Loading...
Approved Traffic Impact WorksheetAPPENDIX A Page 1 of 2 Transportation Impact Analysis Worksheet PERMITTING & DEVELOPMENT ENGINEERING DIVISION 121 5th Avenue N P: 425.771,0220 www.edmondswa.gov Name of Proposed Project: Edmonds Apartments Owner/Applicant Roy Gurlsli,_ Gursli Partnership Name 5909 169th Street SW Street/Mailing Address Lynnwood, WA 98037 City State Applicant Contact Person: Steve Barnes. Cornerstone Architectural Graup Name 6161 NE 175th Street, Suite 101 Street/Mailing Address Kenmore, WA 98028 Zip City Telephone: _(425) 210-5502 Telephone: (206) 682-5000 Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): Firm Name Telephone: 1. PROJECT DESCRIPTION Contact Name E-mail: a. Location - Street address: 8509 244th Street SW b. Specify existing land use: RM1.5 State Zip Attach a vicinity map and site plan.) c. Specify proposed type and size of development: 19 Residential Units (# of residential units and/or square footage of building) d. Date construction will begin and be completed: Start: 2018 Completion: 2019 e. Define proposed access locations: Off access easement on 244th Street SW APPENDIX A Page 2 of 2 f. Define proposed sight distance at site egress locations: 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. IX CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used. Per Unit ITE Land Use Category Fee Rate New Use 220 19 Units $ 2,987.09 Prior Use 220 8 Units 544.49 1 $1=2;4� Units in square feet, # of dwelling, vfp, etc. X 19 X 8 Fee $ 56,754.71 = I $ -234,9&;Z2 1 4,355.9,- New Use Fee: $ 56,754.71 - Prior Use Fee: $ 23-, 9fr.7� _ $ 11 NEW DEVELOPMENT Per Unit ITE Land Use Category Fee Rate New Use $ ❑ OTHER X 4,355.92 52,398.79 Units in square feet, # of dwelling, vfp, etc. MITIGATION FEE E MM N ATI N: INDEPENDENT FEE CALCULATION: $240.00 + consultant fee TOTAL TRANSPORTATION IMPACT FEE $ 52,398.79 ' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. 20/�.0 6 1 TABLE 1- VEHICULAR TRIP GENERATION EDMONDS APARTMENTS - EDMONDS SEPA - TRAFFIC IMPACT ANALYSIS WORKSHEET Time Period Size (X) TG Rate Enter % I Enter Trips Exit % Exit Trips I Total (T) Apartments (ITE LUC 220; 11- net new units) Weekday 11 6.65 50% 37 50% 37 73 AM peak hour 11 0.51 20% 11 80% 4 6 PM peak hour 11 0.62 65% 41 35% 2 7 T = trips, X = number of units A vehicle trip is defined as a single or one direction vehicle movement with either the origin or destination (exiting or entering; inside the study site. The above trip generation values account for all the site trips made by all vehicles for all purposes, including commuter, visitor, recreation, and service and delivery vehicle trips.