Loading...
BLD2021-0020+Bond Worksheet+2.15.2021_1.00.11_PM+2047669Site Improvement Bond Quantity Worksheet S15 Webdate: 04/03/2015 LIM King County Department of Permitting & Environmental Review 35030 SE Douglas Street, Suite 210 Snoqualmie, Washington 98065-9266 206-296-6600 TTY Relay 711 Project Name: 76th Ave Townhomes Location: 7528 215th St. SW, Edmonds, WA 98026 Clearing greater than or equal to 5,000 board feet of timber? yes If yes, Forest Practice Permit Number: (RCW 76.09) Page 1 of 9 Bond Quantity Sheets X no For alternate formats, call 206-296-6600. Date: Project No.: Activity No.: 2/12/2021 17206.20 Note: All prices include labor, equipment, materials, overhead and profit. Prices are from RS Means data adjusted for the Seattle area or from local sources if not included in the RS Means database. Unit prices updated: 3/2/2015 Version: 3/2/2015 Report Date: 2/12/2021 Site Improvement Bond Quantity Worksheet S15 Webdate: 04/03/2015 Reference # Unit Price Unit Quantity # of Applications Cost EROSION/SEDIMENT CONTROL Number Backfill & compaction -embankment ESC-1 $ 6.00 CY Check dams, 4" minus rock ESC-2 SWDM 5.4.6.3 $ 80.00 Each Crushed surfacing 1 1/4" minus ESC-3 WSDOT 9-03.9(3) $ 95.00 CY Ditching ESC-4 $ 9.00 CY Excavation -bulk ESC-5 $ 2.00 CY Fence, silt ESC-6 SWDM 5.4.3.1 $ 1.50 LF 193 1 $ 289.50 Fence, Temporary (NGPE) ESC-7 $ 1.50 LF Hydroseeding ESC-8 SWDM 5.4.2.4 $ 0.80 SY Jute Mesh ESC-9 SWDM 5.4.2.2 $ 3.50 SY Mulch, by hand, straw, 3" deep ESC-10 SWDM 5.4.2.1 $ 2.50 SY Mulch, by machine, straw, 2" deep ESC-11 SWDM 5.4.2.1 $ 2.00 SY Piping, temporary, CPP, 6" ESC-12 $ 12.00 LF Piping, temporary, CPP, 8" ESC-13 $ 14.00 LF Piping, temporary, CPP, 12" ESC-14 $ 18.00 LF Plastic covering, 6mm thick, sandbagged ESC-15 SWDM 5.4.2.3 $ 4.00 SY Rip Rap, machine placed; slopes ESC-16 WSDOT 9-13.1(2) $ 45.00 CY Rock Construction Entrance, 50'x15'x1 ESC-17 SWDM 5.4.4.1 $ 1,800.00 Each 1 1 $ 1,800.00 Rock Construction Entrance, 100'x15'x1' ESC-18 SWDM 5.4.4.1 $ 3,200.00 Each Sediment pond riser assembly ESC-19 SWDM 5.4.5.2 $ 2,200.00 Each Sediment trap, 5' high berm ESC-20 SWDM 5.4.5.1 $ 19.00 LF Sed. trap, 5' high, riprapped spillway berm section ESC-21 SWDM 5.4.5.1 $ 70.00 LF Seeding, by hand Sodding, 1" deep, level ground ESC-22 SWDM 5.4.2.4 $ 1.00 SY ESC-23 SWDM 5.4.2.5 $ 8.00 SY Sodding, 1" deep, sloped ground ESC-24 SWDM 5.4.2.5 $ 10.00 SY TESC Supervisor ESC-25 $ 110.00 HR 40 1 $ 4,400.00 Water truck, dust control ESC-26 SWDM 5.4.7 $ 140.00 HR WRITE -IN -ITEMS **** (see page 9) Each ESC SUBTOTAL: 30% CONTINGENCY & MOBILIZATION: ESC TOTAL: COLUMN: Page 2 of 9 Bond Quantity Sheets $ 6,489.50 $ 1,946.85 $ 8,436.35 A Unit prices updated: 3/2/2015 Version: 3/2/2015 Report Date: 2/12/2021 Site Improvement Bond Quantity Worksheet Web date: 04/03/2015 Existing Right -of -Way Future Public Right of Way & Drainage Facilities Private Improvements Unit Price Unit Quant. Cost Quant. Cost Quant. Cost GENERAL ITEMS No. Backfill & Compaction- embankment GI - 1 $ 6.00 CY 50 $ 300.00 Backfill & Compaction- trench GI - 2 $ 9.00 CY Clear/Remove Brush, by hand GI - 3 $ 1.00 SY Clearing/Grubbing/Tree Removal GI - 4 $ 10,000.00 Acre Excavation - bulk GI - 5 $ 2.00 CY 1150 $ 2,300.00 Excavation - Trench GI - 6 $ 5.00 CY Fencing, cedar, 6' high GI - 7 $ 20.00 LF Fencing, chain link, vinyl coated, 6' high GI - 8 $ 20.00 LF Fencing, chain link, gate, vinyl coated, 21 GI - 9 $ 1,400.00 Each Fencing, split rail, 3' high GI - 10 $ 15.00 LF Fill & compact - common barrow GI - 11 $ 25.00 CY Fill & compact - gravel base GI - 12 $ 27.00 CY Fill & compact - screened topsoil GI - 13 $ 39.00 CY Gabion, 12" deep, stone filled mesh GI - 14 $ 65.00 SY Gabion, 18" deep, stone filled mesh GI - 15 $ 90.00 SY Gabion, 36" deep, stone filled mesh GI - 16 $ 150.00 SY Grading, fine, by hand GI - 17 $ 2.50 SY 442 $ 1,105.00 Grading, fine, with grader GI - 18 $ 2.00 SY 687 $ 1,374.00 Monuments, 3' long GI - 19 $ 250.00 Each Sensitive Areas Sin GI - 20 $ 7.00 Each Sodding, 1" deep, sloped ground GI - 21 $ 8.00 SY Surveying, line & grade GI - 22 $ 850.00 Da Surveying, lot location/lines GI - 23 $ 1,800.00 Acre Traffic control crew 2 flaggers GI - 24 $ 120.00 HR 40 $ 4,800.00 Trail, 4" chipped wood GI - 25 $ 8.00 SY Trail, 4" crushed cinder GI - 26 $ 9.00 SY Trail, 4" top course GI - 27 $ 12.00 SY Wall, retaining, concrete GI - 28 $ 55.00 1 SF 431 $ 23,677.50 Wall, rockery I GI - 29 $ 15.00 1 SF 180 $ 2,700.00 Page 3 of 9 SUBTOTAL $ 4,800.00 $ 31,456.50 Unit prices updated: 03/02/2015 *KCC 27A authorizes only one bond reduction. Version: 03/02/2015 Bond Quantity Sheets Report Date: 2/12/2021 Site Improvement Bond Quantity Worksheet Web date: 04/03/2015 Existing Right-of-way Future Public Right of Way & Drainage Facilities Private Improvements Unit Price Unit Quant. Cost Quant. Cost Quant.T Cost ROAD IMPROVEMENT No. AC Grinding, 4' wide machine < 1000s RI - 1 $ 30.00 SY AC Grinding, 4' wide machine 1000-2000 RI - 2 $ 16.00 SY AC Grinding, 4' wide machine > 2000s RI - 3 $ 10.00 SY AC Removal/Disposal RI - 4 $ 35.00 SY Barricade, type III Permanent RI - 6 $ 56.00 LF Curb & Gutter, rolled RI - 7 $ 17.00 LF Curb & Gutter, vertical RI - 8 $ 12.50 LF 84 $ 1,050.00 Curb and Gutter, demolition and disposal RI - 9 $ 18.00 LF 20 $ 360.00 Curb, extruded asphalt RI - 10 $ 5.50 LF Curb, extruded concrete RI - 11 $ 7.00 LF $ - 65 455.00 Sawcut, asphalt, 3" depth RI - 12 $ 1.85 LF 140 $ 259.00 Sawcut, concrete, per 1" depth RI - 13 $ 3.00 LF Sealant, asphalt RI - 14 $ 2.00 LF Shoulder, AC, see AC road unit price RI - 15 $ - SY Shoulder, gravel, 4" thick RI - 16 $ 15.00 SY Sidewalk, 4" thick RI - 17 $ 38.00 SY 144 $ 5,472.00 29 $ 1,102.00 Sidewalk, 4" thick, demolition and dispos RI - 18 $ 32.00 SY 90 $ 2,880.00 24 $ 768.00 Sidewalk, 5" thick RI - 19 $ 41.00 SY Sidewalk, 5" thick, demolition and dispos RI - 20 $ 40.00 SY Sign, handicap RI - 21 $ 85.00 Each Striping, per stall RI - 22 $ 7.00 Each Striping, thermoplastic, for crosswalk RI - 23 $ 3.00 SF 115 $ 345.00 Striping, 4" reflectorized line RI - 24 $ 0.50 LF 210 $ 105.00 Page 4 of 9 SUBTOTAL 1.00 2,325.00 Unit prices updated: 03/02/2015 *KCC 27A authorizes only one bond reduction. Version: 03/02/2015 Bond Quantity Sheets Report Date: 2/12/2021 Site Improvement Bond Quantity Worksheet Web date: 04/03/2015 Existing Right-of-way Future Public Right of Way & Drainage Facilities Private Improvements Unit Price Unit I QuantT Cost Quant. Cost Quant. Cost ROAD SURFACING No. 4" Rock = 2.5 base & 1.5" top course 9 1/2" Rock= 8" base & 1.5" top course Additional 2.5" Crushed Surfacing RS - 1 $ 3.60 SY HMA 1/2" Overlay, 1.5" RS - 2 $ 14.00 SY HMA 1/2" Overlay 2" RS - 3 $ 18.00 SY 150 $ 2,700.00 HMA Road, 2", 4" rock, First 2500 SY RS - 4 $ 28.00 SY HMA Road, 2", 4" rock, Qty. over 2500 S RS - 5 $ 21.00 SY HMA Road, 3", 9 1/2" Rock, First 2500 S RS - 6 $ 42.00 SY 90 $ 3,780.00 300 12,600.00 HMA Road, 3", 9 1/2" Rock, Qty Over 25 RS - 7 $ 35.00 SY Not Used RS - 8 Not Used RS - 9 HMA Road, 6" Depth, First 2500 SY RS - 10 $ 33.10 SY HMA Road, 6" Depth, Qty. Over 2500 SY RS - 11 $ 30.00 SY HMA 3/4" or 1", 4" Depth RS - 12 $ 20.00 SY Gravel Road, 4" rock, First 2500 SY RS - 13 $ 15.00 SY $ Gravel Road, 4" rock, Qty. over 2500 SY RS - 14 $ 10.00 SY PCC Road (Add Under Write -Ins w/Desi RS - 15 Thickened Edge IRS - 17 $ 8.60 LF Page 5 of 9 SUBTOTAL $ 6,480.00 Unit prices updated: 03/02/2015 *KCC 27A authorizes only one bond reduction. Version: 03/02/2015 Bond Quantity Sheets Report Date: 2/12/2021 Site Improvement Bond Quantity Worksheet Web date: 04/03/2015 Existing Right-of-way Future Public Right of Way & Drainage Facilities Private Improvements Unit Price Unit Quant. Cost Quant. I Cost Quant. Cost DRAINAGE (CPP = Corrugated Plastic Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe. Access Road, R/D D - 1 $ 21.00 SY Bollards - fixed D - 2 $ 240.74 Each Bollards - removable D - 3 $ 452.34 Each * (CBs include frame and lid CB Type I D - 4 $ 1,500.00 Each 1 $ 1,500.00 2 $ 3,000.00 CB Type IL D - 5 $ 1,750.00 Each CB Type II, 48" diameter D - 6 $ 2,300.00 Each for additional depth over 4' D - 7 $ 480.00 FT CB Type II, 54" diameter D - 8 $ 2,500.00 Each 2 $ 5,000.00 for additional depth over 4' D - 9 $ 495.00 FT 1 $ 495.00 CB Type II, 60" diameter D - 10 $ 2,800.00 Each for additional depth over 4' D - 11 $ 600.00 FT CB Type II, 72" diameter D - 12 $ 3,600.00 Each for additional depth over 4' D - 13 $ 850.00 FT Through -curb Inlet Framework Add D - 14 $ 400.00 Each Cleanout, PVC, 4" D - 15 $ 150.00 Each 6 $ 900.00 Cleanout, PVC, 6" D - 16 $ 170.00 Each Cleanout, PVC, 8" D - 17 $ 200.00 Each Culvert, PVC, 4" D - 18 $ 10.00 LF 430 $ 4,300.00 Culvert, PVC, 6" D - 19 $ 13.00 LF 278 $ 3,614.00 Culvert, PVC, 8" D - 20 $ 15.00 LF 60 $ 900.00 Culvert, PVC, 12" D - 21 $ 23.00 LF 47 $ 1,081.00 16 $ 368.00 Culvert, CMP, 8" D - 22 $ 19.00 LF Culvert, CMP, 12" D - 23 $ 29.00 LF Culvert, CMP, 15" D - 24 $ 35.00 LF Culvert, CMP, 18" D - 25 $ 41.00 LF Culvert, CMP, 24" D - 26 $ 56.00 LF Culvert, CMP, 30" D - 27 $ 78.00 LF Culvert, CMP, 36" D - 28 $ 130.00 LF Culvert, CMP, 48" D - 29 $ 190.00 LF Culvert, CMP, 60" D - 30 $ 270.00 LF Culvert, CMP, 72" D - 31 $ 350.00 LF Page 6 of 9 SUBTOTAL $ 2,581.00 $ 18,577.00 Unit prices updated: 03/02/2015 *KCC 27A authorizes only one bond reduction. Version: 03/02/2015 Bond Quantity Sheets Report Date: 2/12/2021 Site Improvement Bond Quantity Worksheet Web date: 04/03/2015 DRAINAGE CONTINUED Existing Right-of-way Future Public Right of Way & Drainage Facilities Private Improvements No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Culvert, Concrete, 8" D - 32 $ 25.00 LF Culvert, Concrete, 12" D - 33 $ 36.00 LF Culvert, Concrete, 15" D - 34 $ 42.00 LF Culvert, Concrete, 18" D - 35 $ 48.00 LF Culvert, Concrete, 24" D - 36 $ 78.00 LF Culvert, Concrete, 30" D - 37 $ 125.00 LF Culvert, Concrete, 36" D - 38 $ 150.00 LF Culvert, Concrete, 42" D - 39 $ 175.00 LF Culvert, Concrete, 48" D - 40 $ 205.00 LF Culvert, CPP, 6" D - 41 $ 14.00 LF Culvert, CPP, 8" D - 42 $ 16.00 LF Culvert, CPP, 12" D - 43 $ 24.00 LF Culvert, CPP, 15" D - 44 $ 35.00 LF Culvert, CPP, 18" D - 45 $ 41.00 LF Culvert, CPP, 24" D - 46 $ 56.00 LF 162 $ 9,072.00 Culvert, CPP, 30" D - 47 $ 78.00 LF Culvert, CPP, 36" D - 48 $ 130.00 LF Ditching D - 49 $ 9.50 CY Flow Dispersal Trench 1,436 base+ D - 50 $ 28.00 LF French Drain 3' depth D - 51 $ 26.00 LF Geotextile, laid in trench, polypropylene D - 52 $ 3.00 SY Mid -tank Access Riser, 48" dia, 6' deep D - 54 $ 2,000.00 Each Pond Overflow Spillway D - 55 $ 16.00 SY Restrictor/Oil Separator, 12" D - 56 $ 1,150.00 Each Restrictor/Oil Separator, 15" D - 57 $ 1,350.00 Each Restrictor/Oil Separator, 18" D - 58 $ 1,700.00 Each Riprap, placed D - 59 $ 42.00 CY Tank End Reducer 36" diameter D - 60 $ 1,200.00 Each Trash Rack, 12" D - 61 $ 350.00 Each Trash Rack, 15" D - 62 $ 410.00 Each Trash Rack, 18" D - 63 $ 480.00 Each Trash Rack, 21" D - 64 $ 550.00 Each Page 7 of 9 l,3nir.>tr_1111 $ 9,072.00 Unit prices updated: 03/02/2015 *KCC 27A authorizes only one bond reduction. Version: 03/02/2015 Bond Quantity Sheets Report Date: 2/12/2021 Site Improvement Bond Quantity Worksheet Web date: 04/03/2015 Existing Right-of-way Future Public Right of Way & Drainage Facilities Private Improvements Unit Price Unit Quant. Price Quant. I Cost Quant. Cost PARKING LOT SURFACING Not To Be Used For Roads Or Shoulders No. 2" AC, 2" top course rock & 4" borrow PL - 1 $ 21.00 SY NA NA $ 2" AC, 1.5" top course & 2.5" base cour PL-2 $ 28.00 SY NA NA 4" select borrow PL - 3 $ 5.00 SY NA NA 1.5" top course rock & 2.5" base course PL-4 $ 14.00 SY NA NA UTILITY POLES & STREET LIGHTING Utility pole relocation costs must be accompanied b Franchise Utility's Cost Estimate Utility Poles Relocation UP-1 $ 25,000.00 LS Street Light Poles w/Luminaires UP-2 $ 7,500.00 Each WRITE -IN -ITEMS Such as detention/water quality vaults. No. Area Drain WI - 1 $ 300.00 Each 10 $ 3,000.00 1" Water Meter & Connect to Exist Main WI - 2 $ 12,624.00 Each 5 $ 63,120.00 1.5" Water Service Line WI - 3 $ 1.75 LF 344 $ 602.00 Backflow Prevention WI - 4 $ 200.00 Each 1 $ 200.00 Sewer Cleanout WI - 5 $ 500.00 Each 1 $ 500.00 8 $ 4,000.00 Side Sewer Pipe, 6" PVC WI - 6 $ 12.00 LF 15 $ 180.00 122 $ 1,464.00 Fire/Aid Address sin WI - 7 $ 75.00 Each 4 300.00 Street Address Sin WI - 8 $ 175.00 Each 4 700.00 WI-9 WI-10 SUBTOTAL $ 63,800.00 SUBTOTAL (SUM ALL PAGES): $ 88,132.00 30% CONTINGENCY & MOBILIZATION: $ 26,439.60 GRANDTOTAL: $ 114,571.60 COLUMN: B Page 8 of 9 C $ 10,266.00 $ 84,296.50 $ 25,288.95 $ 109,585.45 D Unit prices updated: 03/02/2015 *KCC 27A authorizes only one bond reduction. Version: 03/02/2015 Bond Quantity Sheets Report Date: 2/12/2021 Site Improvement Bond Quantity Worksheet Web date: 04/03/2015 Original bond computations prepared by: Name: Greg Guillen, PE, SE PE Registration Number: 25385 Firm Name: CG Engineering Address: 250 4th Ave S, Ste 200, Edmonds, WA 98020 Stabilization/Erosion Sediment Control (ESC) Existing Right -of -Way Improvements Future Public Right of Way & Drainage Facilities Private Improvements Calculated Quantity Completed Total Right -of Way and/or Site Restoration Bond*/** (First $7,500 of bond* shall be cash.) Performance Bond* Amount (A+B+C+D) = TOTAL Maintenance/Defect Bond* Total NAME OF PERSON PREPARING BOND* REDUCTION: Date: 2/12/2021 Tel. #: 425.778.8500 Project No: 17206.20 FINANCIAL GUARANTEE REQUIREMENTS PERFORMANCE BOND* MINIMUM BOND* AMOUNT PUBLIC ROAD & DRAINAGE AMOUNT REQUIRED FOR RECORDING OR MAINTENANCE/DEFECT BOND* TEMPORARY OCCUPANCY AT (A) $ 8,436.4 SUBSTANTIAL COMPLETION *** (B) $ 114,571.6 (C) $ - (D) $ 109,585.5 (A+B) $ 123,008.0 (T) $ 232,593.4 Minimum is $2000. T x 0.30 $ 69,778.0 Minimum is $2000. Date: (B+C) x 0.25 = $ 28,642.9 Minimum is $2000. * NOTE: The word "bond" as used in this document means a financial guarantee acceptable to King County. ** NOTE: KCC 27A authorizes right of way and site restoration bonds to be combined when both are required. The restoration requirement shall include the total cost for all TESC as a minimum, not a maximum. In addition, corrective work, both on- and off -site needs to be included. Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restoration needs to be reflected in this amount. The 30% contingency and mobilization costs are computed in this quantity. *** NOTE: Per KCC 27A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes. REQUIRED BOND* AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY KING COUNTY Page 9 of 9 Unit prices updated: 03/02/2015 Check out the DDES Web site at www.kinpcounty.poy/permits Version: 03/02/2015 Bond Quantity Sheets Report Date: 2/12/2021