Building Permit (3)RE SMOKE•
• Permit
City of
Edmonds
PERMIT NUM
www.edmondswa.gov
Type: FIRE SMOKE
Subtype:
Status: ISSUED
CONTROL SYSTEM
Parcel No: 00576700002002
Site Address: 23400 HIGHWAY 99 EDMONDS,WA 98026
Applied: 7/8/2022
Subdivision: LLA PLN20130029,
005767, 010412
Lot: 0
Issued: 8/10/2022
Fire Sprinklers:
Lot Area:
Zoning:
Final:
Valuation: $0.00
Occupancy Type:
Construction Type:
Expiration Date: 8/5/2023
Code Edition: 0
No. Stories: 0
# of Dwelling Units: 0
Issued by: NED
Scope of Work: GRE APT- FIRE SMOKE CONTROL SYSTEM
WA State Contractor L & I #: GRECOCL835136
•
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
ROB KRALIS
2801 ALASKAN WAY SUITE 310,
(206)225-3242
RKRALIS@GOODMANRE.COM
SEATTLE WA 98121
CONTACT
GOODMAN REAL ESTATE
2801 ALASKAN WAY SUITE 310,
(206)225-3242
rkralis@goodmanre.com
SEATTLE WA 98121
CONTRACTOR
GRE CONSTRUCTION LLC
2801 ALASKAN WAY SUITE 310,
(206)898-9354
tuomoto@goodmanre.com
SEATTLE WA 98121
OWNER
GRE EDMONDS LLC
2801 ALASKAN WAY 310,
(206)448-0259
SEATTLE WA 98121
FEE INFORMATION
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
BUILDING PLAN REVIEW FEE
001.000.345.83.000.00
$220.00
$220.00
8/9/22
R22316
MANUAL CALC
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
8/9/22
R22316
PER PERMIT
FIRE - INSPECTION FEE
001.000.342.40.000.00
$220.00
$220.00
8/9/22
R22316
FIRE - PLAN REVIEW HOURS
001.000.345.83.100.00
$660.00
$660.00
8/9/22
R22316
TOTALS: $1,140.00
$1,140.00
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Wednesday, August 10, 2022 8:28:47 AM 1 of 2
FIRE SMOKE• • PerCity mit
PERMIT NUM
Edmonds
98020 1 11.
www.edmondswa.gov •
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
Request final Fire Department Inspection 425-775-7720.
1. FSCP located in the electrical room on P-1. (referred to on plans as command center)
FOR
2. Installers to be certified NICET technicians
FIRE FINAL INSPECTION
INFORMATION
3. Separate electrical circuit with backup power required
4. Fire ratings will be with building approval
5. Approved subject to field inspection with building and fire.
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
REQUIRED SPECIAL
FOR
INSPECTIONS
INFORMATION
SPECIAL INSPECTION REPORTS
FOR I
Submit all special inspection reports to the City Building Official on a weekly basis.
NFORMATION
INSPECTIONS
- Schedule Online at https://inspection.mybuildingpermit.com
INSPECTIONTYPE INSPECTOR
COMPLETED RESULT
NOTES
X-1 FIRE FINAL
B-5 BLDG SPECIAL
INSPECTION
X-3 BUILDING FINAL
Printed: Wednesday, August 10, 2022 8:28:47 AM 2 of 2