Loading...
Building Permit (3)Type: COMMERCIAL BLDG Subtype: CHANGE OF USE I Status: ISSUED Parcel No: 00434208800000 Site Address: 700 MAIN ST EDMONDS,WA 98020-3032 Applied: 6/30/2022 Subdivision: 004342 Lot: 0 Issued: 8/3/2022 Fire Sprinklers: Yes Lot Area: Zoning: Final: Valuation: $0.00 Occupancy Type: B Construction Type: VB Expiration Date: 8/3/2023 Code Edition: 2018 No. Stories: 0 # of Dwelling Units: 0 Issued by: BAC Scope of Work: FRANCES CENTER -CHANGE OF USE -CLASS TO OFFICES -RIMS 115/121 WA State Contractor L & I #: CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT THOM SULLIVAN 7110 210 ST. SW, EDMONDS WA (425)760-3334 THOM.SULLIVAN@EDMONDSWA.GO 98026 V CONTACT CITY OF EDMONDS 7110 210 ST. SW, EDMONDS WA (425)760-3334 thom.sullivan@edmondswa.gov 98026 121 FIFTH AVE N, EDMONDS WA CONTRACTOR CITY OF EDMONDS 98020 250 5TH AVE N, EDMONDS WA OWNER EDMONDS CITY OF 98020-3146 •' 1 • DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CHANGE OF USE - SUB NO CONST - 001.000.322.10.000.00 $210.00 $210.00 8/3/22 R22161 BLDG PERMIT FEE CHANGE OF USE - SUB NO CONST - 001.000.345.83.000.00 $100.00 $100.00 8/3/22 R22161 BLDG PLAN REVIEW FEE CHANGE OF USE - SUB NO CONST - 001.000.342.40.000.00 $100.00 $100.00 8/3/22 R22161 FIRE INSP FEE CHANGE OF USE - SUB NO CONST - 001.000.345.83.100.00 $100.00 $100.00 8/3/22 R22161 FIRE PLAN REVIEW FEE CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 8/3/22 R22161 PER PERMIT COMMERCIAL STATE SURCHARGE 001.000.237.150 $25.00 $25.00 8/3/22 R22161 TOTALS: $575.00 $575.00 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Wednesday, August 03, 2022 1:58:55 PM 1 of 2 •M MERCIAL BLDG Permit - City of • • • 98020 1 1:. . •. • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its FOR officials, employees, and agents from any and all claims for damages of whatever nature, HOLD HARMLESS INFORMATION arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. Approval of this permit is not an assurance of full compliance of the Building Code. LIFE SAFETY INSPECTION FOR Verification of code compliance is limited to the elements of construction visible to the INFORMATION City Inspector. INSPECTIONS - Schedule Online at https://inspection.mybuildingpermit.com INSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES X-1 FIRE FINAL X-3 BUILDING FINAL" Printed: Wednesday, August 03, 2022 1:58:55 PM 2 of 2