REVIEWED BLD BLD2021-1150 PROJECT DETAILSRECEIVED
Aug 19 2021 BLD2021-1150
DEVELOPMENTDEPARTMENT Es C H E N
BATHROOM REMODEL
PROJECT DETAILS: 520 MAGNOLIA LN
Since the bathroom fans are directly above the toilets, I did not draw them onto the floorplan, but I
described it below. Please let me know if you need any additional information.
"Currently, the bathroom fans are directly above each toilet, about 10" x 10"; we plan on adding a third
fan between the tub & shower area of the master bath.
There are currently no doors to any of the rooms aside from the bathroom on the main floor, so it is one
large open space; there is currently 1 smoke detector in the hallway between the stairs and kitchen. We
will be adding 1 smoke detector and carbon monoxide detector to every bedroom and office/den within
the week.
The interior bathroom walls we plan to add will be framed using pressure -treated 2x4s studded onto the
bottom and top sills every 16" from the center of each stud with a 2 stud corner.
The double vanity wall will contain 2 GFCI circuits/outlets, and the single vanity wall will contain at least
1; plumbing will also be in the walls for the sinks.
In the entire house, there are currently: 5 sinks, 3 toilets, 1 tub, 2 showers, 1 washer, 1 dishwasher, and
2 hose bibbs. We plan on adding 1 sink and 1 tub/shower combo."