Loading...
Permit_1181926CITY OF EDMONDS Mechanical Permit My6uildingPermitxom Permit Information Permit Number RI ngngq-1 nq 1 Issued Date 8/2/2022 Expiration Date 1/29/2023 Job Address 21925 95TH AVE W Fee Paid $125.00 EDMONDS, 98020 Order Confirmation 1163412 Floor Related Permit# Suite Application ID 1181926 Contact Information Contact Name Terry Willey Contractor NW QUALITY REMODEL & DECK LLC Phone Number (360) 668-0191 Property Owner Claudia J Lafollette LNI License# NWQUAQR898JL Address 21925 95TH AVE W EDMONDS, WA Phone# (360) 668-0191 City Bus. License # Property Owner Phone Tenant Name Job Description A (Single Family Residential) (Alteration) Mechanical project involving ( 2 Gas Piping Outlets - Mech) moving water heater and stove gas outlet locations Conditions - Post Permit on site. Do not cover until inspected. Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. Certification Statement - The applicant states: I certify that I am the owner of this property or the owner's authorized agent, including an appropriately licensed contractor. I have furnished true and correct information. I will comply with all provisions of law and ordinances governing this type of construction work, whether specific herein or not. By submitting this application I give the jurisdiction permission to enter the property to perform inspections. I understand that failure to comply with the above may result in revocation of the permit. Applicant: Terry Willey Page 1 of 2 t of EDAf 0 1;�_-o CITY OF EDMONDS Mechanical Permit My6uildingPermitxom Permit Information Permit Number RI n9n99_ingi Issued Date 8/2/2022 Expiration Date 1 /29/2023 Job Address 21925 95TH AVE W Fee Paid $125.00 EDMONDS, 98020 Order Confirmation 1163412 Floor Related Permit# Suite Application ID 1181926 Inspections Inspection IVR Inspector Date Inspection IVR Inspector Date Gas Test/Pipe Mech Rough -in Mechanical Final Inspection Scheduling The issuance of this permit in no way constitutes approval from any other agencies having regulatory authority over the facility and this construction activity. It is the responsibility of the property owner to obtain any and all such required approvals. Page 2 of 2