Loading...
Building Permit (3)Type: MISCELLANEOUS Subtype: NON STANDARD PERMIT I Status: ISSUED Parcel No: 00548900001203 Site Address: 1001 OLYMPIC AVE EDMONDS,WA 98020-2513 Applied: 4/20/2022 Subdivision: 007661, 005489 Lot: 0 Issued: 8/8/2022 Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $0.00 Occupancy Type: Construction Type: Expiration Date: 2/8/2023 Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: BAC Scope of Work: 1001 OLYMPIC AVE LLC-COMPLETE REVIEWS & FINAL INSP FOR CofO WA State Contractor L & I #: WINDSCC8200K CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT WAYNE MALMBERG 527 NW 196TH PL, SHORELINE (425)531-0646 WAYNEM@WINDSTARCONSTRUCTIO WA 98177 N.COM CONTACT WINDSTAR CONSTRUCTION 527 NW 196TH PL, SHORELINE (425)531-0646 waynem@windstarconstruction.com CO WA 98177 WINDSTAR CONSTRUCTION 527 NW 196TH PL, SHORELINE WAYNEM@WINDSTARCONSTRUCTIO CONTRACTOR (425)531-0646 CO WA 98177 N.COM CONTRACTOR 2 BROOKSIDE EXCAVATION LLC 15321 BROOKSIDE PL, (425)879-6159 SNOHOMISH WA 98290 1001 OLYMPIC AVE LLC- OWNER WAYNE MALMBERG 527 NW 196TH PL NE 150TH ST, (425)531-0646 WINDSTAR CONSTRUCTION SHORELINE WA 98177 CO INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT# CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 8/3/22 R22168 PER PERMIT ENGINEERING INSPECTION FEE 001.000.341.82.000.00 $440.00 $440.00 8/3/22 R22168 ENGINEERING REVIEW FEE 001.000.341.82.000.00 $715.00 $715.00 8/3/22 R22168 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 8/3/22 R22168 STORMWATER ENGINEER REVIEW 001.000.341.82.000.00 $1,040.00 $1,040.00 8/3/22 R22168 FEE TOTALS: $2,241.50 $2,241.50 CONDITIONS CONDITION TYPE STATUS NOTES FOR 48 HRS NOTICE-ENGR FINAL 48 Working hours notice is required when requesting your FINAL engineering inspection. NFORMATION It is the owner's responsibility to repair/replace all damage of utilities or frontage DAMAGE TO FRONTAGE FOR improvements in City right of Ways or Easements to City Standards caused by or IMPROVEMENTS INFORMATION occurring during the permitted project. FOR MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS INFORMATION REQUIREMENTS. Printed: Monday, August 08, 2022 10:54:31 AM 1 of 2 -MISCELLANEOUS Permit PERMIT NUM City of Edmonds www.edmondswa.gov INSP PRIOR TO BACKFILL FOR Call for all required inspections. All work shall be inspected prior to backfill. NFORMATION FOR SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS INFORMATION www.mybuildingpermit.com Backflow prevention assembly is required for any irrigation system with an assembly test LANDSCAPE SPRINKLER SYSTEM FOR report. Please contact Public Works 425-771-0235 for more information. If the property is INFORMATION located within the Olympic View Water Sewer District please contact their office. FOR Electronic civil asbuilt shall be submitted to the City prior to final project acceptance. PROJECT CIVIL ASBUILT INFORMATION Asbuilt shall be submitted to Engineeringpermits@edmondswa.gov. Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding SOUND AND NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. FOR STORM COVENANT A stormwater covenant shall be approved for recording prior to project final approval. NFORMATION FOR All utilities shall be located prior to any excavation. New locates shall be called for if at UTILITY LOCATES INFORMATION time of excavation, original locates are no longer identifiable. INSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES X-3 BUILDING FINAL" X-2 ENGINEERING FINAL E-3 STRM MGMT FACILITY E-3 STRM CONVEYANCE E-3 STRM COVENANT E-3 STRM FOOTING DRAIN E-3 STRM TIGHTLINE E-4 WATER SERVICE LINE E-9 COMPOST AMEND E-9 PROJECT ASBUILTS A-1 TESC AND MOBILIZE Printed: Monday, August 08, 2022 10:54:31 AM 2 of 2