Loading...
APPROVED Traffic control plan for Edmonds 2020 CanopyRECEIVED Jul 22 2021 CITY OF EDMONDS !!? SERVICES OWNER/CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL AND DRAINAGE Z Pip Mir Iv. -7 /7 SIDEWALK CLOSED McSTRUI M AHEAD O�IiC�G1YVl>t�] PEDESTRIANS CROSSOVER CORFRQCY®R � 555-533-5553 - Notify police and fire 72 hours prior the alley closure. work SIDEWALK �e rIID -Place 'No C-1 �' Parking' Signs 72 hours prior to closure. SIDEWALK CLOSED CONSTRUCTICA AHEAD MFORCAMN PEDESTRIANS CROSSOVER COMYRAMOR T� 555-555-5555 3 R� hV9 Al • I Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. * Contractor must resolve all local access and safety issues, *All barricades, cones, and signs must be in accordance with the latest edition of the Manual onUniform Traffic Code Devices (MUTCD). ENGINEERING DIVISION APPROVED AS NOTED E 07/23/2021 �kaND-f ZuZ' L �� I Traffic Control Plan #i3 I DRAWING NOT TO SCALE Sidewalk Closure- R