Loading...
Building Permit (3)Type: RESIDENTIAL BLDG Subtype: DECK I Status: ISSUED Parcel No: 27033600103000 Subdivision: 005966 Fire Sprinklers: Valuation: $6,500.00 Code Edition: 0 Scope of Work: CARTON- DECK Site Address: 9509 232ND ST SW EDMONDS,WA 98020-5028 Lot: 0 Lot Area: 8,000 Zoning: RS-8 Occupancy Type: Construction Type: No. Stories: 0 # of Dwelling Units: 0 Applied: 5/16/2022 Issued: 8/2/2022 Final: Expiration Date: 7/28/2023 Issued by: NED I WA State Contractor L & I #: TRUENNC892N6 I CONTACTS NAME TYPE NAME ADDRESS T PHONE EMAIL APPLICANT NICHOLAS ZEIGLER 14326 26TH AVE NE, SEATTLE (206)992-3117 TRUENINETY@GMAIL.COM WA 98125 CONTACT TRUE 90 CARPENTRY 14326 26TH AVE NE, SEATTLE (206)992-3117 trueninety@gmail.com WA 98125 14326 26Th Avenue Ne, Seattle CONTRACTOR TRUE NINETY CARPENTRY (360)481-7711 TRUENINETY@GMAIL.COM WA 98125 9509 232ND ST SW, EDMONDS OWNER KAREN M & MARK CARTON WA 98020 DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 5/18/22 R20303 PER PERMIT PERMIT FEE - RESIDENTIAL 001.000.322.10.000.00 $245.00 $245.00 8/2/22 R22137 PLAN REVIEW FEE - RESIDENTIAL 001.000.345.83.000.00 $208.25 $208.25 5/18/22 R20303 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 8/2/22 R22137 TOTALS: $499.75 $499.75 CONDITION TYPE STATUS NOTES Printed: Tuesday, August 02, 2022 8:57:21 AM 1 of 2 'RESIDENTIAL BLDG Permit City of Edmonds PERMIT NUM www.edmondswa.gov• 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. \r\n2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable.\r\n3- SOUND OR NOISE - Sound/Noise originating from temporary FOR construction sites as a result of construction activity are exempt from the noise limits of ALL BUILDING PERMITS INFORMATION ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.\r\n4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. \r\n5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647- 0982. Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION provide manufactures installation instructions on site for Building Inspector. Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding SOUND AND NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. INSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES A-1 BUILDING PRECON B-2 FOOTINGS B-4 FRAMING B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" Printed: Tuesday, August 02, 2022 8:57:21 AM 2 of 2