall be installed on all hot water tanks. Per UPC 608.
Approval of this foundation design is conditional subject to inspection of existing
site soil conditions.
Retaining Walls must be designed and constructed to resist the lateral pressure
Foundation Bearing
of the retained material.
Provisions must be made for the control and drainage of surface water around
buildings.
Applicant, an behalf of his or her spouse, heirs, assigns, and successors in
interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for
Hold Harmless
damages of whatever nature, arising directly or indirectly from the issuance for
this permit. Issuance of this permit shall not be deemed to modify, waive or
reduce any requirements of any City ordinance nor limit in any way the City's
ability to enforce any ordinance provision.
Hose Bibbs (exterior faucets) are required to have a permanently affixed anti -
Hose Bibbs
siphon device installed.
Lot Lines Staked
Lot line stakes must be in place at the time of foundation/setback inspection.
Maximum Height 2S feet. The agent/contractor shall set up the equipment;
establish the datum point and the point of average grade. Call for inspection to
Maximum Height
verify. These items must be consistent with the approved plan. If the proposed
height of a building (as shown on the plans) is within 12 inches of the maximum
height permitted for the zone an elevation survey is required.
Final approval on a project or final occupancy approval must be granted by the
Building Official prior to use or occupancy of the building or structure. Check the
Occupancy
job card for all required City inspections including final project approval and final
occupancy inspections.
Printed: Tuesday, January 21, 2020 9:32:41 AM 2 of 5
RESIDENTIAL BLDG Permit
PERMIT NUMBER
:41111P111".
City of Edmonds
121 Sth Ave N, Edmonds WA 98020 BLD2019-0116
www.edmondswa.gov 425.771.0220
Any request for alternate design, modification, variance or other administrative
deviation (hereinafter "variance") from adopted codes, ordinances or policies
must be specifically requested in writing and be called out and identified.
Processing fees for such request shall be established by Council and shall be paid
upon submittal and are non-refundable.
Permit Disclaimer
Approval of any plat or plan containing provisions which do not comply with city
code and for which a variance has not been specifically identified, requested and
considered by the appropriate city off icial in accordance with the appropriate
provision of city code or state law does not approve any items not to code
specification.
New and existing buildings shall have approved address numbers, building
numbers or approved building identification placed in a position that is plainly
Post Address
visible from the street or road fronting the property. Address numbers shall be
Arabic numerals or alphabet letters. Numbers shall be legible from the public
way, at least 4 inches high with a A inch min. stroke width on a contrasting
background.
PRV Required
Pursuant to UPC 608 a pressure regulator valve (PRV) shall be installed near the
water shutoff.
Separate Permit Required For: FIRE.
A residential fire sprinkler system is required. A recommended flow -through
design will meet specifications and reduce equipment and continuing
Separate Permit Required
maintenance requirements. ECDC19.05.020132. Provide a minimum combination
water service of one inch (1") meter and one and one half (11/2") service line, or
show that domestic and fire protection needs can be met with a smaller service.
DFM17
Sound/Noise originating from temporary construction sites as a result of
construction activity are exempt from the noise limits of ECC Chapter 5.30 only
Sound/Noise
during the hours of 7:00arn to 6:00pm on weekdays and 10:00am and 6:00prn on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits
of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
Underground Utility Locates
Call for locates of underground utilities prior to any excavation.
Underground Wiring
All new, extended, re -built or relocated electrical utility and/or service shall be
placed underground.
Vent Connectors
Type B or L vent connectors required on fuel -burning appliances passing through
unheated spaces. Per IMC 803.2
Water Line Asbuilt
Owner/Contractor to provide Water Service Line asbuilt at final inspection. See
City Standards for requirements.
City approved plastic piping may be used in water service piping provided that
where metal water service piping is used for electrical grounding purposes,
Water Service Piping
replacement piping shall be of like materials (UPC 604.8). A state electrical
permit and inspection is required if electrical grounding is altered, removed,
improved, or added. Contact State Dept. of Labor & Industries Electrical Division
at 425-290-1400.
Printed: Tuesday, January 21, 2020 9:32:41 AM 3 of S
RESIDENTIAL BLDG Permit
City of Edmonds PERMIT NUMBER
121 5th Ave N, Edmonds WA 98020 BLD2019-0116
www.edmondswa.gov / 425.771.0220
Water Service Shutoff
Pursuant to UPC 605.2 a water service shutoff shall be installed on the water line
as it enters the building.
Whole House Fan
Installer shall provide the manufacturer's installation, operating instructions,
and a whole house ventilation system operation description. A label shall be
affixed to the whole house timer control that reads "Whole House Ventilation"
(see operating instructions).
SEQID
�iIASP C7110N.
TYPE INSPE
I N S PEC
t6mp ETED
DATE'
TIONS
kesbLT,�.-'-,
NO E&
B-6 BUILDING FINAL"
OTHER - BUILDING
E-2 TESC AND MOBILIZE
B-1 BUILDING PRECON
B-2 FOOTINGS
B-2 FOUNDATION DRAIN
B-2 FOUNDATION WALL
B-2 PIER FOOTINGS
B-2 RETAINING WALL
B-2 SETBACKS
B-3 UNDERFLR FRAMING
B-4 DRYWALL FASTENING
B-4 HEIGHT VERIFICATION
B-2 SLAB INSULATION
B-3 GAS PIPING TEST
B-3 LATH
B-3 MECH ROUGH IN
B-3 PLUMB GROUND WK
B-3 PLUMB ROUGH IN
B-5 INSULATION ENERGY
E-3 STRM TIGHTLINE
E-4 DRIVE WIDTH SLOPE
B-4 FRAMING
B-3 ROOF SHEATHING
Printed: Tuesday, January 21, 2020 9:32:41 AM 4 of 5
OIL' RESIDENTIAL BLDG Permit
PERMIT NUMB?
City of Edmonds
121 Sth Ave N, Edmonds WA 98020 BLD2019-0116
Ll www.edmondswa.gov 425.771.0220
B-4 INTERIOR SHEATH
E-4 DWTRENCH
E-4 RET WALL DRAA
L-4 WA ILK SERVICE LINE—j��
E-6 ENGINEERING FINAL —
Printed: Tuesday, January 21, 2020 9:32:41 AM 5 of S
'�)V. Isq,
BUILDING PERMIT
APPLICATION
Development Services
Building Division
121 Sth Ave N / Edmonds, WA 98020
425.771.0220
For handouts, submittal requirements, permit status and inspection
scheduling information go to: httl)!//www.edmotidswa.gov/
JOB SITE INFORMATION/LOCATION. (Where the work is taking place)
Job Site Address: 9527 190th PI SW, Edmonds, Wa 98020
Parcel: 00434600007901
Lot /Unit/Suite #: Subdivision: —,
PROPERTY OWNER:
Name: Chak & Eva Aw
Mailing Address: 114 N 200th St
City/State/Zip: Shoreline, WA 98133
Phone #: 425-785-2038
Email: chakaw63@gmail.com
OWNER INSTALLATION: *If yes, read and sign*
Wilt work be performed by the property owner? ED Yes El No
I own, reside in, or will reside in the completed structure.
This installation is being made on property that I own which is
not intended for sale, lease, rent, or exchange according to
RCW 18.27.090.
Owner Signature:
APPLICANT / CONTACT INFORMATION:
Name of Applicant: Jacob Strobl
MailingAddress: POBOX20764
City/State/Zip: SEATTLE/WA/98102
Phone tt: 206-661-3622
E-mail: jacob@strobldesign.com
GENERAL CONTRACTOR, (if different from applicant)
General Contractor: PETERSON CUSTOM HOMES INC
Mailing Address: 2114 - 120TH PL SW #13
City/State/Zip: EVERETT/ WA/ 98204
Phone#: 425-789-1711
pchbuilder@msn.com
WA STATE CONTRACTOR L & I # (CCB) & EXPIRATION DATE:
PETERCH968JH - Exp. 04/08/2020
CITY OF EDMONDS BUSINESS LICENSE #:
per(nd #
TYPE OF PERMIT (Provide Details on Page 2)
111 Accessory Structure/
0 Addition
Detached Garage
El Demolition
0 Mechanical
0 Plumbing
[N New Single Family/ Duplex
0 Fire Sprinkler
0 Remodel
11 New Commercial/ Mixed Use
0 Re -Roof
0 Signs
0 Tank
0 Tenant improvement
0 Other
Remociei rermiy Tees are vasea on:
The value of the work performed. Indicate the value (rounded to
and the profit for the work indicated on this application,
Valuation:
PROPOSED NEW SQUARE FOOTAGE FOR THIS APPLICATION
Basement sqft: 1,244 Finished IN Unfinished 11
1st Floor, sq ft:
2,452
2nd Floor, sqft:
Garage/Ca r port:, sq ft:
679
Deck/Covered Porch/Patio:
522
Other sq ft: basement storai:
756
PROJECT DESCRIPTION
Construction of new single family house
per pi ns.
I certify that the information I have provided on this formlapplication is true,
correct and complete, and that I am the property owner or duly authorized
agent of the property owner to submit a permit application to the City of
Edmonds.
Print Name,
doM
Signature* ::::2r._ ate_ A-
GENERAL COMMERCIAL DATA
Occupancy Group(s): Occupant Load(s):
Type(s) of Construction: Fire Sprinklers: Yes El No El
WA STATE ENERGY CODE: If your project affects the building envelope,
mechanical systems, and/or lighting, you must complete the
appropriate WSEC forms.
DEFERRED SUBMITTALS: All commercial building permits that will require
associated plumbing, mechanical, fire sprinkler, and/or fire alarm
permits are applied for separately.
TI / CHANGE OF USE / NEW BLDG: Include TRAFFIC IMPACT worksheet
MECHANICAL EQUIPMENT COUNTS (New and Relocated)
BTUs Gas / Elec Other Qty
A/C Unit /Compressor
Air Handler /VAV
Boiler
Dryer Duct
Elec
Exhaust Fans
7
Fireplace
Gas
2
Furnace
Gas
Heat Pump Unit
Hydronic Heating
Roof Top Unit (Provide eleva-
tions if a Commercial Bldg)
Other:
PLUMBING FIXTURE COUNTS (New, Relocated or re -piped)
Qty Qty
Clothes Washer
1
Tub/ Showers
3
Dishwasher
1
Backflow Device (RPBA, DCDA, AVB)
Drinking Fountain
Pressure Reduction/ Regulator Valve
Floor Drain/Sink
Refrigerator Water Supply
Hose Bibs
2
Water Heater - Tankless? Y or N
N
Hydronic Heat
Water Service Line
Sinks
8
Other:
Toilets
4
Other:
GAS/FUEL CONNECTION COUNTS (New, Relocated or re -piped)
BTUs Qty BTUs Qty
A/C Unit
Outdoor BBQ / Fire pit
Boiler
Stove/Range/Oven
Dryer
Water Heater
Fireplace/ Insert
2
Other:
Furnace Other:
MEDICAL GAS, AIR VACUUM COUNTS
(New, Relocated or re -piped)
Qty
Qty
Carbon Dioxide
Nitrous Oxide
Helium
Oxygen
Medical Air
Other:
Medical - Surgical Vacuum Other:
DEMOLITION
Type of structure to be demolished:
Square footage of structure to be demolished:
AHERA Survey done? Y/N
PSCAA Case #:
Critical Areas Determination:
Study Required El Conditional Waiver El Waiver El
Fill in Place El Fill Material:
Removal E]
Size of Tank (Gallons)
Critical Areas Determination:
Study Required El Conditional Waiver El Waiver El
GRAD E/Fl LL/EXCAVATE
Grading:Cut 1,120 cubic yards
Fill 850 cubic yards
Cut / Fill in Critical Area: Yes IX No El
GENERAL PROVISIONS
APPLICATIONS: Applications are valid for a maximum of 1 year.
ESLHA Applications, 2 years.
LICENSING: All contractors and subcontractors are required to be licensed
with Washington State Department of Labor & Industries and have a
current City of Edmonds Business License.
RIGHT OF WAY PERMIT
PERMIT NUMB
City of Edmonds
k P
121 5th Ave N, Edmonds WA 98020 ENG2019-0439�:�'
www.cityofedmonds.gov / 425.771.0220
Description: AW SFR - INSTALL UTILITIES, SW, CURB RAMP, CROSS WALK ISSUED: 01/22/2020
Address: 9527 190TH PL SW EDMONDS WA 98020
EXPIRES: 07/20/2020
,Permit Type: RIGHT OF WAY Permit Subtype: RESIDENTIAL Parcel Number: 00434600007901
CONTACTS
NAME TYPE NAME ADDRESS PHONE
APPLICANT CHAK AND EVA AW 114 N 200TH ST, SHORELINE WA 98133 (425)785-2038
CONTRACTOR PETERSON CUSTOM HOMES 2114 120TH PL SW, EVERETT WA 98204 (206)351-7255
OWNER CHAK AND EVA AW 114 N 200TH ST, SHORELINE WA 98133 (425)785-2038
FEE INFORMATION
DESCRIPTION AMOUNT PAID,
ENGINEERING INSPECTION FEE
$1,000.00
ENGINEERING INSPECTION FEE
$100.00
RIGHT OF WAY STANDARD PERMIT FEE
$300.00
X-TECHNOLOGY FEE
$35.00
REQUIREMENTS
REQUIREMENTTYPE
NOTES
TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the
City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their posession.
RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched
with asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following
Ithe final inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
INDEMNITY
The Applicant has signed an application which states helshe holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments
or employees, including but not limited to the defense of any legal proceedings including defense costs and attorneyfees by reason of
granting this permit.
RELEASED BY
THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW
DA
Printed: Tuesday, January 21, 2020 9:43:15 AM 1 of 2
\4
CONDITION TYPE�"'
RIGHT OF WAY PERMIT
City of Edmonds PERMIT NUMBER
121 Sth Ave N, Edmonds WA 98020 ENG2019-0439
www.cityofedmonds.gov / 425.771.0220
CONDITIONS
NOTES
Damage to Frontage
Improvements
Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per
City standards that is caused by or occurs during the permitted project.
ESC Required
Maintain erosion & sedimentation control. Keep street clean.
ROW Restoration
Restore ROW to City standards
Sounds/Noise
Sound/Noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on
weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites/activities must comply with the noise limits
of Chapter 5.30, unless a variance has been granted pursuant to ECC S.30.120.
Traffic Control Handout
Traffic Control per approved plan and MUTCD. Refer to City of Edmonds traffic control requirements.
Underground Utility Locates
Call for locates of underground utilities prior to any excavation.
Utility Patch Restoration
Utility patch restoration to be in accordance with Edmonds Standard detail E2.3
Work on Adjacent Property
Easement and/or permission from adjacent property owner is required prior to entry/work within
adjacent property.
INSPECTION TYPE,
DATE
COMPLETE
01AUX0111114" LIM
RESULT NOTES
ROW COMPACT TEST
ROW CURB POST
ROW CURB PRE
ROW DW APPROACH
ROW MAILBOX PRE
ROW PVMT SUBGRADE
ROW RESTOR LIMITS
ROW SIDEWALK POST
ROW SIDEWALK PRE
ROW STRIPING
ROW TRAFFIC CTRL
SWR LTRAL CONNECT
SWR LTRAL PRESSUR
SWR MAIN TAP
SWR PIPE
ROW STRM CONNECT
ENGINEERING FINAL"
Printed: Tuesday, January 21, 2020 9:43:15 AM 2 of 2
SEWER PERMIT
VJ PERMIT NUMB���
7-7 " City of Edmonds
121 Sth Ave N, Edmonds WA 98020 ENG2019-0438
www.cityofedmonds.gov / 425.771.0220
Description: INSTALL SIDE SEWER ISSUED: 01/22/2020
Address: 9527 190TH PL SW EDMONDS WA 98020
EXPIRES- 01/22/2021
PermitType: SEWER Permit Subtype: OTHER Parcel Number: 00434600007901
CONTACTS
NAME TYPE NAME ADDRESS PHONE
APPLICANT CHAK AND EVA AW 114 N 200TH ST, SHORELINE WA 98133 (425)785-2038
CONTRACTOR PETERSON CUSTOM HOMES 2114 120TH PL SW, EVERETT WA 98204 (206)351-7255
OWNER CHAK AND EVA AW 114 N 200TH ST, SHORELINE WA 98133 (425)785-2038
FEE INFORMATION
DESCRIPTION AMOUNT PAV
ENGINEERING INSPECTION FEE $200.00
SEWER GENERAL FACILITY CHARGE RESIDENTIAL $4,417.00
SIDE SEWER NEW $100.00
X-TECHNOLOGY FEE $35.00
REQUIREMENTS
REQUIREMENT TYPE
NOTES
TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the
City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their posession.
RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched
with asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following
the final inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
77
24 HR NOTICE REQUIRED
INDEMNITY
The Applicant has signed an application which states helshe holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments
or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of
granting this permit.
RELEASED BY
THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW
DATE
Printed: Tuesday, January 21, 2020 9:44:48 AM I of 2
SEWER PERMIT
PERMIT NUMBER
City of Edmonds
121 Sth Ave N, Edmonds WA 98020 ENG2019-0438
www.cityofedmonds.gov / 42S.771.0220
CONDITIONS
CONDITION TYPE
NOTES
10'Separation- Water &
Maintain 10' separation between the sanitary side sewer and the water service line.
Sewer
Damage to Frontage
Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per
Improvements
City standards that is caused by or occurs during the permitted project.
Owner/Contractor to provide Side Sewer asbuilt at final inspection. See City Standards for
Side Sewer Asbuilt
requirements.
Refer to City of Edmonds Side Sewer Information handout for approved pipe materials, inspections
Side Sewer Handout
and other requirements.
Underground Utility LocatesTCall
for locates of underground utilities prior to any excavation.
INSPECTIONS
INSPECTION TYPE
DATE
RESULT NOTES
COMPLETE
SWR ASBUILT
SWR FINAL"
SWR PIPE
Printed: Tuesday, January 21, 2020 9:44:48 AM 2 of 2
WATER
METER RECORD
PERMIT NIUMBEk,
-7
77
City of Edmonds
'a'
121 Sth
Ave N, Edmonds WA 98020 �ENG2019-0431%
www.edmondswa.gov
/ 425.771.0220
1014 1111 1.161 :4 IT, r-11V 9 Lai I, i
WATER METER SIZE:
I ISSUED: 01/22/2020
SITE ADDRESS: 9527 190TH PL SW EDMONDS WA 98020
IRRIGATION ONLY: FIRE
SPRINKLING: APARTMENT/CCINDO UNITS:
CONTACTS
NAME TYPE NAME
ADDRESS PHONE
APPLICANT CHAK AND EVA AW
114 N 200TH ST, SHORELINE WA98133 (425)785-2038
CONTRACTOR PETERSON CUSTOM
2114 120TH PL SW, EVERETT WA 98204 (206)3S1-7255
HOMES
OWNER CHAK AND EVA AW
114 N 200TH ST, SHORELINE WA 98133 (42S)78S-2038
FEE INFORMATION
DESCRIPTION
AMOUNT PAID PAID DATE
1" WATER METER FEE
$2,970.00
3/4" WATER GENERAL FACILITY CONNECTION
$5,050.00
PUBLIC WORKS
-UTILITY BILLING INFORMATION
METER NUMBER:
REGISTER NUMBER:
METER LOCATION:
BRAND:
INSTALLATION DATE:
INSTALLED BY:
SERVICE MATERIAL/SIZE:
READ AFTER ADDRESS:
BILLING ACCOUNT NO:
ROUTE:
ADDITIONAL INFORMATION: Fire Sprinkling
TO SCHEDJLE
INSTALLATION, CALL 425.771.0235
THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW
KtLtA.')tU t5Y UA I t
Printed: Tuesday, January 21, 2020 9:46:16 AM 1 of 1
A SPECIAL INSPECTION AND TESTING AGREEMENT
1P
Permit BLD2019-0705
Project: Schwarz,18606 Soundview Place
Prior to issuance of a permit, thiYfivin must be completed in its entirely and returned to the Cityfor
approval. The completedform muw have signatures of acknowledgment by. all parties.
DITTIES AND RESPONSIBILITIES
SI1ECi2I Inspection Firin and Special Inspectors -
The Special Inspection firm of rlr'o�'Cj T_-'
Will perform special inspection for the following types of work (separate forms must be submitted if more than
one firm is (o be employed):
--Reinforced Concrete
—Bolting in Concrete
—Prestressed Concrete
—Shoterete
—Structural Masonry
--Structural Steel/Welding
—fligh Strength Bolting
--Spray applied Fireproofing
—Smoke Control Systems
—Lateral Wood
—.-Structural Observation by design professional
_X_ (irrading/soilsi Pipe Piles
—Stec! Floor arid Rool'Decks
—Other— , _.-
All individual inspectors to be employed on this project will be WADO certified for tile ty
. pe of work they are to
inspect. If inspection is for -,kork that is not covered by the WA130 categories, or the inspector is not WABO
certified. a detailed resunic of the inspector and Finn must be submitted. The resume must show that the
inspector arid tile firin are qualified by education and experience to perform the wor� and testing required by the
project desigm and specificai ions.
Thework shall be inspected for conformance with the plans and specifications approved by the City. Revisions
and addenda sheets will not be used for inspection, unless tile), have been approved by the City. Inspcclion
records shall include:
A daily record to be maintained on site, itemizing tile inspections performed. Any nonconforming work
shall be brought to the immediate attention ofthe contractor for resolution.
A wcckly report shall be submitted to the City, detailing the inspections and testing performed, listing
any nonconforming work and resolution ot'nonconforming items.
A final report shall be submitted to tile building department prior to the Cuilificatv of OQcupancy being,
issued. This report will indicate that inspection and testing was completed in conformance with the
approved plans, sp"Ifications and approved revisions or addenda. Any unresolved discrepancies must
be detai led in the final rcport.
haps 'n-dms,%t-crakappr1 RAh.; St:hwitrz 2019-07 05 docl,'1412020
Contmetor,
The contractor shall providC tile special inspector or agency adequate notification of work requiring inspection.
The City approved plan and specificatioris must be made available, at thejobsite for tile uSe of the special
inspector and the City inspector. The contractor -,hall maintain all daily inspection reports, oil site, for review by
all parties.
The special inspection functions are considered to be in addition to the norinal inspections performed by the City
and tile contractor is responsible for contacting the City to schedule regular inspections, No concrete shall be
poured or other work covered until approval is given by the City inspector.
Buildina Depailment:
The buildine department shall review any revisions and addenda, The Cit% inspector will monitor the special
inspection iunctions for compliance with tile agreement and the approved plans, The City inspector shall be
responsible For approving various stages of construction to be covered and for work to proceed.
Desityn Profmionnis:
The architect andfor engineer will clearly indicate on the plans and specifications the specific types of special
inspection required and shall include a s�hedule for inspection and testing. Tile architect and/or engineer will
coordinate their revision and addenda process in such i way as to ensure that all required City approvals are
obtained. prior to work shown oil the revisions being performed in tile field
Owntr:
The project owner, or the architect or engineer acting as tile owners ap
,ent, shall employ the special inspector or
agency.
ENIFORCEMENT
A failure of the special inspector or firm to perform in keeping with the requirements of the 113C, the approved
plans and this document, may void this agreement and the Building Official's approval of the special inspector.
In such a case a new special inspector and/or firm would need to be proposed for approval. A failure of the
design andior construction parties to perform in accordance with this agreement may result in a STOP WORK
notice being posted on the project until nonconforming items have b"n resolved.
ACKNOWLEDGMENTS
I have read and agree to comply with the terins and conditions of this agreement.
Owner: Signature --Date 7,7, Je, ZP-"
A f)y N-r- ;J
Conti -actor: Date: �0
Arch. /Fng: Karl Schmidt Signature Date; 1.14.20
R_ M LC
Special Insp. r Signature Date: X0
Special Insp. Agency
e, n 4 & a kl - C.J,-
ACCEPTED FO � JE CITY OF EDMONDS BUILDING DIVISION
By: Date: 41-2-/501Z 0
Schwarz 20119-0705.doc 1114,2026
AMERICAN FOREST
MANAGEMENT
Addendum
To:
Jacob Strobl
01;lava BY A P
Company: Strobl Design
From:
Benjamin Mark — American Forest Management
1, J� A
CC:
2,02-0
Date:
3/6/2020
Re:
Proposed work near tree #106 at 9527 190th Place SW- Edmonds, WA
Greetings,
Per your request, On March 4, 2020, 1 evaluated the recent excavation near the root system of
a tree identified in an arborist report I prepared on April 17th, 2019 as #106.
The subject tree is a Douglas fir with a dripline to the south of 18 feet, 12 feet to the east, and
14 feet to the west. The dripline extends over the property line to the north. Prior to
construction, this tree was surrounded by several mature Douglas fir trees to the west, south
and east which have since been removed. The original arborist report recommended a limit of
disturbance to the roots of Tree #106 no closer than 15 feet to the south.
I visited the site to assess the subject tree's condition following excavation to the south for a
concrete foundation. I found the grade 6 feet south of Tree #106 lowered by approximately 4
feet. Several large structural roots were found cleanly cut at the face of the newly excavated
slope. Seven cut roots over 2 inches were documented. These range in diameter from 3 to 7
inches. A very large surface root at least 12 inches in diameter extends to the north and
appears unaffected by the recent work.
The cut roots represent a significant defect directly impacting the stability of this tree. Using the
International Society of Arboriculture (ISA) Basic Tree Risk Assessment method, I determined
the risk currently presented by this tree under normal weather conditions over a two year time
frame to be HIGH.
This assessment is made subject to Level 2 TRAQ assessment guidelines and best management
practices and represents my observations on the day of the inspection.
I used the ISA Basic Tree Risk Assessment method and assessed this tree for risk of branch or
666rhl
trunk failure. I determined the primary target in the event of failure to be the ne,ig, , , , g A
I IL 12020
11415 NE 128th St, Suite 110, Kirkland, WA 98034 1 Phone: 425.820.3420 1 Fax: 425.820.3437 1 arnericanfor�e'strqqricrj�6-rrt t,!i9rh,
�Cjs
Memo —9527 190th Place SW, Edmonds WA
house to the north due to the prevalence of winds from the south west in this area, and all of
the roots on the south side of this tree being severed.
I determined the likelihood of whole tree failure to be probable under normal weather
conditions in a two year time frame. I also determined the likelihood of the tree striking the
target in the event of failure. Following these conclusions, I assigned the following rating:
TREE #106
WHOLE TREE failure within the following two years is PROBABLE, with a HIGH likelihood of
striking the neighboring house. It is LIKELY the probability of failure and impact would result in
SEVERE consequences such as damage to high value property, serious injury or fatality, or
major disruptions. Following the ISA TRAQ Risk Categorization Matrix, this tree presents a HIGH
risk.
Recommendations
• Adhere to City of Edmonds City Code 18.45.050 — Performance Standards for Land
Development Permits.
• Consult with your City Planner to determine options to expedite removal of this High
Risk tree.
• Obtain all necessary permits from the City of Edmonds before carrying out removal of
this tree.
There is no warranty suggested for any of the trees subject to this report. Weather, latent tree
conditions, and future man -caused activities could cause physiologic changes and deteriorating tree
condition. Over time, deteriorating tree conditions may appear and there may be conditions, which
are not now visible which, could cause tree failure. This report or the verbal comments made at the
site in no way warrant the structural stability or long term condition of any tree, but represent my
opinion based on the observations made.
Nearly all trees in any condition standing within reach of improvements or human use areas represent
hazards that could lead to damage or injury.
Please call if you have any questions or need further assistance on this project.
Sincerely,
Benjamin Mark
ISA Certified Arborist #PN-6976A
ISA Tree Risk Assessment Qualified
American Forest Management, Inc. March 5, 2020
13W
Ail
IZZ
AI-7
An
7
nk J,4
'his neighboring house is a
Potential target in the event
ff a whole tree failure.
RAN-,
Memo —9527 190th Place SW, Edmonds WA
Looking down at the face of the excavated slope and recently assembled concrete form for the
foundation. Note the largest root cut is at the surface and is approximately 6 feet from the
trunk of #106.
American Forest Management, Inc. March 5, 2020
AMERICAN FOREST MANAGEMENT
Date: 3.4.2020
Inspector: Benjamin Mark
TREE RISK ASSESSMENT SUMMARY
Site: 9527 119Gth Place SW
Edmonds, WA 98020
DEIIH Height
Tree # Spec!" (Inch-) (feet) Location Defects Failure Impact Conseq. EM Recommendation
Recent excavation and all roots cut 6
On slope near north
feet south of this tree. Newly
106
Douglas fir
39
115
property line.
exposed interior tree.
Probable
High
Severe
High
Remove
Lik 9-Iffibod of Failure
Imminent - started or likely in near future
Probable - expected in normal weather conditions
Possible - could occur, but unlikely in normal weather conditions
Improbable - not likely in most weather conditions
Likelihood of Impact
Very Low - remote, protected target, rarely used
Low - not likely, protected target, occasionally used area
Medium - 50/50 chance of impacting target
High - most likely, fully exposed target, constant occupancy
Likelihood
offallure
Likelihood Impactilria Tar,
iet
Vert lWvT—
Low
I Medium
H I a h
lomminiont
Unlikely
Sam what likely
Likely
Very likely
Probable_
Unlikely
Unlikely
Somewhat Likely
Likely
:Possible
Unlikely
Unlikely
Unlikely
Somewhat Likely
� Improibable
Unlikely
Unlikely
Unlikely
Unlikely
'C of re
Illue
o"Seque"tos
Negligible - no injury, repaired or replaced, low -value
Minor - moderate property damage, minor injury, small disruptions
Significant - high property damage, considerable disruption or personal injury
Severe - damage to high value property, serious injury or fatality, major disruption
Likelihood of failure
& Impact
Conswequ nwsoffailure
Negligible
Minor
Significant
Severe
Vqry likely
Low
Moderate
High
Extreme
it 4
Low
Moderate
High
High
Sbrin,ewhat likely
Low
Low
Moderate
Moderate
Unlikely
Low
Low
Low
Low
Low - mitigation may be appropriate, lower work priority
Moderate - mitigation and/or retention and monitoring
High - mitigation measures must be taken
Extreme - mitigation measures as soon as possible
A
-'Mar
AMERICAN FOREST
MANAGEMENT
Aw Property
9527 190th Place SW
Edmonds, WA 98020
Arborist Report
April 17, 2019
11415 NE 1281h St., Suite 1 TO, Kirkland, WA 98034 1 Phone, 425.820.3420 1 Fax: 425.820.3437
a merica nf orestmanagement.com
April 171h, 2079
Page I
Table of Contents
1 . Introduction ....................................................................................................................... .............................. 2
2. Description ........................................................................................................................ .............................. 2
3. Methodology .................................................................................................................... . ............................. 2
4. Observations ..................................................................................................................... . ............................. 3
5. Discussion ........................................................................................................................... . ............................. 4
6. Tree Protection Measures ................................................................................... 4
Appendix
Site/Tree Photos — pages 6-7
Tree Summary Table - attached
Tree Conditions/Tree Plan Map
AMERICAN FOREST MANAGEMENT, INC.
April 17th, 2019
Page 2
1. Introduction
American Forest Management was contacted by Jacob Strobl, architect at Strobl Design and asked to
compile an arborist report for a parceflocated within the City of Edmonds.
The proposed development encompasses Snohomish County Parcel #00434600007901. Our
assignment is to prepare a written report on present tree conditions, which is to be filed with the
preliminary permit application.
This report encompasses all of the criteria set forth under the City of Edmonds tree regulations
(Chapter 18.45 of the Edmonds Community Development Code - ECDC).
Dateof Field Examination . .................................................................................................... April 12, 2019
2. Description
Fifteen significant trees with a caliper 6 inches or greater 4 feet above grade (or diameter at breast
height - DBH) were located and assessed on the property. None of these trees are considered non-
viable due to poor health condition, however there are two standing dead snags in this grove.
Additionally, two neighboring trees with driplines that extend over the property line were also
assessed for potential impacts from the proposed development.
Every tree included in this report was identified in the field with a numbered aluminum tag. These tag
numbers correspond with the attached Tree Summary Table and Tree Map. Several trees were found
which did not appear on the original survey. These were added on the attached Tree Summary Table
and their approximate location added to the Tree Map. Their actual location should be verified in an
updated survey. The tree summary table provides descriptive data for all assessed trees, including
drip -line measurements.
3. Methodology
Each tree in this report was visited. Tree diameters were measured by tape. This required removing
some ivy from each tree to get an accurate measurement. The tree heights were measured using a
digital clinometer. Each tree was visually examined for defects and vigor. The tree assessment
procedure involves the examination of many factors:
• The crown of the tree is examined for current vigor. This is comprised of inspecting the
crown (foliage, buds and branches) for color, density, form, and annual shoot growth, limb
dieback and disease. The percentage of live crown is estimated for coniferous species only
and scored appropriately.
• The bole or main stem of the tree is inspected for decay, which includes cavities, wounds,
fruiting bodies of decay (conks or mushrooms), seams, insects, bleeding, callus development,
broken or dead tops, structural defects and unnatural leans. Structural defects include
crooks, forks with V-shaped crotches, multiple attachments, and excessive sweep.
• The root collar and roots are inspected for the presence of decay, insects and/or damage,
as well as if they have been injured, undermined or exposed, or original grade has been
altered.
Based on these factors a determination of viability is made. Trees considered 'non -viable' are trees
that are in poor condition due to disease, extensive decay and/or cumulative structural defects, which
exacerbate failure potential. A 'viable' tree is a tree found to be in good health, in a sound condition
AMERICAN FOREST MANAGEMENT, INC.
April 171h, 2019
Page 3
with minimal defects and is suitable for its location. Also, it will be wind firm if isolated or left as part
of a grouping or grove of trees.
The four condition categories are described below:
Excellent — free of structural defects, no disease or pest problems, no root issues, excellent
structure/form with uniform crown or canopy, foliage of normal color and density, above average
vigor, it will be wind firm if isolated, suitable for its location
Good —free of significant structural defects, no disease concerns, minor pest issues, no significant root
issues, good structure/form with uniform crown or canopy, foliage of normal color and density,
average or normal vigor, will be wind firm if isolated or left as part of a grouping or grove of trees,
suitable for its location
Fair — minor to moderate structural defects not expected to contribute to a failure in the near future,
no disease concerns, moderate pest issues, no significant root issues, asymmetric or unbalanced crown
or canopy, average or normal vigor, foliage of normal color, moderate foliage density, will be wind
firm if left as part of a grouping or grove of trees, cannot be isolated, suitable for its location
Poor — major structural defects expected to cause fail in the near future, disease or significant pest
concerns, decline due to old age, significant root issues, asymmetric or unbalanced crown or canopy,
sparse or abnormally small foliage, poor vigor, and/or not suitable for its location
The attached Tree Summary Table provides specific information on tree sizes and drip -line
measurements.
4. Observations
Most of the subject parcel was covered in dense mats of English ivy which is climbing into the canopy
of the majority of the trees included in this report.
Twelve of the 15 significant trees found here are Douglas fir (Pseudotsuga menziesii) all but two of
which are in good condition, the others are in fair condition. These range in caliper from 15"-44". Most
are on the larger end of this range with an average caliper of 35.75"
Trees #101 -107 are Douglas fir situated near the northern edge of the subject property. Most of
these form a grove of contiguous canopy cover which includes trees north of the property line. There
are two standing dead snags in this grove. Trees #101 and #106 are the only trees able to be
retained in the proposed site plan due to the necessary excavation cut on the hillside. There are likely
large structural roots on this slope which would be destroyed at the planned grade.
Trees #108-112 are Douglas fir in the center of the parcel. All of these will need to be removed for
the proposed structure to fit within the front yard setback. Limits of disturbance are shown for some
trees which are proposed for removal in case revised plans include their retention.
Other species present are red older (Alnus rubra), big leaf maple (Acer macrophyflum), and bitter
cherry (Prunus emorginata). These are all located along the raised grade within the proposed building
footprint. These are considered 'pioneer species' trees which are often the first to naturally germinate
in open areas. These are fast growing when young, and quickly reach maturity. Their branch strength is
rated as weak. A typical characteristic of these trees upon reaching maturity is to shed limbs as they
become host to decaying fungi and eventually fall from primary stem failure.
AMERICAN FOREST MANAGEMENT, INC.
April 771h, 2019
Page 4
Neighboring Trees with Overhanging Canopies
Tree #201 is an apple (Malus sp.) with two primary stems for a calculated 8" DBH which has been
regularly pruned to maintain a height of 12'. This tree is part of a small orchard in the southwest
corner of the neighboring property. Its canopy extends approximately 12' over the east property line.
This tree is below the existing driveway grade 6' to the west.
#202 is a Douglas fir with a DBH of 14" growing just north of the property line in a grove which
includes trees #101 -107. It is in fair condition with a thin canopy as a result of being dominated by
the larger trees nearby.
5. Discussion/Recommendations
Due to lack of existing targets, no high -risk tree conditions were observed at the site. All subject
trees would be rated as low to moderate risk under an ISA Level 11 Basic Assessment, however this
assessment is a limited by the extent of ivy coverage on their lower trunks. A reassessment upon
final building and grading plans would be prudent.
Given the proposed site plan, few of the trees found on the property are able to be retained. These
trees are primarily Douglas fir and will help maintain a buffer to the property to the north.
The neighboring trees to the north are not likely to sustain damage related to construction if all work
performed remains outside of their Limits of Disturbance (LOD). The ground to the south of them on the
subject property is sloped and there are several large trees which are not able to be retained (#102,
#103, #104, and #105) due to the excavation cut to meet planned grade. Neighboring tree #202 is
located at the top of the slope and is dominated by the larger trees to the south. This has led it to
developing a thin canopy and likely a relatively small structural root system due to the larger trees
sheltering it from prevailing winds. Removing these trees, particularly #105 will open up tree #202 to
more severe exposure than it has previously received.
The extent of drip -lines (farthest reaching branches) for the subject trees to be retained can be
found on the tree summary table at the back of this report. The recommended LOD measurements
can also be found on the tree summary table. The LOD measurements are based on species, age,
condition, drip -line, and prior improvements. These shall be referenced when determining the
feasibility of retention.
6. Tree Protection Measures
The following general guidelines are recommended to ensure that the designated areas set aside for
the preserved trees are protected and construction impacts are kept to a minimum. Tree protection
should adhere to best management practices for tree and soil protection during development activity.
1. Tree protection fencing shall be erected around retained trees and positioned just beyond the drip -
line edge prior to moving any heavy equipment on site. Doing this will set clearing limits and avoid
compaction of soils within root zones of retained trees.
2. Any existing improvements to be removed within the drip -lines or tree protection zones shall be
removed by hand or utilizing a tracked mini -excavator.
3. Excavation limits should be laid out in paint on the ground to avoid over excavating.
AMERICAN FOREST MANAGEMENT, INC.
April 171h, 2019
Page 5
4. Excavations within the drip -lines shall be monitored by a qualified tree professional so necessary
precautions can be taken to decrease impacts to tree parts. A qualified tree professional shall monitor
excavations when work is required and allowed within the "limits of disturbance".
5. To establish sub grade for foundations, curbs and pavement sections near the trees, soil should be
removed parallel to the roots and not at 90 degree angles to avoid breaking and tearing roots that
lead back to the trunk within the drip -line. Any roots damaged during these excavations should be
exposed to sound tissue and cut cleanly with a saw. Cutting tools should be sterilized with alcohol.
6. Areas excavated within the drip -line of retained trees should be thoroughly irrigated daily during
dry periods.
7. Preparations for final landscaping shall be accomplished by hand within the drip -lines of retained
trees. Large equipment shall be kept outside of the tree protection zones at all times. Simply finish
landscape within 10' of retained trees with a 2" to 4" layer of organic mulch.
There is no warranty suggested for any of the trees subject to this report. Weather, latent free conditions,
and future man -caused activities could cause physiologic changes and deteriorating tree condition. Oyer
time, deteriorating tree conditions may appear and there may be conditions, which are not now visible
which, could cause tree failure. This report or the verbal comments made at the site in no way warrant the
structural stability or long term condition of any tree, but represent my opinion based on the observations
made.
Nearly all trees in any condition standing within reach of improvements or human use areas represent
hazards that could lead to damage or injury.
Please call if you have any questions or if we can be of further assistance.
Sincerely,
q1401"
IV
Benjamin Mark
ISA Certified Arborist #PN-6976A
ISA Tree Risk Assessment Qualified
AMERICAN FOREST MANAGEMENT, INC.
April 7 71�, 20 7 9
Page 6
Photos
#108#109 #106 #110 #111 #112
:)te ivy on
�ms
AMERICAN FOREST MANAGEMENT, INC.
I k�is
.. �l I I . Ti
N 4
FA
ot 4;'
'lei
3�3.?rs
z "a
I li-f ,
N-4
-a� 7, '404
Ik
Htm o
ZN
On- I
AW4L
10
C, L l"L I
b2
10
102, f
Jul
104-
. . ........ .. .
113
IV
5r.7 MI.
14
Is X/1" 1Z
Fri,=
4 ?"o
t I
4-p
-77; PKW
—.0 0u: Hle,
N'LL t, I IVIL *t�\,
rviek
I'Z' .1AoK LIM
;;;jr
rw 1�
01 -q — 6 -INC
MPL�.
a i
N
4
LIMIT OF
t> % S Tv e S 0,,N(.X
X �UV�SMVt(2-
ftm�ovp(k;
Tree Summa Table I I I
American orest Management, Inc.
For:
9527 190th PI SW Edmonds WA
Date:
4/11/2019
Inspector:
Ben Mark
Tag
1113
Genus species
I DBH (inches)
Height (feet)
D -Lin2 LIM it of Disturbance (feet)
L
I Condition
Viable
I yes/no
Proposal
Comments
N S
W
I
101
Douglas Fir
Pseudotsuga menziesii
37
107
21
14
Good
Yes
Retain
Trunk touches utilitiy lines. Ivy. Limbed up @ 30' and thin above
102
Douglas Fir
Pseudotsuga menzlesii
15
85
12
14
6
Good
Yes
Remove
Added to map
103
Douglas Fir
Pseudotsuga menziesti
27
95
16
14
10
Good
-Yes
Remove
Next to snag
104
Douglas Fir
Pseudotsuga menziesii
34
110
24
19
22
Good
Yes
Remove
105
Douglas Fir
Pseudotsuga menziesri
36
105
14
19
22/15
Good
Yes
Remove
No canopy north
106
Douglas Fir
Pseudotsuga menz�esfi
39
115
18/15
12
14
Fair
Yes
Retain
Possible decay present in main stem. Added to map
107
Douglas Fir
Pseudotsuga menziesii
41
97
15
16
22/16
Good
Yes
Remove
Good taper
108
Douglas Fir
Pseudotsuga menziesn
39
64
28
18
25
Fair
Yes
Remove
Broken at 38'
109
Douglas Fir
Pseudotsuga menziesit
44
118
20
12
20
Good
Yes
Remove
Stout taper. Added to map
110
Douglas Fir
Pseudotsuga menziesti
38
120
26/15
6
19
Good
Yes
Remove
Dense ivy on south side. Just south of dead Douglas Fir
I'll
Douglas Fir
Pseudotsuga menziesii
35
117
25/15
15
Good
Yes
Remove
112
Douglas Fir
Pseudotsuga menziesfi
44
105
16
16
16
Fair
Yes
Remove
Broken at 39'. New leader and lesser codominant. Added to map
113
Alder
Alnus, rubra
14
51
16
16
20
12
Fair
Yes
Remove
Leans east. Added to map.
114
[Bitter Cherry
Prunus emarginata
11
6
10
7
11
a:[
Yes
Remove
Broken top. Added to map
115
Big Leaf Maple
71 r macrophyllum
20
61
12
1 16
14
1
F; r
Yes
Remo�dded
to map
Neighbor
Trees
201
jApple
malus so
5,6
12
12/6
Good
Yes
202
1 Douglas Fir
Pseudotsugs menziesii
114
Fair
Yes
Leans west, thin crown
Drip -Line and Limits of Disturbance measurements from face of trunk
Trees on neighboring properties - Drip -line and Limits of Disturbance measurements from property lines
Calculated DBH for multistern trees: The DBH in BOLD is the square root of the sum of the DBH of each
individual stem, squared. Example 3
stem DBH = Square Root 1(steml)2 + (stem2)2 + (stem3)2 )]
Addendum
To: Jacob Strobl
Company: Strobl Design
From: Benjamin Mark — American Forest Management
cG
Date:
Re:
Greetings,
3/6/2020
Proposed work near tree #106 at 9527 190th Place SW- Edmonds, WA
AMERICAN FOREST
MANAGEMENT
P
JU
Per your request, On March 4, 2020, 1 evaluated the recent excavation near the root system of
a tree identified in an arborist report I prepared on April 17th, 2019 as #106.
The subject tree is a Douglas fir with a dripline to the south of 18 feet, 12 feet to the east, and
14 feet to the west. The dripline extends over the property line to the north. Prior to
construction, this tree was surrounded by several mature Douglas fir trees to the west, south
and east which have since been removed. The original arborist report recommended a limit of
disturbance to the roots of Tree #106 no closer than 15 feet to the south.
I visited the site to assess the subject tree's condition following excavation to the south for a
concrete foundation. I found the grade 6 feet south of Tree #106 lowered by approximately 4
feet. Several large structural roots were found cleanly cut at the face of the newly excavated
slope. Seven cut roots over 2 inches were documented. These range in diameter from 3 to 7
inches. A very large surface root at least 12 inches in diameter extends to the north and
appears unaffected by the recent work.
The cut roots represent a significant defect directly impacting the stability of this tree. Using the
International Society of Arboriculture (ISA) Basic Tree Risk Assessment method, I determined
the risk currently presented by this tree under normal weather conditions over a two year time
frame to be HIGH.
This assessment is made subject to Level 2 TRAQ assessment guidelines and best management
practices and represents my observations on the day of the inspection.
I used the ISA Basic Tree Risk Assessment method and assessed this tree for risk of branch or
trunk failure. I determined the primary target in the event of failure to be the neighboring
ea(-) k q
D Cp
f I . -) I " 2:." J
I ,-.% U -
11415 NE I 281h St., Suite I 10, Kirkland, WA 9803A I Phone: 425.820.3420 1 Fax: 425.820.3437 1 arnericanfo;iestmanagement.corn
Y C. ZZZ..�(
I c�,.,� j , i
Memo —9527 190th Place SW, Edmonds WA
house to the north due to the prevalence of winds from the south west in this area, and all of
the roots on the south side of this tree being severed.
I determined the likelihood of whole tree failure to be probable under normal weather
conditions in a two year time frame. I also determined the likelihood of the tree striking the
target in the event of failure. Following these conclusions, I assigned the following rating:
TREE #106
WHOLE TREE failure within the following two years is PROBABLE, with a HIGH likelihood of
striking the neighboring house. It is LIKELY the probability of failure and impact would result in
SEVERE consequences such as damage to high value property, serious injury or fatality, or
major disruptions. Following the ISA TRAQ Risk Categorization Matrix, this tree presents a HIGH
risk.
Recommendations
Adhere to City of Edmonds City Code 18.45.050— Performance Standards for Land
Development Permits.
• Consult with your City Planner to determine options to expedite removal of this High
Risk tree.
• Obtain all necessary permits from the City of Edmonds before carrying out removal of
this tree.
There is no warranty suggested for any of the trees subject to this report. Weather, latent tree
conditions, and future man -caused activities could cause physiologic changes and deteriorating tree
condition. Over time, deteriorating free conditions may appear and there may be conditions, which
are not now visible which, could cause tree failure. This report or the verbal comments made at the
site in no way warrant the structural stability or long term condition of any free, but represent my
opinion based on the observations made.
Nearly all trees in any condition standing within reach of improvements or human use areas represent
hazards that could lead to damage or injury.
Please call if you have any questions or need further assistance on this project.
Sincerely,
9 -
'/1", Jkk���
Benjamin Mark
ISA Certified Arborist #PN-6976A
ISA Tree Risk Assessment Qualified
American Forest Management, Inc. March 5, 2020
- I-q'S 41
., 4
140.
,let ''Y
At,
tiv.
J
AU
V4
C-A
''. � fl.
Memo —9527 190th Place SW, Edmonds WA
Looking down at the face of the excavated slope and recently assembled concrete form for the
foundation. Note the largest root cut is at the surface and is approximately 6 feet from the
trunk of #106.
American Forest Management, Inc. March 5, 2020
AMERICAN FOREST MANAGEMENT
Date: 3.4.2020
Inspector: Benjamin Mark
TREE RISK ASSESSMENT SUMMARY
Site: 9527 19Dth Place SW
Edmonds, WA 98020
DUH Height
Tree # Species (inches) (feet) Location Defects Failure Impact Conseq. En Recommendation
Re ent excavation and all roots cut 6
On slope near north
fee south of this tree. Newly
106
Douglas fir
39
115
property line.
exposed interior tree.
Probable
High
Severe
High
Remove
Likelihood ofFallure
Imminent - started or likely in near future
Probable - expected in normal weather conditions
Possible - could occur, but unlikely in normal weather conditions
Improbable - not likely in most weather conditions
Likelihood of Impact
Very Low - remote, protected target, rarely used
Low - not likely, protected target, occasionally used area
Medium - 50/50 chance of impacting target
High - most likely, fully exposed target, constant occupancy
Likelihood
of fallure
lukellihood Impactlourer3et
io: �'E
LIM N, 11
1"Medhim,
r 'Igh
tramilnent.
Unlikely
Some hat likely
Likely
Very likely
Probable_
Unlikely
U likely
Somewhat Likely
Likely
��
Unlikel
Unlikely
Unlikely
Somewhat Likely
Ulblo
Unrpmobablo
Unlikely
Unlikely
Unlikely
Unlikely
................ - ---- �'ll""I'll, . 11- 1 .1-1.1-1 1-, . . --- 11 f
Copsequences o Failure j.1, R"
Negligible - no injury, repaired or replaced, low -value
Minor - moderate property damage, minor injury, small disruptions
Significant - high property damage, considerable disruption or personal injury
Severe - damage to high value property, serious injury or fatality, major disruption
Likelihood of faillure,
I
impWirct
c2nEt"o
ncesofFe Hure,
Neallolble
—MAU
-qU
Minor
I Sianificant
I Severe
Very likely
Low
Moderate
High
Extreme
Likely
Low
Moderate
High
High
Somewhat likely
Low
Low
Moderate
Moderate
Unlikely
Low
Low
Low
Low
Low - mitigation may be appropriate, lower work priority
Moderate - mitigation and/or retention and monitoring
High - mitigation measures must be taken
Extreme - mitigation measures as soon as possible
4N
April 171h, 20 7 9
Page I
Table of Contents
1. Introduction ...................................................................................................................................................... 2
2. Description ....................................................................................................................................................... 2
3. Methodology ................................................................................................................................................... 2
A. Observations ................................................................................................................................................... 3
5. Discussion .......................................................................................................................................................... 4
6. Tree Protection Measures ................................................................................... A
Appendix
Site/Tree Photos — pages 6-7
Tree Summary Table - attached
Tree Conditions/Tree Plan Map
AMERICAN FOREST MANAGEMENT, INC.
April 771h, 2079
Page 2
1. Introduction
American Forest Management was contacted by Jacob Strobl, architect at Strobl Design and asked to
compile an arborist report for a parcel located within the City of Edmonds.
The proposed development encompasses Snohomish County Parcel #00434600007901. Our
assignment is to prepare a written report on present tree conditions, which is to be filed with the
preliminary permit application.
This report encompasses all of the criteria set forth under the City of Edmonds tree regulations
(Chapter 18.45 of the Edmonds Community Development Code - ECDC).
Dateof Field Examination: .................................................................................................... April 12, 2019
2. Description
Fifteen significant trees with a caliper 6 inches or greater 4 feet above grade (or diameter at breast
height - DBH) were located and assessed on the property. None of these trees are considered non-
viable due to poor health condition, however there are two standing dead snags in this grove.
Additionally, two neighboring trees with driplines that extend over the property line were also
assessed for potential impacts from the proposed development.
Every tree included in this report was identified in the field with a numbered aluminum tag. These tag
numbers correspond with the attached Tree Summary Table and Tree Map. Several trees were found
which did not appear on the original survey. These were added on the attached Tree Summary Table
and their approximate location added to the Tree Map. Their actual location should be verified in an
updated survey. The tree summary table provides descriptive data for all assessed trees, including
drip -line measurements.
3. Methodology
Each tree in this report was visited. Tree diameters were measured by tape. This required removing
some ivy from each tree to get an accurate measurement. The tree heights were measured using a
digital clinometer. Each tree was visually examined for defects and vigor. The tree assessment
procedure involves the examination of many factors:
• The crown of the tree is examined for current vigor. This is comprised of inspecting the
crown (foliage, buds and branches) for color, density, form, and annual shoot growth, limb
dieback and disease. The percentage of live crown is estimated for coniferous species only
and scored appropriately.
• The bole or main stem of the tree is inspected for decay, which includes cavities, wounds,
fruiting bodies of decay (conks or mushrooms), seams, insects, bleeding, callus development,
broken or dead tops, structural defects and unnatural leans. Structural defects include
crooks, forks with V-shaped crotches, multiple attachments, and excessive sweep.
• The root collar and roots are inspected for the presence of decay, insects and/or damage,
as well as if they have been injured, undermined or exposed, or original grade has been
altered.
Based on these factors a determination of viability is made. Trees considered 'non -viable' are trees
that are in poor condition due to disease, extensive decay and/or cumulative structural defects, which
exacerbate failure potential. A 'viable' tree is a tree found to be in good health, in a sound condition
AMERICAN FOREST MANAGEMENT, INC.
April 171h, 2019
Page 3
with minimal defects and is suitable for its location. Also, it will be wind firm if isolated or left as part
of a grouping or grove of trees.
The four condition categories are described below:
Excellent — free of structural defects, no disease or pest problems, no root issues, excellent
structure/form with uniform crown or canopy, foliage of normal color and density, above average
vigor, it will be wind firm if isolated, suitable for its location
Good — free of significant structural defects, no disease concerns, minor pest issues, no significant root
issues, good structure/form with uniform crown or canopy, foliage of normal color and density,
average or normal vigor, will be wind firm if isolated or left as part of a grouping or grove of trees,
suitable for its location
Fair — minor to moderate structural defects not expected to contribute to a failure in the near future,
no disease concerns, moderate pest issues, no significant root issues, asymmetric or unbalanced crown
or canopy, average or normal vigor, foliage of normal color, moderate foliage density, will be wind
firm if left as part of a grouping or grove of trees, cannot be isolated, suitable for its location
Poor — major structural defects expected to cause fail in the near future, disease or significant pest
concerns, decline due to old age, significant root issues, asymmetric or unbalanced crown or canopy,
sparse or abnormally small foliage, poor vigor, and/or not suitable for its location
The attached Tree Summary Table provides specific information on tree sizes and drip -line
measurements.
4. Observations
Most of the subject parcel was covered in dense mats of English ivy which is climbing into the canopy
of the majority of the trees included in this report.
Twelve of the 15 significant trees found here are Douglas fir (Pseudotsuga menziesii) all but two of
which are in good condition, the others are in fair condition. These range in caliper from 15"-44". Most
are on the larger end of this range with an average caliper of 35.75"
Trees # 10 1 - 107 are Douglas f ir situated near the northern edge of the subject property. Most of
these form a grove of contiguous canopy cover which includes trees north of the property line. There
are two standing dead snags in this grove. Trees #101 and #106 are the only trees able to be
retained in the proposed site plan due to the necessary excavation cut on the hillside. There are likely
large structural roots on this slope which would be destroyed at the planned grade.
Trees #108-112 are Douglas fir in the center of the parcel. All of these will need to be removed for
the proposed structure to fit within the front yard setback. Limits of disturbance are shown for some
trees which are proposed for removal in case revised plans include their retention.
Other species present are red alder (Alnus rubra), big leaf maple (Acer macrophylium), and bitter
cherry (Prunus emarginata). These are all located along the raised grade within the proposed building
footprint. These are considered 'pioneer species' trees which are often the first to naturally germinate
in open areas. These are fast growing when young, and quickly reach maturity. Their branch strength is
rated as weak. A typical characteristic of these trees upon reaching maturity is to shed limbs as they
become host to decaying fungi and eventually fall from primary stem failure.
AMERICAN FOREST MANAGEMENT, INC.
April 171h, 2019
Page 4
Neighboring Trees with Overhanging Canopies
Tree #201 is an apple (Malus sp.) with two primary stems for a calculated 8" DBH which has been
regularly pruned to maintain a height of 12'. This tree is part of a small orchard in the southwest
corner of the neighboring property. Its canopy extends approximately 12' over the east property line.
This tree is below the existing driveway grade 6'to the west.
#202 is a Douglas fir with a DBH of 14" growing just north of the property line in a grove which
includes trees #101 -107. It is in fair condition with a thin canopy as a result of being dominated by
the larger trees nearby.
5. Discussion/Recommendations
Due to lack of existing targets, no high -risk tree conditions were observed at the site. All subject
trees would be rated as low to moderate risk under an ISA Level 11 Basic Assessment, however this
assessment is a limited by the extent of ivy coverage on their lower trunks. A reassessment upon
final building and grading plans would be prudent.
Given the proposed site plan, few of the trees found on the property are able to be retained. These
trees are primarily Douglas fir and will help maintain a buffer to the property to the north.
The neighboring trees to the north are not likely to sustain damage related to construction if all work
performed remains outside of their Limits of Disturbance (LOD). The ground to the south of them on the
subject property is sloped and there are several large trees which are not able to be retained (#102,
#103, #104, and #105) due to the excavation cut to meet planned grade. Neighboring tree #202 is
located at the top of the slope and is dominated by the larger trees to the south. This has led it to
developing a thin canopy and likely a relatively small structural root system due to the larger trees
sheltering it from prevailing winds. Removing these trees, particularly # 105 will open up tree #202 to
more severe exposure than it has previously received.
The extent of drip -lines (farthest reaching branches) for the subject trees to be retained can be
found on the tree summary table at the back of this report. The recommended LOD measurements
can also be found on the tree summary table. The LOD measurements are based on species, age,
condition, drip -line, and prior improvements. These shall be referenced when determining the
feasibility of retention.
6. Tree Protection Measures
The following general guidelines are recommended to ensure that the designated areas set aside for
the preserved trees are protected and construction impacts are kept to a minimum. Tree protection
should adhere to best management practices for tree and soil protection during development activity.
1. Tree protection fencing shall be erected around retained trees and positioned just beyond the drip -
line edge prior to moving any heavy equipment on site. Doing this will set clearing limits and avoid
compaction of soils within root zones of retained trees.
2. Any existing improvements to be removed within the drip -lines or tree protection zones shall be
removed by hand or utilizing a tracked mini -excavator.
3. Excavation limits should be laid out in paint on the ground to avoid over excavating.
AMERICAN FOREST MANAGEMENT, INC.
April 771h, 2019
Page 5
A. Excavations within the drip -lines shall be monitored by a qualified tree professional so necessary
precautions can be taken to decrease impacts to tree parts. A qualified tree professional shall monitor
excavations when work is required and allowed within the "limits of disturbance".
5. To establish sub grade for foundations, curbs and pavement sections near the trees, soil should be
removed parallel to the roots and not at 90 degree angles to avoid breaking and tearing roots that
lead back to the trunk within the drip -line. Any roots damaged during these excavations should be
exposed to sound tissue and cut cleanly with a saw. Cutting tools should be sterilized with alcohol.
6. Areas excavated within the drip -line of retained trees should be thoroughly irrigated daily during
dry periods.
7. Preparations for final landscaping shall be accomplished by hand within the drip -lines of retained
trees. Large equipment shall be kept outside of the tree protection zones at all times. Simply finish
landscape within 10' of retained trees with a 2" to 4" layer of organic mulch.
There is no warranty suggested for any of the trees subject to this report. Weather, latent tree conditions,
and future man -caused activities could cause physiologic changes and deteriorating tree condition. Oyer
time, deteriorating tree conditions may appear and there may be conditions, which are not now visible
which, could cause tree failure. This report or the verbal comments made at the site in no way warrant the
structural stability or long term condition of any tree, but represent my opinion based on the observations
made.
Nearly all trees in any condition standing within reach of improvements or human use areas represent
hazards that could lead to damage or injury.
Please call if you have any questions or if we can be of further assistance.
Sincerely,
Benjamin Mark
ISA Certified Arborist #PN-6976A
ISA Tree Risk Assessment Qualified
AMERICAN FOREST MANAGEMENT, INC.
Ar%ry
R,
U�o
ITT It:
OR,
�3i 1
wou
oil
CAI P
Al
Ah
I$ 4t
TV
N�o
— NAA
,ow
.1whavla-8
-bQA Q%Q"I
�"Il a% -Zia
%jj'A,j
ITree Summa Table I
American Forest Management, Inc.
For:
9527 190th PI SW Edmonds WA
Date:
4/11/2019
Inspector:
Ben Mark
Tag #
IlD
Genus species
!DBH (inches)
Height (feet)
Drip -Line Limit o Disturbance (feet)
Condition
Viable
I yes/no
Pro osal
Comments
N
I S
E
w
101
Douglas Fir
Pseudotsuga menziesfi
37
107
21
14
Good
Yes
Retain
Trunk touches utilitiy lines. Ivy. Limbed up @ 30' and thin above
102
Douglas Fir
Pseudotsuga menz�esfi
15
85
12
14
6
Good
Yes
Remove
Added to map
103
Douglas Fir
Pseudotsuga menziesii
27
95
16
14
10
Good
Yes
Remove
Next to snag
104
Douglas Fir
Pseudotsuga menziesii
34
110
24
19
22
Good
Yes
Remove
105
Douglas Fir
Pseudotsuga menziesfi
36
105
14
19
22/15
Good
Yes
Remove
No canopy north
106
Douglas Fir
Pseudotsuga menzieso
39
115
18/15
12
14
Fair
Yes
Retain
Possible decay present in main stem. Added to map
107
Douglas Fir
Pseudotsuga menziesit
41
97
1
15
16
22/16
Good
Yes
Remove
Good taper
108
Douglas Fir
Pseudotsuga menziesd
39
64
28
18
25
Fair
Yes
Remove
Broken at 38'
109
Douglas Fir
Pseudotsuga mem�esfi
44
118
20
12
20
Good
Yes
Remove
Stout taper. Added to map
110
Douglas Fir
Pseudotsuga menz�esfi
38
120
26/15
6
19
Good
Yes
Remove
Dense ivy on south side. Just south of dead Douglas Fir
ill
Douglas Fir
Pseudotsuga men2jesti
35
117
25/15
15
Good
Yes
Remove
112
Douglas Fir
Pseudotsuga mem�esfi
44
105
16
16
16
Fair
Yes
Remove
Broken at 39'. New leader and lesser codominant. Added to map
113
Alder
Alnus rubra
14
51
16
16
20
12
Fair
Yes
Remove
Leans east. Added to map.
114
Bitter Cherry
jPrunus emarginata
11
48
6
10
7
Yes
Remove
Broken top. Added to map
115
Big Leaf Maple
Acer macrophyflum
20
61
12
16
14
1 1
%j[
F r
Yes
Remove
I Added to map
Neighbor
Trees
201
jAppl�
Malus sp
5,6
12
12/6
Good
Yes
202
IDouglas Fir
Pseudotsuga menz�esfi
14
Fair
Yes
Leans west , thin crown
Pqp-Line and Limits of Nisturbance measurements from face of trunk
Trees on neighboring properties - Drip -line and Limits of Disturbance measurements from property lines
Calculated DBH for multistern trees: The DBH in BOLD is the square root of the sum of the DBH of each
individual stem, squared. Example 3
stem DBH = Square Root [(steml)2 + (stem2)2 + (stem3)2 )]
? . 1p�
AMERICAN FOREST
MANAGEMENT
Aw Property
9527 190th Place SW
Edmonds, WA 98020
Arborist Report
April 17, 2019 JUN 0 5 20ig
BUILD:NG DEPARTMENT
Cj-j Y OF EDMONDS
Y%Z)�Rov� -C) I 10
11415 NE 1 281h St., Suite 110, Kirkland, WA 98034 1 Phone: 425.820.3420 1 Fax: 425.820.3437
americanforestmanagement.com
09
April 171h, 2019
Page I
Table of Contents
1. Introduction ...................................................................................................................................................... 2
2. Description ....................................................................................................................................................... 2
3. Methodology ................................................................................................................................................... 2
4. Observations ................................................................................................................................................... 3
5. Discussion .......................................................................................................................................................... 4
6. Tree Protection Measures ................................................................................... 4
Appendix
Site/Tree Photos — pages 6-7
Tree Summary Table - attached
Tree Conditions/Tree Plan Map
AMERICAN FOREST MANAGEMENT, INC.
April 17'h, 20 7 9
Page 2
1. Introduction
American Forest Management was contacted by Jacob Strobl, architect at Strobl Design and asked to
compile an arborist report for a parcel located within the City of Edmonds.
The proposed development encompasses Snohomish County Parcel #OOA34600007901. Our
assignment is to prepare a written report on present tree conditions, which is to be filed with the
preliminary permit application.
This report encompasses all of the criteria set forth under the City of Edmonds tree regulations
(Chapter 18.45 of the Edmonds Community Development Code - ECDC).
Dateof Field Examination: .................................................................................................... April 12, 2019
2. Description
Fifteen significant trees with a caliper 6 inches or greater 4 feet above grade (or diameter at breast
height - DBH) were located and assessed on the property. None of these trees are considered non-
viable due to poor health condition, however there are two standing dead snags in this grove.
Additionally, two neighboring trees with driplines that extend over the property line were also
assessed for potential impacts from the proposed development.
Every tree included in this report was identified in the field with a numbered aluminum tag. These tag
numbers correspond with the attached Tree Summary Table and Tree Map. Several trees were found
which did not appear on the original survey. These were added on the attached Tree Summary Table
and their approximate location added to the Tree Map. Their actual location should be verified in an
updated survey. The tree summary table provides descriptive data for all assessed trees, including
drip -line measurements.
3. Methodology
Each tree in this report was visited. Tree diameters were measured by tape. This required removing
some ivy from each tree to get an accurate measurement. The tree heights were measured using a
digital clinometer. Each tree was visually examined for defects and vigor. The tree assessment
procedure involves the examination of many factors:
The crown of the tree is examined for current vigor. This is comprised of inspecting the
crown (foliage, buds and branches) for color, density, form, and annual shoot growth, limb
dieback and disease. The percentage of live crown is estimated for coniferous species only
and scored appropriately.
• The bole or main stem of the tree is inspected for decay, which includes cavities, wounds,
fruiting bodies of decay (conks or mushrooms), seams, insects, bleeding, callus development,
broken or dead tops, structural defects and unnatural leans. Structural defects include
crooks, forks with V-shaped crotches, multiple attachments, and excessive sweep.
• The root collar and roots are inspected for the presence of decay, insects and/or damage,
as well as if they have been injured, undermined or exposed, or original grade has been
altered.
Based on these factors a determination of viability is made. Trees considered 'non -viable' are trees
that are in poor condition due to disease, extensive decay and/or cumulative structural defects, which
exacerbate failure potential. A 'viable' tree is a tree found to be in good health, in a sound condition
AMERICAN FOREST MANAGEMENT, INC.
April 171h, 2079
Page 3
with minimal defects and is suitable for its location. Also, it will be wind firm if isolated or left as part
of a grouping or grove of trees.
The four condition categories are described below:
Excellent — free of structural defects, no disease or pest problems, no root issues, excellent
structure/form with uniform crown or canopy, foliage of normal color and density, above average
vigor, it will be wind firm if isolated, suitable for its location
Good — free of significant structural defects, no disease concerns, minor pest issues, no significant root
issues, good structure/form with uniform crown or canopy, foliage of normal color and density,
average or normal vigor, will be wind firm if isolated or left as part of a grouping or grove of trees,
suitable for its location
Fair — minor to moderate structural defects not expected to contribute to a failure in the near future,
no disease concerns, moderate pest issues, no significant root issues, asymmetric or unbalanced crown
or canopy, average or normal vigor, foliage of normal color, moderate foliage density, will be wind
firm if left as part of a grouping or grove of trees, cannot be isolated, suitable for its location
Poor — major structural defects expected to cause fail in the near future, disease or significant pest
concerns, decline due to old age, significant root issues, asymmetric or unbalanced crown or canopy,
sparse or abnormally small foliage, poor vigor, and/or not suitable for its location
The attached Tree Summary Table provides specific information on tree sizes and drip -line
measurements.
4. Observations
Most of the subject parcel was covered in dense mats of English ivy which is climbing into the canopy
of the majority of the trees included in this report.
Twelve of the 15 significant trees found here are Douglas fir (Pseudotsuga menziesii) all but two of
which are in good condition, the others are in fair condition. These range in caliper from 15"44". Most
are on the larger end of this range with an average caliper of 35.75"
Trees #101 -107 are Douglas fir situated near the northern edge of the subject property. Most of
these form a grove of contiguous canopy cover which includes trees north of the property line. There
are two standing dead snags in this grove. Trees #101 and #106 are the only trees able to be
retained in the proposed site plan due to the necessary excavation cut on the hillside. There are likely
large structural roots on this slope which would be destroyed at the planned grade.
Trees #108-112 are Douglas fir in the center of the parcel. All of these will need to be removed for
the proposed structure to fit within the front yard setback. Limits of disturbance are shown for some
trees which are proposed for removal in case revised plans include their retention.
Other species present are red alder (Alnus rubra), big leaf maple (Acer macrophylium), and bitter
cherry (Prunus emarginata). These are all located along the raised grade within the proposed building
footprint. These are considered 'pioneer species' trees which are often the first to naturally germinate
in open areas. These are fast growing when young, and quickly reach maturity. Their branch strength is
rated as weak. A typical characteristic of these trees upon reaching maturity is to shed limbs as they
become host to decaying fungi and eventually fall from primary stem failure.
AMERICAN FOREST MANAGEMENT, INC.
April 17th, 2019
Page 4
Neighboring Trees with Overhanging Canopies
Tree #201 is an apple (Malus sp.) with two primary stems for a calculated 8" DBH which has been
regularly pruned to maintain a height of 12'. This tree is part of a small orchard in the southwest
corner of the neighboring property. Its canopy extends approximately 12' over the east property line.
This tree is below the existing driveway grade 6' to the west.
#202 is a Douglas fir with a DBH of 14" growing just north of the property line in a grove which
includes trees #101 -107. It is in fair condition with a thin canopy as a result of being dominated by
the larger trees nearby.
5. Discussion/Recommendations
Due to lack of existing targets, no high -risk tree conditions were observed at the site. All subject
trees would be rated as low to moderate risk under an ISA Level 11 Basic Assessment, however this
assessment is a limited by the extent of ivy coverage on their lower trunks. A reassessment upon
final building and grading plans would be prudent.
Given the proposed site plan, few of the trees found on the property are able to be retained. These
trees are primarily Douglas fir and will help maintain a buffer to the property to the north.
The neighboring trees to the north are not likely to sustain damage related to construction if all work
performed remains outside of their Limits of Disturbance (LOD). The ground to the south of them on the
subject property is sloped and there are several large trees which are not able to be retained (# 102,
# 103, # 104, and # 105) due to the excavation cut to meet planned grade. Neighboring tree #202 is
located at the top of the slope and is dominated by the larger trees to the south. This has led it to
developing a thin canopy and likely a relatively small structural root system due to the larger trees
sheltering it from prevailing winds. Removing these trees, particularly # 105 will open up tree #202 to
more severe exposure than it has previously received.
The extent of drip -lines (farthest reaching branches) for the subject trees to be retained can be
found on the tree summary table at the back of this report. The recommended LOD measurements
can also be found on the tree summary table. The LOD measurements are based on species, age,
condition, drip -line, and prior improvements. These shall be referenced when determining the
feasibility of retention.
6. Tree Protection Measures
The following general guidelines are recommended to ensure that the designated areas set aside for
the preserved trees are protected and construction impacts are kept to a minimum. Tree protection
should adhere to best management practices for tree and soil protection during development activity.
1. Tree protection fencing shall be erected around retained trees and positioned just beyond the drip -
line edge prior to moving any heavy equipment on site. Doing this will set clearing limits and avoid
compaction of soils within root zones of retained trees.
2. Any existing improvements to be removed within the drip -lines or tree protection zones shall be
removed by hand or utilizing a tracked mini -excavator.
3. Excavation limits should be laid out in paint on the ground to avoid over excavating.
AMERICAN FOREST MANAGEMENT, INC.
April 171h, 2019
Page 5
4. Excavations within the drip -lines shall be monitored by a qualified tree professional so necessary
precautions can be taken to decrease impacts to tree parts. A qualified tree professional shall monitor
excavations when work is required and allowed within the "limits of disturbance".
5. To establish sub grade for foundations, curbs and pavement sections near the trees, soil should be
removed parallel to the roots and not at 90 degree angles to avoid breaking and tearing roots that
lead back to the trunk within the drip -line. Any roots damaged during these excavations should be
exposed to sound tissue and cut cleanly with a saw. Cutting tools should be sterilized with alcohol.
6. Areas excavated within the drip -line of retained trees should be thoroughly irrigated daily during
dry periods.
7. Preparations for final landscaping shall be accomplished by hand within the drip -lines of retained
trees. Large equipment shall be kept outside of the tree protection zones at all times. Simply finish
landscape within 10' of retained trees with a 2" to 4" layer of organic mulch.
There is no warranty suggested for any of the trees subject to this report. Weather, latent tree conditions,
and future man -caused activities could cause physiologic changes and deteriorating free condition. Over
time, deteriorating tree conditions may appear and there may be conditions, which are not now visible
which, could cause tree failure. This report or the verbal comments made at the site in no way warrant the
structural stability or long term condition of any tree, but represent my opinion based on the observations
made.
Nearly all trees in any condition standing within reach of improvements or human use areas represent
hazards that could lead to damage or injury.
Please call if you have any questions or if we can be of further assistance.
Sincerely,
Benjamin Mark
ISA Certified Arborist #PN-6976A
ISA Tree Risk Assessment Qualified
AMERICAN FOREST MANAGEMENT, INC.
le�
spoirk
41,
Mi
17-
-7 7'
oo
IMUW
;e7T -
e�.*-"%-
ALI.
IRV
MaA
'js�'.0 t
4
If
A,
of*-
'i j4. 74
v lob
V
11 KO Ile 02
0
1, 34-2,
162)( 1
'T 101 1
1 4' 1 CA.
-108
f'"D145
fir /V
'f.f t92 113
]10 �2&
' �4 - "
9rII+ 0114
1,r It3A, I
rT,
A' 14
Or-rAl 7'
CC� A
AAa pf
I HF
-"ACX
f--w- i
fAL <KAY
PQIVt^AY
e7 - rr'
flee f-E, 3' Ijlc�
KA.. I Jvt.. 1,1
cAxr- TL PEI^?M I
44--
�4 p
171PI,143A�
eM
VF'.
(-loot) rosowvlluf�j
I 94�F-
%0-�Atlz
Da-\ 9 Ll 1046
L vr a F:
t' % Sru a-SAmie
X wmm 'Vt�
Tree Summary Table American Forest Management, Inc.
For: 9527 190th PI SW Edmonds WA Date: 4/11/2019
Inspector: Ben Mark 4
4
Viable
Tag # ID Genus species DBH (inches) Height (feet) Drip -Line / Limit of Disturbance (feet) Condition yes/no Proposal Comments
Ki R F; W
101
Douglas Fir
Pseudotsuga menziesii
37
107
21
14
Good
Yes
Retain
Trunk touches utilitiy lines. Ivy. Limbed up @ 30' and thin above
102
Douglas Fir
Pseudotsuga menziesd
15
85
12
14
6
Good
Yes
Remove
Added to map
103
Douglas Fir
Pseudotsuga menziesd
27
95
16
14
10
Good
Yes
Remove
Next to snag
104
Douglas Fir
Pseudotsuga menziesii
34
110
24
19
22
Good
Yes
Remove
105
Douglas Fir
Pseudotsuga menziesii
36
105
14
19
22/15
Good
Yes
Remove
No canopy north
106
Douglas Fir
Pseudotsuga menziesii
39
115
18/15
12
14
Fair
Yes
Retain
Possible decay present in main stem. Added to map
107
Pouglas Fir
Pseudotsuga menziesii
41
97
15
16
22/16
Good
Yes
Remove
Good taper
108
Douglas Fir
Pseudotsuga menziesii
39
64
28
18
25
Fair
Yes
Remove
Broken at 38'
109
Douglas Fir
Pseudotsuga menziesit
44
118
20
12
20
Good
Yes
Remove
Stout taper, Added to map
110
Douglas Fir
Pseudotsuga menziesii
38
120
26/15
6
19
Good
Yes
Remove
Dense ivy on south side. Just south of dead Douglas Fir
ill
Douglas Fir
Pseudotsuga menziesit
35
117
25/15
15
Good
Yes
Remove
112
Douglas Fir
Pseudotsuga menziesii
44
105
16
16
16
Fair
Yes
Remove
Broken at 39'. New leader and lesser codominant. Added to map.
113
Alder
Alnus rubra
14
51
16
16
20
12
Fair
Yes
Remove
Leans east. Added to map.
114
Bitter Cherry
Prunus emarginata
11
48
6
10
7
11
Fair
Yes
Remove ��ken
top. Added to map
115
Big Leaf MWple
cer macrophyllum
20
61
12
16
14
14
1
Yes
I Remove
lAdded to map
Nei
hbor Trees
201
lApple
malus sp
5,6
6
Good
Yes
202
Douglas Fir
Pseudotsuga menziesh
14
Fair
Yes
Leans west , thin crown
Unp-Line and Limits of Usturbance measurements Trom tace ot trunk
Trees on neighboring properties - Drip -line and Limits of Disturbance measurements trom property lines
Calculated DBH for multistern trees: The DBH in BOLD is the square root of the sum of the DBH of each
individual stem, squared. Example 3
stem DBH = Square Root [(steml)2 + (stem2)2 + (stem3)2 )]
1
Aw Residence
9527 1901h Place SW (Parcel # 00434600007901)
Edmonds, Washington
June 4, 2019
Project #18102
Critical Areas Report for Geologically Hazardous Areas
Aw Residence
Parcel # 00434600007901
9527 190th Place SW
Edmonds, Washington
The purpose of this report to fulfill the requirements of the Edmonds Community Development
Code (ECDC) as set forth in previous planning department reviews. To ensure completeness,
this report will include excerpts of the ECDC, specifically ECDC 23.80.50, and our responses will
follow each code item or series of items, as appropriate.
From ECDC 23.80.50
Critical area report requirements for geologically hazardous areas are generally met
through submission to the Director of one of more geotechnical engineering reports. In
addition to the general critical area report requirements of section 23.40.90, critical area
reports for geologically hazardous areas must meet the requirements of this Section and
ECDC Chapters 19.05 and 18.30 as applicable. Critical area reports for two or more typos
of critical areas must meet the report requirements for each relevant type of critical area.
Geotechnical report(s) submitted for the purpose of critical areas reviews are required as
necessary in addition to reports, data and other information mandated per ECDC Titles
18 and 19.
A. Preparation by a Qualified Professional. (details omitted for the sake of brevity)
Response:
Andrew L. Glanclon, LEG is a licensed engineering geologist in the State of Washington (License
#2689) with 20 years of professional experience as an engineering geologist in the Puget Sound
region. Mr. Glanclon's credentials fulfill the requirements for a Qualified Professional.
B. Area Addressed in Critical Area Report. The following areas shall be addressed in
a critical area report for geologically hazardous areas:
1. The project area of the proposed activity; and
2. All geologically hazardous areas within 200 feet of the project area or that
have potential to be affected by the proposal
Response:
There was no observed evidence of current or past landslide activity on or within 200 feet of
the subject property. The attached figure titled "Mapped Erosion and Landslide Hazard Areas"
shows the mapped erosion and landslide hazard areas on and adjacent to the subject property.
This map information was from the City of Edmonds GIS viewer. Based on our site
reconnaissance, it is our opinion that the landslide hazard areas present only fulfill the criteria
in set forth in ECDC 23.80.20 B (2), which define are any areas with a slope of 40 percent or
greater that is in excess of 10 feet in vertical height as a landslide hazard area. None of the
other codified landslide hazard area criteria (ECDC 23.80.20) were observed on or adjacent to
the subject property. Based on our knowledge of the area and our review of the geologic and
other mapping resources referenced in our geotechnical report (SFG, January 2014), it is our
a C) —C) I I (,�p
SOUTH FORK GEOSCIENCES, PLLC Roge 1
PO Box 1275
NORTH BEND, WA 98045
425-B90-4658 I INFOCaSFGEO.COM JUN 0 5 20T
BUILDING DEPARTMENT
CITY OF EDMiONDS
Aw Res�dence June 4, 2019
9527 1901h Place SW (Parcel # 00434600007901) Project #18102
Edmonds, Washington
opinion that there are not any off -site critical areas that are likely to impact the proposed
development.
C. Geological Hazards Assessment. A critical area report for a geologically
hazardous area shall contain an assessment of geological hazards including the
following site- and proposal- related information at a minimum.
1. Site and Construction Plans. The report shall include a copy of the site
plans for the proposal showing:
a. The type and extent of geologic hazard areas, any other critical areas,
and buffers on, adjacent to, within 200 feet of, or that are likely to
impact the proposal;
b. Proposed development, including the location of existing and proposed
structures, fill, storage of materials, and drainage facilities, with
dimensions indicating distances to the floodplain, if available;
c. The topography, in two -foot contours, of the project area and all
hazard areas addressed in the report; and
d. Clearing limits;
Response:
As previously stated, the mapped erosion and landslide hazard areas from the City of Edmonds
GIS viewer are shown in an attachment to this report. The referenced grading and drainage
plan (CG Engineering, January 21, 2019) for the project shows the information set forth in C. 1.
b, c & d.
2. Assessment of Geological Characteristics. The report shall include an
assessment of the geologic characteristics of the soils, sediments, and/or
rock of the project area and potentially affected adjacent properties, and a
review of the site history regarding landslides, erosion, and prior grading.
Soils analysis shall be accomplished in accordance with accepted
classification systems in use in the region. The assessment shall include,
but not be limited to:
a. A description of the surface and subsurface geology, hydrology, soils,
and vegetation found in the project area and in all hazard areas
addressed in the report;
b. A detailed overview of the field investigations, published data, and
references; data and conclusions from past assessments of the site,
and site specific measurements, test, investigations, or studies that
support the identification of geologically hazardous areas; and
c. A description of the vulnerability of the site to seismic and other
geologic events;
Response:
These items were addressed in the referenced geotechnical report for the project (SFG, January
2014). However, this section will further address the soil conditions with respect to the
mapped geologic hazards.
Erosion Hazard Areas
Though there are mapped erosion and severe erosion hazard areas on and adjacent to the
subject property, it is our opinion that there are not any specific soil properties that exacerbate
the erosivity of the soils. As such, it is our opinion that no special mitigation is required.
SOUTH FORK GEosclENCES, PLLC Page 2
PO Box 1275
NORTH BEND, WA 98045
425-890-4858 1 INFO@)SFGEO.COM
Aw Residence
9527 190th Place SW (Parcel # 00434600007901)
Edmonds, Washington
June 4, 2019
Project #18102
Implementation of a temporary erosion and sediment control plan that is consistent with the
recommendations in our referenced geotechnical report will adequately mitigate soil erosion
during construction. Buffers and setbacks are not required or warranted for the mapped
erosion hazard areas.
Landslide Hazard Areas
We interpreted the native soils to be Vashon advance outwash sediments. Vashon advance
outwash sediments are alluvial and fluvial sediments that were deposited by meltwater streams
and channels from the advancing Vashon glacial ice sheet. The advance outwash sediments are
typically dense, relatively permeable, and moisture insensitive due to the past glacial
consolidation and the small amount of silt and clay present. Groundwater was not observed in
any of the exploration pits performed for the study and there were no signs of springs
observed.
Medium dense native Vashon advance outwash soils without adverse groundwater conditions
that have slope geometry like the subject property are not prone to deep seated, rotational
slope failures. Due to the relatively low overall slope heights and the proposed regrading and
use of foundation retaining walls, it is our opinion that all the mapped landslide hazard areas
may be altered and that buffers and setbacks for the mapped landslide hazard areas are not
necessary. The referenced grading and drainage plan shows that through the use of retaining
walls and grading of the subject property, the slope geometry will be changed to eliminate
slopes over 40 percent and in excess of 10 feet in vertical height. It is our opinion that the
construction can be performed with temporary cut slopes consistent with OSHA/WISHA rules
without creating an unstable condition during construction. Upon completion, permanent soil
cut slopes and soil slopes in structural fill should be limited to a maximum of 2H:1V. Slopes in
constructed with non-structural fill should be limited to 3H:IV.
3. Analysis of Proposal. The report shall contain a hazards analysis including a
detailed description of the project, its relationship to the geologic
hazard(s), and its potential impact upon the hazard area, the subject
property, and affected adjacent properties; and
4. Minimum Buffer and Building Setback The report shall make a
recommendation for the minimum no -disturbance buffer and minimum
building setback from any geologic hazard based upon the geotechnical
analysis.
Response:
As stated in the preceding response, it is our opinion that the mapped erosion and landslide
hazard areas may be altered as shown in the grading and drainage plan, and the alterations will
not have adverse impacts during construction or upon completion. These alterations will
improve the slope geometry on the subject property and will effectively eliminate the site
conditions that fulfill the landslide hazard area criteria. It is our opinion that these alterations
may be completed, and no buffers or setbacks are required.
D. Incorporation of Previous Study. Where a valid critical areas report has been
prepared within the last five years for a specific site, and where the proposed land
SOUTH FORK GEOSCIFENCES, PLLC Page 3
PO Box 1275
NORTH BEND, WA 98045
425-890-4858 1 INFOCaSFGEO.COM
Aw Residence
9527 1901h Place SW (Parcel # 00434600007901)
Edmonds, Washington
June 4, 2019
Project #18102
use activity and surrounding site conditions are unchanged, said report may be
incorporated into the required critical area report. The applicant shall submit a
hazards assessment detailing any changed environmental conditions associated
with the site.
Response:
To our knowledge, aside from our referenced geotechnical report, there are not any other
previous studies to incorporate into this study.
E. Mitigation of Long -Term Impacts. When hazard mitigation is required, the
mitigation plan shall specifically address how the activity maintains or reduces
the pre-existing level of risk to the site and adjacent properties on a long-term
basis (equal to or exceeding the projected lifespan of the activity or occupation).
Proposed mitigation techniques shall be considered to provide long-term hazard
reduction only if they do not require regular maintenance or other actions to
maintain their function. Mitigation may also be required to avoid any increase in
risk above the pre-existing conditions following abandonment of the activity.
Response:
Since the proposed construction will effectively eliminate the slope conditions that fulfill the
landslide hazard area criteria, the proposed construction is the mitigation. As such, it is our
opinion that additional mitigation for long-term impacts is not warranted. Final soil
stabilization and landscaping will provide long term erosion protection for finished slopes.
F. Additional Technical Information Requirements for Erosion and Landslide Hazard
Areas. In addition to the basic critical area report requirements for geologically
hazardous areas provided in subsections A through E above, technical information
for erosion and landslide hazard areas shall meet the requirements of ECDC 19.05
and include the following information at a minimum.
1. Site Plan. The critical area report shall include a copy of the site plan for the
proposal showing:
a. The height of slope, slope gradient, and cross section of the project
area;
b. The location of springs, seeps, or other surface expressions of ground
water on or within two hundred feet of the project area or that have
potential to be affected by the proposal;
c. The location and description of surface water runoff features;
Response:
F. la. — The referenced civil engineering plans for the project show the slopes and 2-foot
contours of the project site. Since the total relief on the subject property is relatively low and
the native soils have been overconsoliclated by the Vashon glacial ice, it is our opinion that a
cross section of the slope is not warranted.
F. 1b. & c. — No springs, seeps, other surface expressions of groundwater, or surface water
runoff features were noted in our prior site reconnaissance. As such, these features are not
shown on the civil engineering plans for the project.
2. Hazards Analysis. The hazards analysis component of the critical areas
report shall specifically include;
a. A description of the extent and type of vegetative cover;
SOUTH FORK GEOSCIENCES, PLLC Page 4
PO Box 1275
NORTH BEND, WA 98045
425-890-4858 1 INFO @bSFGEO.COM
Aw Residence
9527 190th Place SW (Parcel # 00434600007901)
Edmonds, Washington
June 4, 2019
Project #18102
b. A description of the subsurface conditions based on data from site
specific explorations;
c. Descriptions of surface and ground water conditions, public and private
sewage disposal systems, fills and excavations, and all structural
improvements;
Response:
It is our opinion that for the proposed construction of a single-family residence, these items
were adequately assessed and described in the referenced geotechnica I report for the project
(SFG, April 2014).
d. An estimate of slope stability and the effect that construction and
placement of structures will have on the slope over the estimated life
of the structure;
Response:
The entire site is underlain by medium dense Vashon advance outwash sediments. These
sediments were over -consolidated by the Vashon glacial ice sheet and there are not adverse
geologic conditions or ground water conditions on or near the site. As such, it is our opinion
that the likelihood of a deep-seated, rotational failure on or adjacent to the subject property is
low. The mapped landslide hazard areas are areas that exceed the slope geometry criteria, and
some of these areas were created by previous grading. As previously stated, the proposed
construction will effectively eliminate the slope conditions that fulfill the landslide hazard area
criteria. it is our opinion that the construction and placement of structures will improve the
overall slope stability on the subject property.
e. An estimate of the bluff retreat rate that recognizes and reflects
potential catastrophic events such as seismic activity or a one -hundred
year storm event;
Response:
A bluff retreat rate estimation is not applicable to the subject property or a slope of this nature,
since the slope geometry is not extreme and there is not an ongoing process that creates
accelerated erosion and/or instability, such as stream erosion, channel migration, or toe
erosion from wave action.
f. Consideration of the run -out hazard of landslide debris and/or the
impacts of landslide run -out on down slope properties.
Response:
As previously stated, the native soils are not prone to deep-seated rotational failure and the
proposed construction and critical area alteration will improve the slope geometry on the site.
It is our opinion that the proposed construction and landscaping will eliminate the potential for
landside debris or landslide runout on or adjacent to the subject property.
g. A study of slope stability including an analysis of proposed cuts, fills,
and other site grading;
SouTH FORK GEOSCIENCES, PLLC Page 5
PO Box 1275
NORTH BEND, WA 98045
425-890-4858 1 INFO@SFGEO.COM
Aw Residence June 4, 2019
9527 19011 Place SW (Parcel # 00434600007901) Project #18102
Edmonds, Washington
Response:
As previously stated, it is our opinion that the construction can be performed with temporary
cut slopes consistent with OSHA/WISHA rules without creating an unstable condition during
construction. Permanent soil cut slopes and soil slopes in structural fill should be limited to a
maximum of 2H:lV. Slopes in constructed with non-structural fill should be limited to 3H:lV.
These finished slope recommendations are consistent with the standard of practice in the
region and are relatively conservative.
h. Recommendations for building siting limitations; and
Response:
It is our opinion that the erosion and landslide hazard areas can be fully altered, and the
proposed construction will provide improved slope geometry. As such, no other building siting
limitations are necessary.
1. An analysis or proposed surface and subsurface drainage, and the
vulnerability of the site to erosion;
Response:
Surface Drainage
The Vashon advance outwash sediments are conducive to stormwater infiltration and
stormwater from impervious surfaces will be infiltrated on site. In -situ infiltration testing was
recently performed on the subject property by Nelson Geotechnical Associates, Inc. It is our
understanding that the proposed infiltration trenches were sized based on the
recommendations set forth in referenced infiltration testing report (NGA, May 24, 2019). It is
our opinion that these measures will perform adequately for the proposed development and
there will not be adverse erosion effects.
Subsurface Drainage
Recommendations for foundation and retaining wall were set forth in out referenced
geotechnical report and the recommendations are still valid.
3. Geotechnical Engineering Report. The technical information for a project
within a landslide hazard area shall include a geotechnical engineering
report prepared by a licensed engineer that presents engineering
recommendations for the following:
a. Parameters for design of site improvements including appropriate
foundations and retaining structures. These should include allowable
load and resistance capacities for the bearing and lateral loads,
installation considerations, and estimates of settlement performance;
b. Recommendations for drainage and subdrainage improvements;
c. Earthwork recommendations including clearing and site preparation
criteria, fill placement and compaction criteria, temporary and
permanent slope inclinations and protection, and temporary excavation
support, if necessary; and
d. Mitigation of adverse site conditions including slope stabilization
measures and selismically unstable soils, if appropriate;
SOUTH FORK GEOSCIENCES, PLLC Page 6
PO Box 1275
NORTH BEND. WA 98045
425-890-4858 1 INFO@SFGEO.COM
Aw Residence
June 4, 2019
9527 190th Place SW (Parcel # 00434600007901) Project #18102
Edmonds, Washington
Response:
These design parameters and recommendations were made in the referenced geotechnical
report for the project (SFG, January 2014) and/or have been addressed in previous sections of
this report.
4. Erosion and Sediment Control Plan. For any development proposal on a site
containing an erosion hazard area, an erosion and sediments control plan
shall be required. The erosion and sediment control plan shall be prepared
in compliance with requirements set forth in ECDC Chapter 18.30;
Response:
As previously stated, implementation of a temporary erosion and sediment control plan that is
consistent with the recommendations in our referenced geotechnical report will adequately
mitigate soil erosion during construction.
G. Limited Report Requirements for Stable Erosion Hazard (details omitted for
brevity)
Response:
Not applicable due to the presence of mapped landslide hazard areas.
H. Seismic Hazard Areas (details and subsections omitted for brevity)
Response:
As stated in the referenced geotechnical report, there are no site -specific seismic hazards (such
as liquefaction potential) that significantly impact the subject property or proposed
development. Recommendations for standard seismic considerations were made in the
referenced report and the recommendations are still valid.
Closure
We have enjoyed working with you and we are confident that the information provided in this
report will aid in the design of your project. If there are any questions about this report, please
feel free
A
Engineering Geologist / Owner
South Fork Geosciences, PLLC
Attachment: Mapped Erosion and Landslide Hazard Areas
References:
Edmonds Community Development Code,
https://www.codepublishing.com/WA/Edmonds/
City of Edmonds GIs,
https:Hmaps.edmondswa.gov/Html5Viewer/`?viewer=Edm
onds SSL.HTML
"Subsurface Exploration, Geologic Hazards, and
Geotechnical Engineering Report, Johnson Residence,
Parcel # 00434600007901, 9527 190th Place SW, Edmonds,
Washington", South Fork Geosciences, Project #12058,
January 14, 2014
"Stormwater Infiltration Letter, Aw Residence Infiltration,
9527 190th Place SW, Edmonds, Washington", Nelson
Geotechnical Associates, Inc., NGA File No. 1105019, May
24,2019
SOUTH FORK GEoscIENCES, PLLC Page 7
PO Box 1275
NORTH BEND, WA 98045
425-890-4858 1 INFO@SFGEO.COM
Aw Residence June 4, 2019
9527 190th Place SW (Parcel # 00434600007901) Project #18102
Edmonds, Washington
n.
T 0
r-zrS;r._'
X 9;;;;1
YJ 0 30 60ft
0
I PL. S
North is up
Linear Scale Valid
J
Landslide and Erosion Hazard
N Landslide Hazard Area 40%
severe Erosion Hazard 15%-4096
Erosion Hazard Areas 15%-40%
4
Source: City of Edmonds GIs
Mapped Erosion and Landslide Hazard Areas
SOUTH FORK GEOSCIENCES, PLLC Page 8
PO Box 1275
NORTH BEND, WA 98045
425-890-4858 1 INFO@)SFGEO.COM
r
Aw Residence
9527 1901h Place SW
Edmonds, Washington
Strobl Design LLC
V acob@strobldesign.com
Attention: Jacob Strobl
Subject: Grading Season Extension — Aw Residence
City of Edmonds Permit #. BLD20190116
Mr. Strobl:
Revised September 6, 2019
Project #18102
BY
1D1'Zt19
The purpose of this letter is to provide our opinion with respect to a grading season extension.
Based on our recent correspondence, it is our understanding that the normal grading season
restriction for geologically hazardous areas is from October 11t through May 1st. To facilitate
efficient construction, a reduction of the grading restriction is desired. For the sake of brevity,
we presume that people reading this letter are highly familiar with the subject property and the
proposed development. The remainder of this letter will set forth our opinions on extending
the grading season for the proposed development of the subject property.
Summary of Soil Conditions and Statement of Minimal Risk
The native Vashon advance outwash soils are dense in -place, relatively permeable, and
moderately resistant to erosion, except when subjected to concentrated flows. Based on our
review of the site topography, the native soils present, and the proposed grading and
temporary erosion and sediment control plan prepared by CG Engineering, it is our opinion that
the site work may be performed through the wet season and this construction, the areas
disturbed by construction will remain stable, there will not be an increase in the potential for
soil movement, and the risk of damage to the subject property and adjacent properties will be
minimal.
Review of Wet Season Work Schedule
Though some weather work is required to facilitate timely construction, it is our understanding
that there is an intent to limit earthwork during the wet season. The intent is to start
construction in mid -September and to have the foundation excavation, foundation concrete
placed, and foundation backfill, and temporary soil stabilization completed by mid -November.
Then final grading and landscaping will be completed next year. The following contractor
schedule was provided via e-mail for our review by Strobl Design:
Start: Mid -September
Grub site, install filter and high visibility fencing, construction entrance
,remove certain trees, remove stumps, haul logs.
a 2-weeks
Excavate for foundation including removal of unsuitable soil, import and
compaction of compactable soil if necessary.
0 1-week
Install foundation. Waterproofing, footing and roof drainage.
0 3-weeks.
SOUTH FORK GEOSCIENCES, PLLC
PO Box 1275
NORTH BEND, WA 98045
425-890-4858 1 INFOCaSFGEO.COM
Page 1
Aw Residence Revised September 6, 2019
9527 1901h Place SW Project #18102
Edmonds, Washington
Backfill
1-week
TIES as required.
0 1-week
Total - 8 weeks
This construction scheduling and phasing is consistent for the standard of practice for the Puget
Sound region. As previously stated, it is our opinion that the site work may be performed
through the wet season and this construction, the areas disturbed by construction will remain
stable throughout construction.
Closure
We have enjoyed working with you and we are confident that this letter will aid in the
permitting_QJjjjM6kroject. If there are any questions, please feel free to contact us.
Since
19
I Andrew L. Glandon
AnU1C:VV L. %�JICIIIUL)111 LL%.J
Engineering Geologist / Owner
South Fork Geosciences, PLLC
Cc: City of Edmonds
Attention: Building Department
SOUTH FORK GEOSCIENCES, PLLC Page 2
PO Box 1275
NORTH BEND, WA 98045
425-890-4858 1 INFO(-aSFGEO.COM
. IL
Szafran, Michele
From: Jacob Strobl <jacob@strobldesign.com>
Sent: Friday, September 6, 2019 10:23 AM
To: Szafran, Michele
Subject: RE: BLD2019-0116 AW - Ground Disturbance Timeline Extension
Hi Michele,
*1 Per our phone call, final grading would not occur until the summer of 2020.
Thanks,
Jacob
STROBL DESIGN LLC
206.661.3622
strobidesign.com
From: Jacob Strobl [mailto-.jacob@strobldesign.com]
Sent: Friday, September 06, 2019 9:40 AM
To:'Szafran, Michele' <Michele.Szafra n@ed mondswa.gov>
Cc:'Chak Aw'<chakaw63@gmaii.com>; 'EVA PETERSON' <pchbuilder@msn.com>; 'Andrew Glandon'
<Andrew@sfgeo.com>
Subject: RE: BLD2019-0116 AW - Ground Disturbance Timeline Extension
Hi Michele,
Please see the updated letter addressing your comments in your email below regarding timeline. Let me know
if you need any additional information.
Thanks,
Jacob
STROBL DESIGN LLC
206.661.3622
strobldesign.com
From: Szafran, Michele [mailto: M ichele.Szaf ran @edmondswa.gov]
Sent: Thursday, September 05, 2019 9:46 AM
To:'Jacob Strobl' <iacob@strobldesign.com>
Cc:'Chak Aw'<chaiaw63@gmail.com>; 'EVA PETERSON'<Pchbuilder@msn.com>
Subject: RE: BLD2019-0116 AW - Ground Disturbance Timeline Extension
Jacob,
The seasonal restrictions are from October thru April so any ground disturbing activity during this time should be clearly
addressed by the Geotech. The remaining question regarding the Grading Season Extension letter is what ground
disturbing activity will take place after mid -November? The letter states that final grading and landscaping can be
completed next year, if that's January next year that would need to be in the letter, or if that's April then state that.
A . %
Please see the attached example letter for reference. Additionally the example letter includes mitigating measures along
with ongoing monitoring.
April is a ways out so if you want to address the first scenario for now you may do that and you may always revisit this
for April as it gets closer.
Regards,
Michele Q. Sufran / Plainer
City of Edmonds
1215 th Ave. N.
Edmonds, WA 98020
42S-771-0220
michele.szafran@edmondswa.gov
General permit assistance, online permits, and Web GIS: http://www.edmondswa.gov/handouts.html
Permit Center Hours:
M, T, Th, F 8:00 AM — 4:30 P M
Wednesday 8:30 AM — 12:00 PM
From: Jacob Strobl <*acob@strobldesign.com>
Sent: Thursday, September 5, 2019 7:37 AM
To: Szafran, Michele <Michele.Szafran@edmondswa.gov>
Cc:'Chak Aw'<chakaw63@gmail.com>; 'EVA PETERSON' <pchbuilder@ msn.com>
Subject: RE: BLD2019-0116 AW - Ground Disturbance Timeline Extension
Hi Michele,
The intent is to start construction when the permit is issued in September or alternatively in April if the client
decides to wait till April due to weather. Do you need a construction schedule for both scenarios to review this
request?
Thanks,
Jacob
STROBL DESIGN LLC
206.661.3622
strobldesign.com
From: Szafran, Michele [mailto�.Michele.Szafran@edmondswa.gov]
Sent: Wednesday, September 04, 2019 3:55 PM
To: 'Jacob Strobl'<.iacob@strobldesign.com>
Subject: RE: BLD2019-0116 AW - Ground Disturbance Timeline Extension
Jacob,
I ran the request by with the Development Services Director and there was a question regarding the timelines. My
understanding is that the foundation excavation, foundation concrete and foundation backfill will be completed by mid -
November and then there will be temporary soil stabilization completed until final grading and landscaping next year.
What is next year January, please be more specific.
0
I
-STRUCTURAL CAICVOTJO�U
STRUCTURAL
ENGINEERING
00
Ald RESLDENCE
COMONDS, wA
101301-zoly
Lu
Lu
tn
z
0
0
z
uj
W
B L-D-zo M - D I � 0
L W L-_.. LY)
.----JAN 3 0 20:
BUILDING
4
Criteria Sheet
Codes: Project Location:
Structural: IBC 2015 Street & Number: 9527 190th PI Sw
Loading� ASCE7-10 City: Edmonds State: WA
Wood: NDS 2015 ZIP: 98020
Concrete: ACI 318-14
Latitude: 47.8262 W
Longitude: -122,3610 N
Occupancy Category
Risk Cateciorv: 11 ASCr 7 T.H. I i;.1
Seismic Load Summary:
Analysis Procedure: Equivalent Lateral Force Procedure
Lateral System: Wood'Structural
Panels Rated for Shear
Resistance
R: 6.50
Cd= 4
Base Shear V = 10.7 kips
().= 2.5
Ss= 1.282
S,= 0.503
SDS� 0.85
SDI� 0.34
C�= 0.131
'E= 1.0
Wind Load Summary.
V= 110
KzT= l.00
Exposure = C
Dead Loads:
Roofing
2.5 psf
I/Z'Sheathing
1 �8 psf
Trusses @ 24!'oc
2.5 psf
Misc./Mech.
1.5 psf
Ceiling Finish
2.8 psf
11.1 psf
Use 15 psf
Floor
Finish Floor
1 psf
3/4" Sheathing
2.7 psf
Joists @ I&' oc
2.2 psf
Misc./Mech.
2 psf
Ceiling Finish
2.8
10.7 psf
Use
12 psf
Live Loads:
Snow 25 psf
Floor 40 psf
Soils:
Allowable Bearing 1500 psf
L
00/-111'11-1'1U.�1-14G
Aw Residence
Criteria
Edmonda
r Community
Edmondi
MapdataCMB 800gle
DATE 1013012018
PRO-1. #
DESIGN JpJ
SHEET I
�v 2
00
a)
0
.V
iR ii
z
0
5,
Seismic Design
ASCE 7-10 Seismic Analysis Equivalent Lateral Force Procedure
Seismic Force Resisting System: Per ,
Table 12.2-1 System: Bearing Wall Systems
Type: Light -frame (wood) Walls Sheathed with Wood Structural Panels Rated for Shear Resistance
Risk Catego4 11 1, 11, or III, or IV per Table 1.5-1
Site Class 1 8 per sails report (D assumed, without soils report)
Diaphragm Flexibilityl Flexible
o� 2.5
Ss 1.282 g 2% in 50 yr, Latitude & Longitude lookup
S, 0.503 g 2% in 50 yr, Latitude & Longitude lookup
h, 33 It
R 6.50
1.0
Table 1.5-2
T. = ctq
Eq. 12.8.7
Cd
4
Ct
0.02
Table 12.8-2
Sms = FaSs
Eq. 11.4-1
x
T
0.075
0.03 sec
Table 12.8-2
Eq. 12.8-7
Sm, = FVS,
Eq. 11.4-2
TO
0.08 sec
SDS = '/3 SMS
Eq. 11.4-3
Ts
0.39 sec
2/3
SD1 = SM,
Eq. 11.4-4
k
I.00G
Fa
1.00
Table 11.4-1
CS = SDS
Eq. 12.8-2
Fv
1.00
Table 11.4-2
(RI[e)
sms
SMI
1.28 g
Eq. 11.4-1
CS = SQ 1
r(R/10)
Eq. 12.8-3
0.50 g
Eq. 11.4-2
CS = SDITL
Eq. 12.8-4
SDS
0.855 g
Eq. 11.4-3
T;I(Rlle)
Sol
0.335 g
Eq� 11.4-4
C, 0.044SDSI, Eq. 12.8-5
CS 0.01
Eq. 12.8-5
CS
0.131
Eq. 12.8-2
1�984
Eq. 12.8-3 need not exceed, T < TL
0,010
Eq. 12.8-5 or 12.8-6 minimum
CVX W.,,h k/En 1 WO
Eq. 12.8-12
Cs. design
0.131
F
Fpx Wpx
Eq. 12.10-1
Bldg. Weight
81.7 k
I.X i
Fpx �t 0.2SDSIwVX
Eq. 12.10-2
V=CsW
10.7 k
Eq. 12.8-1, Strength Level Base Shear
Fx < 0.4SDII.Wx
Eq. 12.10-3
V = CS.,dW
7.5 k
Eq. 12.8-1 ASD Base Shear
P= 1.0 Story Shear Diaphragm
ASD Force (p not Included)
hx (ft) Wx hXk (ft) W01C CVX M Fx (k) SV (k) Fpx,.,, Fpx,, FPxmax Fpxdesign V=Fpx/Fx
Roof 20.0 56.7 20.0 1134.0 0.8119 6.2 6.2 6.16 6.78 13.57 &78 1.10
Main 10.0 25 10.0 250.0 0.181 1.4 7.5 2.30 2.99 S.98 2.99 2.20
S 81.7 1384.0 7.5
Aw Residence
Seismic Criteria
L
DATE 10/30/2018
PROJ. #
DESIGN jpj
SHEET 2
00
<
g
ei
m
A
w A
� 2
68
(404
E
LL
4
Ln
z
0
V1
z
�11_
LO
Wind Design - MWFRS
ASCE 7-10 Chapter 27 - Directional Procedure
Design Method Location and Building Dimensions
Wind Coefficients
Exposure C
V= 110 mph
-fatt-le-26-.6--l-
K,= 0.97 Table 27.3-1
G=. 6.8� 26.9.4
Transverse Wind Pressures
US = 0.6 h/L = 0.6
Pressure Coefficients from Finurp 97 4-1-
Bldg Face
L.,
Windward Wall
0.8
Leeward Wall
-0.50
Windward Roof
-0.3/0.17
Leeward Roof
-0.60
Wall Pressures (Unfactoredl
Calculate Kzt?.
YES
Kzt
Ro of Angle -Transverse Dir.
R-0-of Angle - Long Dir
27
';degrees
Ground to top of roof
ft
Sot of roof to top of roof
12
ft
Mean Roof Hei 9-6i, h-
26
4ft
Slhort anDimen-i-n'
sto
44
ift
Long Plan Dimension
74
!ft
Parapet ?
No
Ground to top ofipa-rape-t*
1 Velocity Pressure at Mean' 25.5
Roof Height, qh =
ACr)
Ht
K,
q. I
Pw� waits
I'l-ft
P..11, (Psf)
0-15
0.85
22.38.
15.22,
10.85
15.6Z
Z3.76 -
16.11'
_T625
--iO-25
094
24)5
16-83'
10.85
116.61
25-40
6-98
25.86
17.55
10.85
17.04
3040
1.04
27.38
18.62
10.85
17.68
4V�O
I.Tg�
28.70'
19.K'
0. CS
18.22
51-60
L`13
29.75
20.23
10.85
18.6S
61-76
1.17
30.6
M975'
UO.85
-ii. 6 8
71-80
1.21
316C
21.66
10.6t
10.M
8i 90
t24
32.65
.20'
2y-
-
16 ITS
4.113
91-100
UIS
jj7
i2.56
10.851
20.05.
LongitucHnall-MridPressums
US = 1.7 h/L = 0.4
Pressure Coefficipntq from FI-p- 77 4-1-
Bldg Face
CP
Windward Wall
0.8
Leeward Wall
-0.36
Windward Roof
-0.23/0.25
Leeward Roof
-0.6
W.11 Pr--- (I
Roof Pressures (Unfactored) ASD
Windward
Horiz Proj
Vax - Min Leeward
3.6 -6.6 -13.0
Parapet (Unf, ASD
Windward: Leeward Total (p=q
-NIA- ! -N/A- -N/A-
Transverse Direction
rB.- -Sh.., (k-.Ps)
ASD Roof P-q-r- (I JnI`tnrI1 Aqn
Ht
K,
qz I"wwwds
IFw.11,
P..I(. (psf)
0-15
0.85
0.9
22.38'
23.701
15.22
1611
7.89
7.89
13.87
14.40
15-20
20-25
094.
: 75
16.83
7.89
14.83
25-30
0.98
.24
j5�.86-
718 9
SIG
_ A—
36 0
1.04-
2TJ8'
-18-.6 2
_,K9�
41-�O
�9-52-
16.45
1.13
29.75
20.i:�
7.89
16.88
1.17'
30.81
20.95
7.89
17.31
711-�_O
1_211 - ------
_3t8_6
17.73
W-40
'124
_3165'
22.20----
- -
789
:
18.06
91-100,
1.26,
33.18
22.S6
7.
18.2
Windward
H riz Proj
- - - ---- -- - Leeward
Max Min
(psf)
b.4 . -t.-V -13.0
208
Parapet (Unf) ASD
Windward Leeward Total (p=q
-NtA- -N/A- -N/A-
Longitudinal Direction
S)
-,.vD CotvTlRots
L3117�i 0 t g I c Tl o tJ!It
Aw Residence DATE 1013012018
Wind Criteria PROJ. #
RUCTURAL
GINEE PING DESIGN jPj
SHEET 3
<
IPt ,
L
W
0
W
Z
0
Site Address
Address 9527 190th PI Sw Wind Radius 2.00 Miles
City: Edmonds State: WA Angle 0,
Lat Long 47.82615 -122.3610 Exposure C
Profile 1: 0 'to 180'
Profile 2 : 270 * to 90
SITE MAP Profile 3: 315 * to 135'
0
I`�"`Mea' vdale
dov
A4-.Bee(c*h Park
_>0
Q1,
j,
eo
uthwest
ou&�-Park
PERRI)NVILLE
1-0 C52.)
Edmonds
communityo
College
Edmonds
All
704
(Dw
0 §Y1
2201h SW
d oe 4
Val 06-E Oak o
per n
Iviap, data 02018 Googi
ESCARPMENT
Aw Residence
Kzt Calculations
TRUCTURAL
GINEERING
2-D RIDGE OR 3-D AXISYMMETRICAL HILL
Kzr (11 + K, K2 K3) Z
K, Per Figure
K2 (1 — jxj1jiLh)
K 1 3
K.,
.t 1, If H/Lh!g 0.2
PER RQUW213.8-1
DATE 91512018
PROJ. #
DESIGN jPj
SHEET 4
00
,7,
C2
Ui <
0
in
15
z
0
U)
z
11
Direction 1
I Top 0 Bottom 0 Mid Profile 1 : 0 ' to 180
-10560 ft -S280 ft
Direction 3 10.
,kTop ABottom *Mid
Direction 2
400 ft
200 ft
0 ft
S280 ft 10560 ft
4 Direction 4
400 ft
300 ft
200 ft
100 ft
W U TE
-10560 ft -5280 ft 0 ft 5280 ft 10560 ft
Direction I - 0 'to Site Direction 2 - Site to 180' Direction 3 - 270'to Site Direction 4 - Site to 90
Site Conditions (26.8.1) Site Conditions (26.8.1) Site Conditions (26.8.1) Site Conditions 12G.8.11
1. Unubstructed I Yes 1. Unubstructed Yes 1. Unubstructed Yes
2. Isolated Yes 2. Isolated Yes 2. Isolated Yes
3. Upper Half Hill i No Kzt--i 3. Upper Half Hill No Kzt--1 3. Upper Half Hill No Kzt--1
4. H/Lh �t 0.2 No KzM 4. H/Lh ? 0.2
No Kzt-i 4. H/Lh � 0.2 No Kzt--1
5 . H� 15' 1 Yes 5. H�t 15' Yes 5. H> 15' Yes
Terrain Data Terrain Data Terrain Data
Terrain
I Escrprnnt
fop of Hill Dist
10029
'75;
Bott. of Hill Dist.---t---
L @ H/2
-212
Top of Hill Elev.
upwind
384,
Bott. of Hill Ele v
0
Site Elev.
.1
Site Dist.
1164
0
11-1/2 192
Kzt Calculations
H=i 384
Lh= 10241
X= 10029
Z=. 28
g--: 1.5
v::;r2-5-
K1 value =: 0.85
KW 0.03
K2=! 0.35
lk3=10.99
H/Lh 0.04
Kzt Do!
Atorzk4t.
luTRUCTURAL
NGINEERING
g Srz ;
Site
0 ft
Profile 2 : 270 * to 90 '
Site
Terrain
Ridgel
i.p of Hill Dist.
10029
Bott. of Hill Dist,
1008
L Ccb H12
5996
Site
clownwncl
Top of Hill Elev.
1 384
Bott. of Hill Elev.
61
Site Elev.
1641
Site Dist.
11-1/2
0
, I
Kzt Calculations
H= 223
4033
X= 10029
Z-; 28
p=11.5
T .--
y--! 3
K1 value =!1.45
- cijo-ca-
----K2=�A00
k3= 0:98
---H/Lh =IO.06
Terrain- Ridgell
Top of Hill ist 8597
Bott of Hill Dist. -2016
L @ H/2 0
Site upwind
Top of Hill Elev. 464
Bott of Hill Elev. 0
Site Elev. 164.1
Site Dist.
0
11-1/2 2321
Kzt Calculations
H=i,
464
Lh=
8597
X-1
8597
ti=11.5
28
y '3
K1 value= 1-45
KWO.08
K2=: 0.33
k3= �: 0.99
H/Lh =!I 0.05
Kzt = rl
1.00,
1. Unubstructed Yes
Isolated
Yes
3. Upper Half Hill I
No
.2 L
No
5. H�o 15'
Yes
Terrain Data
Terrai-n
Top of Hill gist.
Ridge
8597
BotL of Hi I I Dist.
1 0
L @ H/2.
Site
t.d-ownwnd
Top of Hill Elev.
464
--4-
Bott. of Hill Elev.
1154
Site Elev.
164.1
Site Dis t.
0
14/2
314
Kzt Calculations
H=,
300
Lh=
7217
X=;
8597
Z=:
28
y=-3
K1 value =! 1.45
K1=10,06
K2=.0.21
k3=:0.99
H/Lh =: 0
Kzt=l
1.00
L#1
Aw Residence DATE 91512018
Kzt Calculations PROJ. #
DESIGN jpj
SHEET C; 5
OD
04
rn
T
C
0
VI)
Ln 'n
C)
>
a)
CA
W
0
U
E
L11
V)
z
0
V)
z
Direction 5
Profile 3 : 315 ' to 135
Direction 6
iTop KBottorn *Mid
400 ft
'air
200 ft
Site
19
0 ft
-10560 ft
-5280 ft 0 ft S280 ft
10560 ft
Direction 7
Profile 4 45 ' to 225
Direction 8
A.Top 1113ottom *Mid
400 ft
300 ft
200 ft
Sib
100 ft
X- 0 ft
-10560 ft
-5280 ft 0 ft 5280 ft
10560 ft
Direction 5 - 315 *to Site
Directlon 6 - Site to 135 Direction 7 - 45'to Site
Direction 8 - Site to 22S
Site Conditions (26.8.1)
Site Conditions (26.8.1) Site Conditions t26.8.11
Site Conditions (26.8.11
1. Unubstructed Yes
2. Isolated
Yes
3. Upper Half Hill
No
4. H/Lh ;t Oz2
No
.5. Hz 151
Yes
Terrain Data
Terrain I
Ridgel
Top of Hill Dist
769
Bott. of Hill Dist.
A592
L 0 H/2
0
Site
upwind
Top of Hill Elev.
441
Bott. of Hill Elev-
Site Elev.
0
1641
Site Dist
0
H/2
2il
Kzt Calculations
H=j 441
Lh= 7694
X-- 7694
Z=1 28
V--T1-!F-
Y= 3
K1 value = 11.45
-K`1�10.08
hliliK2 --I .
k3=! 0.99
H/Lh 0.06
1 Kzt 1.001
1. Unubstructed Yes
2. Isolat,
�z m-
3. Upper Half Hill No
Kzt--1
:zt--i
4. H/Lh > --tio-
ot-mi
5. H� 15' Yes
Terrain Data
Terrain
Ridge
Yo-pof F Fill -Dist.
Bott. of Hill Dist.
7694
0
L 0 H/2
1167
Site
Top of Hill Elev.
clownwnd
441
Bott of Hill Elev.
164
Site Elev.
Site Dist
164.1
0
11-1/2
Kzt Calculations
H-' 276.952
Lh=! 6527
X= i694
28
ym-3
KI value =11.45
k1=10.06
K2=iO.21
k3='0.99
H/Lh =!0.04
Kzt =1 1.00
1. Unubstructed Yes
2. Isolated
Yes
3. Upper Half Hill
4.H/Lh?0.2-
No
No-
5. Hz! 15' j
Ye s
Terrain Data
Terrain
Ridge
Top of Hill Dist.
-10560
Bott. of Hill Dist.
0
L @ H/2
-531
Site
downwnd
Top of Hill Elev.
349
Bott. of Hill Elev.
164
Site Elev.
164 . 1
Site Dist.
0
H/2
257
Kzt Calculations
H=j 1851
Lh=l 10029
10560
Z--i 28
IA=11.5
K1 va.�I.e= 1.45
Kl--'0.03
K2=. 0.30
k3=10.99
H/Lh = 0.02
Kzt = 1.00
t Unubstructed Yes
2. Isolated Yes
czt--i 3. Upper Half Hill Kzt-1
(z m- 4. H/Lh 2: 0.2 No__ i<�t-i
S. H� 1S' Yes
Terrain Data
Terrain
Top of Hill Dist.
Ridge
-10560
Bott. of Hill Dist-
9286
L. @ H/2
Site
upwind
Top of Hill Elev.
349
Bott. of Hill Elev. 7
Site
Site Dist.
164.1
0
H/2
7-8-
Kzt Calculations
H=j 342,677
____LtL._10560
10560
Z=: 28
Y=!
3
K1 value 1.45
K1=10.05
K2=-0.33
k3=, 0.99
H/Lh=10.03
Kzt =! 1.06
Aw Residence DATE 91512018
10 Kzt Calculations PROJ. #
DESIGN jpj
STRUCTUPAL
GI NEERING
C*/' SHEET C 6
CT cj
CJ
V
<
0
Y
0
Ln
7
ASCE 7-10 Wind Loads - Components and Cladding
Flat, Gable and Hip Roofs
Wind Coefficients
Exposure� C
V=1 110 mph
K
O�85 !Table 26.6-1
C�C' (Calcufated from Ch. Td-faI3-leis�-
GCP1 0.18 !Table 26.11-1
Velocity Pressure, qh = 0.00256KAJ�V'
Design Wind Pressure, p = qh[(GCp)-(GCpJ]
D��inn Wind Pmqqifrp fnqfl
Part 1: Low -Rise Buildings (h:5 60 feet)
Section 30.4
Location and Building Dimensions
K,t 1.00
Mean Roof Height, h 28 ift
K, 0.97 Jable 303-1
15.3 psf (30.3-1) Design
(30.4-1)
JRoofTylpe Ga�ble
Component
Zone
Effective Wind Area (sq ft)
1510
20
so
100
200
�:soo
Gable and Hip
Roofs 7 to 27
deg
1
+
10.4'
-16.5
9.7*
-16.1
8.3*
7.4*
7.4*
7.4*
-15.3'
-15.0*
-15.0*
-15.0*
2
+
10.4*
-28.8
9.7*
-26.5
8.3*
-23.3
7.4*
-21.1
7A*
-21.1
-- -
-36.5
7,4*
-21.1
-36.5
OH
-36.5
-36.5
-36.5
-36.5
3
+
10.4'
9.7*
8.3*
7.4*
7.4'
7.4*
-42.6
-39.5
-36.2
-33.4
-33.4
-33A
OH
-59.5
-53.3
-45.7
-41.1
-41.1
-41.1
Wall
4
+
18.1
17.3
16.2
15.3*
14.6'
13.5*
-119�6
-183
-17.8
-16.7
-16.1
-15.0*
5
+
18.1
17.3
16.2
15.3*
14.6*
-
13.5*
-15.0'
-24.2
-22.7
-20.5
-18.8
Typ - LC A
+
46.9
43.8
39.5
36.5
35.7
34.6
Parapet (Fig.
Typ - LC B
-37.7
-36.0
-34.0
-32.0
-30.6
-28.5
30.7-1)
-Corner - LC A
Corner-LCB
+
60.7
56.9
52.4
48.7
-34.2
48.0
-31.6
46.9
-28.5
-42.3
-40.0
-36.8
Note: * Indicates 10psf minimum lateral load per 30.2.2 controls this load case for most buildings.
Gable/Hip Roofs 7 -27 degree - Figure 30.4-28 Wall Zones - Figure 30.4-1
a: 10 percent of least horizontal dimension or O.4h, whichever is smaller, but not IM than either 41/9 of
Icast horizontal t1imension or 3 ft (0.9 m).
h: Mean roof height, in feet (meters), except (hat eave height shall be used for 0 5 10P.
0 STRUCTURAL
NGINEERING
0/sr= 17,
Aw Residence
Date: 91512018
Project #:
Design: JPJ
Sheet: C7
0�
00
LO
0
C:
M
F, 'T
LU
'M
0
F-
M
z
0
U)
—fluf.C��k 1-11A10 fitiff5w0f O-J H 9,+,Oc A eC Ll A/
x
L = i5
16 A 12 1 A 7-5 xF
5 16 Aj 0 ?11 fS'S- tief 7.
JA/ Ir AME414)
cH ex PCs r
ca -01
2- 2,17 0
-3 1:51 ?- Op
cf/ 1 0 51
iq
/
STRUCTURAL
ENGINEERING
0 0
Lu
0
u
Lu ;�
Ln
I--
u-
z
z
LLI
- - '
�� F�
��
5ouTtf f1[VATioAi
150014T. GALC. HE16W LIMIT
0
nv loll
T�W- TEMP, TEimp. - TEMP. TEMP
GLA55 TE"P. Tf3[4P.
OUARDRAIL -T ---------------- 71—
LEVEL
MAIN
ELEV, lbo.Q,
AVG,C,RAve
T W. TEMP� TW.
MENT LEVEL
;VES-r EIEVATIOAI
--------------
- — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — -- ±Jl 51C 1 EL
E A r El. f VA T/OA/
R
LATERAL OESIGl/
STRUCTURAL
ENGINEERING
7q'
LOAD
L f.V6rl4
S-61 S. I' �vpvs
SH M P,
7147
136
wALL
sw Li
S E,,j I
0 T-
Sq76
13"
H D
Cm Sri
Hbu7-
16 0
LOAD
ro
L fAlGT H-
t I
5 H f A k
117
WA L I
sw 3
-T
16741 V
D
H Ou H 4w/ C x OF P-157-
A,z-j AIESIDeNCE
10 / 3 o I f
J- P,7'
0 0
uj
0
< u
ui
W
ul
0
z
0
(n
z
w
FERAL OCSIGN
elISF-WEST' DIRIECT-ioA/
v
LOAD
1782*0�
176 2,
LFN6rH
38'
21Y '
s,H i pt P-
14 7:*N'
-7 Li Vt.
WALL
SLj I
SW(
0 0.
No or.
LOAD
LENGTH
S'h EA IZ
WA LL
OT
H.D.
STRUCTURAL
ENGINEERING
l7t7 1782 0
6,6
7 cb I
ioq *F41 7-2
5WI Sw
16 7-zo
,vo a T: A16 Or
LF Sl D 1' /7 ('F-
7PT
0 0
Lu
�7'
0
u
ul
V)
LLJ
U)
z
0
(1)
z
Lu
(n
- ATERAL PEs(6/v
(f n F Ck C*Oxo -Zvf,;-]-
v --3,611 =
3c?/l 7"
-Y,5 3,5 /':*/ 5 - 6 7 4 7 2
-V-t)et -: 4;7?al"-Vc"7 IV /I z se s
V/
59S .1
275'
3 7 3'
60
COLLiCTOR AC)ZCf 2397-
clifeic SPLIC-E
-z3c/z */,? /I 14
tl q � 41&?
P
w Ri 5 oElv E
STRUCTURAL
ENGINEERING
J-P j
0 0
0
uj
tn
z
0
(n
z
uj
V)
j
—V—FR 11 � A ROOF FeAMIAJ6
tz-) -Z..,-
40 Q3 SYSxt?-
LZ -Z-S
jl'� 100pi I
L
/I : 2 Iq #t-1
f- lz Pf/
M 1(-1 2 00
lz 356-#
tZ 3. 6 00
G) (-Z) z x r 0
W., T40 1*11
L 5
sz -1
4.)
X's
ei j
L7ZI
g: 2'
3so
0. os"-
M: 11,025,or-
1
Z,l 00
Clio
7-S'
0 11 ps-/
6,6 &q
-3 FO
iZ-- 457-5
A 0. 12 ": L-1701
STRUCTURAL
ENGINEERING
AW
0 - 71
1076t"
I olzqlwol v
00
uj
Lu
Ln
Lu
0
V)
z
0
V)
z
uj
VERTICAL DES16,V
54
y x
MAW FLOO(Z FRAr"WC,
(D (2) 2x g
W -Z 375 ith
L - is f
f� -: 53 5
M -- 11 TZ
fv :- li 9 t'll
R: 4-�'; r-
A -. o-rW'-Y/qoq
6 L G 5
t�' -. If z o
Ll: Zl'
L4 Li C FS)
23,15;W"
76 f5f
q�lo
az 0-71 V-3st,
03 7 P5L
L) - 5.50
L
Ps,
fb
m I q'Or. q 4t-)
75 ps'
Y675
0 - qS' 2
Sl
STRUCTURAL
yEtNGINEERING
l4t- -�'
@ 613 S'l8xl3.5
-J 7 9 7r,
L IS '
3 P5"
7 2
134 ?rl
(z 7, Z 7 5
o. 5&q L13 69
4r
Px 94,l17q
L 2
67/*
)r,, 6(f
R =27 37 *
6 0.06
Aw RO/Ok"CE
0 0
ui
0
<1 u
w �
Ln
-LU
Q)
z
0
Ln
z
Lu
3:
V)
I
2011 Of 72 ^4 "' ' 2 4.) 4 PISS
Tj
I.V^�;f:TY. ASHINP
After Recording Return to:
City Clerk
City of Edmonds
1215 th Avenue N
Edmonds, WA 98020
NOTICE OF PRESENCE OF CRITICAL AREAS AND/OR
CRITICAL AREAS BUFFERS ON PROPERTY
GRANTOR: Chak-Yoon Aw and I -Wei Aw
GRANTEE: City of Edmonds, a Washington municipal corporation
Legal Description:
Abbreviated Fon-n: LOT 2, CITY OF EDMONDS BLA, REC. 201211010497 AND
201211210469, BEING A PORTION OF TRACT 79, EDMONDS
SEAVIEW TRACTS, VOL. 3, P. 75-76, SNOHOMISH
COUNTY.
Additional Legal is on Exhibit A attached to document
Assessor's Tax Parcel ID No.: 00434600007901
Reference Number(s) of Related Docurnents(s): n/a
NOTICE OF PRESENCE OF CRITICAL AREA(S) AND/OR
CRITICAL AREA BUFFER(S) ON PROPERTY
NOTICE IS HEREBY GIVEN this S day of J14,
V 2019, by
Chak-Yoon and I -Wei Aw ("Grantor"), as required by Grantee, City of Edmonds, pursuant to
Edmonds Community Development Code (ECDC) 23.40.270.13, that at least one type of critical
area and/or critical areas buffer has been found through field verification to be present on the
Property described in Exhibit A hereto. This notice is being recorded as a condition of issuance
for a development permit related to the property. As part of the permit application review process
it was determined that the following type(s) of critical area and/or critical area buffer(s) were
found to be present on the property:
Slopes on and adjacent to the subject property exceed 40%. The steepness of these
slopes classifies the site as a potential landslide hazard area pursuant to Chapter 23.80
ECDC.
The City of Edmonds has adopted ordinances that regulate this type of critical area and/or
buffer. Prospective purchasers are advised hereby that these regulations may limit the type and/or
location of development or other use that may occur on the property. Please contact the City of
Edmonds for specific infon-nation about the applicable critical area regulations.
This notice shall remain on the title records of Snohomish County until released by the
City of Edmonds, which shall only occur if the owner is able to submit a critical areas report to
demonstrate to the City of Edmonds that the critical area designation no longer applies to the
Property. Any release of this notice shall be subject to applicable procedural provisions of the
ECDC.
GRANTOR(S):
By: ztl�
Name: 64 ale- - lom
Title (if applicable):
By:
Name:
Title (if applicable):
STATE OF
)ss.
COUNTY OF
I certify that I know or have satisfactory evidence that CvNa� -vam P, Lj is the
person who appeared before me, and said person acknowledged that he/she sigTted this instrument, on oath stated
that he/she was authorized to execute the instrument and acknowledged it as his/her free and voluntary act for
the uses and purposes mentioned in the instrument.
Dated: � -f -,)06
ROTARY R;'IUC
SWIM 01F
kl.'AY 22, 2021
rUse this snace for notarial stamn/seal)
STATE OF
COUNTY OF
Notary Public V, 66W A o Vp t r kw',, a,
Print Name (-f�um LIL"'�e Oau�s
My commission expires 'IS - ^I-Ql p Zak
)ss.
I certify that I know or have satisfactory evidence that j—(A-)e;-, �) Lj is the
person who appeared before me, and said person acknowledged that he/she signed this instrument, on oath stated
that he/she was authorized to execute the instrument and acknowledged it as his/her free and voluntary act for
the uses and purposes mentioned in the instrument.
Dated: -1 -5 -DOI �
BTAM W IAd4AZ:-X.'II'Z'FC:�
7 Aq p Wn 3r, Z,� Z,-
-MAY 2 2, : ZV. I
space
A
Notary Publiew-jo�LL1\0 ��ag C2 to
PrintName ?U.L*-c4 L�pl-e-
My commission expires 5 - A,;).
-2-
Exhibit A
LEGAL DESCRIPTION OF PROPERTY
LOT 2, CITY OF EDMONDS BLA, RECORDED UNDER 201210195001 AND CORRECTED
UNDER NOS. 201211010497 AND 201211210469, BEING A PORTION OF TRACT 79,
EDMONDS SEAVIEW TRACTS, ACCORDING TO THE PLAT THEREOF RECORDED IN
VOL. 3 OF PLATS, P. 75-76, RECORDS OF SNOHOMISH COUNTY.
PROPERTY ADDRESS: 9527 190" PL. SW, EDMONDS, WASHINGTON
ov EID/11
City of Edmonds
Park Impact Fee Worksheet
"'2 7 17 9
- Aw Residence
Name of Proposed Project.
Current Site Address- 9527 190th P1 SW, Edmonds, WA 98020 Buildinq Permit#: BLDWICI—CM0
Previous Site Address (if different):
Owner/Applicant: Chak & Eva Aw
Applicant Mailing Address- 114 N 200th St, Shoreline, WA 98133
Phone: 425-785-2038 E-mail address: chakaw63@gmail.com
TYPE OF PROPOSED DEVELOPMENT (select one)
New Commercial:
Square footage of all floor area:
Fj Commercial Addition:
Square footage of all floor area -
Description of use:
Description of use-
FE-1 New Single Family:
Does this new residence replace an existing residence demolished with previous 12 months?
F-1 Yes RE No Demo Building Permit No.:
Date issued:
SFR building permit must be issued within 12 months of issue of demo permi .
F-1 New Multi -Family: Number of dwelling units proposed:
Multi -Family Addition: Number of existing dwelling units:
Number of dwelling units propose
Exempt from P1 fee (Low-income or other per ECC 3.36.040. Provide additional documentation.)
Credit (For off -site improvement, etc. per ECC 3.36.050.) $
FEE RATES
TYPE OF DEVELOPMENT: RATE:
Single Family
$2,734.05
per dwelling unit
Multi -Family
$2,340.16
per dwelling unit
Non -Residential
$ 1.34
per square foot of new or additional floor area
For City Use Only Calculate Fee Here:
Total Fee
Int 111_� " V I L� �_
JAKI 3 U *C
S 79.0
7'
<
242.83,
�2 8 �,
6
�E IN—I14Q.7
tMH RIM=40.33
C=m
x ss
C====
190TH PL SW
SDIAH RIM. 141.11
CEN-ERL14E OF EXIST"YG ROADWAY
REPAINT FOG
LINE, R 20'
CS _RIM--140
5
\0
0
ENGINEERI N-G DlVk%#M
Vi: NOTED
Tel-
AW RESIDENCE VEHICLE TRACKING EXHIBIT
SCALE: 1" = 20'
20 u 10 20 40
NOTES: WA
1. VEHICLE USED: SU-30 SINGLE UNIT TRUCK (AASHTO 2011 US CUSTOMARY)
2. DESIGN SPEED: 5.0 MPH
3. STEERING LIMITED TO 80%
2�0 tel - Ott �p IST
U [-�-�3 0 L
26- 19
-0-
eNGINercRING
250 4TH AVE. S., SUITE 200
EDMONDS. WASHINGTON 98020
PHONE (425) 778-8500
FAX (425) 778-5536
AW RESIDENCE mvv I- v I-Wl%o
9527 190TH PL SW BUILDING DEPARTMENT
EDMONDS, WA 98020 CITY OF EDMONDS
DATE 08/26/19
SHEET
VT-1
PROJECT NO, 18300.22
SCALE I" = 20'
TITLE
AW RESIDENCE VEHICLE TRACKING EXHIBIT
TURNING EAST ONTO 190TH PIL SW FROM OLYMPIC VIEW DR
DRAWN BY TAF
CHECKED BY Jpu
APPROVED BY Jpu
w
4M
ENGINEERING
250 4th Ave S Ste 200
Edmonds, WA 98020
Phone: (425) 778-8500
Fax: (425) 778-5536
civil & structural
engineering & planning
DRAINAGE REPORT
CWPLIES WR APPLICABLE
MY STORYWATERMDE
Mae.' � -=V=11.
, -1 1 1
Aw Residence
9527 190" PI SW
Edmonds, WA 98020
0812712019
CG Project No.: 18300.20
'�LD20 (9 0116
R E a U 0
AUG 2 8 2019
13UILDING DEPARTMENT
CITY OF EDMONDS
0
Table of Contents
Section I — Project Overview
Section 11 — Off -Site Analysis
Section III — Permanent Stormwater Control Plan
Section IV —Construction Stormwater Pollution Prevention Plan
Section V — Special Reports and/or Studies
Section VI — Other Permits
Section VII — Bond Quantities & Operation and Maintenance Manual
4= 4M
IENGINiCERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 1 f. 425.778.5536
www.cgengineering.com
Aw Residence - CG #18300.20 August 27, 2019
Drainage Report Section 1, Page 1
Section I — Project Overview
Section i Surnmary
Overview
Existing Condition
Developed Condition
Minimum Requirements
Overview
This drainage report has been written for a new single-family residence project on a 0.32 ac lot. The
existing lot is undeveloped and site topography descends east to west.
Site Address: 9527 190th PI SW, Edmonds, WA 98020
Parcel Number: 00434600007901
Zoning: RS-12
Watershed: Fruitclale Watershed
The new single-family residence will consist of a house and other impervious surfaces consisting of a
driveway, walkways and a deck. The house will have roof coverage of approximately 4,000 sf (0.09 ac).
The project will also include right-of-way (ROW) improvements including a small amount of road
widening and a new 5.5' (curb included) sidewalk along 190th PI SW (see civil plans for more). The total
new/replaced impervious area for the project (including ROW improvements) is approximately 6,050 sf
(0. 14 a c).
Since the project will add more than 5,000 sf of new impervious surfaces, the project is classified as
Category 2 per the Edmonds Community Development Code (herein referred to as ECDC) Chapter
18.30.060.C.I.c.i and the June 2017 Addendum to Edmonds Community Development Code Chapter
18.30 (herein referred to as the Edmonds Stormwater Addendum), Chapter 3.1.3.1. Category 2 projects
are required to comply with Minimum Requirements #1-9 from ECDC 18.30.060.D and Chapter 5 of the
Edmonds Stormwater Addendum.
Existing Condition
The site is currently undeveloped. Vegetation on -site generally consists of grass, shrubs, and small to
large trees. Site topography descends east to west with an average slope of about 17%. On average,
there is about 25 ft of grade change between the east and west property lines. The site contains Severe
Erosion Hazards and Landslide Hazard Areas (see Figure 1-1). The geotechnical reports can be found in
Section V of this report. Please note that the original report by South Fork Geosciences was completed
in 2014 for a previous owner of the subject property. According to the geotechnical engineer, the site
contains advance outwash soils that have been consolidated by glacial advance. Another geotechnical
report has been provided by Nelson Geotechnical Associates since they performed a small-scale Pilot
Infiltration Test to determine the design infiltration rate for the site.
250 4th Avenue South, Suite 200
Edmonds, WA 98020
CENGINiERING ph. 425.778.8500 1 f. 425.778.5536
www.cgengineering.com
Aw Residence - CG #18300.20 August 27, 2019
Drainage Report Section 1, Page 2
The property is bordered by another single-family residence and driveway on the north and east sides,
190" PI SW on the south side, and Olympic View Dr borders the site on the west side. Utilities are
generally located in Olympic View Dr and 190" PI SW (see Figure 1-2). There is an 8" cast iron water main
running north/south along the east side of Olympic View Dr. An 8" concrete sewer main runs east/west
close to the centerline of 190th PI SW and has a manhole located near the center at the edge of the
intersection of Olympic View Dr and 190th pl SW. There are two catch basins in the north edge of 19011 P1
SW that convey runoff to an 18" concrete main that runs east/west down 190th pI SW.
The site appears to take on some upstream runoff from the steep, grassy slopes east of the site. Based
on the elevation contours from the survey and the location of the proposed driveway, there is
approximately 4,600 sf (0.105 ac) of tributary area that has been considered for WWHM modeling
purposes. This extra area can be seen in Figure 1-3. Runoff from the neighboring driveway above appears
to flow along the driveway's edge in a ditch toward 190th PI SW where it will flow into the existing catch
basins along the roadway.
For WWHM modeling purposes and to be conservative, the proposed ROW improvements were
accounted for in the basin area and the existing basin was considered as follows:
Forest (A/B, Steep): 10,650 sf (0.244 ad
Tota 1: 10,650 sf (0.244 ac)
Developed Condition
The project is classified as New Development and will occur on an undeveloped lot. The proposed
develompent is the construction of a new single-family residence that consists of a 2-story house with a
driveway, walkways and a deck. The total of the new impervious area is 6,050 sf (0.14 ac). Land
disturbance will be to the extents of the clearing limits and will be approximately 13,000 sf (see civil
plans for more).
The site will utilize an infiltration trench to comply with Minimum Requirement #5: On -Site Stormwater
Management. The infiltration trench was designed to meet the LID Performance Standard using WWHM
2012 with an infiltration rate of 0.99 in/hr. A stormwater infiltration letter from Nelson Geotechnical
Associates can be found in Section V. A 44'x Yx 3'trench will will be located in the SW quadrant of the
property. All runoff from impervious areas sloping to the site will be tied into the house's roof drains,
which will route the runoff into a catch basin before conveying to the infiltration trench through a 6"
perforated pipe. A 6" overflow pipe in the catch basin will convey excess runoff to an existing catch
basin in the intersection of 190th PI SW and Olympic View Dr. See the civil plans and Section III for more
on the Permanent Stormwater Control Plan.
250 4th Avenue South, Suite 200
Edmonds, WA98020
EINIGINkRING ph.425.778.8500 I f.425.778.5536
www.cgengineering.com
Aw Residence - CG #18300.20
Drainage Report
August 27, 2019
Section 1, Page 3
The proposed impervious areas were considered as follows:
Impervious Areas
Roof: 4,000 sf (0.092 ac)
Deck/Walkways (uncovered): 2S6 sf (0.006 ac)
Driveway (on -site, uncovered): 418 sf (0.010 ac)
Driveway (in ROW, uncovered): 309 sf (0.007 ac)
190t' PI SW Road Widen ing/Sidewa I k: 1,067 sf (0.024 ad
Total: 6,050 sf (0.139 ac)
The new and replaced po I lution-gene rating impervious areas were considered as follows:
Pollution -generating Impervious Areas
Driveway: 730 sf (0.017 ac)
1901h PI SW Road Widening: 160 sf (0.004 ad
Total: 890 sf (0.020 ac)
Total Lot Area: 0.32 ac
Total New Impervious Area: 0. 12 ac
PGHS/PGIS: 0.02 ac
PUGET SOUND FRUITDALE CREEK Total disturbed area: 0.30 ac
Average slope: 17%
NRCS Parent Material: Glacial Outwash
NRCS Hydro. Soil Group: B
9527190ih
4 Place Southwest
ch—Y tj
t
Figure 1-1. Vicinity map (from Google Maps).
250 4th Avenue South, Suite 200
Edmonds, WA 98020
EN(illNiERING ph. 425.778.8500 1 f. 425.778.5536
1 www.cgengineering.com
Aw Residence - CG #18300.20 August 27, 2019
Drainage Report Section 1, Page 4
EXISTING WATER
4-210 PROJECT SITE
9527
U
0 EXISTING SEWER 4-72
4-269
EXISTING STORM
4-211
-4
-- 19M PL3W
44-
267
40
Figure 1-2. Map showing existing utilities near site (from City of Edmonds GIS map).
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ENrBiNiERING ph. 425.778.8500 1 f. 425.778.5536
www.cgengineering.com
Aw Residence - CG #18300.20 August 27, 2019
Drainage Report Section 1, Page 5
Figure 1-3. Aerial image of site (from City of Edmonds GIS map).
Minimum Requirements
Stormwater requirements were determined per the Edmonds Stormwater Addendum, the ECDC, and
Ecology's 2014 Stormwater Management Manual for Western Washington (herein referred to as the
DOE Manual). The project is classified as a Category 2 project per Chapter 3.1 of the Edmonds
Stormwater Addendum and will comply with Minimum Requirements #1-9 per Figure 1-4 (Figure 3.1 in
the Edmonds Stormwater Addendum).
Minimum Requirement #1: Preparation of Stormwater Site Plans: The stormwater site plan consists of
this report and the civil drawings, and is prepared in accordance with Chapter 3 of Volume 1 of the DOE
Manual and the requirements in the Edmonds Stormwater Addendum.
Minimum Requirement #2: Construction Stormwater Pollution Prevention Plan (SWPPP): The SWPPP
shall include a narrative and drawings. The SWPPP narrative shall include documentation that addresses
the 13 elements of Construction Stormwater Pollution Prevention. See Section IV and the civil drawings.
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ENGINEERING ph. 425.778.8500 1 f. 425.778.5536
www.cgengineering.com
Aw Residence - CG #18300.20 August 27, 2019
Drainage Report Section 1, Page 6
Minimum Requirement #3: Source Control of Pollution: Source control BMPs are described in Section
IV and Source Control BIVIP sheets can be found in the Operation and Maintenance Manual in Section
Vill.
Minimum Requirement #4: Preservation of Natural Drainage Systems and Outfalls: Natural drainage
patterns shall be maintained, and discharges from the project site shall occur at the natural location, to
the maximum extent practicable. The manner by which runoff is discharged from the project site must
not cause a significant adverse impact to downstream receiving waters and down gradient properties.
All projects shall submit an off -site qualitative analysis. A qualitative analysis of the upstream and
downstream system entering the site is presented in Section 11.
Minimum Requirement #S: On -Site Stormwater Management: Category 2 project sites that discharge
directly or indirectly to the City's MS4 and are required to comply with Minimum Requirements #1-9
(per ECDC 18.30.060.C) shall either use On -site Stormwater Management BMPs from List #2 or
demonstrate compliance with the LID Performance Standard. This project will comply with the LID
Performance Standard (see Section 111).
Minimum Requirement #6: Runoff Treatment: This requirement applies to the new plus replaced hard
surfaces and the converted vegetated areas. Runoff treatment is not required because the project will
not result in more than 5,000 sf of pollution -generating hard surfaces or % acres of pollution -generating
pervious surfaces.
Minimum Requirement #7: Flow Control: Projects must provide flow control to reduce the impacts of
stormwater runoff from hard surfaces and land cover conversions. Flow control is not required for
projects that discharge directly to, or indirectly through the City's IVIS4 to Puget Sound. Furthermore, the
project will not result in 10,000 sf or more of effective impervious surfaces, convert % acres or more of
vegetation to lawn, or cause a 0.10 cfs or more increase in the 100-year flow frequency (see WWHM
report in Section 111).
Minimum Requirement #8: Wetlands Protection: Not applicable. There are no wetlands located in the
immediate vicinity of the site or along the stormwater's route to Puget Sound.
Minimum Requirement #9: Operation and Maintenance: An Operation and Maintenance Manual that
is consistent with the provisions in Volume V of the Drainage Manual is required for proposed
Stormwater Treatment and Flow Control BIVIPs/facilities. The party (or parties) responsible for
maintenance and operation shall be identified in the operation and maintenance manual. For private
facilities approved by the City, a copy of the operation and maintenance manual shall be retained on -
site or within reasonable access to the site, and shall be transferred with the property to the owner. For
public facilities, a copy of the operation and maintenance manual shall be retained in the appropriate
department. A log of maintenance activity that indicates what actions were taken shall be kept and be
available for inspection. See Section VII.
4= CM 2SO 4th Avenue South, Suite 200
Edmonds, WA 98020
EINIGINkRING ph. 425.778.8500 1 f. 425.778.5536
www.cgengineering.com
Aw Residence - CG #18300.20
Drainage Report
August 27, 2019
Section 1, Page 7
Does the project result in 2,000 square feet, or greater, of new plus replaced hard surface arca9
OR
Does the land disturbing activity total 7,000 square feet or greater?
No
Minimum Requirements No. I through 5 apply Minimum Requirement No. 2 applies
INext Question
Does the project add 5,000 square feet or more of new plus replaced hard surfaces"
OR
Convert 0.75 acres or more of vegetation to lawn or landscaped areas?
OR
Convert 2.5 acres or more of native vegetation to pasture.)
<S�)
Is this a road related p � 'Y
roject? --70S
All Minimum Requirements yes
apply to the new and replaced
hard surfaces and converted
vegetation areas.
All Minimum Requirements
apply to the new hard surfaces
and converted vegetation areas.
Does the project add
5,000 square feet or
more of new hard
surfaces?
yes
Do new hard surfaces add 50% or
more to the existing hard surfaces
within the project limits?
No
No
No a dditional
requirements.
Figure 1-4. Flow Chart for Determining Minimum Requirements for Development (Figure 3.1 in the
Edmonds Stormwater Addendum).
4= CM 250 4th Avenue South, Suite 200
Edmonds, WA 98020
r=NGIN�C=RING ph. 425.778.8500 1 f. 425.778.5536
www.cgengineering.com
Aw Residence - CG #18300.20
Drainage Report
August 27, 2019
Section 11, Page 1
Section 11 — Off -Site A
Section 11 Summary
Task 1 — Define and map the study area
Task 2 — Review all available information of the study area
Task 3 — Field inspect the area
Task 4 - Describe the drainage system, and its existing and predicted problems
Task 1 — Define and majo the study aLea
An initial qualitative analysis shall document potential off -site impacts of stormwater discharges for
each upstream drainage system entering a site, and each downstream drainage system leaving a site
according to Section 6.2.1 of the Edmonds Stormwater Addendum. The downstream analysis shall
extend from the project site to the receiving water, or up to one -quarter mile, whichever is less.
Runoff from the site will enter the City's MS4 within one -quarter mile since the project proposes to
connect into an existing catch basin southwest of the site. The catch basin conveys runoff to the public
storm main that crosses Olympic View Dr and continues west. The receiving water is Fruitdale Creek,
which is about 0.35 mi downstream from the site. The downstream flowpath is outlined below in Figure
11-1 from the City GIS map.
PDJA2
18914 SOUND
VIEW PL
BLA EF1
PO4. K -,:PROJECT SITE
U
CHERRY ST
0 13, e
Figure 11-1. Map showing stormwater flow path and distance from site to outfall (from City of
Edmonds GIS map).
Task 2 — Review all available information on the study area
Existing stormwater improvements were determined from the survey and the City GIS map. There is a
catch basin in the north edge of 190th PI SW at the intersection of Olympic View Dr that conveys runoff
250 4th Avenue South, Suite 200
Edmonds, WA 98020
r=NGIN4ERING ph. 425.778.8500 1 f. 425.778.5536
www.cgengineering.com
Aw Residence - CG #18300.20 August 27, 2019
Drainage Report Section 11, Page 2
through a 12" concrete pipe to a manhole on the south side of 1901h PI SW. From there, runoff is
conveyed through a series of 18" to 36" concrete pipes west down Cherry St and north down Sound
View PI until its outfall into Fruitclale Creek.
Per the City GIS map, the site appears to contain erosion and landslide hazard areas (see Figure 11-2
below). The east side of the lot has a steep, vegetated slope that will bring in extra runoff onto the site.
The existing driveway above the site to the east appears to be sloped such that runoff will flow to 1901h
PI SW and is not expected to contribute runoff to the site. The additional tributary area has been
considered in the design of the infiltration trench for this project.
Figure 11-2. Landslide and Erosion Hazard area map (from City of Edmonds GIS map).
Task 3 — Field inspect the study area
A site visit was done in the afternoon on October 1, 2018. The weather was cloudy and there was light
rain.
From evaluating surrounding conditions, the site appears to take on some upstream runoff from the
steep slopes to the east of the property. This runoff is expected to flow onto the proposed driveway and
into the trench drain. This area has been accounted for in the design of the infiltration trench. Runoff
from all impervious areas has been designed to be connected to the proposed house's roof drains
before being conveyed into a catch basin, which will convey runoff to the infiltration trench that was
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ENGIN�EFZING ph. 425.778.8500 1 f. 425.778.5536
1 www.cgengineering.com
Aw Residence - CG #18300.20
Drainage Report
August 27, 2019
Section 11, Page 3
designed per the LID Performance Standard. In the case of an overflow event, stormwater will back-up
into the catch basin and exit through an overflow pipe that will connect into the existing catch basin in
the NE corner of the intersection of 190th PI SW and Olympic View Dr.
The following figures show pictures that were taken on the site visit that show the existing site, the
upstream area draining to the site, and the end of the flowpath at Fruitclale Creek.
Figure 11-3. From 1901h PI SW, looking north at existing site.
2SO 4th Avenue South, Suite 200
Edmonds, WA 98020
rENGINiCERING ph. 425.778.8500 1 f. 425.778.5536
www.cgengineering.com
Aw Residence - CG #18300.20
Drainage Report
August 27, 2019
Section 11, Page 4
Figure 11-4. Looking north from edge of upstream neighbor's driveway.
Figure 11-5. Looking east up project site at steep slopes upstream from site.
4 = CM I
ENGINiERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 1 f. 425.778.5536
www.cgengineering.com
Aw Residence - CG #18300.20
Drainage Report
August 27, 2019
Section 11, Page 5
Figure 11-6. Looking west toward Olympic View Drive.
4= CM
ENGINEERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 1 f. 425.778.5536
www.cgengineering.com
Aw Residence - CG #18300.20 August 27, 2019
Drainage Report Section 11, Page 6
Figure 11-7. From Sound View PI, looking south at Fruitdale Creek before crossing under road.
Figure 11-8. Looking NE from Sound View Pl.
Task 4 — Describe the drainage system, and its existing and predicted problems
Existing stormwater improvements were determined from the survey and the City GIS map. The
proposed point of connection for the site's stormwater will be through an overflow pipe to a catch basin
in the north edge of 190th PI SW at the intersection of Olympic View Dr. The catch basin conveys runoff
through a 12" concrete pipe to a manhole on the south side of 190th PI SW. From there, runoff is
conveyed through a series of 18" to 36" concrete pipes west down Cherry St and north down Sound
View PI until its outfall into Fruitclale Creek.
The project proposes to route all runoff from impervious surfaces of the site to an infiltration trench
designed per the LID Performance Standard to meet the on -site stormwater management requirements
(see Section 111). On -site runoff is only expected to enter the public storm system in the event of an
overflow and through the house's footing drains. There are no anticipated problems associated with the
development from this project.
= GM
ENGINEERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 1 f. 425.778.5536
www.cgengineering.com
Aw Residence - CG #18300.20 August 27, 2019
Drainage Report Section III Page 1
Section III — Permanent Stormwater Control Plan
Section III Summary
Narrative
LID Performance Standard
WWHM Report
Narrative
The project is classified as a Category 2 project and will comply with Minimum Requirements #1-9
because the project proposes more than 5,000 sf of new impervious surfaces. Category 2 projects shall
either use On -Site Stormwater Management BMPs from List No. 2 for all new plus replaced hard
surfaces and land disturbed, or demonstrate compliance with the LID Performance Standard. This
project will demonstrate compliance with the LID Performance Standard.
LID Performance Standard
Projects selecting this option cannot use rain gardens. Stormwater discharges shall match developed
discharge durations to pre -developed durations for the range of pre -developed discharge rates from 8%
of the 2-year peak flow to 50% of the 2-year peak flow.
Bioretention BMPs, as described in Chapter V-7 — Infiltration and Bioretention Treatment Facilities, may
be chosen to achieve the LID Performance Standard. The Bioretention BMPs that may be used are as
follows: Infiltration Basins (BMP T7.10); Infiltration Trenches (BMP T7.20); Bioretention Cells, Swales,
and Planter Boxes (BMP T7.30); and Compost -amended Vegetated Filter Strips (CAVFS) (BMP T7.40).
An infiltration trench has been chosen to demonstrate compliance with the LID Performance Standard
for this site. The infiltration trench was sized using WWHM 2012 and the "Puget East 36" time series.
Per the geotechnical engineer, an infiltration rate of 0.99 in/hr was used for the design of the trench.
The trench was sized to be 44'x5'x3' (see WWHM report on the following pages).
According to the "Stormwater Infiltration Letter" provided by Nelson Geotechnical Associates, there is
about 2.0' of undocumented fill near the proposed location of the infiltration trench. Based on the
survey, the infiltration trench will be placed such that one end is at an existing elevation of about 143.0
(proposed elevation 143.0) and the other end at existing elevation of about 141.0 (proposed elevation
144.0). Therefore, in order to account for the undocumented fill and provide necessary cover over the
trench, the top of the infiltration trench will be 142.0 and bottom of infiltration trench will be 139.0. This
should place the bottom of the trench either into or right on top of the well -draining outwash soils.
The infiltration trench was designed per the LID Performance Standard to collect runoff from roof drains
from the proposed hard surfaces of the site. All site runoff from new hard surfaces that slope towards
the proposed house will be directly connected to the roof drains by downspouts or by the trench drain
in the driveway. Upstream runoff from steep slopes to the east of the site were accounted for in the
250 4th Avenue South, Suite 200
Edmonds, WA 98020
rEINGINiCERING ph. 425.778,8500 1 f. 425.778.5536
www.cgengineering.com
Aw Residence - CG #18300.20
Drainage Report
August 27, 2019
Section III Page 2
basin area of the trench design in WWHIVI. There will be new and replaced impervious area in the ROW
from a portion of the driveway (approximately 165 sf) that slopes towards 190th PI SW and from the
road widening of 190th PI SW and new sidewalk (approximately 1,067 sf). These areas were included in
the design of the on -site infiltration trench to mitigate ROW flows. The trench was designed to back-up
into a catch basin and overflow into a pipe that is to connect into the existing catch basin in the NE
corner of the intersection of 190th PI SW and Olympic View Dr in an overflow scenario. The house's
footing drains are shown to connect into the overflow pipe that outlets from the proposed catch basin
(see civil plans for more).
WWHM Repor
WWHM2012
PROJECT REPORT
Project Name: Aw Residence Infiltration Trench - LID Standard
Site Name: Aw Residence
Site Address: 9527 190th pl SW
City : Edmonds
Report Date: 8/26/2019
MGS Regoin Puget East
Data Start 1901/10/1
Data End : 2058/09/30
DOT Data Number: 03
Version Date: 2018/10/10
Version : 4.2.16
Low Flow Threshold for POC I : 8 Percent of the 2 Year
High Flow Threshold for POC 1: 50 Percent of the 2 Year
PREDEVELOPED LAND USE
Name : Basin 1
Bypass: No
GroundWater: No
Pervious Land Use acre
A B, Forest, Steep 0.244
Pervious Total 0.244
Impervious Land Use acre
Impervious Total 0
Basin Total 0.244
Element Flows To:
Surface Interflow Groundwater
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ENGINiERING ph. 425.778.8500 1 f. 425,778.5536
www.cgengineering.com
Aw Residence - CG #18300.20
Drainage Report
August 27, 2019
Section III Page 3
MITIGATED LAND USE
Name : Basin 1
Bypass: No
GroundWater: No
Pervious Land Use acre
A B, Lawn, Steep .105
Pervious Total 0.105
Impervious Land Use acre
ROOF TOPS FLAT 0.092
DRIVEWAYS FLAT 0.017
SIDEWALKS FLAT 0.006
SIDEWALKS STEEP 0.024
Impervious Total 0.139
Basin Total 0.244
Element Flows To:
Surface Interflow Groundwater
Gravel Trench Bed 1 Gravel Trench Bed 1
Name : Gravel Trench Bed 1
Bottom Length: 44.00 ft.
Bottom Width: 5.00 ft.
Trench bottom slope 1: 0 To 1
Trench Left side slope 0: 0 To 1
Trench right side slope 2: 0 To 1
Material thickness of first layer: 3
Pour Space of material for first layer: 0.33
Material thickness of second layer: 0
Pour Space of material for second layer: 0
Material thickness of third layer: 0
Pour Space of material for third layer: 0
Infiltration On
Infiltration rate: 0.99
Infiltration safety factor: 1
Total Volume Infiltrated (ac-ft.): 51.006
Total Volume Through Riser (ac-ft.): 2.198
Total Volume Through Facility (ac-ft.): 53.204
Percent Infiltrated: 95.87
Total Precip Applied to Facility: 0
Total Evap From Facility: 0
Discharge Structure
Riser Height: 2.9 ft.
Riser Diameter: 8 in.
Element Flows To:
250 4th Avenue South, Suite 200
Edmonds, WA 98020
eNCMN6ER1NCi ph. 425.778.8500 1 f. 425.778.5536
www.cgengineering.com
Aw Residence - CG #18300.20
Drainage Report
August 27, 2019
Section III Page 4
Outlet 1
Outlet 2
Gravel
Trench Bed
Hydraulic
Table
Stage(feet)
Area(ac.)
Volume(ac-ft.)
Discharge(cfs) Infilt(cfs)
0.0000
0.005
0.000
0.000
0.000
0.0333
0.005
0.000
0.000
0.005
0.0667
0.005
0.000
0.000
0.005
0.1000
0.005
0.000
0.000
0.005
0.1333
0.005
0.000
0.000
0.005
0.1667
0.005
0.000
0.000
0.005
0.2000
0.005
0.000
0.000
0.005
0.2333
0.005
0.000
0.000
0.005
0.2667
0.005
0.000
0.000
0.005
0.3000
0.005
0.000
0.000
0.005
0.3333
0.005
0.000
0.000
0.005
0.3667
0.005
0.000
0.000
0.005
0.4000
0.005
0.000
0.000
0.005
0.4333
0.005
0.000
0.000
0.005
0.4667
0.005
0.000
0.000
0.005
0.5000
0.005
0.000
0.000
0.005
0.5333
0.005
0.000
0.000
0.005
0.5667
0.005
0.000
0.000
0.005
0.6000
0.005
0.001
0.000
0.005
0.6333
0.005
0.001
0.000
0.005
0.6667
0.005
0.001
0.000
0.005
0.7000
0.005
0.001
0.000
0.005
0.7333
0.005
0.001
0.000
0.005
0.7667
0.005
0.001
0.000
0.005
0.8000
0.005
0.001
0.000
0.005
0.8333
0.005
0.001
0.000
0.005
0.8667
0.005
0.001
0.000
0.005
0.9000
0.005
0.001
0.000
0.005
0.9333
0.005
0.001
0.000
0.005
0.9667
0.005
0.001
0.000
0.005
1.0000
0.005
0.001
0.000
0.005
1.0333
0.005
0.001
0.000
0.005
1.0667
0.005
0.001
0.000
0.005
1.1000
0.005
0.001
0.000
0.005
1.1333
0.005
0.001
0.000
0.005
1.1667
0.005
0.001
0.000
0.005
1.2000
0.005
0.002
0.000
0.005
1.2333
0.005
0.002
0.000
0.005
1.2667
0.005
0.002
0.000
0.005
1.3000
0.005
0.002
0.000
0.005
1.3333
0.005
0.002
0.000
0.005
1.3667
0.005
0.002
0.000
0.005
1.4000
0.005
0.002
0.000
0.005
1.4333
0.005
0.002
0.000
0.005
1.4667
0.005
0.002
0.000
0.005
1.5000
0.005
0.002
0.000
0.005
1.5333
0.005
0.002
0.000
0.005
1.5667
0.005
0.002
0.000
0.005
1.6000
0.005
0.002
0.000
0.005
1.6333
0.005
0.002
0.000
0.005
1.6667
0.005
0.002
0.000
0.005
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ENGIIN�CERING ph. 425.778.8500 1 f. 425.778,5536
1 www.cgengineering.com
Aw Residence - CG #18300.20
Drainage Report
August 27, 2019
Section III Page 5
1.7000
0.005
0.002
0.000
0.005
1.7333
0.005
0.002
0.000
0.005
1.7667
0.005
0.002
0.000
0.005
1.8000
0.005
0.003
0.000
0.005
1.8333
0.005
0.003
0.000
0.005
1.8667
0.005
0.003
0.000
0.005
1.9000
0.005
0.003
0.000
0.005
1.9333
0.005
0.003
0.000
0.005
1.9667
0.005
0.003
0.000
0.005
2.0000
0.005
0.003
0.000
0.005
2.0333
0.005
0.003
0.000
0.005
2.0667
0.005
0.003
0.000
0.005
2.1000
0.005
0.003
0.000
0.005
2.1333
0.005
0.003
0.000
0.005
2.1667
0.005
0.003
0.000
0.005
2.2000
0.005
0.003
0.000
0.005
2.2333
0.005
0.003
0.000
0.005
2.2667
0.005
0.003
0.000
0.005
2.3000
0.005
0.003
0.000
0.005
2.3333
0.005
0.003
0.000
0.005
2.3667
0.005
0.003
0.000
0.005
2.4000
0.005
0.004
0.000
0.005
2.4333
0.005
0.004
0.000
0.005
2.4667
0.005
0.004
0.000
0.005
2.5000
0.005
0.004
0.000
0.005
2.5333
0.005
0.004
0.000
0.00S
2.5667
0.005
0.004
0.000
0.005
2.6000
0.005
0.004
0.000
0.005
2.6333
0.005
0.004
0.000
0.005
2.6667
0.005
0.004
0.000
0.005
2.7000
0.005
0.004
0.000
0.005
2.7333
0.005
0.004
0.000
0.005
2.7667
0.005
0.0,04
0.000
0.005
2.8000
0.005
0.004
0.000
0.005
2.8333
0.005
0.004
0.000
0.005
2.8667
0.005
0.004
0.000
0.005
2.9000
0.005
0.004
0.000
0.005
2.9333
0.005
0.004
0.043
0.005
2.9667
0.005
0.004
0.121
0.005
3.0000
0.005
0.005
0.219
0.005
ANALYSIS RESULTS
Stream Protection Duration
Predeveloped Landuse Totals for POC #1
Total Pervious Area:0.244
Total Impervious Area:O
Mitigated Landuse Totals for POC #1
Total Pervious Area:0.105
Total Impervious Area:0.139
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ENGIIN�r=RING ph. 425.778.8500 1 f. 425.778.5536
www.cgengineering.com
Aw Residence - CG #18300.20
Drainage Report
August 27, 2019
Section III Page 6
Flow Frequency Return Periods for Predeveloped
Return Period
Flow(cfs)
2 year
0.000044
5 year
0.000053
10 year
0.000059
25 year
0.000067
50 year
0.000073
100 year
0.00008
Flow Frequency Return Periods for Mitigated
Return Period
Flow(cfs)
2 year
0.024923
5 year
0.039681
10 year
0.047826
25 year
0.056188
50 year
0.061188
POC #1
POC #1
100 year 0.065315 (0.085587 w/out mitigation)
LID Duration
LID Duration
Annual Peaks for Predeveloped and Mitigated.
Year
Predeveloped
Mitigated
1902
0.000
0.021
1903
0.000
0.011
1904
0.000
0.024
1905
0.000
0.011
1906
0.000
0.006
1907
0.000
0.030
1908
0.000
0.019
1909
0.000
0.014
1910
0.000
0.031
1911
0.000
0.016
1912
0.000
0.067
1913
0.000
0.016
1914
0.000
0.033
1915
0.000
0.002
1916
0.000
0.029
1917
0.000
0.019
1918
0.000
0.015
1919
0.000
0.011
1920
0.000
0.014
1921
0.000
0.009
1922
0.000
0.026
1923
0.000
0.013
1924
0.000
0.010
1925
0.000
0.000
1926
0.000
0.019
1927
0.000
0.015
1928
0.000
0.017
1929
0.000
0.029
1930
0.000
0.014
1931
0.000
0.019
1932
0.000
0.023
1933
0.000
0.021
POC #1
250 4th Avenue South, Suite 200
Edmonds, WA 98020
EINIGIN&RING ph. 425.778.8500 1 f. 425.778.5536
1 www.cgengineering.com
Aw Residence - CG #18300.20
Drainage Report
August 27, 2019
Section III Page 7
1934
0.000
0.043
1935
0.000
0.012
1936
0.000
0.018
1937
0.000
0.032
1938
0.000
0.011
1939
0.000
0.005
1940
0.000
0.040
1941
0.000
0.012
1942
0.000
0.031
1943
0.000
0.016
1944
0.000
0.057
1945
0.000
0.033
1946
0.000
0.010
1947
0.000
0.021
1948
0.000
0.030
1949
0.000
0.033
1950
0.000
0.015
1951
0.000
0.008
1952
0.000
0.056
1953
0.000
0.053
1954
0.000
0.019
1955
0.000
0.009
1956
0.000
0.000
1957
0.000
0.014
1958
0.000
0.036
1959
0.000
0.017
1960
0.000
0.001
1961
0.000
0.051
1962
0.000
0.025
1963
0.000
0.005
1964
0.000
0.034
1965
0.000
0.031
1966
0.000
0.010
1967
0.000
0.011
1968
0.000
0.014
1969
0.000
0.011
1970
0.000
0.025
1971
0.000
0.033
1972
0.000
0.052
1973
0.000
0.029
1974
0.000
0.021
1975
0.000
0.046
1976
0.000
0.037
1977
0.000
0.006
1978
0.000
0.035
1979
0.000
0.012
1980
0.000
0.005
1981
0.000
0.013
1982
0.000
0.003
1983
0.000
0.025
1984
0.000
0.022
1985
0.000
0.018
1986
0.000
0.013
1987
0.000
0.026
1988
0.000
0.017
1989
0.000
0.015
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ENGIIN�ERIING ph. 42S.778.8500 I f. 425.778.5536
www.cgengineering.com
Aw Residence - CG #18300.20 August 27, 2019
Drainage Report Section III Page 8
1990
0.000
0.021
1991
0.000
0.034
1992
0.000
0.038
1993
0.000
0.014
1994
0.000
0.025
1995
0.000
0.000
1996
0.000
0.024
1997
0.000
0.015
1998
0.000
0.030
1999
0.000
0.011
2000
0.000
0.016
2001
0.000
0.007
2002
0.000
0.029
2003
0.000
0.021
2004
0.000
0.025
2005
0.000
0.032
2006
0.000
0.004
2007
0.000
0.036
2008
0.000
0.012
2009
0.000
0.010
2010
0.000
0.033
2011
0.000
0.000
2012
0.000
0.033
2013
0.000
0.008
2014
0.000
0.004
2015
0.000
0.023
2016
0.000
0.000
2017
0.000
0.051
2018
0.000
0.037
2019
0.000
0.044
2020
0.000
0.014
2021
0.000
0.034
2022
0.000
0.010
2023
0.000
0.012
2024
0.000
0.071
2025
0.000
0.011
2026
0.000
0.025
2027
0.000
0.021
2028
0.000
0.000
2029
0.000
0.016
2030
0.000
0.031
2031
0.000
0.004
2032
0.000
0.000
2033
0.000
0.000
2034
0.000
0.013
2035
0.000
0.031
2036
0.000
0.022
2037
0.000
0.012
2038
0.000
0.031
2039
0.000
0.011
2040
0.000
0.024
2041
0.000
0.016
2042
0.000
0.036
2043
0.000
0.033
2044
0.000
0.024
2045
0.000
0.014
250 4th Avenue South, Suite 200
0 4M Edmonds, WA 98020
ENGINEERING ph. 425.778.8500 1 f. 425.778.5536
1 www.cgengineering.com
Aw Residence - CG #18300.20
Drainage Report
August 27, 2019
Section III Page 9
2046
0.000
0.019
2047
0.000
0.012
2048
0.000
0.027
2049
0.000
0.029
2050
0.000
0.020
2051
0.000
0.043
2052
0.000
0.016
2053
0.000
0.016
2054
0.000
0.036
2055
0.000
0.006
2056
0.000
0.014
2057
0.000
0.009
2058
0.000
0.013
LID Duration
Ranked Annual Peaks for Predeveloped and Mitigated
Rank
Predeveloped
Mitigated
1
0.0002
0.0709
2
0.0001
0.0673
3
0.0001
0.0573
4
0.0001
0.0556
5
0.0001
0.0533
6
0.0000
0.0523
7
0.0000
0.0513
8
0.0000
0.0513
9
0.0000
0.0463
10
0.0000
0.0441
11
0.0000
0.0434
12
0.0000
0.0432
13
0.0000
0.0405
14
0.0000
0.0383
15
0.0000
0.0369
16
0.0000
0.0368
17
0.0000
0.0365
18
0.0000
0.0359
19
0.0000
0.0358
20
0.0000
0.0356
21
0.0000
0.0350
22
0.0000
0.0343
23
0.0000
0.0340
24
0.0000
0.0336
25
0.0000
0.0335
26
0.0000
0.0334
27
0.0000
0.0334
28
0.0000
0.0333
29
0.0000
0.0330
30
0.0000
0.0328
31
0.0000
0.0326
32
0.0000
0.0324
33
0.0000
0.0321
34
0.0000
0.0313
35
0.0000
0.0311
36
0.0000
0.0311
37
0.0000
0.0308
38
0.0000
0.0306
4 = CM I
ENGI[Ni�ERIINCS
POC #1
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 1 f, 425.778.5536
www.cgengineering.com
Aw Residence - CG #18300.20
Drainage Report
August 27, 2019
Section III Page 10
39
0.0000
0.0306
40
0.0000
0.0301
41
0.0000
0.0300
42
0.0000
0.0295
43
0.0000
0.0292
44
0.0000
0.0291
45
0.0000
0.0291
46
0.0000
0.0289
47
0.0000
0.0287
48
0.0000
0.0271
49
0.0000
0.0263
50
0.0000
0.0255
51
0.0000
0.0254
52
0.0000
0.0253
53
0.0000
0.0253
54
0.0000
0.0252
55
0.0000
0.0248
56
0.0000
0.0247
57
0.0000
0.0242
58
0.0000
0.0242
59
0.0000
0.0238
60
0.0000
0.0236
61
0.0000
0.0234
62
0.0000
0.0230
63
0.0000
0.0219
64
0.0000
0.0218
65
0.0000
0.0215
66
0.0000
0.0215
67
0.0000
0.0214
68
0.0000
0.0211
69
0.0000
0.0208
70
0.0000
0.0208
71
0.0000
0.0207
72
0.0000
0.0199
73
0.0000
0.0194
74
0.0000
0.0192
75
0.0000
0.0192
76
0.0000
0.0189
77
0.0000
0.0185
78
0.0000
0.0185
79
0.0000
0.0179
80
0.0000
0.0177
81
0.0000
0.0175
82
0.0000
0.0168
83
0.0000
0.0166
84
0.0000
0.0165
85
0.0000
0.0164
86
0.0000
0.0162
87
0.0000
0.0162
88
0.0000
0,0161
89
0.0000
0.0159
90
0.0000
0.0157
91
0.0000
0.0155
92
0.0000
0.0155
93
0.0000
0.0154
94
0.0000
0.0149
250 4th Avenue South, Suite 200
Edmonds, WA 98020
CENGIIN�ERIINCS ph. 425.778.8500 1 f. 425.778.5536
1 www.cgengineering.com
Aw Residence - CG #18300.20
Drainage Report
August 27, 2019
Section III Page 11
95
0.0000
0.0147
96
0.0000
0.0145
97
0.0000
0.0144
98
0.0000
0.0141
99
0.0000
0.0140
100
0.0000
0.0139
101
0.0000
0.0139
102
0.0000
0.0139
103
0.0000
0.0138
104
0.0000
0.0136
105
0.0000
0.0136
106
0.0000
0.0132
107
0.0000
0.0132
108
0.0000
0.0129
109
0.0000
0.0126
110
0.0000
0.0126
ill
0.0000
0.0124
112
0.0000
0.0121
113
0.0000
0.0120
114
0.0000
0.0118
115
0.0000
0.0117
116
0.0000
0.0117
117
0.0000
0.0116
118
0.0000
0.0112
119
0.0000
0.0112
120
0.0000
0.0111
121
0.0000
0.0111
122
0.0000
0.0109
123
0.0000
0.0108
124
0.0000
0.0107
125
0.0000
0.0107
126
0.0000
0.0106
127
0.0000
0.0103
128
0.0000
0.0101
129
0.0000
0.0100
130
0.0000
0.0098
131
0.0000
0.0096
132
0.0000
0.0092
133
0.0000
0.0089
134
0.0000
0.0086
135
0.0000
0.0081
136
0.0000
0.0076
137
0.0000
0.0074
138
0.0000
0.0063
139
0.0000
0.0059
140
0.0000
0.0056
141
0.0000
0.0054
142
0.0000
0.0053
143
0.0000
0.0053
144
0.0000
0.0044
145
0.0000
0.0043
146
0.0000
0.0038
147
0.0000
0.0029
148
0.0000
0.0021
149
0.0000
0.0015
150
0.0000
0.0000
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ENGINkRING ph. 425.778.8500 1 f. 425.778.5536
www.cgengineering.com
Aw Residence - CG #18300.20
Drainage Report
August 27, 2019
Section III Page 12
151
0.0000
0.0000
152
0.0000
0.0000
153
0.0000
0.0000
154
0.0000
0.0000
155
0.0000
0.0000
156
0.0000
0.0000
157
0.0000
0.0000
LID Duration
POC #1
The Facility PASSED
The Facility PASSED.
Flow(cfs) Predev Mit Percentage Pass/Fail
0.0000
26176
3281
12
Pass
0.0000
25158
3281
13
Pass
0.0000
24745
3281
13
Pass
0.0000
23851
3281
13
Pass
0.0000
23149
3281
14
Pass
0.0000
22378
3281
14
Pass
0.0000
21552
3281
15
Pass
0.0000
20809
3281
15
Pass
0.0000
20107
3281
16
Pass
0.0000
19446
3281
16
Pass
0.0000
19144
3281
17
Pass
0.0000
18552
3281
17
Pass
0.0000
18015
3281
18
Pass
0.0000
17478
3281
18
Pass
0.0000
17011
3281
19
Pass
0.0000
16570
3281
19
Pass
0.0000
16116
3281
20
Pass
0.0000
15896
3281
20
Pass
0.0000
15469
3281
21
Pass
0.0000
15070
3281
21
Pass
0.0000
14671
3281
22
Pass
0.0000
14299
3281
22
Pass
0.0000
13914
3281
23
Pass
0.0000
13575
3281
24
Pass
0.0000
13257
3281
24
Pass
0.0000
13083
3281
25
Pass
0.0000
12763
3281
25
Pass
0.0000
12401
3281
26
Pass
0.0000
12081
3281
27
Pass
0.0000
11795
3281
27
Pass
0.0000
11512
3281
28
Pass
0.0000
11256
3281
29
Pass
0.0000
11123
3281
29
Pass
0.0000
10892
3281
30
Pass
0.0000
10630
3281
30
Pass
0.0000
10402
3281
31
Pass
0.0000
10165
3281
32
Pass
0.0000
9927
3281
33
Pass
0.0000
9693
3281
33
Pass
0.0000
9496
3281
34
Pass
0.0000
9404
3281
34
Pass
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ENCONiERING ph. 425.778.8500 1 f. 425.778.5536
1 www.cgengineering.com
Aw Residence - CG #18300.20
Drainage Report
August 27, 2019
Section III Page 13
0.0000
9232
3281
35
Pass
0.0000
9042
3281
36
Pass
0.0000
8840
3281
37
Pass
0.0000
8637
3281
37
Pass
0.0000
8449
3281
38
Pass
0.0000
8280
3281
39
Pass
0.0000
8202
3281
40
Pass
0.0000
8018
3281
40
Pass
0.0000
7872
3281
41
Pass
0.0000
7726
3281
42
Pass
0.0000
7552
3281
43
Pass
0.0000
7408
3281
44
Pass
0.0000
7269
3281
45
Pass
0.0000
7132
3281
46
Pass
0.0000
7064
3281
46
Pass
0.0000
6936
3281
47
Pass
0.0000
6812
3281
48
Pass
0.0000
6701
3281
48
Pass
0.0000
6587
3281
49
Pass
0.0000
6463
3281
50
Pass
0.0000
6351
3281
51
Pass
0.0000
6277
3281
52
Pass
0.0000
6163
3281
53
Pass
0.0000
6053
3281
54
Pass
0.0000
5954
3281
55
Pass
0.0000
5849
3281
56
Pass
0.0000
5740
3281
57
Pass
0.0000
5621
3281
58
Pass
0.0000
5511
3281
59
Pass
0.0000
5469
3281
59
Pass
0.0000
5363
3281
61
Pass
0.0000
5281
3281
62
Pass
0.0000
5195
3281
63
Pass
0.0000
5105
3281
64
Pass
0.0000
5012
3281
65
Pass
0.0000
4926
3281
66
Pass
0.0000
4887
3281
67
Pass
0.0000
4798
3281
68
Pass
0.0000
4725
3281
69
Pass
0.0000
4652
3281
70
Pass
0.0000
4573
3281
71
Pass
0.0000
4485
3281
73
Pass
0.0000
4419
3281
74
Pass
0.0000
4348
3281
75
Pass
0.0000
4310
3281
76
Pass
0.0000
4217
3281
77
Pass
0.0000
4149
3281
79
Pass
0.0000
4070
3281
80
Pass
0.0000
3999
3281
82
Pass
0.0000
3931
3281
83
Pass
0.0000
3863
3281
84
Pass
0.0000
3831
3281
85
Pass
0.0000
3765
3281
87
Pass
0.0000
3716
3281
88
Pass
0.0000
3665
3281
89
Pass
0.0000
3606
3281
90
Pass
2SO 4th Avenue South, Suite 200
Edmonds, WA 98020
ENGIIN�ERIING ph. 425.778.8500 1 f. 425.778.5536
www.cgengineering.com
Aw Residence - CG #18300.20 August 27, 2019
Drainage Report Section III Page 14
0.0000 3552 3281 92 Pass
0.0000 3493 3281 93 Pass
0.0000 3438 3281 95 Pass
LID Report
LID Technique
Used for
Total Volume
Volume
Infiltration
Cumulative
Percent Water Quality
Percent
Comment
Treatment?
Needs
Through
Volume
Volume
Volume
Water Quality
Treatment
Facility
(ac-ft.)
Infiltration
Infiltrated
Treated
(ac-ft)
(ac-ft)
Credit
Gravel Trench Bed 1 POC
N
48.42
N
95.87
Total Volume Infiltrated
48.42
0.00
0.00
95.87 0.00
0%
No Treat. Credit
Compliance with LID Standard 8
Duration Analysis Result = Passed
Per1nd and Impind Changes
No changes have been made.
This program and accompanying documentation are provided 'as -is' without warranty of any kind.
The entire risk regarding the performance and results of this program is assumed by End User.
Clear Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties,
either expressed or implied, including but not limited to implied warranties of program and
accompanying documentation. In no event shall Clear Creek Solutions Inc. be liable for any
damages whatsoever (including without limitation to damages for loss of business profits, loss of
business information, business interruption, and the like) arising out of the use of, or
inability to use this program even if Clear Creek Solutions Inc. or their authorized
representatives have been advised of the possibility of such damages. Software Copyright C by
Clear Creek Solutions, Inc. 2005-2019; All Rights Reserved.
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ENGIN�ERING ph. 425.778.8500 1 f. 425.778.5536
1 www.cgengineering.com
Aw Residence - CG #18300.20
Drainage Report
August 27, 2019
Section IV, Page 1
Section IV — Construction Stormwater Pollution
Prevention Plan
Section IV Summary:
Narrative
Construction SWPPP Elements
Source Controls
Erosion control details are provided on the civil plans that are consistent with the City of Edmonds
guidelines. Erosion control plan sheets are provided in full size as a part of the civil drawing set.
A full Construction SWPPP is not required by the Department of Ecology because land -disturbing activity
will be under one acre. The remainder of this section is a discussion of the Construction SWPPP
Elements per Section 2.5.2 of Volume I of the DOE Manual and the requirements in the Edmonds
Stormwater Addendum. See the civil plans for reference.
Construction SWPPP Elements
The elements for construction pollution prevention are discussed as follows:
Element 1: Mark Clearing Limits
To protect adjacent properties and to reduce the area of soil exposed to construction, the limits of
construction will be clearly marked before land -disturbing activities begin. Clearing limits will be to the
extents of necessary land disturbance for the new house and associated driveway and walkways. The
BMPs relevant to marking the clearing limits that will be applied for this project include:
High Visibility Plastic or Metal Fence (BMP C103)
Element 2: Establish Construction Access
Construction access or activities occurring on unpaved areas shall be minimized, yet where necessary,
access points shall be stabilized to minimize the tracking of sediment onto public roads. The proposed
driveway area should be used for a stabilized construction entrance to the site. The BIVIPs relevant to
establishing construction access are:
Stabilized Construction Entrance (BMP C105)
Element 3: Control Flow Rates
The site is small enough that a silt fence used for Element 4 may be used to control flow rates.
Element 4: Install Sediment Controls
250 4th Avenue South, Suite 200
Edmonds, WA 98020
r=NG1NrEr=R1NG ph. 425.778.8500 1 f. 425.778.5536
www.cgengineering.com
Aw Residence - CG #18300.20
Drainage Report
August 27, 2019
Section IV, Page 2
All stormwater runoff from disturbed areas shall pass through an appropriate sediment removal BMP
before leaving the construction site or prior to being discharged. Silt fence will be installed mainly on the
western half of the site and can be seen on the Temporary Erosion Control Plan, C2.1. Pollution
prevention facilities on the erosion control plan must be constructed prior to or in conjunction with all
clearing and grading to ensure that the transport of sediment to surface waters and adjacent properties
is minimized. The specific BIVIPs to be used for controlling sediment on this project include:
Silt Fence (BIVIP C233)
Element 5: Stabilize Soils
Exposed and unworked soils shall be stabilized with the application of effective BIVIPs to prevent erosion
throughout the life of the project. The specific BIVIPs for soil stabilization that shall be used on this
project include:
Temporary and Permanent Seeding (BIVIP C120)
Mulching (BIVIP C121)
Nets and Blankets (BIVIP C122)
Plastic Covering (BMP C123)
Sodding (BIVIP C124)
Topsoiling/Composting (BIVIP C125)
Surface Roughening (BMP C130)
Dust Control (BIVIP C140)
Element 6: Protect Slopes
Exposed slopes shall be stabilized with BIVIPs found in Element 5.
Element 7: Protect Drain Inlets
Drain inlets within 100' of the site along 1901h PI SW and Olympic View Dr and those made operable on -
site will be protected from sedimentation. Stormwater shall not enter the conveyance system without
first being filtered or treated to remove sediment. Inlet protection devices shall be cleaned or removed
and replaced when sediment has filled one-third of the available storage (or as specified by the
manufacturer). The specific BMPs to be used for protecting drain inlets are:
Storm Drain Inlet Protection (BMP C220)
Element 8: Stabilize Channels and Outlets
Conveyance channels are not located on or in the immediate vicinity of the site.
Element 9: Control Pollutants
Design, install, implement and maintain effective pollution prevention measures to minimize the
discharge of pollutants. The suggested BMPs are:
250 4th Avenue South, Suite 200
Edmonds, WA 98020
CENGIIINIkRIING ph. 425.778.8500 1 f. 425.778.5536
www.cgengineering.com
Aw Residence - CG #18300.20
Drainage Report
August 27, 2019
Section IV, Page 3
Concrete Handling (BMP C151)
Sawcutting and Surfacing Pollution Prevention (BMP C152)
Material Delivery, Storage and Containment (BMP C153)
Element 10: Control De -Watering
De -watering is not anticipated.
Element 11: Maintain BMPs
All temporary and permanent erosion and sediment control BMPs shall be maintained and repaired as
needed to assure continued perfon-nance of their intended function.
Element 12: Manage the Project
0 Phase development projects to the maximum degree practicable and take into account seasonal
work limits.
• inspection and monitoring — Inspect, maintain, and repair all BMPs as needed to assure
continued performance of their intended function. Conduct site inspections and monitoring in
accordance with the Construction Stormwater General Permit or local plan approval authority.
• Maintain an Updated Construction SWPPP
- This SWPPP shall be retained on -site or within reasonable access to the site.
- The SWPPP shall be modified whenever there is a change in the design, construction,
operation, or maintenance at the construction site that has, or could have, a significant
effect on the discharge of pollutants to waters of the state.
- The SWPPP shall be modified if, during inspections or investigations conducted by the
owner/operator, or the applicable local or state regulatory authority, it is determined that
the SWPPP is ineffective in eliminating or significantly minimizing pollutants in stormwater
discharges from the site. The SWPPP shall be modified as necessary to include additional or
modified BMPs designed to correct problems identified. Revisions to the SWPPP shall be
completed within seven (7) days following the inspection.
Element 13: Protect Low Impact Development BMPs
High visibility fence shall be placed around the proposed infiltration trench to protect it from
compaction during construction activities.
Source Controls
This project should incorporate required BMPs from Volume IV of the DOE Manual: S407 — BIVIPS for
Dust Control at Disturbed Land Areas and Unpaved Roadways and Parking Lots; S411 — BMPs for
Landscaping and Lawn/Vegetation Management; and S417 — BMPs for Maintenance of Stormwater
Drainage and Treatment Systems. The Operation & Maintenance Manual found in Section V11 contains
guide sheets for the aforementioned BMPs.
250 4th Avenue South, Suite 200
Edmonds, WA 98020
CENGIINiiCERIING ph. 425.778.8500 1 f. 425.778.5536
www.cgengineering.com
Aw Residence - CG #18300.20
Drainage Report
August 27, 2019
Section V, Page I
Section V — Special Reports and/or Studies
Section V Summary:
Narrotive
The following reports are included in this section:
1. Stormwater Infiltration Letter by Nelson Geotechnical Associates, Inc. dated May 24, 2019.
2. Design Infiltration Rate by South Fork Geosciences dated January 18, 2019.
3. Subsurface Exploration, Geologic Hazards, and Geotechnical Engineering Report by South Fork
Geosciences dated January 14, 2014.
4. Soil Resource Report from the USDA and NRCS Web Soil Survey dated September 26, 2018.
250 4th Avenue South, Suite 200
Edmonds, WA 98020
EINIONErERING ph. 425.778.8500 1 f. 425.778.5536
www.cgengineering.com
N11 f� A
GA
Main Office
17311 — 135'h Ave NE, A-500
Woodinville, WA 98072
(425) 486-1669 - FAX (425) 481-25 10
May 24, 2019
Mr. Chak Aw
c/o Jacob Strobl
Strobl Design
VIA Email: iacob@,sti-obIdesign.com
Stormwater Infiltration Letter
Aw Residence Infiltration
9527 — 190" Place SW
Edmonds, Washington
NGA File No. 1105019
Dear Mr. Aw:
NELSON GEOTECHNICAL
AssociATEs, INC.
GEOTECHNICAL ENGINEERS & GEOLOGISTS
Engineering -Geology Branch
5526 Industry Lane, #2
East Wenatchee, WA 98802
(509) 665-7696, FAX (509) 665-7692
This letter documents our explorations and provides our opinions and recommendations for the feasibility
of stormwater infiltration at the property located at 9527 — 190th Place SW in Edmonds, Washington, as
shown on the Vicinity Map in Figure 1.
INTRODUCTION
The property consists of a roughly rectangular -shaped parcel covering approximately 0.32 acres. The
property is currently undeveloped, and is bordered by residential properties to the north and east, and to
the west and south by Olympic View Drive and 1901 Place SW, respectively. The ground surface
generally slopes gently from east to west with localized steep slopes within the central portion of the site.
Vegetation within the site consists of grass yard areas and low shrub plants around the perimeter and
scattered young to mature trees within the central portions of the site. We understand that the proposed
development within the site will consist of constructing a new single-family residence, with an associated
paved driveway, within the east -central and southeastern portions of the site respectively,
We understand that stormwater generated within the property may be directed to onsite infiltration
systems, if feasible. We have been requested to evaluate the infiltration capacity of the site soils within
the property. The City of Edmonds utilizes the Department of Ecology 2014 Department of Ecolm
(DOE) Stormwater Management in Western Washington to determine the design of infiltration or
detention facilities. According to this manual, long-term design infiltration rates for this site are to be
determined by performing on -site infiltration testing consisting of the Small Pilot Infiltration Test (PIT).
Stormwater Infiltration Letter NGA File No. 1105019
Aw Residence Infiltration May 24, 2019
Edmonds, Washington Page 2
SCOPE
The purpose of this study is to explore and characterize the subsurface conditions within the site and to
provide opinions and recommendations for stormwater infiltration. Specifically, our scope of services
included the following:
1. Review available soil and geologic maps of the area.
2. Explore the subsurface soil and groundwater conditions within the site with trackhoe
excavated test pits. Trackhoe was provided by NGA.
3. Perform grain -size sieve analysis on selected soil samples, as needed.
4. Provide long-term design infiltration rates based on one on -site small-scale Pilot
Infiltration Tests (PIT) per the 2014 DOE Stormwater Manual. Location and depth of test
to be determined by civil engineer. Water for the test to be secured by client.
5. Provide recommendations for infiltration system installation.
6. Observe the conditions on steep slopes within the site, and evaluate current slope
stability.
7. Provide our opinion regarding the stability conditions of the steep slopes and potential
impacts from proposed on -site infiltration, as needed.
8. Provide recommendations for slope protection measures and infiltration system location,
as needed.
9. Document the results of our findings, conclusions, and recommendations in a written
geotechnical letter.
SITE CONDITIONS
Surface Conditions
The property consists of a roughly rectangular -shaped parcel covering approximately 0.32 acres. The
property is currently undeveloped, and is bordered by residential properties to the north and east, and to
the west and south by Olympic View Drive and 190'h Place SW, respectively. The subject site is generally
situated on a gentle to steep west -facing slope. The ground surface generally decends westward from the
eastern portion of the property at gradients of 5 to 10 degrees (9 to 18 percent) with a localized north -
south trending steep west -facing slope area within the central portion of the site that reaches gradients of
up to 26 degrees (49 percent). The overall vertical relief of the localized steep slope area is generally 10 to
15 feet, The lower western portion of the site is generally level to very gently sloping to the west.
Vegetation within the site consists of grass yard areas and low shrub plants around the perimeter and
scattered young to mature trees within the central portions of the site. We did not observe any surface
water within the site on our visit on May 9, 2019. We did not observe indications of significant slope
stability issues such as deep-seated landsliding within the site and in the vicinity of the property during
our site visit.
NELSON GEOTECHNICAL ASSOCIATES, INC.
Stormwater Infiltration Letter NGA File No. 1105019
Aw Residence Infiltration May 24, 2019
Edmonds, Washington Page 3
Subsurface Conditions: The geologic units for this area are shown on the Geologic Map of the
Edmonds East and part of the Edmonds West Quadrangles, WashinZo , by J. P. Minard
(U.S.G.S., 1983). The site is mapped as Qva (Advance Outwash deposits), with Qvr (Glacial
Recessional Outwash) nearby. Texture and structure vary from place to place but Advance
Outwash generally is composed of moderate- to well -sorted, stratified, light gray to tan medium
to coarse sand and pebbly sand containing minor amounts of fine sandy silt. Recessional outwash
deposits are generally described as stratified sand and gravel with minor silt and clay layers. In
our explorations, we encountered soils primarily consisting of fine to medium sand with varying
amounts of gravel and minor amounts of silt, which we interpreted to be consistent with the
description of the outwash deposits mapped in this area.
Explorations: The approximate locations of our explorations are shown on the Site Plan in Figure 2. A
geologist from NGA was present during the explorations, examined the soils and geologic conditions
encountered, obtained samples of the different soil types, and maintained logs of the explorations.
The soils were visually classified in general accordance with the Unified Soil Classification System,
presented in Figure 4. The logs of our explorations are attached to this letter and are presented in Figures
5 and 6. We present a brief summary of the subsurface conditions in the following paragraph. For a
detailed description of the subsurface conditions, the exploration logs should be reviewed.
At the surface of Infiltration Pit I we generally encountered approximately 2 feet of dark brown to
reddish brown, silty fine to medium sand with charcoal and various organics, which we interpreted as
undocumented fill. Underlying the layer of undocumented fill, we encounted about 1.8 feet of orange
brown to gray silty fine to coarse sand with gravel and iron oxide staining in a medium dense to dense
condition, which we interpreted as native glacial outwash deposits, Infiltration Pit I terminated at 5.0 feet
below the existing ground surface.
In Test Pits I and 2 we encountered 3.8 to 4.0 feet of dark brown, silty fine to medium sand with gravel
and organics in a loose to medium dense condition, which we interpreted as undocumented fill.
Underlying this deposit, we encountered gray -brown fine to coarse sand with silt and gravel in a medium
dense or better condition, which we interpreted as native glacial outwash soils. Test Pits I and 2
terminated at respective depths of 5.0 and 8.0 feet below the existing ground surface.
NELSON GEOTECHNICAL ASSOCIATES, INC.
Stormwater Infiltration Letter NGA File No. 1105019
Aw Residence Infiltration May 24, 2019
Edmonds, Washington Page 4
In Hand Augers I and 2, we encountered 3.0 feet of surficial dark brown, silty fine to medium sand with
gravel and various organics, which we interpreted as undocumented fill. In Hand Auger 2, we
encountered an additional 2.5 feet of light brown, silty fine to medium sand with gravel and roots in a
loose to medium dense condition, which we interpreted as undocumented fill. Hand Augers I and 2 met
refusal within undocumented fill soils at respective depths of 3.0 and 5.5 feet below the existing ground
surface.
Hydrogeologic Conditions
We did not encounter groundwater seepage in any of our explorations completed within the site. If
groundwater seepage is encountered during construction, we would interpret this water to be perched
groundwater. Perched water occurs when surface water infiltrates through less dense, more permeable
soils and accumulates on top of underlying, less permeable soils. Perched water does not represent a
regional groundwater "table" within the upper soil horizons. Perched water tends to vary spatially and is
dependent upon the amount of precipitation. We would expect the amount of perched water to decrease
during drier times of the year and increase during wetter periods.
Landslide Hazard/Slope Stability
The criteria used for evaluation of landslide hazards include soil type, slope gradient, and groundwater
conditions. The property is generally situated on relatively level to gently westward sloping ground
within the eastern and western portions of the property. A localized steep slope area bisects the central
portion of the site from north to south and extends into the adjacent properties. The short steep slope area
generally decends west at gradients up to 26 degrees (49 percent) to gently sloping ground, as shown on
Cross Section A -A' in Figure 3. The overall height of the steep slope is approximately 10 to 15 feet. We
did not observe evidence of significant slope instability within the immediate vicinity of the property
during our investigation, such as deep-seated landsliding. We also did not observe groundwater seepage
emitting from the site slopes.
The core of the slope is inferred to consist primarily of dense or better native glacial soils, Relatively
shallow sloughing failures as well as surficial erosion are natural processes and should be expected on
these slopes during extreme weather conditions. It is our opinion that while there is potential for erosion,
soil creep, and shallow failures within the loose surficial soils on the site slopes, there is not a significant
potential for deep-seated slope failures under current site conditions.
We understand that any proposed infiltration systems on this site will be located within the southwestern
portion of the property, with the proposed residence being located within the northeastern alighnment of
the property. We estimate that the overall setback of the infiltration system to the steep slope area to be
approximately 60 to 70 feet. It is our opinion that the proposed infiltration system to be located within
NELSON GEOTECHNICAL ASSOCIATES, INC.
Stormwater Infiltration Letter NGA File No. 1105019
Aw Residence Infiltration May 24, 2019
Edmonds, Washington Page 5
the southwestern portion of the property below the steep slope area is feasible and should not adversely
impact the existing slope stability conditions of the steep slope areas within the subject site. Regular
maintenance of this system will be required to ensure functionality.
Storinwater Infiltration
The subsurface soils generally consisted of topsoil and/or fill underlain by fine- to coarse- grained sand
with varying amounts of silt and gravel to the depths explored within the proposed infiltration areas. We
conducted on -site infiltration testing in accordance with the Department of Ecology 2014 Stormwater
Management Manual for Western Washington, to determine the long term design infiltration rate of the
site soils. On -site testing consisted of a Small Pilot Infiltration Test (Small PIT) to determine the long-
term design infiltration rates.
We conducted a Small PIT within Infiltration Pit 1, located as shown on the attached Schematic Site Plan
in Figure 2. The test was conducted within a pit that measured 3.0-feet long by 4.0-feet wide by 5.0-feet
deep. We filled the pit with 12-inches of water at the beginning of the day fa begin the soaking period of
the PIT for approximately 6 hours. At this time, the water flow rate into the hole was monitored with a
Great Plains Industries (GPI) TM 075 water flow meter for the pre-soak period.
After the 6-hour soaking period was completed, the water level was maintained at approximately 12.0-
inches for one hour for the steady-state period.. The flow rate for Infiltration Pit I stabilized at 0.372
gallons per minute (22.32 gallons per hour), which equates to an approximate infiltration rate of 2.98
inches per hour. The water was shut off after the steady-state period and monitored at least every 15
minutes. After 60 minutes, the water level within the pit dropped approximately 2.75 inches, resulting in
an infiltration rate of 2.75 inches per hour.
In accordance with the Table 3.5 of the Department of Ecology 2014 Stormwater Management Manual
for Western Washington, correction factors of 0.8, 0.5, and 0,9 for site variability and number of locations
tested (CF,), testing method (CFt), and degree of influent control to prevent siltation and bio-buildup
(CFn,), respectively were applied to the field measured infiltration rate of 2.75 inches per hour, selected
from the falling -head portion of the testing. A total correction factor of 0.36 was applied to the measured
field infiltration rate obtained frorn the falling head portion of the test to determine the long-term design
infiltration rate. Using the above correction factor, we calculated a long-term design infiltration rate of
approximately 0.99 inches per hour.
NELSON GEOTECHNICAL ASSOCIATES, INC.
Stormwater Infiltration Letter NGA File No. 1105019
Aw Residence Infiltration May 24, 2019
Edmonds, Washington Page 6
CONCLUSIONS
It is our opinion that the subsurface soils within the site are suitable for traditional stormwater infiltration.
Using the above correction factors, we calculated a long-term design infiltration rate of 0.99 inches per
hour to be utilized to design any on -site infiltration systems within the site, provided that the base of the
system tenninates within the native glacial outwash soils encountered at depth.
The storm water management systems should be designed and maintained in accordance with 2014
Stormwater Management Manual for Western Washington. We recommend that any proposed infiltration
systems be placed as to not negatively impact any proposed or existing nearby structures and also meet all
required setbacks from existing property lines, structures, and sensitive areas as discussed in the drainage
manual. In general, infiltration systems should not be located within fill areas within the site (associated
with site grading or retaining wall backfill) as such condition could lead to failures of the placed fills
and/or retaining structures. We should be retained to review infiltration design and oversee installation.
Based on our infiltration testing and additional soil explorations, the observed relatively stable nature of
the steep slopes within the the subject site and the overall distance separating the proposed infiltration
system from the steep slopes within the vicinity of the site, it is our opinion that the proposed infiltration
system to be located within the southwestern portion of the property is feasible and should not adversely
impact the existing slope stability conditions of the steep slope areas within the vicinity of the subject site.
USE OF THIS LETTER
This letter was prepared for Mr. Chak Aw and his agents, for use in planning and budgeting the above -
referenced project only. Our services included an evaluation of the infiltration capability of the site soils
at specific locations and should not be considered as an in-depth geotechnical study of the site or an
evaluation of the overall site stability. This letter may be used for bidding and estimating purposes, but
our letter, conclusions, and interpretations should not be construed as a warranty of the subsurface
conditions. The subsurface conditions between explorations may vary. A contingency for varying
conditions should be incorporated into the project plans.
We recommend that NGA be retained to review the design and provide monitoring and consultation
services during construction to confirm that the conditions encountered are consistent with those indicated
by the explorations, to provide recommendations for design changes should the conditions revealed
during the work differ from those anticipated, and to evaluate whether or not earthwork activities comply
with contract plans and specifications. We should be contacted a minimum of one week prior to
construction activities and could attend pre -construction meetings if requested.
NELSON GEOTECHNICAL ASSOCIATES, INC.
Stormwater Infiltration Letter
Aw Residence Infiltration
Edmonds, Washington
NGA File No. 1105019
May 24, 2019
Page 7
Within the limitations of scope, schedule, and budget, our services have been performed in accordance
with generally accepted geotechnical engineering practices in effect in this area at the time this report was
prepared. No other warranty, expressed or implied, is made. Our observations, findings, and opinions are
a means to identify and reduce the inherent risks to the owner.
�9 V
NELSON GEOTECHNICAL ASSOCIATES, INC.
Stormwater Infiltration Letter
Aw Residence Infiltration
Edmonds, Washington
NGA File No. 1105019
May 24, 2019
Page 8
We appreciate the opportunity to provide set -vice to you on this project. If you have any questions or
require further information, please call.
Sincerely,
NELSON GEOTECHNICAL ASSOCIATES, INC.
Katelyn S. Brower, GIT
Staff Geologist I
44 4-/W/1
Alex B. Rinaldi, GIT
Project Geologist
Khaled M. Shawish, PE
Principal
KSB:ABR:KMS:dy
Six Figures Attached
NELSON GEOTECHNICAL ASSOCIATES, INC.
VICINITY MAP
t
N
Not to Scale
Seavit
I Wh N SW
3: Hutt Park
Mffi St
I rUh M syt
1671h St SW
I Bith S,, S'N
Project Elementary School
Site
To A
I B911, P1 Sw
M! rI
Watt' ,,I
10(ht, St S'N
III P:
Ch"ry st
3
R /9
<
=r
Portofino
U
ReMaurwit & Bar 6AII
Maplewood Rock
Ilvgtl D1
Gem Club
196th St SW
Edmonds
Maplewoo 9-11
d
Elementary School
Park
Itnd;cy Ln vle.lzi.1 lVay
C
0
E
caspers st
700"It st Tit
C
0
Edmonds United
Methodist Church
-K
V. ',I,
d)
THE BOWL
Cucdobf C2
Edmonds, WA
LL
7u
2
IL
z
Project Number
NELSON GEOTECHNICAL
No.
Date
Revision
By
CK
1105019
Aw Residence Infiltration
Vicinity Map
ASSOCIATES, INC.
-eN A
GEOTECHNICAL ENGINEERS & GEOLOGISTS
ABR
1
5/16/19
Original
DPN
Figure 1
W-dlMlt. Offl.. East Mn.whes offlt4
17311 '135thA-14E.A-500 SS26 Inchisby L... #2
M astWenstchmWA 06802
=j
501I)IISS-78961IF-665-7692
CD Site Plan
(C) CDI!�-
C Cri z
(D
1"i N
07
Y
AA-
(D
J
CO CL,
AT -F�
(D 7�!�T �_16—NW,_
�T
0
CD
Ut
LINE
DO
T -2
P
0 71 6 0
rroposed
LC Resi den VM
Fdb
.0 Z We INF�11
A "ZL >
114
> z
r LIM
M
mz
> r
U) U) --------
(0
0
rq 0 z
rn
= oR
M
0
M
LO rrI
0
0
>
r LEGEND
z INF-1
F4 P Property line Number and approximate
0
location of infiltration test pit 0 30 60
TP-1
0 - Number and approximate
,> A A' Approximate location —I
< Scale: 1 inch 30 feet
of cross-section location of test pit
HA-1
2 Number and approximate
*D M
z �<
> Cl) location of hand auger
Go X Pafaranpg% cZifa nlon hneizirl f%n n ninn rivkf
M zei Annimm 91 91711 q fitipri "Aw RPAidPnr-A_" nranarad bv Strnhl Desion LLC_
MILUcompany\2019 NGA Project FoIders\1 1050-19 Aw Residence Infiltration Edmonds1Draflting%SP.dwg
k I
M
0, z
0
(0 3
Cr
Southwest
Northeast
220--
Q M
Q) G
M :3
0 0
190--
__190
M
5'
(D
>
0
0
Fill
D
cu
>
26*
26*
160--
W
a) Fill
Z,
;,:
0, z
10*
HA-2�
-0
E INF-1
X
41.? K >
0 ?
0
z
< 130--
130
M M
z > r
In 0
z
0 z
M
-10
M -4
LQ M
100
100
o
r
.'M; 0 0 z
0
0 30 60 90 120 150
180 210
>
r-
Distance (feet)
Exploration
z
P
E;
Infiltration Test Pit Hand Auger Designation IN F-1 HA-1
;U
Groundwater Level----> V
NOTES:
During Exploration 1)
Stratigraphic conditions are interpolated between
Geologic Contact --> 2)
the explorations. Actual conditions may vary.
Elevations are approximate.
IOU
z
I �<
(approximate)
Reference: Cross Section is based on field measurements usinq a hand-held clinometer and 100-ft tape measure.
>
Co
;U
1 0
;K
M I WcompanyX2019 NGA Pmject Folders\11050-19Aw Residence Infiltration Edmonds\Drafting=.dwg
UNIFIED SOIL CLASSIFICATION SYSTEM
GROUP
MAJOR DIVISIONS
GROUPNAME
SYMBOL
CLEAN
GW
WELL -GRADED, FINE TO COARSE GRAVEL
COARSE-
GRAVEL
GRAVEL
GP
POORLY -GRADED GRAVEL
GRAINED
MORE THAN 50 %
GRAVEL
GM
SILTY GRAVEL
OF COARSE FRACTION
RETAINED ON
SOILS
NO. 4 SIEVE
WITH FINES
GC
CLAYEY GRAVEL
SAND
CLEAN
SW
WELL -GRADED SAND, FINE TO COARSE SAND
SAND
SID
POORLY GRADED SAND
MORE THAN 50 %
RETAINED ON
MORE THAN 50 %
NO. 200 SIEVE
OF COARSE FRACTION
SAND
Sm
SILTY SAND
PASSES NO. 4 SIEVE
SC
WITH FINES
CLAYEY SAND
FINE -
SILT AND CLAY
ML
SILT
INORGANIC
GRAINED
LIQUID LIMIT
CL
CLAY
LESS THAN 50 %
SOILS
ORGANIC
OL
ORGANIC SILT, ORGANIC CLAY
SILT AND CLAY
MH
SILT OF HIGH PLASTICITY, ELASTIC SILT
INORGANIC
MORE THAN 50 %
PASSES
LIQUID LIMIT
CH
CLAY OF HIGH PLASTICITY, FAT CLAY
NO. 200 SIEVE
50 % OR MORE
ORGANIC
OH
ORGANIC CLAY, ORGANIC SILT
HIGHLY ORGANIC SOILS
PT
PEAT
NOTES:
1) Field classification is based on visual SOIL MOISTURE MODIFIERS:
examination of soil in general
accordance with ASTM D 2488-93. Dry -Absence of moisture, dusty, dry to
the touch
2) Soil classification using laboratory tests Moist - Damp, but no visible water.
is based an ASTM D 2488-93.
3) Descriptions of soil density or Wet - Visible free water or saturated,
consistency are based on usually soil is obtained from
interpretation of blowcount data, below water table
visual appearance of soils, and/or
test data.
Project Number
NELSON GEOTECHNICAL
No.
Date
Revision
By
CK
1105019
Aw Residence Infiltration
N �GA ASSOCIATES, INC.
1
5116/19
Original
DPN
ASR
Soil Classification Chart
GEOTECKNICAL ENGINEERS & GEOLOGISTS
Figure 4
Wwd1nv111e Ofte EastWtch� Ofte
17311-135th Ave. NE. A-500 SM Indistry L, #2
Vh 11171 East Wen&Whee, WA 98602
481-2510 (5D9)655-7696/Fw 665-7692
LOG OF EXPLORATION
DEPTH(FEET) Usc SOIL DESCRIPTION
INFILTRATION PIT ONE
0.0-2.0 DARK BROWN TO REDDISH BROWN, SILTY FINE TO MEDIUM SAND WITH ROOTS,
CHARCOAL, AND ORGANICS (LOOSE TO MEDIUM DENSE, MOIST) (UNDOCUMENTED FILL)
2.0-3.2 SM LIGHT BROWN TO ORANGE -BROWN, SILTY FINE TO COARSE SAND WITH [RON-OXIDE
WEATHERING, AND TRACE ROOTS (MEDIUM DENSE TO DENSE, MOIST)
3.2-5.0 SP-SM LIGHT BROWN TO GRAY, FINE TO MEDIUM SAND WITH SILT, GRAVEL, AND IRON OXIDE
STAINING (MEDIUM DENSE TO DENSE, MOIST)
SAMPLES WERE NOT COLLECTED
GROUNDWATER SEEPAGE WAS NOT ENCOUNTERED
TEST PIT CAVING WAS NOT ENCOUNTERED
TEST PIT WAS COMPLETED AT 5.0 FEET ON 5/9/2019
TEST PIT ONE
0.0-3.8 GRASS UNDERLAIN BY DARK BROWN, SILTY FINE TO MEDIUM SAND WITH GRAVEL,
ORGANICS, AND ROOTS (LOOSE TO MEDIUM DENSE, MOIST) (UNDOCUMENTED FILL)
3.8-5.0 SP-SM GRAY -BROWN TO LIGHT BROWN, FINE TO COARSE SAND WITH SILT, GRAVEL, AND IRON -
OXIDE STAINING (MEDIUM DENSE TO DENSE, MOIST)
SAMPLE WAS COLLECTED AT 4.5 FEET
GROUNDWATER SEEPAGE WAS NOT ENCOUNTERED
SLIGHT TEST PIT CAVING WAS ENCOUNTERED
TEST PIT WAS COMPLETED AT 5.0 FEET ON 5/9/2019
TEST PIT TWO
0.0-4.0 GRASS UNDERLAIN BY DARK BROWN TO LIGHT BROWN, SILTY FINE TO MEDIUM SAND
WITH GRAVEL, ROOTS, AND ORGANICS
(LOOSE TO MEDIUM DENSE, MOIST) (UNDOCUMENTED FILL)
4.0-8.0 SP-SM LIGHT BROWN TO GRAY -BROWN, FINE TO MEDIUM SAND WITH SILT, GRAVEL, TRACE
COBBLES, AND IRON OXIDE STAINING (MEDIUM DENSE TO DENSE, MOIST)
SAMPLE COLLECTED AT 8.0 FEET
GROUNDWATER SEEPAGE WAS NOT ENCOUNTERED
TEST PIT CAVING WAS NOT ENCOUNTERED
TEST PIT WAS COMPLETED AT 8.0 FEET ON 5/9/2019
HAND AUGER ONE
0.0-3.0 DARK BROWN TO LIGHT BROWN, SILTY FINE TO MEDIUM SAND WITH GRAVEL, ROOTS,
ORGANICS (LOOSE TO MEDIUM DENSE, MOIST) (UNDOCUMENTED FILL)
SAMPLES WERE NOT COLLECTED
GROUNDWATER SEEPAGE WAS NOT ENCOUNTERED
HAND AUGER CAVING WAS NOT ENCOUNTERED
HAND AUGER MET REFUSAL AT 3.0 FEET ON 5/912019
DJO:ABR NELSON GEOTECHNICAL ASSOCIATES, INC.
FILE NO 1105019
FIGURE 5
LOG OF EXPLORATION
DEPTH(FEET) Usc SOIL DESCRIPTION
HAND AUGER TWO
0.0-3.0 DARK BROWN TO REDDISH BROWN, SILTY FINE TO MEDIUM SAND WITH GRAVEL, ROOTS,
ORGANICS (LOOSE TO MEDIUM DENSE, MOIST) (UNDOCUMENTED FILL)
3.0-5.5 LIGHT BROWN, SILTY FINE TO MEDIUM SAND WITH GRAVEL AND ROOTS
(LOOSE TO MEDIUM DENSE, MOIST) (UNDOCUMENTED FILL)
SAMPLES WERE NOT COLLECTED
GROUNDWATER SEEPAGE WAS NOT ENCOUNTERED
HAND AUGER CAVING WAS NOT ENCOUNTERED
HAND AUGER TWO MET REFUSAL AT 5.5 FEET ON 5/9/2019
DJO:ABR NELSON GEOTECHNICAL ASSOCIATES, INC.
FILE NO 1105019
FIGURE 6
Aw Residence January 18, 2019
9527 190th Place SW Project #18102
Edmonds, Washington
Strobl Design LLC
r acob@strobldesign.com
Attention: Jacob Strobl
Subject: Design Infiltration Rate — Aw Residence
Mr. Strobl:
The purpose of this letter is to provide a design infiltration rate for stormwater infiltration for
the proposed development of a single-family home on the subject property.
Summary
We recommend using a design infiltration rate of 2 inches per hour for the proposed infiltration
trench. The following sections will provide support for our recommendation.
Geologic/Hydrogeologic Setting
Our referenced geotechnical report describes the geologic and hydrogeologic setting and soils
encountered in more detail. For the purposes of the design infiltration rate, EP-2 was close to
the proposed infiltration trench. In EP-2 Vashon advance outwash sediments were
encountered from the ground surface to the total depth explored (5 feet). The soil log and
location of this exploration pit is attached to this report.
There was no groundwater seepage observed in any of the explorations performed for our previous
geotechnical report. Soil conditions observed were generally dry for the time of year (winter),
which is indicative of permeable soils. Also, there were no signs of ponding water or flowing water
observed on the subject property. Groundwater conditions are subject to change depending on
seasonal weather conditions but based on the permeable native advance outwash soils
encountered at depth, we do not anticipate seasonal high groundwater of adverse groundwater
conditions affecting infiltration facilities.
Receptor Soil Horizon
The soils present at the bottom elevation of the proposed infiltration trench consist of medium
dense, light brown GRAVEL with fine to coarse sand (GP). These coarse -grained soils are well
suited for stormwater infiltration. Based on our previous experience with in -situ infiltration
testing of similar soils, measured rates range from approximately 20 to 100 inches per hour.
Design Infiltration Rate
Due to the coarse -grained soils present at the receptor horizon and the nature of the project
(single-family residence) , we recommend using a design infiltration rate of 2 inches per hour.
This rate is extremely conservative for the soils present and based on our previous experience,
this design infiltration rate incoroporates an approximate factor of safety of 10 to 50
(Correction Factor = 0.1 to 0.02). It should also be noted that 2 inches per hour was the design
infiltration rate used for infiltration facility design on the adjacent property to the north (Mione
Short Plat), which South Fork Geosciences worked on as well.
SOUTH FORK GEOSCIENCES, PLLC Page 1
PO Box 1275
NORTH BEND, WA 98045
425-890-4858 1 INFO(-aSFGEO.COM A
- WAI
Aw Residence January 18, 2019
9527 1901h Place SW Project #18102
Edmonds, Washington
Civil Engineering Plan Review
We have reviewed referenced civil engineering plans (CG Engineering, January 17, 2019) and
EP-2 was located near the proposed infiltration trench. The respective locations are shown on
the attached Annotated Grading and Drainage Plan. Based on our recent correspondence with
the civil engineer, it is our understanding that the infiltration trench was sized based on a
design infiltration rate of 2 inches per hour. Also, upon review of the plans, we noted that the
infiltration trench has an overflow to the storm system. Based on the coarse -grained receptor
soils present and the geologic and topographic setting, we do not think the infiltration trench
will ever overflow, but if it did, it would not adversely impact the subject or adjacent properties.
As such, it is our opinion that the overflow feature of the design makes constant head
infiltration testing and/or groundwater mounding analysis onerous and wasteful.
Closure
We have enjoyed working with you and we are confident that this letter will aid in the design
and permitU��our project. If there are any questions, please feel free to contact us.
Since
'A
I Andrew L. Glandon
Anul�_Vv L.. %ilalluuIll tL_%J
Engineering Geologist / Owner
South Fork Geosciences, PLLC
Attachments: Annotated Grading and Drainage Plan
Exploration Pit Log (EP-2)
References:
"Subsurface Exploration, Geologic Hazards, and Geotechnical Engineering Report, Johnson Residence,
Parcel # 00434600007901, 9527 190th Place SW, Edmonds, Washington", South Fork Geosciences,
Project #12058, January 14, 2014
"Geologic Map of the Edmonds East and Part of the Edmonds West Quadrangles, Washington", Minard,
James P., 1983, United States Geological Survey, Miscellaneous Field Studies, Map MF-1541, Scale
1:24,000
"Aw Residence, 9527 190th PI SW, Edmonds, WA 98020, Sheets C1.1, C2.1, C2.2, C3.1, C3.2, C4.1 &
C4.2", CG Engineering, Job #18300.20, January 17, 2019
SOUTH FORK GEOSCIENCES, PLLC Page 2
PO Box 1275
NORTH BEND, WA 98045
425-890-4858 1 INFO@SFGEO.COM
Aw Residence
9527 1901h Place SW
Edmonds, Washington
January 18, 2019
Project #18102
EP-2 T-A6-
53,V2 Q.
N
1.226- E-
C3 R�v
Infiltration Tren h
k
Locat on
North is up
Linear scale is valid
-T
1901H PL SW
Source: Grading and Drainage Plan
CG Engineering
Annotated Grading and Drainage Plan
SOUTH FORK GEOSCIENCES, PLLC Page 3
PO Box 1275
NORTH BEND, WA 98045
425-890-4858 1 INFO@SFGEO.COM
Aw Residence
9527 1901h Place SW
Edmonds, Washington
Johnson Residence
9527 1 q0th Place SW, Edmonds, WA
Date: 1-1-2014
Depth Number: EP-2
M
0 Vashon Advance Outwash
loose to medium dense, damp, brown to
reddish brown, fine SAND with gravel and silt
(SP-SM)
2 medium dense, damp, light brown GRAVEL
with fine to coarse sand (GP)
4
6 1 Total Depth = 5 feet
No seepage observed
No caving observed
0-2ft weathered
8
10
12
14
January 18, 2019
Project #18102
Exploration
Pit Log
The subsurrace coomons shown an th.,s #old log represent our obsewattons a[ Itte Ww and tocation of axcavatoa ffooMod by go"c riterprelation
andlud9nent. and where noted, by mffwenr?g an3"s and laboratory testiq FW condbons shown rmy not W representatwe of condtons at other
tffnes. South Fork Goosuences mY nor be respon&bfe forusp ormforpretabon by others of intonnaton presLnted on these Aogs.
SouTH FORK GEOSCIFENCE:S
POBOx 1275
NORTH BEND, WA 98045
Project# 12058 PHONE: (425) 831-2023
SOUTH FORK GEOSCIENCES, IPLLC Page 4
PO Box 1275
NORTH BEND, WA 98045
425-890-4858 1 INFO(-a)SFGEO.COM
SOUTH FORK GEOSCIENCES
PO Box 1275
NORTH BEND, WA 98045
(425) 831-2023
AGLANDON@COMCAST.NET
January 14, 2014
Project #: 12058
Subsurface Exploration, Geologic Hazards,
and Geotechnical Engineering Report
Johnson Residence
Parcel # 00434600007901
9527 190th Place SW
Edmonds, Washington
Introduction
The purpose of this study was to gain subsurface information to be utilized in the design and
construction of a single-family residence on the subject property. The proposed construction will
consist of grading, foundation subgrade preparation, home construction, utility installation,
driveway construction, and retaining wall construction. Authorization to proceed with this study
was provided by Mr. Chris Johnson via e-mail on December 10, 2013. This report was prepared
for Mr. Johnson and his agents for specific use in support of this project. The location of the
subject property is shown in the attached Vicinity Map. An excerpt of the proposed site plan
prepared by Architects Northwest and the approximate locations of the subsurface explorations
logged for this study are shown on the attached Site and Exploration Plan.
Site Conditions
The subject property was located. at 9527 190th Place SW in Edmonds, Washington. The property
was irregularly shaped and was approximately 150 feet in the east -west direction and ranged from
approximately 90 to 100 feet in the north -south direction. Based on information from the
Snohomish County Assessor website, the property was 0.32 acres in size. The property sloped
gently to moderately from the east down to the west. Based on a review of the site survey, the slope
on the west portion of the property was on the order of 5 to 10 percent, and some of the areas to the
east had slopes up to approximately 50 percent. Based on our field observations, some of the steeper
areas were associated with past grading. Based on the surveyed elevations, there is approximately
32 feet of total relief on the property. The property was bordered on the west by Olympic View
Drive, to the south by 190th Place SW, and to the north and east by existing residential properties.
The property was marked with survey stakes at key points to delineate the property. The western
portion of the property had been cleared and was covered with grass. Near the southern and central
(E-W) portion of the lot, there was an area that appeared to have been filled to provide vehicle
SOUTH FORK GEOSCIENCES, PO Box 1275, NORTH BEND, WA 98045,(425) 831-2023
access to the property. An area near the north property line had not been cleared and was covered
with typical second -growth forest vegetation. Vegetation in the forested portion of the property
consisted of Douglas Fir and maple trees with underbrush consisting of blackberry vines and sallal.
We did not observe any signs of accelerated soil erosion or soil movement during our site
reconnaissance.
Subsurface Conditions
Subsurface conditions on the property were inferred from a visual reconnaissance of the property, a
review of the referenced geologic map (Minard, 1983) and seven exploration pits excavated with a
subcontracted track -mounted excavator provided by Northwest Excavating and Trucking Co., Inc.
The explorations were logged by the undersigned licensed engineering geologist and were
immediately backfilled. The approximate locations of the subsurface explorations are shown in the
Site and Exploration Plan and the exploration logs are attached to this report. Our interpretation of
the native soils found at depth as Vashon advance outwash is in agreement with the referenced
geologic map. The detection of fill soils on the property is due to the site specific nature of our
study.
Stratigraphy
Fill Soils
Fill soils were encountered in all of the exploration pits performed for this study except for EP-2,
which was located in an area that had not been cleared. The fill soils in the other exploration pits
ranged in depth from the ground surface to 3.5 to 9 feet below the ground surface. As shown in
the attached logs, the fill soils varied in grain size distribution and in relative density. The fill
soils included construction rubble which primarily consisted of asphalt and concrete pieces, with
small amounts of other manmade material (garbage). We presume that the fill soils were placed
to provide better vehicle access to the property and possibly in association with filling a past
topographic low. Due to their inconsistency, generally low relative density, and lack of
knowledge of the means and methods used to place and compact the fill soils, proposed
structures should not be founded on existing fill soils without mitigation measures, which are set
forth in later sections of this report.
Vashon Advance Outwash
Vashon advance outwash sediments were encountered in all of the exploration pits logged for
this study. In EP-2 these sediments were encountered from the ground surface to the total depth
explored (5 feet). In the other exploration pits, the advance outwash sediments were encountered
underlying the fill soils at a depth ranging from 3.5 to 9 feet below the ground surface to the
maximum depth of each exploration pit. The advance outwash sediments generally consisted of
medium dense, sand with gravel or gravel with sand. Vashon advance outwash sediments are
alluvial and fluvial sediments that were deposited by meltwater streams and channels from the
advancing Vashon glacial ice sheet. As the glacial ice advanced, the advance outwash sediments
were overridden and consolidated by the glacial ice. As such, the advance outwash sediments
are typically dense, relatively permeable, and moisture insensitive due to the past glacial
2
SOUTH FORK GEOSCIENCES, PO Box 1275, NORTH BEND, WA 98045, (425) 831-2023
consolidation and the small amount of silt and clay present. Due to their relatively coarse grain
size distribution, the advance outwash sediments are moderately resistant to erosion, except
when subjected to concentrated water flows.
Hydrology
There was no groundwater seepage observed in any of the explorations performed for this study.
Soil conditions observed were generally dry for the time of year, which is indicative of permeable
soils. Also, there were no signs of ponding water or flowing water observed. Groundwater
conditions are subject to change depending on seasonal weather conditions, but based on the
permeable advance outwash soils encountered at depth, we do not anticipate encountering adverse
groundwater conditions during construction.
Geolo2ic Hazards
The following discussion of potential geologic hazards is based on the visual reconnaissance of the
site, the subsurface explorations, reviews of aerial photographs and regional topographic and
geologic maps of the area, and review of the applicable City of Edmonds Municipal Code and maps
that are available online.
Based on our comparison of the City of Edmonds Municipal Code to the topographic and geologic
features of the subject property, the property does not fulfill the criteria for an erosion hazard area,
landslide hazard area, or a seismic hazard area. The following two sections of this report will set
forth some basic erosion control best management practices for use in construction and will address
general seismic risks and design parameters associated with a seismic event.
Erosion Concerns
Though special mitigations are not necessary, a temporary erosion and sediment control (TESC) plan
should be created and implemented during site construction. It is our opinion that implementation of
a relatively basic erosion control plan will prevent off site sediment transport. The proper use of
"best management practices" (BMPs) should be utilized during earthwork activities to reduce the
potential for erosion and sediment transport off of the property. The following is a partial list of
BMPs that should be implemented:
0 Phasing and scheduling earth work activities during dry conditions
0 Rock construction entrances
0 Straw mulch
0 Plastic sheeting
0 Silt fence
0 Keeping exposed soils and stockpiles covered when not actively worked
0 Establish temporary/permanent vegetation as soon as possible after foundation and utility
installation
SOUTH FORK GEOSCIENCES, PO Box 1275, NORTH BEND, WA 98045,(425) 831-2023
Implementation of a TESC plan will likely be a requirement of the clearing and grading or building
permit. South Fork Geosciences is available to design the TESC plan and to provide any required
inspections during construction.
Seismic Concerns
Generally, there are four types of potential geologic hazards associated with large seismic events:
1) ground rupture; 2) seismically induced landslides; 3) liquefaction; and 4) ground motion. The
potential for each of these to impact the site is discussed below.
Ground Rupture
Most large earthquakes in the Puget Sound area are sub -crustal events with epicenters ranging
from 50 to 70 kilometers in depth. The subject property is approximately 5 to 6 miles south of
the Southern Whidbey Island Fault Zone (SWIFZ). Though the subject property is near the
SWIFZ, to our knowledge, there are no signs of past ground rupture in the immediate vicinity of
the subject property. Based on the location of the subject property to the south of the known
fault zone and the lack of sufficient information to infer a recurrence interval for earthquakes on
the SWIFZ (Johnson, et al., 2004), it is our opinion that the probability of ground surface rupture
impacting the subject property is low, and no mitigations are necessary.
Seismically Induced Landslides
Due the topography and absence of steep slopes on the subject property, it is our opinion that the
potential for seismically induced slope failures on the site is low and no mitigations are
necessary.
Liquefaction
Liquefaction is a condition where loose, saturated, fine sandy soils lose their shear strength due
to rapid pore pressure build-up when subjected to high intensity cyclic loads, such as occur
during earthquakes. Due to the medium dense, well -graded, native soils encountered in the
subsurface explorations and the absence of adverse ground water conditions, the liquefaction
potential of this site is very low, and no mitigations are necessary.
Ground Motion
Seismic hazards that will affect the structure would likely be due to the intensity and duration of
the ground shaking. The structural design of the project should be consistent with 2009
International Building Code (2009 IBC) guidelines (Section 1613). Based on the results of our
subsurface explorations and our estimation of soil properties at depth utilizing available geologic
data, Site Class "C" as defined by Table 1613.5.2 of the IBC may be used for the design of the
project.
Geotechnical Engineering Recommendations
Our exploration indicates that, from a geotechnical standpoint, the subject property is suitable for
the proposed development, provided the risks discussed are accepted and the recommendations
4
SOUTH FORK GEOSCIENCES, PO Box 1275, NORTH BEND, WA 98045,(425) 831-2023
contained herein are properly followed. Though the surficial fill soils encountered will need to
be mitigated during site grading, the underlying medium dense, Vashon advance outwash
sediments will be capable of providing support for the proposed structure or structural fill soil.
To aid in the design of the project, the following general recommendations for site development
are provided. South Fork Geosciences is available for further consultation with respect to
specific design items, if needed.
Site Preparation and Site Grading
It is likely that structural fill soils will be required to establish grades for the project. Any fill soil
placed beneath a foundation, retaining wall, or driveway/parking area must be constructed as a
structural fill. In areas that will provide structural support, any existing fill soils or loose soils
should be removed and replaced with structural fill as described below, or the fill soils should be
mitigated as described in later sections for specific applications.
Structural fill is defined as non -organic soil, placed in maximum 8-inch loose lifts, with each lift
being compacted to at least 95 percent of the maximum dry density, using the modified Proctor
test (ASTM: D1557) as the standard. Prior to placing any structural fill the exposed soils must
either be undisturbed or be compacted to a dense, non -yielding condition and be approved for
structural fill placement. In the case of utility trench filling, the backfill should be placed and
compacted in accordance with the applicable City of Edmonds or utility franchise standards.
If fill soil will be imported to the site, it should be free of organics and other deleterious material.
Mineral soils with more than 5 percent fines are considered to be moisture sensitive. The use of
moisture sensitive soils should be confined to dry weather conditions. The moisture condition of the
imported soil should be within a few percent of the optimum moisture content of the soil. Soils that
are too dry or too wet of the optimum moisture content to achieve suitable compaction will need to
be moisture conditioned prior to final compaction. The existing fill soils should be considered
moisture sensitive. The native, Vashon advance outwash sediments are not moisture sensitive, but
due to the dry soil conditions observed, may require the addition of water to be placed as structural
fill. In the case that moisture sensitive soils are used in structural fills, this type of work should be
limited to the summer months and good weather conditions.
Placement and compaction of the structural fill should be monitored by a competent field
technician. In situ density testing should be performed during fill placement to verify proper
compaction of the fill soil. A sample of the planned structural fill soil will need to be available at
least 48 hours prior to fill placement for laboratory analysis.
Temporary cut slopes may be necessary to allow the installation of the foundations and for utility
installation. Temporary cut slopes should be limited to 1H: IV (Horizontal: Vertical) in the
existing fill soils and 1/2H:IV in the Vashon advance outwash sediments. Stability of the cut
slopes is the responsibility of the on -site contractor and a safe work environment should be
maintained at all times. A trench shield or trench box should be used to install all utilities over 4
feet in depth or the sides of trenches and excavations should be sloped back per OSHA/WISHA
standards.
5
SOUTH FORK GEOSCIENCES, PO Box 1275, NORTH REND, WA 96045,(425) 831-2023
Foundations
Spread footings may be used for building support when founded on medium dense native soils,
approved structural fill soils, or rock trenches. To limit differential settlements between footings
that bear on both structural fill and medium dense to dense native soils, we recommend that an
allowable bearing pressure of 2,000 pounds per square foot (psf) be utilized for design purposes,
including both dead and live loads. An increase of one-third may be used for short-term wind or
seismic loading. Perimeter footings should be buried at least 18 inches into the surrounding soil
for frost protection; interior footings require only 12 inches burial. However, all footings must
penetrate to the prescribed bearing stratum, and no footing should be founded in or above loose,
organic, or existing fill soils.
It should be noted that the area bounded by lines extending downward at 1 H: IV from any
footing must not intersect another footing or intersect a filled area that has not been compacted to
at least 95 percent of ASTM:D 1557. In addition, a 1.5H: IV line extending down from any
footing must not daylight because sloughing or raveling may eventually undermine the footing.
Thus, footings should not be placed near the edge of steps or near vertical cuts in the bearing
soils.
Anticipated settlements of footings founded on the medium dense native soils or approved rock
trenches should be less than I inch. Loose or disturbed surface soils, excessive moisture present or
poor foundation subgrade preparation could result in larger settlements. South Fork Geosciences
should perform a foundation bearing evaluation prior to concrete placement to verify that the design
bearing capacity of the soil has been attained. A foundation bearing evaluation will likely be
required by the City of Edmonds Building Department as a condition of the building permit.
Perimeter footing drains should be provided as discussed under the section titled Drainage
Considerations.
Lateral loads can be resisted by friction between the foundation and the supporting soils, and/or by
passive earth pressure acting on the buried portions of the foundations. The spread footings must be
backfilled with structural fill compacted to a dense, non -yielding condition to achieve the passive
resistance provided below. The structural fill must extend horizontally outward from the embedded
portion of the foundation a distance equal to at least three times the embedment depth over which the
passive resistance is applied. We recommend the following design parameters,
• Passive equivalent fluid = 300 pcf
• Coefficient of friction = 0.30
The above values are allowable and include a factor of safety of at least 1.5.
Mitigation of Existing Fill Soils
The existing fill soils are not suitable for structural support without mitigation measures. There
are several options for mitigating the fill soils, but based on our observations and discussion with
Mr. Johnson while onsite during the subsurface exploration, it appears that the basement floor
elevation will be on native soils that are adequate for support of conventional spread footings.
6
SOUTH FORK GEOSCIENCES, PO Box 1275, NORTH BEND, WA 98045,(425) 831-2023
The current plans provided by Architects Northwest indicated a step up to a
structural/crawlspace type floor on the eastern portion of the proposed house. Since fill soils
were encountered in the eastern portion of the building pad, we recommend constructing a full
basement under the entire house, rather than having to extend crawlspace footings down to
bearing soils, or reworking the existing fill soils. We explained this to Mr. Johnson while we
were onsite and he said that the crawlspace area was originally designed as a full basement and a
change was made to the home design to reduce cost. Due to the fill soils being present here, Mr.
Johnson said that they will likely revert to the full basement design to reduce the amount of fill
soil mitigation.
Since the home will likely be built with a full basement, we presume that all spread footings will
be constructed on medium dense, Vashon advance outwash soils. In the event that native soils
are not encountered at the design foundation elevation, the footings will need to be extended
down to native soils, or the fill soil will need to be removed and replaced with structural fill as
explained in the preceding section titled Site Preparation and Site Grading.
Lateral Earth Pressure
Cast -in -place, concrete foundation walls or retaining walls should be designed to resist "at -rest"
lateral soil pressure conditions if the concrete walls will not be free to yield laterally at the top.
Restrained walls should be designed to resist an "at -rest" equivalent fluid pressure of 55 pounds per
cubic foot (pcf). Concrete walls that are free to yield laterally at the top of the wall may be designed
using an active soil pressure of 35 pcf. Surcharges from sloping backfill conditions or adjacent
structural loads should be added to the above lateral soil pressures. Full height drainage of
foundation walls will need to be installed to prevent hydrostatic pressures from acting on the walls.
Rockeries
The site plan provided by Architects Northwest indicates that rockeries will be utilized to face the
cut slopes around the north and east sides of the building envelope. Rockeries should be limited to a
maximum height of 8 feet when facing a native cut, and to 4 feet in height when facing a cut into fill
soils. All rockeries should be built by experienced contractors and should be built in accordance
with the Associated Rockery Contractors standards of practice. The City of Edmonds may require a
detail and geotechnical engineering recommendation for rockeries. South Fork Geosciences can
provide more extensive design recommendation, if required.
Other Retaining Walls
Rockeries, segmental block walls, or cast -in -place concrete walls may be used for grade separation
between the upper and lower driveways. Segmental block walls should be limited to 30 inches in
height without specific design of mechanically stabilized earth (MSE) fill and wall drainage. South
Fork Geosciences is available to design the segmental block wall/MSE fill. Cast -in -place concrete
SOUTH FORK GEOSCIENCES, PO Box 1275, NORTH BEND, WA 98045,(425) 831-2023
walls should be designed by a structural engineer using the soil bearing capacity, lateral resistance,
and lateral earth pressure values in the preceding sections.
Floor Support
We anticipate that the single-family home built on the subject property will utilize slab -on -grade
floors. Slab -on -grade concrete floors should be cast atop a prepared subgrade of structural fill
soil compacted to a minimum of 90 percent of the modified Proctor maximum dry density. A
capillary break with a minimum thickness of 4 inches should be placed atop the prepared
subgrade. The capillary break material should be a gap graded material consisting of pea gravel,
3/4-inch washed drain rock, or clean crushed rock with less than 5 percent fines (material passing
the No.200 sieve). The capillary break will reduce the potential for moisture wicking through
the floor slab. A I 0-mil thick plastic vapor barrier should also be placed atop the capillary break
material. All concrete placement should follow the guidelines set forth by the American
Concrete Institute (ACI).
Driveway Support
Our subsurface explorations indicate that there are fill soils of significant depth located under the
proposed driveways. Full removal and replacement of the existing fill soils with structural fill would
likely be very expensive and earthwork intensive. For driveway support, the whole fill column does
not need to be removed and replaced, provided that there is some tolerance for future settlement.
We recommend that a 2 foot thick pad of structural fill should be placed over the existing fill in the
area that the driveway is to be constructed. The existing fill subgrade should be compacted to a firm
and unyielding condition prior to placing the structural fill pad. The structural fill pad should extend
horizontally beyond the area to be paved by 2 feet. Though the structural fill pad will not entirely
eliminate the potential for settlement, it will reduce the potential for differential settlement, and as a
result will reduce the potential for pavement cracking. We also recommend that the driveway should
be paved with asphalt, since asphalt is somewhat flexible and can tolerate minor amounts of
settlement. Asphalt can also be repaired or overlain more easily than concrete in the event that it
becomes damaged due to cracking.
Drainage Considerations
A perimeter foundation drain should be established to protect the floor slab and internal crawlspace
areas from ground water intrusion. The level of the foundation drain should be set at, or slightly
below, the base of the footing elevation. The drain should consist of 4-inch diameter, rigid,
perforated, PVC drain pipe and should be set to allow for gravity discharge. The drainpipe should be
surrounded by a minimum of 6 inches of pea gravel or washed drain rock. Roof drains should not tie
into the footing drain but should be collected in a separate, tightline drain. The drain lines should be
set to discharge via gravity to a dispersion or infiltration area or to an approved stormwater drainage.
In addition, all footing stem walls that enclose conditioned space should be lined with a minimum,
12-inch-thick, washed gravel blanket provided over the height of the wall that ties into the footing
8
SOUTH FORK GEOSCIENCES, PO Box 1275, NORTH BEND, WA 98045,(425) 831-2023
drain. The washed gravel blanket should be ended one foot below the desired ground surface and the
top of the gravel should be covered with filter fabric. The remaining one foot should be filled with
compacted soil to reduce the amount of surface water entering the wall and footing drain system.
Site Drainage
We have not reviewed any plans for stormwater disposal at this time. The native, Vashon advance
outwash sediments are well suited for infiltration methods due to their relatively coarse grain size
distribution and lack of fine sediments. With the relatively large lot size and the relatively flat area
on the western portion of the property, we presume that infiltration methods such as a series of
drywells or infiltration trenches in the native sediments will be used to dispose of stormwater
generated from the site. Based on our visual assessment of the native Vashon advance outwash
soils, we believe that the soil would be classified as "sand" in the USDA Soil Textural Triangle. We
obtained a grab sample from EP-2 for grain size analysis testing to verify this classification, if
required for infiltration design. South Fork Geosciences is available for additional consultation with
respect to site drainage, if necessary.
9
SOUTH FORK GEOSCIENCES, PO Box 1275, NORTH BEND, WA 98045,(425) 831-2023
Conclusion
Our findings and recommendations provided in this report were prepared in accordance with
generally accepted principles of engineering geology and geotechnical engineering as practiced in
the Puget Sound area at the time this report was submitted. We make no other warranty, either
expressed or implied. Our observations, findings, and opinions are a means to identify and reduce
the inherent risks to the owner.
We are available to provide additional design recommendations and consultation throughout the
development of this project. We should be contacted to review architectural and grading plans and
to provide additional design team support, if needed. We are also available to provide construction
monitoring services during the development of the project for earthwork quality control and to help
ensure that the recommendations in this report are properly implemented. We have enjoyed working
with you and we are confident that this report will aid in the design of your project. If there are any
questions, please contact us at (425) 831-2023.
Sincerely,
'b
Andrew L. Glandon, LEG, CPESC
Geologist / Owner
South Fork Geosciences
Attachments: Vicinity Map
Site and Exploration Plan
Approximate Location of Fill Soils
Exploration Pit Logs
References:
J� A T?-�,
Jainey S. Battermann, PE
Geotechnical Engineer
Minard, James P., "Geologic map of the Edmonds East and Part of the Edmonds West
Quadrangles, Washington" U.S. Geological Survey, Miscellaneous Field Studies Map MF- 154 1,
scale 1:24,000,1983
---�O-- -
SOUTH FORK GEOSCIENCES, PO BOX 1275, NORTH BEND, WA 98045, (425) 831-2023
Edmonds Municipal Code
http://www.edmondswa.jzov/aovemment/rules-and-reizulations.html
City of Edmonds Maps
http://www.edmondswa.gov/services/mas-a-gis-data/services-maps-mal)s.html
United States Department of Agriculture Natural Resources Conservation Service,
h!Ltp:Hwebsoilsurvey.nrcs.usda.c,�ov
Snohomish County Assessor Property Summary
hLtps://www.snoco.org/proptax/(ujcvtcbfeqgvolbpgOg5xm45)/result.asl2x
USGS Quaternary Faults Web Mapping Application
hn://earthquake.usgs.gov/hazards/Afaults/m4p/
Johnson, S.Y., Blakely, R.J., Brocher, T.M., Sherrod, B.L., Kelsey, H.M., and Lldke, D.J.,
compilers, 2004, Fault number 572, Southern Whidbey Island fault zone, in Quaternary fault and
fold database of the United States: U.S. Geological Survey website,
http://earthguakes.usgs.gov/hazards/Afaults, accessed 01/10/2014 03:28 PM
I I
SOUTH FORK GEOSCIENCES, PO BOX 127 b, NORTH BEND, WA 98045, (425) 831-2023
�,o=, "Z
.__ I—, ..
J
0 4,
I if
Ng (L
fill
PI
I "�b
vw
1 4
TT
A.
"IF i Of—
1j,
dl,p;
.41
'L * i
4pe lit
C13
ly I
CL
LO
w
U w
Z Z
w 0
o u
> (Y)
Lo _- N 0
-0
r-, 0 N
X N Z �
0— W — Z
LL x ca (r) 0
0 00 oz
CE)
00 o (qq JD
U) a- z
Co
LO
CD
C\j
'r—
it
0
(1),
r_
(n
_0
C:
0
CL E
_0
w
U)
(D
cz
C\j
C:
(D
c
0
Cl)
0
_D
i
5�1
[Not to Scale
Source: Architects Northwest, Johnson Residence Site Plan, 4-10-13
SOU TH FORK GE OSCIE NCES
PO Box 1275
NORTH BEND, WA 98045
(425) 831-2023
AGLANDONgCOMCAST.NET
Site and Exploration Plan
Johnson Residence, 9527 190t' PI SE, Edmonds, WA
Locations are approximate
Project #12058
a4U't2
73.11, J
W
EP-5
FNot to Scale
------ no ----
, I" \A
V
01
10
'-7
lu
LU
CL -------
ID)74
14
-Z
IcIOTH F[- 5Vq,,
-10-13
Source: Architects Northwest, Johnson Residence Site Plan, 4
SOUTH FORK GEOSCIENCES Locations are approximate
PO Box 1275
i NORTHBEND,WA 98045
(425) 831-2023
AGLAN DONCO)COMCAST. NET
Approximate Location of Fill Soils
Johnson Residence, 9527 1 901h PI SE, Edmonds, WA Project #12058
Johnson Residence
9527 1 q0th Place SW, Edmonds, WA
Date: 1-1-2014
Depth Number: EP-1
(ft)
0 Fill
loose, damp, brown to light brown, fine..to'*
medium SAND, trace gravel, roots'Af esent
(SP)
2 loose to medium dense,..Od�p, light brown, fine
SAND (SP)
4 d Iloose .W'medium dense, damp, brown to light
�r-6�n, fine SAND with silt (SP-SM)
1.9
8
Vashon Advance Outwash
medium dense, damp, light brown, fine to
10 coarse SAND with gravel (SW)
Total Depth = 10 feet
No seepage observed
No caving observed
12 Measured from back of pit, surface slopes
down to west (dashed line = ground surface)
14
Exploration
Pit Log
The subsurface conditions shown on this field log represent our observations at the time and location of excavation, modified by geologic interpretation
andjudgment, and where noted, by engineering ana�ysis and laboratory testing. The conditions shown may not be representative of conditions at other
times. South Fork Geosciences will not be responsible for use or interpretation by others of information presented on these logs.
SOUTH FORK GEOSCIENCES
PO Box 1275
NORTH BEND, WA 98045
Project # 12058 PHONE: (425) 831-2023
Johnson Residence
9527 1 q0th Place SW, Edmonds, WA
Date: 1-1-2014
Depth Number: EP-2
(ft)
0 Vashon Advance Outwash
loose to medium dense, damp, brown to
reddish brown, fine SAND with gravel and silt
'SP-SM,
2 medium dense, damp, light brown GRAVEL
with fine to coarse sand (GP)
4
Total Depth = 5 feet
No seepage observed
6 No caving observed
0-2ft weathered
8
M
12
14
Exploration
Pit Log
IThe subsurface conditions shown on this field log represent our observations at the time and location of excavation, modified by geologic interpretation I
andjudgment, and where noted, by engineering analysis and laboratory testing. The conditions shown may not be representative of conditions at other
times. South Fork Geosciences will not be responsible for use or interpretation by others of information presented on these logs. I
Project # 12058
SOUTH FORK GEOSCIENCES
PO BOX 1275
NORTH BEND, WA 98045
PHONE: (425) 831-2023
Johnson Residence
9527 1 90th Place SW, Edmonds, WA
Date: 1-1-2014
Depth Number: EP-3
(ft)
0 Forest Duff (0-6")
Fill
medium dense, damp, light bro �"ray, fine to
medium SAND with gravel gpd'silt, roots
2 present (SP-SM)
4
6
Vashon Advance Outwash
medium dense, damp, light brown, fine to
medium SAND with gravel, trace silt (SP)
8
Total Depth = 9 feet
No seepage observed
10 Minor caving in low cohesion soils
Measured from back of pit, surface slopes
down to NW (dashed line = ground surface)
12
14
Exploration
Pit Log
The subsurface conditions shown on this field log represent our observations at the time and location of excavation, modified by geologic interpretation
andjudgment, and where noted, by engineering analysis and laboratory testing. The conditions shown may not be representative of conditions at other
times. South Fork Geosciences will not be responsible for use or interpretation by others of information presented on these logs.
SOUTH FORK GEOSCIENCES
PO Box 1275
NORTH BEND, WA 98045
Project # 12058 PHONE: (425) 831-2023
Johnson Residence
9527 1 q0th Place SW, Edmonds, WA
Date: 1-1-2014
Depth
lft� Number: EP-4
0 Fill
loose to medium dense, damp, gray to brown
silty SAND with gravel and construction debris
(asphalt and concrete rubble) (SM)
2
4
11
8 1 Vashon Advance Outwash
loose to medium dense, damp, light brown, fine
to medium SAND with gravel, trace silt (SP)
Total Depth = 9 feet
10 No seepage observed
Minor caving in fill soils
Difficult digging due to rubble in fill soils
Fill soils 0-8 feet
12-1
14
Exploration
Pit Log
The subsurface conditions shown on this field log represent our observations at the time and location of excavation, modified by geologic interpretation
andjudgment, and where noted, by engineering analysis and laboratory testing. The conditions shown may not be representative of conditions at other
times. South Fork Geosciences will not be responsible for use or interpretation by others of information presented on these logs. I
Project # 12058
SOUTH FORK GEOSCIENCES
PO Box 1275
NORTH BEND, WA 98045
PHONE: (425) 831-2023
Johnson Residence
9527 1 q0th Place SW, Edmonds, WA
Date: 1-1-2014
Depth
(ffi Number: EP-5
0 Fill
loose to medium dense, damp, gray to brown
silty SAND with gravel and construction debris
(asphalt and concrete rubble) (SM)
2
4 1 Vashon Advance Outwash
loose to medium dense, dry, light brown, fine
to medium SAND with gravel, trace silt (SP)
6 Total Depth = 6 feet
No seepage observed
No caving observed
Contact between fill and outwash ranges from
8 3 to 4 feet below ground surface
-deeper to south
ON
12
14
Exploration
Pit Log
IThe subsurface conditions shown on this field log represent our observations at the time and location of excavation, modified by geologic interpretation
andjudgment, and where noted, by engineering analysis and laboratory testing. The conditions shown may not be representative of conditions at other
times. South Fork Geosciences will not be responsible for use or interpretation by others of information presented on these logs. I
Project # 12058
SOUTH FORK GF_osciF_NcF_s
PO Box 1275
NORTH BEND, WA 98045
PHONE: (425) 831-2023
Johnson Residence
9527 1 q0th Place SW, Edmonds, WA
Date: 1-1-2014
Depth Number: EP-6
(ft)
0 Fill
loose to medium dense, dry to damp,
brown, silty fine to medium SAND with gravel,
occasional debris (SM)
2
2
8 _
Vashon Advance Outwash
loose to medium dense, dry to damp, brown,
fine to medium SAND with gravel and silt
10 (SP-SM) -medium dense@ 10feet
Total Depth = 11 feet
No seepage observed
12 Very minor caving observed
Measured from back of pit, surface slopes
down to west (dashed line = ground surface)
14
Exploration
Pit Log
The subsurface conditions shown on this field tog represent our observations at the time and location of excavation, modified by geologic interpretation
andjudgment, and where noted, by engineering analysis and laboratory testing. The conditions shown may not be representative of conditions at other
times. South Fork Geosciences will not be responsible for use or interpretation by others of information presented on these logs.
SOUTH FORK GEOSCIENCES
PO Box 1275
NORTH BEND, WA 98045
Project # 12058 PHONE: (425) 831-2023
Johnson Residence
9527 1 q0th Place SW, Edmonds, WA
Date: 1-1-2014
Depth
tft\ Number: EP-7
0 Fill
loose to medium dense, damp, light brown,
silty SAND with gravel, roots present to = 6ft
(SM)
2
4
6 1 Vashon Advance Outwash
medium dense, damp, light brown -gray, fine to
medium SAND with gravel and silt. (SP-SM)
8
12
14
Total Depth = 9.5 feet
No seepage observed
No caving observed
Exploration
Pit Log
The subsurface conditions shown on this field log represent our observations at the time and location of excavation, modified by geologic interpretation
andjudgment, and where noted, by engineering analysis and laboratory testing. The conditions shown may not be representative of conditions at other
times. South Fork Geosciences will not be responsible for use or interpretation by others of information presented on these logs.
Project # 12058
SOUTH FORK GF_oscimcEs
PO Box 1275
NORTH BEND, WA 98045
PHONE: (425) 831-2023
USDA United States
Department of
Agriculture
NRCS
Natural
Resources
Conservation
Service
A product of the National
Cooperative Soil Survey,
a joint effort of the United
States Department of
Agriculture and other
Federal agencies, State
agencies including the
Agricultural Experiment
Stations, and local
participants
Custom Soil Resource
Report for
Snohomish County
Area, Washington
Aw Residence
September 26, 2018
47o 49 35'N
47o 49 33"N
Custom Soil Resource Report
Soil Map
547771 547778 547785 5477M 547799 547806 547W 547E27 547834
3:
Map Sm1e: 1:307ffprWited on A 1andqmpe(11"x8.5')4ieet
-Meters
N 0 4 9 18 V
0 10 20 40 60
Map pugecbon: Web WrGatw Comer coordnates: WGS84 Edge tK:s: LJTM Zone ION WGS84
�V.
47' 49135"N
14Y33"N
MAPLEGEND
Area of Interest (A01)
Area of Interest (AOI)
Soils
Soil Map Unit Polygons
Soil Map Unit Lines
13
Soil Map Unit Points
Special
Point Features
VO
Blowout
Borrow Pit
Clay Spot
0
Closed Depression
Gravel Pit
Gravelly Spot
Landfill
A.
Lava Flow
.&
Marsh or swamp
op
Mine or Quarry
Miscellaneous Water
Perennial Water
Rock Outcrop
+
Saline Spot
Sandy Spot
4g.
Severely Eroded Spot
Sinkhole
Slide or Slip
Sodic Spot
Custom Soil Resource Report
MAP INFORMATION
Spoil Area
The soil surveys that comprise your A01 were mapped at
1:24,000.
Stony Spot
40
Very Stony Spot
Warning: Soil Map may not be valid at this scale.
Wet Spot
Enlargement of maps beyond the scale of mapping can cause
Other
misunderstanding of the detail of mapping and accuracy of soil
Special Line Features
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
Water Features
scale.
. .
Streams and Canals
Transportation
Please rely on the bar scale on each map sheet for map
Rails
measurements.
Interstate Highways
Source of Map: Natural Resources Conservation Service
US Routes
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Major Roads
LocalRoads
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
Background
distance and area. A projection that preserves area, such as the
Aerial Photography
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Snohomish County Area, Washington
Survey Area Data: Version 20, Sep 10, 2018
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Jul 7, 2014—Jul 8,
2014
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Custom Soil Resource Report
Map Unit Legend
Map Unit Symbol Map Unit Name Acres in A01 Percent of A01
3 Aldprwnnd nrqvpllv q:;nriv InAm nA' 1 nn no/.
15 to 30 percent sfopes
Totals for Area of Interest 0.4 100.0%
Map Unit Descriptions
The map units delineated on the detailed soil maps in a soil survey represent the
soils or miscellaneous areas in the survey area. The map unit descriptions, along
with the maps, can be used to determine the composition and properties of a unit.
A map unit delineation on a soil map represents an area dominated by one or more
major kinds of soil or miscellaneous areas. A map unit is identified and named
according to the taxonomic classification of the dominant soils. Within a taxonomic
class there are precisely defined limits for the properties of the soils. On the
landscape, however, the soils are natural phenomena, and they have the
characteristic variability of all natural phenomena. Thus, the range of some
observed properties may extend beyond the limits defined for a taxonomic class.
Areas of soils of a single taxonomic class rarely, if ever, can be mapped without
including areas of other taxonomic classes. Consequently, every map unit is made
up of the soils or miscellaneous areas for which it is named and some minor
components that belong to taxonomic classes other than those of the major soils.
Most minor soils have properties similar to those of the dominant soil or soils in the
map unit, and thus they do not affect use and management. These are called
noncontrasting, or similar, components. They may or may not be mentioned in a
particular map unit description. Other minor components, however, have properties
and behavioral characteristics divergent enough to affect use or to require different
management. These are called contrasting, or dissimilar, components. They
generally are in small areas and could not be mapped separately because of the
scale used. Some small areas of strongly contrasting soils or miscellaneous areas
are identified by a special symbol on the maps. If included in the database for a
given area, the contrasting minor components are identified in the map unit
descriptions along with some characteristics of each. A few areas of minor
components may not have been observed, and consequently they are not
mentioned in the descriptions, especially where the pattern was so complex that it
was impractical to make enough observations to identify all the soils and
miscellaneous areas on the landscape.
The presence of minor components in a map unit in no way diminishes the
usefulness or accuracy of the data. The objective of mapping is not to delineate
pure taxonomic classes but rather to separate the landscape into landforms or
landform segments that have similar use and management requirements. The
delineation of such segments on the map provides sufficient information for the
development of resource plans. If intensive use of small areas is planned, however,
onsite investigation is needed to define and locate the soils and miscellaneous
areas.
Custom Soil Resource Report
An identifying symbol precedes the map unit name in the map unit descriptions.
Each description includes general facts about the unit and gives important soil
properties and qualities.
Soils that have profiles that are almost alike make up a soil series. Except for
differences in texture of the surface layer, all the soils of a series have major
horizons that are similar in composition, thickness, and arrangement.
Soils of one series can differ in texture of the surface layer, slope, stoniness,
salinity, degree of erosion, and other characteristics that affect their use. On the
basis of such differences, a soil series is divided into soil phases. Most of the areas
shown on the detailed soil maps are phases of soil series. The name of a soil phase
commonly indicates a feature that affects use or management. For example, Alpha
silt loam, 0 to 2 percent slopes, is a phase of the Alpha series.
Some map units are made up of two or more major soils or miscellaneous areas.
These map units are complexes, associations, or undifferentiated groups.
A complex consists of two or more soils or miscellaneous areas in such an intricate
pattern or in such small areas that they cannot be shown separately on the maps.
The pattern and proportion of the soils or miscellaneous areas are somewhat similar
in all areas. Alpha -Beta complex, 0 to 6 percent slopes, is an example.
An association is made up of two or more geographically associated soils or
miscellaneous areas that are shown as one unit on the maps. Because of present
or anticipated uses of the map units in the survey area, it was not considered
practical or necessary to map the soils or miscellaneous areas separately. The
pattern and relative proportion of the soils or miscellaneous areas are somewhat
similar. Alpha -Beta association, 0 to 2 percent slopes, is an example.
An undifferentiated group is made up of two or more soils or miscellaneous areas
that could be mapped individually but are mapped as one unit because similar
interpretations can be made for use and management. The pattern and proportion
of the soils or miscellaneous areas in a mapped area are not uniform. An area can
be made up of only one of the major soils or miscellaneous areas, or it can be made
up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example.
Some surveys include miscellaneous areas. Such areas have little or no soil
material and support little or no vegetation. Rock outcrop i's an example.
Custom Soil Resource Report
Snohomish County Area, Washington
3—Alderwood gravelly sandy loam, 15 to 30 percent slopes
Map Unit Setting
National map unit symbol: 2t627
Elevation: 0 to 1,000 feet
Mean annual precipitation: 25 to 60 inches
Mean annual air temperature: 46 to 52 degrees F
Frost -free period: 160 to 240 days
Farmland classification: Farmland of statewide importance
Map Unit Composition
Alderwood and similar soils: 85 percent
Minor components: 15 percent
Estimates are based on observations, descriptions, and transects of the mapunit.
Description of Alderwood
Setting
Landform: Ridges, hills
Landform position (two-dimensional): Backslope
Landform position (three-dimensional): Side slope, nose slope, talf
Down -slope shape: Linear, convex
Across -slope shape: Convex
Parent material: Glacial drift and/or glacial outwash over dense glaciomarine
deposits
Typical profile
A - 0 to 7 inches: gravelly sandy loam
Bwl - 7 to 21 inches: very gravelly sandy loam
Bw2 - 21 to 30 inches: very gravelly sandy loam
Bg - 30 to 35 inches: very gravelly sandy loam
2Cdl - 35 to 43 inches: very gravelly sandy loam
2Cd2 - 43 to 59 inches: very gravelly sandy loam
Properties and qualities
Slope: 15 to 30 percent
Depth to restrictive feature: 20 to 39 inches to densic material
Natural drainage class: Moderately well drained
Capacity of the most limiting layer to transmit water (Ksat): Very low to moderately
low (0.00 to 0.06 in/hr)
Depth to water table: About 18 to 37 inches
Frequency of flooding: None
Frequency of ponding: None
Available water storage in profile: Very low (about 2.7 inches)
Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 4e
Hydrologic Soil Group: B
Forage suitability group: Limited Depth Soils (GO02XS301 WA), Limited Depth
Soils (GO02XF303WA), Limited Depth Soils (GO02XN302WA)
Hydric soil rating: No
10
Custom Soil Resource Report
Minor Components
Indianola
Percent of map unit: 5 percent
Landform: Eskers, kames, terraces
Landform position (three-dimensional): Tread
Down -slope shape: Linear
Across -slope shape: Linear
Hydric soil rating: No
Everett
Percent of map unit. 5 percent
Landform: Karnes, eskers, moraines
Landform position (two-dimensional): Backslope
Landform position (three-dimensional): Side slope
Down -slope shape: Convex
Across -slope shape: Convex
Hydric soil rating: No
Shalcar
Percent of map unit.- 3 percent
Landform: Depressions
Landform position (three-dimensional): Dip
Down -slope shape: Concave
Across -slope shape: Concave
Hydric soil rating: Yes
Norma
Percent of map unit: 2 percent
Landform: Depressions, drainageways
Landform position (three-dimensional): Dip
Down -slope shape: Concave, linear
Across -slope shape: Concave
Hydric soil rating: Yes
11
Aw Residence - CG #18300.20 August 27, 2019
Drainage Report Section VI, Page 1
Section VI — Other Permits
Section VI Summary:
Narrative
Other permits are not anticipated beyond those required by the City of Edmonds.
250 4th Avenue South, Suite 200
Edmonds, WA 98020
rENGINkRING ph. 425.778.8500 1 f. 425.778.5536
www.cgengineering.com
Aw Residence - CG #18300.20 August 27, 2019
Drainage Report Section VII, Page 1
Section V11 — Bond Quantities, Declaration of Covenant, &
Operation and Maintenance Manual
Section V111 Summary:
Narrative
The Bond Quantity Worksheet is a standalone document that can also be submitted to the City of
Edmonds separately from this document.
A Declaration of Covenant is provided for the proposed on -site BMP.
The Operation and Maintenance Manual is a standalone document that will be given to the owner(s)
following the construction of the project.
The maintenance manual contained herein is for the Aw Residence building project. The contractor will
be responsible for the maintenance and operation of all stormwater structures and BMPs requiring
maintenance during construction and, after construction, responsibility will pass to the home owner(s).
The project contractor will be responsible for passing along the information in this maintenance manual
to the owner(s). Upon request by the City, it shall be made available for their inspection. It is generally
expected that few to none of these defects will be present upon the yearly inspection of each facility.
4= 4M
ENGINEERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 1 f. 425.778.5536
www.cgengineering.com
After recording return to:
City Clerk
City of Edmonds
121 Fifth Avenue North
Edmonds, WA 98020
Document Title(s)
Declaration of Covenant - Private Stormwater Facility
Reference Number(s) of Related Documents
N/A
Grantor(s) (Last, First and Middle Initial)
Aw, Chak-Yoon
Aw, I -Wei
Grantee(s) (Last, First and Middle Initial)
City of Edmonds
Legal Description (abbreviated fonn; i.e., lot, plat or section,. township, range, quarter/quarter)
NE 1/4, SE 1/4, SECTION 13, TOWNSHIP 27 NORTH, RANGE 3 EAST, W.M.
Assessor's Property Tax Parcel/Account Number at the Time of Recording:
004346-000-079-01
The Auditor/Recorder will rely on the information provided on this form. The staff will not read the document to verify the accuracy or
completeness of the indexing information provided herein.
DECLARATION OF COVENANT
Private Stormwater Facility
WHEREAS, the undersigned Declarant(s) have installed a stormwater facility under
Edmonds Community Development Code Chapter 18.30 known as a "low impact development
best management practices (LID BMP)" in lieu of other required more conventional stormwater
systems, as selected below:
0 Permeable Pavement 0 Drywell
13 Rain Garden / Bioretention Cell El Gravelless Chamber
0 Other
M Infiltration Trench
WHEREAS, the City of Edmonds has allowed installation of the LID BMP, subject to the
execution and recording of this Declaration of Covenant; NOW, THEREFORE,
THE UNDERSIGNED DECLARANT(S), being the owners of the real property ("the
Property") located at the following address: 9527 190th PI SW
in the City of
Edmonds, Washington, and legally described on Exhibit A attached hereto and incorporated
herein by this reference as if set forth in full, hereby covenants and agrees, on behalf of
himself/herself/themselves/itself and his/her/their/its successors and assigns, as follows:
I Declarant(s) warrant that he/she/they are the owners of the property described on Exhibit
A and have the authority to impose this covenant on the property and bind all future
owners, successors, and assigns of the Declarant(s). The Declarant(s), future owners,
successors, and assigns of the Declarant(s) shall be referred to collectively as "Owners."
2. The Owners of the property described on Exhibit A agree that the property contains a
stormwater management facility called a "LID BMP," which was installed to mitigate the
stormwater quantity and quality impacts of some or all of the impervious or non-native
pervious surfaces on the property. "Low impact development" means development
conducted in a way that seeks to minimize or completely prevent alterations to the natural
hydrology of the site. Low impact development includes site planning and design to
reduce alterations of natural soil and vegetation cover, minimize impervious surfaces, and
specific practices that help to replicate natural hydrology such as permeable pavements,
green roofs, soil amendments, bioretention systems, and dispersion of runoff.
3. The Owners of the property described on Exhibit A shall maintain the size, placement,
and design of the LID BMP as depicted on the approved site plan, Exhibit B, and design
details shall be maintained and may not be changed without written approval either from
the Engineering Division of the City of Edmonds or through a future development permit
from the City of Edmonds. Chemical fertilizers and pesticides shall not be used where
LID BMP is located. . All costs of maintenance and repair shall be the sole responsibility
of the Owners.
4. The Owners of the property described on Exhibit A shall inspect LID BMPs annually for
physical defects. After major storm events, the system shall also be checked to ensure
that the overflow system is working properly. The Owners also shall maintain all LID
BMP so it functions as designed on a year-round basis.
5. The City of Edmonds is hereby granted by the Owners the right, but not the obligation, to
enter upon the property described on Exhibit A at all reasonable times for the purpose of
inspecting the private stormwater LID BMP facility. If, as the result of any such
inspection the City of Edmonds determines that the LID BMP is in disrepair, requires
maintenance or repair, or is otherwise not functioning as provided in the BMP site plan,
the City Engineer or his designee shall have the right, but not the obligation, to order the
Owners of the property described on Exhibit A to maintain or repair the same.
6. If the City of Edmonds determines that the LID BMP requires maintenance or repair
pursuant to Section 5, the City of Edmonds shall provide notice to the Owners of the
deadline within which such maintenance or repair must be completed. Said notice may
further advise that, should the violator fail to perform required maintenance or make
repairs within the established deadline, the work may be done by the city or a contractor
designated by the City Engineer and the expense thereof shall be charged to the Owners.
The City's officers, agents, employees, and contractors shall have the right, which is
hereby granted by the Owners, to enter upon the property described on Exhibit A in order
to perform such work. The Owners shall bear the cost of all work performed.
7. The Owners shall indemnify, defend and hold harmless the City of Edmonds, its officers,
officials, employees and agents from any and all claims, demands, suits, penalties, losses,
damages, judgments, attorneys' fees and/or costs of any kind whatsoever, arising out of
or in any way resulting from the approval of the LID BMP, the installation and presence
of the LID BMP, and the acts or omissions of the Owners, their officers, employees,
contractors, and agents relating to the construction, operation and maintenance of the LID
BMPs on the property, except for the City's intentional and willful tortious acts, and
waive and release the City of Edmonds from any and all claims for damages and
injunctive relief which the Owners may themselves have now or in the future, by reason
of the construction, maintenance and operation of said LID BMPs.
8. This covenant shall run with the land and be binding upon the Declarant(s), as the owner
of the property described on Exhibit A, and on Declarant's successors and assigns as to
such property.
Dated:
DECLARANT(S):
(Signature)
(Print Name)
(Signature)
(Print Name)
State of Washington
ss.
County of Snohomish
APPROVED:
ClTY OF EDMONDS
(Signature)
(Print Name)
(Title)
On this day personally appeared before me
I Declarant(s) I to me known to be the individual, or individuals described in and who executed
the within and foregoing instrument, and acknowledged that he/she/they signed the same as
his/her/their free and voluntary act and deed, for the uses and purposes therein mentioned.
SUBSCRIBED AND SWORN before me this day of � 201—
(Signature)
(Name legibly printed or stamped)
Notary Public in and for the State of Washington.
Residing at:
My commission expires
Exhibit A
EDMONDS SEA VIEW TRS BLK 000 D-01 - LOT 2 CITY OF ED LLA REC UND AFN
201211210469 & SURV REC UND AFN 201210195001 CORR BY NO 201211010497
BEING SWLY PTNLOT 79 SD PLAT
Exhibit B
Tag,
NED 44 x5 x3 'U.."
FILTRA I ON TRENCH f
lit
w ROM
1 90TH, I L SWtj
Aw Residence - CG #18300.20
Drainage Report
August 27, 2019
Section V11, Page 2
Aw Residence
9527 19011 PI SW
Edmonds, WA 98020
OPERATION AND MAINTENANCE MANUAL
Date: August 2019
2SO 4th Avenue South, Suite 200
Edmonds, WA 98020
ENGINiERING ph. 425.778.8500 1 f. 425.778.5536
www.cgengineering.com
Aw Residence - CG #18300.20
Drainage Report
August 27, 2019
Section VII, Page 3
Operation and Maintenance Manual
This Operation and Maintenance Manual has been created for the Aw Residence: a 6,050 sf single-family
residence project on a 0.32-acre lot. The proposed storm system consists of an infiltration trench that
collects runoff from all new impervious areas on -site via roof drains.
Included in this Operation and Maintenance Manual is an 11" x 17" grading and drainage plan sheet
showing the location of the infiltration system. Please note that this map is generated during the design
phase and may not reflect all changes made in permitting and construction. CG Engineering may be
contacted for an updated copy of this map once the as -built drawings are completed for the site. The
contractor will be responsible for the maintenance and operation of all stormwater structures and BMPs
requiring maintenance during construction and, after construction, responsibility will pass to the home
owner(s). An aerial image of the project area can be seen on the following page in Figure VII-1.
Attached at the end of this section are maintenance sheets taken from the 2014 Stormwater
Management Manual for Western Washington (DOE Manual). Guide sheets for source controls are also
included that were taken from the DOE Manual. Maintenance sheets are included for the following
facilities:
Infiltration: The downward movement of water from the surface to the subsoil. See "No. 2" for
maintenance. "No. 1 — Detention Ponds" sheets are included as they are referenced by "No. 2".
Catch Basins: Concrete structures with steel grates that collect stormwater runoff from the site
and act as junctions for storm conveyance pipes. See "No. 5" for maintenance.
Trench Drains: Drainage pipes with metal grates crossing driveways to collect stormwater
runoff. See "No. 5" for maintenance.
Vegetation Management: Landscaping can include grading, soil transfer, vegetation removal,
pesticide and fertilizer applications, and watering. Stormwater contaminants include toxic
organic compounds, heavy metals, oils, total suspended solids, coliform bacteria, fertilizers, and
pesticides.
Facilities shall be inspected for defects listed in the following facility sheets. Most maintenance tasks are
generally reactionary to a defect being found, rather than a matter of constant upkeep. It is generally
expected that few to none of these defects will be present upon the yearly inspection of each facility.
The facility sheets list the potential conditions warranting maintenance and the expected result
following any maintenance. Several engineer's notes for specific tasks are provided within the facility
sheets. Unless otherwise noted on the facility sheets the maintenance tasks should be performed on
an "as needed" basis: (a) when the described defect is visible to whomever performs the yearly
inspection, or (b) should any defect become apparent between inspections.
250 4th Avenue South, Suite 200
Edmonds, WA 98020
IEINIGIIN�ERIIINIG ph. 425.778.8500 1 f. 425.778.5536
www,cgengineering.com
Aw Residence - CG #18300.20 August 27, 2019
Drainage Report Section V11, Page 4
Figure VII-1. Aerial image of project area (from City of Edmonds GIS Map).
4= CM
ENGINEERING
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 1 f. 425.778.5536
www.cgengineering.com
NE 1/4, SE 1/4, SECTION 13, TOWNSHIP 27 NORTH, RANGE 3 EAST, W.M.
0 4m
1ENGINIEERING
- a .513'12" E 16" 250 4TH AVE. S., SUrrE 200
x EDMONDS, WASHINGTON 98020
PHONE (425) 778-8500
42 7 . TOP 600
TOE 41.0
Top: D
:1 FAX (425) 778-5536
EG: 141.0 14" TOE: isio
TOP: is EG: 159.0
\TOP: 142.0 TOE: 154.0
T E: 141.0 ZG: 156.q WINDOWAhELL
t�: 142.0 - T'p�
T.E o
"04
p
I x
�DO
TO
W
L
TOP\ 147.0 TOP: 147..o \TOE: 150.0
TOE: T E: 145.:'o, WE
TOP: 141.75 1 4.50 T P: 11551. 0
TOE: 140.0 ist.0 WIN ow V�E_ X
f TOE: TOP: 164.0 LL
--rOE-159.75
170 67 09,
R90F D FOOTING
DRAI (SEPARAT
07
1 SEE DETAIL) Z-1-
3.
P:
So 30" TGH
TOP: 141.75 TOP: 14 ENTR�,ISBD TOE'l,47.0 H07
TOE: 139.50 (M IN Fl,
A DIER TO
SDOO 145 COVERE CK ABOVE) V/ xx/V
reT
ROOF
ERHANG ENTRY. �.o NEWS( MILYR'NDENCE
iN TO A N Aw.
LO GE: 1,7.3
COV ERF %KABOVE) BS�T FFE: 147.k
I
MA - IS IARA
B SM EDD
TENTR77.0
TOP: 141.7S
CONNECTRO?F CONN�Cr FOOTING`\
TOE: 139.50 D
(MAIN N DRAINS�ONLY
470 AX 1,
44'. 0 J45,0 MAr ENTRY: 158.� <
S'X3' INFIIIATIONTRENCH T E: ISED I"3y�)
BO TOP:OITIENC , :142.
TTOMOFTRENCH: 1 9.00
z
2 =) >
Top: 147�.-' 1 7.4� SEE ARCH PLANS
TOP: 141*10 TOE: 144.50 2'IMAX HT CONCRETE
1011 BASEMENT
RETAINING WA L WAL LOCATIONS z
TOE: 140.0 1 t= t
EG 138 75 1 r- -, GAR�GE ENTRY: 157. AND HEIGHTS 2 2
45 / I w
01 c
TOE: 14 TOP: 1164 a W
TOE: 62 F7
TYPE I CATCH BASIN (SIO _j
M�.ID ID)
R 1 3.0
IEOUT(6"NW):141.0 RENeH D N
(W -INTO R09F DRAINS)
L[15" SW, OVERFLOW): 41.40
0 0 0
/'_lE FN-(6" NEI: 141.50 4"TRA
TOP: 145.0
'14
TOE: 11411 TToE.:pl..`SCol
,�S - -
EG: 4 So 157.96
RAIN TOE: 148.
TIE FOOTING D EG: 14��O TOP: 150. -,S '2 �'4 6 \5
FLO I DESIGN:
ci INTO OVER W PIPE 71 j EG: lSI. T P: 1 5.50 157.96 7AF
TOE: 15 0 DRAWN: ATD
0 0 54'
1 EG: 155.0 .0
0 CHECK: JPU
RAMPGRADES(a "R / T E: 152.50
ipil�q-� jr
/ / JOB NO: 18300.20
152.0 o CB RIM�178.34
/ DATE: 01/21/19
EG: 154.50 6'co) 7
7 ------ �op: I FND 11 1
55.75
CUT IN TOE: 155.2
EG: 116,0
LT. WIDEN E
OUNDTRAV
TO I V M :lNj "B'70
T_H PROPOSED ASPHALT
DRIVEWAY isjo
BS 45-1-2
BSW 147.81 .6 /0
B RI 2.06'-='
�E 1 U.06 sw 151.59 - BS155.53 158.
W 157.92 -\
E 1 40 4 08 159/4
.33 rTO 45. TOC 44 7
V,;� 155-45 T C 157.84
L lbl.53 -v
:� - - - - - - - - - - - ----
41
I IE OUT (8"/W): 162.73
MH RIM=l �0.33 157.34
144.54 t
147.23 isi.01
.66
S _iL 15�;
/TYPE I CATCH BASIN RIM 9 DR*4IJITIE5 BY OTHERS
49 �l �11 41�\ i .30
_j R�PLACE EXIST CB _F
RIM: 158 ' 0±1 (BRING OF-TJFEXkZWG
(8" S): 156.o±i UD W/ SOLID NON UTILI�Y POLE)
IM
LID. ADJUST R
190TH' I'l SW N EC9Z%r
ASPH.
m
GRADING QUANTITIES
TOTAL EXCAVATION (CUT) 1120 CU YDS TOTAL PAVING LEGEND
EMBANKMENT (FILL) - 850 CUYDS NEW ASPHALT
TOTAL 1970 CU YDS OVERLAY EXISTING ASPHALT
rTHE -QUANTITIES SHOWN ABOVE ARE FOR THE PERMIT PROCESS
10 N LY. THESE VALUES ARE APPROXIMATE. DO NOT USE FOR NEW CONCRErE
BIDD;NG, PAYMENT, OR ESTIMATING PURPOSES.
iiv i c�p
1. VESEPARATION IS REQUIRED BETWEEN THE DRY UTILITIES (POWER, GAS, PHONE, CABLE, ETC.) AND
S WER, WATER, AND STORM AND S' FROM ANY CITY MAINLINES.
EG: EXISTING GRADE
2. SITEWALLSPER RUCTURAL
To P: F�N�SH GRADEE ATTOP OF WALL
W
3. DMVE AY SLOPST SHALL NOT EXCEED 14% SLOPE.
TOE: F N SH GRAD AT BOTTOM OF WAI I
4. CONTRACTORTO VERIFY EXISTING ELEVATIONS PRIOR TO CONNECTING PROPOSED DRAINAGE
SYSTEM.
S. FOR TRENCH I NG, SEE DETAILVC4.2.
6. TIGHTLINE PIPES UNDER DRIVABLE SURFACES SHALL HAVE 2'MINIMUM COVER.
SOILS REPORTS:
7._ N EW/REPLACED IMPERVIOUS SURFACE: 6,050 SF
ROOF: 4,000 SF
1. GEOTECHNICAL ENGINEERING REPORT
- DECK/WALKWAYS (UNCOVERED): 256 SF
REPORT NUMBER: 12058
D RIVEWAY (ON -SITE, UNCOVERED): 418 SF
PREPARED BY: SOUTH FORK GEOSCIENCES
DRIVEWAY (ROW, UNCOVERED): 309 SF
DATED: JANUARY 14,2014
190TH ROAD WIDENING: 264 SF
2. STORMWATER INFILTRATION LETTER
SIDEWALK� 803 SF
REPORT NUMBER: 110SO19
8. ALL DISTURBED AREAS ON AND OFF -SITE SHALL BE COMPOSTAMENDED PER REQUIREMENTS OF
PREPARED BY: NELSON GEOTECHNICAL ASSOCIATES
BMP TS.13 IN THE STORMWATER MANUAL, VOLUMEV, CHAPTER 5.
DATED: MAY 24, 2019
9. ALL FINAL RESTORATION SHALL BE COMPLETED BY THE CONTRACTOR, NOT THE CITY OF EDMONDS.
s. RIM=l 72.73
M
APPROVED FOR CONSTRUCTION
CITY OF EDMONDS
DAM -
BY,
CITY ENGINIXNNG DIVISM
z
_j
CL
Ld
z
0
04
V) 0
00
_j 0)
z
(L
z
cn
cn
cn - a
z
-
LLI z
F�' C)
04 M
ul a
ol LLI
SHEET
C3.1
Aw Residence - CG #18300.20
Drainage Report
August 27, 2019
Section VII, Page 5
SAMPLE ACTIVITY LOG
I F-D-ATE FACILITY MAINTENANCE PERFORMED RESULTS / NOTES
4= CM 250 4th Avenue South, Suite 200
Edmonds, WA 98020
ENCSINkRING ph. 425.778.8500 1 f. 425.778.5536
www.cgengineering.com
4.6 Maintenance Standards for Drainage Facilities
The facility -specific maintenance standards contained in this section are
intended to be conditions for determining if maintenance actions are
required as identified through inspection. They are not intended to be
measures of the facility's required condition at all times between
inspections. In other words, exceedence of these conditions at any time
between inspections and/or maintenance does not automatically constitute
a violation of these standards. However, based upon inspection
observations, the inspection and maintenance schedules shall be adjusted
to minimize the length of time that a facility is in a condition that requires
a maintenance action.
Table 4.5.2 Maintenance Standards
No. 1 — Detention Ponds
Maintenance
Defect
Conditions When Maintenance Is
Results Expected When
Component
Needed
Maintenance Is Performed
General
Trash & Debris
Any trash and debris which exceed 1
Trash and debris cleared from site.
cubic feet per 1,000 square feet. In
general, there should be no visual
evidence of dumping.
If less than threshold all trash and
debris will be removed as part of next
scheduled maintenance.
Poisonous
Any poisonous or nuisance
No danger of poisonous vegetation
Vegetation and
vegetation which may constitute a
where maintenance personnel or the
noxious weeds
hazard to maintenance personnel or
public might normally be. (Coordinate
the public.
with local health department)
Any evidence of noxious weeds as
Complete eradication of noxious weeds
defined by State or local regulations.
may not be possible. Compliance with
(Apply requirements of adopted IPM
State or local eradication policies
required
policies for the use of herbicides).
Contaminants
Any evidence of oil, gasoline,
NO
and Pollution
contaminants or other pollutants
eeRtaminants
(Coordinate removal/cleanup with
Or pell[Htants
local water quality response agency).
Rodent Holes
Any evidence of rodent holes if
Rodents destroyed and dam or berm
facility is acting as a dam or berm, or
repaired. (Coordinate with local health
any evidence of water piping through
department; coordinate with Ecology
dam or berm via rodent holes.
Dam Safety Office if pond exceeds 10
acre-feet.)
Volume V— Runoff Treatment BMPs — December 2014
4-32
No. 1 — Detention Ponds
Maintenance
Defect
Conditions When Maintenance Is
Results Expected When
Component
Needed
Maintenance Is Performed
Beaver Dams
Dam results in change or function of
Facility is returned to design function.
the facility.
(Coordinate trapping of beavers and
removal of dams with appropriate
permitting agencies)
Insects
When insects such as wasps and
Insects destroyed or removed from site.
hornets interfere with maintenance
activities.
Apply insecticides in compliance with
adopted IPM policies
Tree Growth
Tree growth does not allow
Trees do not hinder maintenance
and Hazard
maintenance access or interferes
activities. Harvested trees should be
Trees
with maintenance activity (i.e., slope
recycled into mulch or other beneficial
mowing, silt removal, vactoring, or
uses (e.g., alders for firewood).
equipment movements). If trees are
not interfering with access or
Remove hazard Trees
maintenance, do not remove
If dead, diseased, or dying trees are
identified
(Use a certified Arborist to determine
health of tree or removal
requirements)
Side Slopes
Erosion
Eroded damage over 2 inches deep
Slopes should be stabilized using
of Pond
where cause of damage is still
appropriate erosion control measure(s);
present or where there is potential for
e.g., rock reinforcement, planting of
continued erosion.
grass, compaction.
Any erosion observed on a
If erosion is occurring on compacted
compacted berm embankment.
berms a licensed civil engineer should
be consulted to resolve source of
erosion.
Storage Area
Sediment
Accumulated sediment that exceeds
Sediment cleaned out to designed pond
10% of the designed pond depth
shape and depth; pond reseeded if
unless otherwise specified or affects
necessary to control erosion.
inletting or outletting condition of the
facility.
Liner (if
Liner is visible and has more than
Liner repaired or replaced. Liner is fully
Applicable)
three 1/4-inch holes in it.
covered.
Pond Berms
Settlements
Any part of berm which has settled 4
Dike is built back to the design
(Dikes)
inches lower than the design
elevation.
elevation.
If settlement is apparent, measure
berm to determine amount of
settlement.
Settling can be an indication of more
severe problems with the berm or
outlet works. A licensed civil engineer
should be consulted to determine the
source of the settlement.
Piping
Discernable water flow through pond
Piping eliminated. Erosion potential
berm. Ongoing erosion with potential
resolved.
for erosion to continue.
(Recommend a Goethechnical
engineer be called in to inspect and
evaluate condition and recommend
repair of condition.
Volume V— Runoff Treatment BMPs — December 2014
4-33
No. 1 — Detention Ponds
Maintenance
Defect
Conditions When Maintenance Is
Results Expected When
Component
Needed
Maintenance Is Performed
Emergency
Tree Growth
Tree growth on emergency spillways
Trees should be removed. If root
Overflow/
creates blockage problems and may
system is small (base less than 4
Spillway and
cause failure of the berm due to
inches) the root system may be left in
Berms over 4
uncontrolled overtopping.
place. Otherwise the roots should be
feet in height.
Tree growth on berms over 4 feet in
removed and the berm restored. A
height may lead to piping through the
licensed civil engineer should be
consulted for proper berm/spillway
berm which could lead to failure of
restoration.
the berm.
Piping
Discernable water flow through pond
Piping eliminated. Erosion potential
berm. Ongoing erosion with potential
resolved.
for erosion to continue.
(Recommend a Goethechnical
engineer be called in to inspect and
evaluate condition and recommend
repair of condition.
Emergency
Overflow/
Emergency
Only one layer of rock exists above
Rocks and pad depth are restored to
Overflow/
native soil in area five square feet or
design standards.
Spillway
Spillway
larger, or any exposure of native soil
at the top of out flow path of spillway.
(Rip -rap on inside slopes need not be
replaced.)
Erosion
See "Side Slopes of Pond"
Volume V— Runoff Treatment BMPs — December 2014
4-34
No. 2 — Infiltration
Maintenance
Defect
Conditions When Maintenance Is
Results Expected When
Component
Needed
Maintenance Is
Performed
General
Trash & Debris
See "Detention Ponds" (No. 1).
See "Detention Ponds"
(No. 1).
Poisonous/Noxious
See "Detention Ponds" (No. 1).
See "Detention Ponds"
Vegetation
(No. 1).
Contaminants and
See "Detention Ponds" (No. 1).
See "Detention Ponds"
Pollution
(No. 1).
Rodent Holes
See "Detention Ponds" (No. 1).
See "Detention Ponds"
(No. 1)
Storage Area
Sediment
Water ponding in infiltration pond after
Sediment is removed
rainfall ceases and appropriate time
and/or facility is cleaned
allowed for infiltration. Treatment basins
so that infiltration system
should infiltrate Water Quality Design Storm
works according to
Volume within 48 hours, and empty within
design.
24 hours after cessation of most rain
events.
(A percolation test pit or test of facility
indicates facility is only working at 90% of
its designed capabilities. Test every 2 to 5
years. If two inches or more sediment is
present, remove).
Filter Bags (if
Filled with
Sediment and debris fill bag more than 1/2
Filter bag is replaced or
applicable)
Sediment and
full.
system is redesigned.
Debris
Rock Filters
Sediment and
By visual inspection, little or no water flows
Gravel in rock filter is
Debris
through filter during heavy rain storms.
replaced.
Side Slopes of
Erosion
See "Detention Ponds" (No. 1).
See "Detention Ponds"
Pond
(No. 1).
Emergency
Tree Growth
See "Detention Ponds" (No. 1).
See "Detention Ponds"
Overflow Spillway
(No. 1).
and Berms over 4
feet in height.
Piping
See "Detention Ponds" (No. 1).
See "Detention Ponds"
(No. 1).
Emergency
Rock Missing
See "Detention Ponds" (No. 1).
See "Detention Ponds"
Overflow Spillway
(No. 1).
Erosion
See "Detention Ponds" (No. 1).
See "Detention Ponds"
(No. 1).
Pre -settling
Facility or sump
6" or designed sediment trap depth of
Sediment is removed.
Ponds and Vaults
filled with Sediment
sediment.
I and/or debris
I
I I
Volume V — Runoff Treatment BMPs — December 2014
4-35
No. 5 — Catch Basins
Maintenance
Defect
Conditions When Maintenance is Needed
Results Expected When
Component
Maintenance is
performed
General
Trash &
Trash or debris which is located immediately
No Trash or debris located
Debris
in front of the catch basin opening or is
immediately in front of
blocking inletting capacity of the basin by
catch basin or on grate
more than 100 6.
opening.
Trash or debris (in the basin) that exceeds 60
No trash or debris in the
percent of the sump depth as measured from
catch basin.
the bottom of basin to invert of the lowest
pipe into or out of the basin, but in no case
less than a minimum of six inches clearance
from the debris surface to the invert of the
lowest pipe.
Trash or debris in any inlet or outlet pipe
Inlet and outlet pipes free
blocking more than 1/3 of its height.
of trash or debris.
Dead animals or vegetation that could
No dead animals or
generate odors that could cause complaints
vegetation present within
or dangerous gases (e.g., methane).
the catch basin.
Sediment
Sediment (in the basin) that exceeds 60
No sediment in the catch
percent of the sump depth as measured from
basin
the bottom of basin to invert of the lowest
pipe into or out of the basin, but in no case
less than a minimum of 6 inches clearance
from the sediment surface to the invert of the
lowest pipe.
Structure
Top slab has holes larger than 2 square
Top slab is free of holes
Damage to
inches or cracks wider than 1/4 inch
and cracks.
Frame and/or
Top Slab
(intent is to make sure no material is running
into basin).
Frame not sifting flush on top slab, i.e.,
Frame is sifting flush on
separation of more than 3/4 inch of the frame
the riser rings or top slab
from the top slab. Frame not securely
and firmly attached.
attached
Fractures or
Maintenance person judges that structure is
Basin replaced or repaired
Cracksin
unsound.
to design standards.
Basin Walls/
Bottom
Grout fillet has separated or cracked wider
Pipe is regrouted and
than 1/2 inch and longer than 1 foot at the
secure at basin wall.
joint of any inlet/outlet pipe or any evidence of
soil particles entering catch basin through
cracks.
Settlement/
If failure of basin has created a safety,
Basin replaced or repaired
Misalignment
function, or design problem.
to design standards.
Vegetation
Vegetation growing across and blocking more
No vegetation blocking
than 10% of the basin opening.
opening to basin.
Vegetation growing in irlet/outlet pipe joints
No vegetation or root
that is more than six inches tall and less than
growth present.
six inches apart.
Contamination
See "Detention Ponds" (No. 1).
No pollution present.
and Pollution
I
I
Volume V— Runoff Treatment BMPs — December 2014
4-38
No. 5 — Catch Basins
Maintenance
Defect
Conditions When Maintenance is Needed
Results Expected When
Component
Maintenance is
performed
Catch Basin
Cover Not in
Cover is missing or only partially in place.
Catch basin cover is
Cover
Place
Any open catch basin requires maintenance.
closed
Locking
Mechanism cannot be opened by one
Mechanism opens with
Mechanism
maintenance person with proper tools. Bolts
proper tools.
Not Working
into frame have less than 1/2 inch of thread.
Cover Difficult
One maintenance person cannot remove lid
Cover can be removed by
to Remove
after applying normal lifting pressure.
one maintenance person.
(Intent is keep cover from sealing off access
to maintenance.)
Ladder
Ladder Rungs
Ladder is unsafe due to missing rungs, not
Ladder meets design
Unsafe
securely attached to basin wall,
standards and allows
misalignment, rust, cracks, or sharp edges.
maintenance person safe
access.
Metal Grates
Grate opening
Grate with opening wider than 7/8 inch.
Grate opening meets
(If Applicable)
Unsafe
design standards.
Trash and
Trash and debris that is blocking more than
Grate free of trash and
Debris
20% of grate surface inletting capacity.
debris.
Damaged or
Grate missing or broken member(s) of the
Grate is in place and
Missing.
grate.
meets design standards.
No. 6 — is Barriers (e.g., Trash Racks)
Maintenance
fect
Condition When Maintenance is
Results Expec hen
Components
Needed
Maintena s Performed
a
General
Trash and
Trash or debris that is plugging more
B r cleared to design flow
Debris
n 20% of the openings in the barrier,�
apacity.
Metal
Damaged/
Bars > of s�hape 3
Bars in place with no bends more
Missing
�entout �morn
inches.
than 3/4 inch.
Bars.
Bars are!.miss' r en ' barrier
�d
Bars in place according to design.
missing. .�
- '4,
arEe loose and rust is causin %
Barrier replaced or repaired to
—.00'1d�eterio
�01.
rior,
ration to any part of barriiier.
design standards.
>InI utlet
u
Deb is barrier missing or not attached to
'111t firmly attached to pipe
peo"�
pipe
�er
.00'.
Volume V — Runoff Treatment BMPs — December 2014
4-39
S406 BNR,%, for Streets/ Highways
Applicable BN[Ps:
Select de and anti-icers that cause the least erse environmental
Nkact. Apply only as needed using mjpAum quantities.
WheNacticable use roadway �Kers, such as calcium magnesium
acetate, p , sium acetate, op�ilar materials, that cause less adverse
Ns'un
environ enta*NmDac� am'6ea, and sodium chloride.
• Store and transfer;Knd anti -icing materials on an impervious
containment pjKn accN�,ance with BMP Sto=e or Transfe
(Oiltsi ) ol-Ko'lid Raw WS&ls, BY -Products, or Finished Prodncts
in this me.
��u
• S d i-icing materials and grit from
,wfep/clean up accumulated de a�n
. roads as soon as possible after the road 0%Qace clears.
Recommended Additional BMPs
Intensify roadway cleaning in early spring to help r articulates
from road surfaces. N�
0 Include limits on toxic metals in the specifications for de/and
S407 BMPs for Dust Control at Disturbed Land Areas and Unpaved Roadways
and Parking Lots
Description of Pollutant Sources: Dust can cause air and water pollution
problems particularly at demolition sites and in and areas where reduced
rainfall exposes soil particles to transport by air.
Pollutant Control Approach: Minimize dust generation and apply
environmentally friendly and government approved dust suppressant
chemicals, if necessary.
Applicable Operational BMPs:
Sprinkle or wet down soil or dust with water as long as it does not
result in a wastewater discharge.
Use only local and/or state government approved dust suppressant
chemicals such as those listed in Ecology Publication #96-433,
Techniques for Dnst Prevention and Suppression.
Avoid excessive and repeated applications of dust suppressant
chemicals. Time the application of dust suppressants to avoid or
minimize their wash -off by rainfall or human activity such as
irrigation.
Apply storrnwater containment to prevent the conveyance of sediment
into storm drains or receiving waters.
Volume IV - Source Control BMPs — December 2014
2-15
S408
Ecology prohibits the use of motor oil for dust control, Take care when
using lignin derivatives and other high BOD chemicals in areas
susceptible to contaminating surface water or ground water.
Consult with Ecology and the local permitting authority on discharge
permit requirements if the dust suppression process results in a
wastewater discharge to the ground, ground water, storm drain, or
surface water.
Recommended Additional Operational BMPs for Roadways and
Other Trafficked Areas:
• Consider limiting use of off -road recreational vehicles on dust
generating land.
• Consider graveling or paving unpaved permanent roads and other
trafficked areas at municipal, commercial, and industrial areas.
• Consider paving or stabilizing shoulders of paved roads with gravel,
vegetation, or local government approved chemicals.
• Encourage use of alternate paved routes, if available.
• Vacuum sweep fine dirt and skid control materials from paved roads
soon after winter weather ends or when needed.
• Consider using pre -washed traction sand to reduce dust emissions.
Additional Recommended Operational BMPs for Dust Generating
Areas:
Prepare a dust control plan. Helpful references include: Control of
Open Fugitive Dust Sources (EPA-450/3-88-088), and Fugitive Dust
Background Document and Technical Information Document for Best
Available Control Measures (EPA-450/2-92-004).
0 Limit exposure of soil (dust source) as much as feasible.
• Stabilize dust -generating soil by growing and maintaining vegetation,
mulching, topsoiling, and/or applying stone, sand, or gravel.
• Apply windbreaks in the soil such as trees, board fences, tarp curtains,
bales of hay, etc.
Dust Control at Manufacturing Areas
DNwiption of Pollutant Sources:
can 2enera�nsiderable amounts
exhaust systems. 1�?
powdered materials
idustr��alrial handling activities
�A�at is typically removed using
concrete products and handling
dust. Particulate materials that can
cause air p2aulioll—include grain dumt�,wdust, coal, gravel, crushed rock,
d boiler fly ash. Air emissions cAT14oQ41taminate stormwater. The
d5j—ective of this BMP is to reduce the stormwater p_'CN%t4.nts caused by
dust generation and control.
Volitme IV - Source Control BMPs — December 2014
2-16
a
Applicable Operational BMPs:
• Eliminate unpermitted wastewater discharges to s rm sewer, ground
water, or surface water.
• Convey unpermitted discharges to a sanitary ewer if allowed by the
local sewer authority, or to other approve reatment.
Obtain appropriate state and local pe i s for these discharges.
Rec mended Additional Operation BMPs: At commercial and
indust ' I facilities, conduct a survey wastewater discharge connections
to storm ins and to surface wate s follows:
• Conduct ield survey of bu' ings, particularly older buildings, and
other indust ' I areas to lo te storm drains from buildings and paved
surfaces.Note hereth e join the public storm drain(s).
• During non -storm r conditions inspect each storm drain for non-
stormwater discha e Record the locations of all non-stormwater
discharges. Incl e all itted discharges.
• If useful, pre re a map of h area. Show on the map the known
, or
location of orm sewers, sani sewers, and permitted and
unpermi discharges. Aerial p tos may be useful. Check records
' such a iping schematics to identi own side sewer connections
uc'
and ow these on the map. Consider ing smoke, dye, or chemical
an ysis tests to detect connections betw two conveyance systems
.g., process water and stormwater). If desi ble, conduct TV
inspections of the storm drains and record the otage on videotape.
Compare the observed locations of connections *th the information
on the map and revise the map accordingly. Note s ect connections
that are inconsistent with the field survey.
• Identify all connections to storm sewers or to surface wa and take
the actions specified above as applicable BMPs.
S411 BMPs for Landscaping and Lawn/ Vegetation Management
Description of Pollutant Sources: Landscaping can include grading, soil
transfer, vegetation removal, pesticide and fertilizer applications, and
watering. Stormwater contaminants include toxic organic compounds,
heavy metals, oils, total suspended solids, coliform bacteria, fertilizers,
and pesticides.
Lawn and vegetation management can include control of objectionable
weeds, insects, mold, bacteria, and other pests with pesticides. Examples
include weed control on golf course lawns, access roads, and utility
corridors and during landscaping; sap stain and insect control on lumber
and logs; rooftop moss removal; killing nuisance rodents; fungicide
application to patio decks, and residential lawn/plant care. It is possible to
Volnme IV - Sonrce Control BMPs — December 2014
2-21
release toxic pesticides such as pentachlorophenol, carbarnates, and
organometallics to the environment by leaching and dripping from treated
parts, container leaks, product misuse, and outside storage of pesticide
contaminated materials and equipment. Poor management of the
vegetation and poor application of pesticides or fertilizers can cause
appreciable stormwater contamination.
Pollutant Control Approach: Control of fertilizer and pesticide
applications, soil erosion, and site debris to prevent contamination of
stormwater.
Develop and implement an Integrated Pest Management Plan (IPM) and
use pesticides only as a last resort. Carefully apply pesticides/ herbicides,
in accordance with label instructions. Maintain appropriate vegetation,
with proper fertilizer application where practicable, to control erosion and
the discharge of stormwater pollutants. Where practicable grow plant
species appropriate for the site, or adjust the soil properties of the subject
site to grow desired plant species.
Applicable Operational BMPs for Landscaping:
Install engineered soil/landscape systems to improve the infiltration
and regulation of stormwater in landscaped areas.
Do not dispose of collected vegetation into waterways or storm sewer
systems.
Recommended Additional Operational BN[Ps for Landscaping:
• Conduct mulch -mowing whenever practicable
• Dispose of grass clippings, leaves, sticks, or other collected vegetation,
by composting, if feasible.
• Use mulch or other erosion control measures on soils exposed for
more than one week during the dry season or two days during the rainy
season.
• Store and maintain appropriate oil and chemical spill cleanup materials
in readily accessible locations when using oil or other chemicals.
Ensure that employees are familiar with proper spill cleanup
procedures.
• Till fertilizers into the soil rather than dumping or broadcasting onto
the surface. Determine the proper fertilizer application rate for the
types of soil and vegetation encountered.
• Till a topsoil mix or composted organic material into the soil to create
a well -mixed transition layer that encourages deeper root systems and
drought -resistant plants.
• Use manual and/or mechanical methods of vegetation removal rather
than applying herbicides, where practical.
Volume IV - Source Control BMPs — December 2014
2-22
Applicable Operational BMPs for the Use of Pesticides:
Develop and implement an fPM (See section on IPM in Applicable
0
Werational BMPs for Vegetation Manygement and use pesticides
only as a last resort.
Implement a pesticide -use plan and include at a minimum: a list of
selected pesticides and their specific uses; brands, formulations,
application methods and quantities to be used; equipment use and
maintenance procedures; safety, storage, and disposal methods; and
monitoring, record keeping, and public notice procedures. All
procedures shall conform to the requirements of Chapter 17.21 RCW
and Cha2ter 16-228 WAC (A22endix IV-D R.7 .
Choose the least toxic pesticide available that is capable of reducing
the infestation to acceptable levels. The pesticide should readily
degrade in the environment and/or have properties that strongly bind it
to the soil. Conduct any pest control activity at the life stage when the
pest is most vulnerable. For example, if it is necessary to use a
Bacillus thuringiens application to control tent caterpillars, apply it to
the material before the caterpillars cocoon or it will be ineffective. Any
method used should be site -specific and not used wholesale over a
wide area.
• Apply the pesticide according to label directions. Do not apply
pesticides in quantities that exceed manufacturer's instructions.
• Mix the pesticides and clean the application equipment in an area
where accidental spills will not enter surface or ground waters, and
will not contaminate the soil.
• Store pesticides in enclosed areas or in covered impervious
containment. Do not discharge pesticide contaminated stormwater or
spills/leaks of pesticides to storm sewers. Do not hose down the paved
areas to a storm sewer or conveyance ditch. Store and maintain
appropriate spill cleanup materials in a location known to all near the
storage area.
• Clean up any spilled pesticides. Keep pesticide contaminated waste
materials in designated covered and contained areas.
• The pesticide application equipment must be capable of immediate
shutoff in the event of an emergency.
• Spraying pesticides within 100 feet of open waters including wetlands,
ponds, and rivers, streams, creeks, sloughs and any drainage ditch or
channel that leads to open water may have additional regulatory
requirements beyond just following the pesticide product label.
Additional requirements may include:
• Obtaining a discharge permit from Ecology.
• Obtaining a pen -nit from the local jurisdiction.
• Using an aquatic labeled pesticide.
Volume IV - Source Control BMPs — December 2014
2-23
obtain a publication entitled "Suspended, Canceled, and Restricted
Pesticides " which lists all restrictedpesticides and the specific uses that
are allowed.
Applicable Operational BMPs for Vegetation Management:
Use at least an eight -inch "topsoil" layer with at least 8 percent organic
matter to provide a sufficient vegetation -growing medium. Amending
existing landscapes and turf systems by increasing the percent organic
matter and depth of topsoil can substantially improve the permeability
of the soil, the disease and drought resistance of the vegetation, and
reduce fertilizer demand. This reduces the demand for fertilizers,
herbicides, and pesticides. Organic matter is the least water-soluble
form of nutrients that can be added to the soil. Composted organic
matter generally releases only between 2 and 10 percent of its total
nitrogen annually, and this release corresponds closely to the plant
growth cycle. Return natural plant debris and mulch to the soil, to
continue recycling nutrients indefinitely.
Select the appropriate turfgrass mixture for the climate and soil type.
Certain tall fescues and rye grasses resist insect attack because the
symbiotic endophytic fungi found naturally in their tissues repel or kill
common leaf and stem -eating lawn insects. However, they do not,
repel root -feeding lawn pests such as Crane Fly larvae, and are toxic to
ruminants such as cattle and sheep. The fungus causes no known
adverse effects to the host plant or to humans. Endophytic grasses are
commercially available; use them in areas such as parks or golf
courses where grazing does not occur. Local agricultural or gardening
resources such as Washington State University Extension office can
offer advice on which types of grass are best suited to the area and soil
type.
Use the following seeding and planting BMPs, or equivalent BMPs to
obtain information on grass mixtures, temporary and permanent
seeding procedures, maintenance of a recently planted area, and
fertilizer application rates: Temporary and Permanent Seeding,
MitIching, Plastic Covering, and Sodding as described in Volume 11.
• Adjusting the soil properties of the subject site can assist in selection
of desired plant species. For example, design a constructed wetland to
resist the invasion of reed canary grass by layering specific strata of
organic matters (e.g., composted forest product residuals) and creating
a mildly acidic pH and carbon -rich soil medium. Consult a soil
restoration specialist for site -specific conditions.
• Aerate lawns regularly in areas of heavy use where the soil tends to
become compacted. Conduct aeration while the grasses in the lawn are
growing most vigorously. Remove layers of thatch greater than 1/4-inch
deep.
Volume IV - Source Control BMPs — December 2014
2-25
Mowing is a stress -creating activity for turfgass. Grass decreases its
productivity when mown too short and there is less growth of roots
and rhizomes. The turf becomes less tolerant of environmental
stresses, more disease prone and more reliant on outside means such as
pesticides, fertilizers, and irrigation to remain healthy. Set the mowing
height at the highest acceptable level and mow at times and intervals
designed to minimize stress on the turf. Generally mowing only 1/3 of
the grass blade height will prevent stressing the turf.
Irrigation:
The depth from which a plant normally extracts water depends on the
rooting depth of the plant. Appropriately irrigated lawn grasses
normally root in the top 6 to 12 inches of soil; lawns irrigated on a
daily basis often root only in the top I inch of soil. Improper irrigation
can encourage pest problems, leach nutrients, and make a lawn
completely dependent on artificial watering. The amount of water
applied depends on the normal rooting depth of the turfgrass species
used, the available water holding capacity of the soil, and the
efficiency of the irrigation system. Consult with the local water utility,
Conservation District, or Cooperative Extension office to help
determine optimum irrigation practices.
Fertilizer Management:
Turfgrass is most responsive to nitrogen fertilization, followed by
potassium and phosphorus. Fertilization needs vary by site depending
on plant, soil, and climatic conditions. Evaluation of soil nutrient
levels through regular testing ensures the best possible efficiency and
economy of fertilization. For details on soils testing, contact the local
Conservation District, a soils testing professional, or a Washington
State University Extension office.
Apply fertilizers in amounts appropriate for the target vegetation and
at the time of year that minimizes losses to surface and ground waters.
Do not fertilize when the soil is dry. Alternatively, do not apply
fertilizers within three days prior to predicted rainfall. The longer the
period between fertilizer application and either rainfall or irrigation,
the less fertilizer runoff occurs.
Use slow release fertilizers such as methylene urea, IDBU, or resin
coated fertilizers when appropriate, generally in the spring. Use of
slow release fertilizers is especially important in areas with sandy or
gravelly soils.
Time the fertilizer application to periods of maximum plant uptake.
Ecology generally recommends application in the fall and spring,
although Washington State University turf specialists recommend four
fertilizer applications per year.
Vohime IV - Source Control BMPs — December 2014
2-26
Treatment BMPs:
Install biofiltr-altmt,*�les.Laa4-ftlte-r-.strips - (See Chapter 9, Volume V) to
treat roadsidLe ble and
.;.�ere cticable and use engineered topsoil's
tion . These systems C
r m of ro
7"r
w necessary to maintain adequa tation. These systems can
..4� 'I
improve infiltration and stormwater pollutant con ream of roadside
ditches.
S417 BMPs for Maintenance of Stormwater Drainage and Treatment Systems
Description of Pollutant Sources: Facilities include roadside catch basins
on arterials and within residential areas, conveyance systems, detention
facilities such as ponds and vaults, oil/water separators, biofilters, settling
basins, infiltration systems, and all other types of stormwater treatment
systems presented in Volume V. Oil and grease, hydrocarbons, debris,
heavy metals, sediments and contaminated water are found in catch basins,
oil and water separators, settling basins, etc.
Pollutant Control Approach: Provide maintenance and cleaning of
debris, sediments, and oil from stormwater collection, conveyance, and
treatment systems to obtain proper operation.
Applicable Operational BMPs:
Maintain storrnwater treatment facilities per the operations and
maintenance (O&M) procedures presented in Section 4.6 of Volume V in
addition to the following BMPs:
• Inspect and clean treatment BMPs, conveyance systems, and catch
basins as needed, and determine necessary O&M improvements.
• Promptly repair any deterioration threatening the structural integrity of
stormwater facilities. These include replacement of clean -out gates,
catch basin lids, and rock in emergency spillways.
• Ensure adequacy of storm sewer capacities and prevent heavy
sediment discharges to the sewer system.
• Regularly remove debris and sludge from BMPs used for peak -rate
control, treatment, etc. and discharge to a sanitary sewer if approved
by the sewer authority, or truck to an appropriate local or state
government approved disposal site.
• Clean catch basins when the depth of deposits reaches 60 percent of
the sump depth as measured from the bottom of basin to the invert of
the lowest pipe into or out of the basin. However, in no case should
there be less than six inches clearance from the debris surface to the
invert of the lowest pipe. Some catch basins (for example, WSDOT
Type I L basins) may have as little as 12 inches sediment storage
below the invert. These catch basins need frequent inspection and
cleaning to prevent scouring. Where these catch basins are part of a
stormwater collection and treatment system, the system
Volume IV - Source Control BMPs - December 2014
2-37
owner/operator may choose to concentrate maintenance efforts on
downstream control devices as part of a systems approach.
Clean woody debris in a catch basin as frequently as needed to ensure
proper operation of the catchbasin.
Post warning signs; "Dump No Waste - Drains to Ground Water,"
"Streams ... .. Lakes," or emboss on or adjacent to all storm drain inlets
where possible.
Disposal of sediments and liquids from the catch basins must comply
with "Recommendations for Management of Street Wastes" described
in Appendix IV-G of this volume.
Additional Applicable BY[Ps: Select additional applicable BMPs from
this chapter depending on the pollutant sources and activities conducted at
the facility. Those BMPs include:
• S425 BM.Ps for Soil Erosion and Sediment Control at Industrial Sites
• S427 BMPs for Storage of Liquid, Food Waste, or Dangerous Waste
Containers
• S406 BMPs for Spills of Oil and Hazardous Substances
• S4 10 BMPs for Illicit Connections to Storm Drains
0 S430 BMPs for Urban Streets
,BMPs for Manufacturing Activities - Outside
Description of Pollutant Sources: Manufacturing pollu sources
50�t
include outside process areas, stack emissions, and alKs where
manufacturing activity has taken place in the past,4d significant exposed
"'Utant materials remain.
P 11 _ n Control Approach: Cover an ontain outside manufacturing
a 3rev s
nd �i tormwater run-on and c amination, where feasible.
Applicable 0'*'ation2
• Sweep paved "arei
stormwat r.
• Alter the acti - y by
stormwat .
BMP:
y, as needed, to prevent contamination of
or minimizing the contamination of
ApgKable Structural Source Co?h�ol BMPs: Enclose the activity
�pee Figure 2.2.6): If possible, enclose ufacturing activity in a
,40"'b'uilding.
Cover the activity and connect floor drains to a shktary sewer, if
approved by the local sewer authority. Berm or slopN4e floor as
needed to prevent drainage of pollutants to outside area'sNCigure
2.2.7)
Volume IV - Source Control BMPs — December 2014
2-38
Aw Residence January 18, 2019
9527 1901h Place SW Project #18102
Edmonds, Washington
Strobl Design LLC
iacob@strobldesign.com
bLD20[90k,�'
Attention: Jacob Strobl
Subject: Design Infiltration Rate — Aw Residence
Mr. Strobl:
The purpose of this letter is to provide a design infiltration rate for stormwater infiltration for
the proposed development of a single-family home on the subject property.
Summary
We recommend using a design infiltration rate of 2 inches per hour for the proposed infiltration
trench. The following sections will provide support for our recommendation.
Geologic/Hyd rogeo logic Setting
Our referenced geotechnical report describes the geologic and hydrogeologic setting and soils
encountered in more detail. For the purposes of the design infiltration rate, EP-2 was close to
the proposed infiltration trench. In EP-2 Vashon advance outwash sediments were
encountered from the ground surface to the total depth explored (5 feet). The soil log and
location of this exploration pit is attached to this report.
There was no groundwater seepage observed in any of the explorations performed for our previous
geotechnical report. Soil conditions observed were generally dry for the time of year (winter),
which is indicative of permeable soils. Also, there were no signs of poncling water or flowing water
observed on the subject property. Groundwater conditions are subject to change depending on
seasonal weather conditions but based on the permeable native advance outwash soils
encountered at depth, we do not anticipate seasonal high groundwater of adverse groundwater
conditions affecting infiltration facilities.
Receptor Soil Horizon
The soils present at the bottom elevation of the proposed infiltration trench consist of medium
dense, light brown GRAVEL with fine to coarse sand (GP). These coarse -grained soils are well
suited for stormwater infiltration. Based on our previous experience with in -situ infiltration
testing of similar soils, measured rates range from approximately 20 to 100 inches per hour.
Design Infiltration Rate
Due to the coarse -grained soils present at the receptor horizon and the nature of the project
(single-family residence) , we recommend using a design infiltration rate of 2 inches per hour.
This rate is extremely conservative for the soils present and based on our previous experience,
this design infiltration rate incoroporates an approximate factor of safety of 10 to 50
(Correction Factor = 0.1 to 0.02). It should also be noted that 2 inches per hour was the design
infiltration rate used for infiltration facility design on the adjacent property to the north (Mione
Short Plat), which South Fork Geosciences worked on as well.
SOUTH FORK GEOSCIENCES, PLLC '4g1j,
PO BOX 1275
NORTH BEND, WA 98045
425-890-4858 1 INFOPSFGEO.COM JAN 3 0 2019
BUILDING
Aw Residence January 18, 2019
9527 1901h Place SW Project #18102
Edmonds, Washington
Civil Engineering Plan Review
We have reviewed referenced civil engineering plans (CG Engineering, January 17, 2019) and
EP-2 was located near the proposed infiltration trench. The respective locations are shown on
the attached Annotated Grading and Drainage Plan. Based on our recent correspondence with
the civil engineer, it is our understanding that the infiltration trench was sized based on a
design infiltration rate of 2 inches per hour. Also, upon review of the plans, we noted that the
infiltration trench has an overflow to the storm system. Based on the coarse -grained receptor
soils present and the geologic and topographic setting, we do not think the infiltration trench
will ever overflow, but if it did, it would not adversely impact the subject or adjacent properties.
As such, it is our opinion that the overflow feature of the design makes constant head
infiltration testing and/or groundwater mounding analysis onerous and wasteful.
Closure
We have enjoyed working with you and we are confident that this letter will aid in the design
and permijU
��our project. If there are any questions, please feel free to contact us.
Since
9- 01
I b-2A
I Andrew L. Glandon
Anulluvv L %J1C111UU1 I, LL%J
Engineering Geologist / Owner
South Fork Geosciences, PLLC
Attachments: Annotated Grading and Drainage Plan
Exploration Pit Log (EP-2)
References:
"Subsurface Exploration, Geologic Hazards, and Geotechnical Engineering Report, Johnson Residence,
Parcel # 00434600007901, 9527 190th Place SW, Edmonds, Washington", South Fork Geosciences,
Project #12058, January 14, 2014
"Geologic Map of the Edmonds East and Part of the Edmonds West Quadrangles, Washington", Minard,
James P., 1983, United States Geological Survey, Miscellaneous Field Studies, Map MF-1541, Scale
1:24,000
"Aw Residence, 9527 1901h PI SW, Edmonds, WA 98020, Sheets C1.1, C2.1, C2.2, C3.1, C3.2, C4.1 &
C4.2", CG Engineering, Job #18300.20, January 17, 2019
SOUTH FORK GEOSCIENCES, PLLC Page 2
PO Box 1275
NORTH BEND, WA 98045
425-890-4858 1 INFO@SFGEO.COM
Aw Residence January 18, 2019
9527 1901h Place SW Project #18102
Edmonds, Washington
I T-
EP-2
MAm I-
A
N
oil.
1A
6
A A0
\0
Infiltration Trenc - 4
Location
North is up
T
-4- Linear scale is valid
1901H PL SW
Source: Grading and Drainage Plan
CG Engineering
Annotated Grading and Drainage Plan
SOUTH FORK GEOSCIENCES, PLLC Page 3
PO BOx 1275
NORTH BEND, WA 98045
425-890-4858 1 INFOCO)SFGEO.COM .. Mki
H
Aw Residence January 18, 2019
9527 1901h Place SW Project #18102
Edmonds, Washington
Johnson Residence Exploration
9527 1 901h Place SW, Edmonds, WA Pit Log
Date: 1-1-2014
Depth .. . r- r% f%
0 Vashon Advance Outwash
loose to medium dense, damp, brawn to
reddish brown, fine SAND with gravel and sift
2 _I I medium dense, damp, light brown GRAVEL
I Iwith fine to coarse sand (GP)
4
Total Depth = 5 feet
No seepage observed
6 No caving observed
0-2ft weathered
8
10
12
14
The subsWace cm&--ons shown on ths field log represent oa obsmaWns at the tum and bcatm of excavaton, ffrdfied by geologc intarwelabon
andludgawl, and wtwe noted, by angmaenng ana4sls and laboratory testng. The oordbons shown may not be rWesenfatwe ofconcibons at ottw
&Tm- South FM Geosuences YWI not be responsible for use or interprotaf-un by oUffs of inforaoton presented on these logs.
SOUTH FORK GEOSCIENCES
PO Box 1275
NORTH BEND, WA 98045
Project 9 12058 PHONE: (425) 831-2023
SOUTH FORK GEosciENCES, PLLC
PO Box 1275
NORTH BEND, WA 98045
425-890-4858 1 INFO@SFGEO.COM
Page 4
0
SOUTH FORK GEOSCIENCES
PO Box 1275
NORTH BEND, WA 98045
(425) 831-2023
AGLANDON@COMCAST.NET
January 14, 2014
Project #: 12058
BLVWIq-oII(P
Subsurface Exploration, Geologic Hazards,
and Geotechnical Engineering Report
Johnson Residence
Parcel # 00434600007901
9527 1901h Place SW
Edmonds, Washington
Introduction
The purpose of this study was to gain subsurface information to be utilized in the design and
construction of a single-family residence on the subject property. The proposed construction will
consist of grading, foundation subgrade preparation, home construction, utility installation,
driveway construction, and retaining wall construction. Authorization to proceed with this study
was provided by Mr. Chris Johnson via e-mail on December 10, 2013. This report was prepared
for Mr. Johnson and his agents for specific use in support of this project. The location of the
subject property is shown in the attached Vicinity Map. An excerptof the proposed site plan
prepared by Architects Northwest and the approximate locations of the subsurface explorations
logged for this study are shown on the attached Site and Exploration Plan.
Site Conditions
The subject property was located at 9527 1 q0th Place SW in Edmonds, Washington. The property
was irregularly shaped and was approximately 150 feet in the east -west direction and ranged from
approximately 90 to 100 feet in the north -south direction. Based on information from the
Snohomish County Assessor website, the property was 0.32 acres in size. The property sloped
gently to moderately from the east down to the west. Based on a review of the site survey, the slope
on the west portion of the property was on the order of 5 to 10 percent, and some of the areas to the
east had slopes up to approximately 50 percent. Based on our field observations, some of the steeper
areas were associated with past grading. Based on the surveyed elevations, there is approximately
32 feet of total relief on the property. The property was bordered on the west by Olympic View
Drive, to the south by I q0th Place SW, and to the north and east by existing residential properties.
The property was marked with survey stakes at key points to delineate the property. The western
portion of the property had been cleared and was covered with grass. Near the southern and central
(E-W) portion of the lot, there was an area that appeared to have been filled to provikvehicle
177,, 7,
SOUTH FORK GEOSCIENCES, PO Box 1275, NORTH BEND, WA 98045,(425) 831 0 2U19
BUILDING
access to the property. An area near the north property line had not been cleared and was covered
with typical second -growth forest vegetation. Vegetation in the forested portion of the property
consisted of Douglas Fir and maple trees with underbrush consisting of blackberry vines and sallal.
We did not observe any signs of accelerated soil erosion or soil movement during our site
reconnaissance.
Subsurface Conditions
Subsurface conditions on the property were inferred from a visual reconnaissance of the property, a
review of the referenced geologic map (Minard, 1983) and seven exploration pits excavated with a
subcontracted track -mounted excavator provided by Northwest Excavating and Trucking Co., Inc.
The explorations were logged by the undersigned licensed engineering geologist and were
immediately backfilled. The approximate locations of the subsurface explorations are shown in the
Site and Exploration Plan and the exploration logs are attached to this report. Our interpretation of
the native soils found at depth as Vashon advance outwash is in agreement with the referenced
geologic map. The detection of fill soils on the property is due to the site specific nature of our
study.
Stratigraphy
Fill Soils
Fill soils were encountered in all of the exploration pits perfon-ned for this study except for EP-2,
which was located in an area that had not been cleared. The fill soils in the other exploration pits
ranged in depth from the ground surface to 3.5 to 9 feet below the ground surface. As shown in
the attached logs, the fill soils varied in grain size distribution and in relative density. The fill
soils included construction rubble which primarily consisted of asphalt and concrete pieces, with
small amounts of other manmade material (garbage). We presume that the fill soils were placed
to provide better vehicle access to the property and possibly in association with filling a past
topographic low. Due to their inconsistency, generally low relative density, and lack of
knowledge of the means and methods used to place and compact the fill soils, proposed
structures should not be founded on existing fill soils without mitigation measures, which are set
forth in later sections of this report.
Vashon Advance Outwash
Vashon advance outwash sediments were encountered in all of the exploration pits logged for
this study. In EP-2 these sediments were encountered from the ground surface to the total depth
explored (5 feet). In the other exploration pits, the advance outwash sediments were encountered
underlying the fill soils at a depth ranging from 3.5 to 9 feet below the ground surface to the
maximum depth of each exploration pit. The advance outwash sediments generally consisted of
medium dense, sand with gravel or gravel with sand. Vashon advance outwash sediments are
alluvial and fluvial sediments that were deposited by meltwater streams and channels from the
advancing Vashon glacial ice sheet. As the glacial ice advanced, the advance outwash sediments
were overridden and consolidated by the glacial ice. As such, the advance outwash sediments
are typically dense, relatively permeable, and moisture insensitive due to the past glacial
2
SOUTH FORK GEOSCIENCES, PO Box 1275, NORTH BEND, WA 98045,(425) 831-2023
consolidation and the small amount of silt and clay present. Due to their relatively coarse grain
size distribution, the advance outwash sediments are moderately resistant to erosion, except
when subjected to concentrated water flows.
Hydrology
There was no groundwater seepage observed in any of the explorations performed for this study.
Soil conditions observed were generally dry for the time of year, which is indicative of permeable
soils. Also, there were no signs of ponding water or flowing water observed. Groundwater
conditions are subject to change depending on seasonal weather conditions, but based on the
permeable advance outwash soils encountered at depth, we do not anticipate encountering adverse
groundwater conditions during construction.
Geologic Hazards
The following discussion of potential geologic hazards is based on the visual reconnaissance of the
site, the subsurface explorations, reviews of aerial photographs and regional topographic and
geologic maps of the area, and review of the applicable City of Edmonds Municipal Code and maps
that are available online.
Based on our comparison of the City of Edmonds Municipal Code to the topographic and geologic
features of the subject property, the property does not fulfill the criteria for an erosion hazard area,
landslide hazard area, or a seismic hazard area. The following two sections of this report will set
forth some basic erosion control best management practices for use in construction and will address
general seismic risks and design parameters associated with a seismic event.
Erosion Concerns
Though special mitigations are not necessary, a temporary erosion and sediment control (TESC) plan
should be created and implemented during site construction. It is our opinion that implementation of
a relatively basic erosion control plan will prevent off site sediment transport. The proper use of
"best management practices" (BMPs) should be utilized during earthwork activities to reduce the
potential for erosion and sediment transport off of the property. The following is a partial list of
BMPs that should be implemented:
Phasing and scheduling earth work activities during dry conditions
Rock construction entrances
Straw mulch
Plastic sheeting
Silt fence
Keeping exposed soils and stockpiles covered when not actively worked
Establish temporary/permanent vegetation as soon as possible after foundation and utility
installation
3
SOUTH FORK GEOSCIENCES, PO Box 127 5, NORTH BEND, WA 98045, (425) 831-2023
Implementation of a TESC plan will likely be a requirement of the clearing and grading or building
permit. South Fork Geosciences is available to design the TESC plan and to provide any required
inspections during construction.
Seismic Concerns
Generally, there are four types of potential geologic hazards associated with large seismic events:
1) ground rupture; 2) seismically induced landslides; 3) liquefaction; and 4) ground motion. The
potential for each of these to impact the site is discussed below.
Ground Rupture
Most large earthquakes in the Puget Sound area are sub -crustal events with epicenters ranging
from 50 to 70 kilometers in depth. The subject property is approximately 5 to 6 miles south of
the Southern Whidbey Island Fault Zone (SWIFZ). Though the subject property is near the
SWIFZ, to our knowledge, there are no signs of past ground rupture in the immediate vicinity of
the subject property. Based on the location of the subject property to the south of the known
fault zone and the lack of sufficient information to infer a recurrence interval for earthquakes on
the SWIFZ (Johnson, et al., 2004), it is our opinion that the probability of ground surface rupture
impacting the subject property is low, and no mitigations are necessary.
Seismically Induced Landslides
Due the topography and absence of steep slopes on the subject property, it is our opinion that the
potential for seismically induced slope failures on the site is low and no mitigations are
necessary.
Liquefaction
Liquefaction is a condition where loose, saturated, fine sandy soils lose their shear strength due
to rapid pore pressure build-up when subjected to high intensity cyclic loads, such as occur
during earthquakes. Due to the medium dense, well -graded, native soils encountered in the
subsurface explorations and the absence of adverse ground water conditions, the liquefaction
potential of this site is very low, and no mitigations are necessary.
Ground Motion
Seismic hazards that will affect the structure would likely be due to the intensity and duration of
the ground shaking. The structural design of the project should be consistent with 2009
International Building Code (2009 IBC) guidelines (Section 1613). Based on the results of our
subsurface explorations and our estimation of soil properties at depth utilizing available geologic
data, Site Class "C" as defined by Table 1613.5.2 of the IBC may be used for the design of the
project.
Geotechnical Engineering Recommendations
Our exploration indicates that, from a geotechnical standpoint, the subject property is suitable for
the proposed development, provided the risks discussed are accepted and the recommendations
4
SOUTH FORK GEOSCIENCES, PO Box 1275, NORTH BEND, WA 98045,(425) 831-2023
contained herein are properly followed. Though the surficial fill soils encountered will need to
be mitigated during site grading, the underlying medium dense, Vashon advance outwash
sediments will be capable of providing support for the proposed structure or structural fill soil.
To aid in the design of the project, the following general recommendations for site development
are provided. South Fork Geosciences is available for further consultation with respect to
specific design items, if needed.
Site Preparation and Site Grading
It is likely that structural fill soils will be required to establish grades for the project. Any fill soil
placed beneath a foundation, retaining wall, or driveway/parking area must be constructed as a
structural fill. In areas that will provide structural support, any existing fill soils or loose soils
should be removed and replaced with structural fill as described below, or the fill soils should be
mitigated as described in later sections for specific applications.
Structural fill is defined as non -organic soil, placed in maximum 8-inch loose lifts, with each lift
being compacted to at least 95 percent of the maximum dry density, using the modified Proctor
test (ASTM: D1557) as the standard. Prior to placing any structural fill the exposed soils must
either be undisturbed or be compacted to a dense, non -yielding condition and be approved for
structural fill placement. In the case of utility trench filling, the backfill should be placed and
compacted in accordance with the applicable City of Edmonds or utility franchise standards.
If fill soil will be imported to the site, it should be free of organics and other deleterious material.
Mineral soils with more than 5 percent fines are considered to be moisture sensitive. The use of
moisture sensitive soils should be confined to dry weather conditions. The moisture condition of the
imported soil should be within a few percent of the optimum moisture content of the soil. Soils that
are too dry or too wet of the optimum moisture content to achieve suitable compaction will need to
be moisture conditioned prior to final compaction. The existing fill soils should be considered
moisture sensitive. The native, Vashon advance outwash sediments are not moisture sensitive, but
due to the dry soil conditions observed, may require the addition of water to be placed as structural
fill. In the case that moisture sensitive soils are used in structural fills, this type of work should be
limited to the summer months and good weather conditions.
Placement and compaction of the structural fill should be monitored by a competent field
technician. In situ density testing should be performed during fill placement to verify proper
compaction of the fill soil. A sample of the planned structural fill soil will need to be available at
least 48 hours prior to fill placement for laboratory analysis.
Temporary cut slopes may be necessary to allow the installation of the foundations and for utility
installation. Temporary cut slopes should be limited to 1 H: IV (Horizontal: Vertical) in the
existing fill soils and 1/2H: IV in the Vashon advance outwash sediments. Stability of the cut
slopes is the responsibility of the on -site contractor and a safe work environment should be
maintained at all times. A trench shield or trench box should be used to install all utilities over 4
feet in depth or the sides of trenches and excavations should be sloped back per OSHAAVISHA
standards.
SOUTH FORK GEOSCIENCES, PO Box 1275, NORTH BEND, WA 98045, (425) 831-2023
Foundations
Spread footings may be used for building support when founded on medium dense native soils,
approved structural fill soils, or rock trenches. To limit differential settlements between footings
that bear on both structural fill and medium dense to dense native soils, we recommend that an
allowable bearing pressure of 2,000 pounds per square foot (psf) be utilized for design purposes,
including both dead and live loads. An increase of one-third may be used for short-term wind or
seismic loading. Perimeter footings should be buried at least 18 inches into the surrounding soil
for frost protection; interior footings require only 12 inches burial. However, all footings must
penetrate to the prescribed bearing stratum, and no footing should be founded in or above loose,
organic, or existing fill soils.
It should be noted that the area bounded by lines extending downward at I H: IV from any
footing must not intersect another footing or intersect a filled area that has not been compacted to
at least 95 percent of ASTM:D 1557. In addition, a I.5H: IV line extending down from any
footing must not daylight because sloughing or raveling may eventually undermine the footing.
Thus, footings should not be placed near the edge of steps or near vertical cuts in the bearing
soils.
Anticipated settlements of footings founded on the medium dense native soils or approved rock
trenches should be less than 1 inch. Loose or disturbed surface soils, excessive moisture present or
poor foundation subgrade preparation could result in larger settlements. South Fork Geosciences
should perform a foundation bearing evaluation prior to concrete placement to verify that the design
bearing capacity of the soil has been attained. A foundation bearing evaluation will likely be
required by the City of Edmonds Building Department as a condition of the building permit.
Perimeter footing drains should be provided as discussed under the section titled Drainage
Considerations.
Lateral loads can be resisted by friction between the foundation and the supporting soils, and/or by
passive earth pressure acting on the buried portions of the foundations. The spread footings must be
backfilled. with structural fill compacted to a dense, non -yielding condition to achieve the passive
resistance provided below. The structural fill must extend horizontally outward from the embedded
portion of the foundation a distance equal to at least three times the embedment depth over which the
passive resistance is applied. We recommend the following design parameters.
• Passive equivalent fluid = 300 pcf
• Coefficient of friction = 0.30
The above values are allowable and include a factor of safety of at least 1.5.
Mitigation of Existing Fill Soils
The existing fill soils are not suitable for structural support without mitigation measures. There
are several options for mitigating the fill soils, but based on our observations and discussion with
Mr. Johnson while onsite during the subsurface exploration, it appears that the basement floor
elevation will be on native soils that are adequate for support of conventional spread footings.
6
SOUTH FORK GEOSCIENCES, PO Box 1275, NORTH BEND, WA 98045,(425) 831-2023
The current plans provided by Architects Northwest indicated a step up to a
structural/crawlspace type floor on the eastern portion of the proposed house. Since fill soils
were encountered in the eastern portion of the building pad, we recommend constructing a full
basement under the entire house, rather than having to extend crawlspace footings down to
bearing soils, or reworking the existing fill soils. We explained this to Mr. Johnson while we
were onsite and he said that the crawlspace area was originally designed as a full basement and a
change was made to the home design to reduce cost. Due to the fill soils being present here, Mr.
Johnson said that they will likely revert to the full basement design to reduce the amount of fill
soil mitigation.
Since the home will likely be built with a full basement, we presume that all spread footings will
be constructed on medium dense, Vashon advance outwash soils. In the event that native soils
are not encountered at the design foundation elevation, the footings will need to be extended
down to native soils, or the fill soil will need to be removed and replaced with structural fill as
explained in the preceding section titled Site Preparation and Site Grading.
Lateral Earth Pressure
Cast -in -place, concrete foundation walls or retaining walls should be designed to resist "at -rest"
lateral soil pressure conditions if the concrete walls will not be free to yield laterally at the top.
Restrained walls should be designed to resist an "at -rest" equivalent fluid pressure of 55 pounds per
cubic foot (pcf). Concrete walls that are free to yield laterally at the top of the wall may be designed
using an active soil pressure of 35 pcf. Surcharges from sloping backfill conditions or adjacent
structural loads should be added to the above lateral soil pressures. Full height drainage of
foundation walls will need to be installed to prevent hydrostatic pressures from acting on the walls.
Rockeries
The site plan provided by Architects Northwest indicates that rockeries will be utilized to face the
cut slopes around the north and east sides of the building envelope. Rockeries should be limited to a
maximum height of 8 feet when facing a native cut, and to 4 feet in height when facing a cut into fill
soils. All rockeries should be built by experienced contractors and should be built in accordance
with the Associated Rockery Contractors standards of practice. The City of Edmonds may require a
detail and geotechnical engineering recommendation for rockeries. South Fork Geosciences can
provide more extensive design recommendation, if required.
Other Retaining Walls
Rockeries, segmental block walls, or cast -in -place concrete walls may be used for grade separation
between the upper and lower driveways. Segmental block walls should be limited to 30 inches in
height without specific design of mechanically stabilized earth (MSE) fill and wall drainage. South
Fork Geosciences is available to design the segmental block wall/MSE fill. Cast -in -place concrete
7
SOUTH FORK GEOSCIENCES, PO Box 1275, NORTH BEND, WA 98045,(425) 831-2023
walls should be designed by a structural engineer using the soil bearing capacity, lateral resistance,
and lateral earth pressure values in the preceding sections.
Floor Support
We anticipate that the single-family home built on the subject property will utilize slab -on -grade
floors. Slab -on -grade concrete floors should be cast atop a prepared subgrade of structural fill
soil compacted to a minimum of 90 percent of the modified Proctor maximum dry density. A
capillary break with a minimum thickness of 4 inches should be placed atop the prepared
subgrade. The capillary break material should be a gap graded material consisting of pea gravel,
3/4-inch washed drain rock, or clean crushed rock with less than 5 percent fines (material passing
the No.200 sieve). The capillary break will reduce the potential for moisture wicking through
the floor slab. A 10-mil thick plastic vapor barrier should also be placed atop the capillary break
material. All concrete placement should follow the guidelines set forth by the American
Concrete Institute (ACI).
Driveway Support
Our subsurface explorations indicate that there are fill soils of significant depth located under the
proposed driveways. Full removal and replacement of the existing fill soils with structural fill would
likely be very expensive and earthwork intensive. For driveway support, the whole fill column does
not need to be removed and replaced, provided that there is some tolerance for future settlement.
We recommend that a 2 foot thick pad of structural fill should be placed over the existing fill in the
area that the driveway is to be constructed. The existing fill subgrade should be compacted to a firm
and unyielding condition prior to placing the structural fill pad. The structural fill pad should extend
horizontally beyond the area to be paved by 2 feet. Though the structural fill pad will not entirely
eliminate the potential for settlement, it will reduce the potential for differential settlement, and as a
result will reduce the potential for pavement cracking. We also recommend that the driveway should
be paved with asphalt, since asphalt is somewhat flexible and can tolerate minor amounts of
settlement. Asphalt can also be repaired or overlain more easily than concrete in the event that it
becomes damaged due to cracking.
Drainage Considerations
A perimeter foundation drain should be established to protect the floor slab and internal crawlspace
areas from ground water intrusion. The level of the foundation drain should be set at, or slightly
below, the base of the footing elevation. The drain should consist of 4-inch diameter, rigid,
perforated, PVC drain pipe and should be set to allow for gravity discharge. The drainpipe should be
surrounded by a minimum of 6 inches of pea gravel or washed drain rock. Roof drains should not tie
into the footing drain but should be collected in a separate, tightline drain. The drain lines should be
set to discharge via gravity to a dispersion or infiltration area or to an approved storinwater drainage.
In addition, all footing stem walls that enclose conditioned space should be lined with a minimum,
12-inch-thick, washed gravel blanket provided over the height of the wall that ties into the footing
8
SOUTH FORK GEOSCIENCES, PO Box 1275, NORTH BEND, WA 98045,(425) 831-2023
drain. The washed gravel blanket should be ended one foot below the desired ground surface and the
top of the gravel should be covered with filter fabric. The remaining one foot should be filled with
compacted soil to reduce the amount of surface water entering the wall and footing drain system.
Site Drainage
We have not reviewed any plans for stormwater disposal at this time. The native, Vashon advance
outwash sediments are well suited for infiltration methods due to their relatively coarse grain size
distribution and lack of fine sediments. With the relatively large lot size and the relatively flat area
on the western portion of the property, we presume that infiltration methods such as a series of
drywells or infiltration trenches in the native sediments will be used to dispose of stormwater
generated from the site. Based on our visual assessment of the native Vashon advance outwash
soils, we believe that the soil would be classified as "sand" in the USDA Soil Textural Triangle. We
obtained a grab sample from EP-2 for grain size analysis testing to verify this classification, if
required for infiltration design. South Fork Geosciences is available for additional consultation with
respect to site drainage, if necessary.
9
SOUTH FORK GEOSCIENCES, PO Box 1275, NORTH BEND, WA 98045, (425) 831-2023
Conclusion
Our findings and recommendations provided in this report were prepared in accordance with
generally accepted principles of engineering geology and geotechnical engineering as practiced in
the Puget Sound area at the time this report was submitted. We make no other warranty, either
expressed or implied. Our observations, findings, and opinions are a means to identify and reduce
the inherent risks to the owner.
We are available to provide additional design recommendations and consultation throughout the
development of this project. We should be contacted to review architectural and grading plans and
to provide additional design team support, if needed. We are also available to provide construction
monitoring services during the development of the project for earthwork quality control and to help
ensure that the recommendations in this report are properly implemented. We have enjoyed working
with you and we are confident that this report will aid in the design of your project. If there are any
questions, please contact us at (425) 831-2023.
Sincerely,
Andrew L. Glandon, LEG, CPESC
Geologist / Owner
South Fork Geosciences
Attachments: Vicinity Map
Site and Exploration Plan
Approximate Location of Fill Soils
Exploration Pit Logs
References:
FA
Jamey S. Battermann, PE
Geotechnical Engineer
Minard, James P., "Geologic map of the Edmonds East and Part of the Edmonds West
Quadrangles, Washington" U. S. Geological Survey, Miscellaneous Field Studies Map MF- 154 1,
scale 1:24,000,1983
10
SOUTH FORK GEOSCIENCES, PO Box 1275, NORTH BEND, WA 98045,(425) 831-2023
Edmonds Municipal Code
http://www.edmondswa.gov/govemment/rules-and-regulations.html
City of Edmonds Maps
http://www.edmondswa.gov/services/maps-a-gis-data/service�-maps-maps.html
United States Department of Agriculture Natural Resources Conservation Service,
http://websoilsurvey.nrcs.usda.gov
Snohomish County Assessor Property Summary
https://www.snoco.org�proi)tax/(ujcvtcbfeggvolbi)gOq5xm45)/result.aspx
USGS Quaternary Faults Web Mapping Application
http://earthquake.usjzs.gov/hazards/qfaults/map/
Johnson, S.Y., Blakely, R.J., Brocher, T.M., Sherrod, B.L., Kelsey, H.M., and Lidke, D.J.,
compilers, 2004, Fault number 572, Southern Whidbey Island fault zone, in Quaternary fault and
fold database of the United States: U.S. Geological Survey website,
http://earthquakes.us,izs.govihazards/qfaults, accessed 01/10/2014 03:28 PM
I I
SOUTH FORK GEOSCIENCES, PO Box 1275, NORTH BEND, WA 98045,(425) 831-2023
-will'
"ji
2. ti Tl;
*4
all 7
t t7l `
IN
TT. zi t
Z I= `
Ij 4Z
IAAVHUI'
-NN J1111 .�Ii
fill =!I`I —Oak
7
%
01
ILI j
;IJ I
Q'I
I
tj.,NNN,Av 'r IN
A S
INN%
J
u F e jo. N, .40' jo
U)
T 40
cu
0
cl, 41
6
IJ
0- 40#
(n
III F_
u LO Ld
Z 'I z
w 0
o
w (y)
�: N 0
C)_ 0 0
X Z @
0 W Z
LL x (Y) 0
0 00 a
ED z
LO <�
o 0 o
U) 0- z
00
U-)
C)
C\l
0
0
U)
_0
C:
0
C -o
Z LLJ
2z�
>N
C
01)
C\l
LO
0')
C)
70
(n
(D
0
0
FNot to Scale
e,17F— FL/,::,NN
PCA= - I- - - . 6 -20
Source: Architects Northwest, Johnson Residence Site Plan, 4-10-13
SOUTH FORK GEOSCIENCES
PO Box 1275
NORTH BEND, WA 98045
(425) 831-2023
AGLANDONCaCOMCAST. NET
Site and Exploration Plan
Johnson Residence, 9527 1 901h PI SE, Edmonds, WA
Locations are approximate
Project #12058
IA4 a' 2* E
V."
%
EP-5
Not to Scale
51
EP-3
Lu
kJ
431
W. or
EP-1
110TH P� SV�
151 -FE FILA%N
Source: Architects Northwest, Johnson Residence Site Plan, 4-10-13
SOUTH FORK GEOSCIENCES Locations are approximate
PO Box 1275
NORTH BEND, WA 98045
(425) 83 1-2023
AGLANDON(gCOMCAST.NET
1; 13
Approximate Location of Fill Soils
Johnson Residence, 9527 1 901h PI SE, Edmonds, WA Project #12058
Johnson Residence
9527 1 q0th Place SW, Edmonds, WA
Date: 1-1-2014
Depth Number: EP-1
(ft)
0 Fill
loose, damp, brown to light brown, fine X*
medium SAND, trace gravel, roots.p4sent
(SP)
2 loose to medium dense, �Idmp, light brown, fine
-SAND (SP)
4 � Iloose .16medium dense, damp, brown to light
Pr-6`wn, fine SAND with silt (SP-SM)
LI
8
101 Vashon Advance Outwash
medium dense, damp, light brown, fine to
coarse SAND with gravel (SW)
Total Depth = 10 feet
No seepage observed
No caving observed
12 Measured from back of pit, surface slopes
down to west (dashed line = ground surface)
14
Exploration
Pit Log
The subsurface conditions shown on this field log represent our observations at the time and location of excavation, modified by geologic interpretation
andjudgment, and where noted, by engineering analysis and laboratory testing. The conditions shown may not be representative of conditions at other
times. South Fork Geosciences will not be responsible for use or interpretation by others of information presented on these logs.
SOUTH FORK GEOSCIENCES
PO Box 1275
NORTH BEND, WA 98045
Project # 12058 PHONE: (425) 831-2023
Johnson Residence
9527 1 q0th Place SW, Edmonds, WA
Date: 1-1-2014
Depth Number: EP-2
(ft)
0 Vashon Advance Outwash
loose to medium dense, damp, brown to
reddish brown, fine SAND with gravel and silt
-SM,
2 medium dense, damp, light brown GRAVEL
with fine to coarse sand (GP)
.'SP
4
Total Depth = 5 feet
No seepage observed
6 No caving observed
0-2ft weathered
8
10
M
14
Exploration
Pit Log
IThe subsurface conditions shown on this field log represent our observations at the time and location of excavation, modified by geologic interpretation I
andjudgment, and where noted, by engineering analysis and laboratory testing. The conditions shown may not be representative of conditions at other
times. South Fork Geosciences will not be responsible for use or interpretation by others of information presented on these logs. I
Project # 12058
SoLffH FoRK GEOSCIENCES
PO Box 1275
NORTH BEND, WA 98045
PHONE: (425) 831-2023
4
Johnson Residence
9527 1 q0th Place SW, Edmonds, WA
Date: 1-1-2014
Depth Number: EP-3
(ft)
0 Forest Duff (0-6")
Fill
medium dense, damp, light brow(i-g�ay, fine to
medium SAND with gravel �nd"s**ilt, roots
2 present (SP-SM)
4
6
Vashon Advance Outwash
medium dense, damp, light brown, fine to
medium SAND with gravel, trace silt (SP)
Total Depth = 9 feet
No seepage observed
10 Minor caving in low cohesion soils
Measured from back of pit, surface slopes
down to NW (dashed line = ground surface)
12
14
Exploration
Pit Log
The subsurface conditions shown on this field log represent our observations at the time and location of excavation, modified by geologic interpretation
andjudgment, and where noted, by engineering analysis and laboratory testing. The conditions shown may not be representative of conditions at other
times. South Fork Geosciences will not be responsible for use or interpretation by others of information presented on these logs.
SOLffH FORK GF-osciENcF-s
PO Box 1275
NORTH BEND, WA 98045
Project # 12058 PHONE: (425) 831-2023
a
Johnson Residence
9527 1 q0th Place SW, Edmonds, WA
Date: 1-1-2014
Depth
Iffi Number: EP-4
0 Fill
loose to medium dense, damp, gray to brown
silty SAND with gravel and construction debris
(asphalt and concrete rubble) (SM)
2
4
6
8 1 Vashon Advance Outwash
loose to medium dense, damp, light brown, fine
to medium SAND with gravel, trace silt (SP)
Total Depth = 9 feet
lo— No seepage observed
Minor caving in fill soils
Difficult digging due to rubble in fill soils
Fill soils 0-8 feet
12-1
14
Exploration
Pit Log
IThe subsurface conditions shown on this field log represent our observations at the time and location of excavation, modified by geologic interpretation I
and judgment, and where noted, by engineering analysis and laboratory testing. The conditions shown may not be representative of conditions at other
times. South Fork Geosciences will not be responsible for use or interpretation by others of information presented on these logs. I
Project # 12058
SOUTH FORK GEOSCIENCES
PO Box 1275
NORTH BEND, WA 98045
PHONE: (425) 831-2023
a
Johnson Residence
9527 1 q0th Place SW, Edmonds, WA
Date: 1-1-2014
Depth
Iffi Number: EP-5
0 Fill
loose to medium dense, damp, gray to brown
silty SAND with gravel and construction debris
(asphalt and concrete rubble) (SM)
2
4 1 Vashon Advance Outwash
loose to medium dense, dry, light brown, fine
to medium SAND with gravel, trace silt (SP)
6 Total Depth = 6 feet
No seepage observed
No caving observed
Contact between fill and outwash ranges from
8 3 to 4 feet below ground surface
-deeper to south
10
12
14
Exploration
Pit Log
IThe subsurface conditions shown on this field log represent our observations at the time and location of excavation, modified by geologic interpretation I
and judgment, and where noted, by engineering analysis and laboratory testing. The conditions shown may not be representative of conditions at other
times. South Fork Geosciences will not be responsible for use or interpretation by others of information presented on these logs. I
Project # 12058
SOUTH FORK GEOSCIENCES
PO Box 1275
NORTH BEND, WA 98045
PHONE: (425) 831-2023
0
Johnson Residence
9527 1 q0th Place SW, Edmonds, WA
Date: 1-1-2014
Depth
Iftl Number: EP-6
0 Fill
loose to medium dense, dry to damp, I.Vd
brown, silty fine to medium SAND with gravel,
occasional debris (SM)
6
8 _
Vashon Advance Outwash
loose to medium dense, dry to damp, brown,
fine to medium SAND with gravel and silt
10 (SP-SM) -medium dense@ 10 feet
Total Depth = 11 feet
No seepage observed
12 Very minor caving observed
Measured from back of pit, surface slopes
down to west (dashed line = ground surface)
14
Exploration
Pit Log
IThe subsurface conditions shown on this field log represent our observations at the time and location of excavation, modified by geologic interpretation
andjudgment, and where noted, by engineering analysis and laboratory testing. The conditions shown may not be representative of conditions at other
times. South Fork Geosclances will not be responsible for use or interpretation by others of information presented on these logs. I
Project # 12058
SOUTH FORK GEOSCIENCES
PO Box 1275
NORTH BEND, WA 98045
PHONE: (425) 831-2023
a
Johnson Residence
9527 1 q0th Place SW, Edmonds, WA
Date: 1-1-2014
Depth Number: EP-7
(ft)
0 Fill
loose to medium dense, damp, light brown,
silty SAND with gravel, roots present to t 6ft
(SM)
4
6 Vashon Advance Outwash
medium dense, damp, light brown -gray, fine to
medium SAND with gravel and silt (SP-SM)
8
12
14
Total Depth = 9.5 feet
No seepage observed
No caving observed
Exploration
Pit Log
The subsurface conditions shown an this field log represent our observations at the time and location of excavation, modified by geologic interpretation
andjudgment, and where noted, by engineering analysis and laboratory testing. The conditions shown may not be representative of conditions at other
times. South Fork Geosciences will not be responsible for use or interpretation by others of information presented on these logs.
SOUTH FORK GEOSCIENCES
PO BOX 1275
NORTH BEND, WA 98045
Project # 12058 PHONE: (425) 831-2023
civil & structural
CENGINIECERING engineering & planning
July 17, 2019
Robert English —City Engineer
City of Edmonds
121 5th Avenue N, 2nd Floor
Edmonds, WA 98020
RE: Driveway Waiver
Dear Mr. English,
Application Number:
Project Name:
Project Address:
TBD
Aw Residence
9527 190th Place SW
T�LD20 11�_ 0 1 k ��
Due to the circumstances surrounding the site at 9527 1901h Place SW, our firm would like to submit this
request to allow the project to waive the required sidewalk improvements indicated by the Comprehensive
Sidewalk Plan.
The proposed project is a new single-family residence, zoned RS-12, which per 18.90.030 typically would not
require sidewalk. That being said, the City has a Comprehensive Sidewalk Plan dated 1/21/1985 which does
indicate a sidewalk requirement for this street, and which typically overrules the requirements of the cited
chapter. For the specific case of this project, due to some of the unique existing conditions described below,
we would like to revisit this requirement.
In Section 18.90.030,13 of the Edmonds Community Development Code it states that:
With the approval of both the planning director and city engineer, the requirements of this chapter may
be waived, if it can be demonstrated by the applicant that there are special circumstances related to
topography or otherfactors which make the construction of the sidewalk economically unfeasible or
practically impossible.
The property is also at the intersection of 190th and Olympic View Dr. Olympic View Dr. does not have
existing sidewalks on its east side, mainly due to the slope, which puts most of the houses high off of the
street, with steep driveways into the properties.
Topography varies along the 1901h frontage of the subject property, but for stretches is 14-15% grade,
consistent with the various steep driveways on the east side of Olympic View Dr. (Figure 1). The property is
also at the intersection of 1901h and Olympic View Dr. Olympic View Dr. does not have existing sidewalks on
its east side, mainly due to the slope, which situates most of the houses higher than the street, with steep
driveways into the properties. At the east edge of the property, there is a power pole aligned with the
proposed sidewalk location which includes power lines from several directions and transformers (Figure 2).
The proposed sidewalk required at this location seems to be too steep, cost prohibitive, and unlikely to be'
continued further due to the existing power pole and current existing developed properties.
The longitudinal slope of the road would be well over any ADA requirements. Further, the work tips the si VL
over the Category 2 drainage thresholds, kicking the site into further requirements and civil engineerting"'
design costs for the owner. For these reasons, it seems to be unnecessary for the development of this "-''
project. The Sidewalk Comprehensive plan proposes sidewalk all the way along 190th Place SW and Cherry
Street (the road roughly aligning with 190th across Olympic View Dr), but there is not actually a sidewalk for
at Ipasta h1ork in Pithpr Hirsortinn
I U 20A
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 1 f. 425.778.5536
www.cgengineering.com
Aw Residence
Sidewalk Waiver
0
6 6
6
J-oi�-'[-O' 2
T
14,114 SO. FT. x
M 0.324 ACRES 8 0
L 25-
Set
;RASS
S
1145.44, IE CM 161.0
"PLAT 0 R/ 157,6
EN' -INC 1 2 Pft 156,8
(� I I - 77,
44.3
/ 1574-
0 1 S 79-07,
-�42 (w 1
8 RIM=142.06
CB RIM=157.79
----------- r - --r-
190TH 15-L S SPH/ I I
I I \\\\ \\(\ - /,--I\ 11� \�\\\
SOWEPOMNE101' EXISTING ROADWAYZ:D_TM= 156,18 CQ RI
Figure 1: 190" Place SWAlignment
Figure 2: Power Pole alongside road.
July 17, 2019
Page 3 of 3
4M 250 4th Avenue South, Suite 200
do Edmonds, WA 98020
CEMIN&RING ph. 425.778.8500 1 f. 425.778.5536
1 www.cgengineering.com
PETERSON
CUSTOM HOMES, INC
2114 120th PI SW * Hnit B * Pviora++ MIA QQOnA Ok An
0. / dy. I / I I * Fax 420. / 89.1680
Email: pchbuilder@msn.com
7/9/2019
ESTIMATE TO INSTALL SIDEWALK ON 190THPL SW ADJACENT TO 9527 — 190"' PL
SW, EDMONDS, WA
1. Estimate, haul, dispose of approx. 100 cu ycls. of unsuitable existing fill
Refer to Geotech report 4,500
2. Import and compact structural fill -sidewalk and driveway area 5,700
3. Import fill soils for remainder of right of way approx. 240 cu yds 9,600
4. Cut and replace asphalt for 11' lane 4,400
5. Curb, gutter, driveway, and sidewalk 11,850
6. Replace or relocate 2 catch basins along 1901h pl SW 5,400
7. Relocate power pole as quoted by Nathan Hawkinson, Engineer
for the PUD. 22,000
8. Traffic Control 2,100
9. Contractors Supervision and percentage 9,800
10. S.S.T. 7,836
TOTAL
NOTE: This estimate does not include any extra work along Olympic View
Drive.
L
BUT01 q__ o I I (P
GENERAL NOTES
ALL WORK SHALL COMPLY WITH APPLICABLE CODES AND ORDINANCES
INCLUDING THE 2015 INTERNATIONAL RESIDENTIAL CODE AS WELL AS THE 2015
WASHINGTON STATE ENERGY CODE AS WELL AS THE CURRENT CITY OF
EDMONDS CODE.
STRUCTURAL DRAWINGS SHALL BE USED IN CONJUNCTION WITH DESIGN
DRAWINGS FOR BIDDING AND CONSTRUCTION. DRAWINGS INDICATE GENERAL
AND TYPICAL DETAILS OF CONSTRUCTION. WHERE CONDITIONS ARE NOT
SPECIFICALLY INDICATED BUT ARE OF A SIMILAR CHARACTER TO DETAILS
SHOWN, SIMILAR DETAILS OF CONSTRUCTION SHALL BE USED, SUBJECT TO
REVIEW AND APPROVAL BY THE ARCHITECT.
REFER TO DIMENSIONS AND NOTES FOR SIZES AND LOCATIONS; DO NOT SCALE
DRAWINGS. DIMENSIONS ARE TO FACE OF STUD OR MASONRY WALL AND
CENTERLINE OF COLUMNS, UNLESS NOTED OTHERWISE. CONTRACTOR SHALL
VERIFY ALL DIMENSIONS AND CONDITIONS FOR COMPATIBILITY BEFORE
PROCEEDING, ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF
THE ARCHITECT.
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SAFETY PRECAUTIONS AND
THE METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES REQUIRED TO
PERFORM THE WORK.
CONTRACTOR -INITIATED CHANGES SHALL BE SUBMITTED IN WRITNG TO THE
ARCHITECT FOR APPROVAL PRIOR TO FABRICATION OR CONSTRUCTION.
CHANGES SHOWN ON SHOP DRAWINGS ONLY WILL NOT SATISFY THIS
REQUIREMENT.
LIFE SAFETY
GUARDRAILS OR HANDRAILS SHALL BE PROVIDED ON ALL OPEN SIDES OF
STAIRS OR ELEVATED PLATFORMS. GUARDRAILS SHALL NOT BE LESS THAN 361,
HIGH. HANDRAILS SHALL BE BETWEEN 34" AND 38" ABOVE STAIR NOSING.
OPENINGS SHALL RESTRICT A 4" DIAMETER SPHERE FROM PASSING THROUGH.
HANDGRIPS SHALL NOT BE LESS THAN 1 1/4" NOR MORE THAN 2" IN
CROSS -SECTIONAL DIMENSION. RETURN HANDRAILS AT ENDS.
DOOR AND WINDOW NOTES
WINDOW SUPPLIER SHALL REFER TO EXTERIOR ELEVATIONS AND SCHEDULES
FOR CONFIGURATION AND OPERATION OF ALL WINDOW AND DOOR UNITS.
MAINTAIN ALIGNMENTS AND FORMATS TO MEET DESIGN INTENT; ADJUST
ROUGH OPENINGS AS NECESSARY. SUBMIT SHOP DRAWINGS FOR APPROVAL.
ALL WINDOWS AND DOORS TO BE INSTALLED PER MANUFACTURER'S
REQUIREMENTS.
WINDOWS LABELED "EGRESS" ON DRAWINGS SHALL FULFILL FOLLOWING
REQUIREMENT: 5.7 SF MIN. NET CLEAR OPEN AREA; 20" MIN. CLEAR OPEN
WIDTH; 24" MIN. CLEAR OPEN HEIGHT; 44" MAX. SILL HEIGHT.
EXTERIOR DOORS SHALL HAVE MIN. Y2" THROW ON DEAD BOLT OR DEAD LATCH
AND VISITOR OBSERVATION PORT. WINDOWS WITHIN 10'OF GRADE OR
ACCESSIBLE DECK MUST BE CAPABLE OF BEING LOCKED. ALL LOCKS,
INCLUDING DOOR LOCKS, MUST BE ABLE TO BE OPENED WITHOUT THE USE OF
A KEY OR SPECIAL KNOWLEDGE OR EFFORT.
WINDOWS WITHIN 24" OF A DOOR AND WITHIN 60" OF FLOOR, WINDOWS WITHIN
18" OF FLOOR, GLAZED DOORS, AND ALL SHOWER OR TUB ENCLOSURES SHALL
HAVE SAFETY GLAZING.
MISCELLANEOUS
INSTALL DRAFT STOPS IN FLOOR -CEILING ASSEMBLIES SO THAT CONCEALED
SPACE DOES NOT EXCEED 1000 SF. FIRE BLOCK PER IRC R903.
SOLID FUEL -BURNING APPLIANCES, INCLUDING FIREPLACES, SHALL HAVE TIGHT
FITTING METAL OR GLASS DOORS AND OUTSIDE SOURCE OF COMBUSTION AIR,
WITH AN OPERABLE DAMPER, DIRECTLY CONNECTED TO THE FIRE BOX, AND
TIGHT-FiTTING, READILY OPERABLE FLUE DAMPER OR APPROVED AUTOMATIC
CONTROL. METAL FIREPLACES AND CHIMNEYS MUST BE UL- OR ICC- APPROVED
AND MUST BE INSTALLED PER MANUFACTURIER'S REQUIREMENTS.
PROJECT INFORMATION
OWNER NAME: CHAK YOON & I WEI AW
SITE ADDRESS: 9527 190TH PL SW
EDMONDS, WA 98020
PARCEL#: 00434600007901
ZONING: RS-12
BUILDING HEIGHT: 26-0" MAX
LEGAL DISCRIPTION: Section 13 Township 27 Range 03 Quarter SE EDMONDS SEA VIEW
TIRS BILK 000 D-01 - LOT 2 CITY OF ED LLA REC UND AFN 201211210469 & SURV REC
UND AFN 201210195001 CORR BY NO 201211010497 BEING SWILY PTNLOT 79 SO PLAT
HVAC SYSTEM: GAS FURNACE
BUILDING AREA (HEATED SPACE):
FINISHED BASEMENT LEVEL: 1,244 SF
MAIN LEVEL: 2,452 SF
TOTAL: 3,696 SF
DRAWING INDEX
Al GENERAL NOTES, PROJECT DATA, DRAWING INDEX, & LEGEND
A2 SITE PLAN (INCLUDED AS INDIVIDUAL SHEET)
SURVEY (INCLUDED AS INDIVIDUAL SHEET)
CIVIL
C1.1 COVER SHEET AND GENERAL NOTES
C2.1 TEMPORARY EROSION CONTROL PLAN
C2.2 EROSION CONTROL DETAILS
C3.1 GRADING AND DRAINAGE PLAN
C3.2 GRADING AND DRAINAGE DETAILS
C4.1 WATER AND SEWER PLAN
C4.2 WATER AND SEWER DETAILS
ARCHITECTURAL
A3 BASEMENT FLOOR PLAN& WINDOW DOOR SCHEDULE
A4 MAIN LEVEL FLOOR PLAN
A5 ELEVATIONS & DETAILS
A6 ELEVATIONS & SECTIONS
STRUCTURAL
SIA GENERAL STRUCTURAL NOTES
S1.2 GENERAL STRUCTURAL NOTES
S2.1 FOUNDATION PLAN
_S2.2 MAIN FLOOR FRAMING PLAN
S2.3 ROOF FRAMING PLAN
S3.11 CONCRETE DETAILS
S3.2 CONCRETE DETAILS
S4.1 WOOD DETAILS
S4.2 WOOD DETAILS
ENERGY CODE NOTES
REQUIREMENTS OF THE 2015 WASHINGTON STATE ENERGY CODE SHALL BE
FOLLOWED.
PRESCRIPTIVE ENERGY CODE COMPLIANCE
CLIMATE ZONE 4C MARINE
GLAZING U-VALUE, VERTICAL:
MAX. ALLOWED: 0.30
PROPOSED:
0.30
GLAZING U-VALUE, OVERHEAD:
MAX. ALLOWED: 0.50
PROPOSED:
0.50
DOOR U-VALUE:
MAX. ALLOWED: 0.30
PROPOSED:
0.30
CEILING INSULATION:
REQUIRED: R-49
PROPOSED:
R-49
VAULTED CEILING INSULATION:
REQUIRED: R-38
PROPOSED:
R-38
ABOVE GRADE WALL INSULATION:
REQUIRED: R-21
PROPOSED:
R-21
INTERIOR WALL BELOW GRADE:
REQUIRED: R-21
PROPOSED:
R-21
EXTERIOR WALL BELOW GRADE:
REQUIRED: R-10
PROPOSED:
R-10
FLOOR ABOVE UNHEATED SPACE:
REQUIRED: R-30
PROPOSED:
R-38
SLAB ON GRADE.
REQUIRED: R-10
PROPOSED:
R-10
GLAZING U-VALUES ARE SHOWN ON THE
WINDOW AND DOOR SCHEDULES.
SEE SHEET A3.
ENERGY INFORMATION TABLE WSEC R406.2
MEDIUM DWELLING UNIT:
OPTIONS:
3a HIGH EFFICIENCY HVAC EQUIPMENT
GAS FURNACE WITH MINIMUM AFUE OF 94 %
=1.0 CREDITS
4 HIGH EFFICIENCY HVAC DISTRIBUTION SYSTEM
ALL WORK SUBJECT
1.0 CREDITS
TO FIELD
5c EFFICIENT WATER HEATING
INSPECTION FOR
GAS WATER HEATER WITH MIN. EF OF 0.91
CODE COMPLIANCE
=1.5 CREDITS
TOTAL CREDITS REQUIRED: 3.5
TOTAL ACHIEVED: 3.5
VVSEC R401.3 INSULATON CERTIFICATE
THE DESIGN PROFESSIONAL OR BUILDER SHALL COMPLETE AND POST A
"INSULATION CERTIFICATE FOR RESIDENTIAL CONSTRUCTION" WITHIN TOF
THE ELECTRICAL PANEL PRIOR TO FINAL INSPECTION.
VVSEC R403.11.1 PROVIDE A PROGRAMMABLE THERMOSTAT FOR THE PRIMARY
SPACE CONDITIONING SYSTEM WITHIN EACH DWELLING UNIT.
WSEC R404.1 A MINIMUM OF 75 PERCENT OF PERMANENTLY INSTALLED
LAMPS IN LIGHTING FIXTURES SHALL BE HIGH EFFICACY LAMPS.
FANS SHALL VENT DIRECTLY TO EXTERIOR OF THE BUILDING. FANS TO
OPERATE CONTINUOUS.
VAPOR RETARDERS SHALL BE INSTALLED AS SPECIFIED IN WSEC R502.1
EXTERIOR JOINTS SHALL BE SEALED, CAULKED, GASKETED, OR
VVEATHERSTRIPPED.
CUTDOOR AIR INLET/S TO BE PROVIDED BY USING EXHAUST FANS PER IRC
MI 507.3.4.4. PER WSEC M1507.3.4.4, OUTDOOR AIR SHALL BE DISTRIBUTED TO
EACH HABITABLE SPACE BY INDIVIDUAL OUTDOOR AIR INLETS. WHERE
OUTDOOR AIR SUPPLIES ARE SEPARATED FROM EXHAUST POINTS BY
DOORS, PROVISIONS SHALL BE MADE TO ENSURE AIR FLOW BY
INSTALLATION OF
DISTRIBUTION DUCTS, UNDERCUTTING DOORS, INTALLATION OF GRILLES,
TRANSOMS, OR SIMILAR MEANS. DOORS SHALL BE UNDERCUT TO A MINIMUM
OF 1/2 INCH (12.7MM) ABOVE THE SURFACE OF THE FINISH FLOOR COVERING.
PER WSEC TABLE R402.1.1 - WINDOW & DOOR HEADERS SHALL BE INSULATED
WITH A MINIMUM OF R-10 INSULATION.
APPROVED
P"LANS MUST BE
ON JOB SITE
LEGEND
7/2-
_TL__
_Po_
-FF-
___0 Ds
1--�
+ 123.4
+ F2�A
Z�l
A�1.
G
(D
STROBL
DESIGN LLC
DESCRIPTION
Residential Design
2 X 6 STUDS AT 16" ON CENTER
P.O. BOX 20764
2 X 4 STUDS AT 16" ON CENTER
Seaffle, WA 98102
Phone: (206) 661-3622
EXISTING WALL TO REMAIN
12358 REGISTERED
RE'3'STERED
FA
EXISTING WALL TO BE REMOVED
A TECT
ECT
�O
BEARING WALL
�JACOB A STIR
J 0. T ,
ACOB A STIR I3L
AT OF W S., r
�T.
E OF WASHINGTON
POST OR POINT LOAD ABOVE
BEAM OR HEADER
POST
DIRECTION OF JOIST OR TRUSS SPAN
(CANTILEVER DASHED)
EXTENT OF JOISTS OR TRUSSES
CHANGE IN LEVEL
DETAIL NUMBER/ SHEET ON WHICH DETAIL IS
SHOWN
SECTION NUMBER/ SHEET ON WHICH SECTION
IS
SHOWN
ELEVAT�ON NUMBER/ SHEET ON WHICH
Approved, A residential fire sprinkler system is
ELEVAT ON IS SHOWN
required. A recommended flow -through design
SHEAR WALL PANEL TYPE PER SHEAR WALL
will meet specifications and reduce equipment
and continuing
SCHEDULE/ SHEAR WALL NUMBER
maintenance requirements.
ECDC19.05.020B2. Provide a minimum
WINDOW NUMBER - SEE WINDOW SCHEDULE
combination water service of one inch IV')
meter and one and one half (11/2") service line,
DOOR NUMBER - SEE DOOR SCHEDULE
or show that domestic and fire protection
needs can be met with a smallerservice.
SHOWER HEAD
HOSE BIB
4" TIGHT LINE
4" PERFORATED DRAIN
4" PERFORATED FOUNDATION DRAIN
FILTER FABRIC FENCE
DOWNSPOUT
EXISTING CONTOUR
N
PROPOSED CONTOUR
EXISTING SPOT ELEVATION
PROPOSED SPOT ELEVATION
C�
Z
REVISION
SMOKE DETECTOR
T LU
CARBON MONOXIDE DETECTOR
I
CITY OF EDMOND
EXHAUSTFAN
BUILDING DEPARTMI.:
IT
0
W 'RK
THERMOSTAT
ADDRESS -
OWNER
APPROVED DATE:
ABBREVIATIONS BLDG.OFFICIAL
P
B ' O.W.
E30TTOIM OF WALL PERMIT �NL3MBE
C.B. CATCH BASIN
CIL
CENTERLINE
C.O. CLEAN OUT
CONIC.
CONCRETE
CMU
CONCRETE MASONRY UNITS
DN
DOWN
EL.
ELEVATION PPROVIED BY L
EQ.
EQUAL
E
EW
EXISTING
EACH WAY
EXTG
EXISTING
F.F.E.
FINISHED FLOOR ELEVATION
O/C
ON CENTER
P/B
PLANTING BED
Sim
SIMILAR
Date 01/21/201ci
T.O.W. TOP OF WALL
TYP.
U.N.O.
TYPICAL
UNLESS NOTED OTHERWISE
Scale
V.I.F.
W/
VERIFY IN FIELD
WITH
Drawn 01 U
Job JUN 0 5 2(
T -0
Sheet TFIVOF E PAR
PERMIT SET 01/21/2019
Al
W"_
-�EX15hNC, >rEX15TAr,10
FIR 16" HIR,
��Exl TINJ
TP
F�OPERT� 14" F
LIJE
-73.10, -- 1 11 - I " \ LI
TOP: 142 0 \ -
TOE: 141*0 TO'P: 1'0 0
EG: 141.0 TOE'-k58.o
1 1 9 )<- x 11 1 1 TOP: 156�O EG: 159.8,,
\TOP: 142.0 LLJ TOE 15'41.0
EG: 1:56.!p -WINDOWWI�I_
j 0) TOP: 156.0
T�EG: 141.0 1 uh: 150.0
E \-- - -
BUILDINC, WINDOW
36" FIR T VE
-ro BE RE�y VED E�\ A
TOP\147.0 TBACK W)NDO \14 OP-158.0
\,,TOP: 147.0 52.11 C
WELL TOE: 150.0
TOE: TOEQ145 0 EX\171N \FJR- -
TOP:141.75 1 .50 -Tcz. 1:S .0 TO T > BE
TOE: 140.0 N WINDOWWE�l
A TOE: 1
1,4 TOP: 164.0
'I CAL 51.
t-RONT YARD 5'jH -IME-159.7�,
SETBACK IQLINIS, ; F
FIR I'X TRE154TO E
ROOF A FOOTING IS 2
EX15TI D4 N IS PARATE�
40" F SEE�ETAJQ
C3.
To (N 44" FIR T EE
REMO TO E REMO 5� T CAL.C.
(E)6A5 TOP: 14175 0
LINE TOE: 139.5� SD�O E:
BUIL No -
'K
-4 -1 \ QD
W�_ W" OL
7w� w
PROPOEeD PROPOSL
LATER LINE
SEE CIVIL 61RADIN&
SEE 6111L
TOP: 141. 5
OE: 139.50
44'xS'X3' INFILTRATION TRENCL BUILE (5-
(2) TOP: OF TRENCH: 142 SET K
1. Ay K/4
B IMPILfkl - -
SEE ARCH PLANS
T P: 147.6 -t'
TOP: 141.50 T 0 FOR BASEMENT
AE: 144.5
WAL LOCATIONS
TOE: 140 0 AND HEIGHTS
EG: 138.75 /(�A
ORCH
PROPERTY TOP 45.0 FP\,OPEPT*T'
LINE TOE: 14 LINE\
EG: 1
TYPE I CATCH BASIN (SOLID LID
RIM: 143.0 P POSED I/ EXISTIN6'1-
_E - TR3F ED
IE Iff 6" N ): i4l.50 D INA& 4' R
IE OUT (6" NW): 141.0 EE Gi�k PONr=
H
(6� SW 1;� TNRO INb LINE
OVERFLOW): 141.40
T C C\..
k
"ON
TO
TOP: 145.0
TOE: 141.5
EG: 141.5 TOE: 144..50
EG: 145: TOP: 150. 157.96
IN 5'tv:i.
TIE FOOTING DRAIN TOE: I
INTO OVERFLOW PIPE
... ... ... ...
EG: 15 0 TOP: 155.50 157.96
To _77-pz -�1,45 TOE: 154.0
PROPOSED 51 141611 PROPERTY
P: Y49.0
EG: 155.0 EXISTA&
RETAININ& KNLjZ5EE LINE
TOE�148.0 . ..........
Gj>AL, TYP EG: 149.0
TFZE� 0
T :152.50
.: ... . .. .. ......
_f! 152.0 N E �TIN XI�Tltq\rl
EG. 154.50
PE
-7-
..............
0 OINIS'
P: 155 75 .. .. ... ... . IEXh�T
.. ... .. ..
E: 155.25 ro' DEG
VSAWCUTIN
�00
EG: 156.0 -
ASPHALT. WIDEN
WESTBOUND TRAVEL
LANE TO 11'MIN_� 158.70 x
WIDTH
PROPOSED ASPHALT
3 DRIVEWAY
15870
BS 5.12
0811 F
�EX15TIN& MNERMONTFIACTOR IS RES
tHOSIONAONTROLAHO INAGE
BSW 147.81 161,
SW 15159 BSW/155 53 157.92 158. 8 4 /ExI 5TIN& DEC
DE(V E
Tn as-
47 TOC 151.51 TqC\155. 5 T C 157.5 ME4T - TRF DAM PT.-I-121A'
VIMFY V4/PE
ON
MANHOLE COVER\
TOP PF 55
FOR �ElrHT CALGNLATION
(HT. 6ALr-)
144.54� 157.34
147.23 S
S ENGINEERING DNIW
. . . . . . . . . . . . . . . . . . . i151.01 lS4.9%-/ S I
S S /��1.5�7.t66 1%0.57 S AP G
/TYPE I CATCH B IN P, _ _ D Y ALITI 1-:5 BY OTHERS NO
RIM: 1 8 0+ R PLACE EXIST C13 16L30 (BRIN OFFOFEXISTING ZAp �OAS NDft
0 C U4
/1E OUT [8" S): 1 6'. LDW/SOLIDNON- UTI POLE)
�LIP LID. ADJUST RIM , I
(D!51TE PLAN NORTH PROJECT INFORMATION ZONING CALCULATIONS HEIGHT CALCULATIONS
OWNER NAME: CHAK YOON & I WEI AW LOT AREA: 13,939 SIF A=+162.6
SITE ADDRESS: 9527 190TH PL SIN B = +160.0'
51TE PLAN NOTES (T EDMONDS, WA 98020 LOT COVERAGE: 26.2% PROPOSED (3,653 SF/ 13,939 SIF) C = +142.5' Setback Required At I
1.) PER Ewc, 15.40.020W(5) ROGKERIE5 ARE PROHIBITED IN PARCIELM 00434600007901 35% ALLOWABLE (4,879 SF) D = +147.5 Front
a npz
DEVONATED 6EOL061GALLY HAZARDOUS AREAS OTHER THAN ZONING: RS-12 Sides =11 tc�
BUILDING HEIGHT: 25'-0" MAX IMPERVIOUS AREA CALCULATIONS AVERAGE GRADE = 153.125'
ER05ION HAZARD AREAS AS DEFINED IN CHAPTER 23.0& ECDC. LEGAL DISCRIPTION: Section 13 Township 27 Range 03 Quarter SE TOTAL: 4,987 SF (SEE CIVIL) PROPOSED BUILDING HEIGHT 172.0'
EDMONDS SEA VIEW TRS ELK 000 D-01 - LOT 2 CITY OF ED LLA REC MAXIMUM 78.125' Other
UND AFN 201211210469 & SURV REC UND AFN 201210195001 CORR BY
NO 201211010497 BEING SWLY PTNLOT 79 SO PLAT SLOPE
LOT SLOPE = VARIES SEE CIVIL SHEET C3 PERMIT SET 01/21/2019
STROBL
DESIGN LLC
Residential Design
P.O. BOX 20764
Seattle, WA 98102
Phonw. (206) 661-3622
RE'31STERED
A _ECT
12358FRrGISTERED
A ECT
1ACOB A STROBL
T OF W"S.'..T.'
�s A E OF �WASHINGTON
I`i��
LU
0
z
LU
,S)
LU QL
vy LU
REVISIONS BY
5/3 �)/20 1 q _6
5/2(9/20lq J5
(C
(Dry
REsuB
SEP 19 2019
BUILD NG D
C14OF EpAORTMI
EE)M No
Date 01/21/201cl
Scale
Drawn 1/5" = P-O"
Job
Sheet
A2
NINDON SCHEDULE
NIDTH X HEIOHT
5'-0" X 5'-0", 5LIDIN& HINDOPq, TEMP., EGRE55,030 U-VALUE
5'-0" X 5'-0", 5LIDIN6 PqINDOV4, TEMP., ErRE55,030 U-VALUE
5--o" X 5'-0", PICTURE V411'-O" UNDER5LIDINC, PqINDOPq, 0.50 U-VALUE
5'-0" X 5'-0", PIGTURE N/I'-O" UNDER5LIDIN6 NINDOI/q, 0.30 U-VALUE
5'-0" X 5--0", PICTURE kq/l'-O" UNDERSILIDIN6 PqINDOkq, 0.30 U-VALUE
5'-0" X 5'-0", PICTURE I^V['-O" UNDER5LIDIN& NINDON, 0.50 U-VALUE
5'-0" X 2'-0", PICTURE NINDON, 0.30 U-VALUE
2-6' X 4'-0", 51LIDIN6 NINDON, 0.30 U-VALUE
cl Co'-4" X 3--ro", XOX51-011,16 NINDOIN, 0.30 U-VALUE
1 2'-(g" X 5LIVIN6 HINVOIN, TEMP., 0.50 U-VALUE, OE35GUFRE RAIN &LA!55�
2
X XO N L' I IN OIN
0 '0'
P*'O
5 0
U-v
U
5
D
N TEN 30 A
5 _V
L
A
UE
LUE' 055GUP
11 5'-0" X 5--b", 5LIDIN& NINDON, &RE55,030 U-VALUE
D AL
RE
12 5.70.'X 5--(q--,5LIDINr, V41NDOPq, (5RE55, 0.50 U-VALUE
N N VAL
15 2' 0" X 5'-0", X CASEMENT V41N OV4, 0.30 U-VALUE, OBSCURE RAIN CLASS
EM N , SC �
13 5'-0" X 5'-0", PICTURE NINDON TEMP., 0.50 U-VALUE, OBSCURE RAIN (5LA55
TURE TE
�55 U-VALUE
14 5'-0" X 5-6", 5LIDIN& NPqINDON, ORE55, 0.30 U VALUE
2
0
Lu
5'-0" X PICTURE Wl'-O" UNDERSLIDIN& HINDOV4, 0.30 U-VALUE
NOT L15ED
5'-0" X 5--b", PICTURE I^Vl'-O" UNDERSLIDIN6, NINDOK 030 U-VALUE
5'-0" X 5'-( 5", PICTURE N/1 --0" UNDERSLIDIN6 HINDOV4,0.30 U-VALUE
7'--7" X 5'-( b", PICTURE 1^1/1 --0" UNDERSILiniNS mlmDoN, o.3o u-VALUE
T--V X W-6", PICTURE VVI'-O" UNDERSLIDIN& HINDOP4, 0.30 U-VALUE
2'-0" X 4'-0" OPERABLE SKYLIrzHT, TEMP., 0.45 U-VALUE, VELUX
2'-0" X 4'-0" OPERA13LE SKYL16HT, TEMP., 0.45 U-VALUE, VELUX
2'-0" X 4'-0" OPERABLE 5KYLI6HT, TEMP., 0.45 U-VALUE, VELUX
(82-0" X 5'-0", X CASEMENT NINDOI/q, TEMP., 0.50 U-VALUE
V41NDOPq NOTES:
1) NEV4 V41NDON5 TO BE INSULATED LOPq E, AR60N OAS FILLED,
MINIMUM U-VALUE OF 0-30, 4 NFRC CERTIFIED, TYP.
2) CONTRACTOR TO VERIFY ALL ROU6H OPENINO
DIMENSIONS "ANUFACTUREIR PRIOR TO FRAMIN6.
(Df3ASEMENT FLOOR PLAN 1/4" = I.-Ol. NORTH
FIN15HED 1,244 5F
STORAGE -15(9 5F
GP,AI^L5PAGr= = 455 5F
POOR 5rHEOULE
HIDTH X HEI6HT
E 1 (2) ro'-O" X 5'-0' SLIVINO DOORS, 6LAZED, TEMP., 0.50 U-\/ALvE
31-01, X V-011 511 E LITE, TEMP., 030 U-VALUE
2 3'-0" X b'-O" E 1145KNC, DOOR, TEMP., UNHEATED SPACE
3 (2) 3'-0" X &'-0" 1145V41146 DOOR, 6LAZED, TEMP., 0.30 U-VALUE
(2) 2'-2" X 5'-0" SIDE LITE, TEMP., 0.30 U-VALUE
4 (4) 3'-0" X &'-0 IN5P41146 DOOR, 6LAZED, TEMP., 0.30 U-VALUE
3'-0" X 8'-0" 51 E LITE, TEMP., 0.30 U-VALUE
f
5 5-0" X &-0" E . INSHIN6 DOOR, 6LAZED, TEMP., 0.30 U-VALUE
(2) 1'-8" X &'-0"
I IDE LITE, TEMP., 0.30 U-VALUE
lb'-O" X &'-0" EXT. 6LAZED 6ARAOE DOOR, TEMP., UNHEATED SPACE
DOOR NOTES
1) NEV4 DOORS TO BE INSULATED LON E, AR&ON OAS FILLED,
MINIMUM U-vALUE OF 0.50, $ NFRG CERTIFIED, TYP.
2) CONTRACTOR TO VERIFY ALL ROU6H OPENIN&
DIMENSIONS K"ANUFACTURER PRIOR TO FRAMIN6.
PLAN NOTE
Id ALL DIMENSIONS TO FACE OF FRAMINr
2) Or- TO VERIFY LOCATION OF EXISTINO
FRAMIN6 AND HEAVERS.
3) HHOLIE-HOU51E EXHAUST FAN IN THE MAIN FLOOR
LAUNDRY ROOM 15 A CONTINUOU5LY-OPERATIN6
EXHAUST FAN PER IRG TABLE M150-1.5.5(1).
HALL TYPES
NEIN 2X6 HOOD STUD a 16" O.C. KALLS V41TH 1/211
&YP5UM VOLLBOARD ON INTERIOR 51DE (1/21,
6PEENBOARD IN NET AREA5), LEVEL FIVE FINISH,
PAINT COLOR PER ONNER, INSULATION PER COVER
SHEET At
NEIq 2X4 PqOOD STUD a 16" O.G. K6,LLS NITH 1/2" 6YP5UM
NALLSOARD ON EACH SIDE (1/2" 6REENBOARD IN NET
AREAS), LEVEL FIVE FINISH, PAINT COLOR PER ONNER,
INSULATION PER COVER SHEET At
Oe, SMOKE DETECTOR (HARD-viiREE> W i3ATTERY E3AcKup)
CARBON MONOXIDE DETECTOR
EXHAUST FAN
GRAKIL SPACE VENTILATION:
455 5F 150 5F = 3.03 SF
5.03 SF O-&q 5F PER VENT = 5.4 VENTS (4 PROVIDED)
PERMIT SET 01/21/2019
STROBL
DESIGN LLC
Residential Design
P.O. BOX 20764
Seattle, WA 98102
Phone: (206) 661-3622
REGSTERED
eA ;'TECT
AC B A STROB
ITECT
12358 FIEGISTERED
FA
JAC
T OF W.. I .T,
ATE OF WASHINGTON
LU
11)
z
Lu
ks)
Lu
< CE
u- Lu
I REVISIONS I BY I
Date 01/21/20[cl
Scale
Drawn 1/4" = 1'-0"
Job M �--- 2
Sheet JUN 0 5
A3BUILDING DEI
..OF.5.
0
TEMP
TEMP
TEMP
K�/
TEMP.
DECK
TEMP
TEMP.
................
MASTER QFOROQ
TV 01 R
MANUFACTUI D
rvA5 FIREPLACE
T-11— Ov
> ---------------
Ily
itidgOom
36' 1-116H
OUARDRAIL,_/ v- — — — — — — — — — — — — — — — — — — — — T — — — — — — — -
0 11
3b..
HIr5H jj'
61JARDRAIL,
TIrp.
MAIN FLOOR PLAN
MAIN FLOOR = 2,452 5F
6ARA&E = 6-7cl 5F
ROOF VENTILATION CALCULATION:
PROVIDED BY 2" GONTINUOU5 METAL VENT 4
CONTINUOUS RDOE VENT TYPICAL
R506.2 MINIMUM VENT AREA. THE MINIMUM NET FREE
VENTILATION AREA 5HALL BE 1/150 OF THE AREA
OF THE VENTED 5PACE.
ATTIC AREA = 3,151 5F (245 LINIAL FEET)
TOTAL ATTIC AREA = 3,151 5F/150 = 20.8-7 5F REQUIRED
TOTAL VENT AREA PROVIDED
= (245 LINIAL FEET X 29/12 = 40.55 5F PROVIDED
(96-v
4
m
(IAZH 1,
IMIL, 56" PEF — -I
Typ. T-
24'L
DININ& KITCHEN
L
I L - I --J I
100 GFM
FAN MIN.
56" RANrE 2110
16- 14" .1,
17--T---T
Dm
- - - - - - - - - -
P,
1>
2
NORTH
PLAN NOTE
1) ALL DIMEN51ONS TO FACE OF FPAMiNr,.
2.) 6r- To VERIFY LOCATION OF EXISTIN&
FRAMIN6 AND HEADER5.
5) NHOLE-HOU5E EXHAU5T FAN IN THE MAIN FLOOR
LAUNDRY ROOM 15 A GONTINUOU51-Y-OPERATIN&
EXHAU5T FAN PER IRC TABLE M150-133(l).
NALL TYPES
NFPq 2X(o NOOD STUD a 16" O.C. HALLS PqITH 1/2"
rvYPSUM NALLBOARD ON INTERIOR 51DE (V2*
6REENBOARD IN NET AREAS), LEVEL FIVE FINISH,
PAINT COLOR PER OINNER, INSULATION PER COVER
SHEET Al
Z== NEN 2X4 HOOD STUD a 16" O.C. HALLS V41TH 1/2" rYFSUM
HALLE30ARD ON EACH 51DE (1/21, cREENBOARD IN NET
ARE -AS), LEVEL FIVE FINISH, PAINT COLOR PER ONNER,
INSULATION PER COVER SHEET Al
i$e,, SMOKE DETEcToR (HARD-nRED kv BATTERY BACKUP)
CARBON MONOXIDE DETECTOR
EXHAUST FAN
U3 12 1
LAUND v
pq I
110
GFM
cl.-1111
Lu
IN
r
- — — — — — — — — — — —
Je-'—�20 MIN. FIRE DOOR
PV5ELF-CLOSIN&
DEVICE
ATT-I'C,, 66RAr
5E
20
\G
Z— 5/a.. TrPE w 55,�b
I L--J I �iALL5 4 GL
/07
TEMP
F— — — / — — — — — — — — — — — — — — ---
2
PERMIT SET 01/21/2019
STROBL
DESIGN LLC
Residential Design
P.O. BOX 20764
Seatte,WARID2
Phone: (206) 661-3622
12358 � 5REGI�STERED
MIT T
C TECT
JACOB A STROB
r
OF WA,
,.,..T,
�TATE OF WASHINGTON
lt!HE�d
Lu
0
z
Lu
IS)
!T: z
T Lu
I REVISIONS I BY I
Date 01/2i/20iq
Scale
Drawnl/4" = 1'-0"
Job
Sheet
A4
(D NORTH ELEVATION 1/4" = 11-o"
— — — — — — — — — — — — — — — — — — — — — — — — — — — — — — - - - - - - - - ---
g EAST ELEVATION 1/4" = 1.-0"
0004N5PCUT. TYR
2"DIA * GONT. I/qOOD HANDf;_ZAlL_
1-1/2"
C_LR. FROM kNqALL
<
z
5/4" PL <
RISER, iyyNpD_
1-1/4" PLYND.
TREAD,
C;
TREAD (REFER
T FLRPLAN)
z
L_2X4 THRUST E3LOGK
STAIR DETAIL
(2)-2X HEADER N/LED&ER OR JOIST
H6R5. FOP, GARRIA6E SUPPORT
',_5/&"TYFE'X'6YP.E3D. a AREAS
ACCE551BLE UNDER STAIRS
_2x FIREBLOCKINO o MIDPT. OF EA. STAIR RUN
6 ALON& 5TRIN&ER o KALL BETH. EAr-H STUD
(3)-2XI2 STRINGERS -EA. SIDE 4 G.L.
PERMIT SET 01121/2019
STROBL
DESIGN LLC
Residential Design
P.O. BOX 20764
Seatile, WA 98102
Phone: (206) 66W022
REGISTERED
CT
12358 REGISTERED
F�A ECT
11 U �!COB �AST OBL
Tr
OF WAS.,.,
'Tr"
S E OF WASHINGTON
E!HF�l
W
kl)
z
(Z
uj D-
<T Lu
I REVISIONS 113Y
1(5/_30'/2'0Ic'I LS)
Date 01/21/201cl
Scale
Drawn 1/4" � 1'-0"
Job R
Sheet
A5,3u6,pipwj,uNoNG;:DoEr�5pr,il� Zva
DOHNSPOUT, TYP.
(DSOUTH ELEVATION
t
OLA55
C-UARDRAIL
nil
m
1; F011, ni - I
Lmrdr*,.N
ID]
1/4" = 1.-0..
------------ ---------------
LES
/, / 11
]I\
/Tp
\
Wimell
NEST ELEVATION 1/4" = P-0"
I �// �� �//
Ad
BUILDIN6 SECTION
KEYNOTE5
G SO CON'-I'Q JGTION
COMPOSITE ROOF[Nr,
50# BUILDIN& PAPER
5/5" WX PLYHOOD (NAIL PER 5H 5CHEDULE)
FRAM:Nr, PER PLAN
R-41 INSULATION @ FLAT GEILINC-5
R-55 INSULATION a VAULTED CEILIN(55
GL05ED GELL INSULATION (NOT VENTED)
CON5TRUCITIO
Pili��%-L�ELEVATIONS,
�5# BUILDIN& PAPER
/2" CDX PLyyqOOV (MAIL PER 5H SCHEDULE)
2X6 STUDS a 1611 O.C.
R-21 INSULATION. R-10 AT HEADERS.
CONSTRUCTI
0 ING
5/4" PLYHOOD -rLVE 4 5GREN
JOISTS PER FRAMIN(9 PLAN
R-30 INSULATION OVER UNHEATED SPACE
'ETE SLAB (HEATED SPACE)
S F"'m ��Rmr,
�IL. VAF�QREIARR�IEP
b" CRUSHED ROCK
JYPICAL C-eONCEFTE SLAB (UNHEATED SPACE)
— — — — — — — — — — — — —
1/4" = 1.-0..
PERMIT SET 0112112019
STROBL
DESIGN LLC
Residential Design
P.O. BOX 20764
8 affle WA98102
P:one:'(206) 661-3622
REGISTERED
lgff�
Lu
0
z
Lu
IZ
Lu
Itz
ul)
u- LU
I REVISIONS I BY I
Date 01/21/20lq
Scale
Drawnl/4" = 1'-0"
Job
Sheet
JUN 0 5 20119
A6SU,1-IN0G,D:P
I_ ffij,,�
CRITERIA
1. ALL MATERIALS, WORKMANSHIP, DESIGN, AND CONSTRUCTION SHALL CONFORM TO THE
DRAWINGS, SPECIFICATIONS, AND THE INTERNATIONAL BUILDING CODE (2015 EDITION).
2. DESIGN LOADING CRITERIA:
GARAGES
FLOOR LIVE LOAD (PASSENGER VEHICLES) . . . . . . . . . . . . . . 40 PSF
FLOOR CONCENTRATED LOAD (PASSENGER VEHICLES) . . . . . . . . . 3000 LEIS
RESIDENTIAL - ONE AND TWO-FAMILY DWELLINGS
FLOOR LIVE LOAD . . . . . . . . . . . . . . . . . . . . . . . . 40 PSF
MISCELLANEOUS LOADS
DECKS . . . . . . . . . . . . . . . . . . . . . . . . 1.5 x AREA SERVED
DEFLECTION CRITERIA
LIVE LOAD DEFLECTION . . . . . . . . . . . . . . . . . . . . . L/360
TOTAL LOAD DEFLECTION . . . . . . . . . . . . . . . . . . . . . L/240
ENVIRONMENTAL LOADS
SNOW . . . . . . . . . . . Ce=1.0, ls=1.0, Ct=1.1, Pg=20 PSF, Pf=25 PSF
WIND . . . . . . . GCpi=0.18, 110 MPH, RISK CATEGORY 11, EXPOSURE -8-
EARTHQUAKE . ANALYSIS PROCEDURE: EQUIVALENT LATERAL FORCE PROCEDURE
LATERAL SYSTEM: LIGHT FRAMED SHEAR WALLS
3. STRUCTURAL DRAWINGS SHALL BE USED IN CONJUNCTION WITH ARCHITECTURAL DRAWINGS
FOR BIDDING AND CONSTRUCTION. ARCHITECTURAL DRAWINGS ARE THE PRIME CONTRACT
DRAWINGS. ANY DISCREPANCIES FOUND AMONG THE DRAWINGS, THE SPECIFICATION,
THESE GENERAL NOTES AND THE SITE CONDITIONS SHALL BE REPORTED TO THE
ARCHITECT, WHO SHALL CORRECT SUCH DISCREPANCY IN WRITING. ANY WORK DONE BY
THE GENERAL CONTRACTOR AFTER DISCOVERY OF SUCH DISCREPANCY SHALL BE DONE AT
THE GENERAL CONTRACTOR's RISK.
4. PRIMARY STRUCTURAL ELEMENTS NOT DIMENSIONED ON THE STRUCTURAL PLANS AND
DETAILS SHALL BE LOCATED BY THE ARCHITECTURAL PLANS AND DETAILS. VERTICAL
DIMENSION CONTROL IS DEFINED BY THE ARCHITECTURAL WALL SECTIONS, BUILDING
SECTION, AND PLANS. DETAILING AND SHOP DRAWING PRODUCTION FOR STRUCTURAL
ELEMENTS WILL REQUIRE DIMENSIONAL INFORMATION CONTAINED IN BOTH ARCHITECTURAL
AND STRUCTURAL DRAWINGS.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SAFETY PRECAUTIONS AND THE METHODS,
TECHNIQUES, SEQUENCES OR PROCEDURES REQUIRED TO PERFORM THE CONTRACTORS WORK.
THE STRUCTURAL ENGINEER HAS NO OVERALL SUPERVISORY AUTHORITY OR ACTUAL AND/OR
DIRECT RESPONSIBILITY FOR THE SPECIFIC WORKING CONDITIONS AT THE SITE AND/OR
FOR ANY HAZARDS RESULTING FROM THE ACTIONS OF ANY TRADE CONTRACTOR. THE
STRUCTURAL ENGINEER HAS NO DUTY TO INSPECT, SUPERVISE, NOTE, CORRECT, OR
REPORT ANY HEALTH OR SAFETY DEFICIENCIES TO THE OWNER, CONTRACTORS, OR OTHER
ENTITIES OR PERSONS AT THE PROJECT SITE.
6. CONTRACTOR SHALL PROVIDE TEMPORARY BRACING FOR THE STRUCTURE AND STRUCTURAL
COMPONENTS UNTIL ALL FINAL CONNECTIONS HAVE BEEN COMPLETED IN ACCORDANCE WITH
THE PLANS. CONFORM TO ASCE 37-14 "DESIGN LOADS ON STRUCTURES DURING
CONSTRUCTION".
7. CONTRACTOR -INITIATED CHANGES SHALL BE SUBMITTED IN WRITING TO THE ARCHITECT
AND STRUCTURAL ENGINEER FOR APPROVAL PRIOR TO FABRICATION OR CONSTRUCTION.
CHANGES SHOWN ON SHOP DRAWINGS ONLY WILL NOT SATISFY THIS REQUIREMENT.
8. DRAWINGS INDICATE GENERAL AND TYPICAL DETAILS OF CONSTRUCTION. WHERE
CONDITIONS ARE NOT SPECIFICALLY INDICATED BUT ARE OF SIMILAR CHARACTER TO
DETAILS SHOWN, SIMILAR DETAILS OF CONSTRUCTION SHALL BE USED, SUBJECT TO
REVIEW AND APPROVAL BY THE ARCHITECT AND THE STRUCTURAL ENGINEER. ALL
TYPICAL NOTES AND DETAILS SHOWN ON DRAWINGS SHALL APPLY, UNLESS NOTED
OTHERWISE. TYPICAL DETAILS MAY NOT NECESSARILY BE INDICATED ON THE PLANS BUT
SHALL STILL APPLY AS SHOWN OR DESCRIBED IN THE DETAILS. WHERE TYPICAL
DETAILS ARE NOTED ON THE PLANS, THE SPECIFIED TYPICAL DETAIL SHALL BE USED.
WHERE NO TYPICAL DETAIL IS NOTED, IT SHALL BE THE CONTRACTOR's RESPONSIBILITY
TO CHOOSE THE APPROPRIATE TYPICAL DETAIL FROM THOSE PROVIDED OR REQUEST
ADDITIONAL INFORMATION. THE CONTRACTOR SHALL SUBMIT ALL PROPOSED ALTERNATE
TYPICAL DETAILS TO THOSE PROVIDED WITH RELATED CALCULATIONS TO THE ENGINEER
FOR APPROVAL PRIOR TO SHOP DRAWING PRODUCTION AND FIELD USE.
9. SHOP DRAWINGS FOR THE FOLLOWING ITEMS SHALL BE SUBMITTED TO THE ARCHITECT AND
STRUCTURAL ENGINEER FOR REVIEW PRIOR TO FABRICATION OF THESE ITEMS.
CONNECTOR PLATE WOOD ROOF TRUSSES
GLUED LAMINATED MEMBERS
MANUFACTURED LUMBER (PSL'S, LSL'S, LVL'S)
PLYWOOD WEB JOISTS
APPROVED SETS OF ALL SHOP DRAWINGS SHALL ALSO BE SUBMITTED TO THE BUILDING
DEPARTMENT.
10. SHOP DRAWING REVIEW., DIMENSIONS AND QUANTITIES ARE NOT REVIEWED BY THE
ENGINEER OF RECORD, THEREFORE MUST BE VERIFIED BY THE CONTRACTOR. CONTRACTOR
SHALL REVIEW AND STAMP DRAWINGS PRIOR TO REVIEW BY ENGINEER OF RECORD.
CONTRACTOR SHALL REVIEW DRAWINGS FOR CONFORMANCE WITH THE MEANS, METHODS,
TECHNIQUES, SEQUENCES AND OPERATIONS OF CONSTRUCTION, AND ALL SAFETY
PRECAUTIONS AND PROGRAMS INCIDENTAL THERETO. SUBMITTALS SHALL INCLUDE A
REPRODUCIBLE AND ONE COPY; REPRODUCIBLE WILL BE MARKED AND RETURNED WITHIN
TWO WEEKS OF RECEIPT WITH A NOTATION INDICATING THAT THE SUBMITTAL HAS BEEN
FOUND TO BE IN GENERAL CONFORMANCE WITH THE DESIGN OF THE BUILDING. THE
SUBMITTED ITEMS SHALL NOT BE INSTALLED UNTIL THEY HAVE BEEN APPROVED BY THE
BUILDING OFFICIAL.
SHOP DRAWING SUBMITTALS PROCESSED BY THE ENGINEER ARE NOT CHANGE ORDERS. THE
PURPOSE OF SHOP ORAIHNG SU6AffTTALS BY THE CONTRACTOR fS TO DEMONSTRATE TO THE
ENGINEER THAT THE CONTRACTOR UNDERSTANDS THE DESIGN CONCEPT, BY INDICATING
WHICH MATERIAL IS INTENDED TO BE FURNISHED AND INSTALLED AND BY DETAILING THE
INTENDED FABRICATION AND INSTALLATION METHODS. IF DEVIATIONS, DISCREPANCIES,
OR CONFLICTS BETWEEN SHOP DRAWING SUBMITTALS AND THE CONTRACT DOCUMENTS ARE
DISCOVERED EITHER PRIOR TO OR AFTER SHOP DRAWING SUBMITTALS ARE PROCESSED BY
THE ENGINEER, THE DESIGN DRAWINGS AND SPECIFICATIONS SHALL CONTROL AND SHALL
BE FOLLOWED.
THE FOLLOWING APPLY UNLESS SHOWN OTHERWISE ON THE DRAWINGS
11. SHOP DRAWINGS OF DESIGN BUILD COMPONENTS INCLUDING CANOPIES, BALCONIES, COLD
FORM STEEL FRAMING, TEMPORARY SHORING, CURTAIN WALL SYSTEMS, SKYLIGHT FRAMES,
PREFABRICATED STAIR SYSTEMS, EXTERIOR CLADDING, AND PRE-ENGINEERED SYSTEM
SHALL BE STAMPED AND SIGNED BY A STRUCTURAL ENGINEER LICENSED IN THE STATE OF
WASHINGTON. SHOP DRAWINGS SHALL BE APPROVED BY THE COMPONENT DESIGNER PRIOR
TO REVIEW OF THE ARCHITECT OR ENGINEER OF RECORD FOR GENERAL CONFORMANCE WITH
THE DESIGN OF THE BUILDING. THE COMPONENT DESIGNER IS RESPONSIBLE FOR CODE
CONFORMANCE AND ALL NECESSARY CONNECTIONS NOT SPECIFICALLY CALLED OUT ON
ARCHITECTURAL OR STRUCTURAL DRAWINGS. SHOP DRAWINGS SHALL INDICATE MAGNITUDE
AND DIRECTION OF ALL LOADS IMPOSED ON BASIC STRUCTURE. DESIGN CALCULATIONS
SHALL BE SUBMITTED WITH THE SHOP DRAWINGS.
12. DEFERRED SUBMITTALS: SHOP DRAWINGS AND CALCULATIONS OF DEFERRED SUBMITTAL
COMPONENTS SHALL BE STAMPED AND SIGNED BY A STRUCTURAL ENGINEER LICENSED IN
THE STATE OF WASHINGTON AND SHALL BE APPROVED BY THE COMPONENT DESIGNER PRIOR
TO REVIEW BY THE ARCHITECT OR ENGINEER OF RECORD FOR GENERAL CONFORMANCE.
ALL NECESSARY CONNECTIONS NOT SPECIFICALLY CALLED OUT ON THE ARCHITECTURAL OR
STRUCTURAL DRAWINGS SHALL BE INCLUDED. SHOP DRAWINGS SHALL INCLUDE THE
MAGNITUDE AND DIRECTION OF ALL LOADS IMPOSED ON THE BASIC STRUCTURE. DESIGN
CALCULATIONS SHALL ACCOMPANY ALL DEFERRED SUBMITTALS. THE ARCHITECT OR
CONTRACTOR SHALL FORWARD DEFERRED SUBMITTALS TO THE BUILDING OFFICIAL WHERE
REQUIRED.
DEFERRED SUBMITTAL BUILDING COMPONENTS FOR THIS PROJECT SHALL INCLUDE:
PREFABRICATED CONNECTOR PLATE WOOD ROOF TRUSSES
GEOTECHNICAL
13. FOUNDATION NOTES: ALLOWABLE SOIL PRESSURE AND LATERAL EARTH PRESSURE ARE
ASSUMED AND THEREFORE MUST BE VERIFIED BY A QUALIFIED SOILS ENGINEER OR
APPROVED BY THE BUILDING OFFICIAL. IF SOILS ARE FOUND TO BE OTHER THAN
ASSUMED, NOTIFY THE STRUCTURAL ENGINEER FOR POSSIBLE FOUNDATION REDESIGN.
FOOTINGS SHALL BEAR ON FIRM, UNDISTURBED EARTH AT LEAST 18" BELOW ADJACENT
FINISHED GRADE. UNLESS OTHERWISE NOTED, FOOTINGS SHALL BE CENTERED BELOW
COLUMNS OR WALLS ABOVE.
BACKFILL BEHIND ALL RETAINING WALLS WITH FREE DRAINING, GRANULAR FILL AND
PROVIDE FOR SUBSURFACE DRAINAGE.
ALLOWABLE SOIL PRESSURE . . . . . . . . . . . . . . . . . . . . . . 1500 PSF
LATERAL EARTH PRESSURE (RESTRAINEDMNRESTRAINED) . . . . . . . 55 PCF/35 PCF
ALLOWABLE PASSIVE EARTH PRESSURE (FS OF 1.5 INCLUDED) . . . . . . . 300 PCF
COEFFICIENT OF FRICTION (FS OF 1.5 INCLUDED) . . . . . . . . . . . . . . 0.3
SEISMIC SURCHARGE PRESSURE (UNIFORM LOAD) . . . . . . . . . . . . .. 7H PSF
CONCRETE
14. CONCRETE SHALL BE MIXED, PROPORTIONED, CONVEYED AND PLACED IN ACCORDANCE WITH
ACT 301, INCLUDING TESTING PROCEDURES. CONCRETE SHALL ATTAIN A 28-DAY
STRENGTH OF Vc = 3,000 PSI AND MIX SHALL CONTAIN NOT LESS THAN 5-1/2 SACKS
OF CEMENT PER CUBIC YARD AND SHALL BE PROPORTIONED TO PRODUCE A SLUMP OF 5"
OR LESS. REQUIRED CONCRETE STRENGTH IS BASED ON THE DURABILITY REQUIREMENTS
OF SECTION 1904 OF THE IBC. DESIGN STRENGTH IS Vc = 2,500 PSI.
15. ALL CONCRETE WITH SURFACES EXPOSED TO WEATHER OR STANDING WATER SHALL BE
AIR -ENTRAINED WITH AN AIR -ENTRAINING AGENT CONFORMING TO ASTM C260, C494, AND
C618. TOTAL AIR CONTENT FOR FROST -RESISTANT CONCRETE SHALL BE IN ACCORDANCE
WITH AN 318-14, TABLE 19.3.2.1 MODERATE EXPOSURE, FI.
16. REINFORCING STEEL SHALL CONFORM TO ASTM A615 (INCLUDING SUPPLEMENT SI), GRADE
60, FY = 60,000 PSI. WELDED WIRE FABRIC SHALL CONFORM TO ASTM A-185.
17. DETAILING OF REINFORCING STEEL (INCLUDING HOOKS AND BENDS) SHALL BE IN
ACCORDANCE WITH ACI 315-99 AND 318-14. LAP ALL CONTINUOUS REINFORCEMENT #5
AND SMALLER 40 BAR DIAMETERS OR 2'-0' MINIMUM. PROVIDE CORNER BARS AT ALL
WALL AND FOOTING INTERSECTIONS. LAP CORNER BARS 15 AND SMALLER 40 BAR
DIAMETERS OR 2'-0" MINIMUM. LAPS OF LARGER BARS SHALL BE MADE IN ACCORDANCE
WITH ACI 318-14, CLASS B. LAP ADJACENT MATS OF WELDED WIRE FABRIC A MINIMUM
OF 8" AT SIDES AND ENDS.
NO BARS PARTIALLY EMBEDDED IN HARDENED CONCRETE SHALL BE FIELD BENT UNLESS
SPECIFICALLY SO DETAILED OR APPROVED BY THE STRUCTURAL ENGINEER.
18. DETAILING OF REINFORCING STEEL (INCLUDING HOOKS AND BENDS) SHALL BE IN
ACCORDANCE WITH ACT 315-99 AND 318-14. LAP ALL REINFORCEMENTS IN ACCORDANCE
WITH "THE REINFORCING SPLICE AND DEVELOPMENT LENGTH SCHEDULE." PROVIDE
CORNER BARS AT ALL WALL AND FOOTING INTERSECTIONS. LAP ADJACENT MATS OF
WELDED WIRE FABRIC A MINIMUM OF 8' AT SIDES AND ENDS.
NO BARS PARTIALLY EMBEDDED IN HARDENED CONCRETE SHALL BE FIELD BENT UNLESS
SPECIFICALLY SO DETAILED OR APPROVED BY THE STRUCTURAL ENGINEER.
19. CONCRETE PROTECTION (COVER) FOR REINFORCING STEEL SHALL BE AS FOLLOWS:
FOOTINGS AND OTHER UNFORMED SURFACES CAST AGAINST AND PERMANENTLY EXPOSED
TO EARTH . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-
FORMED SURFACES EXPOSED TO EARTH OR WEATHER (#5 BARS OR SMALLER). . 1-1/2'
COLUMN TIES OR SPIRALS AND BEAM STIRRUPS . . . . . . . . . . . . . 1-1/2'
SLABS AND WALLS (INT. FACE). . . GREATER OF BAR DIAMETER PLUS 1/8' OR 3/4'
20. CONCRETE WALL REINFORCING --PROVIDE THE FOLLOWING UNLESS DETAILED OTHERWISE:
6" WALLS #4 @ 16 HORIZ. #4 @ 18 VERTICAL 1 CURTAIN
8" WALLS #4 @ 12 HORIZ. #4 @ 18 VERTICAL 1 CURTAIN
10" WALLS #4 @ 18 HORIZ. #4 @ 18 VERTICAL 2 CURTAINS
21. CAST -IN -PLACE CONCRETE: SEE ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS AND
DIMENSIONS OF DOOR AND WINDOW OPENINGS IN ALL CONCRETE WALLS. SEE MECHANICAL
DRAWINGS FOR SIZE AND LOCATION OF MISCELLANEOUS MECHANICAL OPENINGS THROUGH
CONCRETE WALLS. SEE ARCHITECTURAL DRAWINGS FOR ALL GROOVES, NOTCHES,
CHAMFERS, FEATURE STRIPS, COLOR, TEXTURE, AND OTHER FINISH DETAILS AT ALL
EXPOSED CONCRETE SURFACES, BOTH CAST -IN -PLACE AND PRECAST.
STEEL
22. STRUCTURAL STEEL DESIGN, FABRICATION, AND ERECTION SHALL BE BASED ON:
A. AISC 360 AND SECTION 2205.2 OF THE INTERNATIONAL BUILDING CODE.
B. APRIL 14, 2010 AISC CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES
AMENDED AS FOLLOWS: AS NOTED IN THE CONTRACT DOCUMENTS, BY THE DELETION OF
PARAGRAPH 4.4.1, AND REVISE REFERENCE FROM "STRUCTURAL DESIGN DRAWINGS" TO
'CONTRACT DOCUMENTS" IN PARAGRAPH 3.1.
23. ROLLED SHAPES INCLUDING PLATES, SHALL CONFORM TO ASTM A36, FY = 36 KSI.
CONNECTION BOLTS SHALL CONFORM TO ASTM A307.
24. ARCHITECTURALLY EXPOSED STRUCTURAL STEEL SHALL CONFORM TO SECTION 10 OF THE
AISC CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES.
25. ALL STEEL EXPOSED TO THE WEATHER OR IN CONTACT WITH GROUND SHALL BE CORROSION
PROTECTED BY GALVANIZATION OR PROVIDED WITH EXTERIOR PAINT SYSTEM, UNLESS
OTHERWISE NOTED.
26. SHOP PRIME ALL STEEL EXCEPT
A. STEEL ENCASED IN CONCRETE.
B. SURFACES TO BE WELDED.
C. CONTACT SURFACES AT HIGH -STRENGTH BOLTS.
D. MEMBERS TO BE GALVANIZED.
E ' MEMBERS WHICH WILL BE CONCEALED BY INTERIOR FINISHES.
F. SURFACES TO RECEIVE SPRAYED FIREPROOFING.
G. SURFACES TO RECEIVE OTHER SPECIAL SHOP PRIMERS.
Nyo =*k
27. FRAMING LUMBER SHALL BE S-DRY, KD, OR MC-19, AND GRADED AND MARKED IN
CNFORMANCE WITH WCLIB STANDARD "GRADING RULES FOR WEST COAST LUMBER NO. 17",
OR WWPA STANDARD, "WESTERN LUMBER GRADING RULES 2011*. FURNISH TO THE
FOLLOWING MINIMUM STANDARDS:
JOISTS (2X & 3X MEMBERS) HEM -FIR NO. 2
AND BEAMS MINIMUM BASE VALUE, Fb = 850 PSI
(4X MEMBERS) DOUGLAS FIR -LARCH NO. I
MINIMUM BASE VALUE, Fb = 1000 PSI
BEAMS (INCL. 6X AND LARGER) DOUGLAS FIR -LARCH NO. 1
MINIMUM BASE VALUE, Fb = 1350 PSI
POSTS (4X MEMBERS) DOUGLAS FIR -LARCH NO. 2
MINIMUM BASE VALUE, Fc 1350 PSI
(6X AND LARGER) DOUGLAS FIR -LARCH NO. 1
MINIMUM BASE VALUE, Fc 1000 PSI
STUDS, PLATES & MISC. FRAMING: DOUGLAS-FIR-LARCH OR HEM -FIR NO. 2
28. GLUED LAMINATED MEMBERS SHALL BE FABRICATED IN CONFORMANCE WITH ASTM AND
AIISI/AITC STANDARDS. EACH MEMBER SHALL BEAR AN AITC OR APA-EWS
IDENTIFICATION MARK AND SHALL BE ACCOMPANIED BY AN AITC OR APA-EWS
CERTIFICATE OF CONFORMANCE. ALL SIMPLE SPAN BEAMS SHALL BE DOUGLAS FIR
COMBINATION 24F-V4, Fb = 2,400 PSI, Fv =265 PSI. ALL CANTILEVERED BEAMS
SHALL BE DOUGLAS FIR COMBINATION 24F-V8, Fb = 2400 PSI, Fv = 265 PSI. CAMBER
ALL SIMPLE SPAN GLULAM BEAMS TO 3,500' RADIUS, UNLESS SHOWN OTHERWISE ON THE
PLANS.
29. MANUFACTURED LUMBER, PSL, LVL, AND LSL SHOWN ON PLAN ARE BASED PRODUCTS
MANUFACTURED BY THE WEYERHAEUSER CORPORATION IN ACCORDANCE WITH ICC-ES REPORT
ESR-1387. MEMBERS SHALL HAVE THE FOLLOWING MINIMUM PROPERTIES:
PSL (2.OE) Fb = 2900 PSI, E = 2000 KSI, Fv = 290 PSI
LYL (2.OE) Fb = 2600 PSI, E = 2000 KSI, Fv = 285 PSI
LSL (1.55E) Fb = 2325 PSI, E = 1550 KSI, Fv = 310 PSI
ALTERNATE MANUFACTURED LUMBER MANUFACTURERS MAY BE USED SUBJECT TO REVIEW AND
APPROVAL BY THE ARCHITECT AND STRUCTURAL ENGINEER. ALTERNATE MANUFACTURERZS
PRODUCTS SHALL BE COMPATIBLE WITH THE JOIST HANGERS AND OTHER HARDWARE
SPECIFIED ON PLANS, OR ALTERNATE HANGERS AND HARDWARE SHALL SUBMITTED FOR
REVIEW AND APPROVAL. SUBSTITUTED ITEMS SHALL HAVE ICC-ES REPORT APPROVAL FOR
EQUAL OR GREATER LOAD CAPACITIES.
MANUFACTURED LUMBER PRODUCTS SHALL BE INSTALLED WITH A MOISTURE CONTENT OF
12% OR LESS. THE CONTRACTOR SHALL MAKE PROVISIONS DURING CONSTRUCTION TO
PREVENT THE MOISTURE CONTENT OF INSTALLED BEAMS FROM EXCEEDING 12%.
EXCESSIVE DEFLECTIONS MAY OCCUR IF MOISTURE CONTENT EXCEEDS THIS VALUE.
30. PREFABRICATED PLYWOOD WEB JOIST DESIGN SHOWN ON PLANS IS BASED ON JOISTS
MANUFACTURED BY THE WEYERHAEUSER CORPORATION. ALTERNATE PLYWOOD WEB JOIST
MANUFACTURERS MAY BE USED SUBJECT TO REVIEW AND APPROVAL BY THE ARCHITECT AND
STRUCTURAL ENGINEER. ALTERNATE MANUFACTURERZS PRODUCTS SHALL BE COMPATIBLE
WITH THE JOIST HANGERS AND OTHER HARDWARE SPECIFIED ON PLANS, OR ALTERNATE
HANGERS AND HARDWARE SHALL SUBMITTED FOR REVIEW AND APPROVAL. SUBSTITUTED
ITEMS SHALL HAVE ICC-ES REPORT APPROVAL FOR EQUAL OR GREATER LOAD CAPACITIES.
31. PREFABRICATED CONNECTOR PLATE WOOD ROOF TRUSSES SHALL BE DESIGNED BY THE
MANUFACTURER IN ACCORDANCE WITH THE "NATIONAL DESIGN STANDARD FOR METAL
PLATE -CONNECTED WOOD TRUSS CONSTRUCTION, ANSI/TPI I- BY THE TRUSS PLATE
INSTITUTE FOR THE SPANS AND CONDITIONS SHOWN ON THE PLANS. LOADING SHALL BE
AS FOLLOWS:
TOP CHORD LIVE LOAD 25 PSF
TOP CHORD DEAD LOAD 10 PSF
BOTTOM CHORD DEAD LOAD 5 PSF
TOTAL LOAD 40 PSF
WIND UPLIFT (TOP CHORD) 5 PSF
BOTTOM CHORD LIVE LOAD 10 PSF
(BOTTOM CHORD LIVE LOAD DOES NOT ACT
CONCURRENTLY WITH THE ROOF LIVE LOAD)
WOOD TRUSSES SHALL UTILIZE APPROVED CONNECTOR PLATES (GANGNAIL OR EQUAL).
SUBMIT SHOP DRAWINGS AND DESIGN CALCULATIONS TO THE ARCHITECT AND STRUCTURAL
ENGINEER FOR REV JEW PRIOR TO FABRICATION. SUBMITTED DOCUMENTS SHALL BE
SIGNED AND STAMPED BY A STRUCTURAL ENGINEER REGISTERED IN THE STATE OF
WASHINGTON. PROVIDE FOR SHAPES, BEARING POINTS, INTERSECTIONS, HIPS, VALLEYS,
ETC., SHOWN ON THE DRAWINGS. EXACT COMPOSITION OF SPECIAL HIP, VALLEY, AND
INTERSECTION AREAS (USE OF GIRDER TRUSSES, JACK TRUSSES, STEP-DOWN TRUSSES,
ETC. ) SHALL BE DETERMINED BY THE MANUFACTURER UNLESS SPECIFICALLY INDICATED
ON THE PLANS. PROVIDE ALL TRUSS TO TRUSS AND TRUSS TO GIRDER TRUSS
CONNECTION DETAILS AND REQUIRED CONNECTION MATERIALS. PROVIDE FOR ALL
TEMPORARY AND PERMANENT TRUSS BRACING AND BRIDGING.
32. PLYWOOD SHEATHING SHALL BE GRADE C-D, EXTERIOR GLUE OR STRUCTURAL 11,
EXTERIOR GLUE IN CONFORMANCE WITH DOC PS 1 OR PS 2. ORIENTED STRAND BOARD OF
EQUIVALENT THICKNESS, EXPOSURE RATING AND PANEL INDEX MAY BE USED IN LIEU OF
PLYWOOD.
ROOF SHEATHING SHALL BE 1/2' (NOMINAL) WITH SPAN RATING 32/16.
FLOOR SHEATHING SHALL BE 3/4- (NOMINAL) WITH SPAN RATING 48/24.
WALL SHEATHING SHALL BE I/t (NOMINAL) WITH SPAN RATING 24/0.
PROVIDE APPROVED PLYWOOD EDGE CLIPS CENTERED BETWEEN JOISTS/TRUSSES AT
UNBLOCKED ROOF SHEATHING EDGES. ALL FLOOR SHEATHING EDGES SHALL HAVE
APPROVED TO JOINTS OR SHALL BE SUPPORTED WITH SOLID BLOCKING. ALLOWI/8"
SPACING AT ALL PANEL EDGES AND ENDS OF FLOOR AND ROOF SHEATHING.
REFER TO WOOD FRAMING NOTES BELOW FOR TYPICAL NAILING REQUIREMENTS.
33. ALL WOOD IN DIRECT CONTACT WITH CONCRETE OR MASONRY SHALL BE PRESSURE -TREATED
WITH AN APPROVED PRESERVATIVE OR (2) LAYERS OF ASPHALT IMPREGNATED BUILDING
PAPER SHALL BE PROVIDED BETWEEN UNTREATED WOOD AND CONCRETE OR MASONRY.
34. PRESERVATIVE TREATED WOOD SHALL BE TREATED PER AWPA STANDARD Ul TO THE USE
CATEGORY EQUAL TO OR HIGHER THAN THE INTENDED APPLICATION. TREATED WOOD FOR
ABOVE GROUND USE SHALL BE TREATED TO AWPA UC30. WOOD IN CONTINUOUS CONTACT
WITH FRESH WATER OR SOIL SHALL BE TREATED TO AWPA UC4A. WOOD FOR USE IN
PERMANENT FOUNDATIONS SHALL BE TREATED TO AWPA UC4B.
35. FASTENERS AND TIMBER CONNECTORS USED WITH TREATED WOOD SHALL HAVE CORROSION
RESISTANCE AS INDICATED IN THE FOLLOWING TABLE, UNLESS OTHERWISE NOTED.
WOOD TREATMENT CONDITION PROTECT ION
HAS NO AMMONIA CARRIER INTERIOR DRY G90 GALVANIZED
CONTAINS AMMONIA CARRIER INTERIOR DRY G185 OR A185 HOT DIPPED OR
CONTINUOUS HOT -GALVANIZED
PER ASTM A653
CONTAINS AMMONIA CARRIER INTERIOR WET TYPE 304 OR 316 STAINLESS
CONTAINS AMMONIA CARRIER EXTERIOR TYPE 304 OR 316 STAINLESS
AZCA ANY TYPE 304 OR 316 STAINLESS
INTERIOR DRY CONDITIONS SHALL HAVE WOOD MOISTURE CONTENT LESS THAN 19%.
WOOD MOISTURE CONTENT IN OTHER CONDITIONS (INTERIOR WET, EXTERIOR WET, AND
EXTERIOR DRY) IS EXPECTED TO EXCEED 19%. CONNECTORS AND THEIR FASTENERS
SHALL BE THE SAME MATERIAL. COMPLY WITH THE TREATMENT MANUFACTURERS
RECOMMENDATIONS FOR PROTECTION OF METAL.
STRUCTURAL
ENGINEERING
2124 Third Avenue - suite ioo - Seattle, WA g8r2i
p: �.6443.6 ssfangineers.corn
934 Broadv,ay - Tacoma, WA 98402
P: 253-284-9470 ssfenginears.corn
Colryfight, 2017 Swe- Say Fagdt - All Rights Reserved
.Ae
41111
0
"Wrl:
Pic
DESIGN:
RHR
CHECKED:
RHR
APPROVED:
RHR
REVISIONS:
Al Permit REwislons Match 26,2019
DPD:
P1.1EITITI.E:
Aw Residence
9527 190th PL SW
Edmonds, WA 98020
ARCHITECT.-
StobI Design LLC
P.O. BOX 20764
Seattle, WA 98102
(206) 661-3622
ISSUE:
Permit
SHEETTMI:
General Structural
Notes
SCALE:
DAM
March 26, 2019
PROJECT NO:
10963-2018-14
SHEET NO:
S1 . I
General Structural Notes
THE FOLLOWING APPLY UNLESS SHOWN OTHERWISE ON THE DRAWINGS
36. TIMBER CONNECTORS CALLED OUT BY LETTERS AND NUMBERS SHALL BE "STRONG -TIE" BY C. FLOOR AND ROOF FRAMING: PROVIDE DOUBLE JOISTS UNDER ALL PARALLEL PARTITIONS
SIMPSON COMPANY, AS SPECIFIED IN THEIR CATALOG NUMBER C-C-2017. EQUIVALENT THAT EXTEND OVER MORE THAN HALF THE JOIST LENGTH AND AROUND ALL OPENINGS IN
DEVICES BY OTHER MANUFACTURERS MAY BE SUBSTITUTED, PROVIDED THEY HAVE ICC-ES FLOORS OR ROOFS UNLESS OTHERWISE NOTED. PROVIDE SOLID BLOCKING AT ALL
APPROVAL FOR EQUAL OR GREATER LOAD CAPACITIES. PROVIDE NUMBER AND SIZE OF BEARING POINTS. TOE -NAIL JOISTS TO SUPPORTS WITH TWO 16d NAILS. ATTACH
FASTENERS AS SPECIFIED BY MANUFACTURER FOR MAXIMUM LOAD CARRYING CAPACITY. TIMBER JOISTS TO FLUSH HEADERS OR BEAMS WITH SIMPSON METAL JOIST HANGERS IN
CONNECTORS SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S ACCORDANCE WITH NOTES ABOVE. NAIL.ALL MULTI JOIST BEAMS TOGETHER WITH TWO
RECOMMENDATIONS. ROWS l6d @ 12" ON -CENTER.
ALL 2X JOISTS SHALL BE CONNECTED TO FLUSH BEAMS WITH *LUS* SERIES JOIST
HANGERS. ALL TJI JOISTS SHALL BE CONNECTED TO FLUSH BEAMS WITH "ITS" SERIES
JOIST HANGERS. ALL DOUBLE -JOIST BEAMS SHALL BE CONNECTED TO FLUSH BEAMS WITH
"MIT" SERIES JOIST HANGERS.
WHERE CONNECTOR STRAPS CONNECT TWO MEMBERS, PLACE ONE-HALF OF THE NAILS OR
BOLTS IN EACH MEMBER.
ALL SHIMS SHALL BE SEASONED AND DRIED AND THE SAME GRADE (MINIMUM)AS MEMBERS
CONNECTED.
37. WOOD FASTENERS
A. NAIL SIZES SPECIFIED ON DRAWINGS ARE BASED ON THE FOLLOWING SPECIFICATIONS:
SIZE LENGTH DIAMETER
8d 2-1/2" 0.131"
10d 3- 0.148"
16d BOX 3-1/2" 0.135"
IF CONTRACTOR PROPOSES THE USE OF ALTERNATE NAILS, THEY SHALL SUBMIT NAIL
SPECIFICATIONS TO THE STRUCTURAL ENGINEER (PRIOR TO CONSTRUCTION) FOR REVIEW
AND APPROVAL.
NAILS - PLYWOOD (APA RATED SHEATHING) FASTENERS TO FRAMING SHALL BE DRIVEN
FLUSH TO FACE OF SHEATHING WITH NO COUNTERSINKING PERMITTED. TOE -NAILS SHALL
BE DRIVEN AT AN ANGLE OF 30 DEGREES WITH THE MEMBER AND STARTED 1/3 THE
LENGTH OF THE NAIL FROM THE MEMBER END.
B. ALL BOLTS IN WOOD MEMBERS SHALL CONFORM TO ASTM A307. PROVIDE WASHERS UNDER
THE HEADS AND NUTS OF ALL BOLTS AND LAG BOLTS BEARING ON WOOD. INSTALLATION
OF LAG BOLTS SHALL CONFORM TO THE NATIONAL DESIGN SPECIFICATION FOR WOOD
CONSTRUCTION WITH A LEAD BORE HOLE OF 60 TO 70 PERCENT OF THE SHAW DIAMETER.
LEAD HOLES ARE NOT REQUIRED FOR 3/8' AND SMALLER LAG SCREWS.
38. NOTCHES AND HOLES IN WOOD FRAMING:
A. NOTCHES ON THE ENDS OF SOLID SAWN JOISTS AND RAFTERS SHALL NOT EXCEED
ONE-FOURTH THE JOIST DEPTH. NOTCHES IN THE TOP OR BOTTOM OF SOLID SAWN JOISTS
SHALL NOT EXCEED ONE -SIXTH THE DEPTH AND SHALL NOT BE LOCATED IN THE MIDDLE
THIRD OF THE SPAN. HOLES BORED IN SOLID SAWN JOISTS AND RAFTERS SHALL NOT BE
WITHIN 2 INCHES OF THE TOP OR BOTTOM OF THE JOIST, AND THE DIAMETER OF ANY
SUCH HOLE SHALL NOT EXCEED ONE-THIRD THE DEPTH OF THE JOIST.
8. IN EXTERIOR WALLS AND BEARING PARTITIONS, ANY WOOD STUD IS PERMITTED TO BE
CUT OR NOTCHED TO A DEPTH NOT EXCEEDING 25 PERCENT OF ITS WIDTH. A HOLE NOT
GREATER IN DIAMETER THAN 40 PERCENT OF THE STUD WIDTH IS PERMITTED TO BE
BORED IN ANY WOOD STUD. IN NO CASE SHALL THE EDGE OF THE BORED HOLE BE NEARER
THAN 5/8 INCH TO THE EDGE OF THE STUD. BORED HOLES SHALL NOT BE LOCATED AT
THE SAME SECTION OF STUD AS A CUT OR NOTCH.
C. NOTCHES AND HOLES IN MANUFACTURED LUMBER AND PREFABRICATED PLYWOOD WEB JOISTS
SHALL BE PER THE MANUFACTURERS RECOMMENDATIONS UNLESS OTHERWISE NOTED.
39. WOOD FRAMING NOTES --THE FOLLOWING APPLY UNLESS OTHERWISE SHOWN ON THE PLANS:
A. ALL WOOD FRAMING DETAILS NOT SHOWN OTHERWISE SHALL BE CONSTRUCTED TO THE
MINIMUM STANDARDS OF THE INTERNATIONAL BUILDING CODE, THE AITC 'TIMBER
CONSTRUCTION MANUAL" AND THE AF&PA "NATIONAL DESIGN SPECIFICATION FOR WOOD
CONSTRUCTION". MINIMUM NAILING, UNLESS OTHERWISE NOTED, SHALL CONFORM TO IBC
TABLE 2304.10.1. COORDINATE THE SIZE AND LOCATION OF ALL OPENINGS WITH
MECHANICAL AND ARCHITECTURAL DRAWINGS.
B. WALL FRAMING: REFER ARCHITECTURAL DRAWINGS FOR THE SIZE OF ALL WALLS. ALL
STUDS SHALL BE SPACED AT 16' O.C. UNO. TWO STUDS MINIMUM SHALL BE PROVIDED AT
THE END OF ALL WALLS AND AT EACH SIDE OF ALL OPENINGS. AND AT BEAM OR HEADER
BEARING LOCATIONS. TWO 2x8 HEADERS SHALL BE PROVIDED OVER ALL OPENINGS NOT
OTHERWISE NOTED. SOLID BLOCKING FOR WOOD COLUMNS SHALL BE PROVIDED THROUGH
FLOORS TO SUPPORTS BELOW. PROVIDE CONTINUOUS SOLID BLOCKING AT MID -HEIGHT OF
ALL STUD WALLS OVER 10'-0" IN HEIGHT.
ALL WALLS SHALL HAVE A SINGLE BOTTOM PLATE AND A DOUBLE TOP PLATE. END NAIL
TOP PLATE TO EACH STUD WITH TWO 16d NAILS, AND TOENAIL OR END NAIL EACH STUD
TO BOTTOM PLATE WITH TWO 16d NAILS. FACE NAIL DOUBLE TOP PLATE WITH 16d @
12* O.C. AND LAP MINIMUM 4'-0" AT JOINTS AND PROVIDE EIGHT 16d NAILS @ 4"oc
EACH SIDE JOINT.
ALL STUD WALLS SHALL HAVE THEIR LOWER WOOD PLATES ATTACHED TO WOOD FRAMING
BELOW WITH TWO ROWS OF 16d NAILS @ 12" ON -CENTER, OR ATTACHED TO CONCRETE
BELOW WITH 5/8' DIAMETER ANCHOR BOLTS @ 4'-0' ON -CENTER EMBEDDED 7- MINIMUM,
UNLESS INDICATED OTHERWISE. INDIVIDUAL MEMBERS OF BUILT-UP POSTS SHALL BE
NAILED TO EACH OTHER WITH TWO ROWS OF 16d @12" ON -CENTER. UNLESS OTHERWISE
NOTED, GYPSUM WALLBOARD SHALL BE FASTENED TO THE INTERIOR SURFACE OF ALL
STUDS AND PLATES WITH NO. 6 X 1-1/4" TYPE S OR W SCREWS @ 8" ON -CENTER.
UNLESS INDICATED OTHERWISE, 1/2' (NOMINAL)APA RATED SHEATHING (SPAN RATING
24/0) SHALL BE NAILED TO ALL EXTERIOR SURFACES WITH Bd NAILS @ 6' ON -CENTER
AT PANEL EDGES AND TOP AND BOTTOM PLATES (BLOCK UN -SUPPORTED EDGES)AND TO ALL
INTERMEDIATE STUDS AND BLOCKING WITH 8d NAILS 111 12" ON -CENTER ALLOW 1/8"
SPACING AT ALL PANEL EDGES AND PANEL ENDS.
UNLESS OTHERWISE NOTED ON THE PLANS, PLYWOOD ROOF AND FLOOR SHEATHING SHALL
BE LAID UP WITH GRAIN PERPENDICULAR TO SUPPORTS AND NAILED AT 6' ON -CENTER
WITH Bd NAILS TO FRAMED PANEL EDGES, STRUTS AND OVER STUD WALLS AS SHOWN ON
PLANS AND @ 12" ON -CENTER TO INTERMEDIATE SUPPORTS. PROVIDE APPROVED PLYWOOD
EDGE CLIPS CENTERED BETWEEN JOISTS/TRUSSES AT UNBLOCKED ROOF SHEATHING EDGES.
ALL FLOOR SHEATHING EDGES SHALL HAVE APPROVED TAG JOINTS OR SHALL BE
SUPPORTED WITH SOLID BLOCKING. ALLOW 1/8' SPACING AT ALL PANEL EDGES AND
ENDS OF FLOOR AND ROOF SHEATHING. TOENAIL BLOCKING TO SUPPORTS WITH 16d @ 12-
ON-CENTER UNLESS OTHERWISE NOTED.
r2 I
STRUCTURAL
ENGINEERING
2124 Third Avenue - suite - Seattle, WA 98121
P: 206.443.6212 %fenglneers.corn
934 Elt,oadway - Tacoma, WA 98402
P: 253.284-9470 ssf-gineen.com
COPYright 2017 Swerenn Sq Failft - All Rights Reserved
42AI
DRAWN:
PIC
DESIGN:
RHR
CHECKED:
RHR
APPROVED:
RHR
REVISIONS:
Z� Permit Revisions March 26,2019
DPD:
PROM CT TITLE:
Aw Residence
9527 190th PIL SW
Edmonds, WA 98020
ARCHrrECT:
Stobl Design LLC
P.O. BOX 20764
Seattle, WA 98102
(206) 661-3622
ISSUE:
Permit
SH EET nTLE'
General Structural
Notes
SCALE:
March 26, 2019
�ROJECT NO:
10963-2018-14
SHEU NO:
S1.2
4/S3.2 )�
F-1 - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - -
C) ----------- J ------------------------------- 1- i -------------
- - - - - - - - - - -- - - - - - - - - - - - - - - - I
L J F . . . . .
Ell
SxSxlO'dp. CONCR. FTG. wl (3) #4 E.W. BOT., typ.
IL 7/S3.2
typ.
III
L- - - - - - - - - L - - - - - - - -
3/S3.2 )1,
----------------------------------------
-----------------------------------
AB ON GRADE
PER P N NOTE 3
SLAB ON GR
PLAN No
-ELEVATION PER ARCH.
F - -
r
3/S3.2
- - - - - - - - - - - - j
----------
L— — — — — — — — — — — — — — — — — — — — —
-----------------------------------------
-----------------------
----------
11/S3.1
3/S3.2
- - - - - �13/S3.2 - - - - - -
ll/S3.1
----- n:-:T --------------
11/S3.1 )1,
_F - - - - - - - -
F- - - - - - - - -
i
- - - - - - - - - -
L - - - -
-------------------------------- - ---------------------------------
---------------
- - - - - - - - - - - - - - - L - - - - - - - -
44/S3.2 �__ I - - - - - - - -
Plan Notes Legend Foundation Plan
1. DO NOT SCALE DRAWINGS. REFER ARCHITECTURAL DRAWINGS FOR ALL DIMENSIONS. CONC. WALL BELOW Scale: 1/4" = 1'-0"
2. REFER GENERAL STRUCTURAL NOTES FOR ADDITIONAL REQUIREMENTS.
3. SLAB ON GRADE SHALL BE 4" THICKNESS MINIMUM. REINFORCE WITH 6x6 WlAxWl.4 WWM STRUCTURAL WOOD WALL ABOVE
CENTERED IN SLAB. PROVIDE VAPOR BARRIER PER ARCH. BELOW SLAB OVER 4" MIN. FREE
DRAINING GRAVEL OVER FIRM NATIVE SOILS OR STRUCTURAL FILL COMPACTED TO 957 CONC. FOOTING BELOW
DENSITY.
4. THE BOTTOM OF ALL NEW EXTERIOR FOOTINGS SHALL BE 18" MIN. BELOW GRADE. HD HOLDOWN PER HOLDOWN SCHEDULE - SEE DTL 4/S4.1
STRUCTURAL
ENGINEERING
2124 Third Avenue - Suite - Seattle, WA 98121
P.- 2.6-443.6— ssfenginee-com
934 Broadway -Tacoma WA 98402
p: 253.284-9470 s�ienginaen.com
=ht 2017 S-- Say F�gdt - All Rlght� R—d
42141
Pic
N:
RHR
CHECKED:
RHR
APPROVED:
RHR
REVISIONS:
Al Permit Revisions Nardi 26,2019
DPD.
PROJECTTITLE:
Aw Residence
9527 190th PL SW
Edmonds, WA 98020
ARCHTTECI;
Stobl Design LLC
P.O. BOX 20764
Seattle, VIVA 98102
(206) 661-3622
ISSUE:
Permit
SHEErTITLE:
Foundation Plan
1/4" = 1 -10" U.N.O.
March 26, 2019
PROJECT NO:
10963-2018-14
SHEff NO:
S2. i
NO: OF SHEETS:
R 2 0 ul D
JUN 0 5 2019
HW W/ OFFSET
P.T. 6x6
W/ ECCQ POS
& ABU POST
P.T. 6x6 POST
W/ BC POST
P.T. 2x1O @ 1
P.T. 6x6 POST
W/ BC POST
P.T. 6x6
W/ CCQ POSI
& ABU POST
HW W/ OFFSET
P.T. 5x6 PO�
W/ BC POS
P.T. 6x6
W/ ECCQ POS
& ABU POST
At I C�DTAD WAI I C AM TA Dr CIAM 11 ki fl
Plan Notes
Legend Main Floor Framing Plan
2'-O"x2'-O"xlO"dp. CONCR. FTC. W/ (2) #4 EA SOT.
1.
00 NOT SCALE DRAWINGS. REFER ARCHITECTURAL DRAWINGS FOR ALL DIMENSIONS.
Scale: 1/4' = 1'-0"
STRUCTURAL WOOD WALL BELOW
2.
TYPICAL FLOOR FRAMING CONSISTS OF 3/4" T&G PLYWOOD, FACE GRAIN PERPENDICULAR TO
SUPPORTS OVER JOISTS PER PLAN. NAIL SHEATHING WITH 8D @ 6" D.C. EDGES AND OVER
CONCRETE WALL BELOW
SHEARWALLS, 12" O.C. FIELD.
STRUCTURAL WOOD WALL ABOVE
3.
ALL HEADERS SHALL BE (2) 2XB!S UNLESS NOTED OTHERWISE. AT CONTRACTORS OPTIO - N ' (2)
Beam Schedule
2X8'S MAY BE SUBSTITUTED WITH 4X8 OR 6X6.
CONIC. FOOTING BELOW
MARK SIZE HANGER
4.
PROVIDE (2) BEARING STUDS AT EACH END OF ALL HEADERS AND BEAMS UNLESS NOTED
L"4: X 117/8' LSL HU11
OTHERWISE.
4
NUMBER OF BUNDLED STUDS
11 //8- LSL HHUS410
5.
"SVC INDICATES PLYWOOD SHEATHED SHEARWALL BELOW FRAMING SHOWN. REFER SHEARWALL
SCHEDULE ON DETAIL 2/S4.1. ALL NEW EXTERIOR WALLS SHALL BE SWI UNLESS NOTED
HD HOLDOWN PER HOUDOWN SCHEDULE - SEE DTL. 4/S4.1
OTHERWISE.
6.
REFER GENERAL STRUCTURAL NOTES FOR ADDITIONAL REQUIREMENTS.
7.
SLAB ON GRADE SHALL BE 4" THICKNESS MINIMUM. REINFORCE WITH 6x6 WlAxW1.4 WWM
CENTERED IN SLAB. PROVIDE 6 MIL VAPOR BARRIER BELOW SLAB OVER e MIN. FREE
DRAINING GRAVEL OVER FIRM NATIVE SOILS OR STRUCTURAL FILL COMPACTED TO 95%
DENSITY.
8.
THE BOTTOM OF ALL NEW EXTERIOR FOOTINGS SHALL BE 18" MIN. BELOW GRADE.
STRUCTURAL
ENGINEERING
2124 Third Avenue - Suite 100 . 5!aftl!, WA 98121
p: 2o6.443.6212 stfangine—com
934 Broadvvay - Tacoma, NA�A 98402
P: 253.284-947- ssfengineers.com
GDPAht 2017 Sm— Say Fag6t - All Right Reserved
FIC,
42141
AL
DRAWN:
Pic
DESIGN:
RHR
CHECKED:
RHR
APPROVED:
RHR
REVISIONS:
11 Permit Revisions March 26, 2019
DPD:
PROJECTTITL�:
Aw Residence
9527 190th PL SW
Edmonds, WA 98020
ARCHITECT:
Stobf Design LLC
P.O. BOX 20764
Seattle, VIA 98102
(206) 661-3622
ISSUE:
Permit
=TTTLE:
Main Floor Framing
Plan
SCALE:
1/4" = 1'-0" U.N.O.
March 26, 2019
PROJECT NO:
10963-2018-14
SHEET NO:
S2.2
NO: OF SHEETS:
Lz E 12 U D
JUN 0 5 2019
--ul"IT-1701
P.T. 6x6 POST */ ECCQ
P.T. 6x6 POST "/ CCQ POST
P.T. 6x6 POST I/ ECCQ PC
1. DO NOT SCALE DRAWINGS. REFER ARCHITECTURAL DRAWINGS FOR ALL DIMENSIONS.
2. TYPICAL ROOF FRAMING CONSISTS OF ROOF FRAMING PER ARCHITECTURAL DRAWINGS OVER
q COX PLYWOOD, FACE GRAIN PERPENDICULAR TO SUPPORTS OVER JOISTS PER PLAN. NAIL
SHEATHING WITH 8D 0 6" D.C. EDGES AND OVER SHEARWALLS, 12" D.C. FIELD
3. ALL HEADERS SHALL BE (2) 2X8'S UNLESS NOTED OTHERWISE. AT CONTRACTORS OPTION, (2)
2XWS MAY BE SUBSTITUTED WITH 4X8 OR 6X6.
4. PROVIDE (2) BEARING STUDS AT EACH END OF ALL HEADERS AND BEAM
UNLESS NOTED OTHERWISE. GEID&
5. *SW" INDICATES PLYWOOD SHEATHED SHEARWALL BELOW FRAMING SHOWN. REFER SHEARWALL
SCHEDULE ON DETAIL 2/S4.1. ALL NEW EXTERIOR WALLS SHALL BE SWI UNLESS NOTED
OTHERWISE.
6. REFER lO/S4.1 FOR NAILING AT SHEARWALL INTERSECTIONS.
7. REFER GENERAL STRUCTURAL NOTES FOR ADDITIONAL REQUIREMENTS.
ing Plan jtliIII,
STRUCTURAL WOOD WALL BELOW SCCle: 1/4" = l'-O"
NUMBER OF BUNDLED STUDS
ROOF OVERFRAMING
STRUCTURAL
ENGINEERING
2124 Third Avenue - Suite - Seattle, WA 98121
P: 206-443.6212 ssfengineers-
934 Broadway - Tacoma, WA 984o2
P: 253.284-9470 Wengine—com
Qpyllght 2017 SAer- Say Faildt - All Rights Re—d
42141
DRAWN;
Pic
DESIGN:
RHR
CHECKED:
RHR
APPROVED:
RHR
REVISIONS:
zh Permit Revisims Mardi 26, 2019
DPD:
PROJECTTITIE:
Aw Residence
9527 190th PL SW
Edmonds, WA 98020
ARCHITECT:
Stobl Design LLC
P.O. BOX 20764
Seattle, WA 98102
(206) 661-3622
ISSUE:
Permit
S HEET UTLE:
Roof Framing Plan
SCALE:
1/4" = '-0" U.N.O.
DATE,
March 26, 2019
PROJECT NO:
10963-2018-14
SHEET NO:
S2.3
NO: OF SHEETS:
Q
JUN 0 5 2019
t3U!LO'rqG D�RART
COY OF f
D
CORNER BARS TO
CORNER BARS TO
W
CORNER BARS TO
MATCH CROSS WALL
CORNER BARS TO
MATCH CROSS WALL
MATCH EXTERIOR
HORIZ. REINF.
MATCH HORIZ. REINF.
HORIZ. REINF.
HORI Z. REINF.
(alt. hooks)
CONCRETE WALL
2
"S'
ADD DIAGONAL IN WALL
----------------
LIP4
4.
TO MATCH WALL REINF.
\--ADDITIONAL
—TYP. CORNER
�ADDITIONAL
—TYP. CORNER
PIPE SLEEVES
de
E
VERT. BARS
BARS: 24
F
VERT. BARS
BARS: 24 -
F
AS REOD.
.............
tw
CROSS WALL
CROSS WALL
............
NORMAL
REINFORCING
ADD BARS TO
2'-0" min.
EXCAVATION NOT
MATCH NORMAL
REINFORCING
S2
ALLOWED BELOW
Double Curtain-
Single Curtain
THIS LINE
LINE OF EXCAVATION
Typical Corner Bars at Concrete Walls and Footings
N MAL FOOTIN
REINFORCING
Pipe
and Trench Locations
2
3
Typical Stepped Footing 4
PANEL EDGE NAILING
PANEL EDGE NAILING
PANEL EDGE NAILING —
OVER ALL HOLDOWN STUDS
OVER ALL HOLDOWN STUDS
OVER ALL HOLDOWN STUDS
HOLDOWN (where occurs)
A35 PER SHEARWALL
HOLDOWN (where occurs)
HOLDOWN (where occurs)
A35 PER SHEARWALL
TJI BLKG BETWEEN JOISTS
PER PLAN W/ ALL -THREAD
SCHEDULE
PER PLAN W/ A.B. PER
PER PLAN W/ ALL -THREAD
SCHEDULE
(4) 8d INTO EA. BLOCK
TO MATCH A.B. SIZE I
HOLDOWN SCHEDULE
VERTICAL GRAIN BLKG.
TO MATCH HOLDOWN STUDS
HOLDOWN SCHEDULE
P.T. 2x PLATE W/ A.B.
PER SHEARWALL SCHEDULE
TO MATCH A.B. SIZE IN
HOLDOWN SCHEDULE
VERTICAL GRAIN BLKG.
TO MATCH HOLDOWN STUDS
JOIST DIRECTION AND
SHEATHING PER PLAN
SHEARWALL PER PLAN
(4) Bd INTO EA. BLOCK
SHEARWALL PER PLAN
(5/8"0 0 48"oc elsewhere)
SHEARWALL PER PLAN
(4) 8d INTO EA. BLOCK
NAILING PER SHEARWALL
JOIST DIRECTION AND
(2) #4 CONT. TOP
NAILING PER SHEARWALL ---------
JOIST DIRECTION AND
SCHEDULE (typ.)
SHEATHING PER PLAN
(1 ea. Side of a.b.)
SCHEDULE (typ.)
SHEATHING PER PLAN
13/4' LSL RIM JOIST
13/4* LSL RIM JOIST
(2) #4 CONT. TOP
(1 ea. side of a.b.)
- ri
E
SLAB ON GRADE
(2) f CONT. TOP
(1 ea. side of a.b.)
GARAGE s.o.G. @
WHERE JOISTS ARE
PARALLEL PROVIDE
TJI BLKG. @ 48"oc
E
(2) l6c] 1HRU EA.
JOIST OR BLOCK
PER PLAN
(2) 16d THRU EA.
JOIST OR BLOCK
(2) 16d THRU EA.
JOI ST OR BLOCK
#4 @ 12"oc
WHERE JOISTS ARE
WHERE JOISTS ARE
P.T. 2x6 PLATE W/ A.B.
A
PER SHE RWALL SCHEDULE
HORIZ.
PARALLEL, PROVIDE
TJI BLKG. 0 48"oc
U iA6, O��
SEE RETAINING WALL
PARALLEL, PROVIDE
TA BLKG. 0 48"oc
REINFORCING PER
RETAINING WALL
(5/8"0 @ 48"oc elsewhere)
7,
#4 @ 187oc
"/"kRT.(alt. bends)
SCHEDULE FOR REINF.
SCHEDULE
(U.N.O.)
VERT.(olt. bends)
r i
P.T. 2x6 PLATE W/ A.B. PER
P.T. 2x6 PLATE W/ A.B. PER
(2) #4 CONT. TOP
WSHEARWALL SCHEDULE (U.N.O.)
(5/8"o 0 48"oc elsewhere)
#4 0 12"oc HORIZ
SHEARWALL SCHEDULE (U.N.O.)
(5/8"0 @ 48"oc elsewhere)
ALL FASTENERS INTO PRESSURE
TREATED WOOD SHALL BE GALV.
(I ea. side of o.b.)
11 1 /11�
E
ALL FASTENERS INTO PRESSURE
TREATED WOOD SHALL BE GALV.
(2) #4 CONT. BOT.
ALL FASTENERS INTO PRESSURE
ALL FASTENERS INTO PRESSURE
TREATED WOOD SHALL BE GALV.
OR STAINLESS STEEL PER
GENERAL NOTES
(2) #4 CONT.
,
BOT.
5"
B" 5�
OR STAINLESS STEEL PER
SHALL BE GALV.
0.
Z
-
OR STAINLESS STEEL PER
GENERAL NOTES
5
TREATED WOOD
OR STAINLESS STEEL PER
6
GENERAL NOTES
8"
5" GENERAL NOTES
-7
Retaining
Wall Schedule W/
Slab
LEVEL BACKFILL
Stem Reinforcing Footing Reinforcing
H (ft.)
B1 ts B2 tf
#4 @ 12"oc VERT.
Vert.
Horiz. Top Longit.
#4 @ 12'oc HORIZ.
PROVIDE FREE -DRAINING—
MATERIAL
3. -0.
8.
5� 5� 10"
#4 @ 18'oc
#4 @ 12"oc - (2)#4
P x _j 0 18-oc
FACE OF WALL BLTUMU
4!-0"
11-C 8' 5" 10"
#4 @ 18"Ge
#4 0 12"oc - (2)#4
#5 CONT. AT OPENINGS
SEE PLAN FOR SLAB
PLACE SLAB PRIOR TOI
6'-0"
2'-3- 9" 8. 10"
#4 @ Woe
#4 @ 12"cle - (4)#4
TH CKNES AND
E
BACKFILLING WALL
11/2' Or. @ #4's & #5's
8�-O"
- 8.
2-9 1'-3' 12"
#5 0 12"oc
#4 0 12"oc #4 0 18"oc (6)#5
REINFORCISNIG (typ.)
2' chr. @ #6
6" CONC. WALL
SLAB ON GRADE —A
PER PLAN
FOOTING DRAIN
10'-0"
3-9" 8. 11-9. 18"
#7 0 12"cic
#4 @ 12"oc #4 0 18"oc (8)#5
FBY OTHERS
(2)#5 CONT.
NMI
5"
6' 5"
B1
9
12
STRUCTURAL
ENGINEERING
2124 Third A�enue - Suite ioo - Seattle, WA 98121
p: 2o6.44312 ssfenoneers.com
934 Ehmadway - T—ma, WA 984o2
P: �53.284.9470 ssfengine--m
Copyright 2017 S.— Say Fagdt - All Right R.d
w"'l
DRAWN:
Pic
N:
RHR
CHECKED:
RHR
APPROVED:
RHR
REVISIONS:
Al Perinit Revisions March 26, 2019
DPD:
PROJECT TITLE:
Aw Residence
9527 190th PL SW
Edmonds, VIA 98020
ARCHITECT:
Stobl Design LLC
P.O. BOX 20764
Seattle, WA 98102
(206) 661-3622
ISSUE:
Permit
SHEET TITLE:
Concrete Details
SCALE:
`!4T' = 11�-O" U.N.O.
March 26, 2019
PROJECT NO:
10963-2018-14
SHEEFT NO:
S3.1
NO: OF SHEETS:
R r_ 0- U M
JUN 0 5 20119
BU-LOInG DCp,,FjTVriNT
Uay OF EOL&OWDS
PANEL EDGE NAILING
PANEL EDGE NAILING
OVER ALL HOLDOWN STUDS
OVER ALL HOLDOWN STUDS
HOLDOWN (where occurs)
PER PLAN W1 A.B. PER
HOLDOWN (where occurs)
SHEATHING CAN BE
HOLDOWN SCHEDULE
PER PLAN W/ A.B. PER
PLACED ON EITHER
P.T. A PLATE W/ A.B.
HOLDOWN SCHEDULE
SIDE OF WALL
SHEARWALL PER PLAN
PER SHEARWALL SCHEDULE
(5/8"0 @ 48'oc elsewhere)
SHEARWALL PER PLAN
P.T. 2x PLATE W/ A.B.
2) #4 CONT. TOP
SLAB ON GRADE
PER SHEARWALL SCHEDULE
�l ea. side of a.b.)
PER PLAN
(5
/8"0 @ 48"oc elsewhere)
SLAB ON GRADE
PER PLAN
H
#4 0 18'oc
VERT.(alL bends)
#4 0 12"oc HORIZ.
A LL FASTENER INTO PRESSURE
TREATED WO SHALL BE GALV. (2) #4 CONT.
ITCC R STAINLES STEEL PER TOP & BOT.
(2) #4 CONT. BOT.
l'-6-
ALL FASTENERS INTO PR
TREATED WOOD SHALL BE GALV.
OR STAINLESS STEEL PER
GENERAL NOTES
Interior Wall w/ Thickened Slab
Exterior
Wall w/ Slab on Grade
4
PANEL EDGE NAILING—
—
P.T. 2x PLATE W/ A.B.
OVER ALL HOLDOWN STUDS
PER SHEARWALL SCHEDULE
(5/8`0 0 48"oc elsewhere)
HOLDOWN (where occurs)
PER PLAN W/ A.B. PER
HOLDOWN SCHEDULE
POST, PLINTH, &
FIG.
SHEARWALL PER PLAN
j .
(2) #4 CONT. TOP
8d @6" oc
POST PER PLAN
(I ea. side of CA)
H
JOIST DIRECTION AND
10-dia. PLINTH REINF. N/
ABU SERIES
POST BASE W/
SHEATHING PER PLAN
,(4)#4 x L VERT. & #3 x
5/8'00' A.B.
@ Voc W/ (3)#3 x IN
TOP 5" OF PLINTH
RETAINING WALL PE R 12/S3.2
E
d
P.T. 2xI2 LEDGER w/ 3/4"0 EPDXY ANCHOR
(EMBED 4- MIN.) @ 32' oc
FOOTING SIZE &
REINF. PER PLAN
/—LEVEL BACKFILL
Retaining Wall Schedule
x
H (ft.)
B2
tf
Stem Reinforcing Footing Reinforcing
Vert.
Horiz. Top Longit.
PROVIDE FREE —DRAINING—
S—O"
5-
8"
#4 0 18"oc
#4 @ 12"oc (2)#4
MATERIAL
5-
#4 0 18"oc
#4 0 12"oc #4 @ 18"oc (2)#4
11/2" dr. @ #4's #5's
61-0.
5- 8. 2'-3"
1T
#4 0 12"oc
#4 0 12*oc #4 @ 12"oc; (4)#4
2" dr. @ #6's
8'-0'
I I -y' 8' 2'-9-
12"
#5 @ 12"oc
---
#4 0 12"oc #5 12"oe (5)#5
FOOTING DRAIN
OTHERS
-9. 9' S-9'
18"
#7 0 ffoc
#4 0 12"oc #6 12"oc (8)15
N
qB1ts
B2
10
12
STRUCTURAL
ENGINEERING
2124Third Avenue - Suiw - Seatfl�, WA 98121
p: �o(5-443.62,' ssfeng.neers...
934 Broadway - Tacoma, VV.:�l 984.2
P: 253.28,4.9470 sstengineers.com
Copyright 2D17 Sweawn Say Fack - All Rights Reserved
E
421 1
DRAWN:
PIC
DESIGN:
RHR
CHECKED:
RHR
APPROVED:
RHR
REVISIONS:
Z� Permit Revisions March 26, 2019
DPD:
"OJECTTITLE:
Aw Pesidence
9527 190th PL SW
Edmonds, WA 98020
ARCHFI-ECT:
Stobl Design LLC
P.O. BOX 20764
Seattle, WA 98102
(206) 661-3622
ISSUE:
Permit
SHE11T11-
Concrete Details
3/4" = 1'-0" U.N.O.
oAM.
March 26, 2019
PRCUECT NO:
10963-2018-14
SHEET NO:
S3.2
NO: OF SHEETS:
ULo
JUN 0 5 2019
BUILDING IDEPA
Crr., OF ED�",
Shecirwall Schedule (1000@0
SAWN OR MFR.— IN NAILING PanelEdge Top Plate Connection Base Plate Connection
LUMBER. 2x MIN. PER SCHEDULE Mark Sheathing
SEE NOTES FOR Nailing if Til if Wood at Wood 0 at Concrete ANCHOR BOLT, TYP.
ADDITIONAL 2x NAILER Corner 45*
REQUIRE SWI 15/3f COX PLYWOOD 8d @ Voc IN @ Voc A35 0 24"oc; 16d 0 6"Dc 51ell A.B. 0 48"oc
1/2" MAX. TO Installation
* �'-TER EDGE
COX PLYWOOD 8d 0 4c, 16d 0 4c, A35 0 16*oc (2)rows 16d 0 Voc 5/8"0 A.B. @ 32"Gc OF CONCRETE, TV.
16d NAIU11171 EDGE OF SW2 15/32 (Install with arrow,
NG on top of the bolt
PER SCHEDULE - WASHER SW3(D 15/32- COX PLYWOOD 8d @ 3oc (2)rows l6d @ eoc A35 @ 12*oc (2)rows 16d 0 Voc 5/8"0 A.B. 0 24"oc oriented a. shown) L/�24
Detail A Detall C SW4(D,l 15/32" COX PLYWOOD 8d @ 2". (2)rows l6d @ 4"oc , A35 0 9"oc I (2)rows 16d 0 4"oc(D 5/8"0 A.B. 0 16*oc U., - , 0'
0
BLOCK PANEL EDGES WITH 2x MIN. LAID FLAT AND NAIL PANELS TO INTERMEDIATE SUPPORTS WITH 8d 0 12"o.c.
3/8"
1/2"
0
8d NAILS SHALL BE 0.131"0 x 2 1/2" (common) - 16d NAILS SHALL BE 0.135"0 x 3 11/2� (box)
min
typ.
(D
EMBED ANCHOR BOLTS AT LEAST 7'. EXPANSION BOLTS MAY BE SUBSTITUTED FOR ANCHOR BOLTS WITH 4* EMBEDMENT. TITEN HD SCREW ANCHORS
MAY BE SUBSTITUTED FOR ANCHOR BOLTS W1 �' EMBEDMENT. ALL BOLTS SHALL HAVE 3" x 3" x 1/4' MIN. PLATE WASHERS. PLATE WASHERS SHALL
EXTEND TO WITHIN 1/2' OF THE EDGE OF THE BOTTOM PLATE ON THE SIDE WITH SHEATHING. SEE DETAIL C.
NAI PLYWOOD
EDGE EDGE
OVER Ek S D
T
3x STUDS OR DOUBLE STUDS NAILED TOGETHER W/ BASE PLATE NAILING ARE REQUIRED AT ABUTTING PANEL EDGES OF SW3 AND SW2.
SEE DETAIL B. WHERE 3x STUDS ARE USED FOR SW2, STAGGER NAILS AT ADJOINING PANEL EDGES.
(D
TWO STUDS MINIMUM ARE REQUIRED AT EACH END OF ALL SHEARWALLS AND ALL END STUDS SHALL RECEIVE PANEL EDGE NAILING.
SEE PLANS AND HOLDOWN SCHEDULE FOR ALTERNATE REQUIREMENTS.
16d NAILING;7
PER SCHEDULE
(D
ALL EXTERIOR WALLS SHALL BE SWI, UNLESS NOTED OTHERWISE.
Detol B
(2)
7/16' O.S.B. MAY BE SUBSITUTED FOR 15/32" COX.
PLAN VIEW AT ABUTTING PANEL
0
LTPr. (HORIZIONTAL ORIENTATION) W1 8d COMMON MAY BE SUBSTITUTED FOR A35!s AT CONTRACTORS OPTION.
EDGES OF W3 & W2
RIM
(D
A 2x NAILER ATTACHED W/ BASE PLATE NAILING PER DETAIL A MAY BE SUBSTITUTED FOR A35'. AT CONTRACTORS OPTION.
Detail D
0
AT MULTI -ROW NAILING, MINIMUM OFFSET BETWEEN ROWS AND ROW SPACING 1/2-, SEE DETAIL D.
(D
PROVIDE (3) ROWS 16d 0 Coe AT LVI_ RIMS.
BLOCKI
BTWNL
(2)16d
EA. JOI
MIL LUbr NAILINU
ARWALL BELOW
)VIDE 31/2' LSL JO
BLKG. 0 SHEARWA
EDGE NAILING CLI
JI 4"oc
PLATE CONNECTIi
16d NAILS OR
i W/ LSL
JOISTS PER PLAN
Shearwall Schedule - (Sheathed One Side) 2
INTO
LOCK
I
LOCK
AST BAY
LKG. 0 4�90FC
A35 (a
OMIT 1
- I _�_ PANEL EDGE NAILING _2x BLOCKING
2x BLOCKING SHEATHING PANEL JOINT
BTWNL STUDS 0 ill/ PANEL EDGE NAILING BTWN. STUDS
BOTTOM PLATE CONNECTION
PANEL EDGE NAILING
Bearing Wall Non -Bearing Wall
�.,!Wjjj
NOW==
NOTE:
SEE SHEARWALL SCHEDULE FOR ALL NAILING AND
CONNECTIONS, NOT OTHERWISE NOTED
/_ SHEARWALL PEF
ii N ii on
'ANO—EMIN
SHEARWALL PER PLAN
IF SHEARWALL
16d 0 12'oc A'
OTHER WALLS
INTERSECTING
(see left if she,
(D PLYWOOD PANEL EDGE NAILING PER SHEARWALL SCHEDULE
(Z BASE PLATE NAILING PER SHEARWALL SCHEDULE
(3) 16d @ 8"oc
Typical Shearwall Construction
Typical Shearwall Intersections 10
(6)16d
TYP. S'
Non -Corner
Installation
(Bolt may be
installed 0 45't�
13Y as shown)
4 T
-M
Corner
Installation
(IRst.11 with nnno.
o� top of the bolt
91�
onented as shown) ... -
.if
0'
Typical HDU Holdown
HOLDOWN POST
PER SCHEDULE
HDU HOLDOWN
SHEARWALL PER PLAN
c-7
CONT. #4 EA. SIDE OF
ANCHOR BOLT
Holdown Schedule
EDGE NAIL PER
SWSCHEDULE
FRAMING CONT.
WHERE OCCURS
SSTB PER SCHEDUIE
Plan
Mark
Screws
Anchor
Bolt
A.B.
Embed
Holdown Post 0
HDU2-SDS2.5
(6)SDS 1/421/2"
SSTB20
165/8-
(2) 2x6
HDU4-SDS2 5
(IO)SDS 1/4"x2l/2'
SB5/8x24
18"
4A
HDU5-SDS2.5
(14)SDS 1/4"x2l/2"
SB5/8x24
18"
US
HDU8-SDS2.5
(20)SDS 1/421/2"
SSTB28
247/8"
US
HDUll-SDS2.5
(30)SDS fl/ex2l/2"
SBIX30
24"
6x8
MINIMUM SIZE OF POST AT END OF WALL UNLESS OTHERWISE
NOTED ON FRAMING PLANS.
JULL iur rLAIL
! HEADER
N
(2) BEARING
.O.N.
Typical Header Support w/2 Bearing Studs
(10)16d 0 4'oc STAGGERED (2) 16d 0 EA. STUD
AT EACH SIDE OF SPLICE ELSEWHERE
TOP CHORD SPLICE
6'-0" min. BETWEEN SPLICES
SPLICE TO OCCUR AT
OF VERT. STUD T`YP.
Typical Top Plate Splice
STRUCTURAL
ENGINEERING
4Third Avenue - Suite ino � S!attlq, WA 98-
P: �-6.443-6 ssfengineers.corn
934 Broadway - Tacoma, WA 98402
P: 253.284-9470 ssfengineers.com
0,pyright, 2017 S— Sy Feg6t - All Rights Reserved
Etc,
�A
42141
DRAWN:
PIC
DE51GN:
RHR
CHECKED:
RHR
APPROVED:
RHR
REVISIONS:
Al Permit Revisions March 26, 2019
RD DPD:
12
111110-
PROJECTTITLE:
Aw Residence
9527 190th PL SW
Edmonds, WA 98020
M97
Stobl Design LLC
P.O. BOX 20764
Seattle, WA 98102
(206) 661-3622
ISSUE:
Permit
=TITLE:
Wood Details
SCALE:
3/4" = 1'-0" U.N.O.
DATEt
March 26, 2019
PROIECT NO:
10963-2018-14
SHEET NO:
S4. i
NO: OF SHEETS:
21 17Z P3
JUN 0 5 2019
W.L.DING DEPAIMM.'PIT
Cn"Y OF EDMONDS
SHEATHING
PER PLAN
FULL DEPTH BLOCKING
B LO '
FULL DEPTH BLOCKING -
c may
W/ 8d 0 6"oc (may be
6 "a ( be
W/ 8d 0 6'oc (may be
ven,ing)
drilled for venting)
drilled for venting)
4CKIN
HI EA. TRUSS
USS
f
Hl EA. TRUSS
\—�—PRE—MANUF.
FASCIA
TRUSS
FASCIA
PER ARCH.
PER PLAN
PER ARCH.
NAILING PER
SHEARWALL SCHEDULE per ci-ch.
HEADER/BEAM
POST PER PLAN
SHEARWALL PER PLA
PER PLAN
Exterior Bearing Wall
R
per arch.
Beam & Post
SHEATHING
PER PLAN
PANEL EDGE NAILING OF
SHEARINALL BELOW
SHEATHING PER PLAN —
SHEATHE AND NAIL
PRE—MANUF. TRUSS
TRUSS TO MATCH
PER PLAN
SHEARWALL BELOW
BEAM PER PLAN
PRE—MANUF. TRUSSES —
PER PLAN
30ST CAP PER PLAN
SHEARWALL PER PLAN —
2 x BLKG. TO RECEIVE
PANEL EDGE NAILING
20 STUDS 0 24"oc
W/(2)16d TOE NAILS
EA. END
A35 PER SHEARWALL
SCHEDULE
WATERPROOFING PER
PANEL EDGE NAILING A35 PER SHEARWALL ARCH.
OVER ALL HOLDOWN STUDS SCHEDULE P.T. 2x LEDGER TO MATCH—\ FLOOR/FOUNDATION
VERTICAL GRAIN BLKG. WS
HOLDOWN PER PLAN DECK FRAMING (U.N.O.) FRAMING PER PLAN
TO MATCH HOLDOWN STUDS W/ SDS1/4x4. 1/2" SCREWS
@ 6"oc, STAGGERED
NAILING PER (4)8d INTO EACH BLOCK DECKING PER ARCH —
SHEARWALL SCHEDULE (typ)
JOIST DIRECTION AND
F/;�--SHEATHING PER PLAN . 0
13/4' LSL RIM JOIST OR - ,
MA
1 "16 1
BEAM PER PLAN
P I. DECK JOISTS PER--/
E
P'LAN (where joists are Elevation
perpendicular provide
I
LEAVE ONE END OF (2) 16d THRU EA.
LUS hanger @ledger)
STRAP UNAILED JUST JOIST OR BLOCK
�-E
PRIOR TO COVERING
WHERE JOISTS ARE
F
PARALLEL, PROVIDE
DTTIZ AT (4) LOCATION 1 4� min.
W
TJI BLKG. 0 48"oc
SHEARVIALL PER PLAN
EVENLY DISTR. ALONG DECK _EJ
AND (1) WITHIN 2� OF THE 5r max.
-BEAM/HDR. PER PLAN
(where occurs)
END OF DECK LEDGER. PROVIDE LA SDS pacing Elevation
3/8"0 LAG BOLT. EMBED 3"
INTO TOP P NOTE. LEDGER FASTENER SPACING
MAY BE OFFSET UP TO 3" TO AVOID
INTERFERENCE W/ JOIST ATTACHMENT
Exterior Floor Framing
10
11
Typical Deck Ledger Detail 12
STRUCTURAL
ENGINEERING
2124 Third Avenue - suite - Seattle, WA 98izi
P: 2o6.443.6212 ssfangineers.com
934 Broadway - Tacoma, WA 98402
P: 253.284-9470 ssfengineerr.com,
C-Might 2017 Sa..n SSY Fairk - All PightS Re—ed
WAS
42141
DRAWN:
PIC
DESIGN:
RHR
CHECKED
RHR
APPROVED:
RHR
REVISIONS:
Peraut Revisions March 26, 2019
DPD:
PROJECT TITLE:
Aw Residence
9527 190th Pl- SW
Edmonds, WA 98020
ARCHrrECT:
Stobl Design LLC
P.O. BOX 20764
Seattle, WA 98102
(206) 661-3622
ISSUE:
Permit
SHEET TrrLE:
Wood Details
SCALE:
3/4" = 1'-0* U.N.O.
DATE,
March 26, 2019
PRIMIECT NO:
10963-2018-14
SHEE r NO:
S4.2
NO: OF SHEETS:
F, rz- 3 U P13
JUN 0 5 2019
Duir-mom 2TINNT
CIT Ign
, ON,
NE 1/4, SE 1/4, SECTION 13, TOWNSHIP 27 NORTH,
AW RESIDENCE
9527 190TH PL SW
EDMONDS, WA 98020
OWNER CONSULTANTS UTILITIES LEGAL DESCRIPTION
CHAK AW ARCHITECT CIVIL ENGINEER WATER/SEWER/STORM NATURALGAS FIRE EDMONDS SEA VIEW TRS BUKOOOD-01-LOT2
9527 190TH PL SW STROBL DESIGN CG ENGINEERING CITY OF EDMONDS PUGET SOUND ENERGY EDMONDS FIRE STATION 16 CITY OF ED LLA REC U N D AFN 201211210469 &
EDMONDS, WA 98020 SEATTLE, WA 98105 250 4TH AVE S, SUITE 200 121 STH AVE N RD BOX 91269 8429 196TH ST SW SURV REC LIND AFN 201210195001 CORR BY NO
425.78S.2038 206.661.3622 EDMONDS, WA 98020 EDMONDS, WA 98020 BELLEVUE, WA EDMONDS, WA 98026 201211010497 BEING SWLY PTNLOT 79 SO PLAT
CONTACT: JACOB STROBL 425.778,8500 FAX 778.5536 425.551.1200
CONTACT: JARED UNDERBRINK
APPLICANT PARCEL NUMBER
STROBL DESIGN
SURVEYOR
SOIL/GEOTECH ENGINEER
POWER
TELEPHONE 004346-000-079-01
SEATTLE, WA 98105
GREENE LAND SURVEYING
SOUTH FORK GEOSCIENCES, PLLC
IS
SNCIHOM SH COUNTY PUD
COMCAST
206.661.3622
4708 164TH ST SW
PO BOX 1275
PO'BOX 1107
15815 25TH AVE W
DATUM-
CONTACT: JACOB STROBL
LYNNWOOD, WA 98087
NORTH BEND, WA 98045
EVERETT, WA 98206
LYNNWOOD, WA98087
206.498.0979 FAX: 497.1542
425.831.2023
425.783.1000
NAVD88
CONTACT: ROBERT GREENE
CONTACT., ANDREW GLANDON
GENERAL NOTES
HAULROUTE
RANGE 3 EAST. W.M.
CAUTION1
CALL BEFORE YOU DIGII
BUIE. UTILITIES EXIST IN THE AREA AND UTILITY
INF IORMATION SHOWN MAY NOT BE COMPLETE. CONTACT
THE NE- CALL UTILITY LOCATE SERVICE A MINIMUM OF 48
HOURS PRIOR TO CONSTRUCTION
1-800-424-555
FROM SITE: WEST ON 190TH PIL SW, SOUTH
ON OLYMPIC VIEW DR, EAST ON PUGET DR,
BECOMES 196TH ST SW, CONTINUE EAST
ON 196TH ST SW TO 1-5.
TO SITE: FROM 1-5, WEST ON 196TH ST SW,
BECOMES PUGET DR, NORTH ON OLYMPIC
VIEW DR, EAST ON 190TH PL SVV, SITE ON
NORTH SIDE OF ROAD.
NOTE: HAUL ROUTE NOT PERMITTED FOR A
TRUCK AND TRAILER.
GENERAL NOTES:
CONSTRUCTION SEQUENCE NOTES:
1. ALL MATERIALS AND WORK SHOWN ON THESE PLANS SHALL CONFORM TO THE CITY OF
21. A SEPARATE IRRIGATION PERMIT MUST BE OBTAINED FROM THE CITY PUBLIC WORKS
1. SCHEDULE A PRE -CONSTRUCTION MEETING WITH CITY ENGINEERING DIVISION AT
EDMONDS STANDARD PLANS AND DETAILS, THE FOLLOWING SPECIFICATIONS AND CODES,
DEPARTMENT. PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, PROVIDE TO THE CITY WATER
425-771-0220, EXT. 1326. TWO DAY (48 HR) NOTICE IS REQUIRED.
AND ALL OTHER APPLICABLE LOCAL MUNICIPAL, STATE, AND FEDERAL CODES, RULES AND
QUALITY TECHNICIAN, A COPY OF THE BACKFLOW TEST REPORT. TEST REPORTS CAN BE FAKED
REGULATIONS:
IL
To 42S_744_6057 OR EMA LED TO LINDA.MCMURPHY@EDMONDSWA.GOV. BACKIFLOW
2. REVIEW TEMPORARY EROSION AND SEDIMENT CONTROL NOTES.
CURRENT INTERNATIONAL BUILDING CODE (IBC)
TESTING SHALL BE COMPLETED BYTHE OWNER ANNUALLY THEREAFTER.
CURRENT WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL
3. CALL FOR UTILITY LOCATES.
CONSTRUCTION
22. ASA MINIMUM REQUIREMENT, ALL DISTURBED AREAS ON AND OFF SITE SHALL BE RETURNED
- WASHINGTON STATE DEPARTMENT OF ECOLOGY STORMWATER MANAGEMENT MANUAL
TO THE EQUIVALENT OF THEIR PRECONSTRUCTION CONDITION IN ACCORDANCE WITH
4. INSTALL TESC MEASURES AND MAINTAIN DUST CONTROL WHILE PREVENTING DISTURBANCE
FOR THE PUGET SOUND BASIN (CURRENT EDITION)
APPROPRIATE REQUIREMENTS AND STANDARDS.
OF ANY AREAS OF VEGETATION OUTSIDE THE CONSTRUCTION ZONE.
2. STANDARD PLAN AND TYPE NUMBERS INDICATED ON THESE DRAWINGS REFER TO CITY OF
23. ALL DISTURBED SOIL AREAS SHALL BE COMPOST AMENDED AND SEEDED OR STABILIZED BY
S. HAVE EROSION CONTROL MEASURES INSPECTED BY CITY OF EDMONDS CITY ENGINEERING
EDMONDS STANDARD DETAILS, UNLESS NOTED OTHERWISE
OTHER ACCEPTABLE METHODS FOR THE PREVENTION OF ONSITE EROSION AFTER THE
NSPECTOR. ALL TEMPORARY SEDIMENTATION AND EROSION CONTROL MEASURES MUST BE
:N
COMPLETION OF CONSTRUCTION. SEE EROSION CONTROL PLANS FOR SPECIFIC GRADING AND
PLACE AND INSPECTED PRIOR TO ANY CONSTRUCTION OR SITE CLEARING. EROSION AND
3. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOBSITE WHENEVER CONSTRUCTION IS
EROSION CDNTROL REQUIREMENTS.
SEDIMENTATION CONTROL PRACTICES AND/OR DEVICES SHALL BE MAINTAINED UNTIL
IN PROGRESS.
PERMANENT VEGETATION IS ESTABLISHED.
24. THE CONTRACTOR SHALL KEEP OFF -SITE STREETS CLEAN AT ALL TIMES BY SWEEPING.
4. DEVIATIONS FROM THESE PLANS MUST BE APPROVED BY THE ENGINEER OF RECORD AND THE
WASHI NG OF THESE STREETS WILL NOT BE ALLOWED WITHOUT PRIOR APPROVAL.
6. CLEAR, GRUB & ROUGH GRADE SITE. REVEGETATE DISTURBED AREAS NOT SUBJECT TO
LOCAL GOVERNING AUTHORITY.
ADDITIONAL SURFACE DISTURBANCE IMMEDIATELY AFTER ROUGH GRADING. (OTHER EXPOSED
25. THIS PROJECT IS NOT A BALANCED EARTHWORK PROJECT. BOTH EXPORT AND I MPORT OF SOIL
AREAS SHALL BE STABILIZED PER EROSION CONTROL NOTES BELOW).
5. CONTRACTOR SHALL RECORD ALL APPROVED DEVIATIONS FROM THESE PLANS ON A SET OF
AND ROCK MATERIALS ARE REQUIRED.
"AS -BUILT" DRAWINGS AND SHALL SUMMARIZE ALL ASBUILT CONDITIONS ON ONE SET OF
7. INSTALL UTILITIES AND OTHER SITE IMPROVEMENTS, INCLUDING FRONTAGE IMPROVEMENTS.
REPRODUCIBLE DRAWINGS FOR SUBMITTAL TO THE OWNER PRIOR PROJECT COMPLETION
216. SLOPE OF FINISHED GRADE SHALL BE CONSTANT BETWEEN FINISHED CONTOURS OR SPOT
AND ACCEPTANCE, A SET OF AS -BUILT DRAWINGS SHALL BE SUBMITTED TO THE CITY OF
ELEVATIONS SHOWN.
8. INSTALL INFILTRATION TRENCH. EXCAVATION OF INFILTRATION AREAS SHALL NOT BE
EDMONDS PRIOR TO FINAL APPROVAL OF THE BUILDING OCCUPANCY/FINAL PROJECT
ALLOWED DURING WET OR SATURATED CONDITIONS.THE BMP SHALL NOT BE MADE
APPROVAL.
27. FINISHED GRADE SHALL SLOPE AWAY FROM 13UILDING WALLS AT MINIMUM 5% SLOPE FOR A
OPERATIONAL UNTIL ALL EROSION -CAUSING PROJECTIMPROVEMENTS ARE COMPLETED AND
MINIMUM DISTANCE OF 10 FEET.
ALL EXPOSED GROUND SURFACES ARE STABILIZED.
6. ELEVATIONS SHOWN ARE IN FEET. SEE SURVEY FOR BENCHMARK INFORMATION.
.
28. CONTRACTOTSH ALL BE RESPONSIBLE FOR AND SHALL INSTALL AND MAINTAIN SHORING AND
9. STABILIZE AND COMPOST -AMEND ALL EXPOSED SOILSPRIOR TO REVEGETATION OF ENTIRE
7. THE LOCATIONS OF EXISTING UTILITIES AND SITE FEATURES SHOWN HEREON HAVE BEEN
BRACING AS NECESSARY TO PROTECT WORKERS, EXISTING BUILDINGS, STREETS, WALKWAYS,
SITE.
FURNISHED BY OTHERS BY FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS AND
UTILITIES ANUCITHER EXISTING AND PROPOSED IMPROVEMENTS AND EXCAVATIONS AGAINST
OF GtiOUNIFOR CAVING EMBANKMENTS. CONTRACTOR SHALL ALSO BE RESPONSIBLE
SH ULD THEREFORE BE CONSIDERED APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE.
C)
�Oss
-FOR REMOVAL OF SHORING AND BRACING, AS REQUIRED.
10. ESTABLISH LANDSCAPING AND PERMANENT VEGETATION. ALL TEMPORARY EROSION
I T IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE
ACCURACY OF ALL UTILITY LOCATIONS SHOWN AND TO FURTHER DISCOVER AND PROTECT
CONTROL MEASURES SHALL BE REMOVED UPON FINALSITE STABILIZATION AND APPROVAL BY
CITY INSPECTOR.
ANY OTHER UTILITIES NOT SHOWN HEREON WHICH MAY BE AFFECTED BY THE
29. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CITY AND FOLLOW CITY PROCEDURES FOR
IMPLEMENTATION OF THIS PLAN. CONTRACTOR SHALL VERIFY LOCATION, DEPTH, SIZE, TYPE
ALL WATER SERVICE INTERRUPTIONS, HYDRANT SHUTOFFS, STREET CLOSURES OR OTHER
AND CONDITION OF EXISTING UTILITY LINES AT CONNECTION OR CROSSING POINTS BEFORE
ACCESS RESTRICTIONS. CONTRACTOR SHALL NOT RELOCATE OR ELIMINATE ANY HYDRANTS
TRENCHING FOR NEW UTIUTIES� ENGINEER ASSUMES NO RESPONSIBILITY FOR THE
WITHOUTFIRST OBTAINING WRITTEN APPROVAL FROM THE FIRE MARSHAL.
COMPLETENESS OR ACCURACY OF THE EXISTING UTILITIES AND SITE FEATURES PRESENTED ON
THESE DRAWINGS. ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF CONFLICTS THAT ARISE.
30. COORDINATE AND ARRANGE FOR ALL UTILITY CONNECTIONS, UTILITY RELOCATIONS AND/Olt
SERVICE HITERRUPTIONS WITH THE AFFECTED OWNERS AND APPROPRIATE UTILITY
B. CONTRACTOR SHALL LOCATE AND PROTECT ALL UTILITIES DURING CONSTRUCTION AND SHALL
COMPANIES. CONNECTIONS TO EXISTING UTILITIES SHALL BE MADE ONLY WITH ADVANCE
CONTACT THE UNDERGROUND UTILITIES LOCATION SERVICE (1-800-424-5555) AT LEAST 48
WR17TENAPPROVAL OF THE AUTHORITIES GOVERNING SAID UTILITIES.
HOURS PRIOR TO CONSTRUCTION.
31, ALL UTILITIES SHALL BE PLACED UNDERGROUND.
9. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT THE PROJECT SITE BEFORE
STARTING WORK AND SHALL NOTIFY OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES.
32. EXISTINGUTILITY LINES IN SERVICE WHICH ARE DAMAGED DUE TO CONSTRUCTION WORK
SHALL BEREPARRED AT CONTRACTOR'S EXPENSE AND INSPECTED AND ACCEPTED BY CITY OF
10. PIPE LENGTHS WHERE SHOWN ARE APPROXIMATE AND MAY CHANGE DUE TO FIELD
EDMONDS AND OWNER'S REPRESENTATIVE PRIOR TO BACKIFILLING.
CONDITIONS.
33. NEW UTRITY LOCATIONS ARE GENERALLY SHOWN BY DIMENSION, WHERE NO DIMENSIONS
11. CONTRACTOR SHALL OBTAIN A COPY OF THE GEOTECHNICAL REPORT (WHERE APPLICABLE)
ARE INDICATED, LOCATIONS MAY BE SCALED FROM DRAWINGS. FIELD ADJUSTMENTS SHALL BE
AND SHALL THOROUGHLY FAMILIARIZE HIMSELF WITH THE CONTENTS THEREOF. ALL SITE
APPROVED BY OWNER'S REPRESENTATIVE AND CITY.
WORK SHALL BE PERFORMED IN STRICT COMPLIANCE WITH THE RECOMMENDATIONS OF THIS
34. FIELD STAKE ALL UTILITY STUBS AT THE PROPERTY LINE.
REPORT.
12, STRUCTURAL FILL MATERIAL AND PLACEMENT SHALL CONFORM TO THE RECOMMENDATIONS
35. TRENCH BACKFILL OF UTILITIES LOCATED WITHIN THE CITY RIGHT-OF-WAY SHALL BE
OF THE PROJECT GEOTECHNICAL REPORT.
COMPACTED TO 95%. COMPACTION TEST REPORTS SHALL BE PROVIDED TO THE CITY PRIOR TO
PAVING.
13. SUBGRADE SOILS IN ALL AREAS WHERE RAIN GARDENS, INFILTRATION OR PERVIOUS
PAVEMENT IS TO BE PLACED SHALL BE DELINEATED AND PROTECTED AT ALL TIMES FROM
36. WHERE NEW PIPE CLEARS AN EXISTING OR NEW UTILITY BY 6" OR LESS, PLACE POLYETHYLENE
COMPACTIVE ACTIVITIES (i.e. HEAVY EQUIPMENT, STOCKPILING).
PLASTIC FOAMAS A CUSHION BETWEEN THE UTILITIES.
14. MANHOLES, CATCH BASINS, UTILITIES AND PAVEMENT SHALL BEAR ON MEDIUM DENSE TO
37. SEE MECHANICAL DRAWINGS (WHERE APPLICABLE) FOR CONTINUATION OF SITE UTILITIES
VERY DENSE NATIVE SOIL OR COMPACTED STRUCTURAL FILL. IF SOIL IS DISTURBED, SOFT,
WITHIN THE BUILDING.
LOOSE, WET OR IF ORGANIC MATERIAL IS PRESENT AT SUBGRADE ELEVATION, REMOVE AND
38. SEE DRAWINGS (WHERE APPLICABLE) FOR EXTERIOR ELECTRICAL WORK.
REPLACE WI TH COMPACTED STRUCTURAL FILL PER GEOTECHNICAL REPORT.
�UiErfiC
�k
15. SEE SURVEY AND ARCHITECTURAL DRAWINGS FOR DIMENSIONS AND LOCATIONS OF
39. SEE LANDSCAFE DRAWINGS (WHERE APPLICABLE) FOR SITE IRRIGATION SYSTEM.
BUILDINGS, LANDSCAPED AREAS AND OTHER PROPOSED OR EXISTING SITE FEATURES.
40. PIPE MAiERIAL AND SIGNAGE SUBMITTALS SHALL BE PROVIDED TO CITY ENGINEERING
16. SEE ARCHITECTURAL DRAWINGS FOR PERIMETER FOUNDATION DRAINS. FOUNDATION DRAINS
DIVISION FOR APPROVAL PRIOR TO INSTALLATION.
SHALL BE INDEPENDENT OF OTHER SITE DRAIN LINES AN D SHALL BE TIGHTLINED TO THE
STORM DRAIN SYSTEM WHERE INDICATED ON THE PLANS.
41. EXISTING AILING, DAMAGED OR NON-ADA COMPLIANT FRONTAGE IMPROVEMENTS SHALL BE
REMOVEVAND REPLACED AS DETERMINED BY THE CITY ENGINEERING INSPECTOR.
17. ALL REQUIRED STORMWATER FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR
TO INSTALLATION OF ANY PAVEMENT UNLESS OTHERWISE APPROVED BY THE ENGINEER.
42. UTILITY PPFCHES SHALL BE COMBINED AND FULL WIDTH OR HALF WIDTH OVERLAY WILL BE
REQUIRECDEPENDING ON THE EXTENT OF DISTURBANCE. WHERE UTILITY PATCHES FALL
18. ALL ROOF DRAINS, PERIMETER FOUNDATION DRAINS, CATCH BASINS AND OTHER EXTERNAL
ENTIRELY VITHIN ONE TRAVEL LANE, THE OVERLAY SHALL EXTEND TO THE CENTERLINE OF
ROADWAI WHERE UTILITY PATCHES EXTEND INTO BOTH TRAVEL LANES THEN A FULL WIDTH
DRAINSSHAL BE CONNECTED M THE STORM DRAINAGE SYSTEM, UNLESS NOTED
OTHERWISE.
OVERLAYS REQUIRED.
19. ALL FOOTING DRAINS SERVING BUILDINGS, WALLS, ROCKERIES, ETC. SHALL CONNECFTO THE
DRAINAGE SYSTEM DOWNSTREAM OF THE SITE'S STORMWATER INFILTRATION SYSTEM.
20. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS REQUIRED FOR INSTALLATION OF ALL
SITE IMPROVEMENTS INDICATED ON THESE DRAWINGS.
SHEETINDEX
C1.1
COVER SHEET& GENERAL NOTES
C2.1
TEMPORARY EROSION CONTROL PLAN
C2.2
EROSION CONTROL DETAILS
C3.1
GRADING & DRAINAGE PLAN
.S3.2
GRADING & DRAINAGE DETAILS & ENLARGED GRADING PLAN
C4.1
WATER & SEWER PLAN
C4.2
WATER &SEWER DETAILS
IMPROVEM ENT AN D TRAFFIC CONTROL PLAN
IMPROVEMENT DETAILS
I
NTROL DETAILS
Ai
VICINITY MAP
FITS a
LEGEND
DESCRIPTION
EXISTING
PROPOSED
ABN
BLDG
BOW
q
OR
CIMP
CO
CONIC
CONST
Op
CUYD
DDCVA
DI
DIA
DIP
ABBREVIATIONS
PROPERTY LINE
ABANDONED
MIN
IVU
MON
NIS
OC
PC
PI
PIV
Frr
PVC
P,I
PVMT
PVT
R
REINF
FU
RET
FIT
SO
SECT
MINIMUM
ADJACENT PROPERTY LINE
BUILDING
MECHANICALJOINT
CENTERLINE
BOTTOM OF WALL
MONUMENT
CLEARING LIMITS
CENTERLINE
NOT TO SCALE
SILT FENCE
X- X-
- x- X-
CATCH BA -SIN
ON CENTER
CONTOUR LINE
- 100 - - - - -
(��
CORRUGATED METAL PIPE
POINT OF CURVATURE
FENCE
-11-�
0
CLEANOUT
POINT OF INTERSECTION
SANITARY SEWER LINE
ss - ss -
�ss�ss_
CONCRETE
POST INDI CATORVALVE
MANHOLE
CONSTRUCTION
PROPERTY LINE
STORM DRAIN MAIN
SD - SD -
-SD-SD-
CONCRETE PIPE
POINTOFTANGENCY
_STORM DRAIN PIPE
- - - - - - - - - -
- -
CUBICYARD,
POLYVINYL CHLORIDE PIPE
ROOF DRAIN
R - - - R - - - R -
-R-R�
DOUBLE DETECTOR CHECK
VALVE ASSEMBLY
POINTOFVERTICAL
INTERSEC'nON
FOOTING DRAIN
F - - - F - - - F -
F-F-
DUCTILE IRON PIPE
PAVEMENT
PRESSURE LINE
P - - - P - - - p -
-p-p
DIAMETER
POINT OF VERTICAL TANG.
CATCH BASIN (TYPE 1)
0
0
DUCTILE IRON PIPE
RADIUS
CATCH BASIN (TYPE 2)
EA
EJ
ELEV
EDP
EX
FDC
FFE
EACH
REINFORCEMENT
CLEANOUT
EXPANSION JOINT
RESTRAINED JOINT
CLEANOUT AND WYE
ELEVATION
RETAINING
GRADE BREAK
- - - - - - -
- - - - -
EDGE OF PAVEMENT
RIGHT
STORM DRAIN
SURFACE SWALE
EXISTING
DRAINAGE ARROW
FIRE DEPT. CONNECTION
SECTION
WATER LINE
--WA�
FINISHED FLOOR ELEVATION
SOMH
SIM
SQ
SS
SSMH
STORM DRAIN MANHOLE
WATER METER
a]
FH
FL
FT
GV
HP
HT
ID
IE
L
LOPE
UP
LP
LT
MAX
FIRE HYDRANT
SIMILAR
FIRE HYDRANT
FLANGE
SQUARE
FOC
'or
FEET/FOOT
SANITARY SEWER
PIV
0
GATE VALVE
SANI[TARY SEWER
MANHOLE
GATE VALVE
x
x
HIGH POINT
STA
STI3
STL
TB
TOC
TOW
STATION
TEE
IT.
T.
HEIGHT
STANDARD
90'BEND
INSIDE DIAMETER
STEEL
THRUST BLOCKING
INVERT ELEVATION
THRUST BLOCK
CAP
UENGTH/LINE
TOP OF CURB
CONCRETE PAVEMENT
4
LINED CORRUG ATED
POLYETHYLENE PIPE_
TOP OF WALL
ASPHALT PAVEMENT
LINEAL FOOT
TOP
TYP
Vc
TOP ELEVATION
CRUSHED SURFACING
LOW POINT
TYPICAL
ROCKERY
LEFT
VERTICAL CURVE
SPOT ELEVATION
/-20.0
20.0
MAXIMUM
W/
WITH -
TELEPHONE LINE
T - - - T -
T- T-�'
MECH
MECHANICAL
WM
WATER METER
POWER LINE
E - - - E -
-E-E
. L
�M�AH
GAS LINE
G - - -
IGN
COMPLIES WITH APPLICABLE
lXCITY TO WATE��
t5:TPk,ll
/\PPROVED FOR CONS-VRUC71ON
CITY OF EDMONDS
DA7E..
Br
CITY�664EERING�g[VISION
A� 4mi
mraWeRING
250 47H AVE. S., SUITE 200
EDMONDS, WASHINGTON 98020
PHONE (425) 778-8500
FAX (425) 778-5536
09116119
AM
U, cc I= cc
c Him 2
c ca �i
DESIGN: TAF
DRAWN:
ATD
CHECK:
ipu
JOB NO:
18300.20
DATE:
01/21/19
19%lrlea
0
z
0
C'4
< Lo
0
LLJ
00
1--
_j a)
LLI 0
LLI
0 <
Ld Z
z
LLI
V)
<
V)
ct cl:f
ILLI z
0
w Ld
> :z
04 M
Ln C:��
0 L'i
0) L'i
0 0
SHEET: KESUIP
SEP 19 2019
BUILDING DEPA MENT
OR OFEDMONDS
cl .1
BLP 2co n-
NE 1/4, SE 1/4, SECTION 13, TOWNSHIP 27 NORTH, RANGE 3 EAST, W.M.
ASPHALT
SIDEWALK
NO MON. FND.
FOUND CASE
N 0.7 E 1.8
IE IN 18"E): 136.33
ENGIN&RING
250 4TH AVE. S., SUITE 200
EDMONDS , WASHINGTON 98020
PHONE (425) 778-8500
FAX (425) 778-5536
om6lig 1
co m m m
Ln V) V)
w cc w w
w w -
(L fL (L o.
wj;�4
1,�i
1;�4
�;�4 �;�41
Ln
0
a 0
c)
of
tj
ESIGN:
7AF
DRAWN:
ATID
CHECK:
-OB
Jpu
J N 0:
1830020
DATE:
z
CL
CE
0
0
-ISMH RIM=172.73
V) C,:)
z
CY)
_j
LLI CL 0
L)
z
F- < Z
0 X 0
�-) o
20
Li z CL
r�' 0
0
,ONSTRUCTION
C-4 M
Lo m Q'-
< CY) w LLJ
I
)MONDS
SHEET: RESUB
SEP 19 2019
J
FIT
PUILDING.IDEPMA0
ED NDS
C2.1
NE 1/4, SE 1/4, SECTION 13, TOWNSHIP 27 NORTH, RANGE 3 EAST, W.M.
= 4mi
2' x 2" WOOD/STEEL
FILTER FABR C SECURED-\
TO 2'
WIRE Full"C EQUAL
NATIVE loft,
,ILL -T L L,
/lILTE lABlIC MATERIAL IN CDlGlNlUl ROLLS
USE STAPLES OR WIRE RINGS TO ATTACH
FABRIC TO WIRE
2* . Z* WOOD/STEEL POSTS
/-WIRE MESH FENCE
M SUPPORT FILTER
-111,
I "BURY OBOTIl.. III MIL.1
MATERIAL 8' TO 12"
6' MAX
NOTES*
1. CONTRACIFOR/DEVELOPER SHALL MAINTAIN AND ENSURE PROPER
EROSION CONTROL THROUGHOUT PROJECT. CITY INSPECTION REQUIRED ON
2. SILT FENCE TO BE PLACED DOWNSLOPE OF COMSTRUC�ION ALL EROSION CONTROL METHODS
ACTMTY- BEFORE OTHER WORK C,
R�SON DAT
FILTER FABRIC FENCE JANUARY 2018
CITY OF EDMONDS FILTRATION SYSTEMS
PUBLIC WORKS STANDARD
DEPARTMENT D ETA] L
APPROVED BY R. ENGLISH ER-900
FU WIDTH
551
DETAIL NOTES
THE MINIMUM LENGTH SHALL BE EXTENDED AS NECESSARY TO ENSURE MATERIAL IS NOT TRACKED OFF SITE
AND/OR INTO THE PUBLIC RIGHT-OF-WAY.
ATE DRIVEWAY RAMP AND/OR SITE ACCESS ROAD 15' WIDE MIN. SEE TABLE BELOW FOR REQUIRED LENGTH.
NOTES:
1. SURFACE WATER - ALL SURFACE WATER FLOWING OR OVERTED TOWARD CONSTRUCTION ENTRANCES SHALL BE PIPED
ACROSS THE ENTRANCE. IF PIPING IS IMPRACTCAL A MOUNTABLE BERM WITH 5:1 SLOPES WILL BE PERMITTED.
2. MANTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING
OF SEDIMENT OFF SITE AND/OR ONTO PUBLIC RIGHT-OF-WAY , THIS MAY REQUIRE PERIODIC TOP DRESSING WfTH
ADDITIONAL QUARRY SPILLS AS CONDITIONS DEMAND AND REPAIR AND/OR CLEAROUT OF ANY MEASURES USED TO
TRAP SEDIMENT. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED OFF SITE AND/OR ONTO PUBLIC
RIOHT-OF-WAY MUST BE REMOVED IMMEDIATELY.
3. WHEELS SHALL BE CUEANIM TO REMOVE SEDIMENT PRIOR TO LEAVING THE SITE. WHEN WASHING IS USED. IT SHALL
BE DONE ON AN AREA STABILIZED WITH QUARRY SPILLS AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING
DEVICE.
4. INSPECTOR AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH RAJN.
PROJECT
SIZE
MIN LENGTH OF (FELT)
QUARRY $PALLS*
1/4 ACRE
30
< 1 ACRE
so
3 ACRE
100
3 ACRE
100
PROVIDE OR ASPHALT
TRANS ON WHERE FRONTAGE
ROM IS AN AN II
LEN TO BE DETERMINED
BY CITY INSPECTOR.
CITY INSPECTION REQUIRED ON7
ALL EROSION CONTROL METHODS
BEFORE OTHER WORK CAN RI
REV310 DAT
Y
STABILIZED CONSTRUCTION JANUARN 2019
CITY OF EDMONDS ENTRANCE
PUBLIC WORKS STANDARD
DEPARTMENT D ETAI L
IPPROVED BY R. ENGLISH ER-901
r GRATE
-FILTER SOC WfTH
OVER FLOW HOLES
(TYP)
ATCH BASIN
1- COnCTOPR/DOENVELO ER SKILL MAINTAIN
THS PU �M AT ALL TIMES DURING
CONSTRUCTION PERIOD.
2. ANY SEDIMENT IN CATCH WIN INSERT
SHALL BE REMOVED WHEN INSERT IS
ONI FUU.
3.CrTY INSPECTION REQUIRED ON ALL
EROSION CONTROL METHODS BEFORE
OTHER WORK CAN BEGIN.
REVISIO DATE
TEMPORARY JANUARY 2018
CITY OF EDMOND SEDIMENT TRAP
PUBLIC WORKS FOR CATCH BASINS STANDARD
DEPARTMENT DETAIL
P'"'o, I A ER-902
CITY OF EDMONDS STANDARD DETAIL CITY OF EDMONDS STANDARD DETAIL (—o'\—CITY OF EDMONDS STANDARD DETAIL
SCALE: INTS kZj_S_C_AL_E.T.1
APPROVED FOR CONSTRUCTION
CITY OF EDMONDS
DATE -
BY.
CITY N&LERING DII
C-NGIN66RING
250 4TH AVE. S., SUITE 200
EDMONDS, WASHINGTON 98020
PHONE (425) 778-8500
FAX (425) 778-5536
09116119 1
GO co m BE,
Go
cc w w cc
CL
DESIGN: TAF
DRAWN:
ATID
CHECK:
JPU
JOB NO:
18300.20
DATE:
01/21/19
V)
F-
Ld
0
—i
0
C-4
0
0
Do
_j 0)
0
LLj (L
0
L)
z m
LLI I
00 V)
z
in— �2 0
0
LLI z
r- 0
V)
04 m
cy
< a) LLI
Ld
SHEET: RESUB
SEP 19 2019
BUILDING DEPA
CITY OF EDMRTmEN,
ONDS
C2.2
NE
1/4, SE 1/4,
SECTION
13,
TOWNSHIP 27 NORTH,
RANGE
3 EAST, W.M.
1 6. 4
x
16"
TOP: 142.0 2-
x
30"
X
�'4
TOE .0
EG:: 114411.0
\T.,: L.-
.1�1 00 1
14.1
TOP' 1 60.0
OE�S�5.8
ET 60
rE: 141,00
EG: 141.0
:156.
WINDOW ALL
TOP 156.0
p
TOE: 150.0
�ELL
z
TOF\ 147.0
TOP: 147.0
W Do
N
x
WINDOW
\TOP: 158.0 11 11
To E: 150.0
X
TOP: 141.75
TOE:
1 4.50
TOE.. 1 .0
r-
VIEL b
TOP:
-
. X
WINDOW WELL
r
O�
TOE 140.0
TOP: 164.0
RDT'A
ME-159.75
\ 170
67.09'
ID
N S=
SEE DETAIL)
C3.
\
11%P.So
0
TOP: 141.75
To E: 139.50
TOP: 1T407-
&
TOE"k47.0
E NT
(MAIN FLOOR TO
30"
Ld
I \� 06
ASPHALT.
SIDEWALK
NO MON. FND.
FOUND CASE
N 0.7 E 1.8
IE IN (8" E): 136.33
SDCO .50 COVERE ROVE)
WA j WK-- WA- W� W w z
ROOF
FROO' NEW Sl MILY RiSIDENCE
ERHANG . . \ I 1�1
EI.A.G ENTRY' 15� 0 JAIN FNF%EUAO
=FL 0 S., , ARAGE: 157.38
EDo.%KA El BSTT FFE' 147.�
BSMT ENTRY: �7.0
TOP: 141.75 CONNECTROQF CONN�Cr FOOTING
TOE: 139.50 DRAINS ONLY I DRAINS�NLY
0 7.13
(M X IE: 143
4WXS'X3' INFILTRATION TRENCH T E; t4 .0 Al� ENTRY: 158.�
z TOP: OF TRENCH: 142.0
T
0, ! CH. !I�D
Q
BOTTOMOFTRENCH 1390
ZI TR N Ti
INSTALL PUSH -ON
w : (a '.S. ON TEE SEE ARCH PLANS
K, OBSERVATION PORT PER 3 TOP: 147.0 7.41
z TOP: 141.5 TOE: 144.50 2.'IMAX HT CONCRETE OR ASEMENT
Q 140.00 RETAINING WALL FVALBL LOCATIONS
Ld Ld TOE: p
EG: 138.75 ISO GAAGE ENTRY: .57.3 AND HEIGHTS
0 PE: 14 1 TOP: 64 .
TO :162 1-71
r 3
4=-4m
ENGIMERING
250 4TH AVE. S., SUITE 200
EDMONDS, WASHINGTON 98020
PHONE (425) 778-8500
FAX (425) 778-5536
dffi
09116119
TYPE I IN (SOLID LID) 0) 0) 0) 1 m I c)
CATCH BAS RIM 143 * 0 w -` -1 -` �
/-]E f1N(Ei'5E-)'. 1MISO 4" TRi 5 �ar -ar -I
11QU1R('6'.NW 141,0 TRENCH D
S. 'E L - 1. "A0 C, '�:r 13�
'0 )'14 -MtO RO DRAINS)
'�IF
0
TOP: 145 0 <
0 157.96
EG: 141.5
TOE: 141.5 TOE: 14"4.. .
.250. H
TOE-z 1
EG: 145.. 0 TOP.
TIE FOOTING DRAIN _46'57f' E DESIGN: TAF
INTO OVERFLOW PIPE 7, EG: 1 1. TOP: 155.50
TOE: 154.0 DRAWN: ATD
r EG: 155.0 161.0 A 4
CHECK: JPU
RAMP GRA.ES(& 6:149.0 JOB NO: 18300.20
o/
DATE: 01/21/19
152.0
EG: :154.50
0
�OP: 155.75
1' SAWCUT IN TOE: 155.25
EG: 156.0 77.8,,
0.
5
WES. T.-BZ0'6ND T'RAVEL
LANE TO I
1 158.70
PROPOSEDASPHALT
79-07'42- DRIVEWAY
45.12
242. i'M
0
BS 147.81
B RIN .06 SW 15 59 BS 158.08
OIL11=1410.06 1 .92 co
IN= 40.V4 TO 45. 1.51
1/4" LLJ
"If I I 1 0
IE OUT (8"/W): 162.73
SMH RIM=! .3 144.541 15734 <
.14723 A J154.95 - q
S - 15 .66 1 0. z
162.31
/TYPE I CATCH BASIN RlM 157.79 DR*4111TIES BY OTHERS
RIM: 158.0± R
LrPLACE EX CB
D W/ SOLIIDSTNON_ (BRING(
)FFbFEX1&ZWQ
IRE OUT (8" S): 156 0 $LIP LID. ADJUST RIM UTILI�Y POLE) CB RIM
190TH PL SW �S K-EdESSARY 3: C'4
SMH RIM=172.73 v)
ASPH. DO
LLJ
=�D\ SO
IM=171.42 0
z
GRAD G DRAINAGE PLAN
SCALE: I" = 101
GRADING QUANTITIES
TOTAL EXCAVATION (CUT) - 1120 CU YDS TOTAL PAVfNG LEGEND
EMBANKMENT (FILL) - 850 CU YDS NEWASPHALT
TOTAL 1970 CU YDS
THE QUANTITIES SHOWN ABOVE ARE FOR THE PERMIT PROCESS OVERLAY EXISTING ASPHALT
ONLY, THESE VALUES ARE APPROXIMATE. DO NOT USE FOR NEWCONCRETE
BIDDING, PAYMENT, OR ESTIMATING PURPOSES.
0 0) - %-t
0., V)
NOTES: INOTE: -0 z
1. TSEPARATION IS REQUIRED BETWEEN THE DRY UTILITIES (POWER, GAS, PHONE, CABLE, ETC.) AND - 10 6 5 10 2L)a LLI Z
SEWER, WATER, AND STORM AND 5'FROM ANY CITY MAIN LINES I EG: EXISTING GRADE 10:� r"
2. SITE WALLS PER STRUCTURAL.
TOP: F NISH GRADE AT TOP OF WALL
3. DRIVEWAY SLOPES SHALL NOT EXCEED 14% SLOPE.
TOE: FINISH GRADE AT BOTTnM Q9 WALL
4. CONTRACTOR To VERIFY EXISTING ELEVATIONS PRIOR TO CONNECTING PROPOSED DRAINAGE
SYSTEM.
5. FOR TRENCHING, SEE DETAIL 4/C4.2.
K
6 T GHTLINE PIPES UNDER DRIVABLE SURFACES SHALL HAVE TMINIMUM COVER.
SOILS REPORTS:
7 NEW/REPLACED IMPERVIOUS SURFACE: 6,050 SF
ROOF: 4,OODSF
1. GEOTECHNICAL ENGINEERING REPORT
DECK/WALKWAYS (UNCOVERED): 256SF
REPORT NUMBER: 12058
DRIVEWAY (ON -SITE, UNCOVERED): 418 SF
PREPARED BY: SOUTH FORK GEOSCIENCES
DRIVEWAY (ROW, UNCOVERED): 309 SF
DATED: JANUARY 14, 2014
190TH ROAD WIDENING: 264 SF
2. STORMWATER INFILTRATION LETTER
S IDEWALK: 803 SF
REPORT NUMBER: 110SO19
8. ALL DISTURBED AREAS ON AND OFF -SITE SHALL BE COMPOSTAMENDED PER REQUIREMENTS OF
BM P TS-13 IN THE STORMWATER MANUAL, VOLUME V, CHAPTERS.(see 5D-64z)
4 All FINAI RFMRATInKIWAll RFrnmPjrTFnRVTWFrnNTRA�nR
P REPARED BY: NELSON GEOTECHNICAL ASSOCIATES
DATED: MAY 24,2019
C'4 M --L .
Ln m I
< 01) LAJ 0 p
SHEET: R 2 8 U S
SEP 19 2019
BUILDING DEPARTMENT
CITY OF EDMOND��
C3.1
NE 1/4, SE 1/4, SECTION 13, TOWNSHIP 27 NORTH, RANGE 3 EAST, W.M.
4= 1
4" DIA PERFORATED PVC PIPE
WITH 6" OF 1" MINUS GRAVEL MIN FROM WOOD.
S"
ALL AROUND, WRAPPED IN SEE STRUCTURAL DRAWINGS
NON_WOVEN GEOTEXTILE FABRIC,
SLOPE AT 0.5% MIN. TURN DOWN
P ERFORATIONS AS SHOWN
6'. DOWNSPOUT TIGHTLINE TO FINISHED GRADE
CONVEYANCE SYSTEM @ 0.5%
MIN. PLACE NEXT TO FOOTING
DRAIN OR AS SHOWN ON
GRADING 8, DRAINAGE PLAN
(CONTRACTOR MAY LOCATE ON
EITHER SIDE OF FOOTING DRAIN) 0 0
0 0
00 00
-0 o �oq
LINE OF MAX EXCAVATION. o .06 4 4
0
F SOIL IS OVEREXCAVATED, oo .�6
REPLACE WITH LEAN MIX 0 olo
CONCRETE / / FOOTING
z
1
FOOTING AND ROOF DRAIN SECTION
Z��
WE rA
140.76
140.66
,k,
TYPE 1 1 L CATCH
UNDERDRPJN PI C
0"
/ ILID LID PER GUTTER
W S,
CITY STANVA'. DETAIL
SQ-303 OR
J.) L
TRE
...........
-7-
V.E
5, (MIN)
L-10' N)-
(MI
PROPERTY UNE/EA.SEMENT
PLAN
4 (MIN) DIX OBSE- 10-N LLS
INTS
SPACE 25' APART (MAX), 1
D
'ELL (MIN) PER TRENCH
vi
WNSPOUT
-
CLE&NOU
.......... 4- (MIN) PVC DRAIN
6' iV'N) PIPE PER WSDOT
SPED. 9-05.1p.
(MIN) MAINTAI POSITIVE
4- (MIN) PERFORATE PVC J REMOVABLE PUSLCPE
UNDERDRAIN PIPE PER WSDOT SH-ON PVC TEE
5PEC� 9-05 .2(5), LAID LEVEL PVC DRAIN PIPE
�100' (MAX) —
PROFILE
P TIC BOX NTS GENERAL NOTES;
MARKED "DRAIN" TEST PLUO i. REFER TO THE 2017 OTY OF EDMONDS
STORMWATER ADDENDUM FOR SETBACK
(MIN)
(CHECKLIST 13) AND INFEASIBILITI REQUIREMENTS,
E
OBSERVATION tlCGA"CKFlLL' MIN COVER DEPTIS, AS11J.E N. -.1DU—
WELL, SEE NOTE 3 LOADING. DESIGNER TO SPECIFY COVER DEPTHS IF
VEHICULAR TRAFFIC ANTICIPATED.
WASHED DRAIN
ROCK, SEE 4
NOTE 2 NOTES:
GEOTEXTILE
SEE NOTE I . PLACE OEOTEXTILE FABRIC ALONG WALLS AND TOP
OF WASHED ROCK- GEOTEXTILE SHALL CONFORM TO
(MIN) WSDOT SPEC. 9-33.2(1). GEOTEXnUE FOR
LLx SEPARATI
ON, NON-WOVEM TYPE.
(MIN) S ABOVE
FASONAL 2. WASHED DRAIN ROCK SHALL CONFORM TO WSDOT
UNCOMPACTED NATIVE 0110 HIGH R SPEC. 9-03.12(5). GRAVEL SACKFILL FOR DRI
MATERIAL SCARIff 3" 11DWATE
N�
(MIN) ECToN TA13LE OR 3. OBSERVATION WELL SHALL CONFORM TO WSOOT
HYDRAULICALLY SPEC 9-05,21(t), PERFORATED PVC UNDERDRAIN
RESTRICTIVE PIPE.'
LATER
REMS ON DATE
TYPICAL DOWNSPOUT DECEMIDER 2Ot7
CITY OF EDMONDS INFILTRATION TRENCH
PUBLIC WORKS STANDARD
DEPARTMENT DETAIL
APPROVED BY: R. ENGLISH SD-636
ASPHALT CONCRETE
WEARING COURSE
HMA CLASS 1/2" PG 64-22
(WSDOT STD SPEC 5-04.1)
CRUSHED SURFACING
BASE COURSE (WSDOT
STD SPEC 9-03.9(3))
SUITABLE NATIVE MATERIAL
FILL; TOP 12" COMPACTED TO A
MINIMUM OF 95% RELATIVE
COMPACTION USING AASHTO
T-180 (ASTM D1557).
UNSUITABLE NATIVE MATERIAL
SHALL BE REPLACED
CITY OF EDMONDS STANDARD DETAIL /� TYPICAL PAVEMENT SECTION
—EITYX k,.f ) SCALE: V'=l'-lll
7
o
B 142.45
o
BSW
140.74
143.18
p
T�'C 1"" TOC 143.10
141.8
A
G
G
r,'� ENLARGED GRADING PLAN
U4 SCALE. -V = S' "I I I I =1 a
5 0 2.5 5 10
APPROVED FOR CONSTRUCTION7
CITY OF EDMONDS
DAM- C) LILVI,
By. — v&x j �
arf Waka itioN
CENGINeeRING
250 4TH AVE. S., SUITE 200
EDMONDS, WASHINGTON 98020
PHONE (425) 778-8500
FAX (425) 778-5536
09116119 1
V) LA 0
w w w
F-
2 2 2
DESIGN: TAF
DRAWN: ATD
CHECK: JPU
JOB NO: 18300.20
DATE:
01/21/191
V)
z
Lj -j
co-
Z
Z
0
04
0
op
Ld
Z
Lj CL
C-)
<
-
z
<
Lj
0
0) V)
— a
Z z
— Ld
Lj.j z
w r�, 0
0
< C)
04 m
>1 Ln n
< a) Lu
SHEET: RESUS
SEP 19 2019
BUILDING DEPARTMENT
CITY OF EDMONDS
C3.2
ASPHALT
31DEWALK
NO MON. FND.
FOUND CASE
N 0.7 E 1.8
1
IE 1. (8" E): 136.33
NE 1/4, SE 1/4, SECTION 13, TOWNSHIP 27 NORTH, RANGE 3 EAST, W.M.
301, 0
x '7
I , I x . / I
1 8" x 30' .
2' E
�73,1
14"\
z x
O� 170
0 67.09'
30"
—W WA-WA-W A-� W
NEW SI ILY RIESIDENCE
I AIN FiE.�OM
I IARAGE: 157 3
NEW V. WATER BS�AT FFE: 147.
1-1/2" 1 / j�
METER AND
COPPER SERVICE L
LINE(@
Li I
C
I
-CX'L
IR111NrION
D
'I
x
L- VALVE
z
A
w
L)
LL
I
v ssco
zf 1\
SSCO 2 1 , ' -- — 1\ I I
IE: 144.84 :4. s
-2�-_46'57f' E
0 6" SS 0 W/ 12" CAST IRON PHOLE
COVERW/1 HEX BOLTS .14'
IE: 144.02± 1610
END CONP 1/2 PIPE 1 0
NEW SIDE SEWER
W 7- 77.821,
CO CTION W/ 8"x6!'WYE
W
�e�IE! 143.02
7ft7'
2
do
f -T-
42.a-y
,CB RIN .2.06
E OU, 0.06
E IN= 140[74
IE OUT (8"IW): 162.73
MH RIM=l 0.33
S
S S S S
M 157.79
/* CB RI
L
U) 190TH PL SW
SPH
1: — \\,\\ \\\\k \ / \\\\ / \\\\ N\\\
WAILRANDSi ERPLAN
NOTES:
1. PIPE BEDDING AND TRENCHING PER DETAIL 41C4.2.
2 ' HMA & UTILITY PATCHING PER DETAIL S/C4.2.
3. A MINIMUM OF S'OF HORIZONTAL SEPARATION IS REQUIRED BETWEEN WATER
AND STORM LINES.
A4 . CITY SHALL TV SEWER MAIN PRIOR TO FINAL ACCEPTANCE.
S. ALL FINAL RESTORATION SHALL BE COMPLETED BY THE CONTRACTO R, NOT TH E
CITY OF EDMONDS.
OFA LN
5 10 J" "
APPROVED FOR CONSTRUCTION
CITY OF EDMONDS
DATE;
BY.
= 4ml
ENGINGGRING
250 4TH AVE. S., SUITE 200
EDMONDS, WASHINGTON 98020
PHONE (425) 778-8500
FAX (425) 778-5536
09116119 1
co co ca ca
co =) =) n
In In
cc
F-
oo� o0z I lm= C�� a=
DESIGN: TAF
DRAWN:
ATID
CHECK:
JPU
JOB NO:
18300.20
DATE:
01/21/19
a_
w
Ljj
04
Ld
U) 0
00
Lj a-
z
LLI F-
<
V�
Ld z
LLJ
0
C-4 M
U) 0
<
< a) 1-161
SHEET: RESUB
SEP 19
2019
BUILDING
CITY OFDEEDPMAOTNfvDlENT
S
C4.1
NE 1/4, SE 1/4, SECTION 13, TOWNSHIP 27 NORTH, RANGE 3 EAST, W.M.
PROPERTY
LIME
R.O.W
IRINISHED GRADE-\
-'-.-'TYBZ3P-EC
BALL VALVE
A 4e.
�L - - J
z
DIRECTION '411_�
(IF FLOW
WATER
WIN
MATERIAL USI
ALL I" SERVICES TO BE TYPE "K" SOFT COPPER TUBING
I. BALL CORP, MR WFFA CC THEM INLET AND COPPER (CTS) GRIP OUTLET (FORD OR MUELLER)
DUAL PURPOSE UNION
MIPT X CTS GRIP 13ALL VALVE: CURB STOP EQUAL TO FORD 384-4440 FOR 1
@Mn�M ��Sft�MI I" METER SEDER WITH ANGLE BALL METER VALVE 15- HIGH WITH DUAL
A D OUTLET. HORIZOWAL IN HORIZONTAL, OUTLET EQUAL TO FORD VB74-15W-11-4+
I. USE SAME AS ABOVE AND AVID A SINGLE CHECK, EQUAL TO FORD VEHI 1-44
I" CO TAP SERVICE SADDLE EQUAL TO ROMAC 101S
IN UNPAVED AREAS: CAR-H 1314 MS11CF WITH DUCTILE IRON COVER AMID CAST IRON READER GOOR;
,I PAYED AREAS; ARMOR CAST A6001946PGK12 BOX W1 A600196969 RGI LD
FOR VACANT LOT (FUTURE USE) LOCATION MARKED WITH PAINTED 2- X 4- WAKE WITH -WATER- STENCILED ON IT
14 CA. VINYL COATED WIRE TRACER (TAPED TO PLASTIC PIPE EVERY 10') TO BE GROUNDED AT METER AND HOUSE
S111111LE 11 1/4" OR I" PLUI REMOVE WHE14 CONNECTION IS MADE TO CUSTOMER LIME WITH COMPRESSION '17TING.
WATER SEHVICE TO HOUSE, INSTALLED BY OWNER/CDNTRAGTOR (PER PLUMBING CODE)
P OPERTY OWNER RESPONSIBLE FOR PURCHASING 3/4" OR 1- METER THROUGH THE CITY AT DEVELOPMENT SERVICES
CEPARTMENI CITY WILL SUPPLY AND INSTALL METER AFIIER PURCHASE, IF USING 3/4- METER, CONTRACTOR WILL
PROVIDE REDUCERS
BACK SIDE OF MEFER OX SHALL BE SET AT THE PROPERTY LINE UNLESS APPROVED BY THE CITY ENGINEER.
METER BOXES SHALL OT BE SET IN DRIVEWAY AREAS UNLESS TRAFFIC RATED BOX IS APPROVED 13Y CITY ENGINEER.
REVISIO DATE
3/4" - 1 JAMIJARNY 2018
CITY OF EDMONDS WATER SERVICE
ilo PUBLIC WORKS INSTALLATION 777ANDARD
DEPARTMENT DETAIL
APPROVED BY: R. ENGLISH WA- 130
RESIDENCE
CLEANOU
WITH 45'
BE 0 AND
CAP
CLEANOLrr (MAX)
(Ty?)
OT TO EXCEED OC' BETWEEN CLEANOUT�
CLEANOUT (WE WITH W
AND C"OUT COVER) AND
CONCRETE LEVELING COLLAR
LOCKING COVER
F'2'± f-FINISHED GRADE
/12-
SEE NOTE 3
ENO or ROPER GRIPPER PLUG
(CHERN 27061 OR APPROVED
EQUAL)
5
7
WATER TIGHT CAP
45'
RISER
A
LEVELING COUT/
SEE NOTE 4
45,
12" PVC SLEEVE
a' RISER
4� OR 6' SIDE SEWER
WYE AND 6* CITY STUB
V Or
GEI,16�L TLEANDUT QUAIL
4,5' SEND
D
4*OR6*7
12" LOCKING COVER
SIDE SEWER CLEANOUT DETAIL
SEE NCTE.1
AT PROPERTY LINE/C[1Y EASEME
5
LEVELING COLLAR
SEE NOTE 4
NOTES6
ASPHALT SURFACE
1. SEWER PIPE SHALL BE SDR-35 AND JOINTS SHALL BE
CASKETED,
12*1
2. PIP SLOPE TO BE 2% MIN AND UP 70 509 MAX.
3. SEWER CLEANOUr COVER TO BE CAST JORDAN IRON WORKS
1 FOOT LONG 12' PVC
PRODUCT 000366102 STAR PIPE COSP48L OR APPROVED
SLEEVE
7RISERENDEOF
EQUAL,
6"
PIPE GRIPPER
4. LFVEUNG COLLAR SHALL BE CONSTRUCTED AS FOLLOWS!
PLUG (CMERNE 270261
PLUG (.H�
0 CIR
R APPR(WED EQUAL)
IN ROADWAYS PER COE SID DWG GU-424
TYPICAL CLEANOUT
IN SIDEWALK/LANDSCAPED ARM. EITHER 24"a4'4'
NCR
BEEF CONCRETE COLLAR OR 24' DIAMETER . 6' DEEP
CONCRETE COLLAR
REVISION DATE
OAT
CITY OF EDMONDS
SEWER CLEANOUT DETAILS
JANUARY 2018
0 a
PUBLIC WORKS
HM
STANDARD
ST
DEPARTMENT
, f. IBSQ
T IL
DETAIL
SS-200
SS_ 00
APPROVED BY: R. ENGLISH
(IF STUB FOR FUTURE DEVELOPMENT)
SEWER STUB SHALL BE LOCATED 10' INSIDE PROPERTY LINE & STAKED. PLACE 2-�4'
TIMBER AT END OF SIDE SEWER STUB AND CUT TO LENGTH TO ENSURE Z FEET
EXTENDS ABOVE GRADE. PAINT TOP IS INCHES WHITE, IN I INCH HIGH LEITERS,
STENCIL THE NUMBER OF EVEN FEET FROM GROUND ELEVATION TO THE SEWER STUB
INVERT. 8 GAUGE WIRE TO BE DOUBLE WRAPPED AROUND PIPE AND 2 x 4 STAKE AT
OR ABOVE FINISHED GRADE,
rLOCKING CLEANOUT COVER
PER COE STE) OrL 5S_200
..0 22�V OR 45' SEND
6" TEST TEE
r6' LATERAL SEWER
SLOPE - 2% MIN TO 50% MAX 6 " WE/6- ROMAC SADDLE
SEE NOTES I AND 2
10, POSSIBLE
SEWER MAIN
LOCATION
22.5' OR 45� 13END
6' TE TEE
6" TEE
P SSIBLE
SEWER MAN
LOCATION
NOTES,
1. WHEN TAPPING INTO EXISTING MAN A ROMAC STYLE OR SADDLE SHALL BE USED PLACEMENT OF TEE SHALL DEPEND ON
DEPTH OF SEWER MAIN. AS A MINIMUM. THE TEE SHALL BE PLACED AT A 45 DESIRES ANGLE FROM PIPE SPRINGLINE.
2�11` NEW 14AIN IS BEING INSTALLED OR MAJN 15 BEING REPLACED. SERVICE CONNECTION TO THE MAIN SHALL BE DONE
WITH A WYE. WYE SHALL BE AT A 45 DEGREE ANGLE FROM PIPE SPRINGLINE.
3. IF CONNECTI NO EXISTING PRIVATE SIDE SEWER TO NEW CITY LATERAL, A CONCRETE/PVC STRONCEIACK FERNCO SO SERIES
OR ROMAC COUPLING SHALL BE USED AND SECURED PER IMER'S INSTRUCTIONS.
4. BORING OF SERVICES WITHIN RIGHT OF WAY IS NOT ALLOWED.
5. SEWER PIPE SHALL BE SDR-35 AND JOINTS SHALL BE GASKETED.
6. IF STUB FOR FUTURE DEVELOPMENT. USE RUBBER JOINT BISCUIT PLUG OR OTHER APPROVED WATERE HT PLUG.
REVISION DATE
MAY 2018
CITY OF EDMONDS NEW LATERAL SEWER
PUBLIC WORKS STANDARD
DEPARTMENT DETAIL
'. 4''S APPROVED BY: R. ENGLISH SS-202
F-0 7t-ICI Y,�I- tUIVIUIMU,) Zo I /AIN UAKLJ Ut I AIL LIIY UI I:UIVIUNIJ�) blANUAKU ULIAIL
CA _ ('m )I_ CITY OF EDMONDS STANDARD DETAIL
E: SCALE: NTS
SCALE: NTS
SEE COE SID OTL GU-410
v!
>.EDDNIQ.'A�-R'- (5/.' MINUS)
MIN G�U" , ;.r. MOD 9-03. 1 6A2
OR SUITABLE EXCAVATED VATERIAL AS
APPROVED By CITY ENGINEER
(SEE NOTE 2 BELOW)
6' MIN __-FOUNDATION (IF REQUIRED)
SEE NOTE 4
8, MI 8, MIN
SEE NOTE 1
NOTESm
1. MAXIMUM WIDTH OF TRENCH AT TOP OF PIPE
36' FOR PIPE UP TO AND INCLUDING 12" DIAMETER
O.D. PLUS 18" FOR PIPE LARGER T14AN 12" NOMINAL DIAMETER
2. REFER TO CITY OF EDMONDS MODIFICATIONS TO DNISION 9 OF WSDOT STANDARD SPECIFICATIONS FOR MATERIAL
GRADATION AND ADDITIONAL INFORMATION.
3. TRENCH 3ACXFfU_ SHALL MEET A MINIMUM COMPACTION OF 95% DENSITY PER ASTM D 1557.
4. IF UNSTABLE, MATERIAL IS ENCOUNTERED BELOW PIPE ZONE, CONTRACTOR SHALL REMOVE AND REPLACE AS REQUIRED
BY C17Y ENGNEER,
REVISION DATE
CITY OF EDMONDS TYPICAL TRENCH SECTION JANUARY Zola
PUBLIC WORKS STANDARD
DEPARTMENT DETAIL
L-i;' w, APPROVED BY: R, ENGLISH GU-400
r/1"At. JOINT INAIL 11 A NEAT STRAIGHT -11. CLASS 1/2-
LINE - ALL EXPOSED VERTICAL EDGES SHALL IG 64-22
BE TACKED NEATLY PER WSDOT STANDARD
SPECIFICATIONS 5-04.3(5)A APPROVED TACK (SEE NOTES 4 5)
OR APPROVED EQUAL AND SEALED PER I.
WSDOT STD 5-04.3(5)C. SLOPE EXCAVATION
TO AVOID UNDERMINING EXISTING PAVEMENT, ri
............. ...... ............. - ............
EXIS No ......
HMA ............ ...........
............... . . .
................. ......
..............
4
EXISTING
MATERI
A
CRU-11 - SURFACE S, ZE IMPORT OR NATIVE MATERIAL J.
CC BACKFILL SHALL BE COMPACTED
URSi PER WSDOT STO TO 95% MAXIMUM DENSITY
SPEC 9-039(3) (SEE NOTE 2)
(SEE NOTE 'i) TRENCH MDTH
NOTES�
1. SEE CITY OF EDMONDS MODIFICATIONS TO DIVISION 9 OF THE CURRENT WSDOT STANDARD SPECIFICATIONS FOR
BACKFILLING REQUIRDAENTS.
2. SU MIT PROCTOR AND DENSITY TESTS FROM CERTIFIED TESTING COMPANIES DOCUMENTING THAT THE BACKFILL
MEETS A MINIMUM OF 95% DENSITY PER ASTM D 1557,
3. C55 DEPTH SHALL BE A MINIMUM 6' OR MATCH EXISTING WHICHEVER 15 GREATER, WHEN MATCHING EXISTING
CSSC DEPTH GREATER THEN 6*. THEN C513C SHAU BE INSTALLED IN MULTIPLE EQUAL THICKNESS LETS NOT
EXCEEDING 6-1
4. ROADWAY HIM DEPTH SHALL BE A MINIMUM OF 4" THICK. UNLESS APPROVED BY THE ENGINEER, ANY DEPTH
GREATER THAN 4" SHALL MATCH EXISTIND.
S� ALLEY HMA DEPTH SHALL BE A MINIMUM OF 2- THICK. UNLESS APPROVED BY THE ENGINEER, ANY DEPTH GREATER
THAN 2* SHALL MATCH EXISTING.
6. UNLESS APPROVED BY THE ENGINEER. THE HMA SHALL BE INSTALLED IN MULTIPLE EQUAL THICKNESS LIFTS NOT
EXCEEDING 2"%
7. FINAL PAVEMENT JOINTS SHALL BE NEATLY AND UNIFORMLY SEALED WITH WSOOT STANDARD SPECIFICATIONS
5-04.3(5)C APPROVED JOINT SEALANT OR APPROVED EQUAL,
REVISION DATE
CITY OF EDMONDS TYPICAL HMA AND JANUARY 2018
UTILITY PATCH
PUBLIC RKS
STANDARD
DEPARTMENT
DETAIL
1 890 APPROVED BY: R. ENGLISH GU-410
r') CITY OF EDMONDS STANDARD DETAIL rg�_ CITY OF EDMONDS STANDARD DETAIL
SCALE: NTS
APPROVED FOR CONSTRUCTION
CITY OF EDMONDS
DATE, 'IwAv�
BY.
CITY ENQWXAING DIMS'&
1111CM 1
ENGINGeRING
250 4TH "E. S., SUITE 200
EDMONDS, WASHINGTON 98020
PHONE (425) 778-8500
FAX (425) 778-5536
09116119
.0 co m m
co Z> Z) =) Z)
0 LA 0
Lu w
CC w
cc ca
DESIGN: TAF
DRAWN:
ATD
CHECK: ipu
JOB NO: 18300.20
DATE:
01/21/191
Ln
_j
w
Lij
0
3::
3:: C14
0
LAJ
00
0)
LLI CL
<
0
0
z m 3::
z
Lj F-
<
0 (Ij
CF)a
Of
LLI z
1" 0
Ld
C14 M
tn E
< 0) Ld
SHEET: R23us
SEP 19 2019
BUILDING DEPART ENT
CITY OF EDMOOMVI
DS
C4.2
NE 1/4, SE 1/4, SECTION 13, TOWNSHIP 27 NORTH, RANGE 3 EAST, W.M.
O� 170 67.09'
"J,/
30"
WA- W� A- w
NEW SAeMILY 116IDENCE
C
JARIN FFE: 0
'A 77 AGE: 157 3
\X Bl� T FFE: 14�.k
NL
zi c
Of
z
A
__7
5s
El
v
1 0
30-
ASPHALT 0
Rl'qq
SIDEWALK
F I
llq �W�e Y_�_4b �D7 E/
PARALLEL TYPE B T 161.0 14'
CURBRAMP
ol
RELOCATE STR
Sim AINTCROSSWALK SIGN
6� 0 7
PER CITY DETAIL
RELOCATE 7- 7 82
STOP SIGN
rE�
NO MON. F
C S
FOUND , Aj2E
N 0.7 4.2:
1. C..CRE_-�.
242.
2
8
/,o
Q.06 iZ;ING
0.06
IE IN (8" E): 136.33 IN= 4074 (2% MAX) -
C4 �All
5. G
IE OUT (8"/W)! 162.73
MH IM=l .33 '4;
S
S CEI RIM 157.79
Cl :.0
RET�TECURB WORK ZONE 1: PE
C
NC C
A SHOULDER RK 3
0 1 C5.
N 90TH
,.TT
190TH PL SW .C3 ERU
REMOVE EXIST
OGLINE, REALIGN ASPH.
& PAINT NEW
FOGLINE, R = 20'-,,
L SO
7 C8 RIM=171.42
CUEXISTING C2 WORK ZONE 2:
RBRAMP 5. LANE CLOSURE ON 190TH
SDMH CENTERLINE OF EXISTING ROADWAY CB RIM=156.18
WORK ZONE 2:
EXIST CROSSWALK SHALL 4'x4' LANE CLOSURE ON 190TH
BE REMOVED. LANDING WORK ZONE 3: /1�,N
Sim 4 PAINT & REALIGN LANE CLOSURE ON
OSS
5.. R WALK PER CITY OLYMPICVIEWDR
DETAIL
SCALE: I" =
IENGIMIERING
250 4TH AVE. S., SUITE 200
EDMONDS, WASHINGTON 98020
\L PHONE (425) 778-8500
FAX (425) 778-5536
w
co
X i
�SMH RIM �172.73
Et
APPROVED FOR CONSTRUCTION
CITY OF EDMONDS
DAVE
BY. sw—
ariAN�NEEIRINdjDIVISION
09116119 1
z m co co co co
2 cO 5n) :�) =Ln) :)
- Lu w Lu �n
CE cc w cc ix
Ed Lu
cn (n o cn c3)
w
o Z:;
o o o &
DESIGN: TAF
DRAWN: ATD
CHECK: JPU
JOB NO: 18300.20
Z
IL
_j
0
z cj:�
Ld
:2 z
o LLJ 0
04 >
v) c)
00 0
0) cK C)
LLI a-
z
LLI <
0 V�
0
LLi
z
0 Ld
0
:2 W
In 2:
al
< w V) <
61
SHEET: R E 19 u s
SEP 19 2019
BUILDING DEPARTMENT
INDS
C6.1
2' MIN SAWCUr
5-1/2- SEE NOTE 10 HMA I' OR MATCH
EXISTING. WHICH.R 11
'ST
GR
oos rr/FT
I- NOTE
4
STANDARD
MINUS CSTC 21"E NOTE " _I MINUS CSIRC
STANDARD Typr *A" CURR/GuITER
(NOT TO SCALP
NOTES:
1. CITY INSPECl"ON REQUIRED ON FORM WORK PRIOR TO POUR,
2. FORMS SHALL. BE TRUE TO UNE AND GRADE AND SECURELY STAKED.
3. EXPANSION JOINTS SHALL BE PLACED ADJACENT TO ANY STRUCTURE.
4. EXPANSION JOINTS SHALL BE EVERY 10 FEET.
5. EXPANSION JOINTS SHALL HAVE 1/2- TO 5/8' NOE PREMOUDED JOINT MILLER.
S. CONCRETE SHALL. BE CLASS 3000.
7. FINISH SHALL BE UGHT BROOM.
8. C FIR SHALL BE SPRAYED WITH C CURING COMPOUND OR SHALL BE COVERED AND KEPT MOIST FOR 72 HOURS.
9. REMOVAL/ OPLACEMENT OF CONCRETE CURB S� BE FROM EXPANSION TO EXPANSION JOINT, UNLESS OTHERWISE
DIRECTED BY CITY ENGINEER.
10. A 2-FT MINIMUM ASPHALT SAWCUR MAY BE REQUIRED AS DETERMINED By CITY ENGINEER.
11. CURB/GVTTER SHALL BE 18' OR AS DIRECTED BY CITY ENGINEER.
12. ALL VERTCAL EDGES SHALL BE KED.
REVISION DATE
CONCRETE CURB DECEMBER 2017
qjlTY OF EDMONDS AND GUTTER
PUBLIC WORKS STANDARD
DEPARTMENT DETAIL
'� 4'' " , , APPROVED BY: R_ ENGLISH TR-520
NE 1/4, SE 1/4, SECTION 13, TOWNSHIP 27 NORTH, RANGE 3 EAST, W.M.
EXPAN N DUN
JOIN- MINT
4
4..
A
4
11 D.C. 5' 0.0.
PLAN IAEW
(NOT TO SCALE)
5. MIN
FULL DEPTH 1/2- EXPANSION
I
OURB/oUTTIER JOINT MATERML
SEE COE SM MAX
DTL TR-521 _2%
4 1�2" F47
4:J404
AF
2' MIN 5/8- MINUS CSTO
ON NATIVE B RING SOIL
SEE NOTE 9
NOTES: (NOT TO SCALE)
1. CITY INSPECTION REQUIRED ON FORM WORK PRIOR TO POUR.
2. CONCRETE SHALL BE CLASS 3000.
3. FINISH SHALL BE LIGHT BROOM,
4. SIDEWALK THICKNESS SHALL BE 4".
5. SIDEWALK THICKNESS AT DRIVEWAYS SHALL BE e THICK.
6* CUR AND 6010? INA BE POURED SEPARA�TELY MOM SIDEWALK.
LOS FOR JUNCTION BOXES AND UTILITY VAULTS SHALL BE NON-SKID AS SPECIFIED By ENGINEER.
SEE CO STI DTL TR-530 FOR POSSIBLE ROOT BARRIER INSTAIUM"O",
SUBI SHALL BE COMPACTED TO 95X MAXIMUM DENSITY.
CITY OF EDMONDS
CONCRETE SIDEWALK
PUBLIC WORKS
0
-T
STANDARD]
DEPARTMENT
:DETAIL
TR-53:1
APPROVED ETY R ENGUSH
9
a
EXPANSION
U SION JOINT
JOINT
SEE DRIVEWAY
CURB jo.
TRANSMONAL
GETAL BELOW G
c
A D GUTTER. SEE
COE BID DTL
FULL DEPTH-1 TR-520 EXISTING PAVEMENT
1/2- EXPAN
E, 2j" 2% MAX
2
A_
A
DRIV CURB TRANSITIONAL DETAIL
FOR CURB
(DO RB AND GUTTER SHALL BE POURED SEPARATELY FROM THE SIDEWALK. CITY INSPECTION REQUIRED ON FORM WORK
P IOR 70 POUR.
0 D IVEWAY APRON INCLUDING WHO RAMPS SHALL BE A MINNUM OF 6' THICK AND SHALL BE PLACED ON 2- OF 5/8-
C COMPAC7ED TO 95X MAXIMUM DENSITY.
0 1 BGRADE SHALL BE COMPACTIED TO 95X MAkXlMUM DENSITY.
(1) 2 ASPHALT SAWCUT MAY BE REQUIRED WITH CURB/GUff`rER INSTALLATION. REFER TO COE SID DTL TR-520.
CONCRETE SHALL BE CLASS 30DO.
CURB TRANSITION SHOULD MAINTAIN A SLOPE NO GREATER THAN 8.3X. IF THE SLOPE REQUIREMENT CANNOT BE
ACHIEVED ' MAX MUM CURB THE I'RANSMON LENGTH SHALL BE I 5-FEET.
MAINTAIN 1 /2' UP AT GUTTER.
IF DRIVEWAY WIDTH EXCEEDS 15'. INSTALL A FULL DEPTH EXPANSION JOINT AT CENTER OF DRIVEWAY.
INSTALL MINIMUM 5-Fr TRANSITION PANEL BETWEEN DRIVRAY$ AND WHEN CONNECTING TO EXISTING SIDEWALK.
@FINISH SHALL BE UGHT BROOM.
R SION DATE
DRIVEWAY APPROACH JA ARY =18
CITY OF EDMONDS TYPE I
PUBLIC WORKS STANDARD
DEPARTMENT DETAIL
Al. 'T"Q AlF1.1 BY� R. ENGLISH - TR-541
12' THERMOPLASTIC blDP BAR
(TYPICAL
AT CONTROL INTERSECTIONS ONLY)
-1 ES I. I. AND BE CENTEDtEID ON
THE ROAD IENTEIUNE STRIPES SHALL ALIO
BE CENTER D ON LANE DELINEATORS OF
MULTILANE ROADS
A- MP[
�1' , ' THERMOPLASTIC STRIPES;
'�-PUEAR - BETWEEN 'I"
(SEE NOTE 1)
-V
CLEAR SPAZE BETWIFEN STRIPE
AND CURB OYP)
N07-S,
1. DIMENSION MAY MARY DEPENDING ON ROAD WON (COORDINATE ACTUAL SPACING WITH ENGINEER)
CITY OF-EDMONDS
CROSSWALK DETAIL
TV
REVISION DATE
BY
JANUARY 2013
STANDARD
PUBLIC WORKS
DEPARTMENT
DIETAIL
TR-562
APPROVED BY. R ENGLISH
CITY OF EDMONDS STANDARD DETAIL CITY OF EDMONDS STANDARD DETAIL CITY OF EDMONDS STANDARD DETAIL
A I , CITY OF EDMONDS STANDARD DETAIL
��SCAL'.Ts SCALE: NTS SCALE: NITS k,7
\lr� _j SCALF� NTS
NOTES,
• THE ADDRESS NU..ERS
9802 1 OULD BE 3" HIGH
REFLECTIVE WHrrE V1 L SET
ON A GREEN VINYL
BACKGRO MD.
- ADDRESS SIGN REQUIRED
WHEN ADOR CAN NOT BE
S FROM THE STREET AND
PLACED ON ".4" TREATED
WOOD POST.
• HEIGHT TO 8070M OF SIGN
12' MIN
R=1.0" Mp)�
gnni.(ZT -4ZIAl
0 (TYP) i ��- -0�) A- 4 c
Bmima cZUmAR BIG LONG
LOCK
SERIES OR EQUAL)
CAP (ZUMAR 850 LONG
LOCK SERIES OR EQUAL)
SIGN ML
A
1 8
a
D
E
F
G
-
POST MOUNTED 25 & 30 MPH
30" MIN
9.
- 5"
11 .5-
.
11.5 MIN
CI
MOUNTED 35 MPH
VAR
1
.5'
12.5-1
4' MIN
S� Cl
S' C.
MOUNTED STATE ROUTE
.5-
12.5-151,3-
MIN
1 6' C
1 11- C
OVERHEAD(SIGN MASIT ARMS)
I VAR
116-
.5"
13.5-1
6- MIN
IS' 0112-
C
I
NOTES,
1. MATTER- - .0110 FLAT ALUMINUM UNDED CORNERS WITH ENGINEER GRADE FLOURESCENT OMONO GRADE SHEETH4G.
2. COLOR - GREEN BACKGROUND %TTB WHITE LETTERS. NUMBERS AND BORDER ON BOT14 SIDES OF TliE SIGN.
3. � SHALL BE FHWA D SERIES AND LAID CUT AS 1. - STANDARD HIGHWAY I -I AND MANKIND (SHIM)
BOOK
3. ALL LETTERING SHALL BE COMPOS OF UPPER CASE LETTERS.
4. ALL POST MOUNTED SIGNS FACING TRAFFIC ON 25 MPH AND 30 MPH STREETS SHALL HAVE ALL 4- LETTERING.
S, ALL MOUNTED SIGNS FACING TRAFFIC ON 35 MPH STREETS SHALL HAVE THE NAME OF THE STREET IN 6- LETTERING.
6. ALL MOUNTED SIGNS FACING TRAFFIC ON STATE ROUTE SHALL NAME THE NAME OF THE STREET IN 6' LETTERING
INCLUDING. TYPE ABBREVIATED AS (ST. AVE. DR. PL. WAY. OR. ETC) AND GEOGRAPHIC DEUN�MRS (W AND SW).
7. AU. OVERHEAD MOUNTED (TRAFFIC SIGNAL LAST ARMS) SIGNS SHAJ_L HAIE THE NAME OF THE STR IN 12"
LETTERING.
- VARIABLE LENGTHS REQUIRED FOR NAMED SERI
REVS' I "A"
STREET NAME SIGN AND llR:LO .0117
CITY OF EDMONDS FIRE -AID ADDRESS AND
PUBLIC WORKS POST MOUNTING DETAIL STANDARD
DEPARTMENT DETAIL
TR-570
APPROVED BY- R. ENGLISH 0
LOTH
cowc-RIETE -
NOTES4
SIGN POST:
SIGN POST SHALL BE 2*.2" SQUARE STEEL
POF- MINIMUM 14 GAUGE, WITH 7/16-
VIE-PUNCHED KNOCKOUTS ON 1' CENTERS FULL.
LENGTH FOUR SIDES COMPLYING W/ ASTIM SPEC
M53 AND BE HIM DIPPED GALVANIZED.
POST S14ALL BE ROLLED CARBON SHEET STEEL
AND I U. BE HOT DIPPED GAI.NANIZED IN
ACCORDANCE WITH ASTM AS53, 090, STRUCTURAL
O� GRADE 50.
(D ANCHOR SHALL HAVE FOUR 7/16" DAN. HOLES.
3' ABOVE GRADE SHALL WElEr THE
REG REMENTS, OF ASTM A500 GRADE 8
AND SHALL E HOT DIPPED GALVANIZED.
INSTALL TWO CORNER BOLTS ZUMAR TUO70.
4.,E� WOOD PI MAY BE USED WHEN POST IS
MORE THAN 10' FROM MOE OF TRAVEL LANE (OR
APPROVED BY ENGINEER).
I
SM TRAFFIC STREET SION DETAIL M-575 FOR
GUIDANCE ON SIGN INSTALLATIONS.
SIGN POST INSTALLATION 1ESISo. %T'Es
CITY OF EDMONDS IN NON -SIDEWALK AREA
PUBLIC WORKS STANDARD
DEPARTMENT DETAIL
APPROVED BY. R. ENGLISH TR-571
_.- Iklft (�T
A-
B
12 -1.
.AA
M.-
7. CIt R'� i� 15 A� I--
_pl
TYPE PARALLEL A "",p ...... TYPE PAX- B
7 A A "t, 1,
....RE.
2.1 RF
lop
-M-E.J -.-%2�U U.".M.- _c.
A`- P'
01.1.11".Tall
p
@
- - - AT—
AENCRp
y
PARALLEL CURB RAMP
STANDARD P F40.112-041
P-1-A PAI -IT PA'I IT
CITY OF EDMONDS STANDARD DETAIL
7 SCALE: NTS
SIDEWALK
PROPOSED LANE WIDTH
1 O't
10.01±
ADDITION
EXIST LANE WIDTH
MIN
� 1SA.-W-CUT
'T
1.5%
/-
r.--N CITY OF EDMONDS STANDARD DETAIL CITY OF EDMONDS STANDARD DETAIL 190TH PL SW SECTION
�!) SCALE: NTS SCALE: NITS US SCALE: 1-1-
EXISTING LANE WIDTH
APPROVED FOR CONSTRUCTION
CITY OF EDMONDS
DATE.
ar
CITY ENGIN&ERING DIVISION
4= 4m
IENGIN&RING
250 4TH AVE. S.. SUITE 200
EDMONDS, WASHINGTON 98020
PHONE (425) 778-8500
FAX (425) 778-5536
09116119
DO PC DO CID
GO M m
L"I In
UJ w UJ U.1
w w = =
t= t t=
0: cc ca
M, ALL! w U.1
m c, C. CL 0.
DESIGN: TAF
DRAWN:
ATD
CHECK:
JPU
JOB NO:
18300.20
DATE:
01/21/19
V)
0
z
Ld
m
0 Li
C'4 >
0
00 0
_j ICY) Qf
LLI IL IL
0
z
LAJ F-
00
Cr) V) F_
0
LLI z Ld
0 Ld
Ln n
< 0) LLj V)
SHEET: 3 u B
SEP 19 2019
BUILDING
F PIT
TIT Or
Y 0 =PAO
M
C5.2
Table 61-1-2. Meaning of Symbols on Typical Application Diagrams
Arrow board
Shadmvehicle
00
Arrow board support or trailer
(shown facing down)
Sign (shown facing left)
Chargeable message sign or support trailer
surveyor
13
ChannelizIng device
Temporary barrier
Crash well
Temporary barrier with warning light
Direction of temporary traffic detour
—1. or I.d..rl.n signal
Direction of traffic
Tru&-mounted afteuruator
Flagger
Type 3 barricade
High-level warning device
(Flag free)
17'�
Warning light
Longitudinal chanselizing device
M
Work space
Luminaire
Pavement markings that should be
Worl,vehicle
removed for a long-term project
Table 6H-3. Meaning of Letter Codes on Typical Application Diagrams
Road Type
Disree Bmtwoon Sig ne*-
A
I c
10-to
I Oct..,
U.b. (high ap..d)'
350 f. at
350 feet
350 feet
Fkaal
Boo feet
506 1-
Boo feet,!
E.p..—y Freeway
1,000 feet
1,500 f,,t
2.840 feet
S��m�g,,yob.d.�.inedbyhighW,gmW
The oolunnn heading, A, B, and C on, he charier... ahmn in Rgue, SH-1 Mr,ugh 31-1-46. The A dim—lon 1. the
0. tarailion or point of rritrid- b the Fiat man. The B dira—ion is the dietanoo baWaon the first and
=dmM'gn,,'hTsh,Cdi,m.i,,i,th.di.�,.��.M...c.�d.dthi,d�gn,. (Th,Trign`i,thg,v,
Table 6H-4. Formulas for Determining Taper Length
Speed (S) Taper Length (L) In feet
WS'
60-
L= WS
where: L rep"Hangth in %at
W Adthofolffeatin feet
S =�,ted,,se,dinit, roff-p,�95h-paramfl,
,pmdpd,,t,-rk,tm,Eng,orthe,nbd�tad
fin,.,ed I. raph
MUTCD TABLES
SCALE: NTS
(a
Figure 6H-11 1. Lane Closure on a Two -Lane Road
with Low Traffic Volumes (TA-1 1)
M W
" -1
C (optional)
ptional) z
(optional)
50 to 10oft
(Optioned)
=ace (opficial)
Butte pace (optional)
50 to 100 It
Tables 6H-2 ard 6H-3
he meaning of the 5111
bola and(or letter
TO
as used in this figure.
ONCOMING
A
(optional) —
see Section 38.16)
B (optional)
<
(Optional)
M-1
(options
(optional)
Note Sea
,.It
Gym
cod
(�,_) �nMUT��CDDETAIL
Typical Application 11
0-
IENGINErERING
250 4TH AVE. S., SUITE 200
EDMONDS, WASHINGTON 98020
PHONE (425) 778-8500
Figure 61-1-3. Work on the Shoulders (TA-3) FAX (425) 778-5536
IN xx lx3N
affou ROAD WORK.,
Shoulder taper
(see Note 7)
J_
Gut
1/3L
T 14
6.
4 q�
a
09116119
T?A
L
Shouldertaper
Shouldertaper 'see Note 7)
(see Note 7)
M L
z
0
[L
L)
M
DO 1:1:1
Lu
Cc
ce W
Co
.01
W
W
cc Co
L:1:11
CC cc
cc oc
a
Note., Se Tables 611-2 and 611-3
I., the meaning of the
symbols anftr letter 1
codes used in this figure. I A
0) Cn
Ln
Ch
0)
00
(If
<
Typical Application 3
DESIGN: TAF
DRAWN: ATD
MUTCD DETAIL
CHECK: JRU
JOB NO: 18300.20
SCALE: NTS
DATE: 01/21/19
TRAFFIC CONTROL PLAN NOTES:
1. REFERENCE DETAIL I/CS.3 FORTYPICAL TRAFFIC CONTROL SYMBOLS, SIGN SPACING, ETC.
2. WORK EXPECTED TO OCCUR DURING THE CITY APPROVED WORK HOURS.
3. ONLY (1) WORK ZONE MAY BE WORKED ON AT ONCE.
WORK ZONE 1;
190TH SHOULDER WORK (DETAIL #3/C5.3).
WORKZONE3:
LANE CLOSURE ON 190TH (DETAIL 2/CS.3). CLOSE ONLY ONE LAME AT ONCE.
WORK ZONE 3:
LANE CLOSURE ON OLYMPIC VIEW DRIVE (DETAIL 2/C53). CLOSE ONLY ONE LANE AT ONCE.
APPROVED FOR CONSTRUCTION
CITY OF EDMONDS
DAM
By.
CITY EkiNdERING DIVI&ON
-1
0
0
C'4
C:)
00
_J
z
LLj CL
0
0
LLJ
0 0
0
LIJ z
0
LL.
C14 :2
to M
<
0::
SHEET- ZL'-- ��5 U 0
SEP 19 2019
BUILDING DEPARTM
CITY OF EDMONDENT
S
C5.3
EXISTING LEGAL DESCRIPTION: TAX ACCT 004346-000-078-00
(TRACT 78) AND 004346-000-079-01 (TRACT 79)
PER CHICAGO TITLE CO. ORDER NO. 5255651
BLAKE PL
TRACT 78 AND TRACT 79, EXCEPT THE EAST 75 FEET THEREOF, EDMONDS SEA\lEW
TRACTS ACCORDING TO THE PLAT THEREOF, RECORDED IN VOLUME 3 OF PLATS,
PAGES 75 AND 76, RECORDS OF SNOHOMISH COUNTY. WASHINGTON.
SITUATE IN THE COUNTY OF SNOHOMISH, STATE OF WASHINGTON.
1
LEGEND
I
30'.
3" BRASS SURFACE MONUMENT -.3 FEET BELOW ASPH NO CASE
0i
I
x SET TACK IN LEAD WITH SHINER LS 29539
W < <
0.
c6
FOUND CASED MONUMENT
co cl
SET 1/2' REBAR WITH CAP LS 29539
N
I
0 CATCH BASIN
C4 c1l
La
-6- FIRE HYDRANT
Ill GAS VALVE
C, m
HOSE BIB
0
C)
WOOD FENCE
z
LIGHT
MAIL BOX EQUIPMENT AND
SMH RI 6 44
n
PROCEDURES
ROCKERY
SAN. SEWER MANHOLE ALL MEASUREMENTS WERE MADE WITH
N 88*32',38" W 1299.13' MEAS.
SP S-17-84 LOT 2 SP S-17-84
FND 1/2" REBAR WICAP LS N 89'15'23" W 330.00' PLAT
AN ELECTRONIC THEODOLITE WITH A
SIGN ONE SECOND HORIZONTAL AND
0 10'
VERTICAL DISPLAY AND MANUFACTURES
@ STORM DRAIN MANHOLE STANDARD POINTING DEVIATION OF
-0- UTILITY POLE THREE SECONDS AND AN ELECTRONIC
DISTANCE MEASUREMENT DEVICE WITH
VALVE A STANDARD DEVIATION OF 3MM± 7*
3PPM
ED WATER METER I Ld m I
I . 11-7-
ASPH ASPHALT FIELD TRAVERSE METHOD IN L T
COMPLIANCE WITH W.A.C. 3,32-1�0-090 14W
CALC CALCULATED
ALL POINTS INDICATED FOUND WERE
DW DRIVEWAY VISITED IN 3-2012 UNLESS OTHERWISE
NOTED.
G GAS
IE INVERT ELEVATION 0—
MEAS. MEASURED
OHP&T OVERHEAD POWER AND TELEPHONE NO MON. FND.
SO STORM DRAIN FOUND CASE
N 0.7 E 1.8
S SEWER I
W WATER ISMH M=14 3N
I
DECIDUOUS OR ORNAMENTAL EVERGREEN TREE
TRUE EXTENT OF CANOPY NOT SHOWN
CONIFEROUS TREE
TRUE CANOPY NOT SHOWN
ui
� 'n
200.0 SPOT ELEVATION IS LOCATED AT THE DECIMAL POINT
OF ELEVATION UNLESS NOTED WITH LEADER OR X 191 ST ST SW
LAND SURVEYORS CERTIFICATE
p
THIS MAP CORRECTLY REPRESENTS A SURVEY MADE BY ME OR UNDER MY 6
DIRECTION IN CONFORMANCE WITH THE REQUIREMENTS OF THE SURVEY RECORDING z
ACT AT THE REQUEST OF CHRIS MIONE IN MARCH, 2012
N 01*02'17" E 1321.08'
MON. 2064
'_196TH ST SW
U
Y'R-TIFICATE NO. 29539
N 88-32'38- W-j 2-9-9—.2r--Y-7w
"n
REVISIONS
GENERAL NOTES
SURVEYED BY
RGG
4/11/19 UPDATE TOPO LOT 2
HORIZONTAL DATUM: NAD 83/96
DRAWN BY
CHECKED BY
z
WA. STATE COORD. SYS. N.
95
ZONE - R.T.K.
APPROVED BY
VERTICAL DATUM: NAVD 1988
PER NETWORK CHECK MON 2064
DATE PRINTED
4/06/ -
SCALE
1 30,
F.B. NO.
OPEN
CB RIM=171.42
ZONED RS-12
NOTE:
lb FOUND 1/2 " REBAR AT 30' OFFSET TO
EXISTING ROADWAY CE
MON AT 92ND AVE W. AND 188TH ST SW
LOT 3 SP S-17-84
UJI
c'j
p BRUSH
E;
z
�'-'06.28
34 ioe
4a
sog
JOB NO.
GREENE LAND SURVEYING TOPOGRAPHIC SURVEy 2012.03
"f ANDSOAPLAKE, WA 98026198861 FOR DRAWING NO.
lq� DAVE PEDERSON 03Mione
PHONE (206) 498-0979 FAX (206) 497-1542 PTN: N.E. 1/4 S.E. 1/4, SEC. 13, T 27 N, R 3 E, W.M.1 SHEET 1 OF
FD (_2
(f)
r)uDD01q-o'l(p - -
(C111117,111 (c 0111
RESUB
JUN 0 5 2019
BUILDING DE
CITY PAO
OF EDMRTmENi
No,