Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
ENG2022-0312 ROW PERMIT
RIGHT OF WAY EUC PERMIT o PERMIT NU City of Edmonds 1 1 www.cityofedmonds.gov / i �r�c. 1890 Description: COMCAST-MAINTENANCE SPLICES AT MULTIPLE LOCATIONS ISSUED: 08/01/2022 Address: 713 LAUREL ST EDMONDS WA 98020-4027 EXPIRES: 02/01/2023 Permit Type: RIGHT OF WAY EUC Permit Subtype: MINOR Parcel Number: 00484500703601 CONTACTS NAME TYPE NAME ADDRESS PHONE APPLICANT CODY SHACKETT 410 VALLEY AVE NW, PUYALLUP WA 98371 (253)341-9318 CONTACT CABLECOM 19910 NORTHCREEK PARKWAY NORTH, BOTHELL WA 98011 (360)454-3163 CONTRACTOR CABLECOM LLC 20021 120TH AVE NE, SUITE 101, BOTHELL WA 98011 (360)863-2628 OWNER KING MARIE S 713 LAUREL ST, EDMONDS, WA 98020 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $40.00 RIGHT OF WAY MINOR - EUC PERMIT FEE $110.00 $110.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW 08/01 /2022 RELEASED BY DATE Printed: Monday, August 01, 2022 2:06:05 PM 1 of 2 oe e n,y RIGHT OF WAY EUC PERMIT sAd - City of Edmonds 1 1 . -. •.425.771.0220 CONDITIONS CONDITION TYPE NOTES ALERT RESIDENTS ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS REQUIREMENTS. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS www.mybuildingpermit.com POTHOLING VERIFY CLEAR BORE CROSSINGS. RESTORE LANDSCAPE Restore landscape to like or better conditions Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on SOUND AND NOISE weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTIONS INSPECTION TYPE DATE RESULT NOTES COMPLETE A-1 JOB START X-2 ENGINEERING FINAL" Printed: Monday, August 01, 2022 2:06:05 PM 2 of 2 RECEIVED Lti�y of Epiy04o� ANC. 1 g90 SECTION A RIGHT OF WAY CONSTRUCTION PERMIT APPLICATION Complete and submit this Application in accordance with the Submittal Requirements outlined in Right -of -Way permit Handout E63. J U N 24 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT If any field is not applicable to your project, write "N/A" instead of leaving blank. All fields required. Incomplete Applications will be denied. General• Project Name COMCAST - JB0000994725 Site Address or if no site address use Property Address at NW corner of project area: 713 LAUREL ST, EDMONDS, WA 98020 Associated Permits: BLD PLN ENG Owner and Entity Holding Franchise (if applicable) Name ofCompanyCOMCAST CABLE HOLDING Franc hiseOrdinanceNo: Point of Contact OWEN SHACKETT Title PERMIT COORDINATOR Address 410 VALLEY AVE NW City PUYALLUP State WA Zip 98371 Phone253-341-9318 EmailOWEN SHACKETT@CABLE.COMCAST.COM Contractor and Authorized Agent of • • - •• •w) Name of CompanyCABLECOM LLC Contractor ContactsDuring Construction Primary Name CABLECOM LLC - MICHAEL FINCH Agent Name SUNSHINE CRABBS Title CONSTRUCTION SUPERVISOR Title PERMIT COORDINATOR Mobile 360-965-5085 Address 19910 NORTHCREEK PARKWAY NORTH, SUITE 100 Email MICHAEL.FINCH@CABLECOMLLC. NET City BOTHELL State WA Zip 98011 Secondary Name Phone 360-454-3163 Title Email SUNSHINE.CRABBS@CABLECOMLLC. NET Mobile City of Edmonds Business License No: N R - 021818 Email State License No: CABLEL*971 DP 56 Contractor verifies it is currently bonded Contractor verifies it currently has general liability insurance NOTE: ECDC 18.6o.02o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. ❑ Multifamily residential ❑ Commercial ❑ City project ❑ Single family residential subdivision ❑ Single family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? ❑ Other, please specify: ❑ Utility Franchise Work associated with development (check one of the above boxes as well) ❑ Traffic Control Only (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 vttility Franchise Work (no associated development) Project Description Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) MULTIPLE MAINTENANCE & SPLICE LOCATIONS AT THE FOLLOWING ADDRESSES: Aerial 1 1 1713 LAUREL ST Aerial 1 2 1831 8TH AVE S RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF JxJ LF SF Alley 72 hours + LF I x I LF SF Parking 72 hours + I LF JxJ LF I SF SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. 1. The work in the right of way is on or for the following type of facilities: ❑ telecommunications d cable ❑ power ❑ gas ❑ water ❑ sewer ❑ storm 1. CompletedDetails of Work to be Does the utility owner have existin overhead infrastructure in the area of work? x • 2. Will any equipment be added underground or above ground (e.g. pedestals, vaults, etc.)? x If yes, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? X 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility system? X 5. Does the work involve proposed additions to an aboveground utility system? If es: x Are the additions for the purpose of serving new commercial development? Are the additions for the purpose of serving a single-family residential subdivision? Details of • to be Completed ®i 6. Does your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial development? X City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 If yes, answer the following questions related to project area, i.e. the actual area in which the project is proposed: 6a. Does your project involve wires/cables/lines? If yes: How many are existing? I I How many are to be added? 6b. Does your project involve poles? If yes: How many poles are existing in the project area? What is the height of the existing poles? How many poles are to be removed? Are additional poles to be laced? How many? I I What is the height of the additionalpoles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: How many? What is the height of the poles after? Describe the modification rebuild: SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. APPLICANT SIGNATURE: , 6"d4/a C24A6� DATE: APPLICANT PRINTED NAME: Sunshine Crabbs APPLICANT TITLE: PERMIT COORDINATOR NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 Asbuilt Cover Completed By: 0 f-%r , + W - ,. E ` S Completion Date: 1/0/1900 Address: I 713 LAUREL ST, EDMONDS, WA 98020 I COMCAST Survey Revision Date: Survey Revision Task ID: Footages Entered On Right of Way, Private Exterior, and Private Interior tabs. Footages are summarized on Survey Rollup tab.- Engineered For: Project Manager: Are Additional Pages Needed: No P2 ID: JB0000994725 Legend New Ped ❑ Pole N New Vault ❑V Lock Box Existing U/G Footage 150' Existing Aerial Text Box Text New U/G Callout Arrow New Aerial New Tap Interior Path Phase Identifier ❑1 Footage Break - Fiber Splice Point Power Supply PS p Loop Hard Surface Cut � OStorage Riser R Abandoned Cable Hemlock ,yay Q Hemlock St Provide Clear Construction Details MULTIPLE MAINTENANCE & SPLICE LOCATIONS AT THE FOLLOWING ADDRESSES: Laurel Way v Q Aerial 1 1713 LAUREL ST Laurel St Aerial 2 18318TH AVE S Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or ENGINEERING DIVISION occurs during the permitted project. ..,7TED _ 17/29/2022 RECEIVED PinC 5t OWNER/CONTRACTOR IS RESPONSIBLE FOR JUN 24 2022 EROSION CONTROL AND DRAINAGE CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Route Overview Completed By: 0 W ,: ,. E ` S Completion Date: 1/0/1900 Address: I 713 LAUREL ST, EDMONDS, WA 98020 I COMCAST Survey Revision Date: Survey Revision Task ID: Footages Entered On Right of Way, Private Exterior, and Private Interior tabs. Footages are summarized on Survey Rollup tab.- Engineered For: Project Manager: Are Additional Pages Needed: No P2 ID: JB0000994725 Legend Cl) New Ped ❑ Pole N New Vault w Lock Box J Q Existing U/G Footage 150' Existing Aerial Text Box Text New U/G Callout Arrow New Aerial New Tap Interior Path Phase Identifier ❑1 Footage Break Fiber Splice Point Power Supply Ps Loop Hard Surface Cut � OStorage Riser R Abandoned Cable Hemlock Way Q Hemlock St � Provide Clear Construction Details MULTIPLE MAINTENANCE & SPLICE LOCATIONS AT THE FOLLOWING ADDRESSES: Laurel Way ❑1 � H Q p ❑2 Aerial 1 713 LAURELST 1831 Aerial 2 STH AVE S 00 �urCl 5c RECEIVED Pill- JL J U N 24 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Inp ueol W! Table 6E-1. Stopping Sight Distance as a Function of Speed Speed* Distance 20 mph 115 feet 25 mph 155 feet 30 mph 200 feet 35 mph 250 feet 40 mph 305 feet 45 mph 360 feet 50 mph 425 feet 55 mph 495 feet 60 mph 570 feet 65 mph 645 feet 70 mph 730 feet 75 mph 820 feet ' Posted speed, off-peak 85th-percentile speed prior to work starting, or the anticipated operating speed NOTE: INSTALL TEMPORARY NO PARKING SIGNS 48 HOURS PRIOR TO START OF WORK. ACCESS TO DRIVEWAYS WILL BE GIVEN AT ALL TIME DURING CONSTRUCTION ALL LANES SHOULD BE A MINIMUM OF 10' IN WIDTH AS MEASURED TO THE NEAR FACE OF THE CHANNELIZING DEVICES. �ZOZ/6Z/LI am-9 � 431G,. NOISIA10 JNNc EINION3 Mo THIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIAL DESIGN: REV DESCRIPTION DATE DRAWN BY: DOM 0 ISSUE FOR PERMIT 06/15/2022 APPROVED APPROVED APPROVED Figure 61-1-6. Shoulder Work with Minor Encroachment (TA-6) A Nb MOMO avom ON] T HEMLOCK ST 1=1111 l loft MIN.*I l lal t LAUREL ST Typical Application 6 i END ROAD WORK Note: See Tables 6H-2 and 61-1-3 for the meaning of the symbols and/or letter codes used in this figure. Work vehicle Truck -mounted attenuator (optional) Buffer space (optional) 1/3 L A ROAD J6 WORK AHEAD i IMPORTANT NOTICE Section # 4216/4217 of the Government Code requires a Dig Alert Identification Number to be issued before a "Permit to Excavate" will be valid For your Dig Alert I.D. CALL TOLL FREE 48 HOURS BEFORE YOU DIG UNDERGROUND SERVICE ALERT 1-800-227-2600 Table 614-2. Meaning of Symbols on Typical Application Diagrams ® Arrow board Shadow vehicle O O • Arrow board support or trailer (shown facing down) IN Sign (shown facing left) Changeable message sign or support trailer ® Surveyor a Channelizing device 0 Temporary barrier ® Crash cushion ® Temporary barrier with warning light Direction of temporary traffic detour Traffic or pedestrian signal _0111101 Direction of traffic ® Truck -mounted attenuator r� Flagger ® Type 3 barricade High-level warning device (Flag tree) Warning light ® Longitudinal channelizing device Work space 1111110--• Luminaire \\\\`Pavement markings that should be removed for a long-term project o Work vehicle Table 6H-3. Meaning of Letter Codes on Typical Application Diagrams Road Type Distance Between Signs** A B T C Urban (low speed)* 100 feet 100 feet 100 feet Urban (high speed)* 350 feet 350 feet 350 feet Rural _ 500 feet 500 feet 500 feet Expressway / Freeway 1,000 feet 1,500 feet 2,640 feet Speed category to be determined by highway agency The column headings A, B, and C are the dimensions shown in Figures 6H-1 through 61-1-46. The A dimension is the distance from the transition or point of restriction to the first sign. The B dimension is the distance between the first and second signs. The C dimension is the distance between the second and third signs. (The'first sign" is the sign in a three -sign series that is closest to the TTC zone. The "third sign" is the sign that is furthest upstream from the TTC zone.) Table 6H-4. Formulas for Determining Taper Length Speed (S) Taper Length (L) in feet WS2 40 mph or less L = - 60 45 mph or more L = WS Where: L = taper length in feet W = width of offset in feet S = posted speed limit, or off-peak 85th-percentile speed prior to work starting, or the anticipated operating speed in mph 713 LAUREL ST, EDMONDS, WA TRAFFIC CONTROL - 713 LAUREL ST PROJ#: JB994725-HOUSING SWAP CONSTRUCTION TYPE: MAINTENANCE SYSTEM: EDMONDS NODE: RECEIVED J U N 24 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT TC-1 SHEET: 1 OF 2 Table 6E-1. Stopping Sight Distance as a Function of Speed Speed` Distance 20 mph 115 feet 25 mph 155 feet 30 mph 200 feet 35 mph 250 feet 40 mph 305 feet 45 mph 360 feet 50 mph 425 feet 55 mph 495 feet 60 mph 570 feet 65 mph 645 feet 70 mph 730 feet 75 mph 820 feet Posted speed, off-peak 85th-percentile speed prior to work starting, or the anticipated operating speed NOTE: INSTALL TEMPORARY NO PARKING SIGNS 48 HOURS PRIOR TO START OF WORK. ACCESS TO DRIVEWAYS WILL BE GIVEN AT ALL TIME DURING CONSTRUCTION ALL LANES SHOULD BE A MINIMUM OF 10' IN WIDTH AS MEASURED TO THE NEAR FACE OF THE CHANNELIZING DEVICES. THIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIAL DESIGN: REV DESCRIPTION DATE DRAWN BY: DOM 0 ISSUE FOR PERMIT 06/15/2022 APPROVED APPROVED APPROVED Figure 61-1-6. Shoulder Work with Minor Encroachment (TA-6) OV3H`d �aoM Tr adoa A LAUREL ST nmmomava Tr LAUREL WAY L END ROAD WORK Note: See Tables 61-1-2 and 61-1-3 for the meaning of the symbols and/or letter codes used in this figure. Work vehicle x 000 Truck -mounted o attenuator (optional) 10 ft IN.I Buffer space (optional) I 1/3 L A ■ ROAD PINE ST b WORK AHEAD Typical Application 6 IMPORTANT NOTICE Section # 4216/4217 of the Government Code requires a Dig Alert Identification Number to be issued before a "Permit to Excavate" will be valid For your Dig Alert I.D. CALL TOLL FREE 48 HOURS BEFORE YOU DIG UNDERGROUND SERVICE ALERT 1-800-227-2600 Table 6H-2. Meaning of Symbols on Typical Application Diagrams ® Arrow board Shadow vehicle O ®� Arrow board support or trailer (shown facing down) Sign (shown facing left) Changeable message sign or support trailer ® Surveyor ■ Channelizing device 0 Temporary barrier ® Crash cushion ® Temporary barrier with warning light Direction of temporary traffic detour Traffic or pedestrian signal Direction of traffic ® Truck -mounted attenuator 0r0 Flagger ® Type 3 barricade High-level warning device (Flag tree) Warning light © Longitudinal channelizing device Work space Luminaire \\\\`Pavement markings that should be removed for a long-term project p Work vehicle Table 614-3. Meaning of Letter Codes on Typical Application Diagrams Road Type Distance Between Signs — A B TC Urban (low speed)* 100 feet 100 feet 100 feet Urban (high speed)* 350 feet 350 feet 350 feet Rural 500 feet 500 feet 500 feet Expressway / Freeway 1,000 feet 1,500 feet 2,640 feet Speed category to be determined by highway agency " The column headings A, B, and C are the dimensions shown in Figures 6H-1 through 61-1-46. The A dimension is the distance from the transition or point of restriction to the first sign. The B dimension is the distance between the first and second signs. The C dimension is the distance between the second and third signs. (The "first sign" is the sign in a three -sign series that is closest to the TTC zone. The "third sign" is the sign that is furthest upstream from the TTC zone.) Table 6H-4. Formulas for Determining Taper Length Speed (S) Taper Length (L) in feet WS2 40 mph or less L = 60 45 mph or more L- WS Where: L = taper length in feet W = width of offset in feet S = posted speed limit, or off-peak 85th-percentile speed prior to work starting, or the anticipated operating speed in mph 713 LAUREL ST, EDMONDS, WA TRAFFIC CONTROL - 831 8TH AVE S PROJ#: JB994725-HOUSING SWAP CONSTRUCTION TYPE: MAINTENANCE SYSTEM: EDMONDS NODE: RECEIVED J U N 24 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT TC-2 SHEET: 2 OF 2