Loading...
2022-02-01 City Council - Full Agenda-30731. 2. 3. 4. 5. 6. Op E D o Agenda Edmonds City Council s71. ,HvREGULAR MEETING - VIRTUAL/ONLINE VIRTUAL ONLINE MEETING EDMONDS CITY COUNCIL MEETINGS WEB PAGE, HTTP://EDMONDSWA.IQM2.COM/CITIZENS/DEFAULT.ASPX, EDMONDS, WA 98020 FEBRUARY 1, 2022, 7:00 PM THIS MEETING IS HELD VIRTUALLY USING THE ZOOM MEETING PLATFORM. TO JOIN, COMMENT, VIEW, OR LISTEN TO THE EDMONDS CITY COUNCIL MEETING IN ITS ENTIRETY, PASTE THE FOLLOWING INTO A WEB BROWSER USING A COMPUTER OR SMART PHONE: HTTPS://ZOOM. US/J/95798484261 OR JOIN BY PHONE: US: +1 253 215 8782 WEBINAR ID: 957 9848 4261 PERSONS WISHING TO PROVIDE AUDIENCE COMMENTS USING A COMPUTER OR SMART PHONE ARE INSTRUCTED TO RAISE A VIRTUAL HAND TO BE RECOGNIZED. PERSONS WISHING TO PROVIDE AUDIENCE COMMENTS BY DIAL -UP PHONE ARE INSTRUCTED TO PRESS *9 TO RAISE A HAND. WHEN PROMPTED, PRESS *6 TO UNMUTE. IN ADDITION TO ZOOM, REGULAR COUNCIL MEETINGS BEGINNING AT 7:00 PM ARE STREAMED LIVE ON THE COUNCIL MEETING WEBPAGE, COMCAST CHANNEL 21, AND ZIPLY CHANNEL 39. "WE ACKNOWLEDGE THE ORIGINAL INHABITANTS OF THIS PLACE, THE SDOHOBSH (SNOHOMISH) PEOPLE AND THEIR SUCCESSORS THE TULALIP TRIBES, WHO SINCE TIME IMMEMORIAL HAVE HUNTED, FISHED, GATHERED, AND TAKEN CARE OF THESE LANDS. WE RESPECT THEIR SOVEREIGNTY, THEIR RIGHT TO SELF-DETERMINATION, AND WE HONOR THEIR SACRED SPIRITUAL CONNECTION WITH THE LAND AND WATER. - CITY COUNCIL LAND ACKNOWLEDGMENT CALL TO ORDER/FLAG SALUTE LAND ACKNOWLEDGEMENT ROLL CALL APPROVAL OF THE AGENDA AUDIENCE COMMENTS APPROVAL OF THE CONSENT AGENDA 1. Approval of Council Special Meeting Minutes of January 25, 2022 2. Approval of 6:30 PM Council Special Meeting Minutes of January 18, 2022 3. Approval of Council Meeting Minutes of January 25, 2022 4. Approval of claim checks. Edmonds City Council Agenda February 1, 2022 Page 1 5. Acknowledge receipt of a Claim for Damages from Dawn Ridgway 6. Arts Commission Candidate Appointment 7. Temporary Employment Agreement for Admin Help in Council Office PUBLIC HEARING 1. Public Hearing on Proposed Amendments to the 2022 Adopted City Budget (60 min) 8. COUNCIL BUSINESS 1. 2022 Parks, Recreation & Open Space (PROS) Plan (45 min) 2. Enterprise Resource Planning System (ERP) Replacement: Action Items (15 min) 3. Hybrid Meetings Update and Vote to Extend Virtual Meetings (20 min) 9. MAYOR'S COMMENTS 10. COUNCIL COMMENTS ADJOURN Edmonds City Council Agenda February 1, 2022 Page 2 6.1 City Council Agenda Item Meeting Date: 02/1/2022 Approval of Council Special Meeting Minutes of January 25, 2022 Staff Lead: Scott Passey Department: City Clerk's Office Preparer: Scott Passey Background/History N/A Staff Recommendation Review and approve the draft meeting minutes on the Consent Agenda. Narrative N/A Attachments: 01-25-2022 Draft Council Special Meeting Minutes Packet Pg. 3 6.1.a EDMONDS CITY COUNCIL VIRTUAL ONLINE SPECIAL MEETING DRAFT MINUTES January 25, 2022 ELECTED OFFICIALS PRESENT Kristiana Johnson, Councilmember Will Chen, Councilmember Neil Tibbott, Councilmember Diane Buckshnis, Council President Pro Tern Vivian Olson, Council President Susan Paine, Councilmember Laura Johnson, Councilmember Mike Nelson, Mayor ELECTED OFFICIALS ABSENT None 1. CALL TO ORDER STAFF PRESENT Jeff Taraday, City Attorney Sharon Cates, City Attorney's Office Jessica Neill Hoyson, HR Director At 6:15 p.m., the Edmonds City Council Special Meeting was called to order by Mayor Nelson. The Council utilized the Zoom online meeting platform to conduct this meeting. 2. CLOSED SESSION The Council then convened in closed session to discuss collective bargaining strategy per RCW 42.30.140(4)(A). ADJOURN At 6:59 p.m., the closed session concluded and the meeting was adjourned. Edmonds City Council Draft Minutes January 25, 2022 Page 1 Packet Pg. 4 6.2 City Council Agenda Item Meeting Date: 02/1/2022 Approval of 6:30 PM Council Special Meeting Minutes of January 18, 2022 Staff Lead: Scott Passey Department: City Clerk's Office Preparer: Scott Passey Background/History N/A Staff Recommendation Review and approve the draft meeting minutes on the Consent Agenda. Narrative N/A Attachments: 01-18-2022 Draft Council Special Meeting Mlnutes Packet Pg. 5 6.2.a EDMONDS CITY COUNCIL SPECIAL VIRTUAL ONLINE MEETING ELECTED OFFICIALS PRESENT Mike Nelson, Mayor Vivian Olson, Council President Kristiana Johnson, Councilmember Will Chen, Councilmember Neil Tibbott, Councilmember Diane Buckshnis, Councilmember Susan Paine, Councilmember Laura Johnson, Councilmember 1. CALL TO ORDER DRAFT MINUTES January 18, 2022 STAFF PRESENT Scott Passey, City Clerk Dave Rohde, GIS Analyst ALSO PRESENT Brook Roberts, Student Representative The Edmonds City Council virtual online meeting was called to order at 6:31 p.m. by Mayor Nelson. 2. INTERVIEW FOR APPOINTMENT TO A CITY BOARD OR COMMITTEE 1. PFD BOARD CANDIDATE INTERVIEW Edmonds Public Facilities District (PFD) Executive Director Joe McIalwain introduced Robert White who applied for an open position on the PFD Board. He has joined the board at recent meetings, engaging and asking great questions. As his resume indicates, he has a great background that will lend itself nicely to the PFD's development. Councilmembers introduced themselves and interviewed Mr. Robert White for appointment to the PFD (responses in italics): Councilmember Paine expressed her support for his application, noting he has a lot of great qualities and she was glad he was interested in volunteering for the PFD Board. Councilmember Buckshnis welcomed Mr. White and thanked him for his service. She found his resume spectacular and anticipated he would be fabulous in this role on the PFD Board. Councilmember Chen welcomed Mr. White and thanked him for applying. He recalled speaking with Mr. Robert during his interview with the Diversity Board and anticipated he would excel in both positions. He asked Mr. White how he balances his time. I balance my time pretty well. My family recognizes that my brain does not turn off until about 10 p.m. I balance my family time and have capacity for everything I want to do. Edmonds City Council Draft Minutes January 18, 2022 Page 1 Packet Pg. 6 Councilmember Tibbott asked what drew him to apply for the PFD Board. What drew me was the uniqueness of the PFD Board. Coming from a non-profit and public administration background, this is a combination of both. Having that opportunity to serve on a board that includes both of my loves was exactly what I want to do. I also have a love for the arts, something I did not get involved with until later in my life. I wish I had known more about the arts when I was young, how much the arts improve our lives. Councilmember K. Johnson commented if you want to get something done, ask a very busy person. She anticipated he could fit the PFD meeting in because it starts at 7:30 a.m. I am early bird person, and work every day from 6 a.m. so an early morning meeting definitely helps. Councilmember K. Johnson agreed the arts are very important in our lives and to this community so there needs to be a well -functioning, financially vigorous and strong PFD Board. I completely agree. Councilmember L. Johnson welcomed Mr. White and thanked him for applying and his eagerness to serve. She found his resume very relevant, specifically his fundraising success which will come in handy. She agreed with his comment about the arts; she also found the arts later in life through her children and it has been such a cornerstone to their lives and many conversations that relate back to the arts. She also commiserated with his comment about his brain not turning off until late at night, something she also experiences, noting it was a mixed blessing. Council President Olson commented having been military herself, they are instructed how to write a more civilianized resume when transitioning to civilian life about. He did such a good job that she literally could not tell what career fields he was in. She invited him to share more about his military background. That took a lot of time and skill; when I first got out four years ago, that resume was night and day compared to my current resume. I started a little over 20 years ago, both enlisted and became an officer about haivay through my career. I've served in various fields, from engineer, air defense artillery, and finishing my career as a field artillery officer. I spent most of career oversea and, a little stateside in Georgia, Oklahoma, Virginia where I studied with the Marine Corps University for a year. The best leadership experience besides the Marine Corps was graduating from the Army Ranger School. Council President Olson thanked him for his service. Councilmember K. Johnson asked if he had time for a part-time job doing avalanche control. I wish and have talked to the Mountaineers about that. It would be fun to do field arterially, it is an interesting career field, something you don't do every day. Thank you for the opportunity. I appreciate Mr. Mclalwain and what the ECA does. I attended last night's MLK event, and was blown away about what's available in this community, literally being able to walk down the street from home to attend events makes a big difference. Being close to community is important to me and I've wanted to be more involved since moving here almost a year ago. Council President Olson advised the appointments are on the Consent Agenda tonight. 2. INTERVIEW FOR A BOARD/COMMISSION Mayor Nelson introduced Anne Nadreau, applicant for the Sister City Commission (SCC). She spent about 10 years living in Japan and speaks fluent Japanese. Council President Olson invited Ms. Nadreau to describe her background and her interest in the SCC I grew up in Richmond Beach and have always lived 2-3 blocks from the Edmonds city limits. I currently live in Shoreline. I lived in northern Japan for 11 years including one year in Kyoto, but spent most of my time in Hokkaido. I've been on the Seattle Christ Church Sister City Board for 20 years, so it felt closer to home to be involved with Edmonds and Japan versus New Zealand. I love Japan and speak the language. Edmonds City Council Draft Minutes January 18, 2022 Page 2 Packet Pg. 7 I hosted a couple kids 10 years ago during one of the SCC exchanges. I thought it would be great to get more involved closer to home with a country that I know and love well. Councilmembers interviewed Anne Nadreau for appointment to the SCC (responses in italics): Councilmember Paine welcomed Ms. Nadreau and thanked her for applying. As someone who lived in New Zealand and traveled in Japan, it is a fun background to have and it was interesting to do software work. The community appreciates the cultural exchange with Hekinan. She liked her resume and was glad she was bringing her talents to Edmonds. Councilmember Tibbott commented the SCC is a lot of fun; there is a lot of enjoyment in building relationships. He asked if she had any ideas about what Edmonds can do to welcome Hekinan delegates and introduce them to the Edmonds way of life. I've hosted a lot of Japanese friends over the years so I have a fairly good idea of the things they like to do when they are here. They convinced me to take them to karaoke where there was no Japanese songs and they spoke not a word of English; we went and managed to have good time anyway with some songs they knew and sang in Japanese. There are definitely cultural differences; I am kind of half Japanese even though I do not look it. I became a "citizen " when I was in Japanese because I went straight from college to living and working there. I'm fairly accustomed to the type of group activities that they enjoy. I don't have any specific activities; I've taken guys to gun ranges and have been involved with a lot of activities with the Seattle Christ Church group. I was on the sports committee so I was often involved with teams that came over such as a volleyball team whose kids were doing home stay and wanted to do other activities. I can support anything and am available to help come up with ideas based on age group, group size, etc. when the Hekinan delegations come again. Councilmember K. Johnson said she has had wonderful experiences with the Hekinan delegation who typically come in October because they love Halloween, the celebration in downtown Edmonds and bring their own costumes. She recognized they probably would not come again until COVID is behind us. If I know typical Japanese style, they come for that particular event and pass it on to others and it becomes the time that they come. With Christ Church, there is a certain time kids visit and it seems to be the same time each year. October is a great season; summertime can be tough because there is so much going on. Councilmember K. Johnson said the last Hekinan delegation even brought their own scarecrow. She anticipated Ms. Nadreau would have a good time with the SCC. Hopefully, the delegations can visit in the next year or two when this is all over. Councilmember Buckshnis said she was excited to have her join the SCC, noting her resume is great. She recalled past activities have included making beer at Gallagher's, and a concert they put on at the ECA which she found fascinating. She looked forward to having the delegations come again, noting Ms. Nadreau's fluency in Japanese will be very helpful. Right before COVID, I went to Japan for the rugby world cup with a group of 30-40 people who played rugby. I love the country, the people and the language and miss it; Japan was one of the countries that locked down and has not allowed people in. The only people I know who have visited Japan are friends who are Japanese citizens. I have a lot of friends in Japan who are quite senior and I'm hoping I get to see them in their lifetime. I usually try to go a minimum of 3-4 times a year and I'm really missing my trips. Unfortunately with COVID stats, it does not look like they will open any time soon. Councilmember Chen said he was pleased that she applied to serve on the SCC, noting her resume speaks for itself and her experience will be a good addition to the SCC. He went to Toyoko 27 years ago and found it quite a different experience. He was born and raised in China and people mistake him as Japanese. He would like to plan another trip to Japan. I have a number of friends who wish they'd visited when I lived in Japan and other friends who say the next time I go, let them know. I love planning trips, Edmonds City Council Draft Minutes January 18, 2022 Page 3 Packet Pg. 8 6.2.a giving people advice and helping people enjoy their visit to Japan and hope I can do that in this role in the future. Councilmember L. Johnson asked how she pronounced her last name. Ms. Nadreau pronounced it "Nay- dro." Councilmember L. Johnson commented she would be a great addition to the SCC. She thanked her for applying and looked forward to the opportunity to meet in person. I assume everyone is still meeting virtually. Councilmember L. Johnson answered yes. The Christ Church Board is as well. I travel a lot for business although not as much since the pandemic. I went to Europe in October, everyone was vaccinated and boostered, but haven't traveled since then. Council President Olson commented for the public, it is not typical for most of the City's boards and commission to have a member that is not a citizen of Edmonds. There is a special provision in the SCC that allows that and she was excited to have Ms. Nadreau join. The code allows the council to appoint a minimum of two SCC members a year and she invited Ms. Nadreau to encourage others to apply. 3. ADJOURN With no further business, the council meeting was adjourned at 6:58 p.m. Edmonds City Council Draft Minutes January 18, 2022 Page 4 Packet Pg. 9 6.3 City Council Agenda Item Meeting Date: 02/1/2022 Approval of Council Meeting Minutes of January 25, 2022 Staff Lead: Scott Passey Department: City Clerk's Office Preparer: Scott Passey Background/History N/A Staff Recommendation Review and approve the draft meeting minutes on the Consent Agenda. Narrative N/A Attachments: 01-25-2022 Draft Council Meeting Minutes Packet Pg. 10 6.3.a EDMONDS CITY COUNCIL VIRTUAL ONLINE MEETING DRAFT MINUTES January 25, 2022 ELECTED OFFICIALS PRESENT Mike Nelson, Mayor Vivian Olson, Council President Kristiana Johnson, Councilmember Will Chen, Councilmember Neil Tibbott, Councilmember Diane Buckshnis, Councilmember Susan Paine, Councilmember Laura Johnson, Councilmember ALSO PRESENT Brook Roberts, Student Representative 1. CALL TO ORDER/FLAG SALUTE STAFF PRESENT Dave Turley, Administrative Services Director Jessica Neill Hoyson, HR Director Susan McLaughlin, Dev. Serv. Director Rob English, Acting Public Works Director Rob Chave, Planning Manager Pamela Randolph, WWTP Manager Megan Menkveld, Deputy Admin. Services Dir. Eric Engmann, Senior Planner Jeff Taraday, City Attorney Scott Passey, City Clerk Dave Rohde, GIS Analyst The Edmonds City Council virtual online meeting was called to order at 7:05 p.m. by Mayor Nelson. The meeting was opened with the flag salute. 2. LAND ACKNOWLEDGEMENT Councilmember L. Johnson read the City Council Land Acknowledgement Statement: "We acknowledge the original inhabitants of this place, the Sdohobsh (Snohomish) people and their successors the Tulalip Tribes, who since time immemorial have hunted, fished, gathered, and taken care of these lands. We respect their sovereignty, their right to self-determination, and we honor their sacred spiritual connection with the land and water." 3. ROLL CALL City Clerk Scott Passey called the roll. All elected officials were present, participating remotely. 4. PRESENTATIONS 1. LUNAR NEW EDMONDS PROCLAMATION Mayor Nelson read a proclamation proclaiming January 29, 2022, Edmonds' First Annual Lunar New Year celebration. 2. PROJECT UPDATE ON THE WASTEWATER TREATMENT PLANT CARBON RECOVERY PROJECT Edmonds City Council Draft Minutes January 25, 2022 Page 1 Packet Pg. 11 6.3.a WWTP Manager Pamela Randolph reviewed: • Pathway to Sustainability, developed 2014 o High efficiency blower (phase 3) ■ Project saves: $33,909/year and 345 tons CO2, equivalent to: - 36.5 homes' energy use for one year - 799 barrels of oil consumed o Aeration & Blower (phase 4) ■ Project saves $34,062/year and 264 tons CO2, equivalent to: - 27.9 homes' energy use for one year - 611 barrels of oil consumed o Dewatering (phase 5) ■ Project saves: $133,211/year and 537 tons CO2, equivalent to: - 56.7 homes' energy use for one year - 1,243 barrels of oil consumed o Carbon Recovery ■ This phase will focus on the sewage sludge incinerator efficiency. We are evaluating options to reduce operational costs and the environmental footprint. Opportunities include clean gasification and drying the biosolids to create a high -nutrient soil amendment product. • Edmonds WWTP Process Flow Diagram identifying location of Phase 3, 4, 5 and 6 • Photographs of: o Before and midpoint o Demolition o Current status of the 600 BLG o Biotower - first piece of new equipment online o Odor control and traffic on 2' Avenue • Construction Impacts - Supply Chain and Staffing Challenges o Due to Covid 19 and supply chain impacts we have experienced significant cost overruns. ■ Increased price of steel ■ Long production lead times ■ People unavailable - working remotely ■ Increased shipping cost and timeframes ■ Staffing for both WWTP and construction impacts ■ Covid 19 has limited our ability to meet with our contractors face to face and build the sense of team. Successful design build projects rely on this type of synergy. • Asbestos Violation - Appeal in the Works o On December 3, 2021, the WWTP had an impromptu inspection from PSCA. o A Notice of Violation was issued due to the inspector noting that renovations had begun without an updated AHERA report. o Work was stopped until the report was obtained. o Our belief is that we followed the regulations as written. On December 29, 2021, our appeal was lodged with the Pollution Control Hearings Board. o We will continue to the work this issue in hope of having a resolution by March 2022. • Negotiation with Ameresco and DES - Potential Added Scope o Alternative 1 ■ (Headworks Screenings Side stream) - Install a washer compactor, modify the screenings handling area and replace the man -door with a rollup door to accommodate a larger screenings roll -away dumpster. (Note - this alternate does not include the new screw conveyor for the screenings, which is addressed in Alt. #9) Edmonds City Council Draft Minutes January 25, 2022 Page 2 Packet Pg. 12 6.3.a o Alternative 2 ■ Add a "Packed Tower" to the emission train for the Ecoremedy package to enhance activated charcoal life expectancy. - This requires placing the activated carbon filter (ACF) outside the building. Ecoremedy will "furnish" the packed tower as a third emissions control equipment, at no additional cost to their package. - Includes GM furnishing emissions ductwork package (blue ductwork) associated with Alt.2 Packed Tower and outdoor carbon filter. o Alternative 3 ■ (Temporary sludge loadout) Modifications and provisions for sludge loadout operations associated with temporary hauling of dewatered sludge and screenings. - Includes purchasing the necessary hoses to connect the DS pump to the wye and the hoses necessary at the loading dock for loadout, to be used for construction phase and for future outage situations. o Alternative 5 ■ (Biochar Conveyance) Modifications and revisions necessary to retain the existing vacuum filter, vacuum filter pump and ash thickener to enhance the biochar product by extracting more moisture, thus making it a dryer and more marketable product. - Make piping provisions for bypassing the ash thickener and for bypassing the vacuum filter; these provisions will allow use of these apparatus by manual and deliberate change -over of valves by plant operators o Alternative 9 ■ Headworks Screenings Conveyor - Upgrade screenings belt conveyor to screw conveyor in the Headworks building o Alternative 10 ■ Architectural screen added on top of fagade wall adjacent to parking lot to obscure new EcoFilter unit o Alternative 11 ■ (Caustic tank for Nuvoda) Relocate caustic storage tank from parking lot to a new elevated space created inside the wall next to the new BioAir EcoFilter o Alternative 12 ■ Replace the swinging gate with a sliding gate at parking lot entrance o Alternative 17 ■ BioAir - EcoFilter Upgrade - Upgrade package for dual technology as a result of odor study Potential Funding Sources for cost overruns, energy incentives, grants, tax savings 0 2010 Plant staff began working with SNO PUD and entered into an Energy Challenge - since then we have received approximately $304,000 in PUD revenue to complete energy efficiency projects. We anticipate the Carbon Recovery project is estimated to be $20,000 - $30,000 and should have this information within the next month. o The project did receive a $255,000 grant from the Department of Commerce. We will be requesting the funds within the next month. o We are working with Lighthouse Law to determine what equipment will be deemed tax exempt due to the fact that we will soon be selling carbon rich biochar. We estimated this amount to be between $750,000 and $1 million; however the Department of Revenue will make the final assessment. What About the Future - Nutrient Removal o The State of Washington Department of Ecology just issued the General Permit for Nutrient Removal. ■ Increases electrical demand ■ Increases cost of treatment, pumping and recycle flows Edmonds City Council Draft Minutes January 25, 2022 Page 3 Packet Pg. 13 6.3.a ■ Reduces plant capacity ■ Will require one more large capital project to retrofit plant for future processes o Long term discussions prior to the issuance o Current Status — On January 4, 2022, a Stipulation for partial stay of PSNGP was granted. The work at the WWTP had to be completed to ensure a fully functional plan for the next 30 years Councilmember Buckshnis thanked Ms. Randolph for the thorough explanation. She asked if the $750,00041 million related to biochar would be a yearly amount or a one-time tax exemption. Ms. Randolph answered the City will not pay sales tax on equipment purchased so the $750,000-$1 million is a one time. Anything used in production of the biochar would be tax exempt such as the polymer purchased on a routine basis, equipment replacement, etc. It will depend on how the Department of Revenue (DOR) classifies it; they may say all the equipment is 100% tax exempt or only pieces of it are. The City still have to pay taxes on the BioAir, the tax exempt status is only on equipment associated with producing biochar. Councilmember Paine recalled discussions about the ability for the biochar to be sold as nutrients and fertilizer for forestry uses. She asked if that was still a potential revenue source. Ms. Randolph answered the City will be able to sell the biochar. A marketing study has been done and there are 2-3 groups in the northwest seriously considering purchasing biochar. As long as the City is selling a product, then the tax exempt status works. If the product cannot be sold and it has to be hauled somewhere, there is no tax exemption. She has also contacted people in eastern Washington interested in purchasing the biochar. She did not anticipate there would be a problem selling the biochar, but the amount of profit and the market for it is not clear because there is not a lot of biochar developed from biosolids. Councilmember Paine asked when the project is expected to be 90% complete and whether there were still impacts from shipping and supply delays. Ms. Randolph answered the last piece of equipment was delivered last week so all the equipment is on site. The plan is to have the project to the point of making biochar late March/early April. It will take a while to dial in the process so trucks may have to be partially there into April/May; she hoped not and that biochar could be produced right away, but because she did not have any experience with it, she did not want to promise they would be producing biochar by April 1 St. Councilmember Paine said she would be happy to have it up and running by March or so; it is an amazing system replacement in a short period of time. Council President Olson said all her questions were related to nutrient removal and the impacts of that change. She referred to the increase in electrical demand, and asked although solar panels were not part of the original project, could they or should they be considered to meet that new electrical demand. Ms. Randolph answered solar panels are not the solution. They have looked at solar panel projects three different times in the past 5-6 years; they considered installing solar panels on the primary decks, the aeration decks to try to generate enough energy. The most they were able to generate was enough for a charging station at the pagoda for laptops. There is not enough space and if solar panels are placed on primary or secondary decks, the reflection will impact the plant's neighbors. She summarized they have not been able to move forward with any solar projects. They looked at potential energy saving projects in the outfall, but it does not make sense due to the cost of the generator. The wastewater treatment plant's monthly electrical requirements are pretty high. Council President Olson appreciated that that had been considered. Council President Olson referred to the 1/3 volume impact to the plant capacity over the nutrient removal, finding that highly concerning. The plant was well situated, even with the community partners, to absorb a lot of density growth and the impact to the wastewater treatment plant. She asked the length of the interlocal agreements with the plant's partners. Ms. Randolph answered the partnership agreement is up Edmonds City Council Draft Minutes January 25, 2022 Page 4 Packet Pg. 14 6.3.a for renewal. Another item will be coming to council next week, a request for an extension and an amendment so that the City can discuss the impacts of the nutrients general permit with the partners. The 30 year contract has been amended, but expired in 2018. The long term agreement with King County on the Ballinger pump station expires in 2055. Council President Olson asked if there was anything regarding this investment in the amendment, recalling the partners were also investors in the infrastructure and she assumed there was some value return for them. Ms. Randolph explained the way the partnership agreement reads is that the City of Edmonds owns 51.787% of the treatment plant and the partners own the rest. The partners pay capital bills based on that percentage. When the nutrient permit comes into play, the partners are as affected as Edmonds. If Edmonds loses 50% of its capacity, they also lose 50% of their capacity. One of reason for extending the contract is have those discussions. Some partners have utilized more of their capacity than other partners so each partners' utilization of the plant has to be considered. Edmonds owns 51 % but only utilizes 48%. Ms. Randolph commented it was difficult to explain how the partnership agreement works and she offered to discuss it with councilmembers individually. Staff needs time to work with the partners and evaluate how this will affect them. If the City were to do another project for nutrient removal, the partners would be responsible for 48% of that project. Worst case is losing one-third of the capacity; the City currently only uses about 50% of the plant so there is still some room for growth but not as much as previously thought. Council President Olson commented that was the point she wanted to make, that that may need to be considered on a shorter timeline than before. The whole reason for these improvements was sustainability and although she did not have a problem with nutrient removal and its impacts, it will need to be managed in the shorter term than had been previously thought. Councilmember K. Johnson referred to comments in the presentation about increased cost of steel, supply chain problems, etc., which she assumed would result in higher costs and staff was in negotiations with Ameresco. She asked if staff would return to the council to inform whether the project can be completed within the original guaranteed amount or if additional funding would be required. Ms. Randolph answered if there is any change to the guaranteed maximum (g-max) price, they will have to come back to talk with council and explain why there is an increase and why it was not covered in the g-max price. Discussions started in August due to cost overruns and some things Ameresco does not believe were in the base scope but the City believes were. Department of Enterprise Services (DES) has gotten involved because the City is using a DES program to deliver the project. Ms. Randolph continued, in discussions with Ameresco and DES, staff has been very clear they cannot authorize any additional funds for the project; if staff is convinced additional funds are necessary, they will need to explain and try to get buy -in from the city council. There is a g-max price, and from the City's perspective, Ameresco should deliver a turnkey project for the g-max price. There are some things that are included in original design that would result in savings for the City if they were done now versus in the future such as architectural screening for the biotower, moving the caustic tank, adding swing gates, etc. Ameresco believes there are things for which they should be able to ask for more money; staff is working through those with them and will present council with a resolution to all the issues. Councilmember K. Johnson said that is the other shoe that's going to drop; how much is it going to cost? Ms. Randolph said they have been in discussion with the project team over the past few months and doing their best to express that a g-max price should mean a g-max price. Councilmember K. Johnson said it was good to see that progress is being made and that it is close to coming online. She expressed her appreciation for the attention to odor control. 5. APPROVAL OF THE AGENDA Edmonds City Council Draft Minutes January 25, 2022 Page 5 Packet Pg. 15 6.3.a COUNCIL PRESIDENT OLSON MOVED, SECONDED BY COUNCILMEMBER BUCKSHNIS, TO APPROVE THE AGENDA IN CONTENT AND ORDER. MOTION CARRIED UNANIMOUSLY. 3 t1101 WrIN mrsillu Iu I oleo V Mayor Nelson invited participants and described the procedures for audience comments. Marlin Phelps said on October 11, 2001, one month after the 9-11 attacks, Assistant U.S. Attorney Thomas Wells was shot four times while sitting in his Queen Anne home. The first person to arrive to the crime scene happened to be an off -duty police officer sitting nearby listening to a scanner. When the Seattle Police Department arrived 3%2 minutes after Tom Wells' neighbor called 911 because she heard gunshots, that man showed up at her doorstep and asked what she had seen. She told him she heard gunshots. He offered a hypothesis, that man was the lookout and was also an Edmonds cop and his partner and confidant was the shooter. Tom Wells' murder and Edmonds have a lot in common. If he had the name of the cop that showed up first, he could tie it together. Before leaving on a recent vacation to Brazil, he did a public records request to Seattle Police Department asking for the name and department that officer worked for. Seattle Police Department's response was that was an ongoing investigation, and they were not obliged to provide that information. Mr. Phelps said it was an Edmonds cop, now an FBI agent, who killed Tom Wells and he deserved to ask that question. Linda Ferkingstad, Edmonds, said no City agenda is virtuous that takes property rights, values and freedoms from its citizens. Vacant property owners have to pay Edmonds $3,000-$12,000 for every tree they need to remove before the City will allow removal. No U.S. city is entitled to take the worth of private property from citizens without just compensation. The Edmonds tree ordinance was written to save trees, not by using incentives but by taking money for trees from all property owners. Because it violates private property rights, it is not applicable to everyone yet, only to owners of vacant properties, a minority who cannot make an impactful protest without acquiring attorneys. During the pandemic, Edmonds destroyed any economically feasible use or sale of vacant properties by placing more financial strain on owners. Edmonds levies huge fines on owners for using their property and withholds permits from those complying with zoning and building codes until the City has been paid for the owners' trees. Her family is not an unintended consequence as stated; every owner has been targeted and harmed by the tree ordinance. Ms. Ferkingstad cited a few who have spoken with her: couples who invested in and live on double lots who can no longer afford to divide and realize their retirement income, others have sold their properties at a loss, some have spent more than $200,000 to comply before ultimately paying the fines and many have just given up building in Edmonds. The arbitrary cap on tree fines is $2/square foot of land, $107,250 for their land, 25% more than what they paid for it. To escape extortion, 50% tree retention is required. Large trees must remain 10 feet from their three smaller homes. Zero percent retention is required for multifamily developments. She asked whether Edmonds had devalued vacant properties by the worth of their trees so the City can purchase the land at a steep discount. This is wrong; Edmonds land prices are down while the cost of single family homes has skyrocketed. Low home inventory is the result of permit delays, huge fines and expensive code requirements on vacant land. Edmonds' tree ordinance has slowed building of greatly needed single family developments. Fewer housing options means less economy and economic growth for Edmonds. The council is harming the environment by pushing out urban sprawl and consuming forests and agricultural land. She requested the council restore to all property owners the property rights and freedoms protected by the constitution. Ken Reidy, Edmonds, said utility franchises are distinct from easements. Easements are a form of property right; franchises involve franchise fees, insurance requirements and many other things. He asked why the City of Edmonds would condition a street vacation on the provision of easements to entities that Edmonds City Council Draft Minutes January 25, 2022 Page 6 Packet Pg. 16 6.3.a have franchises when easements are different than franchises. The minutes of the June 7, 2019 Olympic View Water and Sewer District (OVWSD) meeting document that district staff informed him that they did not have a franchise agreement with the City of Edmonds at that time. He questioned how that type of thing happened. When Edmonds City Council passed Ordinance 3506 on June 22, 2004, whose responsibility was it to keep track that the related franchise with OVWSD would expire ten years later? He has asked the City to disclose whether the 2016 city council knew that the OVWSD franchise expired over two years before the council voted to require the grant of an easement to OVWSD; that request has not been honored. When the City of Edmonds requires a utility easement be granted to the City when a street is vacated, property owners are not also required to provide compensation. Per the City code, it is either or; the City cannot require both a utility easement plus compensation. Mr. Reidy continued, the city council was told the following in 2016, while OVWSD has requested easements for their utilities within 92' Avenue West, the City of Edmonds is not requiring any easement, thus the City should be monetarily compensated for the vacation. The City was the only entity with the authority to require an easement. The either or law is simple and easy to understand. It says the City can require compensation or the following: a grant of an easement to the City in exchange for the easement vacated. The words "to the City" are pure and clean, the words "either or" are easy to understand. As the City required over $90,000 plus the grant of an easement to a third party rather than to the City, he requested city council establish a citizen taskforce to investigate this entire matter and prepare a report for city council that includes recommended next steps. This investigation can also research how expiration of important items like franchises, the CEMP, and hearing examiner contracts can go unnoticed. He will contact Council President Olson to add formation of a citizen taskforce to a future city council agenda. Marjie Fields, Edmonds, referred to funding for Perrinville Creek included in tonight's budget discussions, commenting while there is certainly a desperate need to fix damage done to that watershed, she was concerned about spending money on lower Perrinville Creek, dealing with the symptoms of the watershed problem which won't help until the cause of the problem is also fixed. She acknowledged the City needed to negotiate with Lynnwood about that, but also needed to look at what could be done in Edmonds to protect the watershed. One major thing that can be done is protect Perrinville Woods from being clearcut and bulldozed for development as those trees collect massive amounts of stormwater runoff, keeping it out of Perrinville Creek. Development on the steep slopes of the property would not only greatly increase runoff but obviously send huge quantities of sediment into the creek, making the situation worse. If the City cannot figure out how to protect those woods from development, it will be very expensive in the form of increased damage to Perrinville Creek for decades to come. Once those trees are gone, they are gone. Recognizing the council has many things to consider, she requested they also pay attention to this issue. Deborah Arthur, Edmonds, said good job to the council and nice to see everyone. (Written comments submitted to PublicComment@Edmondswa.gov are attached.) 7. APPROVAL OF THE CONSENT AGENDA COUNCIL PRESIDENT OLSON MOVED, SECONDED BY COUNCILMEMBER BUCKSHNIS, TO APPROVE THE CONSENT AGENDA. Councilmember K. Johnson requested Item 3, Approval of Council Meeting Minutes of January 18, 2022, be removed from the Consent Agenda. MOTION CARRIED UNANIMOUSLY. The agenda items approved are as follows: 1. APPROVAL OF COUNCIL SPECIAL MEETING MINUTES OF JANUARY 4, 2022 Edmonds City Council Draft Minutes January 25, 2022 Page 7 Packet Pg. 17 6.3.a 2. APPROVAL OF 5:45 PM COUNCIL SPECIAL MEETING MINUTES OF JANUARY 18, 2022 4. APPROVAL OF PAYROLL AND BENEFIT CHECKS, DIRECT DEPOSIT AND WIRE PAYMENTS 5. APPROVAL OF CLAIM CHECKS AND WIRE PAYMENT. 6. AUTHORIZE THE ADVERTISEMENT OF A REQUEST FOR PROPOSALS FOR JOB ORDER CONTRACTING 7. APPROVE A PROFESSIONAL SERVICES AGREEMENT WITH THE BLUELINE GROUP FOR THE DESIGN OF THE PHASE 13 WATERLINE REPLACEMENT PROJECT 8. AMENDMENT TO CITY'S INTERLOCAL AGREEMENT WITH SOUTH COUNTY FIRE ITEMS REMOVED FROM CONSENT 3. APPROVAL OF COUNCIL MEETING MINUTES OF JANUARY 18, 2022 Councilmember K. Johnson said the appointment of Boards and Commission states incorrectly that Laura Johnson was the Community Transit alternate when she is actually the alternate. COUNCILMEMBER K. JOHNSON MOVED, SECONDED BY COUNCILMEMBER TIBBOTT, TO CORRECT THE JANUARY 18 2022 MINUTES AS STATED. MOTION CARRIED UNANIMOUSLY. COUNCIL PRESIDENT OLSON MOVED, SECONDED BY COUNCILMEMBER BUCKSHNIS, TO ADOPT THE AMENDMENTS TO THE JANUARY 18, 2022 MINUTES ON PAGE 42 THAT WERE DOCUMENTED IN THE EMAIL AT 6:24 P.M. FROM CITY CLERK SCOTT PASSEY. MOTION CARRIED UNANIMOUSLY. 8. COUNCIL BUSINESS NON -REPRESENTED EMPLOYEES COMPENSATION STUDY HR Director Neill Hoyson advised the council has reviewed the Non -Represented Employee Compensation Study and it has also been reviewed by committee and everyone has a good understanding of the information. She recalled Council President Olson had an outstanding question related to comparison. Shannon Drohman, Compensation Connections, explained the question from the last meeting was related to job matching for the Development Services Director. They looked at the job matching again; one of the matches in the Milliman Public Employees survey required professional engineer designation so that match was removed from the data collection for that job. The other matches did not have that requirement which was more reflective of the work performed and the qualifications needed for the City of Edmonds position. Removing that match decreased the overall market data for that position by about $1,000, but did not affect the salary grade placement for the job. Council President Olson thanked Ms. Drohman for reviewing the data again. Edmonds City Council Draft Minutes January 25, 2022 Page 8 Packet Pg. 18 6.3.a Councilmember K. Johnson raised a theoretical question; it seemed the consultant evaluated each of the non -represented positions from 1-22 and as a result looked at variances between the current grade, midpoint and the market 50' percentile and came up with an average of 6.7%. However, within each pay grade, there was a high degree of variation, ranging from 4.7% over to 18.3% under. She wondered why they did not make those adjustments on the pay range rather than an overall average. Ms. Drohman said they are suggesting that both occur. The first piece is a 6% increase to the non -represented salary ranges overall, and then looking at individual job placement to see where they best fit in the salary ranges based on the market data. The second document that Councilmember K. Johnson referenced compares the pay range midpoints they are proposing to the former pay range midpoint. Councilmember K. Johnson said those are not based on job title but rather on the current grade which in her mind are two different things. Ms. Neill Hoyson explained the variances that are identified in each grade are based on the jobs that are current in those grades and the data that came back to support that change. The positions themselves in those grades are driving the recommended change and that is what is identified as the variance. She summarized it is based on the data that came back on the positions that currently sit in those ranges. Councilmember K. Johnson commented a variety of references were used to determine comparable jobs but she did not understand why there were comparator cities if they were not used. Ms. Drohman answered they are using the comparator cities' information and supplementing it with published survey sources for some jobs. Councilmember K. Johnson said it looked like they relied on the published survey sources rather than comparator cities. Ms. Drohman said the market data that informs their recommendations includes the comparator city data. Councilmember K. Johnson said she did not see that in the presentation; they referenced all the other sources, but she did not see many comparator cities except AWC. She asked if AWC was the source for comparator cities. Ms. Drohman answered yes, explaining in the detail where it says AWC-city name, that is the comparator city data. Councilmember K. Johnson commented there are a lot of other references and it was hard for her to understand why they needed those other references when comparator cities must have equivalent jobs. Ms. Drohman answered some of the comparator cities do not have comparable job matches for some of City of Edmonds' positions. One reasons for using published survey data is to round that out so there is comparable data for all of Edmonds' positions. The City's compensation policy also states additional sources of data can be considered to provide more context and information related to the larger labor market and what is happening with the City's job. They used a mix of comparable city information and the published survey sources in alignment with the policy. Ms. Neill Hoyson agreed the policy states where it is a relevant factor, other published sources will be reviewed regionally as well as private market. At this point the City competes for labor beyond the comparator cities and are in competition for labor across the entire region with both public and private sector so it was very relevant in this study to look at those sources as well. Councilmember Buckshnis referred to wages versus benefits, noting the cost to implement the recommendation for the non -rep employees would be about $250,000. To help citizens understand, she asked for an explanation of why wages are separated from benefits and the impact on benefits if the recommendation is approved, making it more than $250,000. Ms. Neill Hoyson said wage data is used to set wages; benefit data is used to set benefit levels. In order to right -align wages to be competitive in the marketplace and continue to do the work the City needs to do for the citizens, council may make budgetary or financial decisions to potentially hold benefits stable for a while to offset some of that cost. They are both components of total compensation costs, but they must be set separately. Particularly in this case when there is a big change in wages, the council may look at benefits and decide how to maintain or adjust those to account for costs related to wage. Edmonds City Council Draft Minutes January 25, 2022 Page 9 Packet Pg. 19 Kathy Marek, Compensation Connections, was also present to answer questions COUNCILMEMBER PAINE MOVED, SECONDED BY COUNCILMEMBER BUCKSHNIS, TO ADOPT THE 2021 NON -REP COMP STUDY WITH A 6% ADJUSTMENT TO THE NON -REP SCHEDULE AND IMPLEMENTATION OF THE RANGE CHANGES FOR THE 29 POSITIONS IDENTIFIED AS NEEDED ADJUSTMENT EFFECTIVE FEBRUARY 1, 2022. UPON ROLL CALL, MOTION CARRIED (7-0), COUNCILMEMBERS K. JOHNSON, CHEN, TIBBOTT, BUCKSHNIS, PAINE AND L. JOHNSON AND COUNCIL PRESIDENT OLSON VOTING YES. At Councilmember L. Johnson's request, Mayor Nelson declared a brief recess (8:26-8:36 p.m.) 2. 2022 BUDGET AMENDMENTS Councilmember Buckshnis reviewed: 2022 Budget Comments o Council knew that we would revisit the budget in 2022. o Timeliness is imperative since 2022 Budget was approved in November and now almost February o Items were left out of the budget such as the reorganization of the Municipal Court, a new uptown Satellite Office and a potential Police Department restructure which could have significant impact on the 2022 budget. o We are still in a pandemic and have economic pressures from a spike in inflation, supply shortages, three projected interest rate hikes and other concerning economic indicators. o We have local budgetary pressures from changes in the South Fire Contract and the impact on both wages and benefits from the recent compensation study. o It might be advantageous to postpone some appropriations until Council and the public can be provided more details as amendments happen quarterly. o The use of $2.1 million in unrestricted reserves in this budget should be a Council decision as to the amount and purpose and per our approved Fund Balance Policy. o These amendments came from four Council Members and this presentation is a compilation of their items. o The first section identifies decision packets that are in question of removal and the second section suggest addition to the budget. o To save time, each item will be motioned by the presenter (and after a second) any member of Council can provide reason for motion. After vetting, a vote will occur and five vote items or super majority will be highlighted. o A budget hearing is scheduled for February 1 st. o A super -majority vote (five votes) is needed in order for any amendment to be moved to the budget ordinance. Councilmember L. Johnson raised a point of order, stating she has questions about the entire process Councilmember Paine referred to the agenda memo, explaining it was put out last week and it was substantially unchanged this week. The agenda memo either needs to be substantiated or retracted as it is very personalized and violates several aspects of the code of conduct. She talked with Council President Olson last week about changing the agenda memo and either she was unable to revise it or was told it had been changed. However, no changes were made to the agenda memo other than adding approximately 20 words at the end. Her name is mentioned five times in the agenda memo and she questioned how that had anything to do with the effort to make budget amendments. Edmonds City Council Draft Minutes January 25, 2022 Page 10 Packet Pg. 20 6.3.a Councilmember Buckshnis raised a point of order, stating she did not understand Councilmember Paine's point of order. Councilmember Paine said this was her complaint, the agenda memo needs to either be substantiated or retracted. The agenda memo is highly personalized, she is mentioned five times and there are wildly inappropriate mentions of other current and past councilmembers. The fourth paragraph states there wasn't adequate time which is not true; the budget was first introduced on October 4r' and it is now January 25t'', there has been more than ample time for people to get their questions answered. There were over seven weeks of review and a vote taken the last week of November which was plenty of time for all the participants to participate and they did participate in abundance. She summarized this has not been an unvetted budget. Councilmember Buckshnis asked what Councilmember Paine's point of order was. Mayor Nelson said she did not make a point of order, he called on her to speak. Councilmember Paine said the agenda memo brings up information from the prior decade. The next paragraph in the agenda memo states there is an OPMA violation which is not accurate and that she put a new hearing policy in place which is not accurate or truthful. She said having this information in an agenda memo is entirely wrong. The second to last paragraph states a simple majority passed the budget on December 17, 2021; Councilmember Paine questioned the date of December 17, 2021 as that was not a budget date. She said all budgets that go through the normal process require a simple majority to pass. The statement about a simple majority is a giant red herring. She reiterated that unless the agenda memo can be substantiated, it needed to be retracted because it violates the code of conduct which states, councilmembers have a public stage and privileged platform to show how individuals with contrasting views can have common ground, demonstrate problem -solving approaches and achieve solutions. COUNCILMEMBER PAINE MOVED, SECONDED BY COUNCILMEMBER L. JOHNSON, THAT UNLESS THE AGENDA MEMO COULD BE SUBSTANTIATED, IT NEEDED TO BE RETRACTED BECAUSE IT VIOLATES THE CODE OF CONDUCT. Councilmember Paine continued reading from the code of conduct, councilmembers shall focus discussions and debates on visions, policies and their implementation, noting the agenda memo does not do that. She continued reading from the code of conduct, no councilmembers shall dominate proceedings during council or other public meetings. This memo is not neutral and does not offer a balanced, neutral approach. The two authors of the agenda memo clearly were not thinking about the code of conduct when they wrote it. Councilmember Buckshnis raised a point of order, pointing out this was brought up at the December Finance Committee meeting and she questioned why it was being raised now when the background and history is well documented. She has yet to hear from Councilmember Paine about the December 17t' meeting which she put on the agenda. Mayor Nelson asked Councilmember Buckshnis to state her point of order. Councilmember Buckshnis said this is out of order for what is happening with the agenda item which deals with amendments. Mayor Nelson said Councilmember Paine is raising an issue with the agenda item which is relevant and he ruled point not taken. Councilmember Paine continued reading from the code of conduct, that conduct should not be personalized. Mentioning councilmembers' name eight times in the agenda memo shows it is absolutely personal and does not focus on the business of the city. She requested the agenda memo be retracted if it cannot be substantiated. There is evidence at prior council meetings that the city attorney said the OPMA rules were not violated. Councilmember L. Johnson agreed with Councilmember Paine's statements. She expressed concerns with a number of false and misleading statements in the agenda memo. She referenced the statement, the authors of this memo have significant questions that were left unvetted which represented many citizens' Edmonds City Council Draft Minutes January 25, 2022 Page 11 Packet Pg. 21 6.3.a concerns, which purposely creates a narrative that staff was not available to council which could not be further from the truth. If questions were left unvetted, it was due to choices made by councilmember, not a lack of opportunity to vet. The administrative services department kept a running list of questions and answers that were posted online and updated numerous times throughout the process, weekly and sometimes daily. In addition, staff was available to answer questions by phone, email and during council meetings which the majority of councilmembers participated in. Councilmember L. Johnson referred to another statement in the agenda memo, another noteworthy item that caused the need to reopen this 2022 budget process was that citizens felt their voices were not heard at the 11/16/21 budget continuation meeting and some contended it was not compliant with the OPMA. She pointed out the council code of conduct begins with, the city council finds that councilmembers should seek to continually improve the quality of public service and ensure public confidence and the integrity of local government and its effective, transparent, and equitable operation. The code of ethics states, we are dedicated to the highest ideals of honor and integrity in all public and personal relationships and will conduct the business of the city in a manner that is not only fair in fact, but in appearance. She was concerned with the repetitive and unsubstantiated claims of OPMA violations in two agenda memo, claims that were already addressed by the city attorney last week and this week, is purposely misleading and does not ensure public confidence in the integrity of local government and is neither fair in fact or appearance. Councilmember L. Johnson referred to the statement in the agenda memo, the use of unrestricted reserves without council notification or review is contrary to the fund balance of the city, stating the claim of without council notification is false. The council was notified in October when the administration presented the draft budget; there were no surprises and there was plenty of time to address concerns and to ask questions through email, phone or at meetings if one prioritized attendance. Councilmember L. Johnson referred to the statement in the agenda memo, no one from the administration had notified or contacted Councilmember Buckshnis of this new process of no notice adjournment. Both councilmembers were excluded from final deliberations or vetting process. Those statement are false; it has been verified that all councilmembers were notified by email, the usual council notification method, and no councilmembers were excluded although some did choose not to prioritize their attendance. She expressed concern that tonight's discussions were based on an agenda memo full of falsehoods and by doing so, puts a stamp of approval on it and she did not approve of the agenda memo. Councilmember L. Johnson continued, a public hearing was set and one would think a public hearing would happen prior to council making decisions on amendments, but that does not appear to be the way that is being steamrolled through tonight. She fully objected to the agenda memo, requesting it be substantiated and retracted because she was not comfortable moving forward with it. Councilmember Buckshnis said when the agenda memo was proposed, then Council President corrected an error and it has been before council three times. She expressed willingness to retract the background/history, explaining the intent was to move through the amendments which everyone was aware of. Citizens have contacted councilmembers with different issues, including a probable OPMA violation and the SAO has been contacted. If councilmembers are worried about the agenda memo, she offered to take it out. There are amendments that need to be addressed and that is what this agenda item and the PowerPoint presentation is about. She will gladly rewrite the agenda memo, noting any objections could have been raised last week, but no one contacted her with any concerns which is unfortunate because she utilized information from the council minutes. Councilmember Buckshnis continued, it is true that she was not contacted prior to the no -notice adjournment meeting, the email came out at 10 p.m. that night. She suggested proceeding with the Edmonds City Council Draft Minutes January 25, 2022 Page 12 Packet Pg. 22 6.3.a amendments; the agenda memo was only providing background/history. The narrative and recommendation are the crux of the agenda item. She has seen many agenda memos over the years that personalize and bring people's names into the discussion. She offered to take the names out. Her intent was to provide background/history and move forward in an easy a fashion as possible. Council President Olson said she did not find the background/history section of the agenda memo factually incorrect. She preferred not to focus on the background and history and instead move forward with the amendments. This is the same exact agenda memo that was included in last week's packet. The amendments Councilmember Buckshnis proposed, deleting the background/history from the memo and proceeding with action, would be acceptable to her if someone wanted to make that amendment. She recommended proceeding with this agenda item. Councilmember Paine agreed with Councilmember L. Johnson's comments. She was troubled that this will be on the record, not retracted and not addressed by Council President Olson. She spoke to Council President Olson last week about the nature of the agenda memo and no changes were made. The next day, there was a letter to the editor about the need for an environment of collaboration and respect, leaving her to believe that two senior councilmembers who have been council presidents in the past, decided to put this forward without discussing it with the council president which she found troubling. She was the one who requested a public hearing and Council President Olson put that on the agenda, but now councilmembers are trying to bulldoze ahead without hearing from the public. That is not correct or in keeping with the council's established practice. She referred to comments councilmembers have made requesting no decisions be made without hearing from the public. These are substantial changes to an established budget and she was concerned with having that discussion in advance of a public hearing. Councilmember L. Johnson said the agenda memo was published and is part of tonight's discussion, it cannot simply be deleted. This needs to be brought forward again with an agenda memo written in good faith which this one was not. To say that is simply background/history is stating that it is accurate and she did not think it was. She suggested the city attorney weight in, pointing out the claims in the agenda memo of probable OPMA violation was huge. To simply say get on with it and not dwell on it, the agenda memo is the introduction to the subject and should provide a factual history, but in this case it is somebody's own spin on it and it is not fact based. As a legislative body, the council should work off facts; she was offended the council was being asked to move forward with it and accept its falsehoods. She requested the city attorney weigh in on the claims of OPMA violations. City Attorney Jeff Taraday answered as it pertains to the budget, he was not aware of facts that in his opinion constituted an OPMA violation. Councilmember L. Johnson recalled this question has been previously raised and addressed by Mr. Taraday. Mr. Taraday answered that is entirely possible; he did not have perfect recall of everything he has said at various council meetings in the past. He reiterated he was not aware of a OPMA violation that occurred in conjunction with the budget. Councilmember Buckshnis reiterated this same agenda memo was in the December Finance Committee packet and former Council President Paine made one correction. The information was introduced in 2021 and has been part of the public record for a long time. She was willing to retract it if councilmembers were that offended by it. No one has heard from the SAO yet about the OPMA issue related to the public hearing where a rule was created that citizens could not speak a second time. The city attorney has provided his opinion, but the SAO has not. The intent was for councilmembers to discuss and refine the proposed amendments in order for the public to weigh in at the public hearing. She was concerned objections were voiced to avoid proceeding with the agenda item. She preferred to move forward and she will include only the recommendation in next week's agenda memo. Edmonds City Council Draft Minutes January 25, 2022 Page 13 Packet Pg. 23 Councilmember Chen proposed to have a public hearing next week and then vote the following week. Mayor Nelson advised there is already public hearing next week. Councilmember K. Johnson said the public hearing is scheduled two weeks from today. Councilmember Chen said it makes sense to have the public hearing first and then vote. Councilmember Buckshnis advised the public hearing is next week, February V. Councilmember Paine restated the motion: TO HAVE THE AGENDA MEMO STRUCK THROUGH FROM THIS WEEK'S AGENDA PACKET BECAUSE IT COULD NOT BE SUBSTANTIATED. Council President Olson asked if the intent was to proceed with the business associated with the agenda item if this motion was approved or were those separate and unrelated. Mr. Taraday said they are separate and unrelated; passage of the motion would not prevent the council from moving forward with considering the proposed amendments. Council President Olson recalled Councilmember Buckshnis suggested deleting the background/history. Mr. Taraday said he considered those to be similar proposals. Councilmember Paine said she did not consider them the same. Councilmember L. Johnson asked the purpose of an agenda memo. City Clerk Scott Passey said it is to introduce business before the body; it typically includes background and history if that is relevant, recommendation, narrative and any attachments that support the proposal/question. Councilmember L. Johnson asked what parts of the memo would be struck through. Councilmember Paine answered all of it. Councilmember Buckshnis said even though she quoted some parts from the minutes, she will delete the entire background/history. She suggested the council move forward with introducing the amendments tonight so citizens understand them. The council does not need to vote on the amendments tonight. UPON ROLL CALL, MOTION CARRIED (4-1-2), COUNCILMEMBERS TIBBOTT, PAINE AND L. JOHNSON AND COUNCIL PRESIDENT OLSON VOTING YES; COUNCILMEMBER K. JOHNSON VOTING NO; AND COUNCILMEMBERS CHEN AND BUCKSHNIS ABSTAINING. COUNCILMEMBER CHEN MOVED, COUNCILMEMBER TIBBOTT, FOR COUNCILMEMBER BUCKSHNIS TO INTRODUCE THE AMENDMENTS, BUT HAVE THE PUBLIC HEARING NEXT WEEK AND THEN VOTE THE FOLLOWING WEEK. Council President Olson pointed out February 8tn is committee night so unless a special meeting was held, it would not be possible to vote on February 8t''. She expressed support for a special meeting on February 8' if other councilmembers agreed. Councilmember Paine suggested a quick reading of the amendments tonight, although she did not understand why it was necessary to go through all this again. She suggested a time limit of 25 minutes. Councilmember L. Johnson offered a friendly amendment, instead of the week following the public hearing, vote at the February 15t'' meeting. Councilmember K. Johnson commented this item was scheduled for one hour and the Council has not even begun yet. She suggested moving forward with the agenda item, holding the public hearing next week, and continue discussion after the public hearing. The amendments are of utmost importance and the discussion should not be delayed. Edmonds City Council Draft Minutes January 25, 2022 Page 14 Packet Pg. 24 6.3.a Council President Olson agreed, suggesting if the maker/seconder of the motion were interested in withdrawing the motion, the council could get on with reviewing the proposed amendments. There is a plan for a public hearing and voting can occur once the work on the amendments is concluded. She did not think the motion accomplished anything other than locking the council into a timeline that may/may not work. Tonight is an opportunity to introduce the amendments prior to next week's public hearing. Councilmember Chen said the intent of his motion was not to vote tonight. The amendments could be introduced as scheduled and then have the public hearing followed by a vote with public inputs in mind which is a better procedure. Council President Olson supported the idea of not voting tonight. Councilmember Paine supported having the vote after the public hearing and expected that to happen on February 8t''. The council has been on this topic for nearly 45 minutes, leaving a few more minutes of the one hour that was scheduled for this item and then the council can proceed with the agenda. Councilmember Tibbott said as the seconder of the motion, he was in favor of Councilmember Buckshnis reading the amendments tonight in preparation for a public hearing next week. He was also in favor of a special meeting following committee meetings especially if the committee meeting agendas could be adjusted and the only business item in the special meeting would be these budget amendments. He was unclear on the logistics of creating a special meeting following committee meetings as those meetings last until 9:00 p.m. Councilmember L. Johnson said in supporting the motion, it was with the understanding the council would not vote on the amendments tonight, Councilmember Buckshnis quickly reading the proposed amendments tonight, holding the public hearing as scheduled and then waiting until the next regular meeting to vote. It is extremely important and as Councilmember Tibbott said, committee nights are already full, staff will need to be present, making it a very long day for everyone and council needs to make these decisions when well rested. She requested the vote occur at the council's next regular meeting. Councilmember Paine said she said February 8t'', but she meant February 15' Mayor Nelson restated the motion VOTE ON THE BUDGET AMENDMENTS ON FEBRUARY 8TH. Councilmember L. Johnson asked if Councilmember Chen would accept an amendment to the next regularly scheduled meeting, February 15t'', versus committee night. Councilmember Chen said the departments are waiting for the council to finalize the budget so they can proceed with advertising, hiring, etc. so he did no want to delay it further. He supported scheduling a special meeting if necessary. UPON ROLL CALL, MOTION CARRIED (6-1), COUNCILMEMBERS CHEN, TIBBOTT, BUCKSHNIS, PAINE AND L. JOHNSON AND COUNCIL PRESIDENT OLSON; COUNCILMEMBER K. JOHNSON VOTING NO. Councilmember Buckshnis reviewed the proposed 2022 budget amendments: # 1 - REDI Manager • There was not sufficient information to support an on -going FTE. With this issue comes two motions: 1) Hire consultant to evaluate City on REDI metrics (what has already been done and what needs to be done) and propose three alternatives to accomplishing that work" and with that the allocation reduced to 70K Edmonds City Council Draft Minutes January 25, 2022 Page 15 Packet Pg. 25 6.3.a 2) Substitute Motion: Hire REDI Manager for year one of a intended three year position to assess what is done, what needs to be done, to do the work, to train staff, and to set systems in place to carry on the work internally and with an occasional professional services contract after the three year period. #11 — One Commander FTE • Proposed organizational restructure of the Police Department should be brought forth to a council committee. Appropriation is premature. • Motion: Remove this decision packet. #13 — Body Cameras • This one will be removed as Police Chief advised it is a requirement #14 — Police Scuba Team • In the past, we had a three member dive team. While a five member team may be optimal, suggests looking for community partners to fund the service level between minimum and optimal in future years. • Motion: Decrease scuba team to three. # 16 — Public Information Officer • Not sufficient support for FTE provided. • Motion: Remove this decision packet #20 — Solar Program • This is a pilot project geared towards low-income families; yet it takes approximately $13K to be part of the $5K grant program and this is not a realistic expectation. There are many state solar program that offers incentives and grants. • Motion: Remove this decision packet. #21 — Last year, a $550K appropriation was approved and $409,000 was left unspent and is now a carry forward. The City is distributing funds in household pants from ARPA as well. • Motion: Remove decision packet. #22 —New FTE position to manage existing_ capital projects • There is not sufficient information to support a full time FTE or how this position will manage what projects. Council committee should review to determine what exactly projects are part of this request. • Motion: Remove decision packet. #33 — FCA Assessment • Recent bonds were approved based on the previous conditions assessment report and most projects will be completed in three years. A discussion about the timing of the re -assessment should be brought forth to a Council Committee. • Motion: Remove decision packet. #34 — Carpet Cleaning • Could the City buy the carpet cleaning equipment and have our fully staffed custodial team do the twice annual carpet cleaning. There is not sufficient information to support this new expense especially when a new custodian is in the budget. • Motion: Remove the decision packet. Process can be handled via a budget amendment and Council Committee review. #35 — Vehicle purchase for Maintenance and Custodial. 0 Unclear as to the number of vehicles? DP 70 purchased a variety of 8 vehicles for an average of $60,625 per vehicle and no annual maintenance cost. Council should review all vehicles included in the 2022 budget to determine needs over want. • Motion: Delete the decision packet. Schedule car purchase decision be brought forth to a Council Committee. #37 — $100,000 ongoingfor or aging infrastructure Edmonds City Council Draft Minutes January 25, 2022 Page 16 Packet Pg. 26 6.3.a • The City bonded in order to address the backlog of infrastructure capital maintenance project and are unable to spend all the bonded amount this year. • Motion: Delete the decision packet. #38 — New Police perimeter fence • The cost of providing a fence or other means of securing the police area should be vetted through a committee to determine if less expensive alternatives. • Motion: Delete the decision packet. #40 — 2022 Commute Trip Reduction • During the pandemic, this seems to be an unneeded expense since many employees are working from home. An amendment can always come through after proper vetting of the PPW committee. What was the data for the 2021 program? • Motion: Delete decision packet. #41 — Purchase Messaee Board • Is this necessary for city work? The civic organizations that want to use them can rent them from a sign company. This is not a city function. • Motion: Delete decision packet. #47 — Yost and Seaview Assessment and Rehabilitation • This entire project has yet to be brought forth to Council and an amendment can occur in 2022 or is this part of the City Infrastructure? The numbers in the description do not match the project status. • The numbers in the description do not match the project status as Yost cost of $440K with interfund of $65K and then no cost for Seaview. But an assessment of $130K is listed with the entire project listed to be between $3.OM to $3.5M. • Motion: Delete decision packet and bring forth to Council Committee and handle through amendment process. #48 — 3-year Rate Study Consultant • The CIP/CFP should be scrubbed before we allow any review by a consulting firm since number inconsistencies have been noted. • Motion: Delete Decision Packet. #51 — Overtime • Potential estimates for pilot projects is not a sufficient reason to add overtime. Increasing the overtime appropriation should be addressed with Council Committee to look at consistency in overtime over the years. • Motion: Delete decision packet. #55 — Edmonds Marsh Water Quality Improvements 0 No justification for water mitigation or the phases of this stormwater project. Suggest that the stormwater aspect be clarified in the CIP/CFP process. Council review to determine costs and plans for all project as these funds potentially impact utility rates. • Motion: Delete decision packet. #60 — Perrinville Creek Projects • No information provided from the Administration (promised in 2020) when the Creek was damaged by high water flow and City blocked portions of the creek to force flow into two vaults. • Motion: Delete decision packet and bring forth budget amendment when plan is established. #61 - Green Streets and Rain Gardens • No information to support the green streets and the definition does not exist in City documents. Rain garden grants available through Snohomish County and how would the bio-retention and rain gardens should be built to reduce flooding? • Motion: Delete decision packet. #70 — New vehicles Edmonds City Council Draft Minutes January 25, 2022 Page 17 Packet Pg. 27 6.3.a • There are already a number of vehicles in the police and public works departments. These vehicles purchases can wait a year when Council has a better understanding of all cars needed from the B-Fund and supply shortages decrease. • Motion: Delete decision packet. #71- Vehicle charging network • Further review of this to entail creating a charging network system and data on current use of our charging stations. • Motion: Delete decision packet. #72 - Strategic Planningfor or optimizing the solar panel upgrade on Frances Anderson Building. • There is not sufficient information in place to understand this request. Should be vetted more fully by Council Committee to determine cost or impact of aged infrastructure. • Motion: Delete decision packet. Councilmember Buckshnis reviewed 2022 budget amendments to increase appropriations • Motion to add Municipal Court restructure to reflect impact on 2022 budget numbers (currently represented only as attachments to the budget via DP 230-22001,02, and 03) • Motion to reflect the expense of the new satellite City Hall office on HWY 99 in the 2022 budget numbers. • Motion to add $100K for the Creative District's Fourth Avenue Corridor project design. Councilmember Buckshnis reviewed 2022 budget amendments to increase appropriations • Motion to add $60K for study of a Police Station relocation and/or City Hall relocation. • Motion to add $150K for Streetlights in the Lake Ballinger Area (CIP/CFP impact) • Motion to add the South County Fire adjustment to the budget. 3. INTRODUCTION REGARDING CODE AMENDMENT TO ECDC ENTITLED BICYCLE PARKING DEVELOPMENT STANDARDS Planning Manager Rob Chave introduced Senior Planner Eric Engmann, a temporary employee hired to work on code amendments. There are several amendments in the pipeline, this is the first one and there will be more in succession. Mr. Engmann previously worked in Bellevue and Seattle and is originally from Florida. Development Services Director Susan McLaughlin explained tonight's agenda is an introduction to potential bicycle parking regulations including, 1) connection to the Comprehensive Plan goals, 2) highlights of draft amendment, and 3) a special goodbye. She reviewed: • Bike Parking Ties to Major Sustainability Goals o Comprehensive Plan Transportation Element ■ Policy 4.1: Encourage active transportation by providing safe facilities for bicycle and pedestrians ■ Policy 4.13: Place highest priority for improvements to bicycle facilities and installation of bike racks and lockers near schools, commercial districts, multifamily residents, recreation areas, and transit facilities o Community Sustainability Element ■ Policy B.3: Explore and support the use of...transportation options that reduce Greenhouse gas emissions o Climate Action Plan ■ Goal: Carbon Neutral by 2050 ■ TR-3: Reduce vehicle miles traveled (VMT) by promoting active transportation Mr. Engmann reviewed: Edmonds City Council Draft Minutes January 25, 2022 Page 18 Packet Pg. 28 6.3.a • Proposing new chapter in Title 17 for bicycle parking and storage o Four main components 1. Creates bike parking standards for multifamily and non-residential development 2. Separated into short term and long term parking requirements 3. Includes locational, installation and maintenance requirements (how to operate) 4. Provides definitions, calculations, and applicability standards to support new chapter • Difference between short-term and long term bicycle parking o Short term parking ■ Less than 4 hour parking ■ Bike rack near primary entrance ■ Higher need with non-residential use o Long term parking ■ More than 4 hour parking (overnight) ■ Parked in secure on -premise space ■ Higher need with multifamily residential use • Proposed short term bicycle parking requirement Type of use I Minimum Number of Spaces Required Multiple dwelling unit 1 per 10 dwelling units Non-residential 1 per 12 vehicle parking spaces; not less than 2 spaces • Proposed long term bicycle parking requirement Type of use Minimum Number of Spaces Required Multiple dwelling units' 0.75 per unit Non-residential 1 per 25,000 square feet of floor area; not less than 2 spaces Footnote 1: multiple dwelling units with individual garages or those with ground floor units with direct outdoor access are exempt from this requirement o Edmonds bicycle advocacy group proposed increasing the non-residential to 2 per 25,000 square feet and not less than three • Standards — Multifamily examples Development Type Short Term Spaces Long Term Spaces 10 multifamily units 2 8 50 multifamily units 5 38 100 multifamily units 10 75 • Standard — Non-residential examples Development Type Short Term Spaces Long Term S aces Smaller building 2 2-3 Medium building (25,000-50,000 square feet) —5 2-4 Larger building over 50,000 square feet 13-15 3-5 • Locational and installation requirements o Visibility and illumination o Proximity to entrances o Accessibility o Minimum area requirements (18" by 60") o Secure structures o Electrical outlets (long-term) o Accommodations for wall mountings (long-term) Draft code review o Code draft, planning board minutes, and Edmonds bicycle advocacy group letter are included in council agenda packet Edmonds City Council Draft Minutes January 25, 2022 Page 19 Packet Pg. 29 6.3.a o Code update page ■ The code updates webpage is now outline ■ Sign up for notification list for all code updates or just this topic ■ www.edmondswa.gov/codMdates ■ QR code to visit the bike parking specific page Councilmember L. Johnson referred to the statement in the agenda memo, substantially damaged or improved or if a parking lot is expanded by 50% or more and asked how the 50% or more was determined, how often parking lots were substantially damaged, improved or expanded by 50% or more, and why wouldn't the requirement bicycle parking be required for any expansion. She referred to his comment that townhomes may be able to store onsite and asked whether the code could be written so it was not specific to townhomes but the exemption would only apply if there was an ability to store onsite case -by -case. Mr. Engmann responded 50% is seen as a major expansion. For example, an older building may add 1-2 parking spaces, should that trigger compliance with the code? Typically the standard is higher than that and addresses a major improvement. He acknowledged 50% may be too high, but the goal is not to have it be any expansion because the addition of 1-2 parking spaces may not be enough to trigger those improvements. Councilmember L. Johnson observed the intent is to meet goals and combat climate change; if there is any increase in parking spaces which increases auto usage, she felt there should be some expansion of bike parking. She summarized any expansion to accommodate more cars should trigger a requirement to also accommodate bikes. Mr. Engmann said that could be looked at that. With regard to substantial expansion, Mr. Engmann said that was discussed with the Planning Board, what method should be used. For example, when improvements are made to an existing multifamily building, the question arises at what point do they have to meet these standards. A bathroom or kitchen remodel might not require compliance. In the code, the requirement to come into compliance with the code is typically 75% improvement. The Planning Board is proposing to use the lower threshold of 50%. They looked at several examples of 50% improvement and it is a major renovation and it was felt that that would be the appropriate point to require these improvements versus smaller improvements. The building official also agreed. With regard to townhomes, Mr. Engmann agreed there could be a better way to phrase that so it is not an automatic opt out, acknowledging there may smaller townhomes that do not have space to store bikes. Councilmember Paine said this was very exciting to see this, code changes that encourage non-polluting aspects and she was glad bike parking was being proposed. She asked when it would be appropriate to have bike storage lockers, recalling the letter from bicycle advocacy group included a suggested change related to storage lockers. She noted if someone is working for 7-9 hours, they are not checking on their bike during the day unless they feel the parking is not secure. She encouraged him to take the issue of bike security seriously, noting someone losing their bike is akin to losing their car stolen if that is their sole mode of transportation. She also encouraged him to consider the numbers offered by the bicycle advocacy group as the group is comprised of regular bike riders who know their stuff. She referred to the picture of the wave pattern bike rack, noting that is the advocacy group's least favorite bike rack design and they prefer the C-shaped rack. Councilmember Tibbott found this very interesting and looked forward to seeing its application. He referred to the City current incentives related to development of multifamily and asked if those incentives would be replaced a requirements for bicycle storage. Mr. Engmann said he was not familiar with incentives other than in one district. Councilmember Tibbott vaguely remembered while on the Planning Board including incentives for bike storage in exchange for some other feature. Mr. Chave recalled it was Edmonds City Council Draft Minutes January 25, 2022 Page 20 Packet Pg. 30 6.3.a part of the incentives in the Westgate zone. Councilmember Tibbott said he would hate to see the incentive go away, yet he saw the value of requiring bike storage. Councilmember Tibbott pointed out the impact of bike racks on walkways. The proposal refers to installation on private property and he asked whether bike racks downtown or in front of other commercial space that might take up public walkway space were addressed in the code. Mr. Engmann answered this affects development on private property; there are different standards on public property. Councilmember K. Johnson challenged some of standards, relaying there are standards for multifamily dwelling units in areas where there is not safe bicycle access. For example, the presentation mentioned 75 long term and 10 short term spaces for a 100 unit multifamily building on Highway 99, but there isn't access to the Swift Line or north -south access on Highway 99. There is the interurban trail and east -west bicycle routes, but if long and short term spaces are required, the building needs to connect to a usable bicycle network. It doesn't make sense to encourage bicycle use in areas where people cannot safely ride a bike. Mr. Engmann suggested that was a philosophical question. Councilmember K. Johnson agreed it was philosophical, but was related to the redevelopment of Highway 99, space allocated in the right-of-way and the standards the City is encouraging. It takes the theoretical and attaches it to reality and she saw a disconnect. Ms. McLaughlin said one of challenges, chicken before the egg, is building out an entire city network with protected, all ages and abilities bicycle facilities. That is a goal to become carbon neutral, but the City does not have the capital funding to do that. There are all sorts of riders, some are very comfortable riding in traffic and do not need a protected facility. Best practice facilities for all ages and abilities are protected; but to preclude the ability to store a bike for people who are comfortable on a standard roadway would go against progress toward climate goals. Councilmember K. Johnson challenged that, commenting in the development of networks, bicycles have to be considered as a mode of transportation. There is nothing that prohibits bicycles on those highways, but they are not safe unless they are planned for. She saw a disconnect and felt the City should do both; if there is a requirement for long and short term spaces, there should also be safe access to Swift, the Park & Ride and north -south travel. Councilmember Buckshnis asked if there were statistics to support the requirements, anticipating there would be concern from builders, people who do not need bikes and want parking instead. She asked if a public hearing will be held. Mr. Engmann said there will be a public hearing. In developing code amendments, consideration is given to what other cities including surrounding cities have done, best practices, etc. The Master Builders Association and other builder groups are also consulted for feedback. The proposed standards are used in a lot of surrounding cities. Typical best practice is between %2 - 3/4 space per unit which is common in the Puget Sound region. Councilmember Buckshnis asked if it was appropriate to have that requirement for every unit and was that saying that bikes were equivalent to cars, noting the requirement for vehicle parking was one space/unit. Builders are required to provide one parking space per unit and additional space for bike storage. Mr. Engmann answered bike storage is usually much smaller spaces, long term storage is usually in a secure room with bicycle mounts on the walls, etc. and is not equivalent to a parking space. COUNCILMEMBER PAINE MOVED, SECONDED BY COUNCILMEMBER CHEN, TO EXTEND TO 10:40 P.M. MOTION CARRIED UNANIMOUSLY. Councilmember Chen asked if ADA access was considered. Mr. Engmann answered ADA is required for any new construction, walkways and entrances and safe passage to the space. Edmonds City Council Draft Minutes January 25, 2022 Page 21 Packet Pg. 31 6.3.a Council President Olson commented she was thrilled to see the QR code and anticipated citizens were as well. Having a code update page and being on the notification list for updates will excite many citizens. In the interest of time, she will submit her comments via email. Ms. McLaughlin displayed the following: Thank you to Rob Chave for 30 years of service to Edmonds Last day January 31 His wit, experience and leadership will be missed by all Councilmember Buckshnis thanked Rob Chave for the time he has given to the City and all his work over the years. She had many stories and was very happy for him. Mr. Chave said it has been pleasure to work for Edmonds. One of the nice things about a small city is getting o do a lot of things which has Edmonds allowed him to do. Thirty years is a long time and now feels like the right time. A number of people have left the City over the past 1-2 years, and he was thinking they must know something he doesn't. After looking into it, he decided he would be stupid if he didn't follow them so he is retiring. He wished everyone well in continuing to serve and support Edmonds as it evolves and prospers in the future. The City is in good hands between the mayor, council and dedicated staff who work hard for the City and deserve all the gratitude they can get. 4. ENTERPRISE RESOURCE PLANNING SYSTEM (ERP) REPLACEMENT Deputy Administrative Services Director Megan Menkveld introduced herself to council. She reviewed: • Enterprise Resource Planning (ERP) System o General Ledger (GL) ■ Financial statements ■ Capital ■ Accounts payable/receivable ■ Budget o Payroll & HRIS ■ Position control ■ "Hire to Retire" ■ Timekeeping (pay codes) ■ Benefits ■ Employee self-service o Utility Billing o Other (outside scope) ■ Permitting (Tracklt) ■ Procurement (N/A for Edmonds) The existing ERP solution, Eden went live in 2001 (20 years old). It is now being phased out by Tyler Technologies. o Tyler Technologies no longer sells Eden to new customers. o Tyler no longer invests in improvements to the software. Minimally they still provide security updates, software patches, and changes due to new regulatory requirements. o Tyler has indicated they will continue to support the product, but it will eventually become technologically obsolete due to the operating system it runs on, the hardware it uses, or changes to the language (code) used to program the software. o Tyler has a new product that customers can opt for called Munis. Traditional Option (One Service Agreement) Edmonds City Council Draft Minutes January 25, 2022 Page 22 Packet Pg. 32 6.3.a Budget & Reporting Suite Option (Potentially Two Service Agreements) • Sole Source • Attaches to any ERP system ] � ERP System Options 1. Only OpenGov (12 to 15 months) 2. Only Munis (24 to 8 months) o Or other ERP 3. OpenGov Budget plus Munis ERP o Budget Suite (5 months) o ERP (x months) Examples of OpenGov Budget and Reporting Suite Considerations: Level of Importance Budget Suite ERP 1. Operational Risk Management Low High o Eden will become non -operational 2. State of Emergency o ARPA Funding High High o Remote Working o Availability of Information 3. Market Conditions o Eden customers all need to replace system at the same time N/A High o "Great Resignation" 4. City Staff Resources o Leanly staffed in Finance and IT High High o Requires other departments' key staff time o Competing ro'ects and priorities within and between departments 5. ERP Customer References and Feedback High High 0 Considerations: ARPA (Jeff Taraday opinion forthcoming) Edmonds City Council Draft Minutes January 25, 2022 Page 23 Packet Pg. 33 o ARPA: American Rescue Plan Act — Coronavirus State and Fiscal Recovery Funds: A subset of ARPA 0 2 CFR Part 35 111. Eligible Uses I A. Public Health and Economic Impacts ■ Purpose is to "Authorize the use of payments from the Fiscal Recovery Funds to respond to the public health emergency with respect to COVID-19... ■ Must be in response to the disease itself.. o Mt. Vernon, WA (12/08/2021) City council agenda memo — entire ERP ■ Staff proposes utilizing American Rescue Plan Act (ARPA) funding to replace our current financial software to use this electronic software that will also allow transparency. This expense meets the criteria of using these funds since the purchase and integration of OpenGov Cloud ERP software mitigates employee exposure to events like COVID-19 by providing a software solution that establishes a telework infrastructure, council access, and provides a tool for better communication and public access to the final budget. It allows staff to input, review and approve financial data remotely and minimizes physical contact o Puyallup, WA (08/24/2021) City council agenda memo — Budget Suite only ■ Proposed use of ARPA funding was presented to Council on July 13, 2021. ■ Subject: ■ Approve a five-year contract with OpenGov for buu geting and transparency software. ■ Fiscal Impacts: ■ Utilize ARPA funding (revenue losses) for the initial five-year contract, then transition ■ to the regular IT operating budget for ongoing annual subscription fees. Considerations: RFP Waiver (Jeff Taraday opinion forthcoming) o Would need to hire project manager/consultant to write and execute a product RFP o Both the preparation of the proposal and response are technical and detailed, a lengthy process. OpenGov typically does not respond to RFPs for those reasons. o OpenGov is on the WA State list of National Association of State Procurement Officials (NASPO) vendors o There are realistically only three products on the market that make sense for o Edmonds. ■ Tyler Munis ■ Springbrook (no response) ■ OpenGov o Other cities have followed scientific methods in their product comparison. o RCW Exception Uniform exemptions to competitive bidding requirements (39.04.280 RCW) 1. Purchases that are clearly and legitimately limited to a single source of supply (Sole Source Vendor): 2. Purchases involving special facilities or market conditions (auction) 3. Surplus Property (surplus property from another government 4. Purchases in the event of an emergency 5. Interlocal Agreements (State standard contracts) 6. Competitive Negotiations Competitive negotiation can be used as an alternative to the competitive 7. bidding procedures for the acquisition of electronic data processing and telecommunications systems; 8. energy saving or energy related equipment or services; or when it is determined in writing that the use 9. of competitive bidding is neither practical nor advantageous to the City. o Menlo Park, CA (City Council 09/22/2020) Edmonds City Council Draft Minutes January 25, 2022 Page 24 Packet Pg. 34 ■ The rapid switch to remote work due to the COVID-19 pandemic has exacerbated the limitations of the current system and necessitated a more rapid adoption schedule. Further complicating matters, the workload requirements of the annual independent audit, preparation of financial statements, and preparation of the annual budget creates a relatively narrow window of potential "go -live" times. ■ Staff recommends that the City Council waive formal bid requirements and authorize the city manager to enter into a five-year agreement with OpenGov for financial accounting software -as -a- service (SaaS) OpenGov Budget & Reporting Suite o Accessible to Limitless Users o The only Modern Cloud ERP for local government o Future -proof your government's most important software investment by choosing the only modern cloud ERP designed to unify and automate the many mission -critical process of local government o Example of City Manager Dashboard on OpenGov versus Eden OpenGov Budget & Reporting Suite Public Feedback o Ashland, OR ■ Both an Online Budget Book and pdf version of the book were put online for the public. After several months, the pdf received about 5 downloads and the Online Budget Book had over 1,000 users. ■ The Finance Director said that residents have used information from the Online Budget Book and Transparency Portal during council meetings. In one example, a resident was making claims about how funds were being mismanaged and giving wrong numbers to support his claim. Another resident went to the City website and found the correct numbers in the meeting. o Minneapolis, MN ■ Budget -watchers routinely expressed appreciation for the level of financial transparency on the website. There was also a notable increase in the level of public debate around the budget. ■ Video instructions and on -screen navigation help available so they can do as much or as little as they can. Recommendation: 1. Phased Implementation Starting Now 2. Waiver of RFP's 3. Do not need RFP for OpenGov budget suite 4. Meanwhile, vet entire ERP General P�]F HISWaiver of UP's Ledger em 1❑vee ut Rty Riuin Self -Service] ERP Planning & Implementation (12 months+) council Approval for OpenGov Budget Module Planning, Implementation&Training 8u dget Suite January March May 5eptemher Oecemher Fehrua o Budget Suite Now ■ Remote Work ■ Accessibility ■ ARPA June November ,,,,1i11111111 o ERP Later ■ Select Project Manager ■ Evaluate Products ■ Plan for human resources 2023 Edmonds City Council Draft Minutes January 25, 2022 Page 25 Packet Pg. 35 6.3.a ■ Transparency Plan for change management ■ No change to Eden process for staff (besides budget) ■ Can attach to any ERP Cost and Budget Impacts o Billing Frequency: Annual o Pan nt Terms: Net 30 SOFTWARE SERVICES Product/Services Start Date End Date Annual Fee Budgeting & Planning Dashboards, Financial Integration, Open Town Hall, Operating & Capital Budgeting, Reporting & Analytics, Stories, Transparency, Workforce Planning 02/02/2022 01/31/2027 $67,822.00 Software Annual Total $67,822.00 PROFESSIONAL SERVICES Product/Services Start Date Professional Services Deployment — Prepaid 02/02/2022 $55,500.00 Services Total Amount $55,000.00 e Billing/Service Periods Period 1 February 1, 2022 $123,322 Period 2 February 1, 2023 $67,822 Period 3 February 1, 2024 $67,822 Period 4 February 1, 2025 $67,822 Period 5 1 February 1, 2026 $67,822 Total for 5 year contract $394,610 e Comparison to NASPO • City of Edmonds ARPA Funds Appropriation Schedule o Most than adequate to cover the cost 101111111111111hipproved)Requeste� Spent Approvedl Account Amount Expenditures Remaining Funds Balance Recount A - City Fx enditures 750,000 90 474.35 859 526 79,984.54 10,490 Account B - Household Support 4,150,000 1,050,000.00 3,100,000 240,432 809,568 Account C- Business Support 1,125,000 562,006.94 562,993 236,321 325,686 Account ❑ - Nonprofd Support 500,000 420,500.00 79,500 420,500 - Account F - Joh Retraining 600,000 60c,000.00 - 199,999 400,001 Account F - Green Infrastructure 4,768,099 - 4,768,099 Total Funds 11,893,099 2,722,981 9,170,118 1,177,237 e Next Steps o January 25, 2022 ■ Full Council Presentation ■ Waiver of RFP's ■ OpenGov Budget Suite w/ Agreement o February 1, 2022 ■ Approve Waiver of RFP's ■ Mayor signature for OpenGov Budget Suite Agreement Edmonds City Council Draft Minutes January 25, 2022 Page 26 Packet Pg. 36 6.3.a o March 8, 2022Finance Committee ■ ERP evaluation status ■ Project manager search status ■ Recommendation for product selection & project manager ■ Next steps with full council Councilmember Buckshnis advised Ms. Menkveld presented to the Finance Committee in December and January. She suggested the council also approve the use of ARPA Funds. She was ready to vote tonight, but will wait until next week. She commended Ms. Menkveld for all her hard work. Councilmember Paine asked if a decision was made to waive the RFP requirement, what time delays were anticipated if that were challenged. City Attorney Jeff Taraday said as mentioned in the presentation, they are still looking at those issues and he was not ready to provide an opinion yet. 9. REPORTS ON BOARD AND COMMITTEE MEETINGS COUNCIL COMMITTEE MINUTES 10. MAYOR'S COMMENTS Mayor Nelson encouraged everyone to check out the first ever Edmonds Lunar New Year celebration on Saturday. There will be activities all day on Highway 99, a movie, etc. Further information is available at www.lunameMearedmonds.com. Mayor Nelson recognized Rob Chave's long and dedicated service. He has been the go -to for decades, is a class act and someone who does not rattle easily. He first met Mr. Chave when he was on the Planning Board and found him to be a bottomless pit of knowledge and institutional history of anything and everything related to planning. He will be greatly missed, he greatly appreciated his service to the City and wished him all the best. 11. COUNCIL COMMENTS Councilmember Chen said he was very excited about the Chinese New Year celebration. He plans to attend the activities including the lion dance and Kung Fu demonstration by Master Leon's NW Kung Fu and Martial Arts Team. Those are not only entertaining, but a good demonstration about culture, and discipline and other great qualities. He relayed he had heard that the activities originally scheduled for 10:30 a.m. on Highway 99 had been canceled because the church had a few COVID cases and the church elders felt it best to cancel those activities. Councilmember Chen thanked Rob Chave for his service to the City. His interactions with him included his presentation tonight and the Historic Preservation Commission's calendar that he has learned a lot from. He wished him happy retirement. Councilmember Paine extended her best wishes to Rob Chave, commenting he has been a great source of information for her. She anticipated he will enjoy retirement, commenting it can be a lot of fun. She hoped people had an opportunity to enjoy Lunar New Year celebration in Edmonds. She encouraged people to use the COVID tests that were sent out as COVID numbers are still elevated and the hospitals are still pretty full. She encouraged voters to check out the resources and vote on the school levy. Councilmember Buckshnis recalled the time she, Mr. Chave and Lora Petso went to Engel's for a beer. She wished him a great retirement, commenting she was looking forward to retiring soon herself. Edmonds City Council Draft Minutes January 25, 2022 Page 27 Packet Pg. 37 Councilmember Buckshnis announced the passing of long time Rotarian Sharalyn Ramm on Sunday. Ms. Ramm got her involved with the CASA gift giving program that she now oversees and will be missed. Councilmember Tibbott wished Rob Chave the best in his retirement. He recall the Planning Board would get deep into the weeds during their discussion and would look to Mr. Chave to help dig them out. He appreciated the countless ways he has participated in the look and design of the City and assured he would be remembered and missed. Councilmember Tibbott looked forward to Chinese New Year, especially the food. Council President Olson relayed Student Representative Brooks' good night as he had to leave the meeting early. She wished Sharalyn Ramm rest in peace, noting that was sad news to hear. She thanked Rob Chave for his service to the City and extended her best wishes to him on his retirement. Councilmember L. Johnson relayed her excitement at the City's first official recognition of Lunar New Year, the Year of the Tiger. She looked forward to watching one of the two lion dances and seeing Caitlin Chung's artwork on the perimeter fence at the Frances Anderson Center. She extended her thanks and appreciation to Rob Chave for his 30 years of dedicated service, stating she enjoyed working with him and getting to know him when she served on the Historic Preservation Commission. She wished him the best in his new adventure. Councilmember K. Johnson wished Rob Chave happy trails, anticipating he will enjoy retirement. She thanked him for his service to the City for the past three decades, commenting she had enjoyed working with him on the Historic Preservation Commission, her favorite council assignment. She was sorry to hear about the passing of Sharalyn Ramm. She wished everyone a Happy Lunar New Year, the Year of the Tiger. 12. ADJOURN With no further business, the council meeting was adjourned at 10:36 p.m. Edmonds City Council Draft Minutes January 25, 2022 Page 28 Packet Pg. 38 6.4 City Council Agenda Item Meeting Date: 02/1/2022 Approval of claim checks. Staff Lead: Dave Turley Department: Administrative Services Preparer: Nori Jacobson Background/History Approval of claim checks #250987 through #251072 dated January 27, 2022 for $1,795,667.88 (re -issued check #251067 $500). Staff Recommendation Approval of claim checks. Narrative In accordance with the State statutes, City payments must be approved by the City Council. Ordinance #2896 delegates this approval to the Council President who reviews and recommends either approval or non -approval of expenditures. Attachments: claims 01-27-22 FrequentlyUsedProjNumbers 1-27-22 Packet Pg. 39 6.4.a vchlist 01/27/2022 2:47:09PM Bank code : usbank Voucher Date Vendor 250987 1/27/2022 076040 911 SUPPLY INC Voucher List City of Edmonds Page Invoice PO # Description/Account Amoun CM-2-1658 CM-2-1658 - RETURN RADIO POUC RETURN RADIO POUCHES 001.000.41.521.22.31.00-234.0( 10.1 % Sales Tax 001.000.41.521.22.31.00 -23.6( INV-2-15273 INV-2-15273 - EDMONDS PD - INVE U PROTECH RADIO POUCH E 001.000.41.521.22.31.00 234.0( .m 10.1 % Sales Tax 001.000.41.521.22.31.00 23.6, O INV-2-15545 INV-2-15545 - EDMONDS PD - GAGI > BLAUER 8561 TROUSERS o L 001.000.41.521.22.24.00 104.9� a BLAUER L/S SHIRT Q 001.000.41.521.22.24.00 179.9E N NAME TAPE N r- 001.000.41.521.22.24.00 9.0( N BLAUER S/S SHIRT c 001.000.41.521.22.24.00 159.9E 2 NAME TAPES E 001.000.41.521.22.24.00 18.0( Z 10.1 % Sales Tax 001.000.41.521.22.24.00 47.6 j INV-2-15884 INV-2-15884 - EDMONDS PD - PEEF 7 PEER SUPPORT POLOS @ 001.000.41.521.10.24.00 279.9' Q 7 CUSTOM EMBROIDERY 001.000.41.521.10.24.00 84.0( 7 NAME TAPES 001.000.41.521.10.24.00 56.0( 10.1 % Sales Tax 001.000.41.521.10.24.00 42.4, Total: 981.9 j Page: 1 Packet Pg. 40 vchlist 01/27/2022 2:47:09PM Voucher List City of Edmonds Bank code : usbank Voucher Date Vendor Invoice 250988 1/27/2022 078745 A-1 LANDSCAPING & CONSTRUCTION EOMA.Pmt 4 250989 1/27/2022 065052 AARD PEST CONTROL 250990 1/27/2022 077469 ALLEN, ROBERT 250991 1/27/2022 065568 ALLWATER INC 51164 53233 53437 53487 JAN 2022 010422027 PO # Description/Account EOMA.PMT 4 THRU 12/31/21 EOMA.PMT 4 THRU 12/31/21 332.000.64.594.76.65.00 EOMA.PMT 4 THRU 12/31/21 125.000.64.594.76.65.00 Total : MEADOWDALE CC PEST CONTROI MEADOWDALE CC PEST CONTROI 001.000.64.576.80.41.00 10.4% Sales Tax 001.000.64.576.80.41.00 WWTP: 1/13/22 PEST CONTROL SE 1/13/22 Pest Control Service 423.000.76.535.80.41.00 10.4% Sales Tax 423.000.76.535.80.41.00 PARK MAINT PEST CONTROL CUSS PARK MAINT PEST CONTROL CUS 001.000.64.576.80.41.00 10.4% Sales Tax 001.000.64.576.80.41.00 MEADOWDALE CC PEST CONTROI MEADOWDALE CC PEST CONTROI 001.000.64.576.80.41.00 10.4% Sales Tax 001.000.64.576.80.41.00 Total JAN 2022 BOOT REIMBURSEMENT BOOT REIMBURSEMENT JAN 2022 001.000.41.521.22.24.00 Total WWTP: 1 /11 /22 ACCT: COEWASTE: Acct COEWaste:- 6.4.a Page: 2 Amoun 714, 052.1 £ 69,759.2- Ui 783,811.% um t U E M 90.0( z 4- 0 9.3E 'R 0 L 0. 77.0( Q N 8.0- N ti N 0 129.0( N E 13.4, a: c m 94.0( E t U 9.7£ r 430.51 Q 250.7( 250.7( Page: 2 Packet Pg. 41 vchlist 01/27/2022 2:47:09PM Bank code : usbank Voucher Date Vendor 250991 1/27/2022 065568 ALLWATER INC 250992 250993 Voucher List City of Edmonds Invoice (Continued) 011222034 1/27/2022 001375 AMERICAN PLANNING ASSOCIATION 138087-2212 328906-2212 1/27/2022 069751 ARAMARK UNIFORM SERVICES 656000175025 656000178039 656000178046 6.4.a Page: 3 PO # Description/Account Amoun 423.000.76.535.80.31.00 38.0( 10.4% Sales Tax 423.000.76.535.80.31.00 3.9E WWTP: ACCT: COEWASTE: 1/12/2; Acct COEWaste:- 423.000.76.535.80.31.00 21.7E 10.4% Sales Tax E 423.000.76.535.80.31.00 2.2E 'M Total: 65.9E 0 PLANNING - MEMBERSHIP DUES 'R MClugston membership dues 4/22-& o 001.000.62.558.60.49.00 533.0( Q. PLANNING - MEMBERSHIP DUES a BShipley - APA membership dues- 001.000.62.558.60.49.00 468.0( N Total : 1,001.0( N WWTP: 1/12/22 UNIFORMS,TOWEL Mats/Towels $49.23 + $5.12 tax = $5 E 423.000.76.535.80.41.00 54.3E .� Shirt & Cargo Samples + Coat Lab=$ 423.000.76.535.80.24.00 2.7( c WWTP:1/19/22 UNIFORMS,TOWEI E Mats/Towels $47.88 + $4.98 tax = $5 423.000.76.535.80.41.00 52.8E Shirt & Cargo Samples + Coat Lab=$ a 423.000.76.535.80.24.00 2.7( PARKS MAINT UNIFORM SERVICE PARKS MAINT UNIFORM SERVICE 001.000.64.576.80.24.00 63.4, 10.4% Sales Tax 001.000.64.576.80.24.00 6.5� Total : 182.6: Page: 3 Packet Pg. 42 vchlist 01/27/2022 2:47:09PM Bank code : usbank Voucher Date Vendor 250994 1/27/2022 001699 ASSOC OF WA CITIES 250995 1/27/2022 001527 AW WA 250996 1/27/2022 074815 BERESFORD BOOTH PLLC 250997 1/27/2022 073250 BMI GENERAL LICENSING 250998 1/27/2022 078836 BROCKETT, HAILEY Voucher List City of Edmonds 6.4.a Page: 4 Invoice PO # Description/Account Amoun 94444 2022 WORKERS COMP RETRO MEI 2022 WORKERS COMP RETRO PR( 001.000.39.518.61.49.00 27,919.2( 2022 WORKERS COMP RETRO PR( 511.000.77.548.68.49.00 393.2< 2022 WORKERS COMP RETRO PR( 423.000.75.535.80.49.00 917.5< u 2022 WORKERS COMP RETRO PR( E 422.000.72.531.90.49.00 1,179.6E 'R 2022 WORKERS COMP RETRO PR( 111.000.68.542.61.49.00 1,048.6" O 2022 WORKERS COMP RETRO PR( 423.000.76.535.80.49.00 1,703.9� o 2022 WORKERS COMP RETRO PR( Q- a 421.000.74.534.80.49.00 1,048.6' Q Total : 34,210.8` N N 7001 983321 WWTP: PRANDOLPH 3/1/22-2/28/2": ti N PRANDOLPH 3/1/22-2/28/23 MEMBE c 423.000.76.535.80.49.00 248.0( N Total : 248.0( . M BID-41 BID/ED! RENEWAL OF NON-PROFI- BID/ED! RENEWAL OF NON-PROFI- 140.000.61.558.70.41.00 m 121.0( E Total: 121.0( U �a 41847066 2022 MUSIC LICENSE FEE Q 2022 MUSIC LICENSE FEE 001.000.64.571.22.49.00 391.0( Tota I : 391.0( 2006389.009 REFUND: ACTIVITY CANCELLATIOP REFUND: ACTIVITY CANCELLATIOP 001.000.239.200 295.0( Page: 4 Packet Pg. 43 vchlist 01/27/2022 2:47:09PM Bank code : usbank Voucher Date Vendor 250998 1/27/2022 078836 078836 BROCKETT, HAILEY 250999 1/27/2022 073029 CANON FINANCIAL SERVICES Voucher List City of Edmonds 6.4.a Page: 5 Invoice PO # Description/Account Amoun (Continued) Total : 295.0( 27937576 CANON 2501F contract charge 1 /1 - 1 /31 /2022 001.000.21.513.10.45.00 26.4z ui 10.4% Sales Tax 001.000.21.513.10.45.00 2.7E 27937577 DEV SVCS - COPIER MONTHLY CO U Bldg copier (SN: QNR12044)- E 001.000.62.524.10.45.00 32.3z Z 10.4% Sales Tax o 001.000.62.524.10.45.00 3.3E -R 27937578 DEV SVCS COPIER MONTHLY CON 0 Planning copier (SN: QNR11863)- 0. 001.000.62.524.10.45.00 32.3z Q 10.4% Sales Tax 001.000.62.524.10.45.00 3.3E N 27937589 ENG COPIER JANUARY 2022 N ENG COPIER JANUARY 2022 001.000.67.518.21.45.00 279.8- N 27937590 DEV SVCS MONTHLY RENTAL/LEA; E January 2022 Copier Contract- 001.000.62.524.10.45.00 217.4, 10.4% Sales Tax m 001.000.62.524.10.45.00 22.6, E 27995950 DEV SVCS COPIER - MONTHLY CO Bldg Copier (SN: 3CE08167)- f° r 001.000.62.524.10.45.00 35.0 � Q 10.4% Sales Tax 001.000.62.524.10.45.00 3.6E 27995954 DEV SVCS COPIER MONTHLY CON Bldg copier (SN: 3CE08167)- 001.000.62.524.10.45.00 35.0, 10.4% Sales Tax 001.000.62.524.10.45.00 3.6E Page: 5 Packet Pg. 44 vchlist 01/27/2022 2:47:09PM Voucher List City of Edmonds Bank code : usbank Voucher Date Vendor Invoice PO # 250999 1/27/2022 073029 073029 CANON FINANCIAL SERVICES (Continued) 251000 1/27/2022 077353 CAPITOL CONSULTING LLC 1 251001 1/27/2022 003510 CENTRAL WELDING SUPPLY 251002 1/27/2022 069457 CITYOF EDMONDS 251003 1/27/2022 069457 CITYOF EDMONDS 251004 1/27/2022 076816 CITY OF EDMONDS VEBA TRUST CG107160 I N V-58 INV-57 2022-AFSCME VEBA 6.4.a Page: 6 Description/Account Amoun Total : 697.9: STATE LOBBYIST JANUARY 2022 STATE LOBBYIST JANUARY 2022 001.000.61.511.70.41.00 3,750.0( ui Total: 3,750.0( m PM: YOST POOL CARBON DIOXIDE t U PM: YOST POOL CARBON DIOXIDE E 001.000.64.576.80.31.00 240.0< 10.4% Sales Tax o 001.000.64.576.80.31.00 24.9; R Total: 265.0( o L EOGA.ENG2020-0314 ROW PERMIT a EOGA.ENG2020-0314 ROW PERMIT Q 423.000.75.594.35.41.00 150.0( N Total : 150.0( ti N EOJA.ENG2020-0337 ROW PERMIT c EOJA.ENG2020-0337 ROW PERMIT 421.000.74.594.34.41.00 150.0( Total: 150.0( 6 AFSCME 2022 VEBA CON. SUM m AFSCME 2022 VEBA CON. SUM E 001.000.23.512.51.23.15 1,000.0( U AFSCME 2022 VEBA CON. SUM r 001.000.23.523.30.23.15 500.0( Q AFSCME 2022 VEBA CON. SUM 001.000.31.514.23.23.15 2,500.0( AFSCME 2022 VEBA CON. SUM 001.000.31.514.31.23.15 250.0( AFSCME 2022 VEBA CON. SUM 001.000.61.557.20.23.15 250.0( AFSCME 2022 VEBA CON. SUM Page: 6 Packet Pg. 45 vchlist 01/27/2022 2:47:09PM Bank code : usbank Voucher Date Vendor 251004 1/27/2022 076816 CITY OF EDMONDS VEBA TRUST Voucher List City of Edmonds 6.4.a Page: 7 Invoice PO # Description/Account Amoun (Continued) 001.000.62.524.10.23.15 500.0( AFSCME 2022 VEBA CON. SUM 001.000.62.524.20.23.15 1,500.0( AFSCME 2022 VEBA CON. SUM 001.000.62.558.60.23.15 250.0( AFSCME 2022 VEBA CON. SUM 001.000.64.571.21.23.15 250.0( E AFSCME 2022 VEBA CON. SUM M 001.000.64.571.22.23.15 1,250.0( AFSCME 2022 VEBA CON. SUM o 001.000.65.518.20.23.15 500.0( AFSCME 2022 VEBA CON. SUM o 001.000.67.518.21.23.15 1,500.0( a AFSCME 2022 VEBA CON. SUM Q 422.000.72.531.90.23.15 250.0( N AFSCME 2022 VEBA CON. SUM N 423.000.76.535.80.23.15 250.0( N AFSCME 2022 VEBA CON. SUM c 512.000.31.518.88.23.15 750.0( 2022-EPOA 2022 EPOA VEBA CONTRIBUTION E 2022 EPOA VEBA CONTRIBUTION 001.000.41.521.10.23.15 300.0( 2022 EPOA VEBA CONTRIBUTION 001.000.41.521.11.23.15 300.0( E 2022 EPOA VEBA CONTRIBUTION U �a 001.000.41.521.21.23.15 2,100.0( Q 2022 EPOA VEBA CONTRIBUTION 001.000.41.521.22.23.15 10,200.0( 2022 EPOA VEBA CONTRIBUTION 001.000.41.521.26.23.15 300.0( 2022 EPOA VEBA CONTRIBUTION 001.000.41.521.40.23.15 600.0( 2022 EPOA VEBA CONTRIBUTION 001.000.41.521.71.23.15 600.0( Page: 7 Packet Pg. 46 vchlist 01/27/2022 2:47:09PM Bank code : usbank Voucher Date Vendor 251004 1/27/2022 076816 CITY OF EDMONDS VEBA TRUST Voucher List City of Edmonds 6.4.a Page: 8 Invoice PO # Description/Account Amoun (Continued) 2022-LSUP VEBA 2022 LAW SUPPORT VEBA CONTRI 2022 LAW SUPPORT VEBA CONTRI 001.000.41.521.10.23.15 300.0( 2022 LAW SUPPORT VEBA CONTRI 001.000.41.521.11.23.15 1,500.0( 2022 LAW SUPPORT VEBA CONTRI 001.000.41.521.30.23.15 300.0( E 2022 LAW SUPPORT VEBA CONTRI 001.000.41.521.70.23.15 300.0( 2022 LAW SUPPORT VEBA CONTRI O 001.000.41.521.80.23.15 300.0( 2022-NR VEBA 2022 NON REP VEBA CONTRIBUTI( o 2022 NON REP VEBA CONTRIBUTI( Q- a 001.000.21.513.10.23.15 600.0( Q 2022 NON REP VEBA CONTRIBUTI( N 001.000.22.518.10.23.15 2,400.0( ti 2022 NON REP VEBA CONTRIBUTI( c? 001.000.31.514.23.23.15 600.0( c 2022 NON REP VEBA CONTRIBUTI( 001.000.31.514.31.23.15 600.0( •� 2022 NON REP VEBA CONTRIBUTI( 001.000.41.521.10.23.15 1,200.0( 2022 NON REP VEBA CONTRIBUTI( m 001.000.62.524.10.23.15 600.0( E 2022 NON REP VEBA CONTRIBUTI( U �a 001.000.62.524.20.23.15 11200.0( Q 2022 NON REP VEBA CONTRIBUTI( 001.000.62.558.60.23.15 4,800.0( 2022 NON REP VEBA CONTRIBUTI( 001.000.64.571.21.23.15 600.0( 2022 NON REP VEBA CONTRIBUTI( 001.000.64.571.22.23.15 1,800.0( 2022 NON REP VEBA CONTRIBUTI( 001.000.64.576.80.23.15 600.0( Page: 8 Packet Pg. 47 vchlist 01/27/2022 2:47:09PM Bank code : usbank Voucher Date Vendor 251004 1/27/2022 076816 CITY OF EDMONDS VEBA TRUST 251005 251006 251007 Voucher List City of Edmonds Invoice (Continued) 1/27/2022 078498 COMMUNITIES OF COLOR COALITION 1019 1/27/2022 068903 DEPT OF NATURAL RESOURCES 1/27/2022 064531 DINES, JEANNIE PO # Description/Account 2022 NON REP VEBA CONTRIBUTI( 001.000.66.518.30.23.15 2022 NON REP VEBA CONTRIBUTI( 001.000.67.518.21.23.15 2022 NON REP VEBA CONTRIBUTI( 111.000.68.542.90.23.15 2022 NON REP VEBA CONTRIBUTI( 423.000.76.535.80.23.15 2022 NON REP VEBA CONTRIBUTI( 511.000.77.548.68.23.15 2022 NON REP VEBA CONTRIBUTI( 001.000.23.512.51.23.15 Total PMT 3 ERPF HOUSEHOLD SUPPOF PMT 3 ERPF HOUSEHOLD SUPPOF 142.000.39.518.63.41.00 Total LAND ASSESSMENT FOR CITY OW Land assessment for city owned prop 001.000.39.513.10.49.00 Total 22-4135 INV 22-4135 - EDMONDS PD TRANSCRIPTIONS CS21-1 MEHL 001.000.41.521.21.41.00 TRANSCRIPTIONS CS21-15523 MEI 001.000.41.521.21.41.00 TRANSCRIPTIONS CS21-15444 MEI 001.000.41.521.21.41.00 22-4141 FINANCE MINUTES 1/14 AND CITY finance minutes 1/14 and city minute: 001.000.31.514.31.41.00 6.4.a Page: 9 Amoun 5,400.0( U) m 600.0( u E 1,200.0( 'R 600.0( O R 600.0( o 52,600.0( a a N N 8,696.9, N 8,696.9: c N E �a 47.3, 47.3, E t U �a 72.0( Q 144.0( 36.0( 536.4( Page: 9 Packet Pg. 48 vchlist 01/27/2022 2:47:09PM Voucher List City of Edmonds 6.4.a Page: 10 Bank code : Voucher usbank Date Vendor Invoice PO # Description/Account Amoun 251007 1/27/2022 064531 064531 DINES, JEANNIE (Continued) Total : 788.4( 251008 1/27/2022 078827 DIVE INTO YOUR IMAGINATION 11369 2022 VISITOR GUIDE PHOTOGRAP 2022 VISITOR GUIDE PHOTOGRAP 001.000.61.558.70.41.00 200.0( Total : 200.0( 251009 1/27/2022 060401 EDMONDS HARBOR INN INC 952 WWTP: DKORSTAD & RHAHN 1/3 & DKORSTAD & RHAHN 1/3 & 1/422 H 423.000.76.535.80.49.00 525.E Tota I : 525.6' 251010 1/27/2022 076610 EDMONDS HERO HARDWARE 2758 WWTP: PO 481 TORCH KIT PO 481 TORCH KIT 423.000.76.535.80.31.00 74.9� 10.4% Sales Tax 423.000.76.535.80.31.00 7.8( 2761 WWTP: PO 481 ROPE, SHOVEL PO 481 ROPE, SHOVEL 423.000.76.535.80.31.00 29.9E 10.4% Sales Tax 423.000.76.535.80.31.00 3.1 , 2791 PM: BLADE FOR GREENHOUSE PM: BLADE FOR GREENHOUSE 001.000.64.576.81.31.00 6.5� 10.4% Sales Tax 001.000.64.576.81.31.00 0.6� Total: 123.1 251011 1/27/2022 008705 EDMONDS WATER DIVISION 6-00025 MARINA BEACH PARK SPRINKLER MARINA BEACH PARK 001.000.64.576.80.47.00 217.1( 6-00200 FISHING PIER & RESTROOMS FISHING PIER & RESTROOMS 001.000.64.576.80.47.00 593.7( 6-00410 BRACKETT'S LANDING SOUTH SPF Page: 10 Packet Pg. 49 vchlist 01/27/2022 2:47:09PM Voucher List City of Edmonds 6.4.a Page: 11 Bank code : usbank Voucher Date Vendor Invoice PO # Description/Account Amoun 251011 1/27/2022 008705 EDMONDS WATER DIVISION (Continued) BRACKETT'S LANDING SOUTH SPF 001.000.64.576.80.47.00 454.0z 6-00475 ANWAY PARK RESTROOMS ANWAY PARK RESTROOMS 001.000.64.576.80.47.00 1,128.5, 6-01127 W WTP: 11 /15/21-1 /14/22 METER 201 11 /15/21-1 /14/22 200 2ND AVE S / E 423.000.76.535.80.47.64 6-01130 W WTP: 11 /15/21-1 /14/22 METER 94; 11/15/21-1/14/22 200 2ND AVE S / o 423.000.76.535.80.47.64 23.7.' R 6-01140 W WTP: 11 /15/21-1 /141 /22 METER 51 o 11/15/21-1/141/22 200 2ND AVE S / IN a 423.000.76.535.80.47.64 2,004.1' Q 6-01250 CITY PARK BALLFIELD SPRINKLER CITY PARK BALLFIELD SPRINKLER N N 001.000.64.576.80.47.00 212.2' N 6-01275 CITY PARK PARKING LOT c CITY PARK PARKING LOT y 001.000.64.576.80.47.00 1,774.7z .E 6-01280 CITY PARK SPRAY PARK CITY PARK SPRAY PARK a ; 001.000.64.576.80.47.00 336.2( y 6-02125 PINE STREET PLAYFIELD SPRINKL E PINE STREET PLAYFIELD SPRINKL U 001.000.64.576.80.47.00 373.1 £ r 6-02727 BOYS & GIRLS CLUB SPRINKLER Q BOYS & GIRLS CLUB SPRINKLER 001.000.64.576.80.47.00 323.5 , 6-02730 CIVIC CENTER PLAYFIELD SKATE I CIVIC CENTER PLAYFIELD SKATE 1 001.000.64.576.80.47.00 323.5, 6-02745 VETERANS PLAZA VETERANS PLAZA 001.000.64.576.80.47.00 498.8, Page: 11 Packet Pg. 50 vchlist 01/27/2022 2:47:09PM Bank code : usbank Voucher Date Vendor 251011 1/27/2022 008705 EDMONDS WATER DIVISION Voucher List City of Edmonds 6.4.a Page: 12 Invoice PO # Description/Account Amoun (Continued) 6-02885 DOWNTOWN RESTROOM DOWNTOWN RESTROOM 001.000.64.576.80.47.00 485.8z .. 6-02900 FAC SPRINKLER FAC SPRINKLER 001.000.64.576.80.47.00 323.5 6-03000 CIVIC CENTER PARKING LOT SPRI E CIVIC CENTER PARKING LOT SPRI 001.000.64.576.80.47.00 669.0E 6-03275 HUMMINGBIRD HILL PARK SPRINKI o HUMMINGBIRD HILL PARK SPRINKI Ta 001.000.64.576.80.47.00 212.2< o 6-03575 MAPLEWOOD PARK SPRINKLER L a MAPLEWOOD PARK SPRINKLER Q 001.000.64.576.80.47.00 408.2( N 6-04400 SEAVIEW PARK SPRINKLER N SEAVIEW PARK SPRINKLER N 001.000.64.576.80.47.00 323.5, c 6-04425 SEAVIEW PARK y SEAVIEW PARK E 001.000.64.576.80.47.00 735.8" T 6-04450 SIERRA PARK SPRINKLER a ; SIERRA PARK SPRINKLER m 001.000.64.576.80.47.00 488.7, E 6-06040 5 CORNERS ROUNDABOUT IRRIGF U 5 CORNERS ROUNDABOUT IRRIGF r 001.000.64.576.80.47.00 56.3E Q 6-07775 MATHAY BALLINGER SPRINKLER MATHAY BALLINGER SPRINKLER 001.000.64.576.80.47.00 425.2E 6-08500 YOST PARK SPRINKLER YOST PARK SPRINKLER 001.000.64.576.80.47.00 1,699.2E 6-08525 YOST POOL YOST POOL Page: 12 Packet Pg. 51 vchlist 01/27/2022 2:47:09PM Voucher List City of Edmonds 6.4.a Page: 13 Bank code : Voucher usbank Date Vendor Invoice PO # Description/Account Amoun 251011 1/27/2022 008705 EDMONDS WATER DIVISION (Continued) 001.000.64.576.80.47.00 336.2( Total: 14,639.9 , 251012 1/27/2022 008812 ELECTRONIC BUSINESS MACHINES AR209500 ENG COPIER 12/4/21-1/3/22 ENG COPIER 12/4/21-1/3/22 001.000.67.518.21.45.00 152.9' 10.4% Sales Tax 001.000.67.518.21.45.00 15.9( Total : 168.& 251013 1/27/2022 078829 EVEREST TRANSPORTATION SYSTEMS 276254 WWTP: 1/18/22 EMPTY TOTES SHI EMPTY TOTES SHIPPING 423.000.76.535.80.42.00 1,400.0( Total : 1,400.0( 251014 1/27/2022 009350 EVERETT DAILY HERALD EDH946462 PLANNING - LEGAL NOTICE PLN2021-0027 Hutchings/Martin 001.000.62.524.20.41.40 80.8z EDH947034 PLANNING - LEGALAD PLN2021-0052 Petso- 001.000.62.558.60.41.40 70.5, Total : 151.3E 251015 1/27/2022 066378 FASTENAL COMPANY WAEVE186435 WWTP: PO 715 TRASH LINERS FOI PO 715 TRASH LINERS FOR RESTF 423.000.76.535.80.48.00 155.3( 10.4% Sales Tax 423.000.76.535.80.48.00 16.1 E Total : 171.4; 251016 1/27/2022 077668 FRISK, DONNA 2006390.009 REFUND: ACTIVITY CANCELLATIOP REFUND: ACTIVITY CANCELLATIOP 001.000.239.200 550.0( Tota I : 550.0( 251017 1/27/2022 071560 GREAVES COMPANY INC 173842 WWTP: PO 716 PRESSURE REGUL Page: 13 Packet Pg. 52 vchlist 01/27/2022 2:47:09PM Bank code : usbank Voucher List City of Edmonds Voucher Date Vendor Invoice PO # Description/Account 251017 1/27/2022 071560 GREAVES COMPANY INC (Continued) PO 716 PRESSURE REGULLATOR 423.000.76.535.80.48.00 Freight 423.000.76.535.80.48.00 10.4% Sales Tax 423.000.76.535.80.48.00 Tota I : 251018 1/27/2022 078839 HAHN, ROSS RHAHN-1.4.22 WWTP: RHAHN 1/2022 EXP CLAIM 1/3 1/3 & 1/4/22 DINNER RECEIPTS 423.000.76.535.80.49.00 Purchased Hair Dryer from Walgreem 423.000.76.535.80.35.00 Tota I : 251019 1/27/2022 078391 HARRIS, BRITTANY 1-21-2022 1-21-2022 - PARKING - EDMONDS F PARKING REIMBURSEMENT 1/21/2; 001.000.41.521.40.43.00 Total 251020 1/27/2022 074966 HIATT CONSULTING LLC 2019-294 TOURISM PROMOTION & MARKETI TOURISM PROMOTION & MARKETI 120.000.31.575.42.41.00 Total 251021 1/27/2022 061013 HONEY BUCKET 0552526096 FRANCES ANDERSON CENTER HC FRANCES ANDERSON CENTER HC 001.000.64.576.80.45.00 0552526097 SEAVIEW PARK HONEY BUCKET SEAVIEW PARK HONEY BUCKET 001.000.64.576.80.45.00 Total 251022 1/27/2022 078838 IKEBE, EMILY 2006393.009 REFUND: ACTIVITY CANCELLATIOP REFUND: ACTIVITY CANCELLATIOP 6.4.a Page: 14 Page: 14 Packet Pg. 53 vchlist 01/27/2022 2:47:09PM Voucher List City of Edmonds 6.4.a Page: 15 Bank code : Voucher usbank Date Vendor Invoice PO # Description/Account Amoun 251022 1/27/2022 078838 IKEBE, EMILY (Continued) 001.000.239.200 295.0( Tota I : 295.0( 251023 1/27/2022 073548 INDOFF INCORPORATED 3535284 WWTP: PO 745 TOILET PAPER ROL PO 745 TOILET PAPER ROLLS (GEf 423.000.76.535.80.31.00 90.6z 10.4% Sales Tax 423.000.76.535.80.31.00 9.4' Total : 100.0 i 251024 1/27/2022 069349 INTERNATIONAL CODE COUNCIL INC 1001421079 BLDG-WEBINAR REGISTRATION ICC Live Event (Webinar) on 11/16/2- 001.000.62.524.20.49.00 40.0( Total : 40.0( 251025 1/27/2022 078832 JOURNAL GRAPHICS INC 726857 ERPF.VISIT EDMONDS GUIDE ERPT.VISIT EDMONDS GUIDE 001.000.61.558.70.41.00 8,000.0( Visit Edmonds Guide 001.000.61.558.70.41.00 817.0E Total : 8,817.0E 251026 1/27/2022 076521 KORSTAD, DAN DKORSTADI-2022 WWTP: DKORSTAD 1/3 & 1/4/22 DIl` DAN KORSTAD 1/3 & 1/4/22 DINNEF 423.000.76.535.80.49.00 39.2( Total: 39.2( 251027 1/27/2022 075159 LIFE INSURANCE CO OF NO AMER February 2022 Cigna FEBRUARY 2022 CIGNA PREMIUM; February Cigna Premiums 811.000.231.550 12,575.1 E Total : 12,575.1 E 251028 1/27/2022 073603 LIGHTHOUSE LAW GROUP PLLC 20553 expenses 12-21 REIMBURSEMENT FOR EXPE 12/21 reimbursement for expenses - 1 001.000.36.515.41.41.00 62.1 < 12/21 reimbursement for expenses - Page: 15 Packet Pg. 54 vchlist 01/27/2022 2:47:09PM Bank code : usbank Voucher List City of Edmonds Voucher Date Vendor Invoice PO # Description/Account 251028 1/27/2022 073603 LIGHTHOUSE LAW GROUP PLLC (Continued) 001.000.36.515.41.41.00 Jan-2022 01-2022 LEGALS FEES 01-2022 Legal fees 001.000.36.515.41.41.00 Total : 251029 1/27/2022 067235 MARYS TOWING INC 100327 INV 100327 - CS 22-1189 - EDMONE TOW BLUE CADILLAC - CS 22-1189 001.000.41.521.22.41.00 10.4% Sales Tax 001.000.41.521.22.41.00 99549 INV 99549 - CS 22-55 - EDMONDS F TOW RED SUBARU - CS 22-55 001.000.41.521.22.41.00 10.4% Sales Tax 001.000.41.521.22.41.00 Total 251030 1/27/2022 078809 MCKAY POLYGRAPH 11322EPD INV 11322EPD - EDMONDS PD PRE -EMPLOYMENT POLYGRAPH 1, 001.000.41.521.10.41.00 PRE -EMPLOYMENT POLYGRAPH 1, 001.000.41.521.10.41.00 Total 251031 1/27/2022 020039 MCMASTER-CARR SUPPLY CO 71290870 WWTP: PO 748 PIPE FITTINGS, FL/ PO 748 PIPE FITTINGS, FLANGES, 423.000.76.535.80.48.00 Freight 423.000.76.535.80.48.00 10.4% Sales Tax 423.000.76.535.80.48.00 Total 251032 1/27/2022 078837 MILANDIN, TAMARA 2006392.009 REFUND: ACTIVITY CANCELLATIOP 6.4.a Page: 16 Page: 16 Packet Pg. 55 vchlist 01/27/2022 2:47:09PM Bank code : usbank Voucher Date Vendor 251032 1/27/2022 078837 MILANDIN, TAMARA 251033 251034 251035 1/27/2022 069923 MOTION INDUSTRIES INC Voucher List City of Edmonds Invoice (Continued) WA33-0000869443 WA33-0000869835 1/27/2022 078840 MR ROOTER PLUMBING & HEATING 219247768 222861428 1/27/2022 074798 NATIONAL BUSINESS FURNITURE MK573217-KFI 6.4.a Page: 17 PO # Description/Account Amoun REFUND: ACTIVITY CANCELLATIOP 001.000.239.200 550.0( Total : 550.0( WWTP: PO 749 ELECTRIC MOTOR; N PO 749 ELECTRIC MOTORS t 423.000.76.535.80.35.00 1,272.6' U Freight M 423.000.76.535.80.35.00 152.5' 10.4% Sales Tax o 423.000.76.535.80.35.00 148.2, R WWTP: PO 749 ELECTRIC MOTOR p PO 749 ELECTRIC MOTOR Q. 423.000.76.535.80.35.00 7,317.8, Q Freight ... 423.000.76.535.80.35.00 N 164.9E N 10.4% Sales Tax N 423.000.76.535.80.35.00 778.2- c Total: 9,834.4: N E BRACKETTS LANDING NORTH REE BRACKETTS LANDING NORTH REE a: 125.000.64.576.80.48.00 19,785.4� 10.4% Sales Tax E 125.000.64.576.80.48.00 2,057.6� U BRACKETTS LANDING NORTH REE° BRACKETTS LANDING NORTH REE r Q 125.000.64.576.80.48.00 19,785.4� 10.4% Sales Tax 125.000.64.576.80.48.00 2,057.6� Total : 43,686.3E NEIGHBORHOOD OFFICE CHAIRS lobby, office, court chairs for uptown 001.000.60.557.20.35.00 3,159.3( Page: 17 Packet Pg. 56 vchlist 01/27/2022 2:47:09PM Bank code : usbank Voucher Date Vendor 251035 1/27/2022 074798 NATIONAL BUSINESS FURNITURE Voucher List City of Edmonds Invoice (Continued) 251036 1/27/2022 074866 NORTHWEST PLAYGROUND EQUIPMEN 49194 251037 1/27/2022 065720 OFFICE DEPOT 213645624001 213753526001 251038 1/27/2022 070166 OFFICE OF THE STATE TREASURER December, 2021 PO # Description/Account 10.4% Sales Tax 001.000.60.557.20.49.00 PLAQUE PLAQUE 127.000.64.575.50.31.00 10.4% Sales Tax 127.000.64.575.50.31.00 Total : Total ; INV 213645624001 - ACCT 9052043' JUMBO PAPERCLIPS 001.000.41.521.10.31.00 SILVER SHARPIES 36/BOX -DISC 001.000.41.521.10.31.00 JUMBO PAPERCLIP - 20 PKS 001.000.41.521.10.31.00 10.4% Sales Tax 001.000.41.521.10.31.00 INV 213753526001 - ACCT 9052043' 10 FINE POINT SILVER SHARPIES - 001.000.41.521.10.31.00 10.4% Sales Tax 001.000.41.521.10.31.00 Total COURT, BLDG CODE & JIS TRANSI• Emergency Medical Services & Traun 001.000.237.120 PSEA 1, 2 & 3 Account 001.000.237.130 Building Code Fee Account 001.000.237.150 State Patrol Death Investigation 6.4.a Page: 18 Page: 18 Packet Pg. 57 vchlist 01/27/2022 2:47:09PM Voucher List City of Edmonds Bank code : usbank Voucher Date Vendor Invoice 251038 1/27/2022 070166 OFFICE OF THE STATE TREASURER (Continued) 251039 251040 251041 1/27/2022 078545 PALMER, DALE 1/27/2022 027450 PAWS 2006391.009 DEC 2021 1/27/2022 072507 PEACE OF MIND OFFICE SUPPORT 011422 6.4.a Page: 19 PO # Description/Account Amoun 001.000.237.330 57.6, Judicial Information Systems Account 001.000.237.180 1,711.0( Washington Auto Theft Prevention 001.000.237.250 559.0< Um Traumatic Brain Injury U 001.000.237.260 264.8E E Accessible Communities Acct 001.000.237.290 11.1' _M Z Multi -Model Transportation O 001.000.237.300 11.1' Hwy Safety Acct o 001.000.237.320 272.9, a WSP Hwy Acct Q 001.000.237.340 326.9( N Domestic Violence Prevention N 001.000.237.370 15.0( ti N DNA Database Acct c 001.000.237.400 13.31 N Total : 9,974.3: •� REFUND: ACTIVITY CANCELLATIOI' a ; REFUND: ACTIVITY CANCELLATIOP m 001.000.239.200 295.0( E Total: 295.0( U M DEC 2021 - ANIMAL SHELTERING - r Q DEC 2021 ANIMAL SHELTERING 001.000.41.521.70.41.00 1,449.0( Total : 1,449.0( PLANNING - PROF SERVICES 1/5/22 ADB Meeting Minutes 001.000.62.558.60.41.00 388.0( Page: 19 Packet Pg. 58 vchlist 01/27/2022 2:47:09PM Voucher List City of Edmonds 6.4.a Page: 20 Bank code : Voucher usbank Date Vendor Invoice PO # Description/Account Amoun 251041 1/27/2022 072507 072507 PEACE OF MIND OFFICE SUPPORT (Continued) Total : 388.0( 251042 1/27/2022 071783 PIGSKIN UNIFORMS 2022-04 INV 2022-04 - EDMONDS PD - ROBI SUMMER JUMPSUIT W/ALTERATIC 001.000.41.521.22.24.00 540.0( ui Freight 001.000.41.521.22.24.00 20.0( Sales Tax U 001.000.41.521.22.24.00 48.1 E Total : 608.1( Z 251043 1/27/2022 028860 PLATT ELECTRIC SUPPLY 2K59531 WWTP: PO 750 BOLT CONNECTOR 4- O PO 750 BOLT CONNECTOR, LIGHT Ta o 423.000.76.535.80.48.00 480.2' Q. 10.4% Sales Tax Q 423.000.76.535.80.48.00 Total : 530.1; N ti 251044 1/27/2022 076909 POWER DMS INC INV-15496 INV-15496 - CUSTA-15565 - EDMOI` N PROFESSIONAL 1/2022-1/2023 c 001.000.41.521.10.41.00 6,093.81' E STANDARDS WASPC LE 1/2022-1/2 001.000.41.521.10.41.00 650.0( 10.4% Sales Tax 001.000.41.521.10.41.00 701.3E Total : 7,445.1 <, � ca 251045 1/27/2022 070955 R&R STAR TOWING 157706 INV 157706 - CS 22-716 - EDMOND,' Q TOW BLUE SCION - CS 22-716 001.000.41.521.22.41.00 184.0( 10.5% Sales Tax 001.000.41.521.22.41.00 19.3, 157894 INV 157894 - CS 22-1033 - EDMONE TOW SILVER PONTIAC - CS 22-103 001.000.41.521.22.41.00 184.0( 10.5% Sales Tax Page: 20 Packet Pg. 59 vchlist 01/27/2022 2:47:09PM Voucher List City of Edmonds 6.4.a Page: 21 Bank code : Voucher usbank Date Vendor Invoice PO # Description/Account Amoun 251045 1/27/2022 070955 R&R STAR TOWING (Continued) 001.000.41.521.22.41.00 19.3, Tota I : 406.6' 251046 1/27/2022 067802 SAN DIEGO POLICE EQUIP CO 650431 INV 650431 - ACCT 1733 - EDMOND 223 AMMO 500/CS 001.000.41.521.22.31.00 1,699.3, 10.4% Sales Tax 001.000.41.521.22.31.00 176.7' Total : 1,876.0E 251047 1/27/2022 066918 SEDOR, NORMAN 6 REIMBURSMENT REIMBURSEMENT 009.000.39.517.20.23.00 1,782.0( REIMBURSEMENT 009.000.39.517.20.29.00 5,700.0( Total : 7,482.0( 251048 1/27/2022 071655 SHI INTERNATIONAL CORP B14601970 DEC-2021 CLOUD SERVICE CHARC Dec-2021 Cloud Service Charges 512.000.31.518.88.41.00 876.7E 10.4% Sales Tax 512.000.31.518.88.41.00 91.1 £ Total : 967.9: 251049 1/27/2022 078782 SMITH FIRE SYSTEMS INC 56745 WWTP: 2022 FIRE EXTINGUISHER: 2022 FIRE EXTINGUISHERs INSPE 423.000.76.535.80.41.00 269.0( Tota I : 269.0( 251050 1/27/2022 037375 SNO CO PUD NO 1 201184538 HICKMAN PARK HICKMAN PARK 001.000.64.576.80.47.00 28.8( 202250627 9TH/GASPER LANDSCAPED BED 9TH/GASPER LANDSCAPED BED 001.000.64.576.80.47.00 17.71 202540647 SIERRA PARK IRRIGATION 8100 191 Page: 21 Packet Pg. 60 vchlist 01/27/2022 2:47:09PM Bank code : usbank Voucher Date Vendor 251050 1/27/2022 037375 SNO CO PUD NO 1 251051 1/27/2022 063941 SNO CO SHERIFFS OFFICE Voucher List City of Edmonds Invoice (Continued) 222704280 2021-7158 251052 1/27/2022 070167 SNOHOMISH COUNTY TREASURER December 2021 251053 1/27/2022 038100 SNO-KING STAMP PO # Description/Account SIERRA PARK IRRIGATION 8100 191 001.000.64.576.80.47.00 WWTP: 12/21/21-1/18/22 METER 10 12/21/21-1/18/22 200 2ND AVE S / N 423.000.76.535.80.47.61 Total INV 2021-7158 DEC 2021 - EDMONC 102 BASE RATE DAYS @ $142.63Ef 001.000.39.523.60.41.50 26 BOOKINGS @ $128.88EA 001.000.39.523.60.41.50 5 VIDEO COURT HRS @ $207.96EA 001.000.39.523.60.41.50 Total Crime Victims Court Remittance Crime Victims Court Remittance 001.000.237.140 Total 68993 INV 68993 - EDMONDS PD DATER STAMP 001.000.41.521.10.31.00 Freight 001.000.41.521.10.31.00 10.4% Sales Tax 001.000.41.521.10.31.00 251054 1/27/2022 037303 SO SNOHOMISH CO FIRE & RESCUE Feb-22 Total FEB-2022 FIRE SERVICES CONTRA Feb-2021 Fire Services Contract Pay 001.000.39.522.20.41.50 Total 6.4.a Page: 22 Amoun 17.6E N 23, 813.8, 23,878.01 E 14,548.2E o R 3,350.8E p L Q. 1,039.8( Q 18,938.91 N N ti N 130.7E N 130.7E E M a: c 45.5E t 5.0( m r Q 5.2( 55.81 654, 236.4, 654,236.4: Page: 22 Packet Pg. 61 vchlist 01/27/2022 2:47:09PM Bank code : usbank Voucher Date Vendor 251055 1/27/2022 075675 SORENSON FORENSICS LLC 410 DI-7• 251057 251058 251059 1/27/2022 038410 SOUND SAFETY PRODUCTS Voucher List City of Edmonds Invoice 49248 122549/4 452430/1 1/27/2022 074797 SUPER CHARGE MARKETING LLC 10450 1/27/2022 076781 TELETECHSERV GA LLC 1/27/2022 072649 THE WIDE FORMAT COMPANY 011422005 133833 6.4.a Page: 23 PO # Description/Account Amoun INV 49248 - EDMONDS PD STR ANALYSIS - REFERENCE SMPI 001.000.41.521.21.41.00 230.0( 13 - STR ANALYSIS - NON DIFF EVI 001.000.41.521.21.41.00 3,640.0( Ij Total: 3,870.0( WWTP: JRICHARDSON RAINGEAR t U JRICHARDSON RAINGEAR E 423.000.76.535.80.24.00 274.7, Z 10.4% Sales Tax o 423.000.76.535.80.24.00 28.5 R WWTP:JNORDQUIST RAINBOOTS p JNORDQUIST RAINBOOTS - Everett Q. 423.000.76.535.80.24.00 144.9� Q 9.8% Sales Tax .. 423.000.76.535.80.24.00 N 14.2- N Total : 462.4< N SOCIAL MEDIA SERVICES FOR JAI\ SOCIAL MEDIA SERVICES FOR JAI\ E E 001.000.61.557.20.41.00 650.0( .2 Total: 650.0( c SMALL CELL REVIEW AND CONSUI SMALL CELL REVIEW AND CONSUI t 111.000.68.542.90.41.00 600.0( m Total : 600.0( Q DEV SVCS LARGE FORMAT PLOTT Monthly contract charge for HP Page) 001.000.62.524.10.45.00 192.5( 10.4% Sales Tax 001.000.62.524.10.45.00 20.0, Total : 212.5: Page: 23 Packet Pg. 62 vchlist 01/27/2022 2:47:09PM Voucher List City of Edmonds Bank code : Voucher usbank Date Vendor Invoice PO # Description/Account 251060 1/27/2022 070774 ULINE INC 143705223 WWTP: PO 746 BARRICADE & DUC PO 746 BARRICADE & DUCT TAPE 423.000.76.535.80.31.00 Freight 423.000.76.535.80.31.00 10.4% Sales Tax 423.000.76.535.80.31.00 Tota I : 251061 1/27/2022 071549 UNIVAR SOLUTIONS USA INC 49766078 WWTP: 1/13/22 SOD. BISULFITE 1/13/22 SOD. BISULFITE 423.000.76.535.80.31.54 10.4% Sales Tax 423.000.76.535.80.31.54 Tota I : 251062 1/27/2022 067865 VERIZON WIRELESS 9897201225 C/A671247844-00001 Cell Service Fac-Maint 001.000.66.518.30.42.00 Cell Service-PD 001.000.41.521.10.42.00 Cell Service-PW Sewer 423.000.75.535.80.42.00 Tota I : 251063 1/27/2022 069816 VWR INTERNATIONAL INC 8807257885 WWTP: PO 647 BEAKER PO 647 BEAKER 423.000.76.535.80.31.00 10.4% Sales Tax 423.000.76.535.80.31.00 8807257886 WWTP: PO 704 CANNISTERS PO 704 CANNISTERS 423.000.76.535.80.31.00 10.4% Sales Tax 423.000.76.535.80.31.00 6.4.a Page: 24 Page: 24 Packet Pg. 63 vchlist 01/27/2022 2:47:09PM Voucher List City of Edmonds 6.4.a Page: 25 Bank code : usbank Voucher Date Vendor Invoice PO # Description/Account Amoun 251063 1/27/2022 069816 069816 VWR INTERNATIONAL INC (Continued) Total : 251.4: 251064 1/27/2022 068259 WA ST CRIMINAL JUSTICE 201136055 INV 201136055 - EDMONDS PD - M/ 12/2021 MACHADO TRAINING 001.000.41.521.40.49.00 350.0( Total : 350.0( 251065 1/27/2022 075635 WCP SOLUTIONS 12608170 PARKS FACILITY MAINT SUPPLIES PARKS FACILITY MAINT SUPPLIES 001.000.64.576.80.31.00 3,592.4( 10.4% Sales Tax 001.000.64.576.80.31.00 373.E Total : 3,966.0- 251066 1/27/2022 078302 WEBER, CAROL 12 VISIT EDMONDS WEBSITE SUPPOI VISIT EDMONDS WEBSITE SUPPOI 001.000.61.558.70.41.00 500.0( Tota I : 500.0( 251067 1/27/2022 078302 WEBER, CAROL 10 VISIT EDMONDS WEBSITE SUPPOI VISIT EDMONDS WEBSITE SUPPOI 001.000.61.558.70.41.00 500.0( Total : 500.0( 251068 1/27/2022 064800 WEHOP 644953 FLOWER PROGRAM: PLANTS FLOWER PROGRAM: PLANTS 125.000.64.576.80.31.00 228.8 10.4% Sales Tax 125.000.64.576.80.31.00 23.8( Total : 252.6 , 251069 1/27/2022 065936 WESSPUR TREE EQUIPMENT INC SO-446159 PM: PRUNER KIT, BLADES, SAW, H PM: PRUNER KIT, BLADES, SAW, H 001.000.64.576.80.31.00 819.5� 10.4% Sales Tax 001.000.64.576.80.31.00 85.2� Page: 25 Packet Pg. 64 vchlist 01/27/2022 2:47:09PM Voucher List City of Edmonds Bank code : usbank Voucher Date Vendor Invoice PO # 251069 1/27/2022 065936 065936 WESSPUR TREE EQUIPMENT INC (Continued) 251070 1/27/2022 074609 WEST COAST ARMORY NORTH 2455761 251071 1/27/2022 063008 W SDOT 251072 1/27/2022 011900 ZIPLY FIBER 86 Vouchers for bank code : usbank 86 Vouchers in this report RE 41 JZ0186 L021 RE 41 JZ0605 L011 425-775-1344 6.4.a Page: 26 Description/Account Amoun Total : 904.71 INV 2455761 - EDMONDS PD BAY RENTAL 11/2/21 001.000.41.521.40.41.00 110.0( ui LANE FEES NOV & DEC 2021 001.000.41.521.40.41.00 32.6( 10.4% Sales Tax U 001.000.41.521.40.41.00 14.8z Total: 157.4z 5 E20CE.PROJECT COSTS FOR DEC 4- O E20CE.PROJECT COSTS FOR DEC R o 112.000.68.595.33.41.00 591.5E Q. GATEWAY SIGN RELOCATION PLAI Q GATEWAY SIGN RELOCATION PLAI �- 001.000.64.576.80.41.00 157.0E N Total : 748.6: r- N 425-775-1344 RANGER STATION o 425-775-1344 RANGER STATION 001.000.64.571.23.42.00 Total: 110.6E Bank total : 1,796,167.81 E Total vouchers : 1,796,167.81 r Q Page: 26 Packet Pg. 65 6.4.b PROJECT NUMBERS (By Project Title) Project Engineering Accounting Project Funding Project Title Number Number STM 174th St. & 71 st Ave Storm Improvements c521 im STM 175th St. SW Slope Stabilization c560 E21 FB STM 2018 Lorian Woods Study qMi s018 EBFA SWR 2019 Sewerline Replacement Project c516 EBGA STM 2019 Storm Maintenance Project c525 EBFC WTR 2019 Swedish Waterline Replacement c523 EBJA STIR 2019 Traffic Calming i038 E9AA STIR 2019 Traffic Signal Upgrades i045 E9AD UTILITIES 2019 Utility Rate & GFC Update s020 EBJB WTR 2019 Waterline Overlay i043 E9CB 2019 Waterline Replacement c498 E7JA STIR 2020 Guardrail Installations i046 EOAA 20 Overlay Progranla i042 STIR 2020 Pedestrian Safety Program i049 EODB STIR 2020 Pedestrian Task Force 02 STIR 2020 Traffic Calming _ i048 EOAC STIR 2020 Traffic Signal Upgrades i047 EOAB STIR 2020 Waterline Overlay i053 EOCC STIR 2021 Guardrail Installations i057 E21AB STIR 2021 Overlay Program 051 E21 CA STIR 2021 Pedestrian Task Force i062 E21DB SWR 2021 Sewer Overlay Program i060 E21CC STM 2021 Stormwater Overlay Program i061 E21 CD STIR 2021 Traffic Calming i056 E21 AA WTR 2021 Waterline Overlay Program i059 E21CB STIR 2022 Guardrail Program i073 E22AC STIR 2022 Overlay Program i063 E22CA STIR 2022 Pedestrian Safety program i072 E22DA 2022 Sewerline Overlay Program i065 E22CC _ STIR 2022 Signal Upgrades i070 E22AA STIR 2022 Stormwater Overlay Program i066 E22CD STIR 2022 Traffic Calming Program 071 E22AB UTILITIES 2022 Utility Rate and GFC Study s030 E22NB STIR 2022 Waterline Overlay Program i064 E22CB 220th Adapti i028 EBAB STIR 228th St. SW Corridor Improvements i005 E7AC 11111110& 2j/3th St,ysland & Mj�c. Ramna i037 EBDC STIR 238th St. SW Walkway (100th Ave to 104th Ave) c423 E3DB 238th St. SW Walkway (Edmonds Way to Hwy 99) c485 STIR 76th Ave Overlay (196th St. to OVD) i052 E20CB STIR 76th Ave W & 220th St. SW Intersection Improvements i029 EBCA STIR 76th Ave W at 212th St SW Intersection Improvements c368 ElCA STIR 84th Ave W Overlay from 220th to 212th i031 EBCC STIR 89th PI W Retaining Wall i025 E7CD urb Ram i033 EBDB STIR Admiral Way Pedestrian Crossing i040 E91DA STD Audible Pedestrian Signals i024 E7AB STM Ballinger Regional Facility Pre -Design s022 E9FA STIR Bikelink Project c474 ESDA STIR Citywide Bicycle Improvements Project i050 EODC SWR Citvwide CIPP Sewer Rehab Phase I c488 E6GB STIR Citywide Pedestrian Crossing Enhancements i026 E7DC Citywide Protected/Permissive Traffic Signal Conversion i015 E6AB PRK Civic Center Playfield (Construction) c551 EOMA PRK Civic Center Playfield (Design) c536 EOMA Revised 12129/2021 Packet Pg. 66 PROJECT NUMBERS (By Project Title) 6.4.b Project Engineering Accounting Project Funding Project Title Number Number WTR Dayton St. Utility Replacement Project (3rd Ave to 9th Ave) c482 ESJB MENfilfiiii Dayton Street Stormwater Pump Station c455 Jim FAC Edmonds Fishing Pier Rehab c443 E4MB Edmonds Marsh Water Quality Project c564 E21 FE STR Edmonds Street Waterfront Connector c478 ESDB WTR Elm St. Waterline Replacement 6 c561 E21JB STR Elm Way Walkway from 8th Ave to 9th Ave i058 E21 DA WTR Five Corners Reservoir Re -coati c473 ESKA PM Fourth Avenue Cultural Corridor STR Hwy 99 Gateway Revitalization STR Hwy 99 Revitalization Stage 3 (224th-238th) STR Hwy 99 Revitalization Stage 4 (224th-220th) STM Lake Ballinger Associated Projects SWR Lake Ballinger Trunk Sewer Study SWR Lift Station #1 Basin & Flow Study STR Minor Sidewalk Program STM NPDES (Students Saving Salmon) GF Official Street Map & SidewalkIan Update STM OVD Slope Repair & Stabilization STM Perrinville Creek Flow Reduction Improvements c282 s014 i067 i068 c436 s011 c461 017 m013 s025 m105 c552 STM Perrinville Creek Recovery Study s028 SWR Phase 10 Sewerline Replacement Project c566 WTR Phase 11 Annual Water Utility Replacement Project c549 WTR Phase 12 Annual Water Utility Replacement Project c558 WTR Phase 13 Waterline Replacement Project c565 Phase 2 Annual Storm Utility Replacement Project c547 STM Phase 3 Storm Utility Replacement Project c563 L STM Phase 4 Storm Utility Replacement Project c567' SWR Phase 8 Annual Sewer Replacement Project c548 SWR Phase 9 Annual Sewer Replacement Project c559 FAC PW Concrete Regrade & Drainage South c502 SWR Sanitary Sewer and Stormwater Pipe Rating Services c562 STM Seaview Park Infiltration Facility c479 STM Seaview Park Infiltration Facility Phase 2 c546 WWTP Sewer Outfall Groundwater Monitoring c446 STR SR 104 Adaptive Systems (136th-226th_ 9 STR SR Revitalization Stage 2 (Medians, Gateway Signage & Hawk Signal) i055 UTILITIES Standard Details Updates solo STM Storm Drain Improvements @ 9510 232nd St. SW c495 STM Stormwater Comp Plan Update s017 STR Sunset Walkway Improvements c354 STR Trackside Warning System c470 UTILITIES Utility Funds reserve Policies Study s029 STR Walnut St. Walkway (3rd-4th) i044 PRK Waterfront Development & Restoration (Construction) c544 PRK Waterfront Development & Restoration (Design) c496 PRK Waterfront Development & Restoration (Pre - Design) m103 STM Willow Creek Daylighting/Edmonds Marsh Restoration c435 WWTP WWTP Outfall Pipe Modifications c481 WTR Yost & Seaview Reservoir Assessment s026 WTR Yost & Seaview Reservoir Repairs and Upgrades m160 PRK Yost Park Infiltration Facili c556 EBMA E6AA E22CE E22CF E4FD ESGB E4GC E6DD E7FG EONA E7FA E20FC E21FC E22GA EOJA E21JA E22JA EOFB E21FD E22FA EOGA E21 GA E9MA E21 GB ESFD EOFA E4HA E22CG E20CE ESNA E7FB E6FD E1 DA ESAA E22NA E9DC E7MA E7MA E7MA E4FC ESHA EOJB E22JB E21 FA Revised 12/29/2021 Packet Pg. 67 6.4.b PROJECT NUMBERS (By Engineering Number) Engineering Project Project Accounting Funding Number Number i046 STR EOAB i047 o STR EOAC i048 STR EOCA i042 STR EOCC i053 STR EODA s024 STR i049 STR EODC i050 STM EO STM EOFB c547 SWR EOGA JL48 WTR EOJA c549 Project Title 2020 Guardrail Installations 2020 Traffic Signal Upgrades 2020 Traffic Calming 2020 Overlay Program 2020 Waterline Overlay 2020 Pedestrian Task Force 2020 Pedestrian Safety Prog Citywide Bicycle Improvements Project Seaview Park Infiltration Facility Phase 2 Phase 2 Annual Storm Utility Replacement Project Phase 8 Annual Sewer Replacement Projec Phase 11 Annual Water Utility Replacement Project WTR EOJB 26 Yost & Seaview Reservoir Assessment PRK EOMA c551 Civic Center Playfield (Construction) PRK EOMA c536 Civic Center Playfield (Design) MEOPME" - GF EONA s025 Official Street Map & Sidewalk Plan Update STR E1CA 76th Ave W at 212th St SW Intersection Improvements STR E1 DA c354 Sunset Walkway Improvements STR E20CB M 76th Ave Overlay (196th St. to OVD1 STR E20CE i055 SR Revitalization Stage 2 (Medians, Gateway Signage & Hawk Signal) STM Perrinville Creek Flow Reduction Improvem STR E21AA i056 2021 Traffic Calming STR E21AB i057 2021 Guardrail Installations STR E21 CA 051 2021 Overlay Program WTR E21 CB i059 2021 Waterline Overlay Program SWR E21 CC i060 2021 Sewer Overlay Program STM E21 2021 Stormwater Overlay Program STR E21 DA i058 Elm Way Walkway from 8th Ave to 9th Ave STR r E21 DB M 2021 Pedestrian Task Force PRK E21 FA c556 Yost Park Infiltration Facility E21 FB � AMSW Slope Stabilization STM E21 FC s028 Perrinville Creek Recovery Study STM E21 FD e 3 Storm Utility Replacement Project Ed STM E21 FE c564 Edmonds Marsh Water Quality Project MLSWR E21 GA JL59 Phase 9 Annual Sewer Replacement Proje SWR E21GB c562 Sanitary Sewer and Stormwater Pipe Rating Services WTR E21JA 8 Phase 12 Annual Water Utility Replacement Project WTR E21JB c561 Elm St. Waterline Replacement STR F99AA i070 2022 Signal Upgrades STR E22AB i071 2022 Traffic Calming Program STR i073 2022 Guardrail Program STR E22CA i063 2022 Overlay Program STR i064 2022 Waterline Overlay Program STR E22CC i065 2022 Sewerline Overlay Program STR i066 2022 Stormwater Overlay Progra STIR E22CE i067 Hwy 99 Revitalization Stage 3 (224th-238th) STR E2 i068 Hwy 99 Revitalization Stage 4 (224th-220th) STR E22CG i069 SR-104 Adaptive Systems (136th-226th) STR E22DA i072 2022 Pedestrian Safety program STM E22FA c567 Phase 4 Storm Utility Replacement Project SW c566 Phase 10 Sewerline Replacement Project WTR E22JA c565 Phase 13 Waterline Replacement Project WTR m160 Yost & Seaview Reservoir Repairs and Upgrades UTILITIES E22NA s029 Utility Funds reserve Policies Study Revised 12/29/2021 Packet Pg. 68 6.4.b PROJECT NUMBERS (By Engineering Number) Engineering Project Project Accounting Funding Number Number Project Title UTILITIES E22NB s030 2022 Utility Rate and GFC Study STR E3DB c423 238th St. SW Walkway (100th Ave to 104th Ave) STM c435 Willow Creek Daylighting/Edmonds Marsh Restoration STM E4FD c436 Lake Ballinger Associated Projects STM E4FE c455 Dayton Street Stormwater Pump Station SWR E4GC c461 Lift Station #1 Basin & Flow Study WWTP E4HA JS c446 J�tfall Groundwater Monitoring FAC E4MB c443 Edmonds Fishing Pier Rehab STR E57 c470 cside Warning System STR E5DA c474 Bikelink Project STR E5DB c478 Edmonds Street Waterfront Connector STM E5FD c479 Seaview Park Infiltration Facility SWR E5GB 11 Lake Ballinger Trunk Sewer Study WWTP E5HA c481 WWTP Outfall Pipe Modifications WTR E5JB c482 Dayton St. Utility Replacement Project (3rd Ave to 9th Ave) WTR E5KA c473 Five Corners Reservoir Re -coating UTILITIES E5NA solo Standard Details Updates STR E6AA s014 Hwy 99 Gateway Revitalization STR E6AB i015 Citywide Protected/Permissive Traffic Signal Conversion STR E6DA c485 238th St. SW Walkway (Edmonds Way to Hwy 99) ST Minor Sidewalk Program STM E6FD s017 Stormwater Comp Plan Update SWR E6GB 88 Citywide CIPP Sewer Rehab Phase III STR E7AB i024 Audible Pedestrian Signals STR E7AC i005 228th St. SW Corridor Improvements STR E7CD i025 89th PI W Retaining Wall STR Citywide Pedestrian Crossing Enhancements STM E7FA m105 OVD Slope Repair & Stabilization IV STM E7FB Storm Drain Improvements @ 9510 232nd St. SW STM E7FG m013 NPDES (Students Saving Salmon) WT c498 2019 Waterline Replacert, PRK E7MA c544 Waterfront Development & Restoration (Construction) PRK E7Mq2WW c496 Waterfront Development & Restoration (Design) PRK E7MA m103 Waterfront Development & Restoration (Pre - Design) STR E8AB i028 220th Adaptive STR E8CA i029 76th Ave W & 220th St. SW Intersection Improvements STR i031 84th Ave W Overlay from 220th to 21 STR E8DB i033 ADA Curb Ramps STR E8DIff i037 238th St. Island & Misc. Ramps STM E8FA s018 2018 Lorian Woods Study STM E8FB St. & 71st Ave Storm Improvements STM E8FC c525 2019 Storm Maintenance Project SWJ& E8GJW c516 2019 Sewerline Replacement Proj4h WTR E8JA c523 2019 Swedish Waterline Replacement UTILITIES s020 Zulu utlilre & GFC Update PM E8MA c282 Fourth Avenue Cultural Corridor IV STR E9AA i038 2019 Traffic Calming STR E9AD i045 2019 Traffic Signal Upgrades WTR E9CB i043 2019 Waterline Overla now- STR E9DA i040 Admiral Way Pedestrian Crossing STR E9DC i044 Walnut St. Walkway (3rd-4th) STM E9FA s022 Ballinger Regional Facility Pre -Design FAC E9MA c502 PW Concrete Regrade & Drainage South Revised 12/29/2021 Packet Pg. 69 6.4.b PROJECT NUMBERS (By New Project Accounting Number) Engineering Project Project Accounting Funding Number Number Project Title PM E81MA c282 Fourth Avenue Cultural Corridor STIR E1 DA c354 Sunset Walkway Improvements STIR E1CA c368 76th Ave W at 212th St SW Intersection Improvements STIR E3DB c423 238th St. SW Walkway (100th Ave to 104th Ave) STM E4FC c435 Willow Creek Daylighting/Edmonds Marsh Restoration STM E4FD c436 Lake Ballinger Associated Projects FAC E4MB c443 Edmonds Fishing Pier Rehab WWTP E4HA c446 Sewer Outfall Groundwater Monitoring STM E4FE c455 Dayton Street Stormwater Pump Station SWR E4GC c461 Lift Station #1 Basin & Flow Study STIR E5AA c470 Trackside Warning System WTR E5KA c473 Five Corners Reservoir Re -coating STIR E5DA c474 Bikelink Project STIR E5DB c478 Edmonds Street Waterfront Connector STM E5FD c479 Seaview Park Infiltration Facility WWTP E5HA c481 WWTP Ouffall Pipe Modifications WTR E5J13 c482 Dayton St. Utility Replacement Project (3rd Ave to 9th Ave) STIR E6DA c485 238th St. SW Walkway (Edmonds Way to Hwy 99) SWR E6GB c488 Citywide CIPP Sewer Rehab Phase III STM E7FB c495 Storm Drain Improvements @ 9510 232nd St. SW PRK E7MA c496 Waterfront Development & Restoration (Design) WTR E7JA c498 2019 Waterline Replacement FAC E9MA c502 PW Concrete Regrade & Drainage South SWR E8GA c516 2019 Sewerline Replacement Project STM E8FB c521 174th St. & 71st Ave Storm Improvements WTR E8JA c523 2019 Swedish Waterline Replacement STM E8FC c525 2019 Storm Maintenance Project PRK EOMA c536 Civic Center Playfield (Design) PRK E7MA c544 Waterfront Development & Restoration (Construction) STM EOFA c546 Seaview Park Infiltration Facility Phase 2 STM EOFB c547 Phase 2 Annual Storm Utility Replacement Project SWR EOGA c548 Phase 8 Annual Sewer Replacement Project WTR EOJA c549 Phase 11 Annual Water Utility Replacement Project PRK EOMA c551 Civic Center Playfield (Construction) STM E20FC c552 Perrinville Creek Flow Reduction Improvements PRK E21 FA c556 Yost Park Infiltration Facility WTR E21JA c558 Phase 12 Annual Water Utility Replacement Project SWR E21 GA c559 Phase 9 Annual Sewer Replacement Project STM E21 FB c560 175th St. SW Slope Stabilization WTR E21JB c561 Elm St. Waterline Replacement SWR E21 GB c562 Sanitary Sewer and Stormwater Pipe Rating Services STM E21 FD c563 Phase 3 Storm Utility Replacement Project STM E21 FE c564 Edmonds Marsh Water Quality Project WTR E22JA c565 Phase 13 Waterline Replacement Project SWR E22GA c566 Phase 10 Sewerline Replacement Project STM E22FA c567 Phase 4 Storm Utility Replacement Project STIR E7AC i005 228th St. SW Corridor Improvements STIR E6AB i015 Citywide Protected/Permissive Traffic Signal Conversion STIR E6DD i017 Minor Sidewalk Program STIR E7AB i024 Audible Pedestrian Signals STIR E7CD i025 89th PI W Retaining Wall STIR E7DC i026 Citywide Pedestrian Crossing Enhancements STIR E8AB i028 220th Adaptive STIR E8CA i029 76th Ave W & 220th St. SW Intersection Improvements Revised 12/29/2021 Packet Pg. 70 6.4.b PROJECT NUMBERS (By New Project Accounting Number) Engineering Project Project Accounting Funding Number Number Project Title STIR EBCC 031 84th Ave W Overlay from 220th to 212th STIR EBDB i033 ADA Curb Ramps STIR EBDC i037 238th St. Island & Misc. Ramps STIR E9AA i038 2019 Traffic Calming STIR E9DA i040 Admiral Way Pedestrian Crossing STIR EOCA i042 2020 Overlay Program WTR E9CB i043 2019 Waterline Overlay STIR E9DC i044 Walnut St. Walkway (3rd-4th) STIR E9AD i045 2019 Traffic Signal Upgrades STIR EOAA i046 2020 Guardrail Installations STIR EOAB i047 2020 Traffic Signal Upgrades STIR EOAC i048 2020 Traffic Calming STIR EODB i049 2020 Pedestrian Safety Program STIR EODC i050 Citywide Bicycle Improvements Project STIR E21 CA i051 2021 Overlay Program STIR E20CB i052 76th Ave Overlay (196th St. to OVD) STIR EOCC i053 2020 Waterline Overlay STIR E20CE i055 SR Revitalization Stage 2 (Medians, Gateway Signage & Hawk Signal) STIR E21 AA i056 2021 Traffic Calming STIR E21AB i057 2021 Guardrail Installations STIR E21 DA i058 Elm Way Walkway from 8th Ave to 9th Ave WTR E21 CB i059 2021 Waterline Overlay Program SWR E21 CC i060 2021 Sewer Overlay Program STM E21CD i061 2021 Stormwater Overlay Program STIR E21DB i062 2021 Pedestrian Task Force STIR E22CA i063 2022 Overlay Program STIR E22CB i064 2022 Waterline Overlay Program STIR E22CC i065 2022 Sewerline Overlay Program STIR E22CD i066 2022 Stormwater Overlay Program STIR E22CE i067 Hwy 99 Revitalization Stage 3 (224th-238th) STIR E22CF i068 Hwy 99 Revitalization Stage 4 (224th-220th) STIR E22CG i069 SR-104 Adaptive Systems (136th-226th) STIR E22AA i07O 2022 Signal Upgrades STIR E22AB i071 2022 Traffic Calming Program STIR E22DA i072 2022 Pedestrian Safety program STIR E22AC i073 2022 Guardrail Program STM E7FG m013 NPDES (Students Saving Salmon) PRK E7MA m103 Waterfront Development & Restoration (Pre - Design) STM E7FA m105 OVD Slope Repair & Stabilization WTR E22JB m160 Yost & Seaview Reservoir Repairs and Upgrades UTILITIES ESNA solo Standard Details Updates SWR ESGB s0l l Lake Ballinger Trunk Sewer Study STIR E6AA s014 Hwy 99 Gateway Revitalization STM E6FD s017 Stormwater Comp Plan Update STM EBFA s018 2018 Lorian Woods Study UTILITIES EBJB s020 2019 Utility Rate & GFC Update STM E9FA s022 Ballinger Regional Facility Pre -Design STIR EODA s024 2020 Pedestrian Task Force GF EONA s025 Official Street Map & Sidewalk Plan Update WTR EOJB s026 Yost & Seaview Reservoir Assessment STM E21 FC s028 Perrinville Creek Recovery Study UTILITIES E22NA s029 Utility Funds reserve Policies Study UTILITIES E22NB s03O 2022 Utility Rate and GFC Study Revised 12129/2021 Packet Pg. 71 6.4.b PROJECT NUMBERS (By Funding) Project Engineering Accounting Project Funding ProiectTitle Number Number FAC Edmonds Fishing Pier Rehab c443 E4MB FAC PW Concrete Regrade & Drainage South c502 E9MA GF Official Street Map & Sidewalk Plan Update s025 EONA PM Fourth Avenue Cultural Corridor c282 EBMA PRK Civic Center Playfield (Construction) c551 EOMA PRK Civic Center Playfield (Design) c536 EOMA PRK Waterfront Development & Restoration (Construction) c544 E7MA PRK Waterfront Development & Restoration (Design) c496 E7MA PRK Waterfront Development & Restoration (Pre - Design) m103 E7MA PRK Yost Park Infiltration Facility c556 E21 FA STM 174th St. & 71 st Ave Storm Improvements c521 EBFB STM 175th St. SW Slope Stabilization c560 E21 FB STM Phase 4 Storm Utility Replacement Project c567 E22FA STM 2018 Lorian Woods Study s018 EBFA STM 2019 Storm Maintenance Project c525 EBFC STM 2021 Stormwater Overlay Program i061 E21 CD STM Ballinger Regional Facility Pre -Design s022 E9FA STM Phase 3 Storm Utility Replacement Project c563 E21 FD STM Dayton Street Stormwater Pump Station c455 E4FE STM Lake Ballinger Associated Projects c436 E4FD STM NPDES (Students Saving Salmon) m013 E7FG STM OVD Slope Repair & Stabilization m105 E7FA STM Perrinville Creek Flow Reduction Improvements c552 E20FC STM Perrinville Creek Recovery Study s028 E21 FC STM Phase 2 Annual Storm Utility Replacement Project c547 EOFB STM Seaview Park Infiltration Facility c479 ESFD STM Seaview Park Infiltration Facility Phase 2 c546 EOFA STM Storm Drain Improvements @ 9510 232nd St. SW c495 E7FB STM Stormwater Comp Plan Update s017 E6FD STM Willow Creek Daylighting/Edmonds Marsh Restoration c435 E4FC STM Edmonds Marsh Water Quality Project c564 E21 FE STR 2019 Traffic Calming i038 E9AA STR 2019 Traffic Signal Upgrades i045 E9AD STR 2020 Guardrail Installations i046 EOAA STR 2020 Overlay Program i042 EOCA STR 2020 Pedestrian Safety Program i049 E0D13 STR 2020 Pedestrian Task Force s024 EODA STR 2020 Traffic Calming i048 EOAC STR 2020 Traffic Signal Upgrades i047 EOAB STR 2021 Guardrail Installations i057 E21 AB STR 2021 Overlay Program i051 E21 CA STR 2021 Traffic Calming i056 E21AA STR 228th St. SW Corridor Improvements i005 E7AC STR 238th St. Island & Misc. Ramps i037 EBDC STR 238th St. SW Walkway (100th Ave to 104th Ave) c423 E3DB STR 238th St. SW Walkway (Edmonds Way to Hwy 99) c485 E6DA STR 76th Ave Overlay (196th St. to OVD) i052 E20CB STR 76th Ave W & 220th St. SW Intersection Improvements i029 EBCA STR 76th Ave W at 212th St SW Intersection Improvements c368 ElCA STR 84th Ave W Overlay from 220th to 212th i031 EBCC STR 89th PI W Retaining Wall i025 E7CD STR Hwy 99 Revitalization Stage 3 (224th-238th) i067 E22CE STR Hwy 99 Revitalization Stage 4 (224th-220th) i068 E22CF STR SR-104 Adaptive Systems (136th-226th) i069 E22CG STR ADA Curb Ramps i033 EBDB Revised 12/29/2021 Packet Pg. 72 6.4.b PROJECT NUMBERS (By Funding) Project Engineering Accounting Project Funding ProiectTitle Number Number STIR Admiral Way Pedestrian Crossing 040 E9DA STIR Audible Pedestrian Signals i024 E7AB STIR Bikelink Project c474 ESDA STIR Citywide Bicycle Improvements Project i050 EODC STIR Citywide Pedestrian Crossing Enhancements 026 E7DC STIR Citywide Protected/Permissive Traffic Signal Conversion i015 E6AB STIR Edmonds Street Waterfront Connector c478 ESDB STIR Elm Way Walkway from 8th Ave to 9th Ave i058 E21 DA STIR Hwy 99 Gateway Revitalization s014 E6AA STIR Minor Sidewalk Program i017 E6DD STIR SR Revitalization Stage 2 (Medians, Gateway Signage & Hawk Signal) 055 E20CE STIR Sunset Walkway Improvements c354 E1 DA STIR Trackside Warning System c470 ESAA STIR Walnut St. Walkway (3rd-4th) i044 E9DC STIR 2021 Pedestrian Task Force 061 E21 DB STIR 2022 Overlay Program i063 E22CA STIR 2022 Waterline Overlay Program 064 E22CB STIR 2022 Sewerline Overlay Program i065 E22CC STIR 2022 Stormwater Overlay Program 066 E22CD STIR 2022 Signal Upgrades i07O E22AA STIR 2022 Traffic Calming Program 071 E22AB STIR 2022 Pedestrian Safety program i072 E22DA STIR 2022 Guardrail Program 073 E22AC STIR 2020 Waterline Overlay i053 EOCC STIR 220th Adaptive 028 EBAB SWR 2019 Sewerline Replacement Project c516 EBGA SWR 2021 Sewer Overlay Program 060 E21 CC SWR Citywide CIPP Sewer Rehab Phase III c488 E6GB SWR Lake Ballinger Trunk Sewer Study s0l l ESGB SWR Lift Station #1 Basin & Flow Study c461 E4GC SWR Phase 8 Annual Sewer Replacement Project c548 EOGA SWR Phase 9 Annual Sewer Replacement Project c559 E21 GA SWR Sanitary Sewer and Stormwater Pipe Rating Services c562 E21 GB SWR Phase 10 Sewerline Replacement Project c566 E22GA UTILITIES 2019 Utility Rate & GFC Update s020 EBJB UTILITIES Standard Details Updates solo ESNA UTILITIES Utility Funds reserve Policies Study s029 E22NA UTILITIES 2022 Utility Rate and GFC Study s030 E22NB WTR 2019 Swedish Waterline Replacement c523 EBJA WTR 2019 Waterline Overlay 043 E9CB WTR 2019 Waterline Replacement c498 E7JA WTR 2021 Waterline Overlay Program 059 E21 CB WTR Dayton St. Utility Replacement Project (3rd Ave to 9th Ave) c482 ESJB WTR Elm St. Waterline Replacement c561 E21JB WTR Five Corners Reservoir Re -coating c473 ESKA WTR Phase 11 Annual Water Utility Replacement Project c549 EOJA WTR Phase 12 Annual Water Utility Replacement Project c558 E21JA WTR Yost & Seaview Reservoir Assessment s026 EOJB WTR Phase 13 Waterline Replacement Project c565 E22JA WTR Yost & Seaview Reservoir Repairs and Upgrades m160 E22JB WWTP Sewer Outfall Groundwater Monitoring c446 E4HA WWTP WWTP Outfall Pipe Modifications c481 ESHA Revised 12/29/2021 Packet Pg. 73 6.5 City Council Agenda Item Meeting Date: 02/1/2022 Acknowledge receipt of a Claim for Damages from Dawn Ridgway Staff Lead: NA Department: Administrative Services Preparer: Marissa Cain Background/History N/A Staff Recommendation Acknowledge receipt of a Claim for Damages from Dawn Ridgway Narrative Dawn Ridgway 19928 81st PI W ($5,440.92) Attachments: Claim for Damages - Dawn Ridgway - for council Packet Pg. 74 6.5.a CITY OF EDMONDS CLAIM FOR DAMAGES FORM Date Claim Form Received by City Please take note that Dawn Ridgway , who currently resides at 19928 81st P1 W mailing address home phone # NIA woel p�'hone ani who resided at at the time of the occurrence and whose date of birth is , is claiming damages against The City of Edmonds in the sum of $ 5,440.92 arising out of the following circumstances listed below. DATE OF OCCURRENCE: December 13, 2021 LOCATION OF OCCURRENCE: 19928 81st PI A Edmond. WA DESCRIPTION: ff Fir, PMEGM8191IMi 1. Describe the conduct and cir'cilmstance that brought about the injury or damage. Also describe the injury or damage. Tree belonging to the City of Edmond fell onto Ms. Rid wa 's property and porton of wood fence and trampoline were damaged (attach an extra sheet for additional information, if needed) 2. Provide a list of witnesses, if applicable, to the occurrence including names, addresses, and phone numbers. 3. Attach copies of all documentation relating to expenses, injuries, losses, and/or estimates for repair. 4. Have you submitted a claim for damages to your insurance company? X Yes No If so, please provide the name of the insurance company: and the policy #: * * ADDITIONAL INFORMATION REQUIRED FOR AUTOMOBILE CLAIMS ONLY License Plate # Type Auto: _ (year) (make) DRIVER: Address: Phone#: Passengers: Name: Address: Driver License # (model) _ OWNER: Address: Phone#: Name: Address: a� a� E M 0 L 0 4- E .2 V Form Revised 04'09.'2021 Page I of 2 Packet Pg. 75 6.5.a This Claim form must be signed by the Claimant, a person holding a written power of attorney from the Claimant, by the attorney in fact for the Claimant, by an attorney admitted to practice in Washington State on the Claimant's behalf, or by a court -approved guardian or guardian ad litem on behalf of the Claimant. declare under penalty of perjury under the laws of the state of Washington that the foregoing is true and correct. Signature of Claimant Or Signature presentative Print Name of Pepresentative OL'_r,J� ULC� Date and place (residential address, city and county) Date and place (residential address, city and county) Bar Number (if applicable) ANGELA SHULTS OFFICIAL SEAL Notary Public, State of Illinois My Commission Expires November 16, 2024 Please present the completed claim form to: City Clerk's Office City of Edmonds 121 51h Avenue North Edmonds, WA, 98020 8:00 a.m. to 4:30 p.m. E .2 U Form Revised 04'091_'021 Page 2 of 2 Packet Pg. 76 6.6 City Council Agenda Item Meeting Date: 02/1/2022 Arts Commission Candidate Appointment Staff Lead: Carolyn LaFave Department: Mayor's Office Preparer: Carolyn LaFave Background/History Mayor Nelson and the Arts Commission Committee are recommending candidate Harry Kirchner's appointment to the Arts Commission, Position #5, General. Staff Recommendation Confirm the appointment of Harry Kirchner to Arts Commission, Position #5, General. Narrative Mr. Kirchner's strong background in literary arts, along with his interest in performing and visual arts, arts education and cultural diversity make him an excellent candidate for this position. Packet Pg. 77 6.7 City Council Agenda Item Meeting Date: 02/1/2022 Temporary Employment Agreement for Admin Help in Council Office Staff Lead: Vivian Olson, Council President Department: City Council Preparer: Scott Passey Background/History As the council legislative assistant contract is ending without a replacement lined up, an employee from another department is able to work the hours needed in the short term to help out until the job is permanently filled. Staff Recommendation N/A Narrative N/A Attachments: REVISED City Council Executive Assistant Employment Agreement (JNH and SEC edits) 1.25_Redacted Packet Pg. 78 6.7.a c EMPLOYMENT AGREEMENT E EXECUTIVE ASSISTANT TO CITY COUNCIL c a E WHEREAS, the City Council of the City of Edmonds, Washington (hereinafter "City w Council") utilizes the services of an Executive Assistant to perform a variety of administrative and confidential tasks related to its legislative functions; and a E WHEREAS, the Mayor of the City of Edmonds is by state statute the chief 0 administrative officer of the City, invested with the power to hire and fire employees and to direct their day-to-day activities; and WHEREAS, in the interest of fostering an appropriate working relationship between the Executive Assistant and the City Council, the Mayor has evidenced his wish to delegate the day-to-day responsibility for the direction of said person to the City Council's President; and WHEREAS, with the Mayor's consent, the City Council wishes to fill the position of Executive Assistant with an employee, specifically answerable to the Council, under specific, limited terms and conditions governed by the provisions of this employment agreement and not subject to the general personnel policies of this City; NOW, THEREFORE, the City of Edmonds, Washington and Jerrie Bevington (hereinafter "Employee") do hereby enter into this agreement for employment services ("Agreement"). The Employee's employment shall be governed exclusively by the provisions of this Agreement unless otherwise provided herein. 1. Term of Employment: This Agreement will take effect as of the effective date set forth below and will expire owno later June 30, 2022- or sooner, should the Council fill this position with a regular _appointment.uniess extended ant to its t Thereafter-, this Agq-7eement may be extended thfough januafy > 2023, the City Couneil. The ptir-pose of one year- teiq:ns is to pefmit an an"al t:&i4w of the perfemanee of the Employee by the outgoing City Couneil President in of!def! that the City Couneil President may detefmiae whether or- not it is appropriate to r-enew this Agreement f6t! an additional tefm. It is one of the basic understandings of this Agreement that the Employee will work closely with the City Council President and the City Council. As such, this position shall be one in which the confidence of the City Council President and City Council shall be essential to the proper performance of the Employee's duties. Therefore, the City Council reserves the right not to r-ene , this "gree,,w-nt, er to terminate this Agreement as herein provided in order to preserve that confidence and a feeling of confidentiality between the City Council President, the City Council and the Employee as Executive Assistant. 2. Duties: The Employee shall serve as the Executive Assistant for the City Council, performing a variety of administrative duties as assigned. The Employee shall be under the general day-to-day direction of the City Council President and shall provide such Packet Pg. 79 6.7.a 2 2022 Employment Agreement Executive Assistant to City Council assistance as may be necessary to individual members of the City Council. For project C work (requested by individual members of the City Council), authorization from the City c Council President is required. In the event of a conflict in such directions, the Employee a w shall rely upon the direction of the City Council President. A generalized description of the duties of this position is attached hereto as Exhibit A and incorporated herein by this reference. The listing of duties in Exhibit A is intended as a descriptive tool only, and a shall not limit the City Council President or City Council to make task assignments; E provided, however, that such duties be linked to the City Council President's Office and 1 the legislative function of the City Council and shall, in all respects, be governed by statutory, constitutional and ordinance limitations on the duties of public employees. The U City Council President, by her signature below, specifically represents that the Mayor has delegated his statutory authority to direct the day-to-day duties of this Employee, and this Employee alone, to the City Council to be exercised by and through the City Council N President. This delegation is revocable by the Mayor and shall not be binding on the subsequent elected or appointed mayors unless ratified by them. a 3. Hours of Work: This is a part-time position. The Employee shall work office hours as assigned and directed by the City Council through the City Council President. Such hours may normally be worked between 8:00 a.m. and 5:00 p.m. Monday through Friday. The hours of work on Tuesdays may be adjusted to 6:00 — 10:00 pm. In addition, the Employee may perform assigned work off site. Such hours shall be within prescribed limits and approved by the City Council President. It is anticipated that the Employee shall work up to 20 hours per week. NOTE: The level of the Employee's benefits is based upon a proration of hours worked. This general description of working hours shall not limit the ability of the City Council President to change the working schedule or adjust it from time to time. 4. Wages and Benefits: The wages for this position have a base rate of $18.00 per hour. The City will pay the aplieable employer's retirement, , Washington State industfial Taxes, and sueh other- payinen4s or- benefits as may be 4 under- the pf-01HRORS -Of state and federal law based upen the fmmber- of hour-s ,,,�,,,4ed. MEBT benefits shall be provided as r-equked by law of! by the pt!evisians of plan deettfnef4. "Pian Doettfne4' shall fnea-a for- the pur-poses of this Agr-eement the M T ofQther- centmet, or- peliey deettmeiAs, whieh f!eq�ytheir teethe paftieipatien of all qualified employees. This is a temporary position. which is not eligible for Citv benefits other than those required by law. The benefits to be paid to the Employee shall be governed solely by this Agreement. No benefit not specifically addressed or listed herein shall be granted to the Employee. The provisions of this Agreement shall control over any conflicting provision of the City ordinances, City Personnel Policy Manual, any collective bargaining agreement or any other general grant of benefits to City employees. The benefits which the Employee shall receive are limited to the following: Coverage under the Industrial Insurance Program (Workers' Compensation); coverage under Social Security and Medicare programs; coverage under the Employment Security programUnemployment Insurance); coverage under the Paid Family and Medical Leave program, and Packet Pg. 80 6.7.a 2022 Employment Agreement Executive Assistant to City Council Washington State Sick Leave. 11111 VISA I I OIL I 1 ♦ M C E 0 0. E w L 0 0. E . I • I � . !�'i/.�fl.�Il/.lll�.frITIV.�l�f/tit�ll�f/.l1��1 P"We['Ai!!!ifMf--p-MMUTM OVA A 4:3SiEk Leave! Siek lem,eise-a ned at the rate of1houfs per- yeaf whileh is 40 hours worked ' the a-m nt f houfs period. edsiek l� � to "per- pay' p �cavc-cuirb-c-c«ca�ra� -a Maxiffil-Im- of -h-e ..s. Unused, accrued sick leave shall be forfeited upon termination of employment. 1 5. Confidentiality: One of the basic purposes of this Agreement is to provide an employee who serves in a confidential capacity to the City Council and its City Council President. The Employee acknowledges that she has been informed of the necessity for confidentiality and understands that she shall report directly to the City Council President any matter which she feels would breach such confidence or confidentiality. In the event of any apparent conflict between the needs of the City Council and that of the City in general, the Employee shall report such matter to the City Council President and rely on Packet Pg. 81 6.7.a 4 2022 Employment Agreement Executive Assistant to City Council C his/her direction. In keeping with this confidential relationship, the Executive Assistant E position shall not be a part of a collective bargaining unit or subject to any collective c bargaining agreement. 0. E w 6. Termination of Agreement: The parties acknowledge that this employment agreement creates an at -will employment relationship that may be terminated at any time, a with or without cause, by either party. This paragraph shall control and supersede any E portion of this Agreement that might otherwise be construed as in any way altering the Employee's at -will status. 7. Indemnification: As an employee of the City, the Employee shall have the right to indemnification by and on behalf of the City for actions taken in the scope of her employment in accordance with the provisions of Chapter 2.06 of the Edmonds City Code as same exists or is hereafter amended. 8. Entire Written Agreement: This document represents the entire agreement, written or oral, between the parties. No representation or other oral agreement by either party shall survive the execution of this document. This document shall be amended only upon the express written agreement of both parties. The City Council President shall confer with the Mayor regarding any change. 9. Notices: Notices pursuant to this Agreement shall be given, by deposit in the custody of the United States Postal Service, postage prepaid, addressed as follows: City of Edmonds ATTN: City Council President 121 5th Avenue North Edmonds, WA 98020 N evin ton OW 10. Opportunity to Confer with Independent Counsel: In signing below, the Employee represents and affirms that the City Attorney was not acting as the Employee's counsel in drafting this Agreement and that the Employee had the opportunity to consult with independent counsel in reviewing and deciding to execute this Agreement. 11. Severability: The provisions of this Agreement shall be severable. In the event that any provision hereof is held to be void, illegal, or unenforceable, the remaining provisions shall survive; PROVIDED, however, that in the event the provisions of paragraph 5, relating to the exclusion of this position from any collective bargaining unit, or of paragraph 6, relating to this Agreement as one of at -will employment, are/is held to be unenforceable, invalid, or void, this Agreement shall immediately be at an end. 12. Effective Date: The effective date of this Agreement shall be the date set forth below. DONE THIS day of February 2022. Packet Pg. 82 6.7.a 2022 Employment Agreement Executive Assistant to City Council CITY OF EDMONDS Vivian Olson, City Council President EMPLOYEE Jerrie Bevington C N E 0 0. E w L 0 a E Packet Pg. 83 6.7.a 2022 Employment Agreement Executive Assistant to City Council EXHIBIT A Executive Assistant Duties • Schedules meetings for Council and individual Council members; prepares agenda memos for Council. • Attends Council meetings, prepares requested reports, minutes, agendas, correspondence and other materials as appropriate and according to decisions and approved actions. • Assists Council President in drafting budget and planning of various Council events and functions including coordinating arrangements for meeting facilities, equipment and refreshments as appropriate; coordinates management of legislative priorities with Council President. • Coordinates and prepares press releases for Council as requested and/or various community relations. • Plans and performs complex administrative office coordination; relieves the Council President of technical clerical and administrative duties having Council - wide impact. • Completes PSR's for the department, enters payroll into Eden software for the department and processes Council accounts payables. • Performs various administrative duties including answering telephones and greeting visitors; provides information in person or on the telephone or refers to appropriate department personnel; opens, screens and routes mail. • Maintains calendars relating to Council events as requested; schedules appointments and conferences; assists with travel reservations and vehicle check - in and checkout for Council as requested. • Composes, prepares and types a variety of correspondence, memos, reports and other materials and proofreads materials to assure accuracy and completeness. • Organizes and coordinates office functions, activities and communications; assures efficient workflow and office operations. • Works independently under direction of Council President to complete assignments. • Maintains accurate financial records and files pertaining to departmental expenditures, budget balances and operations; prepares status reports, charts and other documents as requested; prepares and coordinates purchase of office supplies, equipment and other expenditures. • Manages and maintains all records as required by State and Federal law; including, but not limited to, records related to City elections, and records pertaining to State audit requirements. C O E O O. E w L O L E as m r U M i N as U w c x z a Packet Pg. 84 6.7.a 2022 Employment Agreement Executive Assistant to City Council C E • Provides staff support and administrative assistance to various boards and 2 0. committees; prepares reports, agendas, correspondence and other materials as E appropriate and according to decisions and approved actions. w • Manages and maintains website for Council and provide website c support/administration for Council and any Council -related assigned boards, Q- E committees, groups and/or events. • Managesand programs content as directed for the City's cable channels (21/39). • Maintains files and records related to Council activities/business and retains and U purges records as needed under the Washington State records retention and archiving rules. • Operates office machines including: computers, copiers, calculators, fax machines, use of recording equipment for Tuesday night Council meeting other equipment as assigned. • Performs a variety of special duties, projects or activities of the Council Office. Packet Pg. 85 7.1 City Council Agenda Item Meeting Date: 02/1/2022 Public Hearing on Proposed Amendments to the 2022 Adopted City Budget Staff Lead: Diane Buckshnis, Kristiana Johnson Department: City Council Preparer: Scott Passey Background/History On 1/25/22 - a motion was made to strike through the entire 1/25/22 agenda memo as the background history section was challenged that it had not been substantiated. The vote was 4-1-2 and exhibit 1 provides the strike through document. A completely substantiated background/history is available upon request. Recommendation Review Council amendments for vetting and vote and request Attorney or the Administration to prepare an ordinance to amend the 2022 budget. A budget hearing has been set for February 1, 2022. Narrative The PowerPoint presentation provides 2022 Council amendment suggestions and a public hearing is set for 2/1/22. Only super majority votes (five) will be added to the ordinance for final vote. Attachments: Exhibit 1 - feb 1 Council 2022 Budget Amendments exhibit 2 February 1 Council 2022 Budget Amendment exhibit 3 Feb 1 Council 2022 budget amendments exhibit 4 Feb 1 Council 2022 Budget Amendments Fund —Balance —Reserve — Packet Pg. 86 7.1.a City Council Agenda Item m Meeting Date: 1/25/2022 U 2022 Budget amendments a Staff Lead: Diane Buckshnis and Kristiana Johnson 0 Q Department: Council N N Preparer: Diane Buckshnis and Kristiana Johnson *** Background/History E The final 2022 budget for- Couneil for 11/23/21. This timeline later by vote was set was ehanged Getmeil Wesident Paine to I 1/ 16/21. Had the been kep t to th, E and moved tip a week sehedtil e , , /2, date ;t have ; , hided lta ffil a original 23 would all seven eeeoeas � as "Regarding o Q. 0 L .. a that the budget Couneilinember Chen is deserves.appr-eeiation for- the finetuned needs certainly o 0 the timeline bit the thing to do beeause the in L moving a was f!ight right people wef!e plaee and tifiderstoo,a the prmejeets". x it should be noted that Mr, Chen, �e CPA, femer- intemal and extemal auditer- and them to the Gotineilmember—w i ++ asking wait until newly eleeted e e e g the budget. He this in the 12,17,12021 and veting on eenfiFmed statement again eeuneil eemment E he be budget stating was ready to vete and part of the 2022 pr-oeess. _ N E This Getmeilmember- Chen in the 2022 budget.Also, Q amendment pr-oeess allows a3voiee r this had that left O au4hor-s of memo a signif4eant number- of questions we -re tHwetted whieh Their- lists issues be fetmd #6.1 represented many eitizeas eoneefas. eomplete of ean as exhibit m #6.2 the 124 421 Finanee Committee. The that 1— and of gist of fneeting's presentation OT N N O N 2022 budget in to the funds being ffofn bond O O issuanee addition signif4eant provided a new an T Fund Balanee City- notifieatio vas eofArmafy to the pokey of the t V y+ a Packet Pg. 87 7.1.a A. •. •. Lmnmrs- - i-. im I ■ -,; ; - - -.- Recommendation Review Council amendments for vetting and vote and request Attorney or the Administration to prepare an ordinance to amend the 2022 budget. A budget hearing has been set for February 1, 2022. Narrative Exhibit 1 provides the amendments for vetting and final vote. Additional amendments may come from the floor during this process. Only super majority votes (five) will be added to the ordinance for final vote. Attachments Exhibit #1 2022 Power Point Presentation with Amendments Exhibit #2 Applicable Laws regarding budget amendments - Lighthouse Packet Pg. 88 2022 Budget Comments Council knew that we would revisit the budget in 2022. Timeliness is imperative since 2022 Budget was approved and it's Feb. Items were left out of the budget such as the reorganization of the Municipal Court, a new uptown Satellite Office and a potential Police Department restructure which could have significant impact on the 2022 budget. We are still in a pandemic and have economic pressures from a spike in inflation, supply shortages, three projected interest rate hikes and other concerning economic indicators. u� s !n 11 Packet Pg. 89 2022 Budget Comments We have local budgetary pressures from changes in the South Fire Contract, impact on wages and maybe benefits from the recent compensation study and now new sewer plant coming on line. It might be advantageous to postpone some appropriations, run them through Council Committee as amendments happen quarterly. The use of $2.1 million in unrestricted reserves in this budget should be a Council decision as to the amount and and purpose - per Council approved Fund Balance Policy. These amendments came from four Council Members and this presentation is a compilation of their items. Packet Pg. 90 2022 Budget Comments The first section identifies decision packets that are in question of removal with the second section suggesting more appropriations. To save time, each item will be motioned from the person reading this PowerPoint and after a Council second, any member may provide reasons for motion. After vote may occur and those votes of super majority will be noted. Asuper-majority vote (five votes) is needed in order for any amendment to be moved to the udget ordinance. Lighthouse will prepare budget amendment ordinance for final approval. `OfEDnj0�O N hoc. 1890 Packet Pg. 91 m 0 a 0 a. 2022 Budget Amendments 0 # 1 - REDI Manager — there was not sufficient information to support a on- going FTE. With this issue comes at least two motions: 1) Hire a consultant to evaluate City on REDI metrics (what has already been done and what needs to be done) and propose three alternatives to accomplishing that work". With this motion, the allocation will be reduced to $70K 2) Substitute Motion: Hire REDI Manager for budget year (part of an intended three-year contract). Ajob description should be written to ensure an assessment is done, what needs to be done, workpIan for training staff and to set systems in place to maintain the work internally so as at the end of three years, only periodic reviews would occur as needed. Packet Pg. 92 7.1.b m 0 a 0 2022 Budget Amendments L 0 L #11— One Commander FTE — proposed organizational restructure of the Police Department should be brought forth to a council committees and is 3 seems appropriation is premature as not all essential positions are being requested. Motion: Remove this decision packet and set as high priority to immediately run the entire restructure, including all positions through the Council Committees. This is a high priority for public safety and needs to be reviewed holistically. #14 — Police Scuba Team — in the past, we had a three member dive team. While a five member team may be optimal, suggests looking for community partners to fund the service level between minimum and optimal in future years. Motion: Decrease scuba team to three. Packet Pg. 93 2022 Budget Amendments #16 —Public Information Officer —not sufficient support for FTE provided. Motion: Remove this decision packet #20 —Solar Program -this is a pilot project geared towards low- income families; yet it takes approximately $13K to be part of the $5K grant program and this does not appear realistic without support data. There are many state solar program that offers incentives and grants. Motion: Remove this decision packet and review through Council Committee to review alternatives. GOOF EDAf hoc. 1890 Packet Pg. 94 2022 Budget Amendments #21— Last year, a $550K appropriation was approved for Human Services and $409,000 was left unspent and has been carried forward into 2022. The City is distributing funds to households utilizing ARPA funds. Motion: Reduce decision packet by $200K represented by the new request. #22 — New FTE position to manage existing capital projects — there is not sufficient information to support a full time FTE or how this position will manage what projects. Council committee should review to determine what exactly projects are part of this request. Motion: Remove decision packet and move to Council Committee. s Packet Pg. 95 2022 Budget Amendments #33 — FCA Assessment — Recent bonds were approved based on the previous conditions assessment report and most of these projects will be completed in three years. A discussion about the timing of the re -assessment should be brought forth to a Council Committee. Motion: Remove decision packet; bring to Council Committee #34 — Carpet Cleaning — Suggest the city purchase the carpet Cleaning equipment and have custodial team do the cleaning twice a year. There is not sufficient information to support this new expense especially when a new custodian is in the budget. Motion: Remove the decision packet. Process can be handled via a budget amendment and Council Committee review. Packet Pg. 96 7.1.b 2022 Budget Amendments #35 — Vehicle purchase for Maintenance and Custodial. Unclear as to the number of vehicles purchased as DP 70 purchased a variety of vehicles for an average cost of $60,625 per vehicle and no annual maintenance cost. Council should review all vehicles included in the 2022 budget to determine needs over want. Motion: Delete the decision packet. Schedule car purchase decisions be brought forth to a Council Committee. #37 — $100,000 ongoing for aging infrastructure —The City bonded in order to address the backlog of infrastructure capital maintenance project and are unable to spend all the bonded amount this year. Motion: Delete decision packet. OF EI)Af Jac. 1490 m 0 a 0 L _ 0 �L CU Packet Pg. 97 2022 Budget Amendments #38 — New Police perimeter fence — The cost of providing a fence or other means of securing the police area should be vetted through a committee to determine if less expensive alternatives. Motion: Delete decision packet. #40 — 2022 Commute Trip Reduction — During the pandemic, this seems to be an unneeded expense since many employees are working from home. An amendment can always come through after proper vetting of the PPPW committee. No data supplied for the 2021 program. Motion: Delete decision packet. m 0 a 0 L- a. 0 •L E E a m N N O N U 0 U U- N K d C d E t V a Q Packet Pg. 98 2022 Budget Amendments #41— Purchase Message Board — The civic organizations that want to use them can rent them from a sign company. This is not a city function. Motion: Delete decision packet. #47 — Yost and Seaview Assessment and Rehabilitation — this entire project has yet to be brought forth to Council and an amendment can occur in 2022. The numbers don't match the description and Seaview reservoir is not included. This needs to be sorted out in the Council Committee. Motion: Delete decision packet; bring to Council Committee. m O a O L- a. O •L E E m N N N U 3 O U N t x d C d E t V a Q Packet Pg. 99 2022 Budget Amendments #48 — 3-year Rate Study Consultant —The CIP/CFP should be scrubbed before we allow any review by a consulting firm since number inconsistencies have been noted. This can be handled through amendment process once CIP/CFP is reviewed. Motion: Delete Decision Packet. #51— Overtime — Potential estimates for pilot projects is not a sufficient reason to add overtime. Increasing the overtime appropriation should be addressed with Council Committee to look at consistency in overtime over the years. Motion: Delete decision packet; bring through Council Committee. m 0 a 0 L a. _ 0 �L a. E a m N N O N U 0 U L d U_ m c m E U 0 r r Q Packet Pg. 100 2022 Budget Amendment #55 — Edmonds Marsh Water Quality Improvements — no justification for water mitigation or the phases of this stormwater project. Suggest that the stormwater aspect be clarified in the CIP/CFP process. Council review to determine costs and plans for all project as these funds potentially impact utility rates. Motion: Delete decision packet. #60 — Perrinville Creek Projects — No information provided from the Administration (promised in 2020) when the Creek was damaged by high water flow and City blocked portions of the creek to force flow into two vaults. Motion: Delete decision packet and bring forth budget amendment when plan is established. Packet Pg. 101 2022 Budget Amendment #61 - Green Streets and Rain Gardens — City planning documents do not define or support the green streets. Rain garden grants available through Snohomish County and more information needed to determine how the bio-retention and rain gardens are to be built to reduce flooding? Motion: Delete decision packet. 70 — New vehicles — There are already a number of vehicles in the police and public works departments. These vehicles purchases can wait a year when Council has a better understanding of all cars needed from the B-Fund and supply shortages decrease. Motion: Delete decision packet. m 0 a 0 L- a. 0 •L Packet Pg. 102 2022 Budget Amendment #71- Vehicle charging network — Further review of this to entail creating a charging network system and data on current use of our charging stations. Motion: Delete decision packet. #72 - Strategic Planning for optimizing the solar panel upgrade on Frances Anderson Building. There is not sufficient information in place to understand this request. Should be vetted more fully by Council Committee to determine cost or impact of aged infrastructure. Motion: Delete decision packet. Packet Pg. 103 2022 Budget Amendments to ncrease Appropriations • Motion to add Municipal Court restructure to reflect impact on 2022 budget numbers currently represented only as attachments to the budget via DP 230-22001,02, and 03) • Motion to reflect the expense of the new satellite City Hall office on HWY 99 in the 2022 budget numbers. • Motion to add $100K for the Creative District's Fourth Avenue Corridor project design. �e Fug 44 ��c t R90 m 0 a 0 L r- 0 E a m N N N U 0 U r R U- N a+ t K C d t V R a+ a+ Q Packet Pg. 104 2022 Budget Amendments to Increase Appropriations • Motion to add $60K for study of a Police Station relocation and/or City Hall relocation. • Motion to add $150K for Streetlights in the Lake Ballinger Area (CIP/CFP impact) • Motion to add the South County Fire adjustment to the budget. M m 0 a 0 L- a. 0 �L E E a m N N O N U C 0 U U- N a+ t X V a Q Packet Pg. 105 7.1.c MEMORANDUM FOR INCLUSION IN COUNCIL PACKET Date: January 12, 2022 To: Edmonds City Council Cc: Mayor Mike Nelson Dave Turley, Administrative Services Director From: Jeff Taraday, City Attorney Re: Applicable law regarding possible budget amendments Having been made generally aware of a desire by at least some councilmembers to remove previously approved items from the 2022 budget, it seems appropriate to advise the city council regarding applicable law and, in particular, the vote margin that might be required to accomplish that objective. The final paragraph of RCW 35A•33.12o reads as follows: The city council, upon a finding that it is to the best interests of the code city to decrease, revoke or recall all or any portion of the total appropriations provided for any one fund, may, by ordinance, approved by the vote of one more than the majority of all members thereof, stating the facts and findings for doing so, decrease, revoke or recall all or any portion of an unexpended fund balance, and by said ordinance, or a subsequent ordinance adopted by a like majority, the moneys thus released may be reappropriated for another purpose or purposes, without limitation to department, division or fund, unless the use of such moneys is otherwise restricted by law, charter, or ordinance. RCW 35A•33.120 (emphasis added). In other words, any ordinance that the council would be considering to adopt budget amendments would need five votes to pass if the ordinance had the effect of decreasing the appropriations for a given fund. Keep in mind, however, that it is only the ordinance that requires such a vote margin. Any preliminary motions M600 Stewart Street, Suite 400, Seattle, WA 98101 P 206.273.7440 F 206.273.7401 www.lighthouselawgroup.com Packet Pg. 106 7.1.c made as part of the perfecting or finalizing of the ordinance would only need a majority for passage. But, as a practical matter, if an ordinance ultimately contains several amendments that each only garnered four votes during the perfection process, that ordinance might have a difficult time obtaining the five votes necessary for passage. If the final ordinance contains, for example, eight different budget amendments, but only one of those eight actually decreases an appropriation, the ordinance would still need five votes to pass, because there can be only one vote on the final ordinance and the ordinance would decrease appropriations. Accordingly, the council may wish to direct that two ordinances be prepared: one ordinance that contains amendments that decrease appropriation levels and another ordinance that contains other budget amendments that do not decrease appropriation levels. An example of a budget amendment that does not decrease appropriation levels would be the removal of an authorized FTE position without removing the appropriation or funding that had been associated with that FTE position. If two such ordinances are prepared, only the ordinance that decreases appropriation levels would require five votes to pass. Please feel free to contact us with questions. N600 Stewart Street, Suite 400, Seattle, WA 98101 I P 206.273.7440 I F 206.273.7401 I www.lighthouselawgroup.com Packet Pg. 107 7.1.d RESOLUTION NO. 1433 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, ADOPTING THE FUND BALANCE / RESERVE POLICY AS ATTACHED HERTO. WHEREAS, the City Council heard a detailed introduction to the City's Fund Balance / Reserve Policy at the May 7, 2019 council meeting; and WHEREAS, the May 7, 2019 introduction focused on amending the Fund Balance / Reserve Policy to incorporate the Governmental Accounting Standards Board Pronouncement No. 54 Fund Balance Reporting and Governmental Fund Type Definitions, and WHEREAS, the May 7, 2019 introduction focused on amending the Fund Balance / Reserve Policy for the City Contingency Reserve Fund to incorporate Washington State Revised Code of Washington Chapter 35A.33.145, setting statutory limitations at $0.375 per $1,000 of assessed property valuation; and WHEREAS, the May 7, 2019 introduction focused on amending the Fund Balance / Reserve Policy target levels for the City; now therefore, THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. ADOPT THE CITY OF EDMONDS FUND BALANCE / RESERVE POLICY. The city council hereby adopts the following attached document: 1. City of Edmonds Fund Balance / Reserve Policy to read as set forth in Attachment A hereto, which is attached hereto and incorporated herein by this reference as if set forth in full. RESOLVED this 2nd day of July, 2019. CITY OF EDMONDS t MA OR, DA E EARLIN ATTEST: C CLERK, SCOT'1' SEY Packet Pg. 108 7.1.d FILED WITH THE CITY CLERK: June 28, 2019 PASSED BY THE CITY COUNCIL: July 2, 2019 RESOLUTION NO. 1433 Packet Pg. 109 7.1.d City of Edmonds i` 90 Fund Balance Reserve Policy July 2019 Packet Pg. 110 7.1.d Table of Contents DRAFT........................................................................................................ Error! Bookmark not defined. ARTICLEI INTRODUCTION..................................................................................................................... 5 ARTICLE II CRITERIA FOR ESTABLISHING APPROPRIATE FUND BALANCE RESERVE LEVELS......................................................................................................................................................... 6 Section1. Volatility ................................ ............................................... ....................... I............................ 6 Section2. Operating Fund Size.................................................................................................................6 Section 3. Purpose of Fund Balance Reserves...........................................................................................6 Section4. Bond Ratings.............................................................................................................................6 ARTICLE III COMMITTED GENERAL FUND BALANCE RESERVES POLICY.................................6 Section 1. Establishment and Purpose of Operating General Fund Operating Reserve ............................ b ARTICLE IV CONTINGENT RESERVE FUND BALANCE POLICY.....................................................7 ARTICLE V ANNUAL FUND BALANCE TYPES - STATUS REPORT ................................................. 9 ARTICLE VI FIVE-YEAR RESERVE RATE REVIEW............................................................................. 9 ARTICLE VII DEVIATIONS FROM POLICY........................................................................................... 9 ARTICLEVIII DEFINITIONS.....................................................................................................................9 ARTICLEIX EFFECTIVE DATE..............................................................................................................12 Page 4 Packet Pg. 111 7.1.d ARTICLE I INTRODUCTION The overall objective of Fund Balance/Reserve Management Policy is to define that portion of fund balance that is unavailable to support the current budget. In many ways, fund balance represents working capital, which can either be used as a liquidity reserve or for spending in future years. A comprehensive fund balance/reserve management policy provides guidelines for the major funds of the City of Edmonds and provides a structured approach in setting reserve levels in specifically designated funds. This Fund Balance/Reserve Management Policy is intended to guide prudent use of resources to provide for the much needed services to taxpayers and to maintain sound management policies. It is essential that governments maintain adequate levels of fund balance reserves to mitigate risks and provide a back-up for revenue shortfalls. Policy It is the policy of the City of Edmonds to provide for the continuity of City government by planning ahead for economic uncertainties and unforeseen or unplanned major expenditures. In order to achieve reserve goals the City must exercise prudent debt and liability management policies and follow sound fiscal management policies that prioritize the City's core services. This policy establishes reserve fund balance accounts that will provide funding for emergencies, economic uncertainties and for unanticipated operating expenses or revenue shortfalls. In addition, this policy incorporates provisions of Governmental Accounting Standards Board Statement (GASB) no. 54, Fund Balance Reporting and Governmental Fund Type Definitions. Objectives The purpose of this Fund Balance/Reserve Management Policy is to assist the City in the pursuit of the following equally important objectives: 1. Build adequate reserves which will provide the City the resources necessary for financial stabilization, particularly during times of unforeseen emergencies and economic downturns; 2. Establish sound fiscal reserve policies that will serve as the foundation for ensuring that strong fiscal management policies guide future City decisions; 3. Provide prudent guidelines regarding the establishment, use and replenishment of City committed or assigned fund balances/reserves; 4. Establish a process for periodic reporting and review of the City's various fund balances (reserves); and 5. Enhance the City's credit ratings received from rating institutions through the establishment of clearly delineated Fund/Reserve policies that promote strong fiscal management; 6. Establish reserve policies that are in full compliance with GASB 54 financial reporting requirements. Page 5 Packet Pg. 112 7.1.d ARTICLE II CRITERIA FOR ESTABLISHING APPROPRIATE FUND BALANCE RESERVE LEVELS There are key elements that must be reviewed and analyzed to determine the appropriate size of a given fund balance reserve. Failure to follow the guidelines established in this policy can result in developing unattainable fund reserve goals or unsustainable fund balance reserve levels. The following criteria shall be used in determining the appropriate fund balance reserve levels: Section 1. Volatility The predictability and/or the volatility of its revenues or its expenditures (i.e., higher levels of fund balance reserves may be needed if significant revenue sources are subject to unpredictable fluctuations or if operating expenditures are highly volatile). Section 2. Operating Fund Size The overall size of the fund's budgetary events should be taken into consideration in setting the required fund balance reserve level and type for a particular fund. Section 3. Purpose of F and Balance Reserves Another consideration for determining the size of each reserve will be the purpose of the reserve: Is there significant or perceived exposure to one-time outlays (e.g., disasters, immediate capital needs, state budget cuts, or are there potential drains upon fund resources from other funds, or conversely, are there potential reductions in funding transfers from other funds)? Section 4. Bond Ratings The potential impact on the entity's bond ratings and the corresponding increased cost of borrowed funds. ARTICLE III COMMITTED GENERAL FUND BALANCE RESERVES POLICY This Policy shall establish a committed fund balance reserve within the General Fund, define funding levels and call the reserve the General Fund Operating Reserve. The purpose of the reserve is for meeting economic uncertainties, and unanticipated expenses or revenue shortfalls. This Policy requires the City to establish and maintain a General Fund Operating Reserve, within the General Fund, in an amount equal to or greater than 16% of the General Fund's Adopted Annual O e� rating Expenditure Budget. If it is determined that the reserve balances are not adequate, the Finance Director shall propose an amendment to these policies. A detailed accounting of this reserve account will be maintained by the Finance Department to show deposits, withdrawals (when authorized pursuant to policies contained herein) and interest earned. All accounting for these accounts shall be recorded in the City's ERP system. A detailed report, prepared by the Finance Department, shall be presented annually to the Council. Section 1. Establishment and Purpose of Operatin_g General Fund Operating Reserve A separate balance sheet account shall be setup by the Finance Director for the General Fund Operating Reserve, to be used in instances of fiscal emergencies that include: economic uncertainties, unforeseen emergencies and unanticipated operating expenses or revenue shortfalls. Page 6 Packet Pg. 113 7.1.d The Mayor has the power to declare a fiscal emergency based upon one of the following: 1) A natural catastrophe; 2) An immediate threat to health and public safety; or 3) A significant decline in General Fund revenues. The fiscal emergency declared by the Mayor must be approved by a simple majority of the City Council. Limitations of Fund Use Any use of the committed General Fund Operating Reserves shall be used only in cases of fiscal emergency and shall not be used to augment ongoing budgetary/operating spending increases. The committed General Fund Operating Reserve may also be used for one-time non -reoccurring expenditures and/or capital projects (operations and maintenance shall not be included), all as submitted by the Mayor and approved by the Council. The amount of funds to be withdrawn from this committed fund balance reserve shall be determined by the Mayor. In his/her presentation to the Council, the Mayor or his/her designee shall include a detailed list of how the funds will be applied. A simple majority vote of the Council shall be required to approve the amount and use of funds. Transition Policy Council adoption of this policy will trigger moving an amount not less than 16% of the General Fund's unrestricted fund balance to the General Fund Operating Reserve. General Fund Operating Reserve Replenishment If any use of the committed General Fund Operating Reserve has occurred, the Finance Director must present to Mayor and City Council an annual Replenishment Report during the month of November. The Replenishment Report must be presented each year, until the Reserves are fully replenished. The Replenishment Report must include the following information: 1) Amount of Reserves used 2) Whether it is anticipated additional Reserves will be needed in the following budget cycle, or 3) If no additional Reserves are needed, then the Replenishment Report must include a plan for replenishing the Reserve to policy mandated levels. The committed General Fund Reserve shall be restored pursuant to the guidelines delineated below: 1) If a reserve is drawn down by 0-10% of reserve fund balance, then a solution to replenish to at least the minimum shall be structured over a 1 to 3 year period. 2) If a reserve is drawn down by 11-25% of reserve fund balance, then the budgetary plan to restore the reserve shall be structured over a 3 to 5 year period. 3) If the reserve is drawn down by 26-50% of reserve fund balance, then a budgetary plan shall be implemented to return the reserve level to between 75% and 100% of the minimum balance over a 5 to 7 year period. ARTICLE IV CONTINGENT RESERVE FUND BALANCE POLICY This Policy shall establish a fund and define funding levels for a committed Fund Balance Reserve to Page 7 Packet Pg. 114 7.1.d be called the Contingent Reserve Fund. The primary purpose of the reserve is for meeting emergencies of the City and, secondarily, if the General Fund Operating Reserve have been exhausted, the Contingent Reserve Fund can be use in times of economic uncertainties, and for unanticipated expenses or revenue shortfalls. The target balance of the Reserve shall 1) not exceed the limitations set forth by RCW 35A.33.145, which sets the statutory maximum at $0.375 per $1,000 of assessed valuation and 2) when combined with the General Fund Operating Reserve, the two fund balance reserves shall not exceed 20% of the General Fund's Adopted Annual Operatin Expenditure Budget. In other words, if the General Fund Operating Reserve balance equals 16% of operating budget, then the Contingent Reserve Fund balance cannot exceed 4% of the operating budget. It further requires a simple majority vote of Council with a statement declaring the reason for their use. A detailed accounting of the Fund shall be maintained by the Finance Department to show deposits, withdrawals (when authorized pursuant to policies contained herein) and be presented annually to the Council. The Mayor has the power to declare a fiscal emergency based upon one of the following: 1) A natural catastrophe; 2) An immediate threat to health and public safety; or 3) A significant economic decline in General Fund revenues. The fiscal emergency declared by the Mayor must be approved by a simple majority of the City Council. Limitations of Fund Use Any use of the committed Contingent Reserves shall be used in cases of fiscal emergency, shall not be used to augment ongoing budgetary/operating spending increases and should be used only after the General Fund Operating Reserves have been exhausted or when City Council approves specific used of the committed Contingent Reserve for one-time non -reoccurring expenditures and/or capital projects (operations and maintenance shall not be included). The amount of funds to be withdrawn from this committed fund balance reserve shall be determined by the Mayor. In his/her presentation to the Council, the Mayor or his/her designee shall include a detailed list of how the funds will be applied. A simple majority vote of the Council shall be required to approve the amount and use of funds. Contingent Reserve Replenishment If any use of the committed Contingent Reserve has occurred, the Finance Director must present to Mayor and City Council an annual Replenishment Report during the month of November. The Replenishment Report must be presented each year, until the Reserves are fully replenished. The Replenishment Report must include the following information: 1) Amount of Reserves used 2) Whether it is anticipated additional Reserves will be needed in the following budget cycle, or 3) If no additional Reserves are needed, then the Replenishment Report must include a plan for replenishing the Reserve to policy mandated levels. The committed Contingent Reserve shall be restored pursuant to the guidelines delineated below: 1) If a reserve is drawn down by 0-10% of reserve fund balance, then a solution to replenish to at least the minimum shall be structured over a 1 to 3 year period. Page 8 Packet Pg. 115 7.1.d 2) If a reserve is drawn down by 11-25% of reserve fund balance, then the budgetary plan to restore the reserve shall be structured over a 3 to 5 year period. 3) If the reserve is drawn down by 26-50% of reserve fund balance, then a budgetary plan shall be implemented to return the reserve level to between 75% and 100% of the minimum balance over a 5 to 7 year period. ARTICLE V ANNUAL FUND BALANCE TYPES - STATUS REPORT Once a year, in August, the City Finance Director shall present to the Council Finance Committee a comprehensive report on the City's fund balance reserve types as of June 30th. The report shall include an updated fund balance reserve level for each fund balance type. This report shall include the following funds: 1. General Fund Operating Reserve balance; 2. Contingency Reserve Fund balance. ARTICLE VI FIVE-YEAR RESERVE RATE REVIEW Every five years, during the annual budget hearings, the Mayor, based upon a comprehensive financial and economic review of all City fund balance types and in consultation with the City Finance Director, and Department Directors as necessary, shall make recommendations to the City Council for either maintaining existing fund balance reserve polices or revising fund balance reserve policies including percentage ranges established by category herein and replenishment requirements by categories established herein. ARTICLE VII DEVIATIONS FROM POLICY No deviations from the fund balance reserve polices set forth in this Policy will be allowed except as approved by a simple majority of vote by the Council. This includes any increase or decrease in the base fund balance reserve levels established by this policy and expenditures from fund balance reserve accounts for anything other than the intended budgeted use of said fund balance. ARTICLE VIII DEFINITIONS Budget - A plan of financial operation containing an estimate of proposed expenditures for a given period (usually a fiscal year) and a proposed forecast of revenues (receipts) to cover them. A budget is also a plan that outlines an organization's financial and operational goals and strategies in monetary terms. Capital Expenditures are expenditures incurred when monies are spent either to buy fixed assets or to add to the value of an existing fixed asset with a useful life that extends beyond the fiscal year. In accounting, a capital expenditure is added to an asset account ("capitalized"), thus increasing the asset's basis (the cost or value of an asset). The general rule (even for municipalities) is that if the property acquired has a useful life longer than the fiscal year, the cost must be capitalized. The capital expenditure costs are then amortized or depreciated over the life of the asset in question. Page 9 Packet Pg. 116 7.1.d Comprehensive Annual Financial Report (CAFR) - A CAFR is a set of financial statements for a state, municipality or other governmental entity that comply with the accounting requirements established by the Governmental Accounting Standards Board (GASB). It must be audited by an independent auditor using generally accepted government auditing standards. The CAFR consists of three sections: Introductory, Financial and Statistical. The Introductory section orients and guides the reader through the report. The Financial section presents the entity's basic financial statements as well as notes to the statements and the independent auditors' report. The Statistical section provides additional financial and statistical data, including data about financial trends that may better inform the reader about the government's activities. Council - Means the legislative body (the city council) that governs the City of Edmonds. Expenditure - The actual payment of cash or cash equivalent for goods delivered or services rendered, or a charge against available funds in settlement of an obligation as evidenced by an invoice, voucher or other such document during the fiscal year. For governmental reporting purposes, expenditures include expenses or a provision for debt retirement not reported as a liability of the fund from which retired. Fiscal Year - A 12 month period to which the annual operating budget applies and the end of which a governmental unit determines its financial position and the results of its operations. The City has specified January I through December 31 as its fiscal year. Fund - A fund is a self -balancing set of accounts recording cash and other financial resources, together with all related liabilities and "residual" equity or balances, and changes therein, which are segregated for the purpose of carrying on specific activities or attaining certain planned objectives in accordance with special regulations, restrictions or limitations. Fund Balances - The overall objective of fund balance reporting is to isolate that portion of a fund balance that is unavailable to support the following period's budget (see GASB 54 definition below). In general, an unassigned fund balance shall be defined as those amounts that are not restricted, committed, or assigned, of a particular fund at the end of the fiscal year. GASB 54 - Fund Balance Reporting and Governmental Fund Type Definitions - The City of Edmonds's CAFR Financial Statements are required to comply with GASB 54 beginning with its Fiscal Year End 2011 CAFR going forward. GASB 54 changes and identifies fund balance classifications that can be more consistently applied by clarifying existing governmental fund type definitions. Fund balance is basically the difference between the assets and liabilities reported in a fund. GASB statement No. 54 provides the following five categories for classifying fund balance and related definitions to be used for describing the components of fund balance: 1. Nons endahle Fund Balance Amounts that are not in a spendable form or are required to be maintained intact. Due to the nature or form of the resources, they generally cannot be expected to be converted into cash or a spendable form (e.g. Inventories and prepaid amounts). This also Page 10 Packet Pg. 117 7.1.d includes long-term loan and notes receivable and property held for resale. Applies as well to amounts that must be retained intact legally or contractually. 2. Restricted Fund Balance — Amounts that can be spent only for the specific purposes stipulated. Constraints are placed on the use of resources by external parties (e.g. by creditors, grant providers, contributors) or by laws or regulations (e.g. constitution or legally enforceable language). Restrictions may be changed or lifted only with the consent of the resource provider. 3. Committed Fund Balance.— Amounts can only be used for the specific purposes determined by a formal action of City Council. Constraints on fund balance use are imposed by internal formal action of the government's highest level of decision -making authority (e.g. City Council) and can only be removed or changed by taking the same type of action it employed to commit those amounts through legislation, resolution, or ordinance (e.g. funds committed to satisfy contractual obligations). Action to constrain resources must occur prior to year-end; however the amount can be determined in the subsequent period. 4. Assigned Fund Balance — Assigned fund balances include amounts that are limited by the Council, Mayor, or his/her designee, for its intended use, but little or no formal action is required to modify or eliminate those limitations. Assigned fund balances comprises amounts intended to be used for a specific purpose. Amounts reported as assigned should not result in a deficit in unassigned fund balance. Also relates to all governmental funds other than the General Fund, with any remaining positive amounts not classified as nonspendable, restricted or committed. 5. Unassigned Fund Balance — Comprises the residual classification for the General Fund and includes all amounts not contained in the other classifications. Unassigned amounts are available for any purpose. This represents the residual amount of the fund balance that has not been restricted, committed, or assigned. General Fund - In public sector accounting, the General Fund is the primary operating fund for all revenues of the City that are not otherwise restricted as to their use, including monies from local property and sales tax, and other revenue sources that are not assigned for a specific purpose. The General Fund provides the resources necessary to pay/sustain the day-to-day activities for City services such as administration, community services, parks and recreation, police, fire, public works, elected officials, Mayor, and City Council. When governments or administrators talk about "balancing the budget" they typically mean balancing the budget for their general fund. Government Accounting Standards Board (GASB) - GASB is the private, nonpartisan, nonprofit organization that works to create and improve the rules U.S. state and local governments follow when accounting for their finances and reporting them to the public. While the GASB does not have the power to enforce compliance with the standards it promulgates, the authority for its standards is recognized under the Rules of Conduct of the AICPA. Also, legislation in many states requires compliance with GASB standards, and governments usually are expected to prepare financial statements in accordance with those standards when they issue bonds or notes or otherwise borrow from public credit markets. The GASB was established in 1984 and is funded by publication sales, contributions from state and local governments, and voluntary assessment fees from municipal bond issues. Operating Budget — A detailed projection of all estimated income and expenses based on forecasted revenue during a given period (usually one year). Since an operating budget is a short-term budget, capital outlays are excluded because they are long-term costs. One-time revenues, such as grants, settlements, Page 11 Packet Pg. 118 7.1.d sales of assets and transfers are excluded because often they are non -recurring sources of revenues and cannot be counted on coming in from one budget cycle to the next. Revenue - The income of a government from all sources appropriated for the payment of the public expenses. It includes such items as tax payments, fees from specific services, receipts from other governments, fines, forfeitures, grants, shared revenues and interest income. Structural Budget Deficit or "Gap" - A budget deficit (Gap) that results from a fundamental imbalance whereby current year governmental expenditures exceed current year revenues without any consideration of carryover or prior year unspent revenue balances if they exist. A structural deficit remains across the operating fiscal cycle because the general level of government spending is too high for the prevailing revenue structure (e.g., taxes, fees and other sources). A fiscal Gap, is a structural budget deficit over an extended period of time and not only includes the structural deficit at a given point in time but also the difference between promised future government commitments, such as health and retirement spending, and future planned or anticipated tax and other revenues. Another description is that the current revenue structure is insufficient to maintain services at the current level. ARTICLE IX EFFECTIVE DATE This policy shall take effect upon its final adoption by the City Council. Page 12 Packet Pg. 119 8.1 City Council Agenda Item Meeting Date: 02/1/2022 2022 Parks, Recreation & Open Space (PROS) Plan Staff Lead: Angie Feser Department: Parks, Recreation & Cultural Services Preparer: Angie Feser Background/History The City of Edmonds has been working to update its Parks, Recreation, and Open Space (PROS) Plan. The PROS Plan is a six -year plan that anticipates the programming and capital infrastructure investments necessary to meet the community's need for parks, recreation, open space, trails, and arts and culture. The Plan serves as a blueprint for the management, enhancement and growth of the City of Edmonds parks and recreation system. It assists in guiding decisions related to planning, developing and maintaining parks, open space and recreational facilities. This Plan also identifies priorities for recreation programs, special events and arts and culture activities. The draft Plan is Attachment #2 and contains some minor revisions since the initial Plan debut on January 7th, including map updates (Map #5 and #6). The PROS Plan process included a substantial community engagement program, with the intent to hear from a broad range of community voices and to focus on diversity and inclusion through engagement in Chinese, Korean and Spanish. Thus far, the formulation of the PROS plan has included the following community engagement opportunities: 1. Community Survey, which received 1,958 responses (available in Chinese, English, Korean and Spanish) 2. Two Virtual Public Meetings - with simultaneous translation in Chinese, Korean and Spanish 3. Stakeholder group discussions & one-on-one interviews 4. Tabling and outreach at community events 5. Presentations at three Planning Board meetings 6. Ongoing social media and email feedback A general overview of PROS Plan findings were presented at the January 12, 2022 Planning Board meeting, as well as the January 26 Planning Board meeting (conducted as a public hearing). The Planning Board is currently reviewing community feedback and developing their recommendation for Council's consideration of approval. The Parks Capital Program, used for planning purposes, is included in the PROS Plan and found on page 117. This 6-year proposed project list with associated cost estimates, is schedule to presented to the Council's Parks & Public Works Committee on February 8, 2022. The PROS Plan is scheduled for a Council Public Hearing on February 15, 2022 and City Council approval tentative on February 22, 2022. Staff Recommendation Packet Pg. 120 8.1 No recommendation for action during this meeting. This work session is to provide an overview of the PROS Plan process and draft document findings and key recommendations. City staff is requesting initial Council feedback on the proposed Plan to incorporate any revisions for the final version to be approved by Council later in the month. Narrative The 2022 Parks, Recreation & Open Space Plan contains a community profile, a parks and recreation facilities inventory, a needs assessment, a capital projects plan, and considerations for financing and implementation. An updated PROS Plan will allow Edmonds to retain eligibility for state grants through the Washington State Recreation and Conservation Office (RCO), which administers various grant programs for outdoor recreation and conservation efforts. The key recommendations from the 2022 PROS Plan include - 1. Acquisition to Fill Park System Gaps - Secure additional parkland in south and southeast Edmonds 2. Open Space & Conservation Acquisitions - Pursue acquisitions that adjoin city properties or conserve unique natural areas (e.g., wetlands, forests, stream corridors) 3. Park Development & Enhancements Complete renovation of Civic Center Playfield; playground replacements at Maplewood Hill Park, Sierra Park and Yost Memorial Park; and add amenities to Mathay Ballinger Park, Elm Street Park & Pine Street Park 4. Yost Pool Replacement - Refine options for the replacement of Yost Pool 5. Trail Connections - Acquire easements and rights -of -way for trail connections; and coordinate with the Comprehensive Transportation Plan regarding bicycle and pedestrian system improvements 6. ADA & Other Accessibility Enhancements - Remove barriers and improve universal access to and within parks, natural areas and trails 7. User Convenience Improvements Upgrade or replace restrooms and improve signage and wayfinding 8. Municipal Code Update - Review and update City's code in relation to parks and facility usage Attachments: PROS Plan CC Intro PresentationOpt PROS V5 2022-01-270pt Packet Pg. 121 , � •...- -tea .g _ems 41 j Edmonds City Council: 2022 PROS Plan Study Session February 1, 2022 n PROS Plan Overview Scdgq]qj Iruz dug The PROS Plan is a 6-year guide for managing and enhancing parks, open space, trails, and recreation opportunities for the Edmonds community. Plan adoption required to retain eligibility for state & federal grants Edmonds 2022 PROS Plan m cc a U) CL O 06 O cc L Nd Y L a N N O N Packet Pg. 124 8.1.a 4 PROS Plan Overview Steps to Building the Plan: • Inventory Site Assessments • Community Engagement • System -wide Needs Assessment • Goals & Policies Review • Capital Project Planning • Implementation & Funding Strategies • Plan Review & Approval Edmonds 2022 PROS Plan 0 U M a 0 06 0 M L U W Y L M a N N O N Packet Pg. 125 8.1.a 5 Project Timeline Apr May Jun Jul Aug Sep Inventory Assessment Site Assessment Review Conditions Assessment Review Supporting Data Edmonds 2022 PROS Plan Demographics, Mapping, Trends Analysis System Needs Assessment Goals & Policies Review Gap Analysis & Levels of Service Synthesize Community Needs Initiate Plan Development Priorities & Strategies Capital Facilities Plan Implementation Ideas Draft PROS Plan SEPA Checklist Board review Council review 0 U M a Cn 0 06 r- O N a Packet Pg. 126 8.1.a Edmonds Parks, Recreation & open Space (PROS) Plan Community Outreach EDMONDS... KCREAtloN S CULTUpAL sest<'Icfa ar rnrr Y i Language of Choice aa. Please submit questions or comments in the CZ&A Feature located to the center of your menu at the bottom of the screen. Project team members will respond durl ng the live question and Answer session following the presenlatian- -0"M 619F21 P14r*%a1 !i�l- Q&A [ZJ21$-[#r al e11 1'014 21V4-1pT-4-R. a-v--,1_=._ erltO1 LHIJA E4 ir!t91oTIE -)t AXIL� 4-1*rd 11LN F}t=u 1Itl q. tan lnM 3T i'j Pr 9, ±2l rv. Envle sus preguntas o cornentarlos utillrando la funcldn de o,SA (preguntas y respuestas] ublcada an el Centro de sU me tit an la pane Inferior de su pant@Ila- Los mlembro5 del egvipo de proyecto responderan durante la sesidn de preguntas y respuestas an viw despues de la presentacldn. If you would like to listen to the webiriar in Korean, Mandarin or Spanish, please click on the Inter preta[iorh Sutton at the bottom of your screen and select the langvage you want to hear. -6•z-W Mom '—• jt111x '�11+4 2 Yl o xlFll_ IT—r �}�k� Interpretation kQT19Vilk artl M— *AA--A�+r,w%ff1.19wim`-MR01 �. iA*rllf9f'a&1-AIIifi�R L'T �" #91�•Nrf )M-6(1I' -XiA i ` Chi nese") Si desea escuchar la; .Se cion en eoreang, mandarin o espanol, haga el lc en el botdn de i nterpretacicn en la parts inferior de Is pants Ila y seleccione el idioma Rue desea escuchar. We want to hear from you! The Chy of Edmonds envisions a parks and recreation system that serves the needs Of our growing arld r h"Ing population. The Z024 plan will reflecr the changing needs of 2022 City of Edmonds PROS Plan our co unity sawi es. p1 ae a pain o gnat' due servkxs. Please snare your The Crty of Edmonds 0flers parks and community spaces for all Edmonds experience and thoughts 0y raking a residents 10 carte togenter, gray active, and have fun We are updair rg pulpit survey: the Edmund's Parks Recreation and Open Space [PROS] pan and need your help to keep our parts and programs thriving and meet the needs d our gmwng and diverse communaies 19 IT What Is the Edmonds PROS Plan? Tile PROS plan is six -year guide for manaorsg and enhancing parks. open space. vai Is, recreation, and cuhwral ails opportnioes. ereryona in the community plays an rrrgtortant role in the panning process W Sharing their vision for the parks and recreation system and Idenblytng priorities for Itaure programs, events, prential new parks, arE for taking carp 0t our exhsung parks- Having a PROS Plan means that the City is eli98le for stale funding. A draft el the 2W2 PROS Plan will be complete and available m Ina public for review In November 2021. E ngllalt �r l>it.lyfEdmonasaRos-en Korean Der 6it.lyfEdmondsPROS-KO 101 { 5panlah `❑ bil.lya:dmpndsPR95•sp Learn more about the plan, including upcoming events ® cdmondswa.g ovlgovemmunNdepartmrnislparks recreation cultural serviecsfplanning PraleCts 0 edm0adsparks(7lemnondswn.gov I PROSPIan�t•edmandswa.gov ®Q 0;Edm0ndsRec20ne Packet Pg. 127 8.1.a Community Feedback Community Survey • Total Responses: 1,958 Virtual Public Meetings • — 60 Attendees participated Website / Social Media • Ongoing • Chinese, English, Korean, Spanish Edmonds 2022 PROS Plan a� U fC Q CL 0 06 C O L c,> N� -600 engaged respondents a. N N O N T C C O N feel parks & recreation o is essential or important U) L a •4( S ° U visit Edmonds parks at least a a couple times per month o a c a� E t Q Packet Pg. 128 8.1.a 8 Community Feedback Priority improvements to park system • Connect gaps in the trail system & expand trail connections • Improve or upgrade existing parks and amenities • Buy more conservation & open space lands • Renovate or replace the pool • Community events, such as outdoor movies and summer concerts 41111111P, Edmonds 2022 PROS Plan 0 U M a 0 06 r- 0 M L U L a N N 0 N 0 N CL 0 r- Packet Pg. 129 9 PROS Plan Structure Contents: • Introduction & Community Profile • Community Engagement • Goals & Objectives • Inventory & Classifications • Parks & Open Space • Recreation Programs & Facilities • Trails & Connections • Capital Projects & Implementation • Appendices Edmonds 2022 PROS Plan ij 0 U M a CL 0 06 0 M L U w L a N N O N Packet Pg. 130 8.1.a 10 MOM 2022 PROS Plan CHAPTERI PARKS & RECREATION PLANNING FORWARD PLAN PURPOSE The City of Edmonds Parks, Recreation &.Open Space Plan (PROS Plan)- is an update to the 2016 Parks, Recreation & Open Space Plan that builds on the previously completed planning work and incorporates the feedback from an extensive community engagement process conducted in 2021.This.Plan creates a,vision for an innovative, inclusive and interconnected system ofparks, trails and open space that promotes recreation, health, environmental conservation and fiscal responsibility as integral elements of a-thriving,livable Edmonds. The PROS Plan serves as a blueprint for the management, enhancement and growth of the City of Edmonds parks and recreation system,1 t assists in guiding decisions related to planning, developing and maintaining parks, open space and recreational facilities.This Plan also identifies priorities for recreation programs, special events and arts and culture activities. The2022 PROS Plan provides updated system inventories, Providing Edmonds citizens with a balanced system of open land, parks, recreation and cultural arts to ensure a healthy and active quality of life. co mmunityprofile, needs analyses and a comprehensive capital project list. The Plan identifies parks and recreation goals and establishes a long-range plan for the Edmonds parks and recreation system, including action items and strategies for implementation over the next six to ten years.The recommendations in this Plan are based on community input, evaluations ofthe existing park system, operating conditions and fiscal considerations. The PROS Plan is part of the City, broader Comprehensive Plan and is consistent with the guidelines established by the Growth Management Art. The PROS Plan, updated approximately every six years, allows Edmonds to remain current with community interests and retain eligibility for state grants through the Washington State Recreation and Conservation Office (RCO), which administers various grant programs for outdoor recreation and conservation efforts. Thls plan has been regularly updated (1996,2001,2008 and 2016) to remain relevant to Edmonds as the city evolves and changes. 01 Packet Pg. 131 8.1.a III COMMUNITY ff QUIDEHIS ALiTWMT im n&w. anArrlAaEwa pwo da'rndanye voAYm deduriu. n.[ymRr•M1' fr ra•r.[frrii.[.'.•ii �Naeq rdPrriin iLriaW If amptrs 5ofasnpssn rcrwiilrp a+r4gyea�r d[. Alulirif nrcFirro rayvr a r.Nps. Ctrs nlsrorae. RPslem [•s eWn rs . in+l iA[uvMil of aliDµx{�p sn�sav raunrcnR urxayur.9�ll Pnwp dp" WAfifi t Packet Pg. 132 8.1.a 12 The goals and objectives described in this chapter define the recreation and park services that Edmonds aims to provide. These goals and objectives were derived from input received throughout the planning process, from city staff, the Parks and Planning Board and community members. The Growth Management Act (GMA) adopted by the Washington State Legislature in 1990 provided a foundation for land use planning in selected cities and counties .throughout the state, including Snohomish County and the City of Edmonds.It identifies 14 planning goals toguide the development 20 GOALS OBJECTIVES of comprehensive plans and development regulations. Four of these goals directly affect the development and implementation of this plan. ■ "Encourage the retention of .open space and development of creational opportunities, conserve fish and w.ldlife habitat,increase coss to natural resource lands and water, and develop parks." RCW 36.70A.020(9) ■ "Protect the environment and enhance the rtate's high quality of life,including air and water quality, and the availability of water."RCW 36.70A.020(10) ■ "Identify and encourage the preservation oflands, sites, and structiues, that have historical or sachaeological significance."RCW 36.70A, 020(13) ■ "Carry -out the goals fthe Shoreline Management Act with regardsto shorelines and critical areas."RCW 36, 70A.020(14) Also, the Edmonds Comprehensive Plan, the previous PROS Plan and other city planning policies provide a framework for this PROS Plan. A goal is a general statement that describes the overarching direction forthe parks and recreation system. Objectives.am.more specific and describe an outcome or a means to achieve the stated goals. Key project recommendations are specific actions intended to implement and achieve the goals and objectives and are contained in the needs assessment and capital planning chapters of the PROS Plan. w ow a F• ENGAGEMENT E001106 2022 PROS Plan Goal 1: Encourage and facilitate meaningful public involvement in park and recreation planning. Objectives: 1.1 Involve residents and stakeholders m park and recreation facility planning, design and recreation prograrrr developm ent tc solicit community input, £.Diktat e project understanding and build public support, 1.2 Advance diversity,equity, inclusion in, and access to the Cit;ssystem ofparks,natural areas and programs through continued outreach and communications. 1.3 Pursue the formation of a City Council appointed Parks and Recreation Board as a forum for public discussion of ongoing park and recreaticnissues and policies. 1.4 Enoouragelocal burin on- profits and communitypartnersinvolvement in providing and supporting adtural,recreational and athletic opportunities for Al ages and abilities. DIVERSITY, EQUITY & INCLUSION Goal2: Decrease barriers and increase opportunities for participation of underrepresented, diverse populations to reflect the demographics of Edmonds. Objectives: 2.1 Address accessibilitybarriers(socic-economiq language,physical,geographic,transportation) to parks and programs and allocate resourcesto address ]mown gaps. 2.2 Explore and pursue opportunities for alternative outreach and education to diverse groups, such as group walks and day hikes with minority communities, paomotienal materials through schools and faith groups, and youth mentorship or ambassador programs 2.3 Identify appropriate locations within parks and public Twesfor the installation of public art, interpretive signs or cultural displays, and collaborate with diverse groupsto ensure incorporation of any art,history, and culture in parks is done from a diversity, equity and inclusion lens, 2.4 Provide ➢EI training opportunities for staff. DRAFT 21 Packet Pg. 133 8.1.a 13 A CHAPTER 6 PARKS & OPEN SPACE The PROS planning process assesses recreationalneeds and priorities for parks and open space in Edmonds. The park assessment included a discussion of specific local needs with consideration given to the Citys broader parks system. Public input and information on park inventory conditions were also heavily relied upon in the planning process. By considering the location, size, and the number of park facilities by type and use, along with community interests and priorities, the PROS Plan evaluates the existing and future demand for park and recreation amenities and provides recommendations for future initiatives. The six year Capital Improvement Program (CIF), which identifies and prioritizes cruciai upgrades, improvements, and expansions, is based on the needs assessment and the recreational interests expressed by the community, NATIONAL TRENDS A variety of resources have been assembled and summarized to offer a comprehensive overview of current trends, market demands and agency comparisons in the provision of parks and recreation.This information provides perspectives that are helpful when balancing with local insights and feedback from the community to identify the demands and establish public needs during the planning process. The following national and state data highlights some of the Edmond$ 2022 PROS Plan qu6rE kesert pew le dom puLlc eny�gened Packet Pg. 134 8.1.a 14 System Analysis Examining System Gaps: • Park Access & Distribution • Physical Accessibility • Diversity of Places & Spaces • Programs, Events & Activities • Serving Today's Residents • Planning for Future Growth Edmonds 2022 PROS Plan Packet Pg. 135 15 System Analysis Approaches to Service Standards • Acreage / Population -based Quantity of places; # of park acres per # of people • Distribution / Proximity -based Coverage; Travel distance between people & parks • Quality / Condition Condition of existing amenities • Available Amenities Variety & range of recreational amenities and opportunities Edmonds 2022 PROS Plan m c� a a O 0 L V NNd LPL N Y a N N O N Packet Pg. 136 8.1.a 16 System Analysis Considerations • Compares today's inventory to current and future population (per capita metrics) • As population grows, demand for facilities increases • Considers development patterns & future opportunities • Goal is for locally -appropriate, reasonably attainable, and fiscally prudent standards - relatable to the capacity to grow the system • Reframe: example —trail connectivity vs. mileage Edmonds 2022 PROS Plan P opu\a�\or Growing Deficit Current Inventory TODAY TOMORROW Packet Pg. 137 8.1.a 17 System Analysis Level of Service Review • Prior plan noted acreage standard as 11.4 acres per 1,000 population • Applying that standard, creates current deficit of over 220 acres • 2022 Plan proposes reframing standards on active -use and open space Community* Neighborhood Open Space 79.2 acres 26.2 acres 75.6 acres Totals 151.0 acres 1.55 acres/1,000 0.61 acres/1,000 1.76 acres/1,000 4.22 acres/1,000 * Includes acreage from Lynndale Skate Park and Meadowdale PIayfieIds, prorated at 50% Edmonds 2022 PROS Plan 2.25 acres/1,000 1 acres/1,000 3.5 acres/1,000 6.75 acres/1,.000. 17.2 acres 16.7 acres 74.4 acres 107.0 acres Packet Pg. 138 8.1.a 18 System Analysis Level of Service Review • Public Satisfaction (based on survey responses) • Site Conditions Assessment (based on physical site assessments) • Distribution / Travelsheds (based on GIS analyses) • Usage / Visitation (based on survey responses) Edmonds 2022 PROS Plan Public Satisfaction Condition of Local City Parks (rated as Excellent or Good) 76.1% LOS Grade B Condition of Trails in Parks (rated as Excellent or Good) 55.0% LOS Grade D Agency -based Assessment Condition Assessment Rating of Existing Parks (3-point scale) 1.29 LOS Grade B Distribution Criteria* Parkland Access (within 1/2-mile travelshed) Percent Service Area with Access to Active -Use City Parks 48.1% LOS Grade D Parkland Access (within 1/2-mile travelshed) Percent Service Area with Access to All Parks & Open Space 69.8% LOS Grade C Trail System Access (within 1/2-mile travelshed) Percent Service Area with Access to Recreational Trails LOS Grade Usage / Visitation Criteria Frequency of Park or Trail Usage Percent Visiting Parks at Least Multiple Times per Month 88.0% � LOS Grade A *Note: The percentage of land area covered by service area walk sheds is a proxy for the population within the residential portion of the City. W U M a 0 06 c 0 M L U a� vi a a N N 0 N Packet Pg. 139 19 Changes from 2016 Plan Intentional & focused diversity -oriented outreach Diversity, Equity & Inclusion goals and objectives explicit and written into Plan Acquisition focus recommended for south and southeast Edmonds Future land acquisition strategy as tool to guide and refine property searches Edmonds 2022 PROS Plan Packet Pg. 140 8.1.a ,° Changes from 2016 Plan Expanding level of service metrics to include distribution, condition & satisfaction Adjustment to acreage -based standards to focus on active -use parks and open space Increasing acreage -based standard for neighborhood & community parks from 2.7 ac/1000 to 3.25 ac/1000 Trail connectivity as policy, rather than mileage -based metric Edmonds 2022 PROS Plan a� U fC Q � C o 06 d9,f�� O Y - ---- o Packet Pg. 141 8.1.a Key Recommendations Acquisitions to Fill Gaps and for Conservation • Secure additional parkland in south and southeast Edmonds • Pursue acquisitions that adjoin city properties or conserve unique natural areas (e.g., wetlands, forests, stream corridors) Parks Development and Upgrades • Complete renovation of Civic Center Playfield • Playground replacements at Maplewood Hill Park, Sierra Park &Yost Memorial Park • Add amenities to Mathay Ballinger Park, Elm Street Park & Pine Street Park Edmonds 2022 PROS Plan Packet Pg. 142 8.1.a Key Recommendations Trail and Bikeway Connections • Acquire easements & rights -of -way for trail connections • Coordinate with the Comprehensive Transportation Plan regarding bicycle & pedestrian system improvements Yost Pool Replacement • Refine options for replacement of Yost Pool Edmonds 2022 PROS Plan Packet Pg. 143 8.1.a 23 Key Recommendations ADA and Accessibility Enhancements • Remove barriers and improve universal access to and within parks, natural areas and trails User Convenience Improvements • Upgrade or replace restrooms • Improve signage & wayfinding Edmonds 2022 PROS Plan Packet Pg. 144 8.1.a 14 Next Steps City Council review & approval (Feb 15 & 22) Questions /Comments? Edmonds 2022 PROS Plan Packet Pg. 145 8.1.b EdmondS 2022 PRO Edmonds PROS Pan PLACEHOLDER COVER PAGE a+ a DRAFT Packet Pg. 146 ACKNOWLEDGEMENTS City Council Mike Nelson, Mayor Kristiana Johnson, Position #1 Will Chen, Position #2 Neil Tibbott, Position #3 Diane Buckshnis, Position #4 Vivian Olson, Position #5 Susan Paine, Position #6 Laura Johnson, Position #7 Planning Board Alicia Crank, Chair, Position #6 Roger Pence, Vice Chair, Position #2 Mike Rosen, Position #1 Matt Cheung, Position #3 Richard Kuehn, Position #4 Judi Gladstone, Position #5 Todd Cloutier, Position #7 City Staff Angie Feser, Director, Parks, Recreation, Cultural Arts & Human Services Shannon Burley, Deputy Director, Parks, Recreation, Cultural Arts & Human Services Rich Lindsay, Parks Manager Frances Chapin, Arts & Cultural Services Manager Todd Cort, Recreation Supervisor Carrie Haslam, Executive Assistant Consultant Team Conservation Technix, Inc. PRR, Inc. 8.1.b MOW 2022 PRO MESSAGE FROM THE DIRECTOTOR PENDING Angie Feser, Director Parks, Recreation, Cultural Arts & Human Services Department DRAFT V Packet Pg. 148 8.1.b IL O w ._ a O 08 - - — mp=_ a cm .' N t N > � ham_ D _ .-� � ���� Y n� +k • } - - - - '��s} � � �; � �+ 04 04 i kp CL 1� y ,s f i 'F Packet Pg. 149 8.1.b EdmondS 2022 PRO CHAPTER 1 PARKS & RECREATION PLANNING , ORWARD PLAN PURPOSE the City of Edmonds 2022 Parks, Recreation & Open Space Plan (PROS Plan) is an update to the 2016 Parks, Recreation & Open Space Plan that builds on the previously completed planning work and incorporates the feedback from an extensive community engagement process conducted in 2021. This Plan creates a vision for an innovative, inclusive and interconnected system of parks, trails and open space that promotes recreation, health, environmental conservation and fiscal responsibility as integral elements of a thriving, livable Edmonds. The PROS Plan serves as a blueprint for the management, enhancement and growth of the City of Edmonds parks and recreation system. It assists in guiding decisions related to planning, developing and maintaining parks, open space and recreational facilities. This Plan also identifies priorities for recreation programs, special events and arts and culture activities. The 2022 PROS Plan provides updated system inventories, Providing Edmonds citizens with a balanced system of open space, parks, recreation and cultural arts to ensure a healthy and active quality of life. community profile, needs analyses and a comprehensive capital project list. The Plan identifies parks and recreation goals and establishes a long-range plan for the Edmonds parks and recreation system, including action items and strategies for implementation over the next six to ten years. The recommendations in this Plan are based on community input, evaluations of the existing park system, operating conditions and fiscal considerations. the PROS Plan is part of the City's broader Comprehensive Plan and is consistent with the guidelines established by the Growth Management Act. The PROS Plan, updated approximately every six years, allows Edmonds to remain current with community interests and retain eligibility for state grants through the Washington State Recreation and Conservation Office (RCO), which administers various grant programs for outdoor recreation and conservation efforts. this plan has been regularly updated (1996, 2001, 2008 and 2016) to remain relevant to Edmonds as the city evolves and changes. DRAFT Packet Pg. 150 DRAFT s•1.b PLANNING PROCESS This PROS Plan represents the culmination of a year -long planning effort and reflects the community's interests and needs for parks, open space, trails and programming. The planning process, which included a variety of public outreach activities, encouraged public engagement to inform the development of the priorities and future direction of Edmonds' park and recreation system. Community members expressed their interests through surveys, public meetings, stakeholder discussions, online outreach, tabling and direct outreach and Planning Board meetings. In addition to community engagement, the actions identified in this Plan are based on: ■ An inventory and assessment of the City's existing park and recreation facilities to establish the system's current performance and to identify needed maintenance and capital repair and replacement projects, ■ Service level and walkability assessments to quantify the system's ability to serve current and future residents. The Plan's capital facilities section and accompanying implementation and funding strategies are intended to sustain and enhance, preserve and steward the City's critical parks and recreation infrastructure. DEPARTMENT OVERVIEW The Parks, Recreation, Cultural Arts and Human Services Department serves as the community's key resource for providing parks, trails and open spaces, recreation, cultural arts, aquatic facilities and programs and supports tourism and economic development, as well as providing an enhanced quality of life for its citizens. Thousands of participants and visitors join the many programs offered each year. There are 47 city -owned park sites totaling 230 acres, 20,000 square feet of flowerbeds and about one mile of waterfront shoreline in the Edmonds park system. Also, in 2021, the Department expanded to include the Human Services Division, which is intended to serve Edmonds residents in need of assistance, provide guidance and help residents find resources across a variety of issues for the wide demographic spectrum that comprises the city. Since the COVID-19 outbreak the Human Services Division has had a particular focus on helping connect those individuals and families that are financially or housing -stressed with local and regional resources that can help. The Department maintains active community partnerships with the Edmonds School District, Edmonds Boys and Girls Club, Edmonds College, Edmonds Historic Museum, Edmonds Arts Festival Foundation, Edmonds Center for the Arts, Port of Edmonds, Sno-King Youth Club, Edmonds Chamber of Commerce, both Edmonds Rotary Clubs, Edmonds Floretum Garden Club, Edmonds in Bloom, several Environmental Stewards groups, the Dale Turner YMCA, neighboring cities of Mountlake Terrace and Lynnwood, as well as Snohomish County, among other organizations. The Department has 24 full-time employees in five primary areas of focus including Parks Maintenance, Recreation Services, Cultural Arts Services, Human Services and Administration. Parks Maintenance maintains six waterfront beach parks, a fishing pier, and 41 community, neighborhood, special use and open space parks. The division also maintains the Veterans Plaza located at Public Safety complex, Dayton Street Plaza, Frances Anderson Center Bandshell and Hazel Miller Plaza, in addition to Yost Pool and City Park Spray Park. The division is responsible for preserving, maintaining and upgrading all playground structures and equipment as needed. The Parks Maintenance crew maintains the street trees, street landscape beds including downtown corner parks and hanging flower baskets and all City -owned sport fields, as well as assists with numerous City events. Recreation Services creates and implements recreational programs and environmental education and stewardship programs along with arts, tourism and cultural opportunities for city residents. Staff supervise community recreation, adult enrichment, athletics, aquatics, wellness, outdoor recreation, urban agriculture, nature and ranger/naturalist activities and a preschool. Staff supervise recreation program registration, facility rentals and athletic field rentals. The division also oversees the Frances Anderson Center, Meadowdale Community Clubhouse, the Plaza Room, programming in the Edmonds Waterfront Center weekday evenings and is responsible for the concessionaire agreements, 02 Packet Pg. 151 8.1.b EdmondS 2022 PRO which includes the Yost Pool agreement, two outdoor preschool agreements and various recreation programs. The Cultural Services division offers programs that highlight the scope of the arts in Edmonds, from a Community Cultural Plan for the city, a Public Art collection and concerts in the parks, to rotating visual art exhibits and a nationally recognized writers conference. The division works with the Edmonds Arts Commission to update and implement the Community Cultural Plan, an element of the Comprehensive Plan. Cultural Services works with the Economic Development Department on cultural tourism and support for the Washington State -certified Downtown Edmonds Creative District. The Human Services division oversees an allocated contracted full-time dedicated social worker, provides resource navigation, assists in securing shelter for residents as needed and supports the distribution of grants for individuals in need of assistance. In collaboration with Snohomish County, neighboring local jurisdictions, non-profit and faith -based organizations, the Human Services Division works to support the increase of affordable housing while remaining focused on homelessness prevention. Administration focuses on long-range planning, acquisition and development of park facilities, the development of park site master plans, and pursuing and administering grants. Administration provides overall support for the Department in areas of budgeting, communications, customer service, contracts and capital projects administration, among others. COMMISSIONS &, BOARDS The Department plays a vital role in many aspects of community life, with staff support to the Edmonds Memorial Cemetery Board, Planning Board, Edmonds Youth Commission, Edmonds Arts Commission, Tree Board, Creative District Advisory Committee, and Mayor's Conservation Advisory Committee. Planning Board The Planning Board serves in an advisory capacity to the City in regional and local planning and assists in the development of the comprehensive plan and zoning ordinances. The board also advises the Mayor and City Council on the development of all city parks and recreation facilities. Arts Commission Founded in 1975, the City of Edmonds Arts Commission (EAC) ensures the arts are a vital part of our community's quality of life, economic vitality and central identity. The commission is comprised of seven appointed members who advise and make recommendations to the Mayor, City Council or other City commissions or boards on matters pertaining to the arts and the aesthetic of the public realm. Youth Commission The Edmonds Youth Commission is a youth -led commission whose mission is to protect, preserve and enhance the quality of life for Edmonds youth by advising City Council and the public on issues relating to youth policies, programs and opportunities. Tree Board The Department's mission statement provides a The Tree Board is a seven -member committee that framework for future planning and guided the encourages the planting, protecting, and maintaining of development of goals and project recommendations for trees for long-term community benefit. this PROS Plan: Creative District Advisory Committee To provide Edmonds citizens with a balanced system The advisory committee, appointed by the mayor and of open space, parks, recreation and cultural arts to ensure a healthy and active quality of life. City Council, provides recommendations related to the five-year work plan established when the Creative District was certified in late 2018. Q DRAFT 03 Packet Pg. 152 DRAFT s•1.b Mayor's Conservation Advisory Committee This advisory group, appointed by the Mayor, provides recommendations related to community stewardship actions in Edmonds to conserve wildlife habitat, and enhance healthy air, land and water. ACCOMPLISHMENTS SINCE 2016 The 2016 PROS Plan guided City officials, management and staff in making decisions about planning, operating and implementing various parks and recreation services. The following represents a short list of the major accomplishments realized following the adoption of the previous Plan: ■ Renovated Waterfront Walkway, removed creosote bulkhead to restore shoreline habitat and installed artwork on south end of the Waterfront Walkway ■ Updated Seaview Park with inclusive playground ■ Installed Veterans plaza and memorial ■ Prepared Urban Forestry Management Plan ■ Purchased the land, master planned, secured funding and initiated redevelopment of Civic Center Playfield ■ Completed the Fishing Pier Renovation ■ Completed the Dayton Street Plaza ■ Developed 30% design for Marina Beach Park ■ Conducted citywide tree inventory and map and hired a full time arborist ■ Accepted donation of Shirley Johnson property The Parks, Recreation, Cultural Arts and Human Services Department also faced multiple challenges since the 2016 PROS Plan was adopted. The COVID-19 pandemic considerably impacted the Department. The Frances Anderson Center, Meadowdale Clubhouse and Yost Pool were closed in March 2020 and all recreation and cultural programs, special events and facility rentals were canceled, which eliminated a critical funding source for the Department. Athletic field reservations and picnic shelter/area reservations were also canceled, but resumed on a limited basis in the summer of 2020. CURRENT CHALLENGES Impacts of the COVID-19 Pandemic The COVID-19 pandemic and the associated health mandates for social distancing have transformed the way municipalities plan for and conduct public engagement. To develop this Plan, the City implemented a sound public process that was compliant with health mandates by using a range of online tools for communications, engagement and community feedback. Health mandates related to the pandemic also had dramatic impacts on the City's recreation programming and operations, requiring the temporary closure of some facilities, capacity and use restrictions, and the cancellation of recreation programming. However, with a better understanding of transmission and prevention, Edmonds has begun to offer limited in - person recreation programs and community events. In addition, the increase in use of parks and opens space had a significant impact on parks maintenance operations in both safety measures, increased demand for routine maintenance such as litter and garbage, restroom cleaning, and vandalism repair. Equity, Inclusivity & Accessibility: Maintaining and enhancing social equity across recreational opportunities and facilities should be a core function of municipal park and recreation systems. Through this PROS Plan, the City of Edmonds made a concerted effort to reach out to, connect with and engage its historically underrepresented communities, and the City also invested in and committed to outreach in the four major languages of the community: Chinese, English, Korean and Spanish. Also, with substantial past investments in downtown, the City is re-examining the distribution of park and recreation resource investments in other areas of the city, with the goal to advance equity across Edmonds. Further, portions of the City's parks, trails and open space system were developed before the 1999 Americans with Disabilities Act (ADA) was implemented. The conditions assessment identified several deficiencies related to ADA compliance. The City must continue to find ways to provide safe and equitable access to parks, trails, open space areas, facilities, recreation programs and other services. 04 Packet Pg. 153 8.1.b EdmondS 2022 PRO Asset Management & Aging Infrastructure The City of Edmonds' parks, trails and open space system is facing numerous challenges related to aging infrastructure. Deferred maintenance and changing demands translate to the need for up-to-date assessments of the condition, function and quality of park system assets, in addition to understanding where deficiencies may exist. Park aesthetics and amenities are important to usage patterns. Also, a user's perception of personal safety is a determining factor in how one uses and feels in and around parks, trails and open spaces. The conditions assessment of the Edmonds parks, trails and open space areas included in this PROS Plan (see Appendix A) provided a baseline of current conditions to inform the development of the capital project list and implementation strategies. The fiscal needs of the parks system are substantial and long-term funding strategies are needed. Research on recreation also provides information on how park distribution, park proximity, park facilities and conditions have an impact on people's desire to engage in physical activity. It may be valuable to re- evaluate current park designs and maintenance policies to ensure barrier -free, engaging park environments and operational efficiencies. The City will continue to play a major role in enabling healthy lifestyles for the Edmonds community and should continue to enhance the park system and recreation program offerings. Active Older Adults The City of Edmonds' relatively older population, low rates of disability among residents over 65, and high rates of participation among residents of all ages, indicate a potential local need for active recreation opportunities for active older adults. Nationwide, active seniors are often looking at retirement age differently, and many are transitioning to new careers, finding ways to engage with their community, and focusing on their health and fitness. To meet the needs of active older residents, the City will need to consider how the City's park and recreation facilities, partnership with the Senior Center, and programming can meet the needs of this growing group. Balancing Passive & Active Uses Edmonds residents have worked to preserve and maintain the City's greenspaces over many decades. The park system currently includes nearly 76 acres of open space. These areas serve a critical environmental purpose, including sustaining a robust tree canopy, supporting wildlife, clean air and reducing pollutants in stormwater runoff. Some open space areas include passive use trails and provide much -needed natural respite, while other open space areas (e.g., wetlands) function as conservation or wildlife viewing areas. From accessible playgrounds to splash pads to natural play areas, the range of play experiences offered by the City will change and diversify over time, and the population of Edmonds has increased over time. The demand for new amenities must be balanced against preserving and maintaining open space and natural areas. New amenities may require the use or re -use of existing parkland, or more parkland may be required to support the community's future needs. GUIDING DOCUMENTS This PROS Plan is one of several documents that comprise Edmonds' long-range planning and policy framework. Past community plans and other relevant documents were reviewed for policy direction and goals as they relate to parks, open space, trails, recreation and arts and culture opportunities across Edmonds. ■ Aquatic Feasibility Study (2009) ■ Community Cultural Plan (2014) ■ Comprehensive Transportation Plan (2015) ■ Parks, Recreation & Open Space Plan (2016) ■ City of Edmonds Comprehensive Plan (2017) ■ Highway 99 Subarea Plan (2017) ■ Urban Forestry Management Plan (2019) ■ Streetscape Plan (2006) DRAFT 05 Packet Pg. 154 DRAFT CHAPTER 2 COMMUNITY PROFILE Located along the shores of Puget Sound, the City of Edmonds lies about 15 miles north of Seattle. Incorporated in 1890, Edmonds is now home to 4Z470 residents. Edmonds' walkable downtown features a variety of restaurants, art venues, and shopping all within an easy walk to shorefront parks. Surrounding downtown are neighborhoods of family homes interspersed with forested green spaces. the city's primary general commercial areas are concentrated along Highway 99 on the eastern edge of the city. Edmonds is bordered to the north and west by Puget Sound and the community of Woodway, to the east by the cities of Mountlake Terrace and Lynnwood, and to the south by the City of Shoreline.lhe city also surrounds the smaller residential community of Esperance in unincorporated Snohomish County. the City of Edmonds provides a wide range of government services and is dedicated to maintaining the community's unique cultural, recreational, and environmental assets, while supporting sustainable, locally -focused economic growth. The city's parks, open spaces, trails, and recreational opportunities are highly valued for recreation, respite, and their ecosystem attributes. a O ti N T N N O N U) O a d E s c� Q ■ : 10lio Packet Pg. 155 MA ob DRAFT 8.1.b DEMOGRAPHIC PROFILE Edmonds is home to just under 42,500 residents is the third largest city in Snohomish County by population. The city is comprised of many older adults and relatively less families with children as compared to nearby communities, see Figure 1.1he city's residents are generally very well educated and have higher incomes than other county residents. Many residents are employed in the education, health care, professional, or retail trade sectors, including at the Edmonds School District, Premera Blue Cross, the Swedish Medical Center, Providence Regional Medical Center, and major retail chains. Residents also commute to other areas of the Seattle metropolitan region for work. Population & Anticipated Growth the City of Edmonds incorporated in 1890 as primarily a logging and mill town. By 1960, the city had grown to just over 8,000 residents. Major annexations in the 1960s, particularly the annexation of areas northeast of downtown in 1963, dramatically increased the city's population to nearly 24,000 residents, see Figure 2. In the coming decades, the city's population grew at a modest 1-1.5% rate per year, before seeing more rapid growth in the 1990s. Figure 1. Population Characteristics: Edmonds, Snohomish County, and Washington Population (2020) 42,470 827,957 7,705,281 Population (2010) 39,709 713,335 6,724,540 Population (2000) 39,515 606,204 5,894,121 Percent Change (2000-20) 7.5% 37.0% 31.0% Persons w/ Disabilities (%) Household Characteristics Households 11.2% 17,761 11.8% 293,823 12.7% 3,202,241 Percent with children 24.8% 33.7% 30.6% Median Household Income $89,229 $86,891 $73,775 Average Household Size 2.35 2.68 2.55 Average Family Size 2.92 3.16 3.09 Owner Occupancy Rate Median Age 70.7% 45.9 67.1% 38 63.0% 37.7 Population < 5 years of age 4.6% 6.3% 6.1% Population < 18 years of age 17.9% 22.7% 22.2% Population 18 - 64 years of age 60.3% 64.2% 62.7% Population > 65 years of age 21.8% 13.1% 15.1% Sources: Washington Office of Financial Management Population Estimates, 2020 U.S. Census, 2000 Census, 2010 Census, 2015-2019 American Community Survey Over the past twenty years, Edmonds has returned to a slow growth trend, which is expected to continue over the next two decades.lhe Puget Sound Regional Council, which completes land use and population forecasts for regional cities, anticipates that the city will grow to about 47,790 residents by 2040, an increase of about 13% from 2020. In 2020, Edmonds was home to 17,761 households with an average size of 2.35 people, smaller than the average for the county (2.68) and state (2.55). One in four households (25%) were families with children under 18 and 23% were individuals living alone. Re size of a community and its anticipated growth over time are key indicators of whether existing park and recreation facilities will be sufficient to meet future needs. Population growth can also result in increased residential density and/or the development of currently vacant land within a 08 Packet Pg. 157 8.1.b EdmondS 2022 PRO city, potentially increasing the need for away -from -home recreation opportunities while simultaneously reducing potential locations for park and open space acquisition. Advance planning for parks and recreation facilities can help ensure residents can enjoy sufficient, conveniently located parks, open space, and recreation facilities while the community grows and evolves. Figure 2. Population of Edmonds - Actual and Projected:1960-2040 50,000 39,515 40,000 30,744 30,000 26,679 _ 23,684 20,000 10,000 8,016 Ank 1980 Environmental education program walk n e �, n 46,738 47,790 2010 2020 2025 2030 2035 2040 T .N d Taste Edmonds W r� O LdK f N } 0 F N N ± _ N low ~# . -W W O d M f DRAFT Packet Pg. 158 DRAFT s•1.b Age Group Distribution Edmond's residents have a median age of nearly 46 years (2019), which is significantly higher than that of the county and state (both approximately 38 years). The city also has a relatively low number of families with children (25% of all households). These demographics have important implications for park and recreation needs. Adults between 45 to 64 years old make up the city's largest 20-year population group, comprising 33% of the overall population in 2019, see Figure 3. ■ Adults ages 25 to 34 years are users of adult programs. Approximately 10% of residents are in this age category. These residents may be entering long-term relationships and establishing families. ■ Adults between 35 and 54 years of age represent users of a wide range of adult programs and park facilities. Their characteristics extend from having children using preschool and youth programs to becoming empty nesters. This age group makes up 29% of the city's population. ■ Older adults and seniors, ages 55 and older, make up approximately 35% of Edmonds's population. One in seven residents is over the age of 70. This broad age group Figure 3. Age Group Distributions: 2010 & 2019 Under 5 years 5 to 14 years 10% 15 to 24 years 11% 25 to 34 years 10% 35 to 44 years 12% 45 to 54 years 17% 55 to 64 years 16% 65 to 74 years 10% 75 to 84 years 85 years and over represents users of adult and senior programs. These residents may be approaching retirement or already retired and may be spending time with grandchildren. This group also ranges from very healthy, active seniors to more physically inactive seniors. While nearly three in four residents are age 25 or older, 26% of residents are children and young adults. ■ Youth under 5 years of age make up 4% of Edmonds's population, see Figure 3. This group represents users of preschool and tot programs and facilities, and are often trails and open space users, frequently in strollers. These individuals are the future participants in youth activities. ■ Children ages 5 to 14 years make up current youth program, whole -family program, and event participants. Approximately 10% of the city's population falls into this age range. ■ Teens and young adults, age 15 to 24 years, are in transition from youth programs to adult programs and participate in teen/young adult programs where available. Members of this age group are often seasonal employment seekers. About 11% of city residents are teens and young adults. ■ 2010 ■ 2019 4% 5% 9% 12% 12% 12% 15% 14% 12% 6% 6% 3% - 3% 10 Packet Pg. 159 8.1.b EdmondS 2022 PRO Race and Ethnicity According to the 2019 American Community Survey, Edmonds residents identified as 80% White, 8% Asian, 6% as two or more races, 2% as Black or African American, and less than 1% as American Indian or Alaskan Native, Pacific Islander, or another race. Approximately 8% of people identified as Hispanic or Latino of any race. Edmonds is less racially diverse than Snohomish County or Washington State as a whole, where 75% of residents identify as White. The population of Edmonds has become only modestly more diverse over the past decade, see Figure 4. Figure 4. Changes in Racial Composition - 2000 to 2019 w ri ne Asian Two or more races 651.470 7.1% 4.1% Some other race 1.8% Black or African American 2.6% American Indian and Alaska Native 0.7% Native Hawaiian and Other Pacific Islander 0.3% Hispanic or Latino (of any race) 5.3% ;-.3r 80.1% 8.0 % 5.6 % 3.5 % 1.6% 0.3 % 0.8 % 7.9% T A a O ti N 0 N N 0 N LO N O IL' IL c m E z v Q DRAFT 11 Packet Pg. 160 DRAFT In 2019, approximately 17% of Edmonds's residents spoke a language other than English at home; Asian and Pacific Island languages and other Indo-European languages comprise the largest non-English language groups. Just over 5% of residents speak English `less than very well'. Edmonds has a smaller percentage of people who speak a language other than English at home than compared to Snohomish County as a whole (21%). Nationally, the design and marketing of municipal recreation programs have historically been biased against serving these communities. In addition, residents who speak languages other than English may face barriers in finding, accessing, and participating in park and recreation facilities and programs. The City of Edmonds should consider how it could best provide recreational opportunities, programs, and information that are accessible and relevant to, and meet the needs of, all community members. Persons with Disabilities The 2019 American Community Survey reported 11% (4,676 persons) of Edmonds's residents ages 5 years and older have a disability that interferes with daily life activities. This is lower than rates in the county (12%) and state (13%). Approximately 7% of residents between 18 and 64 live with a disability. Among residents 65 and older, the percentage rises to 31%, which is lower than the percentage found in the general senior population of Washington State (35%). Planning, designing, and operating a park system that facilitates participation by residents of all abilities will help ensure compliance with Title II of the Americans with Disabilities Act (ADA). In addition to ADA, there are other accommodations that people with disabilities may need to access parks and participate in recreation programs. Edmonds should consider community needs for inclusive and accessible parks, recreational facilities, programs, marketing, and communications. Employment & Education According to the 2019 American Community Survey, 85% of residents (35,696 people) are age 16 years and older and considered part of the work force population. Of this work force aged population, 65% is in the labor force, 2% is unemployed, and 35% is not in the labor force. About one in four employed residents work in the education or health care industries, while another 16% work in the professional/management industries. The retail trade sector also employs a large percentage of local workers (approximately 13%). Approximately 48% of Edmonds residents over age 25 have a bachelor's degree or higher, and 80% have at least some college education. This level of education attainment is higher than that of Snohomish County and the state (in which 69% of residents have some college). Additionally, 92% of city residents have a high school degree or higher, on par with the statewide average. Higher levels of employment and educational attainment positively correlate with both the income and health status of a community — both of which have further impacts on the use and need for park and recreation facilities, as described in the next two sections. Income & Poverty A community's level of household income can impact the types of recreational services prioritized by community members, as well as their willingness and ability to pay for recreational services. Perhaps more importantly, household income is closely linked with levels of physical activity. Low-income households are three times more likely to live a sedentary lifestyle than middle and upper -income households, according to an analysis of national data by the Active Living by Design organization. In 2019, the median household income in Edmonds was $89,229, slightly higher than the median income for Snohomish County ($86,691). Median household income in Edmonds is over 20% higher than the average for all Washington households ($73,775). 12 Packet Pg. 161 8.1.b EdmondS 2022 PRO Higher income households have an increased ability and willingness to pay for recreation and leisure services, and they often face fewer barriers to participation. The average household in Edmonds is relatively wealthy — about 44% of city household have incomes in the higher income brackets ($100,000 and greater), which is significantly more than across the state (36%). At the lower end of the household income scale, approximately 7% percent of Edmonds households earn less than $25,000 annually, significantly fewer than households in Snohomish County (11%), the State of Washington (15%), and across the United States (23%). In 2019, about 2% of the city's families were living below the poverty level, set at an income of $25,750 for a family of four. This percentage is lower than the countywide (approximately 5%) and statewide (7%) levels. Poverty affects 4% of both youth under 18 and adults 65 and older. Lower -income residents face many barriers to physical activity, including reduced access to parks and recreational facilities, a lack of transportation options, a lack of time, and poor health. Low-income residents may also be less financially able to afford recreational service fees or to pay for services, such as childcare, that can make physical activity possible. Health Status The overall health of a community's residents can impact their ability to participate in recreation and other physical activity and may also reflect, in part, the locality's level of access to appropriate and convenient green spaces, recreation opportunities, and active transportation facilities. In 2016, Snohomish County completed a profile of the health of Edmonds, Mountlake Terrace, and West Lynnwood residents. In general, residents of these communities have higher life expectancy (82.3 years) and the average resident of the county (80.3 years) and face lower rates of premature mortality. According to the County Health Rankings, Snohomish County ranks in the highest quartile of Washington counties for health outcomes, including length and quality of life. Snohomish County residents also rank as some of the healthiest residents in Washington (high middle quartile) when it comes to health behaviors. Approximately 17% of Snohomish County adults ages 20 and older report getting no leisure -time physical activity — on par than the statewide average and better than most counties nationwide. This may be due, in part, to the large number of places to participate in physical activity, including parks and public or private community centers, gyms, or other recreational facilities. Over 86% of residents in Snohomish County have access to adequate physical activity opportunities, equivalent to the average for all Washington residents. Approximately 30% of Snohomish County adults are overweight or obese, compared to 29% of Washington adults. DRAFT Packet Pg. 162 DRAFT s•1.b CHAPTER 3 COMMUNITY ENGAGEMENT EDMOD PARKs, RECREATION E TJR.Ft!RA.I.'i'' V-,ES Engaging the Whole Community Cea consed maximet essedi dolor quatium es re, consequid quo il. Community engagement played an essential role in developing the 2022 PROS Plan. Although the planning process occurred during the COVID-19 pandemic, substantial effort was made to connect with the full Edmonds community, seek their input and provide information about the project. Intentional, direct and on -going outreach to non-English speaking communities was a major tenet of the City's engagement strategy. Public outreach methods were varied and extensive, including: ■ Random -sample mail survey with English, Chinese, Korean and Spanish options ■ Online community -wide survey in English, Chinese, Korean and Spanish ■ Online public meetings with simultaneous translation in Chinese, Korean and Spanish 14 Packet Pg. 163 8.1.b EdmondS 2022 PRO 2021 @ 7 R 22 El, 9110179 F#6:30-PU 8:30 sues nap: /iea.iviramooa:Pxosm,g An: i�ss-z,s.e,ez r��.�. a�. ■a;�xa"aff���� axiawr LOA�€fi79§#tLxaiY( Si '�`isl i6,L,(Edm.mdsF—ces Anderson Center)*-5;€iL, @if IARIV&E(Edmonds)2:Fil (Edmonds) t R±,Q si'&MP€? IMARMET (City of Edmonds) �Z& &St.RTFt&SEn (PROS) if Pilo 3YP7iB1o#tE4+t9>8G[��ffi ifJy.£9i4�4�fy�rSr�(�R9, Yt0k1i7��o0�1�B01gaRo 2.14 � ° m� ®�iiiinpoi7tFifm: o Sample July Meeting Flyer ■ Stakeholder group discussions & one-on-one interviews ■ Tabling and outreach at community events, to include a presence at the Uptown Evening Market near HWY 99 and coordination with other on -going City planning efforts ■ Meetings with the Planning Board and City Council ■ Edmonds city website with plan information and feedback opportunities ■ Multiple social media postings, city newsletter articles and email blasts through the Recreation database and Edmonds School District parent distribution portal COMMUNITY SURVEY A community -wide, online survey was conducted to assess the recreational needs and priorities of Edmonds residents. The City i1,958 wes ed. i Para mas informacibn, + comuncluese con Sample October Meeting Flyer mailed 2,500 surveys to randomly chosen households in Edmonds on May 29, 2021, of which 501 surveys were completed and returned (20% response rate). Online versions of the survey in English, Chinese, Korean and Spanish were posted to the City's website on June 4, 2021. An additional 1,449 surveys in English were completed from the general, community -wide online surveys. In addition, two Chinese, five Korean and one Spanish surveys were completed. In all, 1,958 surveys were collected. Information about the survey was provided on the City's Parks and Recreation website and on the PROS Plan project subpage. It was promoted via multiple in -language social media postings and city email blasts. Printed flyers with QR code links in four languages were made available for distribution by staff of Edmonds Parks! w®F1O1 = We want to hear from you! 2022 City of Edmonds PROS Plan ed— Wew,wm ram: cPaos� p�� d.o...a^�9a�;�, What is the Edmonds PROS Plan? per' 1y1tlinon°e°RO5"� a,a.wM.+"a—w"wwm,m �aMmma papa°.,' Ya I INS Learn more about the plan, including upcoming events Sample Survey Flyer for direct outreach to non-English community groups. Also, significant effort was made to promote the survey to all language groups during community events, pop -ups and flyer distribution through cultural based community organizations throughout the summer months. The survey was closed on August 31, 2021. The survey measured current levels of satisfaction and which facilities were primarily being used by residents. Residents were asked about future improvements and the types of recreational amenities they would like to see considered for the park system. Survey respondents were asked about: ■ Performance and quality of programs and parks ■ Usage of city parks and recreation facilities T c 0 .N a O ti N 0 N N 0 N to O W a c m E z r Q DRAFT 15 Packet Pg. 164 DRAFT ■ Overall satisfaction with the value of services being delivered by the city ■ Opinions about the need for various park, recreation, and trail improvements ■ Priorities for future park and recreation services and facilities Significant survey findings are noted below, and a more detailed discussion of results can be found in the needs assessment chapters covering parks, open space, recreation, and trails (Chapters 6 - 8). Major Survey Findings: ■ Livability: Nearly all respondents (99%) feel that public parks and recreation opportunities are important or essential to the quality of life on Edmonds. ■ Usage: Park visitation is high, with 88% of respondents visiting parks or recreation facilities at least once a month. The most popular activities are beach and waterfront (83%), walking or running (76%), followed by relaxation (61%), playgrounds (41%) and fitness (40%). ■ Park Amenity Priorities: Respondents indicated that the highest unmet need is for pedestrian and bike trails (84%) and an aquatic facility or pool (65%). A plurality of survey respondents think that Edmonds does not have enough walking and biking trails (61%). Respondents to both the mail and online survey ranked improving existing parks, completing the Waterfront Walkway near Ebb Tide Condos, and acquiring additional land for conservation and open space as their top priorities. ■ Recreation Facilities & Programming: Respondents expressed a greater need for community events (56%) and program and activities geared toward youth. In particular, respondents had a higher interest in outdoor programs such as environmental education (46%), youth day camps (41%) and youth sport programs (40%). The complete survey summary is provided in Appendix B. VIRTUAL PUBLIC MEETING #1 The City hosted the first community meeting for the PROS Plan update using Zoom on July 22, 2021 (Thursday). Edmonds staff promoted the meeting through City communication channels, email and social media. Meeting information was provided in simplified Chinese, English, Korean and Spanish. The City also promoted the event through community - based partners. In all, 20 community members participated in the meeting. Real-time, interactive polling questions and question -and -answer functions of Zoom were used to solicit community feedback — all with real-time verbal translation and poll question answers in Chinese, Korean and Spanish. Online Public Meeting #1 Findings: ■ Attendees identified three city parks that should receive additional focus for improvements: Mathay Ballinger, Yost and Marina Beach Parks. ■ Stronger interest was noted for acquiring additional lands that conserve saltwater beaches/waterfront and wetland areas. ■ Attendees favored smaller, more intimate events, such as outdoor movies, uptown evening market and Hazel Miller Plaza summer concerts. ■ It was suggested that the City add more parks, services and facilities in the Hwy 99 corridor and the south end of the city. ■ It was also suggested to acquire forested areas threatened by development, add open space throughout the city and manage/control invasive species. A summary of responses to the online public meeting is provided in Appendix C. VIRTUAL PUBLIC MEETING #2 On October 16, 2021 (Saturday), the City hosted a second virtual public meeting from 1:00 p.m. to 2:30 p.m. on Zoom. The virtual meeting was structured in a manner similar to the first virtual public meeting and included an introductory presentation, live polling and a question -and -answer period. The online public meeting was promoted in multiple languages via social media posts, email blasts, school district email and public meeting announcements. Real-time translation and polling answers in Chinese, Korean and Spanish was also a main feature of this meeting. Attendance included 40 public attendees, two elected officials and project team members. Online Public Meeting #2 Findings: ■ Attendees favored a local -scale pool (indoor or outdoor) over a larger, regional -scale pool if Yost Pool is replaced. ■ A strong majority of attendees favored prioritizing additional park and open space investments in southeast Edmonds and along the Highway 99 corridor. 16 Packet Pg. 165 8.1.b EdmondS 2022 PRO join era for a community meeting juky 22. 2Q2 S 6.34 FIM - 9.30 PM bit ry(E-d ondsPR63mq U10L kc t 125.,21 S 782 meHIC¢ I1r. N 6 6A59 55{A Pasueft 6q+W16 FaAhb"f a An &Aura Irereaq Nandonn w Vmfrh Sample Social Media Posts ■ Attendees reiterated the preference for smaller neighborhood events like concerts in local parks. ■ Pluralities of attendees indicated interest in building additional trails in existing parks, as well as acquiring and building additional trail corridors. A summary of responses to the online public meeting is provided in Appendix D. STAKEHOLDER DISCUSSIONS COVID-sensitive, online focus group discussions and individual interviews with external stakeholders were conducted to more broadly assess local needs and opportunities for partnership and coordination. Stakeholders were identified by city staff based on their past coordination their involvement or interest in the future of recreation, park, athletic or trail facilities. Many recommended the addition or renovation of recreation facilities, such as playgrounds, sports fields and trails. Participants also made several comments about park and recreation deficiencies for those living along Hwy 99 or in the south/southeast portion of Edmonds. Also, many suggested ideas about trail connectivity and safety, open space conservation and partnering with other organizations. Specific SW+4�4�t*�s41 [ITY Or ERM04W .W ■aawxixaan Mcu Sample Project Webpage Content recommendations are incorporated in the needs assessment sections (Chapters 6 — 8), and a full summary is provided in Appendix E. COMMUNITY EVENT TABLING n there were scheduled a series of City staff led tabling events at local markets and community gathering areas Tabling occurred between July and September to build awareness of the PROS Plan and share information about the project. Tabling was held at the following venues: ■ Uptown Market ■ Farmers Market (tabling cancelled due to surge in Delta variant safety precautions) Approximately 50 people were engaged during the event. Community comments ranged from concerns about the need for city investments closer to Hwy 99, to interest in an expanded trail network, to specific park improvements and enhanced communications from the city. Q DRAFT Packet Pg. 166 DRAFT s•1.b MEETING -IN -A -BOX The Meeting -in -a -Box element compiled a variety of materials that allowed for City staff to easily prepare for meetings with community -based organizations and the diversity of communities within Edmonds. The tool -kit served meeting facilitators, so anyone on the project team can easily communicate information in a way that was uniform, but adaptable. The tool -kit included an event guide for meeting facilitation and logistics, a content template for introductory email blasts, templates for a meeting agenda and sign -in sheet. Materials were compiled and prepared in four languages: English, Chinese, Korean and Spanish. PLANNING BOARD MEETINGS The Planning Board provided feedback on the development of the PROS Plan during three regularly scheduled public sessions. The first session occurred on May 26th, shortly after the planning project was initiated. The Board discussed the update and provided their perspectives on a vision for the system, specific challenges, opportunities and ideas about parks, trails and programs. Subsequent sessions in November and January were used to review public feedback and solicit direction from the Board on priorities and recommendations for the new PROS Plan. 0 OTHER OUTREACH In addition to the direct outreach opportunities described above, the Edmonds community was informed about the planning process through a variety of media platforms. The following methods were used to share information about the project and provide opportunities to participate and offer their comments: ■ Edmonds Parks, Recreation & Cultural Services website ■ PROS Plan project webpage ■ Email blasts to the Parks and Recreation participants and distribution list ■ Email blast to parents of all Edmonds Schools in the Edmonds School District ■ Social media: Facebook & Instagram ■ Media releases ■ Postcard mailed to all homes in Edmonds ■ Announcements at Council and Planning Board public meetings ■ Announcements at Stakeholder Focus Group meetings Sample Social Media Post E y I I K. r�� r,.� � m c,�m.i s�•na, { �aa�JMy�YaF..iafr� _ rl n} n�.• • - �rry��iWW hiYd Ml� 18 Packet Pg. 167 8.1. b BENEFITS OF PARKS, RECREATION & OPEN SPACE A number of organizations and non -profits have documented the overall health and wellness benefits provided by parks, open space and trails. The Trust for Public Land published a report called 'Ihe Benefits of Parks: Why America Needs More City Parks and Open Space. This report makes the following observations about the health, economic, environmental and social benefits of parks and open space: ■ Physical activity makes people healthier. ■ Physical activity increases with access to parks. ■ Contact with the natural world improves physical and psychological health. ■ Value is added to community and economic development sustainability. ■ Benefits of tourism are enhanced. ■ Trees are effective in improving air quality and assisting with stormwater control. ■ Recreational opportunities for all ages are provided. Physical Activity Benefits Community Benefits Economic Benefits Residents in communities with increased access to parks, recreation, natural areas and trails have more opportunities for physical activity, both through recreation and active transportation. By participating in physical activity, residents can reduce their risk of being or becoming overweight or obese, decrease their likelihood of suffering from chronic diseases, such as heart disease and type-2 diabetes, and improve their levels of stress and anxiety. Nearby access to parks has been shown to increase levels of physical activity. According to studies cited in a 2010 report by the National Park and Recreation Association, the majority of people of all ages who visit parks are physically active during their visit. Also, the Centers for Disease Control and Prevention (CDC) reports that greater access to parks leads to 25% more people exercising three or more days per week. Park and recreation facilities provide opportunities to engage with family, friends, and neighbors, thereby increasing social capital and community cohesion, which can improve residents' mental health and overall well-being. People who feel that they are connected to their community and those who participate in recreational, community and other activities are more likely to have better mental and physical health and to live longer lives. Access to parks and recreational facilities has also been linked to reductions in crime, particularly juvenile delinquency Parks and recreation facilities can bring positive economic impacts through increased property values, increased attractiveness for businesses and workers (quality of life), and through direct increases in employment opportunities. In Washington, outdoor recreation generates $26.2 billion in consumer spending annually, $7.6 billion in wages and salaries and $2.3 billion in state and local tax revenue. Preserving access to outdoor recreation protects the economy, the businesses, the communities and the people who depend on the ability to play outside. According to the Outdoor Recreation Economy Report published by the Outdoor Industry Association, outdoor recreation can grow jobs and drive the economy through management and investment in parks, waters and trails as an interconnected system designed to sustain economic dividends for citizens. 1AFT 8.1.b The goals and objectives described in this chapter define the recreation and park services that Edmonds aims to provide. These goals and objectives were derived from input received throughout the planning process, from city staff, the Planning Board and community members. The Growth Management Act (GMA) adopted by the Washington State Legislature in 1990 provided a foundation for land use planning in selected cities and counties throughout the state, including Snohomish County and the City of Edmonds. It identifies 14 planning goals to guide the development of comprehensive plans and development regulations. Four of these goals directly affect the development and implementation of this plan. ■ "Encourage the retention of open space and development of recreational opportunities, conserve fish and wildlife habitat, increase access to natural resource lands and water, and develop parks." RCW 36.70A.020(9) ■ "Protect the environment and enhance the state's high quality of life, including air and water quality, and the availability of water." RCW 36.70A.020(10) ■ "Identify and encourage the preservation of lands, sites, and NO structures, that have historical or archaeological significance." RCW 36.70A.020(13) "Carry -out the goals of the Shoreline Management Act with regards to shorelines and critical areas." RCW 36.70A.020(14) Also, the Edmonds Comprehensive Plan, the previous PROS Plan and other city planning policies provide a framework for this PROS Plan. A goal is a general statement that describes the overarching direction for the parks and recreation system. Objectives are more specific and describe an outcome or a means to achieve the stated goals. Key project recommendations are specific actions intended to implement and achieve the goals and objectives and are contained in the needs assessment and capital planning chapters of the PROS Plan. 20 Packet Pg. 169 8.1.b EdmondS 2022 PRO ENGAGEMENT Goal 1: Encourage and facilitate meaningful public involvement in park and recreation planning. Objectives: 1.1 Involve residents and stakeholders in park and recreation facility planning, design and recreation program development to solicit community input, facilitate project understanding and build public support. 1.2 Advance diversity, equity, inclusion in, and access to the City's system of parks, natural areas and programs through continued outreach and communications. 1.3 Pursue the formation of a City Council appointed Parks and Recreation Board as a forum for public discussion of ongoing park and recreation issues and policies. 1.4 Encourage local business, non -profits and community partners involvement in providing and supporting cultural, recreational and athletic opportunities for all ages and abilities. DIVERSITY, EQUITY & INCLUSION Goal2: Decrease barriers and increase opportunities for participation of underrepresented, diverse populations to reflect the demographics of Edmonds. Objectives: 2.1 Address accessibility barriers (socio-economic, language, physical, geographic, transportation) to parks and programs and allocate resources to address known gaps. 2.2 Explore and pursue opportunities for alternative outreach and education to diverse groups, such as group walks and day hikes with minority communities, promotional materials through schools and faith groups, and youth mentorship or ambassador programs. 2.3 Identify appropriate locations within parks and public spaces for the installation of public art, interpretive signs or cultural displays, and collaborate with diverse groups to ensure incorporation of any art, history, and culture in parks is done from a diversity, equity and inclusion lens. 2.4 Provide DEI training opportunities for staff. DRAFT Packet Pg. 170 DRAFT s•1.b PARKS, TRAILS & OPEN SPACE Goal 3: Provide an interconnected park system that offers a wide variety of year-round recreation opportunities and experiences which support and enhance Edmonds' cultural identity and the natural environment. Objectives: 3.1 Acquire or secure parkland identified within this Plan to provide geographically accessible and equitable distribution of community and neighborhood parks 3.2 Provide a distributed park and open space system, such that all residents live within a lh-mile access of a park, trail or open space. 3.3 Prioritize facility development based on demonstrated demand, population served, regional appeal, fiscal opportunity and revenue -generating potential. 3.4 Pursue options to expand trails and coordinate with Public Works to increase connectivity for pedestrians and bicyclists throughout Edmonds, especially to parks, schools, and shopping or business areas. 3.5 Expand the system of off-street recreational trails by utilizing parks, linear open spaces, utility corridors and sensitive areas, as appropriate. 3.6 Provide trailhead accommodations, as appropriate, to include parking, wayfinding signage, benches, restrooms and other amenities. 3.7 Develop City -owned or maintained park and open space sites based on master plans, management plans or other adopted strategies to ensure parks reflect local needs, community input, recreational and conservation goals and available financial resources. 3.8 Design, upgrade and maintain parks and facilities to offer universal accessibility for residents of all physical capabilities, skill levels and age, as appropriate, in compliance with the Americans with Disabilities Act (ADA) Standards for Accessible Design. 3.9 Develop a wider variety of opportunities for exercise and enjoyment to expand the use of the park system throughout the year, including all-weather activities and spaces to support emerging recreation interests. 3.10 Plan for sport fields, courts and specialized recreational facilities (e.g., pump track, off leash dog areas, etc.) with consideration of local needs, partner support/capacity, recreational trends and availability of similar facilities within the City and region. 22 Packet Pg. 171 8.1.b EdmondS 2022 PRO WATERFRONT USE & ACCESS Goal 4: Preserve and pursue opportunities to expand public access and enjoyment of Edmonds' waterfront. Objectives: 4.1 Develop and maintain the Edmonds shoreline as a unique regional recreational, educational and environmental resource that is key to community identity. 4.2 Increase connections and public access, including visual access, to freshwater and marine waterfront areas, including but not limited to the shorelines, tidelands, beaches, lakes, creeks and overlooks. 4.3 Whenever possible and as funding allows, acquire additional waterfront property to enhance the existing public access. 4.4 Improve existing publicly -owned water access sites to address safety and accessibility issues. 4.5 Improve and upgrade developed and undeveloped street ends or rights -of -way, where appropriate, to provide physical or visual access to waterfronts. 4.6 Pursue and maintain community partnerships that support waterfront access, protection and usage. DRAFT 23 Packet Pg. 172 DRAFT s•1.b Photo credit: NATURAL RESOURCE & HABITAT CONSERVATION Chris Walton Goal 5: Conserve and provide access to natural resource lands for habitat conservation, recreation, and environmental education. Objectives: 5.1 Preserve and protect areas with critical habitat or unique natural features, including but not limited to wetlands, stream corridors, tidelands, estuaries, beaches, forests and the Underwater Park. 5.2 Work cooperatively with property owners and developers to preserve habitat and native vegetation, especially when these provide visual or physical linkages to publicly -owned natural resource lands. 5.3 Support the implementation of the Urban Forestry Management Plan. 5.4 Pursue opportunities to provide appropriate public access (e.g. trails, viewpoints and wildlife viewing areas) within open spaces to support passive recreation and environmental education. 5.5 Provide environmental educational opportunities in natural areas with interpretive signage, nature trails and related experiences. 5.6 Cooperate with the County, neighboring jurisdictions and other organizations to identify and conserve open space of mutual benefit, and pursue funding through grants and the Snohomish County Conservation Futures program. 24 Packet Pg. 173 8.1.b MOW 2022 PRO RECREATION PROGRAMS & FACILITIES Goal 6: Provide a varied and inclusive suite of recreation opportunities and experiences to promote health and wellness, year-round activity and social engagement. Objectives: 6.1 Enhance the diversity of recreation programs offered, focusing on programs that are in high demand, serve a wide range of users and utilize the City's unique indoor and outdoor assets. 6.2 Form and maintain partnerships with other public, non-profit and private recreation providers to deliver recreation and cultural services and secure access to existing facilities for community recreation. 6.3 Strategically expand recreation programs that complement services of other providers, as facilities, staffing levels and partner opportunities allow. 6.4 Examine options to replace Yost Pool, along with the financing and funding requirements for capital and operations. 6.5 Maintain and enhance program scholarships and other mechanisms to support recreation access for low-income residents. 6.6 Periodically review and update the fee policy for programs, indoor facility uses and rental rates that supports operational requirements. 6.7 Establish cost recovery goals for recreation programs and facilities. 6.8 Conduct periodic evaluations of program offerings in terms of persons served, equitable geographic distribution and access to programs and facilities, customer satisfaction, cost/subsidy, cost recovery, local and regional recreation trends, and availability of similar programs via other providers. DRAFT Packet Pg. 174 DRAFT O CULTURAL SERVICES Goal 7: Provide arts and cultural opportunities and experiences to promote an engaged and vibrant community. Objectives: 7.1 Utilize the Edmonds Arts Commission as the forum for public discussion of arts and culture issues, and update and support the goals and initiatives of the Community Cultural Plan. 7.2 Work with the community and local organizations to foster a greater variety of cultural, heritage and arts events that reflect the cultural diversity of Edmonds. 7.3 Continue to offer, facilitate and promote community events, such movies, concerts, festivals and markets, to provide opportunities for social engagement and bring families and neighbors together. 7.4 Foster partnerships and collaborations to incubate new cultural programs, activities and offerings. 7.5 Support and advocate for Edmonds' public art, artistic resources, its unique cultural events, and its attraction as a cultural destination —a key element of economic development. 26 Packet Pg. 175 8.1.b EdmondS 2022 PRO PARK OPERATIONS & ADMINISTRATION Goal 8: Maintain and operate a modern, efficient park system that provides a high level of user comfort, safety and aesthetic quality, and protects capital investments. Objectives: 8.1 Maintain parks, recreation and open space facilities according to best practice in a manner that keeps them in safe and attractive condition and promotes community pride. 8.2 Develop, maintain and update asset management plans for major assets to support improved stewardship, reduce costs, and increase maintenance and replacement efficiency. 8.3 Incorporate sustainability and low impact development into design, development and maintenance of the park system and be a leader in sustainable building practices. 8.4 Utilize, as appropriate, native and lower -resource requiring vegetation for landscaping in parks and city owned properties to minimize maintenance requirements, and control invasive vegetation through removal and other environmentally responsible means. 8.5 Allocate adequate funding for maintenance, staffing and asset preservation. 8.6 Pursue alternative funding options and dedicated revenues, such as private donations, sponsorships, partnerships, and grants, along with support through partnerships with service organizations, volunteer groups, businesses and other agencies. 8.7 Encourage and promote volunteerism from a variety of individuals, service clubs, local watershed councils, steward groups, faith organizations and businesses to enhance community ownership and stewardship of parks, trails and open space. 8.8 Promote professional development opportunities that strengthen the core skills and commitment from staff, Board members and key volunteers, to include trainings, materials and/or affiliation with relevant national and regional associations. 8.9 Update City codes related to park regulations and usage to keep parks, trails, waterfronts and open space safe, protect flora and fauna, and communicate user expectations. 8.10 Periodically review and update the Park Impact Fee rates and methodology and utilize impact fees to accommodate growth through the expansion of the recreation system. 8.11 Periodically update the capital facilities plan to address facility improvement needs. 8.12 Update the Parks, Recreation & Open Space Plan periodically and approximately every six years to ensure facilities and services meet current and future community needs and maintain eligibility for State grants. DRAFT Packet Pg. 176 DRAFT s•1.b CHAPTER 5 CLASSIFICATIONS & INVENTORY The City of Edmonds manages over 240 acres of parks and open space, providing nearly a mile of public waterfront access, active recreational facilities for team sports, playgrounds at 14 parks, more than 13 miles of walking paths and trails, and about 80 acres of open space. PARKLAND CLASSIFICATIONS Parkland is classified to assist in planning for the community's recreational needs. The classifications also reflect standards that inform development decisions during site planning, in addition to operations and maintenance expectations for the level of developed facilities or natural lands. The Edmonds park system is composed of a hierarchy of various park types, each offering recreational opportunities and natural environmental functions. Collectively, the park system is intended to serve the full range of community needs. Each park classification defines the site's function and expected amenities and recreational uses. The classification characteristics serve as general guidelines addressing the size and use of each park type. The following six classifications are used in Edmonds' park system: ■ Neighborhood Parks ■ Community Parks ■ Waterfront Parks ■ Special Use Areas ■ Open Space ■ Beautification Areas Neighborhood Parks Neighborhood parks are smaller sites between one and six acres in size that serve nearby residents, generally within walking distance (1/a-mile). These parks are designed primarily for non -supervised, informal recreation activities and provide basic recreational amenities such as places to play, walk or bike and can also offer fields and/ or courts to practice sports. These 28 Packet Pg. 177 Places to Be Active... Places to Find Quiet... The City's neighborhood and community parks offer The open spaces in Edmonds provide acres of wood - ample options to get out and play. These types of land and wetlands to showcase Edmonds' natural parks include playgrounds, sport fields and other beauty. Take a walk, watch wildlife or find respite. amenities for active lifestyles. parks support neighborhood and family gatherings and provide access to natural amenities. Some of the more popular neighborhood parks may include restroom facilities. Community Parks Community parks are larger sites intended to serve multiple neighborhoods or the entire city, within walking, biking or short driving distance from most users These parks are usually between 20 to 50 acres in size and offer a range of recreational features to provide for the community's different interests. Community parks provide places to play, walk and bike, and to participate in organized sports, large gatherings and community events. Since community parks generally include facilities that attract a large number of people from a wide geographic area, these sites include typically off-street parking and restrooms. Community parks can also serve as local neighborhood parks for their immediate areas, and they may be connected to schools or other community facilities. Places to Enjoy... The City of Edmonds takes pride in its efforts to beautify business districts and the waterfront. Waterfront Parks Waterfront parks are sites that provide access to the water and are intended to serve residents and visitors. These sites provide scenic views of freshwater and marine waterfront areas, as well as public access for shoreline walking and boating. Waterfront parks typically provide permanent or portable restrooms. Special Use Areas Special use areas are miscellaneous parklands, landscaped gateways or stand-alone recreation sites designed to support a specific, DRAFT 29 Packet Pg. 178 DRAFT specialized use. Special use areas provide a unique benefit to users not commonly found in other parks. Some of the facilities in this classification are public plazas, viewpoints, community centers, community gardens, aquatic centers, historic sites or sites occupied by buildings. Open Space Open space includes wetlands and shoreline habitat, water bodies, inland forests, shrublands and grass lands. These spaces are left more or less in a natural state with recreation use as a primary or secondary objective. These areas can provide opportunities for passive and active outdoor recreation, such as walking, jogging, wildlife Figure 5. City -owned Parks & Open Space viewing and nature photography. Open space promotes health and wellness by providing a natural physical and mental refuge from the urbanized, built environment, but not all open spaces may provide public access. In some cases, these are environmentally -sensitive areas and can include wildlife habitats, or unique and/or sensitive species. Beautification Areas Beautification areas include landscaped features located along street right-of-ways, intersections and medians, plazas, the Frances Anderson Center and other City - owned facilities and buildings. Hanging flower baskets are also included in beautification areas. The importance of beautification areas, Centennial Plaza Special Use Park 0.08 Dayton Street Plaza Special Use Park 0.10 Dayton Street Plaza - WWTC Special Use Park 0.35 Edmonds Library & Plaza Special Use Park 1.29 Edmonds Memorial Cemetery Special Use Park 6.63 Frances Anderson Center Special Use Park 1.62 Hazel Miller Plaza Special Use Park 0.09 Interurban Trail Special Use Park 3.97 Lake Ballinger Access Special Use Park 0.19 Lynndale Skate Park Special Use Park 2.39 Meadowdale Clubhouse Special Use Park 1.11 Ocean Ave Viewpoint Special Use Park 0.20 Richard F. Anway Park Special Use Park 0.17 Stamm Overlook Special Use Park 0.36 Sunset Ave Special Use Park 1.14 Underwater Dive Park Special Use Park 27.00 Veterans Plaza Special Use Park 0.15 Subtotal 46.83 Elm St Park Neighborhood Park 1.85 Frances Anderson Center Field Neighborhood Park 1.94 Haines Wharf Neighborhood Park 0.69 Hickman Park Neighborhood Park 5.61 Hummingbird Hill Park Neighborhood Park 1.22 Mathay Ballinger Park Neighborhood Park 1.82 Pine St Park Neighborhood Park 1.47 Seaview Park Neighborhood Park 6.05 Sierra Park Neighborhood Park 5.52 Subtotal 26.17 their contribution to creating a pedestrian friendly community and the opportunities for integration of public art elements is also addressed in the Streetscape Plan and in the Community Cultural Plan. Non -City Park & Recreation Sites There are lands owned by other private and public entities that contribute to the recreational and cultural opportunities in and around Edmonds. These lands include property owned by the Edmonds School District, Snohomish County, Edmonds Public Facilities District, City of Lynnwood, and State and Federal agencies. City Park Community Park 13.96 Civic Center Playfield Community Park 7.92 Meadowdale Playfields Community Park 12.05 Yost Memorial Park Community Park 45.27 Subtotal 79.20 144 Railroad Ave Tidelands Waterfront Park 0.90 Brackett's Landing North Waterfront Park 5.06 Brackett's Landing South Waterfront Park 2.22 Waterfront Center Park Waterfront Park 1.94 Marina Beach Park Waterfront Park 3.37 Olympic Beach Waterfront Park 2.85 Subtotal 16.35 Edmonds Marsh Haines Tidelands Open Space Open Space 24.21 0.44 H.O. Hutt Park Open Space 4.53 Maplewood Hill Park Open Space 13.27 Meadowdale Natural Areas Open Space 1.07 Olympic View Open Space Open Space 0.49 Pine Ridge Ext (SW) Open Space 1.14 Pine Ridge Park Open Space 25.33 Seaview Reservoir Open Space 1.31 Shell Creek Open Space Open Space 1.42 Wharf Street Willow Creek Park Open Space Open Space Subtotal 0.12 2.25 75.58 TOTAL ACREAGE 244.12 30 Packet Pg. 179 8.1.b EdmondS 2022 PRO Map 1: Existing Parks & Open Spaces DRAFT 8.1.b PAGE LEFT INTENTIONALLY BLANK a O w a m u a c m Q. O Ca 0 L u Y L Q. N N O N C O A N w Q O ti N O N N O N O w d r C d E t V R a+ a Packet Pg. 181 8.1.b EdmondS 2022 PRO CITY FACILITIES Yost Pool Yost Pool is located within Yost Park and was built by the City in 1972.1he facility is an outdoor pool with a 25 meter x 25 yard pool and spa. The City recently decided to keep the pool open year-round to extend the outdoor aquatics season. Frances Anderson Center The Frances Anderson Center is the "home" of the majority of Edmonds Parks, Recreation & Cultural Services programming. The Center has classroom spaces, a drop -in weight room, a gymnasium and dedicated gymnastics space. The Frances Anderson Center also houses six tenants who provide a wide range of activities that augment and enhance the Department's mission, including a ballet school, youth sports club, Montessori preschool, daycare, sculpting studio space and art gallery. Boys & Girls Club The Edmonds Boys and Girls Club is located at 310 6th Avenue North. The land and the building are owned by the City, and the facility is leased to the Boys and Girls Club. The Club provides youth between the ages of 5 and 18 a safe, positive and fun environment with a variety of activities. The Club offers before and after -school programs for children and youth between the ages of 5 and 18 at its main location, adjacent to the Civic Center Playfields, in addition to summer camps, sports and drop -in programs. Meadowdale Clubhouse This rustic banquet hall is located in North Edmonds at 6801 North Meadowdale Road. The clubhouse is available for rent, and it serves as the location for the City's Meadowdale Preschool program. Amenities include kitchen, fireplace, parking, restrooms and an outdoor fenced playground. Olympic Beach Visitor Station The Olympic Beach Visitor Station is located at the base of the Edmonds Fishing Pier, and it is staffed by Ranger -Naturalists and Volunteer Beach Docents. The Visitor Station typically is open weekends noon-5:00 pm, from Memorial Day through Labor Day. Beach Docents work side -by -side with ranger -naturalists to educate the public about the Edmonds Marine Sanctuary and help monitor the 75-gallon marine touch tank at the station. Plaza Room The Edmonds Plaza Room is located above the Edmonds Library at 650 Main Street, Edmonds. Amenities include an uncovered outdoor patio, free wifi, tables, chairs and kitchen. The Plaza Room is in walking distance to coffee shops, restaurants and boutiques. Frances Anderson Center Meadowdale Clubhouse Olympic Beach Visitor Station A a O ti N 0 N N O N LO W O W IL r c m z Q DRAFT Packet Pg. 182 DRAFT OTHER NEARBY RECREATION FACILITIES Waterfront Center the new Edmonds Waterfront Center / Senior Center is a modern, LEED Gold, all -electric, 26,000 square foot regional community center and replaced the old Edmonds Senior Center building. The Waterfront Center provides program space, banquet rooms, bistro and cafe. Activities include over 70 programs, trips, entertainment, music and arts for seniors, among others. Event space is available for rent. The City provides programs at the Center weekday evenings for all ages. Lynnwood Recreation Center and Pool The Recreation Center and Pool in neighboring Lynnwood offers over 20,000 square feet of indoor aquatic play. The recreation pool includes water slides, a lazy river, water playground and family hot tub. The lap pool area includes a sauna, adult hot tub and warm water therapy pool. The center also includes a cardio/ weight room, fitness studio, racquetball courts and multi -purpose classrooms. Lynnwood Senior Center The Lynnwood Senior Center is a community center serving all people 62 years of age and older with a variety of services, activities and special events. The 4,200-square foot center is a gathering place for active adults and offers activities for the mind and body. Older adults can participate in a number of activities, including exercise classes, yoga, Zumba, dance, computer training, and much more. In addition to a wide range of exercise and physical activity classes, the center offers outdoor recreation programs that include hikes, bicycle excursions and trips throughout the Pacific Northwest. The center also has a community garden where participants can grow flowers and vegetables. Mountlake Terrace Recreation Pavilion The Recreation Pavilion is a multi -purpose facility with an indoor 25-yard swimming pool that has a leisure pool with zero -depth entry, spray toys, lazy river with current, teach pool area with a submerged bench, deep area, easy access with a wheelchair ramp, a therapy pool with a dedicated lift, dry sauna, fitness room, racquetball courts, dance studios, preschool room, and interchangeable multi -purpose rooms for programs or rentals, and an indoor playground. The lobby features vending machines, a barista stand and a retail area to purchase swim wear. Mountlake Terrace Community Senior Center The Mountlake Terrace Community Senior Center seeks to improve the quality of life for aging adults in the community by providing an enlivened, friendly environment promoting health and wellness. Established in 1997 as the Mountlake Terrace Senior Group, the organization agreed to a partnership with the City of Mountlake Terrace and relocated to the 7,000 square foot Mickey Corso Clubhouse in Ballinger Park. The City owns the building, and room rentals are operated by the Senior Group. Dale Turner YMCA The Dale Turner Family Branch of the YMCA of Greater Seattle serves north King and south Snohomish Counties, including the cities of Shoreline, Lynnwood, and Edmonds, as well as the Lake Forest Park and Woodway neighborhoods of Seattle. On -site and outreach programs include free meals, support for homeless and transitional members, child care and school readiness, youth development, family activities, chronic disease prevention, and summer meal programs, among others. Facilities include a pool, weight room and gymnasium. 34 Packet Pg. 183 8.1.b EdmondS 2022 PRO OTHER FACILITIES Along with City -sponsored facilities, other organizations, neighboring communities and public schools expand the number of park and recreation related benefits available to Edmonds residents. ARTS & CULTURE Edmonds Center for the Arts Edmonds Center for the Arts (ECA) is a 700-seat performing arts venue located on the campus of the original Edmonds High School. Originally constructed in 1939, this historic facility was renovated and reopened in 2006 as a state-of-the-art performance hall. ECA, a non-profit organization hired by the City of Edmonds Public Facilities District, manages the facility. ECA presents an array of performing artists from around the world, provides space, production management and technical expertise for community partners and rental clients, includes a gymnasium, and serves more than 75,000 patrons who enjoy the facility annually. ArtWrks ArtWorks is a joint project of Edmonds Arts Festival Foundation and the Edmonds Arts Festival Association and is the headquarters for each of these organizations. Housed in a City -owned building, this facility provides space for arts workshops, special exhibits and meetings. Artworks provides an on- going schedule of classes, workshops, exhibits, art shows, special events and arts organization meetings throughout the year. Wade James Theater Located on City property, the 219-seat theater was built and is operated by the nonprofit Edmonds Driftwood Players. Originally built in 1968 as The Driftwood Theatre, it was renamed during the 1970s in memory of its architect and founding member, Wade James. Graphite The Graphite building in downtown Edmonds is a new, privately -funded arts facility that will be the home of studio spaces and open session workshops for artists. The facility includes a gallery, dark room, art book collection and a flex space. Graphite is also the home of the non-profit Art Start Northwest, which is the funding organization for programs held at Graphite. Edmonds Historical Museum Housed in the historic Carnegie Library, the museum building has two floors. The facility features an exhibit gallery, administrative office, work rooms, a local history library and an extensive photography archive. The building is owned by the City of Edmonds and operated by the Edmonds South -Snohomish County Historical Society. Log Cabin Visitors Center Operated by the Edmonds Chamber of Commerce and owned by the City, the Log Cabin Visitors Center provides information on Snohomish County area attractions, sights and accommodations for guests and travelers. It also offers Edmonds maps and navigational resources, information on Edmonds tours, and other useful resources for visitors. SCHOOLS Edmonds School District provides a range of recreational opportunities for students and the public. The district offers sports fields, playgrounds, outdoor basketball courts and gymnasiums. Public access is limited to times when school is not in session and when there are no competing demands from school - related activities. In past years, the City has developed neighborhood or community park elements in partnership with the District at several school sites. YOUTH ORGANIZATIONS Sno-King Youth Club provides a variety of youth sports, activities and camps at locations in Edmonds and Lynnwood. The organization offers recreational sports including soccer, flag football, T-ball and basketball. Sno-King also provides a local competitive option for soccer players seeking advanced training and competitive opportunities through a premier league. DRAFT 35 Packet Pg. 184 8.1.b NEARBY MUNICIPAL PARK SYSTEMS Mountlake Terrace the City of Mountlake Terrace manages 193 acres of park land, including opportunities for both active and passive recreation. The City's recreation system consists of diverse amenities that include playgrounds, sport fields, tennis courts, disc golf, a boat launch, fishing and beach access and miles of soft -surfaced and paved trails for walking, biking and hiking. Program Coordination Historically, the Cities of Edmonds and Mountlake Terrace produce a joint recreation program guide (the Craze) that highlights recreation programs offered in both communities and the recreation facilities that are available nearby. These nearby facilities provide opportunities for aquatics, athletics/fitness, gymnastics, sports, general recreation, facility rentals and special events. Lynnwood The City of Lynnwood has over 350 acres of park land,100 acres of open space, an 18-hole public golf course,14 miles of trails, a recreation center, senior center, Heritage Park and two athletic complexes. Lynnwood's parks offer a wide range of active and passive recreation opportunities, including innovative playgrounds, spray pools, a skate park, hiking trails, forests, streams, wetlands and wildlife habitat. The City of Edmonds maintains an interlocal agreement with the City of Lynnwood for use of Meadowdale Athletic Complex and Lynndale Skate Park. Snohomish County Snohomish County owns and manages Esperance Park, located within a small unincorporated area within the city limits of Edmonds. Esperance Park is a 9.6-acre county park with athletic fields, accessible walking paths, off -leash dog area, playground, zipline and sport court. Athletic fields include a little league baseball diamond and two practice areas for field sports. In addition, Southwest Olympic View County Park, located in northern Edmonds, is a 120-acre park with two nature trails. The site encompasses a series of forested ravines and Perrinville Creek, which flow through the eastern portion of the Park to Brown's Bay on Puget Sound. Olympic View Drive winds through the site on its way from Lynnwood to Edmonds. ''A k }54 .y. F 36 Packet Pg. 185 8.1.b EdmondS 2022 PRO Hickman Park A gracious cherry tree is the centerpiece at Hickman Park. Photo credit: Chris Walton c d N O noo m U a c m Q. O Ca c 0 r L }, Y L IL N N O N C O .N N O I- C? O N N O N LO O w a r c m E M U 0 r r QiYi 3] CHAPTER 6 PARKS & A OPEN SPACE The PROS planning process assesses recreational needs and priorities for parks and open space in Edmonds. The park assessment included a discussion of specific local needs with consideration given to the City's broader parks system. Public input and information on park inventory conditions were also heavily relied upon in the planning process. By considering the location, size, and the number of park facilities by type and use, along with community interests and priorities, the PROS Plan evaluates the existing and future demand for park and recreation amenities and provides recommendations for future initiatives. The six -year Capital Improvement Program (CIP), which identifies and prioritizes crucial upgrades, improvements, and expansions, is based on the needs assessment and the recreational interests expressed by the community. NATIONAL TRENDS A variety of resources have been assembled and summarized to offer a comprehensive overview of current trends, market demands and agency comparisons in the provision of parks and recreation. This information provides perspectives that are helpful when balancing with local insights and feedback from the community to identify the demands and establish public needs during the planning process. The following national and state data highlights some of the 8.1.b Packet Pg. 187 1j, 51 Im Ell 4.., �oj - ZK t 4 : '- _irk, IY Bray -, - sLandl C i tY F F, d n-I 0 n dj mom Packet Pg. 188 DRAFT O current trends in recreation and may frame future considerations in Edmonds' park system. Examining current recreation trends can help inform potential park and recreation improvements and opportunities that may create a more vibrant parks system as it moves into the future. Additional trend data and summaries are provided in Appendix F. ■ Nationwide, 82% of U.S. adults believe that parks and recreation are essential according to the American Engagement with Parks Survey from 2020. (l) ■ Seventy-seven percent of survey respondents indicate that having a high -quality park, playground, public open space, or a recreation center nearby is an important factor in deciding where they want to live. (l) Playground Trends Reported in Landscape Architect magazine, the top five playground industry trends for 2021 were compiled from data and feedback from parks professionals, landscape architects and educators. 1. Inclusive Playgrounds, increasingly popular over the last few years, have been evolving beyond meeting basic ADA guidelines. Designers are seeking to expand accessible playground equipment, consider multi - generational play, and leverage inclusive play to help overcome societal barriers. 2. ■ Just over half of Americans ages six and older participated in outdoor recreation at least once in 2019, the highest participation rate in five years. However, the number of outings per participant declined — resulting in fewer total recreational outings. (2) 3. ■ Running, jogging, and trail running are the most popular outdoor activities across the nation, based on levels of participation, followed by fishing, hiking, biking, and camping. (2) ■ Walking ranked as the top activity by participation rate (94%) in Washington State. (4) ■ Trail running, day hiking, and recreational kayaking are rapidly increasing in popularity — participation in each increased more than 5% per year between 2014 and 2019. (s) ■ Walking, running, hiking, and cycling saw significant increases in participation in the early months of the COVID-19 pandemic (March to June 2020). (2) ■ People of all ages and income levels are interested in outdoor activities like fishing, camping, hiking, biking, and swimming. Younger people are more interested in participating in team sports, such as soccer, basketball, and volleyball. Older adults are more likely to aspire to individual activities like swimming for fitness, bird and nature viewing, and canoeing. (s) Sources: (1) 2020 American Engagement with Parks Survey (2) 2020 Outdoor Participation Report (3) 2020 Sports, Fitness, and Leisure Activities Topline Participation Report (4) 2018-2022 Recreation and Conservation Plan for Washington State (also known as the Statewide Comprehensive Outdoor Recre- ation Plan, or SCORP) 4. Rope -based Playgrounds, climbers and playground nets provide a technique for working around natural environments and unusual topography. Their flexibility in placement offers more options for connecting with the landscape rather than working around difficult topography. Outdoor Fitness has increased importance during the COVID-19 pandemic as many gyms and indoor fitness centers closed and forced more people to seek outdoor options. Outdoor fitness spaces are being increasingly integrated into park and trail designs to encourage health and physical fitness for all ages. Outdoor Learning has been implemented during the pandemic to replace or supplement indoor classrooms. Outdoor classrooms can encourage activity in children to counteract the reduction in recess time due to hybrid class schedules and remote learning. Seating, tables, shelters, hand sanitizer stations and other outdoor products are helping create outdoor classrooms. Human -powered Play engages users to provide physical energy to "power -up" the activity, such as turning a handle, pressing foot pedals, rotating wheels. These products often relate to sensory experiences like lights and music, story -telling or social games. Spurred on by the social distancing of the pandemic, these five trends in playground design and development point to more human -to -human interactions that reinforce the value of social connections, even in a physically distanced environment. 40 Packet Pg. 189 8.1.b EdmondS 2022 PRO Operational & Service Challenges Due to COVID-19 A statewide survey of Washington park and recreation agencies was conducted in the second half of 2020, with a focus on service demand and operational challenges, both preceding and as a result of COVID-19. City, county and parks and recreation district leaders were asked to complete the survey, and the survey was sent to 227 agencies - 109 cities, 39 counties, 79 Special Purpose Park Districts with 73 responses. The project was a collaboration between the Washington Recreation & Park Association, the Washington State Association of Counties, the Association of Washington Cities, and Metro Parks Tacoma. In a question that asked the agency about how stable its outlook for 2020 pre- and during COVID-19, the percentage of agencies that stated their outlook as very strong and stable decreased by 25 points, with 27.8% indicating as very stable at the beginning of the year LOCAL INTERESTS & NEEDS EDMONDS COMMUNITY SURVEY The community -wide surveys (mailed and on-line) conducted from May to August, 2021 identified why residents visit Edmonds' parks. Respondents indicated that they visit local parks and recreation facilities for a variety of reasons. The most popular activities are visiting the beach and waterfront (83%), walking or running (76%), followed by relaxation (61%), playgrounds (41%) and fitness (40%). Approximately one in three respondents visited for community events/concerts (37%), wildlife viewing (36%), dog walking (35%), or family gatherings (34%). to 2.8% indicating as very stable by August 1, 2020. Similarly, agencies that felt moderately or significantly underfunded and unstable rose from 5.5% to 50% by August 1, 2020. Also, significant majorities of agencies indicated service delivery impacts due to the COVID-19 pandemic in the following ways: ■ Reduced ability to manage, maintain, operate and secure passive parks to safety standards and control access (87%). ■ Cancellation of special events and tourism campaigns that support local employment and drives the local economy (87%). ■ Inability to operate critical community programs, pools, attractions and facilities, including services for vulnerable populations (81%). ■ Lack of ability to hire/maintain seasonal employees & offer programs/services allowable under Safe Start' (74%). ■ Addressing public use and behaviors that put the community at risk, such as tearing down caution tape, using fields (85%). 1 - Safe Start is Washington's phased ap- proach to recovery and reopening the state. Figure 6. Main Reasons for Visiting Local Parks in Edmonds Beach / waterfront 82.9% Walking or running 77.5% Relaxation 60.8% Playgrounds 40.6% Fitness 39.5% Community events / concerts 36.6% Wildlife viewing ! 36.1% Dog walking 34.7% Family gatherings /picnicking 34.4% Recreation programs, classes or camps 1111ft. 26.4% Swimmingf5.3% 20.1% Bike riding19.3% Youth sport programs, including summer sport...19.1% Outdoor sport courts18.1% Sport fields18.1% Watersports / canoeing / kayaking0.5% Other% Fishing at the pier% Indoor sport courts Underwater Dive Park 3.7% N/A - I didn't use any Edmonds facilities 1 1.7% 0% 20% 40% 60% 80% 100% DRAFT 41 Packet Pg. 190 DRAFT Survey questions explored the needs for a number of park priorities for future consideration in Edmonds park and recreation provision. Respondents feel there are not enough trails, pools and conservation areas. Walking and pedestrian trails were clearly the most needed. Figure 7. Needs expressed for parks, trails and recreation facilities Walking / pedestrian trails 1 31.5% Pools i 30.0% Park conservation areas & open space 5.3% Community events (such as the Concerts in the Park) % Picnic areas & shelters Bike trails in parks ®� Indoor gymnasium space Sport fields & sport courts Recreation programs (camps & classes) Developed parks with playgrounds 0% 20% 46.6% 22.8% M 27.1% �.6% 44.8 % 37.1% ,. 11 60.0% 40% 60% 80% 100% ■ Not enough _ About the right number ■ More than enough ■ Don't Know Respondents were asked to rate the condition of a variety of park and recreation facilities on a scale from poor to excellent. Respondents gave overwhelming high marks to the condition of the City's waterfront parks in downtown Edmonds. the survey inquired about specific amenities that participants felt were needed for park and recreation Hickman Park .+W facilities. Of the specific list of amenities provided, respondents indicated that the highest unmet need is for pedestrian and bike trails (84%) and an aquatic facility or pool (65%). Levels of needs for different amenities varied somewhat across the City and based on demographics groups. The complete list ranking (below) provides a summary of expressed needs. Figure 8. Park and recreation amenities that have not been met locally Pedestrian & bike trails in parks 1- Aquatic facility / pool i Indoor fitness & exercise facilities Community gardens Upgraded or renovated playgrounds Outdoor fitness equipment Off -leash dog areas (dog parks) Additional picnic shelters for group gatherings Additional tennis & pickleball courts ®' Lighted, all-weather turf sport fields Additional fields for soccer, football & lacrosse All -abilities, inclusive playgrounds Additional basketball courts Additional fields for baseball / softball 0% 20% 40% 60% 80% 42 Packet Pg. 191 8.1.b EdmondS 2022 PRO When tied to the cost of investments, the most important improvement was focused on existing parkland. When examining park and recreation experiences that may be limited or not available in Edmonds, respondents top two choices were buying additional parks for conservation and open space and building an aquatic center. Figure 9. Support for funding new amenities in Edmonds Buy additional parks for conservation & open space Build an aquatic center Install all-weather sport fields Develop a bike skills course / pump track Provide off -leash dog park(s) 0% 25% 50% 75% 100% ■ Increase Taxes ■ Not in Edmonds OTHER PUBLIC ENGAGEMENT Tabling Events The City conducted "pop-up" tabling in August at the Uptown Market to solicit community feedback on some park and recreation priorities. Participants were given sticky dots to use on a display board that presented six different target areas. The dots could be placed within boxes marked as "most important", "important", or "less important". Ranked in order, the resulting most important focus areas were as follows: ■ Natural open space acquisition ■ New parkland acquisition ■ Park maintenance ■ Picnic shelters & restrooms ■ Trail connections ■ All-weather sports fields & lighting ■ Recreation programs Virtual Public Meeting #1 the first virtual public meeting occurred on July 22, 2022, which introduced the PROS Plan, highlighted community survey results and provided opportunities for public feedback through a series of polling questions and online question and answer periods. One of the polling questions aimed to build on the responses from the community survey and asked participants to select their top three parks for needed improvements from a list of five choices. Attendees identified Mathay Ballinger Park as the top choice and in tied results selected Yost Memorial Park and Marina Beach Park as second choice. Participants were also asked about interest in the City acquiring more conservation lands and open space. In another polling question, a plurality of respondents (42%) indicated interest in acquiring additional saltwater beaches and waterfront, followed by additional wetlands and marshlands (28%). Other comments for park improvements included: ■ Add more parks, services, and facilities in the SR 99 corridor and the south end of the City. ■ Improve Hummingbird Park. DRAFT 43 Packet Pg. 192 DRAFT s•1.b ■ Provide better access to the waterfront, specifically near the Ebb Tide condominiums, and make it ADA accessible. ■ Include bicycle features and access at parks. ■ Build skate parks in other areas of the City outside of the "bowl." Virtual Public Meeting #2 The second virtual community meeting was conducted on October 16, 2021 to report on progress of the planning effort, results of surveys and online feedback and ask a series of questions to gauge areas of interest, priorities for additional parks, ideas on improving existing parks and potential additional community events. The virtual meeting provided polling questions to facilitate inputs by participants. Figure 10. Top Park Improvements Picnic Bike skills area or shelters/tables for pump track gathering 3% 13% Improved maintenance/exist ing parks 17% Playground upgrades & replacement 17% The future direction of the Yost Pool facility was explored in a polling question that asked what the focus/scale should be if the City were to replace Yost Pool with a new aquatics facility. Given the choices of local or regional and indoor or outdoor, the overwhelming majority chose local -scale (76%) with those poll responses split between indoor (39%) and outdoor (36%) pool options. The final polling question focused on targeting the most important options for improving trails in The first polling question asked where the City should prioritize additional park and open space investments. Participants were allows to select up to three areas within the City. Southeast Edmonds (85% of respondents) and the Highway 99 Corridor (81%) were polled as the highest priority with North Edmonds (54%) polled by approximately half the respondents. Southwest Edmonds (42%) and Downtown (12%) were not polled as high priorities. Participants were asked to choose one option among a list of potential park improvements. Improved, permanent restrooms (20%) and additional community gardens (30%) got the most responses in the poll with playground upgrades (17%) or improved maintenance (17%) chosen by one third of the respondents. Additional Community Garden 30% Improved, permanent restrooms 20% Edmonds. Five types of trail improvements were listed along with a sixth choice that included all options. While over 30% of respondents chose all the options, the strongest two directions focused on building connections within existing parks and open spaces and acquiring and building new connections through land purchase or easements. 44 Packet Pg. 193 8.1.b EdmondS 2022 PRO STAKEHOLDERS INSIGHTS A number of focused interviews were conducted with identified stakeholders considers as leaders in various community efforts and activities. Representatives from local business, the Edmonds School District, the Port of Edmonds, the Chamber of Commerce, Rotary, the Korean Community Services Center, Boys and Girls Club, Edmonds Floretum Garden Club, Arts Commission, and advocates for Yost Pool and South Edmonds were included in the interviews to discuss park and recreation issues, opportunities and needs for future improvements. Representatives from agencies that already had working partnerships with City Parks and Recreation valued the relationship and recognized its importance to the community. Organizations without existing partnerships with Parks and Recreation look forward to working more collaboratively for both broader and targeted outcomes. Participants recognized how well parks were maintained but cited the need for more aggressive invasive species control. Trail connections and new bike/pedestrian pathways were advocated for, including specific projects for creating an east/west connection, paving the spur trail to Mathay Ballinger Park, creating safe routes to parks/schools, and enhanced walkability throughout the community. Extending the off -road shared -use Interurban Trail was desired. The concern for an equitable park system was voiced to raise the issue of needed investment in the SR 99 corridor, South Edmonds and southeast Edmonds. Mathay Ballinger Park needs further improvements to help support local recreation activities. Additional neighborhood parks are needed in the identified "gap" areas. The value of locating a small community center along SR 99 for better access to recreation programming and social services was promoted. Better physical access to parks was promoted through acquisition of new parklands in underserved areas and creating full ADA compliance in existing parks. Better access to recreation was promoted through multi-lingual communications and programming made available to South Edmonds and SR 99 communities. Stakeholders identified a number of improvements needed in the park system including Yost Pool upgrades, the need for additional permanent restrooms in parks, and more amenities in Mathay Ballinger Park. The need for recreational opportunities for older children and teens beyond the existing skate park was discussed and ideas such as zip -lines, big swings, BMX tracks and other more engaging park amenities were suggested. The support for more open space and conserved parklands with native tree canopies and native vegetation reinforced the desire for conservation of more open space. The need for restoration efforts, more access to nature and controlling invasive plant species were cited across the different stakeholders. An emphasis on native plants for pollinators and "re - wilding" in parks was recommended. A more active and intentional program for including public art into parks was suggested. A more formalized volunteer program, especially for trail maintenance, was encouraged. Collaboration and communications across various agencies and throughout the community was supported. City Park gazebo DRAFT Packet Pg. 194 DRAFT s•1.b CONDITIONS ASSESSMENT The condition of park infrastructure and amenities is a measure of park adequacy and a required assurance of public safety. General park infrastructure may include walkways, parking lots, park furniture, drainage and irrigation, lighting systems and vegetation. Deferred maintenance over a long period can result in unusable amenities when perceived as unsafe or undesirable by park patrons. The existing conditions within parks were assessed to identify issues and concerns and opportunities for future improvements. The condition assessment matrix shown on the following page summarizes the results of these assessments and can be used to help prioritize needed park improvements. The matrix uses a rating system that ranks the condition of the park element based on the following scale: 1— Good Condition: In general, amenities in good condition offer full functionality and do not need repairs. Good facilities have playable sports surfaces and equipment, working fixtures, and fully intact safety features (railings, fences, etc.). Good facilities may have minor cosmetic defects. Good facilities encourage area residents to use the park. 2 — Fair: In general, amenities in fair condition are largely functional but need minor or moderate repairs. Fair facilities have play surfaces, equipment, fixtures, and safety features that are operational and allow play, but have deficiencies or time periods where they are unusable. Fair facilities remain important amenities for the neighborhood but may slightly discourage use of the park by residents. 3 — Poor: In general, amenities in poor condition are largely or completely unusable. They need major repairs to be functional. Poor facilities are park features that have deteriorated to the point where they are barely usable. Fields are too uneven for ball games, safety features are irreparably broken, buildings need structural retrofitting, etc. Poor facilities discourage residents from using the park. Generally a feature with a rating of "3" should have higher priority for resolution through maintenance, capital repairs or as a new capital project. Park amenity conditions were also averaged across park elements to indicate which types of elements are in greater need for significant upgrades, renovations or overall improvements. Based on this assessment, the City's park system is in need of playground upgrades, sports field improvements, and better ADA compliance. In mid -July 2021, the consultant landscape architect conducted site assessments of the outdoor recreation facilities owned and operated by the City to discern the level of care and need for improvements by visually observing the conditions in the park system. The conditions matrix offers a quick look at the ratings across the system to help discern where the most immediate needs might be for repairs or improvements. Additional information and observations from site assessments are provided in Appendix A. Affik i ` . Sierra Park play equipment 46 Packet Pg. 195 8.1.b EdmondS 2022 PRO ,aouelldwoo M seajy Iein1eN spas padeospue� ri Saail Aced }Inl rl dweb / Blood leog MIMS o!uold � N swowlsaa ti N ri 96eubig ri 3IV o!Ignd (N/)) 6ullgbl1 r z r r r r r z z z ..... zz z z r z r r z r r r z z r z z z z r r s6u!gs!wng al!S uawa13 oeb JeleM/Iood v E w O o goeasAuaJJaleM a eaiv gsea�-gp c n N N sllejl / sleMgled Plaid IleglloS / Ilegaseg N O c spla!d Ja000S 0 U N G O IlegAellon pueS � sluual :spnoo paned o 0 a G O glaNseg :synod paned N spuna6,(eld N N — c-I N M O N N ei N rl rl •i •i n !9 M ei n !9 n !i M a-1 ei !i M "1 I e1 e-I ei _ rl _ _ _ _ !i •'1 •i •i e-I a d m > Y Y Y 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o E w a o C `t C `t C `t C `t C `t L `t J E J E C J L L L L L L L L L L L L L d L d L d F Y O S E E E m on m nn ou oo m m m 3 0 a 3 3 3 3 3 3 u u u z z z z z z z z z m o a m o0 1D 0'. oo V m m io io ry w r v o in m o O N �c �c m o � O m �c w �p a0 v O I� O ill lD V1 O 6 Ci tG O G O O O G N ei E J y w L E w V y ` a E o ? o 0 o n > c o. v _ > E o> oif w a 0 u n v "O H L y J Ul V 0 N 0 ~ u Y a+ C 5 A'1 w 0 N w E a a a L 3 \ a '� _ En a 0 Y o �n m m �e E w v¢ m m °' a a LL > E �m v v o 'n a .0. cvi w E E '^ w o 0 0 0 °' m v° E w 3 z a m m E > 2' >Ll ?" c m > 5 E E n 0 u i7 i 2 2 x2 a vvi �n u o o w w =_ z 0 > 3 DRAFT 47 Packet Pg. 196 DRAFT 8.1.b PAGE LEFT INTENTIONALLY BLANK a O w a m u a c m Q. O Ca 0 L u Y L Q. N N O N C O A N w Q O ti N O N N O N O w d r C d E t V R a+ a Packet Pg. 197 8.1.b EdmondS 2022 PRO In addition to the matrix, the following narrative summarizes the overall considerations resulting from the visual observations. The individual park facility conditions assessments and this summary were also reviewed by parks staff. General Appearance & Perception of Care Overall, the Edmonds park system hosts extensive use by residents and visitors alike. Some parks contained much older infrastructure and recreational amenities that were in need of upgrades, replacements or repairs. Many parks had recently added some new features or replaced playgrounds and there was clear evidence of good stewardship by the parks maintenance staff. Efforts should continue to renovate, update and enhance existing park infrastructure and recreational offerings throughout the park system. Playgrounds & Playground Access Barriers the park system has a variety of play equipment from newly installed to 20+ years in age. Some older equipment is showing evidence for the need to be replaced from worn surface coating, rust, missing Figure 12. Playground Equipment Ages and Predicted Replacement Schedule pieces or just the lack of play attraction. A record of each playground's installation date is kept by park staff as a helpful tool in predicting the future replacement schedule for each park's playground amenities. lhat information helps inform and reinforce the need for play equipment upgrades and replacements. Sierra Park, Yost Park and Maplewood Hill Park all have older playground equipment (more than 20+ years) that is due for replacement. Many playground areas have constructed edges to retain the wood fiber fall safety surfacing. Edging needs to have an opening that does not create an ADA barrier to easy access. Paved ramps or pathways into play areas may be warranted once barriers are removed. At least one park (Sierra Park) still used coarse sand as a safety fall surfacing. While not prohibitive, coarse sand should be replaced by engineered wood fibers or some other more updated convention play surfacing. At Sierra Park, the entire playground should be replaced with more offerings rather than just improving the safety surfacing. Elm Street Park N/A N/A N/A - Frances Anderson Center Field 2018 3 Heavy • Haines Wharf 2010 11 Medium • Hickman Park Hummingbird Hill Park 2009 2007 12 14 Heavy • Medium Mathay Ballinger Park 2013 8 Medium • Pine Street Park 2006 15 Med-heavy • Seaview Park 2019 2 Med-heavy • Sierra Park 1996 25 Light • City Park 2014 7 Heavy • Yost Memorial Park & Pool 1995 26 Medium • Civic Center Playfields 2022 0 Med-heavy Marina Beach Park 2016 5 Heavy Maplewood Hill Park 1985 36 Very light F-ecial Use Parks Meadowdale Community Clubhouse 2017 4 Medium * NOTE: Replacement schedule based on combination of age, amount of usage and predicted wear and tear. • • • • DRAFT 49 Packet Pg. 198 DRAFT s•1.b Paths & Pavement Management Edmonds trail system includes the Interurban Trail, a shared use paved pathway in the southeastern section of the City, a natural -tread trail network in Yost Memorial Park, and a number of paved pathways connecting a series of waterfront parks. While not an extensive trail system extending across the entire City, each trail offers outdoor recreation opportunities and physical activity for residents and visitors. Paved pathways, especially asphalt surfaced, did have locations where cracks have formed at edges and where tree root upheavals have generated pavement cracks. Invasive Himalayan blackberries should be removed and replaced with more suitable native plantings to reduce the repetitive need to hack back the thorns from intruding on the trail. The Interurban Trail was in good condition with its paved surfacing and at its road crossing on 76th. Trash collection was regular and amenities were clean. The City also maintains the SR 104 trail and 8th Avenue trail from the Anderson Center to the Cemetery. In Yost Memorial Park, the trail network showed signs of regular vegetation control to keep the trails open. Trail surfaces were generally navigable. A few rustic "trail" signs were evident. The boardwalks and bridges appear to be aging and will predictably need replacement in the coming years. Where boardwalks had steps the wear was more evident and some steps were uneven. As repairs are made, it may be advisable to extend the boardwalk section into ramps to remove the need for any steps and increase the access for those with mobility limitations. Interurban Trail The paved pathways in Marina Beach Park, through the Port promenade and across the waterfront/beach parks were generally in good condition. The paved pathway along the Edmonds Marsh did show some spots with asphalt pavement cracking or gaps between pavement and wood decking of observation viewpoints. Root upheavals and pavement cracks persist on paved pathways that have large trees nearby. Some parking areas showed evidence of cracking or buckling. Olympic Beach parking area has pavement cracking and significant uplifting in need of repair. Resurfacing or complete renovation should be explored. Cracks and gaps where different surfaces meet raised concerns about ADA-compliance, particularly where asphalt pavements met observation platforms (Edmonds Marsh). Restroom Upgrades Older restroom facilities (built before 2010) may not provide adequate universal access to people with disabilities. All public park restroom facilities (including portable toilets) should provide compliant ADA access for park users. Many older restrooms also did not contain ADA-compliant signage for designating gender identities for entries. The restroom at the entrance to the fishing pier (Olympic Beach Park) could benefit from better lighting. A record of restroom construction dates could help prioritize building replacements to help upgrade the park system and add new permanent restrooms where needed. Trail at Yost Memorial Park 50 Packet Pg. 199 8.1.b EdmondS 2022 PRO Bleachers at Pine Street Park Sports Field Amenities Parks Maintenance staff Many of the existing ballfields could benefit from field renovation to encourage better grass coverage and field playability. Whether the need is for better irrigation, field drainage, soil chemistry or over -seeding for improved grass species, some upgrades could be considered for ballfields. According to the International Building Code any bleachers with more than one tier must have side and back safety railing. Several parks with ballfields have 3- and 5-tiered bleachers with no safety railing. Modify existing bleachers by adding railings or replace with newer bleachers fully railed. Americans with Disabilities Act (ADA) Compliance Architectural barriers, designated parking areas, entry access designs, playground entries and surfacing, play equipment, benches, picnic tables and pathways in older park facilities provides challenges to complying with the guidelines for ADA standards for places of public accommodation. Parks that did not provide some paved pathway to access all the park amenities were not likely to provide accessible benches, picnic tables or grills. Several playgrounds presented obstacles to universal access into the play area. The City does not have an ADA Transition Plan for park facilities, and one should be completed. Maintenance & Operations Despite a challenging mix of older infrastructure and newer facilities, there was clear evidence of active and engaged maintenance practices with little or no signs of neglect or disrepair. However, facilities that are managed by volunteers like the Willow Creek Fish Hatchery may need re-evaluation to avoid having facilities appear to be neglected or disrepair and reflect poorly on the City parks system. Older parks may have residual structures like the swing support pole in Hummingbird Hill Park or the ATM kiosk in Richard Anway Park. Remnant pieces that are no longer serving any function should be removed to help convey the perspective of active care in the park system. Trash collection is greatly accelerated during the busy summer months. Some parks could use more regular pick times or additional trash receptacles as weekend use can overwhelm existing capacity of trash receptacles in popular parks. Consider adding more receptacles in heavily used areas to help cover litter control over busy weekends. Invasive Plant Species Control Blackberries and English ivy appear to be two of the most common invasive plant species established in several natural areas. Along active pathways, blackberries are a hazard when not kept fully in check. Natural areas in Edmonds face continual challenges T c 0 A a O ti N 0 N N O N LO O W a r c m E z a DRAFT 51 Packet Pg. 200 DRAFT from persistent undesirable invasive plant species, degrading the environment and disrupting effective ecosystem services. For over 30 years, the City of Edmonds Parks Department has been committed to reducing pesticide use in its parks, achieving a 60% reduction since 2008 by using Integrated Pest Management (IPM) approach to park maintenance. Invasive plant problems are monitored on a weekly basis. When pesticides are used, they are applied using strict protocols and best practices to protect people, pets, and the environment. When necessary, pesticides are applied by Park staff that have been trained, licensed, and certified through the Washington State Department of Agriculture (WSDA). Training includes requirements for safe practices, knowledge of and adherence to labeling instructions, compliance with state laws, and record keeping. Volunteers in some parks help with mechanical control of blackberries and other vegetation that overgrows into trail areas. Volunteers also replace invasive plants with native plants to prevent regrowth and restore native habitat. Grass Lawn Areas As a planning process, these park site conditions assessments do not explore in-depth evaluations of natural turfgrass conditions. Maintaining durable grass cover for general park use is the target to support enjoyable outdoor recreation activities for park users. Sports fields require a higher degree of care to ensure safe athletic play without significant gaps, disruptive weed cover, uneven density, etc. that could trigger injuries. Whether for sports or general use, mown grass lawns require a continual schedule of care during the growing season. Soil tests should be conducted periodically to determine if soil pH or nutrient levels are adequate for supporting optimum grass growth. Based on each park's soil test results, fertilization schedules can be developed to ensure the right rates, types and frequencies of turfgrass fertilizers are applied for to provide sufficient growth to support specific park uses. Irrigation is recommended for those grass areas where mid- to late summer active use is expected. If not already in place, the park system could have an intentional designation for non -irrigated grass lawns and irrigated areas. The sports field irrigation system needed attention in Frances Anderson Center Fields. Many mown lawn areas were inundated with white clover, potentially indicating low nitrogen levels in the soil. Too much clover in an open grass play area may raise concerns for the higher prevalence of bee activity. Soil testing and resultant fertilization can help encourage denser grass cover with less clover dominance. Signage & Wayfinding Edmonds parks have multiple styles, colors, fonts and materials used in the signs that identify the different parks, usually at a primary entrance. Some signs use bright colors and lists some of the main features within the park. The new signs combine brown and black backgrounds with white lettering. Signature waterfront parks have a variety of engraved rocks, carved wood and aluminum signs that identify the public park. It would be helpful to implement the signage style guide developed in 2010 and uniformly identify the park and amenities using consistent styles, colors, lettering and materials. Consistent graphics can help with "branding" the value of the parks, trails and open space and reminding users who the provider is. Use of the park style guide for signage would be helpful to achieve continuity. For the Edmonds trail system, a unified wayfinding program could be beneficial. Signs were lacking at the starting points for the Edmonds Marsh, to identify the paved pathway. While a printed Yost Park Trail Map is available (at the Frances Anderson Center), Yost Memorial Park's trail network has limited directional and identification signs to let trail users know their location and how to get to their destination. Trail distances are vague and can only be approximately by the map's rough scale. It would be helpful to have a complete navigational/wayfinding sign system that incorporates directional information and trail identification to inform users and enhance the trail experience. 52 Packet Pg. 201 8.1.b EdmondS 2022 PRO PARKS DISTRIBUTION & GAP ANALYSIS Understanding the known gaps in the park system and evaluating the City's existing levels of service for parks will provide a foundation for strategic planning as a basis for a balanced distribution of parks, trails and recreation amenities in the future. To better understand where acquisition efforts should be considered, a gap analysis of the park system was conducted to examine and assess the current distribution of parks throughout the City. The analysis reviewed the locations and types of existing facilities, land use classifications, transportation/ access barriers and other factors as a means to identify preliminary acquisition target areas. In reviewing parkland distribution and assessing opportunities to fill identified gaps, residentially zoned lands were isolated, since neighborhood and community parks primarily serve these areas. Additionally, travelsheds were defined for neighborhood parks using a 1/a-mile primary and 1/z-mile secondary service area with travel distances calculated along the road network starting from known and accessible access points at each park. Travelsheds for community parks were derived using 1/4-mile, 1/2-mile, 1-mile and 2-mile travel distances to acknowledge that these park types (including athletic fields) serve a wider array of users and driving to such sites is typical. Maps 2 through 6 illustrate the application of the distribution criteria from existing parks. Areas in white do not have access to a public park within reasonable walking distance of their home. The illustrated `travelshed' for each existing Edmonds park highlights that certain areas within the City do not have the desired proximity to a local park. The highest concentration of park opportunities currently is in the waterfront and downtown areas. The mapping of park distribution and `travelsheds' helps to illustrate the underserved neighborhoods in Edmonds. Areas of South Edmonds, eastern region of 212th Street SW, and an area in the northern section of the City have no nearby access to public parks or open space as indicated by white areas on Map 6. These parts of the City should be targeted for future acquisitions to help create more equitable access for all residents. Striving to provide a neighborhood park within a reasonable walking distance (e.g., 1/2-mile) will require acquiring new park properties in currently under - served locations, improving multi -modal transportation connections to allow local residents to safely and conveniently reach their local park, and evaluating the potential use of school sites as proxies for local neighborhood parks. As Edmonds redevelops and acquisition opportunities are limited, the City should consider taking advantage of acquisition opportunities in strategic locations and as funding allows to fill gaps and ensure an equitable distribution of park facilities. In concert with the search for developable park land, the City should continue to coordinate with any proposed residential land development projects to consider when and how a public park (or trail connection) could be incorporated into the planning of newly developed or redeveloped residential areas. The development density associated with SR 99 and its importance as a commercial zoning district present a challenge for finding affordable land for creating a public park. Combining a park/recreation facility with a much -needed community center and multi -family (affordable) housing development could be a potential approach, as would other public -private ventures. In an effort to examine more closely the distribution of City parks through an equity lens, a second series of maps were compiled that build off the conditions assessment noted earlier in the chapter. Maps 7 through 12 apply condition assessment ratings with the variety of recreational amenities offered to add an additional layer of data to the travelsheds. For example, Map 7 applies scaled ratings from the conditions assessment to the City's neighborhood parks, and Map 8 applies a scaled rating of amenities provided for neighborhood parks. Map 9 creates a composite of these two maps. One limitation to using only travelshed mapping is that the park catchment areas do not reflect information about the level of site development or quality and condition of the existing amenities. This second series of maps aims to illustrate which parks may be underdeveloped or require additional upkeep or enhancements, which could guide future capital planning to bring parity to existing developed parks. The acquisition and development of additional sites to fill known gaps will further improve distribution and equity to parklands across the City. DRAFT 53 Packet Pg. 202 DRAFT 8.1.b PAGE LEFT INTENTIONALLY BLANK a O w a m u a c m Q. O Ca 0 L u Y L Q. N N O N C O A N w Q O ti N O N N O N O w d r C d E t V R a+ a Packet Pg. 203 8.1.b MOW 2022 PRO L ;WSW 2 — ST SW 0 0.25 0.5 1 1.5 2 MIas Shoreline Map 2: Travelsheds for Small Parks (Neighborhood Parks to 1/2-mile) T C A d O ti N O N N O N LO N 0 w IL r c m E z W� Q DRAFT 8.1.b PAGE LEFT INTENTIONALLY BLANK a O w a m u a c m Q. O Ca 0 L u Y L Q. N N O N C O A N w Q O ti N O N N O N O w d r C d E t V R a+ a Packet Pg. 205 8.1.b EdmondS 2022 PRO VERSION OF Legend LAN WILL INCLUD O City Limits 14-m - 1/4-mile Travelshed to City Parks APS AS 11 X17 FOR - 1/2-mile Travelshed to City Parks BETTER READABILITY 1-mile Travelshed to City Parks Puget Sound 2-mile Travelshed to City Parks - City Parks Open Space & Special Use Areas - Non -city Parks - Edmonds School District - Water / Sea ark 3 J' Sie—Park PUGET DR> — Mapl p—d Hill Park CASPERS ST y Bracket 0 andi g _ Civic Center F Play eltl , Pine Ridge Park t i�e3H sr sw �- 180THS 9W 3 Lynnwood $ 188TH ST SW 3 200TH ST SW j m Vost Memorial Park WALNU ST Edmonds Marsh M 212TH III Beacrh Park Cit�k > > Bp I WDO�N H'AY Pine Parkk ' em B, L Parkk " Woodway t I s� 3 Unincorporated Snohomish Co. 3 I 8 ��■ Hickman�P'ark _ ■ g i F M.thay Ballinger Park 0 0.25 0.5 1 1.5 2 Mies Shoreline Map 3: Travelsheds for Community Parks (2-miles) 204TH ST SW T C 208TH ISW .N / I i4 O // ti i N a w T p $ � N O t N Mountlake LO Terrace > SW O a c d y 2 23STH EL SW"� 238TH ST SW Q 1 DRAFT 8.1.b PAGE LEFT INTENTIONALLY BLANK a O w a m u a c m Q. O Ca 0 L u Y L Q. N N O N C O A N w Q O ti N O N N O N O w d r C d E t V R a+ a Packet Pg. 207 8.1.b EdmondS 2022 PRO RNAI VERSION OF Legend LAN WILL INCLUD O City Limits 14-m - 1/4-mile Travelshed to City Parks APS AS 11 X17 FOR - 1/2-mile Travelshed to City Parks ETTER READABILITY 1-mile Travelshed to City Parks Puget Sound 2-mile Travelshed to City Parks 3-mile Travelshed to City Parks - City Parks - Open Space & Special Use Areas - Non -city Parks - Edmonds School District / _ Water t 1�s3H sT sw d miss C my Perk 180THS 9W Seaview Park I 3 O Lynnwood $ Lmnaak Park 188TH ST SW O S� L n PUGET DR — Y m 196TH ST SW Maplew d 3 L Hill Park (L GASPERS sr e N w MTH ST SW (V i c I € 3 N sra ketts I �I / Civle'CZnter 20aTH STSW T Playreltl , Pine Ritlge Park Z Vost Memorial I �208TH ST SW A N Park ' WALNUT ST Edmonds Marsh --- y Marina w Beach Park �INEST Plne O Street ti Park N Elm Street W r ark O 7 ' N t $ 2 O Es- N l Mountlake LO Woodway Terrace > i Unincorporated U) 6 Snohomish Co. � EL SW 0 d Bdil Pa ke E 3 8 Hic�Park 3 � ■ 235i1{pL SW�236TH ST SW Q 5 Ma�nay • 1 Munger Park 2 0 0.25 0.5 1 1.5 2 l Miles Shoreline Map 4: Travelsheds for Waterfront Parks (3-miles) & Special Use Areas ('h-mile) Packet Pg. 208 DRAFT 8.1.b PAGE LEFT INTENTIONALLY BLANK a O w a m u a c m Q. O Ca 0 L u Y L Q. N N O N C O A N w Q O ti N O N N O N O w d r C d E t V R a+ a Packet Pg. 209 8.1.b EdmondS 2022 PRO VERSION OF Legend LAN WILL INCLUD ty 1 � /4-mLimits - 1/4-mile Travelshed to City Parks APS AS 11 X17 FOR - 1/2-mile Travelshed to City Parks BETTER READABILITY -City Parks Puget Sound - Open Space & Special Use Areas - Non -city Parks - Edmonds School District - Water W1 Marina T B.. Park i city Park w Woodway PUGEr DR Maplow�otl I II Perk GASPERS ST j - n Pine RiJ9e Park I Yost Memorial Park WALNUT ST aBUWppiNWq . Fro Unincorporated yo 6 s w _Snohomish Co. P. 8 = erk 3 ■ 5 Mamay • a ar PPar,kk 9F o 0.25 o.5 1 1.5 2 Mlles Shoreline Map 5: Travelsheds - All City Parks ('h-mile) t i�siH sT sw �- 180TH 5 9 3 Lynnwood $ 188TH ST SW 3 200TH ST SW j �I 20CTH ST SW 208TH ST SW / 2 Mountlake Terrace SW ;WSW 28­ ST SW 1 .N •N� O N T O N N O N LO N O a c a) z Q DRAFT 8.1.b PAGE LEFT INTENTIONALLY BLANK a O w a m u a c m Q. O Ca 0 L u Y L Q. N N O N C O A N w Q O ti N O N N O N O w d r C d E t V R a+ a Packet Pg. 211 8.1.b EdmondS 2022 PRO FiNAi VERSION OF Legend PLAN WILL INCLUD O City Limits MAPS AS 11 X17 FOR 14-m - 1/4-mile Travelshed to City Parks - 1/2-mile Travelshed to City Parks BETTER READABILITY - 1/4-mile Travelshed to Accessible Open Space & Non -City Parks P u g e t Sound 1/2-mile Travelshed to Accessible Open Space & Non -City Parks - City Parks ML Open Space & Special Use Areas - Non -city Parks - Edmonds School District Water - Non-residential Zoning IIIIII/ PUGEr DR m ta6TH Mapl-ZEE Hill Park GASPERS ST Brackens j � Landing _ o civicCenter Playfeltl Pine Ridge Park i Vost Memorial _ Park r WALNUT ST Edmonds Marsh - Marina w l� Bealc�pYipPark City Park BOIyOpjN H'AY ` Pine Street Park - V Elm Slreet Park t 3 � � Woodway3 F Unincorporated -Snohomish Co. S h9 W � 3 8 Hickman ark _ ■ Mathay 5 Munger °9! Park m 9F 0 0.25 0.5 1 1.5 2 Miles Shoreline I nsTHe�sw �-180THS 9W 3 Lynnwood $ {- 188TH ST SW �f 3 200TH ST SW �I 20CTH ST SW 208TH ST SW � t Mountlake Terrace H PL SW Map 6: Travelsheds - Parks & Open Spaces (City & Non -City to 1/2-mile) SW"' 286TH ST SW I Q DRAFT 8.1.b PAGE LEFT INTENTIONALLY BLANK a O w a m u a c m Q. O Ca 0 L u Y L Q. N N O N C O A N w Q O ti N O N N O N O w d r C d E t V R a+ a Packet Pg. 213 8.1.b MOW 2022 PRO W fiues l s 71 3 Lynnwood $ 188TH ST SW I _ ;WSW 28— ST SW 0 0.25 0.5 1 1.5 2 Miles Shoreline Map 7: Conditions Assessment for Neighborhood Parks (Quality; 1/2-mile) T A d O ti N O N N O N LO N 0 W IL r c m E z W� Q DRAFT 8.1.b PAGE LEFT INTENTIONALLY BLANK a O w a m u a c m Q. O Ca 0 L u Y L Q. N N O N C O A N w Q O ti N O N N O N O w d r C d E t V R a+ a Packet Pg. 215 8.1.b MOW 2022 PRO Ranae of Amenities: Limited 3 Lynnwood $ 188TH ST SW I _ ;WSW 28— ST SW 0 0.25 0.5 1 1.5 2 Miles Shoreline Map 8: Conditions Assessment for Neighborhood Parks (Amenities; 1/2-mile) T A d O ti N O N N O N LO N 0 W IL r c m E z W� Q DRAFT 8.1.b PAGE LEFT INTENTIONALLY BLANK a O w a m u a c m Q. O Ca 0 L u Y L Q. N N O N C O A N w Q O ti N O N N O N O w d r C d E t V R a+ a Packet Pg. 217 8.1.b EdmondS 2022 PRO IMM 0 0.25 0.5 1 1.5 2 Miles Shoreline r 6T ST SW 3 Lynnwood $ -TH ST SW I IW�W 2 GTH ST SW Map 9: Conditions Assessment for Neighborhood Parks (Composite; 1/2-mile) T A d O ti N O N N O N LO N 0 a r c m E z W� Q DRAFT 8.1.b PAGE LEFT INTENTIONALLY BLANK a O w a m u a c m Q. O Ca 0 L u Y L Q. N N O N C O A N w Q O ti N O N N O N O w d r C d E t V R a+ a Packet Pg. 219 8.1.b MOMS 2022 PRO M fiues l s 71 3 Lynnwood $ 188TH ST SW ;WSW 28— ST SW 0 0.25 0.5 1 1.5 2 Miles Map 10: Conditions Assessment for Community & Waterfront Parks (Quality; 1/2-mile) T A d O ti N O N N O N LO N 0 W IL r c m E z W� Q DRAFT 8.1.b PAGE LEFT INTENTIONALLY BLANK a O w a m u a c m Q. O Ca 0 L u Y L Q. N N O N C O A N w Q O ti N O N N O N O w d r C d E t V R a+ a Packet Pg. 221 8.1.b EdmondS 2022 PRO RNAI VERSION OF Legend LAN WILL INCLUD pCity Limits APS AS 11X17 FOR �� Range of Amenities: Good Maad.—la Range ofAmenities: Fair ETTER READABILITY Bai PaM ��N Range of Amenities: Limited Puget Sound Haines wnart - City Parks Open Space & Special Use Areas - Non -city Parks I - Edmonds School District MPIaN a a - Water I 2 1—STSW soohomlen Coo n1y Park t 180TH STSW 3 Sea4 ark > Lynnwood#L $ ynndala Pa 988TH ST SW Si _ Pa i 196TH ST SW Maplewood 3 Hill Park \ lop MTH ST SW j t Brackett, A� Landing CiP"yfl nter Pin200TH ST SW e Ritlge / � P==Id , Perk 208TH ST SW Yost Memorial Park \\ / , 1, E mor&lVmrsh Marina �` I Be h Park City Park 000000, 01000 a�. `\\ ♦ Pine, Street` \VVWNN� \ Elm street Park 3 s- Woodway Il 11 Mountlake Terrace Unincorporated w Snohomish Co. PLSW � 3 tL ■ S Parka 8 Hi i,man�Park 3 � ■ � 235it{PL SW� 236TH ST SW g Mathay • Ballinger �gk Park F 9LF I 1� I 0 0.25 as 1 is 2 Mi1a6 $hOrellne Map 11: Conditions Assessment for Community & Waterfront Parks (Amenities; 1/2-mile) Q DRAFT 8.1.b PAGE LEFT INTENTIONALLY BLANK a O w a m u a c m Q. O Ca 0 L u Y L Q. N N O N C O A N w Q O ti N O N N O N O w d r C d E t V R a+ a Packet Pg. 223 8.1.b EdfI ONS 2022 PRO r 6T ST SW I IW�W 2 GTH ST SW IMM 0 0.25 0.5 1 1.5 2 Miles Map 12: Conditions Assessment for Community & Waterfront Parks (Composite;'/2-mile) T A d O ti N O N N O N LO N 0 a r c m E z W� Q DRAFT 8.1.b PAGE LEFT INTENTIONALLY BLANK a O w a m u a c m Q. O Ca 0 L u Y L Q. N N O N C O A N w Q O ti N O N N O N O w d r C d E t V R a+ a Packet Pg. 225 8.1.b EdmondS 2022 PRO LEVEL OF SERVICE ASSESSMENT Service standards are the adopted guidelines or benchmarks the City is trying to attain with their park system; the level of service is a snapshot in time of how well the City is meeting the adopted standards. A level of service (LOS) review was conducted in addition to and in support of the gap analysis as a means to understand the distribution of parkland acreage by classification and for a broader measure of how well the City is serving its residents with access to parks, trails and open space. In the past, the City of Edmonds has used acreage per capita and park distribution to define its standards and measure its level of service for parks and recreation. While adopted acreage standards have been a long- standing traditional measure of park provision, current trends in park system assessment utilize a broader Figure 13. Acreage LOS comparisons from 2016 PROS Plan and more customized analysis of how well parks are benefitting their service area and where improvements should be focused. In their 2008 PROS plan, Edmonds adopted acreage per thousand population for the target quantity of its park facilities. The same Plan also proposed "aspirational" standards. The 2016 PROS plan referenced both acreage standards and measured the calculated needs for additional parkland based on those acreage standards. The adopted 2008 standard required that the City have 490 acres of parklands. With the "aspirational" (2025) standard, the park system would require 440 acres of parklands. These two standards indicated a calculated deficit of over 230 acres. With slightly more than 200 acres in the current City park system, these earlier standards are more than aspirational. The 2016 PROS plan acknowledged that doubling the size of the existing park system was not realistic or attainable. Regional 16.3 0.4 1.0 42.4 1.0 41.1 (24.8) Community*** 79.2 1.8 2.4 104.1 2.0 87.0 (7.8) Neighborhood 26.2 0.6 0.6 24.9 0.7 30.4 (4.3) Special Use*** 19.8 0.5 0.6 23.6 0.7 30.4 (10.6) Open Space 75.6 1.8 6.9 295.3 5.9 251.1 (175.5) All parklands 217.1 5.1 11.4 490.2 10.3 440.1 (223.0) *adopted in the 2008 PROS Plan ** "aspirational" standard from 2008 PROS Plan *** Includes acreage from Lynndale Skate Park and Meadowdale Playfields, prorated at 50% The previous plan combined the acreage of other "park" facility providers to ease the pressure of meeting the parkland acreage standard through the City's park system alone. Sites included County and Edmonds School District properties and raised the existing LOS from 4.83 acres per 1,000 population to 14.08 acres per 1,000 population - an increase of 200% in an effort to align aggregate land holdings with the standards. A review of metrics from national data provides additional color to the assessment. Comparisons are provided below based on National Recreation and Park Association (NRPA) data that reflects the current levels of service of park agencies across the country based on a variety of factors: population size, population density, number of full-time equivalent employees, number of park facilities, acres of parkland and more. The NRPA Park Metrics data are used to compare different park and recreation providers in communities across the country; however, the Park Metrics database relies on self -reporting by municipalities. Some agencies only include developed, active parks, while others include natural lands with limited or no improvements, amenities or access. The comparative standards in the table on the following page should be viewed with this variability in mind. A few highlights from the NRPA agency comparison provide perspectives on Edmonds' park system. When compared with other park agencies, Edmonds' (city- D RAFT 77 Packet Pg. 226 DRAFT s•1.b owned) parkland acreage (5.1 acres/1,000) falls below the lower quartile of park providers. While parkland acreage alone should not be the sole measure of performance, the acquisition of additional parklands are warranted. Looking at the provision of recreation amenities within the park system provides another perspective on the adequacy of park service delivery. From the NRPA Park Metrics data, six amenities were compared with Figure 14. Acres of Parkland from NRPA Metrics All Agencies Pop. 20,000 Edmonds 49,999 Acres of Parkland / 000 Median Acres/1,000 9.9 9.8 5.1 Playgrounds 3,607 2,961 2,857 Baseball -youth 6,763 5,099 7,142 Softball -youth 11,287 9,891 4,761 Dog Parks 46,000 27,528 42,853 Outdoor Pools 37,569 25,402 42,853 Skate Parks 49,750 31,248 42,853 To redirect the most important efforts to creating an equitable park system for Edmonds, an adjusted set of parkland acreage standards is recommended.lhe proposed adjustment to acreage standards eliminate the acreage targets for regional and special use park facilities. the regional classification is currently used for waterfront sites of highly varied sizes. the classification of regional parks from across the country typically designates large tracts of land from fifty to hundreds of acres in size. Since Edmonds' current use of the regional park classification actually targets waterfront sites, its specialized focus does not require an acreage standard, and this Plan relabels the classification to waterfront parks.lhe same rational applies to special use park facilities. These sites are designated for their specialized use which typically predetermines the necessary acreage size for the facility.lhus, no acreage standard is necessary or useful. For neighborhood and community parks, an acreage -based standard is more important and still the median values from an aggregate of all agencies across the country, as well as from jurisdictions with populations in a similar range to that of Edmonds. The comparisons indicate that Edmonds is not significantly deficient in the recreational amenities listed. However, several areas of Edmonds do not provide easy access to these recreational amenities, and residents would have to drive for access for various activities. applicable, in addition to the application of geographic distribution, level of park development and equity considerations. Increasing the adopted acreage standard for neighborhood parks from the adopted 2008 (0.58 ac/1,000) and the aspirational 2035 (0.71 ac/1,000) standards to a more readily measurable 1 acre per 1,000 population would address the known demand for more neighborhood parks in underserved areas.lhe need for neighborhood park acreage would increase from the prior standard to 16.7 acres. If the average neighborhood park size is approximately four acres, an additional three to five new park sites should be targeted for acquisition.lhis quantity coincides with the mapping analysis for existing parkland distribution. For community parks, the acreage -based standard is proposed as 2.25 acres per 1,000 population, resulting in a current need for 17 acres or the equivalent of one new community park. 78 Packet Pg. 227 8.1.b EdmondS 2022 PRO Figure 15. New Proposed Standards for Parkland Acreage Existing Existing LOS 2022 Proposed Current Need Type of Park Inventory (ac.) 000 .. . Community* 79.2 acres 1.85 acres/1,000 2.25 acres/1,000 17.2 acres Neighborhood 26.2 acres 0.61 acres/1,000 1 acres/1,000 16.7 acres Open Space 75.6 acres 1.76 acres/1,000 3.5 acres/1,000 74.4 acres Totals 181.0 acres 4.22 acres/1,000 6.75 acres/1,000 107.0 acres * Includes acreage from Lynndale Skate Park and Meadowdale Playfields, prorated at 50% Considering the future population growth predicted for Edmonds in 2035 (population forecast as 45,550), the demand for community park acreage would result in a need for 23 acres or an equivalent slightly larger new community park. These proposed adjustments to the acreage standards are intended to help focus future acquisitions and development resources on the most important park and recreation facility provision. Figure 16. Future Park Acreage Needs using Proposed Standards Community* 79.2 acres 2.25 acres/1,000 Neighborhood 26.2 acres 1 acres/1,000 Open Space 75.6 acres 1 3.5 acres/1,000 23.3 acres 19.4 acres 83.8 acres Totals 181.0 acres 1 6.75 acres/1,000 1 125.3 acres * Includes acreage from Lynndale Skate Park and Meadowdale Playfields, prorated at 50% ** 2035 population estimated as 45,550 this Plan also proposed an adjustment to the acreage - based standard for City -owned open space from the 2008 standard (6.89 ac/1,000) to 3.5 acres per 1,000 population. This proposed adjustment reduces the current and future acreage need to 74 acres and 84 acres, respectively. Additionally, the Southwest County Park (118 acres) is not included in these calculations, but this large block of wooded open space remains available for the Edmonds community as a natural area contributing to local quality of life for residents and supporting the local ecology. the proposed acreage standards for neighborhood and community parks and open space lands would recalibrate the combined acreage standards from the 2008 11.44 acres per 1,000 population to a more targeted 6.75 acres per 1,000 population. As a more attainable and strategic acreage goal, the City could more realistically become comparable to the nation- wide averages measured by NRPXs data on park and recreation agencies. the use of numeric standards is a blunt and limited tool to assess how well the City is delivering park and recreation services, since the numeric values alone neglect any recognition for the quality of the facilities or their distribution (i.e., the ease to which residents have reasonable, proximate access to park sites). While public ownership of a broad range of recreation lands is crucial to the well-being of the city, the simple use of an overall acreage standard does not match with the citizen input received during this planning process. Residents were particularly interested in the availability of trails, equitable distribution of parks within a reasonable distance from their homes, and conservation of open space. DRAFT 79 Packet Pg. 228 DRAFT The City's park system also was assessed using the Washington Recreation and Conservation Office (RCO) level of service metrics provided in their planning manual. In reviewing the park system as a whole, Figure 17 illustrates the current levels of service across different performance measurements. From the community survey results, public satisfaction of the facilities and amenities that Edmonds provides ranked as the strongest indicator for the park system. Figure 17. Levels of Service with RCO Metrics (System -wide) Public Satisfaction Condition of Local City Parks (rated as Excellent or Good) LOS Grade Condition of Trails in Parks (rated as Excellent or Good) LOS Grade Agency -based Assessment Condition Assessment Rating of Existing Parks (3-point scale) 76.1% B 55.0% D 1.27 LOS Grade B Parkland Access (within 1/2-mile travelshed) Percent Service Area with Access to Active -Use City Parks 48.1% LOS Grade M D Parkland Access (within 1/2-mile travelshed) Percent Service Area with Access to All Parks & Open Space 69.8% LOS Grade C Trail System Access (within 1/2-mile travelshed) Percent Service Area with Access to Recreational Trails LOS Grade Usage / Visitation Criteria Frequency of Park or Trail Usage Percent Visiting Parks at Least Multiple Times per Month 88.0% LOS Grade A SCALE Goad Fair Umhe• * Note: The percentage of land area covered by service area walksheds is a proxy for the population within the residential portion of the City. In addition to readjusting the City's adopted standards to more focused and realistic targets, this PROS plan also evaluated the geographic distribution of parks. The assessment of park distribution (as in the previous park plans) recognized that the most prevalent gaps in individual park service areas was in the south and east of the City. This translates to the highest need for walkable parks to be located in South Edmonds and along the residential proximity to the SR 99 corridor. The gap analysis conducted for this updated PROS park plan reinforces the findings from the 2016 plan to direct the need for additional park acreage as well as new park location targets. 80 Packet Pg. 229 8.1.b EdmondS 2022 PRO PARKS ASSESSMENT SUMMARY Assessing physical conditions within each park facility, mapping distribution of existing parks, measurements of park acreage and comparing park amenity provision represent four methods for assessing the park system. To refine the access and equity of a park system even further, a look at the types and quantities of outdoor recreation offerings generates additional considerations, Comparing size and amenities in each park helps weigh the need for enhancing existing park sites, in addition to adding new parks. Each existing park has a variety of recreational amenities and do not offer equal values in outdoor recreation. For example, Hickman Park at 5.6 acres (compared to Mathay Ballinger Park with 1.82 acres) provides significantly more amenities for play, gathering, walking and sports. While both parks are classified as neighborhood parks, their contribution to meeting local, neighborhood park needs is not the same. Parks with less land and fewer amenities should be considered as targets for expansion through adjacent land acquisition or, at least, enhancement with additional amenities. Hazel Miller Plaza Photo credit: Chris Walton The City also should consider other factors for serving the current and future population of Edmonds, including: ■ Park pressure, or the potential user demand on a park: Residents are most likely to use the park closest to their home. This measure uses GIS analysis to assign all households to their nearest respective park and calculates level of service (in acres of parkland per 1,000 residents) based on the acreage of the park and the number of residents in the `travelshed'. Areas with lower levels of service are more likely to be underserved by parkland and to see higher degrees of use and wear and tear on park amenities. ■ Availability of park amenities: Park systems should include an equitable distribution and quantity of the most common amenities like playgrounds, picnic shelters, sports courts, sports fields and trails to meet local needs and help distribute the potential usage of individual parks. Working to provide well -distributed basic park amenities, while also offering unique outdoor experiences, will result in a varied park system with a range of different recreational opportunities for residents. DRAFT 81 Packet Pg. 230 DRAFT s•1.b OPEN SPACE The Edmonds community is fortunate to have retained several significant natural areas across the City. Approximately 75 acres of open space are owned and managed by the City, in coordination with the acreage of developed parks. These open space properties include forested lands, waterfronts and wetlands across 13 different sites. The open space classification distinguishes natural lands from parks developed for active recreation and other highly managed landscapes. Open space may refer to public properties that are exclusively natural areas or portions of larger parks that are managed as natural areas. These open space lands are managed to preserve, restore, and conserve ecosystem functions, native vegetation and wildlife habitat. Open space properties are undeveloped, primarily left in its natural form, and are managed to retain or enhance natural or scenic resources. However, open space may include trails or interpretive signs, along with modest support amenities such as parking or restrooms. Figure 18. City -owned Open Space Edmonds Marsh 24.21 Haines Tidelands 0.44 H.O. Hutt Park 4.53 Maplewood Hill Park 13.27 Meadowdale Natural Areas 1.07 Olympic View Open Space 0.49 Pine Ridge Ext (SW) 1.14 Pine Ridge Park 25.33 Seaview Reservoir 1.31 Shell Creek Open Space 1.42 Wharf Street 0.12 Willow Creek Park 2.25 Total Open Space Acreage 75.58 Large Open Space Properties The City manages several sizeable open space properties. At more than 10 acres, significant habitat for wildlife and a quiet experience for park visitors is buffered by nature from the surrounding urban environment. These open spaces include Maplewood Hill Park, Edmonds Marsh and Pine Ridge Park, as well as portions of Yost Memorial Park. These large open space areas contain a variety of distinct habitats, such as wetlands and creeks, adding to the diversity of plant species they host. Some of these open spaces also include developed trail systems, serving as recreation opportunities and valuable pedestrian connections for local streets and neighborhoods. Smaller Open Space Properties Smaller open space areas, ranging from less than one acre to five acres, are distributed across the City. Though small, these pockets of natural area serve as refuges for wildlife traveling between larger forested areas, and in some cases, provide modest trail segments. Several of these areas have no developed site improvements or trails and are managed exclusively as natural area set -asides and to preserve or enhance their ecosystem functions. Some of the small open spaces include H.O. Hutt, Shell Creek Open Space and Haines Tidelands. Development of these sites for public recreational use, including the construction of trails, may be limited, or restricted by natural characteristics of the land, including steep slopes, wetlands and other features. Edmonds Marsh 82 Packet Pg. 231 8.1.b EdmondS 2022 PRO LAND CONSERVATION Many of the public lands that the City owns and manages host unique, high -value landscapes. These areas are prioritized for acquisition, conservation and restoration activities to ensure that they continue to thrive and provide their distinct ecosystem functions and benefits. High -quality waterfronts, woodlands and wetlands are all vital to preserving Edmonds' diversity of habitats. Providing safe public access to and within these areas needs to be carefully balanced with the crucial goal of environmental stewardship and natural habitat protection. Forest Lands The City is fortunate to have acquired and protected several forested open spaces, such as Maplewood Hill Park and Pine Ridge Park. Protecting existing forested lands and restoring the native forest within public ownership will continue to provide habitat value, stormwater reduction services and urban heat reduction. Ongoing monitoring and management of these forest lands will be necessary to control invasive vegetation, maintain native plant communities and accommodate appropriate recreational access and usage. the City adopted its Urban Forestry Management Plan in 2019 to take an active role in preserving and enhancing the value of canopy trees on public lands. Park operations and volunteer activities can work to implement aspects of the forestry plan through native tree planting, environmental education programs, public planting and stewardship events and interpretive signage. Edmonds residents also benefit from an additional 140 acres of public open space within city limits provided at Meadowdale Beach Park and the Snohomish County Park. While these two sites are not under the City's ownership, the ecosystem benefits and habitat values offered by these two sites contribute to the greater network of open space lands in Edmonds. Waterfronts Edmonds extensive shoreline offers unique experiences where public waterfront provides access. This special connection to open water expands on the concept of open space, and Edmonds waterfront parks contribute to the open space experience, while also providing other park -like amenities. Acquiring additional public access to the waterfront (marine and freshwater) continues to be a priority for the City to capture and protect the value of its shorelines and aquatic habitat, while allowing more access to beachfront recreation. Wetlands The City code also protects and regulates wetlands in Edmonds. the City's open spaces include several wetland areas, such as the Edmonds Marsh and Willow Creek Park.lhese areas continue to be a high priority for protection and restoration efforts, and low lying properties with prevalent wetlands can provide valuable stormwater management and flood control functions. Generally, they represent fragile ecosystems that host unique plant communities and serve as a valuable habitat for many animals, including bird and amphibian populations. These areas should be included in future open space management and acquisition planning. Riparian Conservation & Trail Corridors Beyond the larger tracts of natural lands to be acquired for open space, the City can look to linear corridors along drainage ways and stream corridors as targets for acquisition. Such riparian habitats benefit from conservation and restoration to ensure adequate forest canopy and can be compatible with connecting trail alignments. Open space and trail corridors are important components to creating the connectivity and walkable networks being sought by residents. SERVICE STANDARDS One primary goal of having an open space acreage standard is to inform the need for investments in local natural areas; however, a City -only accounting of open space lands underrepresents the total amount of open space land protected within Edmonds. As noted above,140 acres of public open space are provided at Meadowdale Beach Park and the Snohomish County Park, which are within city limits. If these sites were included in the level of service calculation, the City would have 217 acres of open space and 5.07 acres per 1,000 population — a significant increase from the City -only level of service of 1.76 acres per 1,000 population. DRAFT 83 Packet Pg. 232 DRAFT s•1.b The proposed acreage standard for open space focuses on only City -owned properties and is adjusted to 3.5 acres per 1,000 population (from the 6.89 acres per 1,000 from the 2016 PROS Plan). The proposed adjustment is intended to re -align the planned target acreage to a more attainable acreage, in terms of potential land areas to pursue and the financial resources to secure them. At this proposed standard, the current need is calculated as an additional 74.4 acres of open space, which would increase to 83.8 acres by 2035. While numerical planning standards are common for helping to determine a desirable number of parks per population, they do not translate easily to natural areas because of the uniqueness of the land base itself. The acquisition, acceptance and inclusion of future, protected natural areas will strengthen and expand the broader network of public open spaces, and the priority should be focused toward those lands that expand ownership of adjacent City -owned properties or to ensure sufficient property is available to accommodate public access, water access and future trail connections. As stated in the goals and objectives, Edmonds should plan to cooperate with County, neighboring jurisdictions, and organizations to identify and protect natural lands. Engaging the Snohomoish County Conservation Futures funding program can help support acquisition efforts. H.O. Hutt Park STEWARDSHIP With existing open space lands as well as natural areas within developed parks, the need to plan for the management and stewardship of these natural environments will be ongoing. Volunteers already contribute to some limited trail maintenance and vegetation management in some parks and programming. More emphasis on (or formalized) volunteer programming could capture a stronger level of participation in park stewardship and contribute to needed vegetation management, trail maintenance, park and natural area restoration planting and environmental education programming. The management of landscapes in City parklands, whether formal plantings in developed parks or diverse forest ecosystems in open spaces, requires continual attention and an investment of significant resources to properly steward and maintain the living landscape. Regardless of the use of these landscapes, the desired outcomes are the same — to sustain healthy, thriving plant communities. Past practices and traditional horticultural methods to achieve this goal have become less reliable in recent years. Changes to the Pacific Northwest climate have increased summer heat and drought, causing more stress for mature and establishing plants. This change has been accompanied by a shift toward more sustainable landscape maintenance practices, reducing potential impacts on the surrounding environment and its inhabitants. Water Conservation Despite the rainy winters, water is not an unlimited resource in the central Puget Sound region, and summers are expected to get hotter and drier as climate change intensifies. It is increasingly likely that not just voluntary, but mandatory, water conservation measures will become necessary on occasion to preserve supplies for the most critical uses, such as domestic consumption. In landscaped areas where shrubs and trees rely on some summer water, maintenance staff have adjusted the irrigation systems to water before sunrise to reduce water waste and maximize plant uptake. Depending on the landscape, watering also may need to be shifted to a deeper and less frequent watering schedule to reduce evaporation and encourage plants to root more 84 Packet Pg. 233 8.1.b EdmondS 2022 PRO deeply. In addition to reducing irrigation volumes and frequency, the City should consider shifting to planting more drought -tolerant species and schedule the majority of new plant installations in the early part of the rainy season to maximize root growth and establishment before the onset of the dry season. Plant Selection Selecting appropriate plants species for park landscapes is the source of a great deal of discussion, both on the local and regional scale. While drought -tolerant plants will be better able to establish in the short term, consideration is also given to how well newly established plants will survive in the long term. In recent years, cities across the Pacific Northwest have seen many mature native trees decline and die in recent years, unable to adapt quickly to the increased summer temperatures and lack of summer moisture. Plant selection for tree replacements or renovations that consider the anticipated climate in 10-50 years will be more likely to create resilient, mature landscapes that can better transition to warmer, drier conditions. In natural areas generally replanted with trees and shrubs native to the immediate area, staff should begin selecting new plants from seed zones that reflect the greater Seattle area's projected climate. This focus on plant provenance (the original geographic source of seed, pollen, or propagule) will allow staff to plant the same native species better adapted to future conditions. In addition to considering the climate in the selection of plants for developed parks, other factors must also be considered, including the mature size of the tree or shrub, any known pests or diseases that may affect the species, and how a fully developed root system will interact with nearby paved surfaces. Invasive Species Management The control of invasive species is a critical element of the restoration process and essential in maintaining a healthy natural landscape. Many invasive and non- native species exhibit strong adaptability to Pacific Northwest environments and displace native species, especially within the disturbed landscapes proximate to urban development. Going forward, the City will need to expand resources to manage invasive species and enhance partnerships to help with these efforts. Also, while removal efforts may be ongoing, those sites cleared of invasives will require continuous monitoring and intervention to reduce or limit the re-establishment of the invasive plants. Through proper management of public open spaces and natural areas, the City and its partners can maintain and enhance its open space areas and the critical ecosystem and community benefits they provide. Stormwater Management The Pacific Northwest region is experiencing more severe rainstorms due to climate change, and more of that rain is falling on impervious surfaces: roads, parking lots and rooftops. This untreated surface water runoff is a source of contamination along the Puget Sound, Lake Ballinger and in other riparian and wetland areas, impacting both people and wildlife, especially salmon populations. State requirements for surface water management are becoming more stringent and costly for both developers and the City. Runoff volumes, peak stream flows and local flooding can be reduced by incorporating trees into stormwater management planning, lessening the need for expensive detention facilities (e.g., catch basins) and the cost of treatment to remove sediment and other pollutants such as lawn chemicals. Green infrastructure is far more cost- effective than grey infrastructure. Using open space and forested landscapes to capture stormwater runoff encourages infiltration into the soil, prevents excessive streambed erosion and reduces sedimentation in major waterways. In addition, a healthy tree canopy increases carbon sequestration potential, encourages local biodiversity and enhances overall environmental resilience by reducing heat island effects and offering cooler, shaded air. DRAFT 85 Packet Pg. 234 OPERATIONS & MAINTENANCE the City of Edmonds Department of Parks, Recreation, Cultural Arts and Human Services provide a wide range of valued community services to its residents. From managing the park facilities and natural areas to programming recreational activities and facilities and enhancing the arts in Edmonds, the Department works to give special character to Edmonds for its residents and visitors. Parks operations manage and maintain 34 developed parks within the total 47 open space, cemetery, and park facilities in the 230+ acres of city -owned inventory. "Ihe park maintenance division also maintains all the seasonal hanging baskets (60+) and the 91 individual corner flower beds in the downtown area. Seasonal workers are trained annually to care for these city beautification assets. Capital repairs and amenity replacements are mostly handled in-house. The number of facilities maintained by the Parks Maintenance Division is well above the average for park and recreation providers across the country (see NRPA comparisons on following page). On a daily basis, Parks Maintenance maintains six waterfront beach parks, a fishing pier, and 40 community, neighborhood, special use and open space parks. General maintenance includes trash and litter, City restroom cleaning and sanitation, irrigation, and vegetation maintenance including mowing, hazard tree maintenance and removal, trimming and landscape bed upkeep for all City owned landscapes. Parks also maintains the Veterans Plaza located at Public Safety complex, Dayton Street Plaza, Frances Anderson Center Bandshell, and Hazel Miller Plaza. Parks maintains Yost Pool and City Park Spray Park from May thru September which is a key asset for this community. The Park Maintenance division is responsible for preserving, maintaining and upgrading all playground structures and equipment as needed. The Parks Maintenance crew maintains the Street Trees and all City -owned baseball and soccer fields in order to keep up with the high demand of organized youth sports. Parks also assists with numerous City events such as the Edmonds Arts Festival, 4th of July, Taste Edmonds, Wenatchee Youth Circus, Concerts in the Park, Hazel Miller Plaza concerts, Oktoberfest, Anderson Center Egg Hunt, Downtown Christmas Tree Lighting and many more small events. The parks maintenance group has characteristically been well - versed in park facility stewardship and care. 86 Packet Pg. 235 8.1.b EdmondS 2022 PRO OPERATIONS COMPARABLES To assess how Edmonds' park and recreation provision compares with other agencies and jurisdictions in terms of capacity and readiness for future growth, a series of benchmarks were evaluated with national and regional performance metrics. National Park & Recreation Agency Comparisons the National Recreation and Park Association (NRPA) 2020 Agency Performance Review provides some park metrics that offer perspectives on the Edmonds park system and its operations division. Selected findings from their benchmarking tool can help reveal any disparities with park acreage, population size and park operations staffing levels. An overview of NRPA agency performance metrics can reveal how Edmonds compares as a park system to other park and recreation providers across the nation. Edmonds' level of service (6.1 ac/1,000) falls below the median (9.6 ac/1,000) but above the lower quartile (5.4 ac/1,000) for total parkland acreage as the typical agency in jurisdictions with populations ranging from 20,000-49,999 residents. Figure 19. NRPA 2020 Agency Performance Metrics Using Edmond's City -owned Park Facilities Number of Parks 20 34 Park Acres 437.1 129 Parks & OS Facilities (# sites) 27 47 Parks, Open Space & Non -parks Acres 530 - 262 Residents per Park 2,281 1,963 1,260 Acres Parkland/1,000 Residents 9.9 9.6 6.1 Miles of Trails 11 8.5 7.4 The typical agency has one park for every 2,281 residents. The number of people per park rises as the population of the town, city, county or region served by an agency increases. Within the similar population category of 20,000-49,999, Edmonds' 1,260 residents per park falls below the median 1,963 residents/park but just above the lower quartile of 1,233 residents per park across the country. Figure 20.2020 NRPA Agency Performance Metrics Comparison Park & Rec FTEs* P&R FTEs/10,000 Residents Annual Operating Expenditures Operating Expenditures/Capita Operating Expenditures/Parkland Acre 41.9 27.3 27.5 8.1 8.9 6.4 $4,342,495 $2,885,847 $4,682,914 $81.19 $95.34 $109.28 $7,160 $8,522 $17,874 DRAFT 87 Packet Pg. 236 DRAFT s•1.b Looking across the spectrum of park and recreation providers, Edmonds' 27.5 FTEs are close to the 27.3 FTE-median for jurisdictions with 20,000-49,999 residents. Note that this FTE comparison is using both park operations and recreation facilities employees. The 2020 NRPA Agency Performance Review reported that the typical park and recreation agency dedicates 44% of its annual operating budget to the management and maintenance of parks and open space and 43% on recreation programming and facilities. ASSET MANAGEMENT & LIFE CYCLE PLANNING As part of park operations, the management of physical assets requires ongoing, proactive planning to capture cost efficiencies. Tracking repairs, maintenance tasks, routine operations and seasonal work can help predict the needs for future labor resources as the system grows. This PROS Plan recommends developing a detailed list of the assets at each park facility site and evaluating asset conditions annually. This task creates a framework for long-term management of the Edmonds park system. Detailed inventories with conditions tracking will help predict replacement needs, monitor safe use, and assist in assigning maintenance frequency. While Edmonds has relied on skilled professional staff to monitor and repair many of its park assets, having a long term predictive model can facilitate budgetary planning for future needs. Most built park amenities have limited lifespans. Buildings, play equipment, pavement, etc. can be tracked from installation dates. As repairs are needed, those assets can have predictable replacement dates that are added to the capital facilities program. Life -cycle planning can help avoid extra time spent repairing outdated amenities and foster more cost effective labor resource use. Beyond managing park assets to ensure a safe and enjoyable park infrastructure, the asset management system can be utilized to track more accurately the labor hours required to perform the many tasks involved in caring for park facilities. Active tracking can much better predict the ability to reach targeted levels of service for keeping parks clean and in good condition. Invasive Species Management The control of invasive species is a critical element in the stewardship of open space lands to ensure their continued conservation values and ecosystem services. An active invasive species control program is also necessary to ensure that the City is meeting the requirements of RCW 7.10 Noxious Weed regulations. This may involve direct control measures for known and identified noxious weed problems, pre -construction prevention of noxious weed spreading, and evaluating new parkland or conservation land noxious weed coverage. Open space properties such as Edmonds Marsh have some invasive plant species concerns. Park properties with large natural areas such as Yost Memorial Park contains invasive weed populations. Some park perimeters abut natural areas with significant Himalayan blackberry populations. Capital Repairs Program Following on a program of asset management tracking and life -cycle planning, a regular capital repair program should proactively address minor repairs and help extend the life of some amenities. When existing staffing is stretched to its limit, park agencies must rely more heavily on outside contractors for implementing even the small capital repair projects. Without adequate staffing, a backlog of needed maintenance and repairs usually exists. With a sufficient skilled labor force, the City can capitalize on using existing staff resources to complete the smaller capital repair projects during off-season capacity. The Edmonds parks maintenance division has been capable of performing a number of in-house capital repairs for park facilities and should continue to weigh what tasks should be out -sourced and what is within staffing capacity. In -House vs. Outside Contractors Park and recreation agencies throughout the country should continually weigh the costs of service provision through internal staffing versus external contracts. Full-time staffing weighed against seasonal resources should explore the off-season workload, training time for new part-time seasonal employees, the availability of seasonal labor and the specialized skill sets for some types of operations. One-time projects and specialized repairs and renovations may require outside contractors while some park agencies have enough trained in- house staff to accomplish smaller capital projects. 88 Packet Pg. 237 8.1.b EdmondS 2022 PRO STAFFING NEEDS The assessments and comparisons of Park Maintenance staffing indicates that Edmonds may be capable of handling the maintenance of its park system. However, the recommendations for Edmonds propose additional parkland and open space acquisitions for the near future. Additional developed park facilities are needed in the southern areas of the City and along the SR 99 corridor. More open space would provide beneficial ecosystem services and protect Edmonds' natural resources. With more parkland, an increase in park maintenance staffing will be necessary. While an asset management tracking system could provide the most accurate predictions that would be specific for labor needs for the Edmonds park system, some measurements from composite park staffing references may shed light on approximate future staffing needs. Compiled from a series of other park providers, the table below offers some estimated labor needs for several types of planned park facilities. Figure 21. Park Performance from Park & Rec Providers Open Space Lands 15 120 acres/year Neighborhood Parks (average 4 acres) 150 3-4 parks/year Community Parks (average 20 acres) 110 0.75 parks/year Special Use Parks (highly varied) 150 size dependent When a typical neighborhood park is fully developed and averages about 4 acres of developed amenities, one full-time employee could be expected to provide adequate maintenance services for four neighborhood parks. Tasks include litter control, mowing, landscape maintenance, playground inspections and would assume time for travelling to and from each park. With predicted greater acreage and higher expected levels of public use, a newly added community park may require more than one FTE to provide the expected level of service. Special use areas like the waterfront spaces and new active sports fields generally accommodate large and repeated numbers of users, generating more wear and tear and triggering higher litter control needs. These highly visible and important public spaces will continue to need special attention from parks crews. The six -year capital facilities plan should be coordinated with the planning and budgeting of future staffing resources to coordinate the growth of Edmonds' park system. DRAFT 89 Packet Pg. 238 CHAPTER 7 REC The recreation facilities and services available within the City of Edmonds are a major community asset and support the physical, mental and social health of community members. More opportunities for neighborhood nature walks (small, quiet gatherings of an educational nature) forest bathing" or forest therapy" for example, bird and plant identification and understanding. Virtual Public Meeting Participant � O F L :i y 5 F i CL N N N C O .y POP N T O N N O N LO a d E s �i Q 90 Packet Pg. 239 8.1.b MOW 2022 PRO RECREATION TRENDS Various resources have been assembled and summarized to offer a comprehensive overview of current recreation trends, market demands, and agency comparisons. The following national and state data highlights some of the current trends in recreation and arts and may frame future considerations in program and activity development. Additional trend data is provided in Appendix F. ■ Seventy-seven percent of respondents to the American Engagement with Parks Survey indicate that having a high -quality park, playground, public open space, or recreation center nearby is an essential factor in deciding where they want to live. (l) ■ Nearly all (93%) of park and recreation agencies provide recreation programs and services. The top five most commonly offered programs include holiday or other special events (65%), educational programs (59%), group exercise (59%), fitness programs (58%), and day or summer camps (57%). (z) ■ Just over half of Americans ages 6 and older participated in outdoor recreation at least once in 2019, the highest participation rate in five years. (Note: This trend may be higher in 2020 and 2021 given the impacts of the COVID-19 pandemic.) The number of outings per participant declined, however, in 2019 continuing a decade -long trend and resulting in fewer total recreational outings. (3) ■ Youth aged 6 to 17 were active outside far less in 2019 than in previous years; the average number of outings per child dropped 15% between 2012 and 2019. (3) ■ Nearly all park and recreation providers in the U.S. experienced declines in revenue in 2020 due to the COVID-19 pandemic. As early as May 2020, most providers had to close facilities temporarily in accordance with health and safety directives. Nearly half of the providers also furloughed or laid off staff due to the funding and facility impacts of the pandemic. (4) ■ When it comes to costs and revenues, the percentage of costs recovered depends on the type of organization. On average, respondents to the 2020 Managed Recreation Industry survey said they recovered nearly 50% of their operating costs. Only a few facilities reported that they covered more than 75% of their operating costs via revenue. For public organizations, 45% of costs are recovered, up slightly from 42% in 2019. (4) ■ Research from the US Bureau of Economic Analysis shows that arts and culture drive 4.2% of the US gross domestic product (GDP), generating $736.6 Billion in 2015. In Washington State, this sector beats the national GDP, providing 7.8% of the State's GDP. Both in Washington and nationally, arts and culture surpass construction and education services in contribution to GDP. (s) ■ 28% of the nation's approximately 4,500 Local Arts Agencies (LAAs) are government agencies, departments, programs, facilities, or other associations. Of those LAAs, 80% are affiliated with municipalities. LAAs promote, support, and develop the arts at the local level, ensuring a vital presence for arts and culture throughout America's communities. (6) Pools, fountains, other water features will become increasingly essential as hotter weather during the summer becomes more prevalent with climate change. - Virtual Public Meeting Participant ■ 84% of LAAs present their own cultural programming to their community. These programs include after -school arts education programs, public art, free concerts in the park, exhibitions, heritage and preservation efforts, festivals, and special events. (6) ■ People who say their neighborhood has easy access to quality arts and cultural activities tend to be more satisfied, identify more with local lifestyle and culture, and invest more time and resources in their communities. (') Sources: (1) American Engagement with Parks Survey (Need date) (2) 2020 NRPA Agency Performance Review (3) 2020 Outdoor Participation Report (4) 2020 State of the Industry Report (5) US Bureau of Economic Analysis, 2015 (6) AFTA 2020 LAA Profile http://surveys. americansforthearts.org/r/391676_60549 cd4741a42.54488835 (7) Knight Foundation Community Ties survey Community-Ties-Final-pg.pdf (knightfoundation.org). Builds off Soul of Community Longitudinal Study (2008- 2010) conducted by the Knight Foundation found key drivers of community attach- ment to be social offerings, openness, and aesthetics. https://knightfoundation.org/ sotc/overal I -findings/ DRAFT 91 Packet Pg. 240 DRAFT According to 2020 Outdoor Participation Report published by the Outdoor Foundation, just over half of Americans ages 6 and older participated in outdoor recreation at least once in 2019, translating to a total of 10.9 billion outdoor outings — a 12% drop from the 2012 high-water mark of 12.4 billion outings. Participation in outdoor recreation, team sports and indoor fitness activities vary by an individual's age. Figure 22. 5-Year Change in Outdoor Recreation Participation by Major Activity (2020 Outdoor Participation Report) 190% 160% 130% 100% 76 % 70% 56% 52% 33% 40% 24% 20% 17% 13% 12% ° 9/1; 10% M = F_�0 4% 2% 2% 1% -20% -1% -2% -4% ° -9/0 -12% -13% -14% 24% -50% tw C W C X LL oo °n U C K N on C oq oq C C u oo C °n C ao C W C C 00 O OD K Y m L u C a E m N bq L 0 -6 -p - w bA O `t 3 N m t 0 v 3 v u a n a in C O o C > m V Y T LL 2 L -� N -6 1 O o N (U f0 Y f0 fl_ -p 00 N �Ob ) •- H u .6 m V -O Y Goi bo d C� O L (Ut6 N OC O R+ C H Y C @ '� c v a c 00 F L Y he'fp O d C L tlq C C O (° O m v n i - Z m F 7 O b0 T U a0 O � � - L � C u m Recreation Management magazine's 2020 Report on the State of the Managed Recreation Industry summarizes information provided by a wide range of professionals (with an average 22.3 years of experience) working in the recreation, sports, and fitness industry. Given the emerging COVID-19 pandemic, Recreation Management also conducted a supplemental survey in May 2020 to learn about both the impacts to the industry and what mitigation steps organizations were taking in response. Regarding program options, respondents from community centers, park departments and health clubs reported that they plan to add programs over the next few years. The ten most commonly planned program additions include: 1. Fitness programs (24% of those who have plans to add programs) 2. Group exercise programs (22.4%) 3. Teen programs (22%) 4. Environmental education (21.8%) 5. Day camps and summer camps (20.9%) 6. Mind -body balance programs (20.5%) 7. Programs for active older adults (18.1%) 8. Special needs programs (17.9%) 9. Holidays and other special events (17.4%) 10. Arts and crafts (17%) Addressing the COVID-19 pandemic required many respondents to either put programs or services on hold (82%) or cut programs or services entirely (34%). Additionally, many respondents have had to rethink their programming portfolios. Two-thirds of respondents (67%) had added online fitness and wellness programming as of May 2020, 39% were involved in programs to address food insecurity, and one in four was involved in programs to provide educational support to out -of -school children. 92 Packet Pg. 241 8.1.b EdmondS 2022 PRO LOCAL PERSPECTIVES Local recreation demands and needs were explored through a variety of public engagement to gather feedback on strengths and limitations of existing recreation programs and resources available to Edmonds residents. Public outreach included a community survey and two virtual public meetings to explore priorities and opportunities to enhance recreation programming. Community Survey the community -wide surveys (mailed and on-line) conducted from May to August, 2021 included several questions related to recreation programs and activities. Respondents expressed a greater need for community events (56%) and program and activities geared toward youth. In particular, respondents had a higher interest in outdoor programs such as environmental education (46%), youth day camps (41%) and youth sport programs (40%). Respondents between 20 and 44 and those with children in the household were more likely to state a strong interest for outdoor programs, youth sports, teen and youth programs. Consistently high need was noted across all age groups for community events. Figure 23. Sentiment Toward the Availability of Recreation Program Options Community events, such as the Concerts in the Park or outdoor movies Outdoor programs, including Beach Rangers or environmental education Youth programs, such as summer day camps, arts or gymnastics Youth sports programs and camps Adult classes, such as arts, music, fitness or wellness Teen activities, such as game nights, trips or camps during school breaks ' Family programs, such as scavenger hunts Adult sports leagues, such as volleyball, pickleball or softball ■ More Needed E-sports leagues 0% sor ■ Current Offerings are Adequate Respondents were asked to rank a list of potential recreation, park and open space investments that included hypothetical relative costs as indicated by the use of dollar symbols (8) for each system investment. When force -ranked against other potential park and recreation system improvements, support for building a new aquatic center ranked fourth out of six choices, with 43% of respondents identifying it as a top or high priority. Respondents to the online -only survey ranked building a new aquatic center more favorably than the mail survey respondents. Given a choice between raising taxes to develop an amenity in Edmonds versus not having such a facility in the city, slight majorities supported more taxes for two of five amenities tested: buying additional parks for conservation and open space (64%) and building an aquatic center (53%). However, and aside from buying additional park for conservation, building an aquatic center was the only other option for which more than half of respondents with children supported raising taxes. Virtual Public Meetings 42.6% As part of the first virtual public meeting in July, attendees were 52.6% ' asked a series of polling questions as 56.4% a way to capture current sentiment and interests. Regarding community 57 8% events, a strong majority of attendees (82%) indicated interest 60. in smaller, more intimate events, such as outdoor movies, Uptown Evening Market, and Hazel Miller Plaza summer concerts. During the second virtual public meeting in October, another polling question explored community events, a topic that was revealed Z00% as a top interest in the community ■ Fewer Needed survey and the first public meeting. Q DRAFT 93 Packet Pg. 242 DRAFT s•1.b Consistent with the first public meeting, the strongest response (41%) for types of events to be pursued was adding more small, neighborhood -focused events such as concerts in local/neighborhood parks. Also, the future direction of Yost Pool was explored in a polling question that asked what the focus/scale should be if the City were to replace the pool with a new aquatics facility. Given the choices of local or regional and indoor or outdoor, the overwhelming majority chose local -scale (76%) with those poll responses split between indoor (39%) and outdoor (36%) pool options. RECREATION FACILITIES The City of Edmonds hosts recreation and arts and culture programs in its parks and in several municipal buildings, most notably the Frances Anderson Center. The day-to-day management, ongoing maintenance, and long-term reinvestment in City facilities are crucial to the success of Edmonds'recreation programs. Additionally, efficient scheduling and use of the facilities ensures that cost recovery, diversity, equity and inclusion, program vitality and other goals are met. Frances Anderson Center The Frances Anderson Center is the "home" of the majority of Edmonds Parks, Recreation & Cultural Services programming. The Center has classroom spaces, a drop -in weight room, a gymnasium and dedicated gymnastics space. The Frances Anderson Center also houses six tenants who provide a wide range of activities that augment and enhance the Department's mission, including a ballet school, youth sports club, Montessori preschool and sculpting studio space. Meadowdale Clubhouse The Meadowdale Clubhouse serves as the location for the City's Meadowdale Preschool program. The clubhouse is also available for rent, and amenities include a kitchen, fireplace, restrooms and an outdoor fenced playground. \ X) 4mpar k A.k 4 Yost Pool .. +; fAC ,t il_ -, Yost Pool is located within Yost Memorial Park and is an outdoor, 25 meter by 25 yard pool and spa. The City recently decided to keep the pool open year-round to extend the outdoor aquatics season. Waterfront Center The new Edmonds Waterfront Center is a 26,000 square foot regional community center that replaced the old Edmonds Senior Center building. The Waterfront Center is not operated by the City, and through a land use lease, the Recreation & Cultural Services division programs space at this facility for recreation programs and classes. The City also uses Edmonds College facilities for volleyball leagues and City of Lynnwood facilities for softball leagues. Going forward, the City should continue to coordinate with the other facility and program providers in the greater Edmonds area, such as the Edmonds School District, Edmonds Boys and Girls Club, Dale Turner YMCA, Sno-King Youth Club, and the cities of Lynnwood and Mountlake Terrace, among others, on program offerings and scheduling. 94 Packet Pg. 243 8.1.b EdmondS 2022 PRO RECREATION PROGRAMS Programming Classifications The categories below represent the major areas of focus for current Edmonds recreation programs. Program lists are based on a review of program offerings for 2018-2021, that were provided by the Department. Figure 24. Existing City Programs by Classification Sports Youth Kidz Love Soccer, Skyhawks Soccer, UK Elite Soccer, Preschool Gymnastics, School -Age Gymnastics, Skyhawks Summer Sports Camps, Steel Soccer Summer Camps, Gymnastics Outdoor Camp Adult Pickleball Clinics, Pickleball Leagues, Sr.Softball, Co -Ed Softball, Women's 4-on-4 Volleyball Leagues, Co-Rec Volleyball Leagues, Basketball 3-on-3 Fitness Youth Taekwando, Kendo, Girls on the Run Adult Sustainable Weight Loss & Wellness, Feldenkrais, Taekwon-Do, Kendo, Circuit Training, Strength & Endurance Interval Training, Intro to Fitness, Yoga, Tai Chi, Qigong, Essentrics, Personal Fitness Training, Pilates Yoga Fusion, Zumba Cultural Arts Youth Drama Kids, Adventures in Art/Drawing/Anime, Custom Art Holiday Cards, Art Camp, Fine Art Day Camps for Teens, Incrediflix Animation, Digital Photography Kids Camp, Steel Band, Kindermusik, Fun Factory, Beginning Watercolor Adult Steel Band, Ukulele Class & Open Jam Sessions, Studio Photography Workshop, Ballroom Dancing, West & East Coast Swing Dancing, Nightclub Two Step Dancing, Clogging, Plein Air Drawing, Beginning Watercolor, Oil Painting, Ukrainian Egg Decorating Aquatics Youth Swim Lessons, Swim Team, Family Swim Adult Family Swim, Lap Swim, Water Walking Education Youth Meadowdale Preschool, Little Fishes Preschool Prep, Babysitting Basics, Play -Well STEM camps, Online Writing, Virtual Homework Tutoring, Reading Funny Stories, Creative Writing, Mad Science Camp, Cursive for Kids Adult Creative Writing, Writing Labs, ESL Tutoring, Specialty / General Interest Youth Cake Decorating, Etiquette Young Ladies & Gentlemen Adult Spanish Language classes, Canine Obedience, American Mahjong, Genealogy, Zentangle, Personal Finance, Healthy Living Special Needs Special Events Taste Edmonds, 4th of July parade and fireworks, Edmonds Arts Festival, Edmonds Classic Car Show, Sweetheart Dance, Health & Fitness Expo, Best Book Poster Contest, Watershed Fun Fair, Concerts in the Park, Outdoor Movies, Moonlight Beach Adventure, Bird Fest, Write on the Sound, Walkable Main Street, Hazel Miller Plaza summer concerts, Uptown Evening Market, Farmers Market, Celebration of Lights, Easter Egg Hunt, Spring Fest, Egg Hunt, Tree Lighting Outdoor Education Youth Junior Beach Rangers, Discovery Days Spring Camp, Discovery Outdoor Beach Camp, Discovery Outdoor Nature Camp, Junior Naturalists Outdoor Nature Camp, Sunset Bay Beach Camps Adult Beach Ranger Program, Bird Fest Guided Walks, Intro to Bird Photography, Backyard Bird, Low Tide Beach Walks, Forest Walks, Starlight Beach Walks Seniors Senior-specifc programs provided by the Senior Center Self -Directed Youth Scavenger Hunts Adult Open Gym Drop -in, Weight Room DRAFT 95 Packet Pg. 244 DRAFT s•1.b Programs Available by Age Groups Below is listed the basic program categories that are available for different age groups. Figure 25. Segmentation of City Programs by Age Group Program .. = Sports Fitness • • Cultural Arts Aquatics Education • • • • Specialty / General Interest Special Needs Special Events Outdoor Education Self -Directed Human Services • • Program Area Definitions (generalized): ■ Sports — Team and individual sports including camps, ■ Outdoor Education — Environmental education, hiking, clinics, and tournaments. Also includes adventure/non- camping, kayaking, and other activities. traditional sports. ■ Seniors — Programs and services that are dedicated to ■ Fitness — Group fitness classes, personal training, serving the needs of seniors. This can include all of the education, and nutrition. activity areas noted above plus social service functions. ■ Cultural Arts — Performing arts classes, visual arts classes, ■ Self -Directed —This includes the opportunities for literary arts, music/video production and arts events. individuals to recreate on their own. This can include ■ Aquatics — Learn to swim classes, aqua exercise classes, activities such as open gym, use of weight/cardio space competitive swimming/diving, SCUBA, and other and lap/recreational swimming. Although not an programs (synchro, water polo, etc.). organized program, time and space must be allocated for ■ Education — Language programs, tutoring, science this purpose. (STEM) classes, computer, and financial planning. Also ■ Human Services —This can include nutrition and feeding included is CPR/AED/First Aid. programs, job training, life skills training, childcare, and ■ Specialty/General Interest —Personal development classes other activities such as health screenings. and dog training classes. ■ Special Needs — Programs for the physically and mentally impaired. Also, inclusion programs. ■ Special Events — City wide special events that are conducted throughout the year. 96 Packet Pg. 245 8.1.b EdmondS 2022 PRO Program Classifications The following are the projected programming classifications for the City. It is important to realize that while certain program areas may be a focus for growth in programs and services, the Department's role in providing the actual service may be different as indicated below. Classification Definitions ■ Core Programs — are those programs that are a primary responsibility of the Parks, Recreation, Cultural Arts and Human Services Department to provide as city -based activities. ■ Secondary Programs — are those programs that are a lower priority to be provided directly by the Department but may be offered by other organizations through contract with the city. ■ Support Programs — are programs that are not a priority for the Department to be providing directly to the community but where the city may provide support through facilities, program coordination, and promotion of activities for other organizations. The following chart identifies and summarizes recommended future core programs, secondary programs and support program areas for the Parks, Recreation, Cultural Arts and Human Services Department. Figure 26. Recommended Future Program Types by Focus Area Adult Sports Cultural Arts Fitness/Wellness Outdoor Education Self -Directed Special Events Aquatics Education General Interest Youth Sports Program Considerations Seniors Human Services Special Needs Edmonds'recreation programs serve all of the major age groups. As shown in the community survey, the Edmonds community considers outdoor programs, youth recreation and youth sports to be high priorities for City recreation services. The following program categories are not extensive due to the nature of the City's offerings and facilities to support programs: ■ Special Needs — This is not a significant program area for the Department currently, but there may be a need to have these types of services available for the community. It is anticipated that the vast majority of programming will be provided by other agencies that specialize in these services, but this will need to be coordinated by the Department. ■ Social Services —This can include nutrition and feeding programs, job training, life skills training, childcare and other activities, such as health screenings. As the Human Services division settles into the Department, consideration should be given to how social services overlap and integrate with broader recreational offerings. Regarding aquatics, the City is not a direct provider of swim lessons or aquatics and has made arrangements for the operation and programming of Yost Pool to other organizations. The strength and continuity of aquatics programming should also be weighed against the physical needs of the pool and its infrastructure. Yost Pool is an aging facility that is nearing the end of its useful life. In the near term, the City should explore the feasibility of replacing Yost Pool, and this concept was generally supported throughout this planning process. With a new facility, the City should re-examine its direct staffing and operations of a new pool, as well as consider additional program options that include lifeguarding classes, CPR/AED/ First Aid, water aerobics, and paddleboard/kayak classes, among others. The City should continue to stay abreast of its program offerings and recreation trends, as well as re-evaluate programs based on participation rates and cost recovery targets. Other recreational offerings could include intergenerational programs or ethnic -based programs that are appropriate for the cultural orientation of the area. The Department also should consider bringing more programming out to the parks and activating the City's parks with programs and outdoor classes. This will help to cross-pollinate recreation customers with the offerings of park facilities and improve overall community awareness of recreational opportunities within Edmonds. a DRAFT 97 Packet Pg. 246 cu CD MorikkkAl —0 6 m 0m 771 oea -4F IL C'41 CN Q .0 w Ap 04 04 dfflo CD op L 04 LO > 0Cl) qq -op, —ddMC Packet Pg. 247 8.1.b EdmondS 2022 PRO SPECIAL EVENTS The Recreation & Cultural Services division is responsible for the overall coordination of community and special events. These public events provide gathering opportunities, celebrations and activation of the downtown and City parks. While not every event is hosted or run by the City, these special events draw the community together, attract visitors from outside the community and are popular with residents. Some examples of recurring or multi -day events include Taste Edmonds, Edmonds Arts Festival, 4th of July parade and fireworks, Farmers Market, Oktoberfest Farmers Market, and Edmonds Classic Car Show. The City also has hosted or supported numerous one-time or single -day events. Recent community events include the following: ■ Sweetheart Dance ■ Health & Fitness Expo ■ Best Book Poster Contest ■ Watershed Fun Fair ■ Concerts in the Park ■ Outdoor Movies ■ Moonlight Beach Adventure ■ Puget Sound Bird Fest ■ Write on the Sound ■ Celebration of Lights ■ Walkable Main Street ■ Hazel Miller Plaza summer concerts ■ Uptown Evening Market ■ Easter Egg Hunt ■ Spring Fest Opportunities to connect are clearly crucial to Edmonds'residents, particularly as the community emerges from the COVID-19 pandemic. Survey and public meeting responses showed strong interest for additional community events, especially smaller, more intimate events such as outdoor movies, the Uptown Evening Market and the Hazel Miller Plaza summer concerts. Participants to this PROS Plan process offered other ideas for events and activities, including the following: ■ Cultural celebrations near international district ■ More opportunities for neighborhood nature walks (i.e., small gatherings of an educational nature) ■ Educational events for wildlife; more environmental awareness events or demonstrations. ■ Tasting tours of different restaurants ■ Consider aerial drone shows for the 4th of July partnered with live music Additionally, the City could explore ideas for events that draw from the diversity of the community, such as festivals or activities celebrating Latin American, Asian or Native American traditions. City parks and facilities also could be promoted for quinceaneras and other family celebrations. Community gathering and special events should continue to be an area of emphasis; however, the overall number and breadth of City -sponsored special events should be carefully managed to align with the availability of resources and impacts to general park and facility use. This will ensure the City can adequately invest in its overall recreational offerings and maintain high -quality special events. Other community groups should be encouraged to be the primary funders and organizers of as many community -wide events as possible. If the City decides to offer more events, it should obtain sponsorships to offset costs and develop a series of seasonal activities. DRAFT 99 Packet Pg. 248 DRAFT s•1.b CHAPTER 8 TRAILS & CONNECTIONS Enhancing and expanding existing trails was identified as one of the highest capital project priorities during the community engagement process, and walking was the top activity for Edmonds residents. Continuing to manage and invest in the trails system, while also improving in right-of-way sidewalk and bike route options are essential to maintaining a healthy and livable community and promoting alternatives to motor vehicle use. TRAIL USE TRENDS Walking and hiking continue to be the most popular recreational activities nationally and regionally. Furthermore, national recreation studies have consistently ranked walking and hiking as the most popular form of outdoor recreation over the last ten years. These studies include: ■ Sports Participation Survey by the National Sporting Goods Association ■ State of the Industry Report by the Recreation Management Magazine ■ Outdoor Recreation in America by the Recreation Roundtable According to the 2020 Outdoor Participation Report published by the Outdoor Foundation, running (including jogging and trail running) was the most popular activity among Americans when measured by the number of participants and total annual outings. Running was also the most popular outdoor activity for all ethnic groups. The 2018-2022 Recreation and Conservation Plan for Washington State confirmed that outdoor recreation is an integral part of life for most Washington residents, with strong participation in the most popular category of activities, which includes walking (94%) and hiking (61%). Considerable increases in participation rates in outdoor recreation activities since 2006 indicate the importance of State and local communities continuing to invest in parks, trails, and open space infrastructure. 100 Packet Pg. 249 W 8.1.b More public paths between neighborhoods. Trails that are for walking rather than biking. - Virtual Public Meeting Participant It would be nice to see the emphasis on trail improvements to accommodate kids safely having fun on their bikes. Also for older kids making trails for mountain type bikers. Away from cars, not on the streets. Maplewood would be great for this. - Virtual Public Meeting Participant I it T . J" Cn FTERl'BIN TRAI a -� ' Co O 'i } 2 LNL L a N N O N G. O ti N O r The COVID-19 pandemic The 2020 Sports & Fitness Industry numbers with the biggest gains N significantly impacted outdoor Topline Report identified sports in running, cycling and hiking. N recreation activities, including trail that increased in popularity in Walking, running and hiking LO j use. Indoor facilities and in -person the last six years, including trail were widely considered the to programming were shut down and running, BMX biking, and day safest activities during pandemic a then only partially restarted in hiking. For most age segments, shutdowns. Reviewing only three 2020 and 2021. Local and regional activities that households aspired months of data (April, May, m park and recreation agencies that to (e.g., fishing, camping, biking, and June 2020) revealed that z managed trail systems were pressed and hiking) related to the need for participation rates for day hiking to adapt to heavy use and crowded supporting trail infrastructure. rose more than any other activity, Q trailhead parking, as many people up 8.4%. shifted their daily exercise routines An August 2020 report from the to outdoor activities, such as Outdoor Industries Association revealed that Americans took walking and bicycling. up new activities in significant DRAFT 101 Packet Pg. 250 Trails for Walkable Communities Trails for Aging Populations Trails for Economic Health a Parks are known to contribute to a healthier community by providing accessible outdoor recreation particularly through the walking trail within each park. Getting to the park by foot or bike can also offer a healthier choice integrated with the park destination and its amenities. In the NRPA publication Safe Routes to Parks, the elements of walkable, healthy community design are outlined as convenience, comfort, access and design, safety and the park itself. Sidewalks, bikeways and trails should provide an integrated alternative transportation system for residents to access parks and other destinations within their community. As further emphasis for the importance of a walkable community to promote public health, the Surgeon General has issued a Call to Action to "step it up" and promote more walking and build a more walkable world. A more connected network of trails, sidewalks, and bike lanes with links to public transit also provides economic values. Today's active seniors are looking at retirement age differently, as many are retooling for a new career, finding ways to engage with their community and focusing on their health and fitness. It will be critical for Edmonds' park and recreation system to take a comprehensive approach to the City's aging population needs. Accessibility and barrier -free parking and paths, walkability and connectivity will be paramount to future planning. Providing programming for today's older adults includes not only active and passive recreation, but also the type of equipment needed to engage in certain activities. Trails provide the infrastructure for the most popular and frequent outdoor recreation activity of older adults: walking. In the 2009 report, Walking the Walk: How Walkability Raises Housing Values in US Cities by Joe Cortright for CEOs for Cities, research cited the connection between home value and walkability. Higher WalkScore measurements where more typical consumer destination were within walking distance were directly associated with higher home values. Homes located in more walkable neighborhoods command a price premium over otherwise similar homes in less walkable areas.'Ihe National Association of Realtors reports in their On Common Ground publication with numerous articles citing the preference of walkable, mixed -use neighborhoods and the role of walkability in creating healthier communities.'Ihese preferences translate into higher housing values. Even the National Association of Homebuilders (March 2014 publication: "Walkability, why we care and you should too") have recognized that walkability is desired by consumers, creates lower development costs and allows flexibility in design. As part of the system of walkability and bike -ability, recreational trails are real estate assets that enhance community c contribute to 8.1.b EdmondS 2022 PRO LOCAL INSIGHTS As noted in previous chapters, feedback from the community survey and two virtual public meetings (see Appendices B, C & D) provided a wealth of local insights on current usage and interests in various park and recreation amenities. Respondents to the community survey indicated that one of the top reason for visiting Edmonds parks and open space is walking or running (78%). Respondents indicated that the highest unmet park and recreation facility need is for walking and pedestrian trails. In the survey, respondents also noted a strong need for additional pedestrian and bike trails in parks (84%). Respondents were asked to rank a list of potential recreation, park and open space investments. Respondents to both the mail and online survey ranked the same items as their top three priorities: expanding trail opportunities, improving or upgrading existing parks, and buying additional land for future parks. Respondents to the mail survey identified expanding trail opportunities as the top priority. Figure 27. Community Need for Additional Park and Recreation Amenities Expanding trail opportunities •• 21.7% 18.2% H Improving or upgrading existing parks 25.9% 12.0%1 Buying additional land for future parks 111=1111 16.0% 15.2% 15.8% Adding new recreational options in existing parks 23.0% 25.1% 25.7% M Expanding recreation classes & camps ® 12.4% 25.3% 0% 20% 40% 60% 80% 100% ■ 1st ■ 2nd 3rd 4th ■ 5th During the second virtual public meeting, a number of comments were offered about the importance of trails, creating stronger linkages to the Interurban Trail, accommodating pedestrian routes between neighborhoods and improving certain parks, such as Maplewood Hill Park, for walking and biking trails. TRAIL CLASSIFICATIONS Defining and reinforcing a recreational trail classification establishes a framework for trail design and prioritizes proposed trail enhancements and development. The recreational trail classification system is based on a tiered network and includes four trail categories: ■ Shared -Use Paved Trails ■ Neighborhood Links ■ Park Trails ■ Water Trails While some sections of trail will accommodate higher volumes of traffic and provide longer connections, other sections may rely on the local street network and be designed to link local or neighborhood destinations. Planning for differing trail types is essential as it encourages appropriate usage and discourages informal trail creation that could destroy vegetation and cause erosion. Shared -Use Paved Trails Shared -use paved trails serve as a vital circulation connection that links adjacent developments, neighborhoods, parks, schools, and other destinations. This trail type is paved with either asphalt or concrete and should be a minimum of 10' wide with one -foot shoulders on each side of the trail. Typical trail users include pedestrians, bicyclists and people with other wheeled devices (e.g., scooters). Bicyclists also use these routes for commuting purposes. The Interurban Trail is an example of a shared -use paved trail. Neighborhood Links Neighborhood linkage trails are multi -use pedestrian walking, hiking and biking connections that link neighborhoods with each other and with open spaces, parks, schools and other destinations. They provide the functional network of the trail system and consist of right-of-way and facilities designed for use by a variety of non -motorized users. They consist of both soft - surface and hard -surface materials, vary in width and may include bike lanes and sidewalks. DRAFT 103 Packet Pg. 252 DRAFT s•1.b Park Trails Several City parks contain pathways, sidewalks and hiking trails that provide access and circulation within and through the park. Yost Memorial Park is a well- known site with internal park trails. Water Trails Water trails are recreational water routes for non - motorized boats and watercraft. The trailhead locations are parks or street ends with dock or beach facilities to enable non -motorized crafts to launch and land. The Cascadia Marine water trail on Puget Sound is a National Recreation Trail and designated one of only 16 National Millennium Trails by the White House. Suitable for day or multi -day trips, the Cascadia Marine Trail (CMT) is supported by 66 campsites and 160 day -use sites. Meadowdale Beach Park, a Snohomish County park, is one of the few Cascadia Marine Trail sites on the east shore of central Puget Sound and is the nearest to Edmonds. Camping on the beach at this park may be permitted for campers entering and exiting the park under wind or human powered watercraft. See: https://www.wwta.org/water- trails/cascadia-marine-traiU TRAIL SYSTEM INVENTORY Within the City of Edmonds, a growing collection of shared -use, neighborhood and park trails provides 8.6 miles of trail facilities that offer many opportunities for connecting with nature, enjoying vistas and accommodating health and wellness, see Map 13 on the following page. However, gaps in the trail network limit the access and enjoyment of trail use in Edmonds, and additional connections should be planned to connect destinations and grow the system. Figure 28. Existing Recreational Trails within Edmonds 88th Street Connection 288.3 0.1 City Park 1,903.0 0.4 Esperance Park (County) 869.6 0.2 H.O. Hutt Park 635.0 0.1 Hickman Park 1,472.5 0.3 Interurban Trail 10,087.8 1.9 Maplewood Hill Park 797.2 0.2 Waterfront Walkway 7,100.0 1.3 Pine Ridge Park 3,992.8 0.8 Seaview Park 680.5 0.1 Southwest County Park (County) 5,611.2 1.1 Yost Memorial Park 11,920.3 2.3 Total Length 45,358.3 8.6 TRAIL NETWORK WALKSHEDS As a supplement to the Comprehensive Transportation Plan (updated in 2015), a gap analysis was conducted during the PROS Plan development to examine and assess the distribution of existing recreational paths and trails. As with the parkland analysis, travel distances were calculated along the road network starting from each existing trail segment's known access points. Trails within parks were also examined. Service areas were calculated with 1/a-mile and 1h-mile walksheds for major trails or parks (e.g., Interurban Trail, Yost Memorial Park) and 1/a-mile walksheds for the remainder. Map 14 illustrates the citywide distribution of recreational trails and the relative access to these corridors within reasonable travel walksheds. Approximately 18% of the City has close -in access to recreational trails, including park trails and the Interurban Trail. 104 Packet Pg. 253 8.1.b EdmondS 2022 PRO Legend O City Limits Recreational Trails Bike Lanes & Routes _ City Parks Open Space & Special Use Areas - Non -city Parks - Edmonds School District - Water 1 Schools FINAL VERSION OF PROS PLAN WILL INCLUDE MAPS AS 11 X17 FOR BETTER READABILITY * Shorelines 1 161H eTS W ,66TH6 sW 3 nwood SW�4' 336TH ST SW T A d O ti N O N N O N N 0 w a r c E V Wr }r Q DRAFT 105 Packet Pg. 254 DRAFT 8.1.b PAGE LEFT INTENTIONALLY BLANK a O w a m u a c m Q. O Ca 0 L u Y L Q. N N O N C O A N w Q O ti N O N N O N O w d r C d E t V R a+ a Packet Pg. 255 8.1.b EdmondS 2022 PRO Legend O City Limits Recreational Trails _ 1/4-mile Travelshed to Trail Access _ 1/2-mile Travelshed to Trail Access - City Parks - Open Space & Special Use Areas Puget Sound - Non -city Parks )T, Edmonds School District - Water I Schools FINAL VERSION OF PROS PLAN 1T6lt,I STSW WILL INCLUDE MAPS AS 11 X17 Snohomish Counly Park FOR BETTER READABILITY 180TH6 IT 3 I Lynnwood Lyn,dale Park 188TH IT SW 196TH IT SW CAS. CHS -IT NIO T6W - 200TH IT SW W nP 204TH sisal M 59�ST z "� 1 wsT 9aTHsrsw v —L-T ST � ~ � 212TH IT m soWOorN WAY 1 ■ I 3 w Esperance Woodway € Park Mountlake Terrace Unincorporated "PL sw � Snohomish Co. 6TH w y` 226THSTSW 3 4 s` fLm Ballinger Park LPL SW 4' 236TN IT SW ­T. IT SW 238TH sT S � j rf' I1�-1 ego 0 0.25 0.5 1 1.5 2 aTH IT SW _ Miles Shoreline 20 A •N� G. O ti N O N N O N LO N ONN W a C a) V Wr Q DRAFT 107 Packet Pg. 256 DRAFT 8.1.b PAGE LEFT INTENTIONALLY BLANK a O w a m u a c m Q. O Ca 0 L u Y L Q. N N O N C O A N w Q O ti N O N N O N O w d r C d E t V R a+ a Packet Pg. 257 8.1.b EdmondS 2022 PRO Similar to transportation planning, recreational trail planning should be geared toward connectivity, rather than mileage. Only considering a mileage standard for paths within the Edmonds park system will result in an isolated and inadequate assessment of community needs with little consideration for better trail connectivity. This Plan recommends a connectivity goal that re -states and reinforces the desire to improve overall connections across the City and enhance off- street linkages between parks and major destinations, as feasible. Expanding trail connections was identified as a top priority through the community engagement process and should also include connections to public transit when possible. TRAIL SYSTEM DESIGN CONSIDERATIONS Trail Development Limitations Opportunities to develop additional trails and connections may be limited due to the built -out nature of Edmonds. One underlying tenet of the recreational trail system is to enable the placement of trails within or close to natural features to provide access to the City's unique landscapes and accommodate outdoor recreational access to creeks, hillsides, and waterfront. the future planning and design of trail routes through natural areas should be based on sensitive and low -impact design solutions that offer controlled access to protect the resource while providing for a positive experience for all modes of trail user. The determination of future trail alignments should prioritize natural resource and natural hazards planning and protections, in part to meet local land use policies and Washington State requirements. Alignment The future growth of the trail network will need to prioritize trail alignments and locations that are optimal from multiple perspectives: trail user, trail experience and trail connectivity. Cost, regulatory and site suitability factors should also be incorporated. New trail alignments should attempt to accommodate different trail use types (i.e., commuter vs. recreational/ destination oriented) and utilize interim solutions such as widening sidewalks, utilizing utility corridors and expanding safe bike lanes and routes as opportunities for trail improvements. Accommodating trail alignments for local, neighborhood link trails as connections to regional, shared -used trails or major park trails is essential for providing access and reducing the sole reliance on trailheads for providing access to the trail network. Access & Trailheads Safe, convenient entryways to the trail network expand access for users and are a necessary component of a robust and successful system. A trailhead typically includes parking, kiosks and signage and may consist of site furnishings such as trash receptacles, benches, restrooms, drinking fountains and bike racks. Trailheads may be within public parks and open space or provided via interagency agreements with partner organizations (e.g., county, school district, public transit, etc.) to increase use and reduce unnecessary duplication of support facilities. Specific trailhead design and layout should be created as part of planning and design development for individual projects and consider the intended user groups and unique site conditions. In some areas, parking on the shoulders is a problem that hinders the utility of the shoulders for pedestrian and bicycle use, while also creating environmental and neighborhood impacts. In areas where parking on the road shoulder is persistent for trail access, the City should explore options for formalizing trailhead parking improvements to accommodate typical demand and localize and manage site impacts resulting from trail use parking. The City should also continue to explore first/last-mile connections so that potential park visitors can arrive using transit, reducing the need for on -site parking. Trail Signs & Wayfinding Coordinated signage plays an important role in facilitating a successful trail system. A comprehensive and consistent signage system is a crucial component of the trail system. It is necessary to inform, orient and educate users about the trail system itself, as well as appropriate trail etiquette. Such a system of signs should include trail identification information, orientation markers, safety and regulatory messages and a unifying design identity for branding. The following signage types should be considered throughout the system: DRAFT 109 Packet Pg. 258 DRAFT s•1.b ■ Directional and regulatory signage ■ Trail user etiquette and hierarchy signage ■ Route identification and wayfinding signage ■ Mileage markers or periodic information regarding distance to areas of interest ■ Warning signs to caution users of upcoming trail transitions or potential conflicts with motor vehicles ■ Interpretive information regarding ecological, historical and cultural features found along and in proximity to the trail ■ QR codes to provide links to additional information The installation of kiosks at trailheads is a best practice that should continue. Kiosks provide important trail information, while reinforcing the visual brand of the City of Edmonds. Ongoing Maintenance Following trail construction, ongoing trail monitoring and maintenance will keep the trails functioning as designed, while protecting capital investments in the network. Future trail renovation projects should be included in the Capital Improvement Plans as a means to identify and secure appropriate resources for needed enhancement. TRAIL AND PATHWAY RECOMMENDATIONS ■ Continue to implement the pedestrian and bikeway plan components of the Comprehensive Transportation Plan ■ Continue to improve trail and trailhead signage and wayfinding and explore ways to indicate connections to bus and rail transit. ■ Support or provide bicycle skills development and education classes for youth in partnership with the school district and local community -based organizations. ■ Improve trailhead areas and parking at Maplewood Hill Park, and explore options to install additional loops at that site. ■ Conduct repairs and trail maintenance, as necessary. 110 Packet Pg. 259 IN " okli DRAFT s•1.b CHAPTER 9 CAPITAL PLANNING & IMPLEMENTATION The preceding chapters provided an overview of the Edmonds park and recreation system and established goals and objectives to guide future plannnig, development and operations. This chapter includes the proposed six - year capital project plan and provides recommendations on other strategies to successfully implement the plan. PROJECT RECOMMENDATIONS Acquisitions to Fill Park System Gaps The acquisition of additional neighborhood parks is necessary to address existing gaps in park services in the South Edmonds area and along the SR 99 corridor. Three new park sites should be pursed followed by public site master planning processes for each sites to determine the desired level of development and types of amenities Additionally, the City should continue to coordinate with local residential developers to include public parks in new subdivisions and utilize tools, such as park impact fee credits, to facilitate the process. Open Space & Conservation Acquisitions The City should continue to seek options to expand its open space holdings and pursue acquisitions that adjoin city properties or conserve unique natural areas, such as wetlands, forested areas and vistas. Riparian corridors with their adjacent wetlands should be protected more actively and eventually undergo any necessary restoration measures to ensure the preservation of habitat and movement of wildlife along natural connections between terrestrial and aquatic habitat. 1 think the top priority is for acquisition especially in SE Edmonds and the marsh. Virtual Public Meeting Participant Complete the 'missing link" in front of the Ebbtide! Virtual Public Meeting Participant Invest in areas outside of the bowl. Virtual Public Meeting Participant More park benches in a covered area for the occasional rain shower. Virtual Public Meeting Participant 112 Packet Pg. 261 Parkland Acquisitions Pursue acquisitions to fill known parkland gaps to improve local access and distribution. ADA Enhancements Reduce barriers to access for recreation amenities and improve accommodations for users of all abilities. Park Development & Upgrades Playground upgrades and other park enhancements will improve year-round recreation opportunities. Trail Connections Pursue a coordinate approach with the Public Works Department to align recreational trail planning with pedestrian and bikeway improvements. 8.1. b Yost Pool Replacement Plan for and implement the replacement of the pool at Yost Memorial Park. C O .y N Q 0 ti N O N N O N LO 0 IX d r C d E t V R a+ a Signage & Wayfinding Improve the consistency of signage and wayfinding. DRAFT 113 Packet Pg. 262 DRAFT 8.1.b Park Development & Enhancements In the immediate near -term, the City should focus on the completion of the redevelopment of Civic Center Playfield, which is currently under construction with completion slated for late 2022. The master plan features youth athletic fields and lighting, permanent restrooms, improved skate park, petanque court grove, a pollinator meadow, multi -sports court, tennis court, a perimeter walking path, fully inclusive playground, picnic areas, and public art. A number of parks have aging infrastructure that warrants significant repairs such as sports court resurfacing or complete replacements. A few playgrounds are nearing the end of their useful life and cycles and should be replaced, including those at Maplewood Hill Park, Sierra Park and Yost Memorial Park. Other development projects may include adding amenities to existing parks such as picnic shelters to Mathay Ballinger Park, Elm Street Park and Pine Street Park and paved pathways connections in Mathay Ballinger Park and Pine Street Park. Tree plantings were identified as a desirable improvement at Pine Street Park and Haines Wharf Park. Additional tree planting could be identified through the implementation of the Urban Forestry Management Plan. Yost Pool Replacement While continuing to manage the existing infrastructure to keep the facility open to the community, the City should refine their options for replacement of Yost Pool, following guidance of the 2009 Aquatic Feasibility Study and the public feedback gathered during this planning process. Trail Connections Trail connections, including sidewalk and bike lanes improvements, are needed to help link destinations across the community. Acquiring additional lands, easements and/or rights -of -way for the continuation of the Interurban Trail (more off -road segments) are recommended. Coordinate with the Comprehensive Transportation Plan (and subsequent updates), as well as coordination with local subdivision and site development projects. ADA & Other Accessibility Enhancements Minor improvements to access, such as providing ramped entrances, for site furnishings are necessary to conform to the Americans with Disabilities Act (ADA) and ensure universal accessibility. The CIP includes upgrades and improvements to remove barriers and improve universal access. In general, the City should make improvements to existing parks as needed to ensure proper maintenance, usability and quality of park features and grounds. The City also should complete an ADA Transition Plan for park and recreation facilities to identify and strategize ADA compliance improvements. User Convenience Improvements Older restroom facilities (built before 2010) may not provide adequate universal access to people with disabilities. Replacement (or major repairs) are recommended for restrooms at Olympic Beach, Seaview Park and Brackett's Landing North. Also, permanent restrooms should be installed at Marina Beach Park and Mathay Ballinger Park. Also, consistent graphics and the implementation of a consistent citywide signage style will improve information, usability and "branding" of the City's park and open space system. In particular, the popular trail network within Yost Memorial Park has limited directional and identification signs to let trail users know their location and how to get to their destination Municipal Code Update The Edmonds municipal code includes definitions of certain park classifications, and these definitions were last updated in 2001. The municipal code should be amended to reflect the current parkland classifications, as appropriate, to relate to land use and development code regulations and requirements. In addition, the code sections related to park usage should be updated. 114 Packet Pg. 263 8.1.b EdmondS 2022 PRO CAPITAL IMPROVEMENTS PLAN The Capital Improvements Plan (CIP) puts into chronological order the project intent and strategic actions to guide the implementation of this Plan. It assigns proposed time frames and estimated costs for specific projects. The CIP provides brief project descriptions for those projects to assist staff in preparing future capital budget requests. The following Capital Improvements Plan identifies the park, trail and facility projects considered for the next six years or more. The majority of these projects entail the maintenance, acquisition and development of parks, recreational amenities and trails. The following table summarizes the aggregate capital estimates by park types for the next six years. Figure 29. Capital Improvements Plan Expenditures Summary Repair/Renovation/Re placement, $27,724,900 Planning, Acquisition, $3,352,200 $6,191,400 Development, $27,156,500 DRAFT 115 Packet Pg. 264 DRAFT 8.1.b PAGE LEFT INTENTIONALLY BLANK a O w a m u a c m Q. O Ca 0 L u Y L Q. N N O N C O A N w Q O ti N O N N O N O w d r C d E t V R a+ a Packet Pg. 265 Edmonds PROS 2022 6-Year Capital Facilities Program Working Draft 8.1.b A 1 Edmonds Marsh Estuary Acquisition TBD $ A 2 Neighborhood park - SE1 South Edmonds target area acq-1 $ 1,500,000 $ 1,545,000 $ 1,545,000 A 3 Neighborhood park - SR99 SR 99 target area acquisition $ 1,500,000 $ 1,591,400 $ 1,591,400 A 4 Neighborhood park-SE2 South Edmonds target area acq-2 $ 2,000,000 $ 2,185,500 $ 2,185,500 A 5 Interurban Trail Extension/acquisition $ 750,000 $ 869,500 $ 869,500 $ 6,191,400 P 1 Parks & Facilities M & O Building ( Design TBD P 2 Neighborhood park - SE1 South Edmonds NH park master plan-1 $ 75,000 79,600 P 3 Waterfront Walkway Design completion $ 500,000 $ 500,000 P 4 Edmonds Marsh Estuary Master Plan $ 250,000 $ 273,200 P 5 Johnson Property Master Plan $ 75,000 $ 82,000 $ 82,000 P 6 Neighborhood park - SR99 SR 99 target area NH park master plan $ 75,000 $ 82,000 $ 82,000 P 7 Neighborhood park - SE2 South Edmonds NH park master plan-2 $ 75,000 $ 84,400 $ 84,400 79,600 500,000 273,200 P 8 4th Avenue Cultural Corridor Design completion $ 2,000,000 $ 2,251,000 $ 2,251,000 $ 3,352,200 D 1 Edmonds Marsh Estuary Restoration TBD D 2 Parks & Facilities M & O Building Construction TBD D 3 City Park Pedestrian safety walkway $ 100,000 $ 50,000 D 4 Civic Center Playfields Renovation project cont (2021 start) $ 9,871,600 $ 9,871,600 50,000 9,871,600 D 5 Mathay Ballinger Park Paved loop pathway $ 50,000 $ 53,000 $ 53,000 D 6 Mathay Ballinger Park Restrooms $ 350,000 $ 371,300 $ 371,300 D 7 Mathay Ballinger Park Small Shelter w/ picnic tables $ 75,000 $ 79,600 $ 79,600 D 8 Cemetery Columbarium Expansion - Phase II $ 150,000 $ 159,100 $ 159,100 9 9 Mari a -Reach Park MasteF PlaR Implementation $r__ $ 4__ - -$-- D 10 Pine Street Park Small Shelter w/ picnic tables $ 75,000 $ 79,600 $ 79,600 D 11 Pine Street Park Paved connecting pathway $ 55,000 $ 58,300 $ 58,300 D 12 Pine Street Park Canopy shade trees $ 25,000 $ 26,500 $ 26,500 D 13 Neighborhood park - SEl South Edmonds NH park development-1 $ 750,000 $ 819,500 $ 819,500 D 14 Waterfront Walkway Construction $ 750,000 $ 750,000 $ 750,000 D 15 Neighborhood park - SR99 SR 99 target area NH park development $ 750,000 $ 844,100 $ 844,100 D 16 Elm Street Park Nature Playground $ 75,000 $ 84,400 $ 84,400 D 17 Elm Street Park Small Shelter w/ picnic tables $ 75,000 $ 84,400 $ 84,400 D D Project 18 19 # Neighborhood park - SE2 4th Avenue Cultural Corridor Site South Edmonds NH park development-2 Construction Project Description $ $ 2022 750,000 6,000,000 Estimate 2022r r $ 869,500 $ $ 6,955,600 $ $ r 869,500 6,955,600 21,156,500 R R R R R R 1 2 3 4 5 6 Greenhouses Johnson Property Meadowdale Playfields Yost Park Yost Park Yost Park Replacement Demolition and securing site Renovations (City of Lynnwood ILA) Trail bridge & boardwalk repairs/replace Pool repair Playground replacement $ $ $ $ $ $ 100,000 200,000 500,000 80,000 175,000 250,000 $ 100,000 $ 200,000 $ 200,000 $ 80,000 175,000 $ $ 257,500 300,000 $ $ $ $ $ $ 100,000 200,000 500,000 80,000 175,000 257,500 R 7 Olympic Beach Park Restroom upgrade $ 50,000 $ 53,000 $ 53,000 R 8 Sierra Park Playground replacement $ 175,000 $ 185,700 $ 185,700 R 9 Yost Park Resurface tennis courts $ 70,000 $ 74,300 $ 74,300 R 10 System -wide Signage & wayfinding $ 50,000 $ 53,000 $ 53,000 R 11 Yost Park Pool upgrades/renovation $ 500,000 $ 546,400 $ 546,400 R 12 Maplewood Hill Park Playground replacement $ 125,000 $ 144,900 $ 144,900 R 13 System -wide Playground replacement / inclusive level $ 175,000 $ 197,000 $ 202,900 $ 399,900 R 14 Elm Street Park Habitat restoration $ 50,000 $ 56,300 $ 56,300 R 15 Yost Park Pool replacement $ 20,000,000 $ 23,881,000 $ 23,881,000 R 16 Seaview Park Restroom replacement $ 350,000 $ 417,900 $ 417,900 R 17 System -wide Capital repairs $ 100,000 Sam. 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 600,000 $ 27,724,900 Totals $ 31,151,600 $ 10,782,666 $ 2,412,469 $ 3,266,572 $ 4,989,575 $ 3,707,678 $ 33,302,481 $ 58,425,000 Project Type NOTES: A Acquisition This list identifies planning -level cost estimates and does not assume the value of volunteer or other non -City contributions. P Master planning Detailed costing maybe necessary for projects noted. D Development - new This list is not an official budget and intended as a guiding document for City staff in the preparation of departmental budgets. R Replacement/Upgrade 117 Packet Pg. 2 6 DRAFT 8.1.b PAGE LEFT INTENTIONALLY BLANK a O w a m u a c m Q. O Ca 0 L u Y L Q. N N O N C O A N w Q O ti N O N N O N O w d r C d E t V R a+ a Packet Pg. 267 8.1.b EdmondS 2022 PRO IMPLEMENTATION A number of strategies exist to enhance and expand park and recreation service delivery for the City of Edmonds; however, clear decisions must be made in an environment of competing interests and limited resources. A strong community will is necessary to bring many of the projects listed in this Plan to life, and the Edmonds City Council has demonstrated its willingness in the past to support parks and recreation and a high quality of life. The recommendations for park and recreation services noted in this Plan may trigger the need for funding beyond current allocations and for additional staffing, operations and maintenance responsibilities. Given that the operating and capital budget of the Parks, Recreation, Cultural Arts and Human Services Department is finite, additional resources may be needed to leverage, supplement and support the implementation of proposed objectives, programs and projects. While grants and other efficiencies may help, these alone will not be enough to realize many ideas and projects noted in this Plan. The following recommendations and strategies are presented to offer near -term direction to realize these projects and as a means to continue dialogue between City leadership, local residents and partners. Additionally, a review of potential implementation tools is included as Appendix G, which addresses local financing, federal and state grant and conservation programs, acquisition methods and others. Enhanced Local Funding According to the city budget, Edmonds maintains reserve debt capacity for local bonds and voter approved debt. The city's non -voted general obligation debt is below its debt capacity limit of $85 million for non -voted debt. Community conversations regarding the potential to redevelop the pool at Yost Memorial Park and/or bundle several projects from the Capital Improvements Plan warrant a review of debt implications for the City, along with the need to conduct polling of voter support for such projects. Park Impact Fees & Real Estate Excise Tax Park Impact Fees (PIF) are imposed on new development to meet the increased demand for parks resulting from the new growth. PIF can only be used for parkland acquisition, planning and/or development. They cannot be used for operations and maintenance of parks and facilities. The City of Edmonds currently assesses impact fees, but the City should review its PIF ordinance and update the methodology and rate structure, as appropriate, to be best positioned to obtain future acquisition and development financing from the planned growth of the community. The City should prioritize the usage of PIF to secure new park properties and finance park or trail development consistent with the priorities within this Plan. The City currently imposes both of the quarter percent excise taxes on real estate, known as REET 1 and REET 2. The REET must be spent on capital projects listed in the City's capital facilities plan element of their comprehensive plan. Eligible project types include planning, construction, reconstruction, repair, rehabilitation or improvement of parks, recreational facilities and trails. Acquisition of land for parks is not a permitted use of REET 2 funds. REET is used for other City projects, such as facility construction and public works projects, may be used to make loan and debt service payments on permissible projects. Through annual budgeting and with discussions with City Council, the Parks, Recreation, and Cultural Services Department should continue to seek access to REET funds and use the capital facilities plan to compile compelling projects to enhance service delivery of the amenities for which the community has indicated strong support. Conservation Futures Program Snohomish County assesses the maximum allowable excise of $0.0625 per $1,000 assessed value to fund the Conservation Futures program and provides cities a venue to access these funds through a local grant process. The City should continue to submit grant applications for support in financing the acquisition of additional natural areas, such as wetlands and forest lands, to facilitate the protection of additional open space and potentially enable improved linkages to expand the trail network DRAFT 119 Packet Pg. 268 DRAFT s•1.b Parkland Donations & Dedications Parkland donations from private individuals or conservation organizations could occur to complement the acquisition of parklands and open space across the City. Gift deeds or bequests from philanthropic - minded landowners could allow for lands to come into City ownership upon the death of the owner or as a tax-deductible charitable donation. Also, parkland dedication by a developer could occur in exchange for Park Impact Fees or as part of a planned development where public open space is a key design for the layout and marketing of a new residential project. Any potential dedication should be vetted by the Department to ensure that such land is located in an area of need or can expand an existing City property and can be developed with site amenities appropriate for the projected use of the property. Grants & Appropriations Several state and federal grant programs are available on a competitive basis, including WWRP, ALEA, and LWCF. Pursuing grants is not a panacea for park system funding, since grants are both competitive and often require a significant percentage of local funds to match the request to the granting agency, which depending on the grant program can be as much as 50% of the total project budget. Edmonds should continue to leverage its local resources to the greatest extent by pursuing grants independently and in cooperation with other local partners. Appropriations from state or federal sources, though rare, can supplement projects with partial funding. State and federal funding allocations are particularly relevant on regional transportation projects, and the likelihood for appropriations could be increased if multiple partners are collaborating on projects. Internal Project Coordination & Collaboration Internal coordination with the Public Works and Development Services Departments can increase the potential of discrete actions toward the implementation of the proposed trail and path network, which relies heavily on street right-of-way enhancements, and in the review of development applications with consideration toward potential parkland acquisition areas, planned path corridors and the need for easement or set -aside requests. However, to more fully expand the extent of the park system and recreation programs, additional partnerships and collaborations should be sought. Public -Private Partnerships Public -private partnerships are increasingly necessary for local agencies to leverage their limited resources in providing park and recreation services to the community. Corporate sponsorships, health organization grants, conservation stewardship programs and non-profit organizations are just a few examples of partnerships where collaboration provides value to both partners. The City has a variety of existing agency and community -based organization partners and should continue to explore additional and expanded partnerships to help implement these Plan recommendations. Volunteer & Community -based Action Volunteers and community groups already contribute to the improvement of park and recreation services in Edmonds. Volunteer projects include park clean- up days, invasive plant removal, tree planting and community event support, among others. Edmonds should maintain and update a revolving list of potential small works or volunteer -appropriate projects for the website, while also reaching out to civic groups and the high school to encourage student projects. While supporting organized groups and community -minded individuals continues to add value to the Edmonds park and recreation system, volunteer coordination requires a substantial amount of staff time, and additional resources may be necessary to more fully take advantage of the community's willingness to support park and recreation efforts. Other Implementation Tools Appendix G identifies other implementation tools, such as voter -approved funding, grants and acquisition tactics that the City could utilize to further the implementation of the projects noted in the Capital Improvements Plan. 120 Packet Pg. 269 � l 121 FPacket Pg. 270 DRAFT 8.1.b 144 RAILROAD AVENUE TIDELANDS 0.9 ACRES Capital Improvement & Planning Opportunities: ■ None noted. Maintenance Considerations: ■ Continue monitoring beach conditions. ■ Keep pathway clear of private vegetation. ■ Replace aging benches. Amenities: WATERFRONT 0 Paved path & seawall (City owned and maintained) ■ Public art (sculptures) ■ Benches 122 Packet Pg. 271 8.1.b EdmondS 2022 PRO BRACKETT'S LANDING - NORTH 5.06 ACRES Capital Improvement & Planning Opportunities: WATERFRONT ■ Parking is at a premium when divers and beach `goers' are visiting the park. Walk-in visitors also frequent the beach with the close proximity to waterfront food services. Consider a sign to direct drivers to go to other public parking lots when lot is full. ■ Refurbish parking entrance gate. Upgrade restrooms. ■ Replace entryway sign, anchor, and public art. Maintenance Considerations: ■ Mount leash rule sign on permanent post (currently attached to sawhorse on walkway). ■ Interpretive signs fading. Plan for replacement. ■ Upgrade informational Dive Park signage. Amenities: ■ Beachfront ■ Benches ■ Bike rack ■ Drinking fountain ■ Edmonds Underwater Park access ■ Interpretive signs ■ Public art (sculptures) ■ Outdoor showers ■ Parking ■ Picnic tables ■ Restrooms ■ Trash receptacles c 0 .y a) a O ti N O N N O N 41 O W d r c m E t .r r a DRAFT 123 Packet Pg. 272 DRAFT s•1.b BRACKETT'S LANDING - SOUTH 2.22 ACRES Capital Improvement & Planning Opportunities: ■ None noted Maintenance Considerations: ■ Update benches as needed. Amenities: WATERFRONT 0 Beachfront ■ Benches ■ Bike rack ■ Bus stop ■ Interpretive sign ■ Open grass area ■ Picnic tables ■ Planting beds ■ Public art (sculptures) ■ Trash receptacles ■ Viewpoint ■ Walking trail c 0 .N 0 o: r a O ti N O N N Co N LO Cn O W d r C d E t V R r•+ r Q 124 Packet Pg. 273 8.1.b EdmondS 2022 PRO CITY PARK 13.96 ACRES rive aisle. Capital Improvement & Planning Opportunities: ■ Addition of pedestrian pathway access to park along northern exit d Maintenance Considerations: ■ 3-tiered bleachers should have safety rails added (to meet International Code). ■ Restroom signs are not ADA-compliant & should be replaced. ■ Handicapped parking signs mounted too low to be ADA-complian ■ Some pavement barriers (gaps/cracks) at restroom E. T c A a O ti N T O N N 0 N LO O a r c m E z Q DRAFT 125 Packet Pg. 274 DRAFT 8.1.b CIVIC CENTER PLAYFIELDS 7.92 ACRES COMMUNITY Capital Improvement & Planning Opportunities: ■ Continue master plan improvements. Site construction began August 9, 2021. Maintenance Considerations: ■ None noted. Amenities: ■ Multi -sport court (1) Y ■ Boys & Girls Club facility a ■ Rubber surface track (1/3 mile) cm ■ Drinking fountains N ■ Field lighting ■ Petanque courts C A ■ Picnic tables > ■ Shade pavilion ■ Playground (inclusive) a p ■ Restrooms ti N ■ Skate park C N ■ Soccer fields (1 competition,1 c practice) LO ■ Tennis courts (1) N ■ Trash receptacles w ■ Walking trail IL r ■ Public art m ■ Pollinator field E v ■ Lighting Q 126 Packet Pg. 275 8.1.b EdmondS 2022 PRO WATERFRONT CENTER PARK 1.94 ACRES Capital Improvement & Planning Opportunities: ■ None noted - newly developed. Maintenance Considerations: ■ None noted. Amenities: WATERFRONT 0 Beachfront ■ Benches ■ Bike rack ■ Drinking fountain ■ Foot wash station ■ Hand -carried boat launch ■ Lighting ■ Naturalized stormwater management areas ■ Parking ■ Public art ■ Trash receptacles ■ Viewpoint ■ Walking trail ■ Natural play area T c 0 2 d a O ti N O N N O N LO O a r c m E z Q DRAFT 127 Packet Pg. 276 DRAFT ELM STREET PARK 1.85 ACRES Capital Improvement & Planning Opportunities: ■ Nature trail with natural play area could be added. ■ Access & entry improvements. ■ Small shelter and small playground area could be added. Amenities: NEIGHBORHOOD 0 Dog waste bag dispenser ■ Natural area ■ Open grass lawn ■ Picnic table ■ Trash receptacle Maintenance Considerations: ■ Native plant restoration and invasive plant species control could be implemented. c 0 A a� a 0 ti N 0 N N O N 0 W d r C d E t V R a+ a 128 Packet Pg. 277 8.1.b Edf11OW 2022 PRO FRANCES ANDERSON CENTER FIELD 1.94 ACRES Capital Improvement & Planning Opportunities: ■ No ADA/universal access to spectator area for amphitheater. Pl access with next site renovation project. Maintenance Considerations: ■ ■ ■ Amenities: an for ADA NEIGHBORHOOD ■ Baseball/softball field ■ Drinking fountain ■ Outdoor amphitheater / covered stage Picnic tables Playground Portable toilets Soccer field Trash & recycling receptacles Sports field irrigation not effecting good coverage for consistent grass growth. Evaluate irrigation system and its coverage to determine best renovation approach. Plan for irrigation system improvements. Manage grass sports fields for reduced clover & plantain to better support sports activities. Some pavement cracking/upheavals near playground need to be addressed to remove tripping hazard. ■ M ■ ■ ■ ■ DRAFT 129 Packet Pg. 278 Sports field irrigation not effecting good coverage for consistent grass growth. Evaluate irrigation system and its coverage to determine best renovation approach. Plan for irrigation system improvements. Manage grass sports fields for reduced clover & plantain to better support sports activities. Some pavement cracking/upheavals near playground need to be addressed to remove tripping hazard. ■ M ■ ■ ■ ■ DRAFT 129 Packet Pg. 278 DRAFT f & . 'I.. pp-- HAINES WHARF PARK Amenities: 0.69 ACRES NEIGHBORHOOD 0 Benches ■ Drinking fountain ■ Interpretive signs Capital Improvement & Planning Opportunities: ■ Lighting ■ No ADA accommodation in the newer (developed 2012) neighborhood park. 0 Overlook ■ Limited shade in this park. Consider shade structure or additional shade trees. 0 Parking ■ Picnic tables Maintenance Considerations: ■ Playground ■ Another feature in lower park area is missing - footings remain. (wind 0 Portable toilet damage?). ■ Shade trees ■ Irrigation not used due to landslide risk. ■ Swing set (2 strap,1 tot,1 inclusive) ■ Trash receptacles c 0 A a� O ti N O N N O N 41 O W a r c m E t .r r a 130 Packet Pg. 279 8.1.b EdmondS 2022 PRO 5 HICKMAN PARK 5.61 ACRES Capital Improvement & Planning Opportunities: ■ Add permanent restrooms to this popular neighborhood park. Maintenance Considerations: ■ Some weed growth in landscape planting beds at entrance. ■ Blackberry bushes intruding on trail through natural area — nee ■ Dog waste bag dispenser missing from post at pedestrian bridge ■ A few pavement cracks need to be addressed. ■ Plan to resurface basketball court. s Amenities: d pruning. NEIGHBORHOOD 0 Baseball/softball field ■ Basketball 1/2 courts (2) ■ Benches ■ Bike racks ■ Boulder play area (former school site) ■ Dog waste bag dispenser ■ Drinking fountain ■ Fitness stations ■ Kiosk ■ Lighting ■ Naturalized SWM basin ■ Open grass lawn ■ Parking ■ Paved walking loop ■ Picnic shelter ■ Playground ■ Portable restrooms ■ Trail ■ Trash & recycling receptacles c 0 A a O ti N 0 N N 0 N 41 O W a r c m E t .r r a DRAFT 131 Packet Pg. 280 c 0 A a O ti N 0 N N 0 N 41 O W a r c m E t .r r a DRAFT 131 Packet Pg. 280 8.1.b HUMMINGBIRD HILL PARK Amenities: 1.22 ACRES NEIGHBORHOOD ■ Basketball court ■ Open grass lawn ■ Picnic tables Capital Improvement & Planning Opportunities: ■ Playground ■ Consider additional play activity options. ■ Shade trees ■ Swing set Maintenance Considerations: ■ Trash and recycling receptacles ■ Invasive blackberry cover the steep slopes. Public likes to pick the berries. Native plant restoration could be planned when/if public opinion shifts in favor of blackberry control. ■ Remove barrier to playground entry to provide for universal access. 132 Packet Pg. 281 8.1.b MOW 2022 PRO MARINA BEACH PARK 3.37 ACRES Capital Improvement & Planning Opportunities: WATERFRONT ■ No ADA-compliant picnic tables. Add at least one accessible picnic table along the walking trail. ■ Add permanent restroom facility ■ Continue to implement master plan improvements. Maintenance Considerations: ■ Based on post markings on new playground equipment, play area needs thicker layer of fall safety surfacing. ■ Add more sand to volleyball court. ■ Add gravel to walkway path where worn down. Amenities: ■ BBQ-Grills ■ Benches ■ Drinking fountain Kiosk @ Dog Park ■ Off -leash dog area �■ Open grass lawn area ■ Picnic tables ■ Playground ■ Portable restrooms ■ Sand volleyball court g■ Shade trees ■ Shoreline access / gravel beach ■ Spigots/foot wash ■ Trash receptacles ■ View point ■ Walking trail ■ Interpretive signs c 0 a� o: a O ti N T_ O N N Co N LO Cn O W d c m E t w r Q DRAFT 133 Packet Pg. 282 DRAFT MATHAY BALLINGER PARK 1.82 ACRES Amenities: NEIGHBORHOOD 0 Playground ■ Bike rack ■ Basketball courts (2) Capital Improvement & Planning Opportunities: ■ Open grass lawn area ■ Paved loop path could be added along with a small picnic shelter. 0 Shade trees ■ Upgrade the ADA parking space. Connect to park features with paved path. 0 Trash receptacles ■ Consider converting one basketball court into an alternative sport/play amenity 0 Dog waste bag dispenser ■ Picnic tables ■ Portable restroom ■ Access to Interurban Trail ■ Parking Maintenance Considerations: ■ Control invasive blackberries. ■ Play equipment climbing net needs cable replacement. ■ Remove access barrier into play area. ■ Replace faded signs c 0 A a� a O ti N 0 N N 0 N O W a r c m E t .r r a 134 Packet Pg. 283 8.1.b EdmondS 2022 PRO ■ OLYMPIC BEACH PARK 2.85 ACRES Amenities: WATERFRONT Public fishing pier (WFWD facility, maintained and operated by City) ■ Benches Capital Improvement & Planning Opportunities: ■ Bike rack ■ The park space between buildings could support a paved pathway to connect the ■ Drinking fountains parking area to the seawall. This connection could enhance public waterfront ■ Interpretive signs access and provide more universal access to the public promenade. ■ Repair buckled asphalt in parking lot and replace landscape trees to avoid future ■ Parking pavement upheavals. ■ Picnic area ■ Public art (sculptures) ■ Restrooms ■ Shoreline access/sand beach g ■ Trash & recycling receptacles ■ View point ■ Visitor center ■ Walking trail ■ Hand -carry boat launch Maintenance Considerations: ■ Remove, powder coat & replace benches ■ Restroom maintenance: heavy graffiti area, consider adding lightin c 0 MA aD a O ti N 0 N N O N 41 O W d r c m E t .r r a DRAFT 135 Packet Pg. 284 DRAFT PINE STREET PARK 1.47 ACRES Capital Improvement & Planning Opportunities: NEIGHBORHOOD ■ No designated handicapped parking for park access. Need to add accommodation. ■ Add shade trees to playground area. Consider adding a small shelter at playground. ■ Perimeter paved park path could enhance use. ■ Outfield fence could use safety cap. Maintenance Considerations: ■ Bleachers need safety rails added (to comply with International Building Code) Amenities: ■ Trash receptacles ■ Bike rack ■ Picnic tables ■ Bench ■ Parking ■ Playground ■ Baseball/softball field ■ Dugouts ■ Portable restroom ■ Climbing rock ■ Swing set (2 strap & 2 toddler) ■ Open grass lawn ■ Bleachers ■ Drinking fountain c 0 A a� a O ti N O N N 0 N 41 O W a r c m E t .r r a 136 Packet Pg. 285 8.1.b EdmondS 2022 PRO SEAVIEW PARK 6.05 ACRES Capital Improvement & Planning Opportunities: ■ No ADA accommodation are provided in this park. Plan for up ADA parking and paved path access to amenities. ■ Drinking fountain at restrooms is not ADA-compliant. Ensure with separate drinking fountain fixture. Check restroom for nee Restroom signs not ADA-compliant. ■ Basketball hoop in parking area is a user conflict &basketball 1/2 relocated in other area of park. Maintenance Considerations: ■ Cracks in asphalt pavement need to be addressed. ■ court could be T c 0 a O ti N T 0 N N 0 N LO Cn O a r c m E z Q DRAFT 137 Packet Pg. 286 DRAFT 8.1.b � �ecl�uouy tree (�,i�a4damher Rra�to 4hyrachfiuti4h spread ui tkre lcrvrur }S R In a test Mu it{ nSt�x, The tins ueti� lkln 104 v� iii E+xy 11 111$ lC sjya Cd 4envgq u v ht6. 'L"d bor4rgkt 1UML-1 EITW M, TIV tired tuTLt d�sYt`d aTkd VCI14w. S51ot�l um EsuXq E�r1A*n4d ha tire". SIERRA PARK 5.52 ACRES Capital Improvement & Planning Opportunities: Amenities: NEIGHBORHOOD ■ Baseball/softball field ■ Basketball hoop in parking lot ■ Benches ■ Braille interpretive trail ■ Improve ballfield infrastructure with roofed dugouts, team benches bleachers with safety railings. ■ Add drinking fountain (ADA-compliant). ■ Old play equipment (1996 installation) should be planned for re to and enhance play opportunities. Maintenance Considerations: ■ ■ ■ ■ ■ Playground safety surfacing should be replaced with engineered other approved safety surfacing. Replace former drinking fountain. Bleachers do not have safety railing. Add to existing or replace entire bleacher. Asphalt path has pavement cracks from root upheavals that need to be addressed. Handicapped parking sign mounted too law. ■ ■ r: ■ ■ ■ ■ 138 Packet Pg. 287 8.1.b MOW 2022 PRO YOST MEMORIAL PARK Amenities: 45.27 ACRES COMMUNITY ' ■ ■ Capital Improvement & Planning Opportunities: ' ■ Outdoor preschool camp program may need some specific amenities. ■ ■ The park would benefit from a master plan to provide for future improvements �■ that could include a renovated/replaced aquatic facility, upgraded vehicular circulation & parking, upgraded recreation amenities, improved park pathways ■ and revised natural trail system. The master planning process could identify ■ the more sensitive environments and define special forest areas to be protected ■ while allocating the park's development envelop and helping align a more sustainable trail network. ' ■ Prior to an overall master plan for the park, the aquatic facility should undergo ' an updated feasibility study to determine the best approach to providing �■ seasonal or year-round aquatic programming for the community. ■ Maintenance Considerations: ■ Trail system's boardwalks and bridges need minor repairs and should be planned for complete replacement within 4-5 years. ■ Some trail alignments follow the fall line (i.e. straight up or down hill), making them less navigable and more prone to erosion. As the boardwalks and bridges are scheduled for replacement, the trail alignment should be evaluated to ensure the improved built trail is in the most preferred alignment. Steep sections of the trail should be re -aligned to reduce the gradient and avoid erosive conditions. ■ Invasive plant species control measures needed (currently done by volunteers — could benefit from higher intensity). ■ Playground replacement due (1995 installation). Basketball 1/2 court Bench Bike racks Drinking fountain Forested natural area with stream corridor Outdoor pool Parking Picnic tables Playground Portable restrooms Restrooms (Pool building) Tennis/Pickleball courts (2 or 8) Trash receptacles ils c 0 a O ti N O N N O N LO W O W IL r c m E z v Q DRAFT 139 Packet Pg. 288 DRAFT CENTENNIAL PLAZA 0.08 ACRES SPECIAL USE Capital Improvement & Planning Opportunities: ■ None noted Maintenance Considerations: ■ None noted DAYTON STREET PLAZA 0.10 ACRES SPECIAL USE Capital Improvement & Planning Opportunities: ■ Use better identification signage to clarify public use/value. Maintenance Considerations: ■ None noted. DAYTON STREET PLAZA - WWTC 0.35 ACRES SPECIAL USE Capital Improvement & Planning Opportunities: ■ Use better identification signage to clarify public use/value. Maintenance Considerations: ■ Some minor graffiti on upper plaza level Amenities: ■ Ornamental plantings ■ Japanese garden ■ Paved brick plaza ■ Japanese stone lantern ■ Brick seating wall ■ Sister City dedication ■ Lighting plaques ■ Holiday tree Amenities: ■ Ornamental plantings ■ Public art ■ Inlaid paver art ■ Retaining wall a Amenities: ■ Not ADA-compliant (many stairs) ■ Benches ■ Paved plaza ■ Fountain ■ Shelter 140 Packet Pg. 289 8.1.b EdmondS 2022 PRO EDMONDS LIBRARY PLAZA 1.29 ACRES SPECIAL USE Capital Improvement & Planning Opportunities: ■ None noted Maintenance Considerations: ■ None noted EDMONDS MARSH 24.21 ACRES Amenities: ■ Benches ■ Bus stop ■ Lighting ■ Ornamental plantings OPEN SPACE Capital Improvement & Planning Opportunities: ■ Identification signs at beginning and end of walkway would be helpful. ■ Implement master plan to daylight Willow Creek. Maintenance Considerations: ■ Check railings at viewpoints for splitting, separation and general wear. ■ Some ADA barriers to viewpoint/overlooks occur where different pavements meet and have gaps or uneven bumps. Repair. ■ Invasive plant species management and control should continue, especially along road ROW. ■ Edmonds Marsh East (across Edmonds Way from the main Marsh) contains 0.85 acres and no developed public access. Continue to monitor and control invasive plant growth. ■ Public art ■ Public rental event space ■ Restrooms - interior ■ Rooftop plaza ■ View point Amenities: ■ Interpretive signs ■ Overlook/viewpoints ■ Boardwalk ■ Paved walking path ■ Trash receptacles ■ Wetlands ■ Natural area ■ Salt & fresh water marsh habitat c 0 A N Q O ti N 0 N N O N 41 O W a r c m E t .r r a DRAFT 141 Packet Pg. 290 I EDMONDS MEMORIAL CEMETERY 6.63 ACRES SPECIAL USE Capital Improvement & Planning Opportunities: ■ Consider installing benches ■ Additional columbarium space Maintenance Considerations: ■ None noted FRANCES ANDERSON CENTER 1.62 ACRES SPECIAL USE Capital Improvement & Planning Opportunities: ■ Update entry sign using new style guide. Maintenance Considerations: ■ Keep plantings trim in front of facility sign. HAZEL MILLER PLAZA 0.09 ACRES SPECIAL USE Capital Improvement & Planning Opportunities: ■ None noted Maintenance Considerations: ■ None noted ■ Amenities: Restroom ■ Shade trees ■ Columbarium ■ Grave sites �rances Anderson and Leisure, C 111111!1111111011111111ii�enter Amenities: ■ Day care facility ■ Gymnasium ■ 64,000 sf community ■ Parks Dept center administration offices ■ Community meeting ■ Restrooms rooms ■ Public art - mosaic, Amenities: fountain, railings ■ Outdoor paved plaza ■ Benches, tables, chairs, ■ Interpretive signs umbrellas 0 A a� a O ti N O N N O N O w a r E t .r a 142 Packet Pg. 291 8.1.b EdmondS 2022 PRO H.O. HUTT PARK 4.53 ACRES OPEN SPACE Capital Improvement & Planning Opportunities: ■ If adjacent land is acquired that offers some park development potential, this open space could be enhanced by the proximity of a developed park with its support amenities (parking, restroom, play area, etc.) Maintenance Considerations: ■ None noted. Amenities: Walking trails ■ "Old growth" trees ■ Dog waste bag dispenser ■ No public parking ■ Walk -to open space for neighborhood INTERURBAN TRAIL Amenities: 3.97 ACRES SPECIAL USE ■ Bench ■ Bike rack Capital Improvement &Planning Opportunities: ■ Bus shelter �■ Dog waste bag dispenser ■ Extend the shared -use paved pathway to 242nd Street along the existing ■ Drinking fountain utility corridor and provides off-street pedestrian and bicycle access to Mathay 4A Ballinger. ■ Interpretive signs ■ Kiosk Maintenance Considerations: ■ Paved shared use regional trail ■ Heavy weekend use requires more frequent trash collection schedule or ■ Trash receptacles additional receptacles. ■ The section of informal trail (not officially signed as Interurban Trail) could be improved with pavement and intentional landscaping. Native plant species should be selected to continue the existing value as a wildlife corridor (mostly for birds) with minimal mown edges to keep vegetation off the path. Q DRAFT 143 Packet Pg. 292 DRAFT s•1.b LAKE BALLINGER ACCESS 0.19 ACRES WATERFRONT Capital Improvement & Planning Opportunities: ■ Consider adding a firm base (pavement) under the bench to reduce mud. ■ Improve waterfront for easier hand -carried watercraft shore launch Maintenance Considerations: ■ None noted LYNNDALE SKATE PARK 2.39 ACRES Description: WeFnities: 0 Hand -carried watercraft shore launch ■ Bench ■ Lakefront access ■ Fishing pole holders (2) Trash receptacle Amenities: SPECIAL USE • Skate park ■ Public art ■ 'Ihe 5,000 sf skate park in Lynndale Park was a joint project between Lynnwood and Edmonds. The skate park includes public art "Fluid Motion" of sculptural steel railings. ■ 'Ihe skate park is supported by parking, restrooms and other features within Lynndale Park. ■ Half of site acreage counted toward Edmonds park system MAPLEWOOD HILL PARK 13.27 ACRES Capital Improvement & Planning Opportunities: OPEN SPACE ■ No parking —pedestrian access only. Adjacent property acquisition could add developable land for additional public access and park amenities. ■ Add one ADA parking space. ■ Old play equipment (1995 installation) should be planned for replacement. Maintenance Considerations: ■ Trail maintenance and natural habitat enhancement. Amenities: ■ Walking trails ■ Swing set ■ Picnic area ■ Wooded open space Mi T c 0 .N a O ti N O N N O N LO Cn O W IL r c m E z Q 144 Packet Pg. 293 8.1.b EdmondS 2022 PRO MEADOWDALE COMMUNITY CLUBHOUSE 1.11 ACRES SPECIAL USE Capital Improvement & Planning Opportunities: ■ No designated ADA parking stall. Maintenance Considerations: ■ Designate ADA parking stall and add handicapped sign closest to building entrance. MEADOWDALE NATURAL AREA 1.07 ACRES Amenities: ■ Bench ■ Community center ■ Community meeting rooms ■ Parking ■ Preschool ■ Picnic table ■ Playground ■ Restrooms ■ Trash receptacle Amenities: OPEN SPACE • No public access ■ Natural area - undeveloped Capital Improvement & Planning Opportunities: ■ Site analyses could determine degree of potential park development. Gap mapping of park facilities could help determine need for this site as a future park (beyond its value as preserved open space). Maintenance Considerations: ■ None noted. MEADOWDALE PLAYFIELDS 12.05 ACRES COMMUNITY Description: ■ Joint development project between Edmonds, Lynnwood and the Edmonds School District ■ Half of site acreage counted toward Edmonds park system Amenities: ■ Lighted youth/adult competition softball fields (3) ■ Multipurpose sand fields (2) ■ Concession building ■ Playground ■ Walking trail ■ Picnic facilities ■ Forested area ■ Pond ■ Restrooms ■ Parking ■ Public art c 0 A a� O ti N O N N 0 N 41 Cn O W a m E t a DRAFT 145 Packet Pg. 294 DRAFT s•1.b OCEAN AVENUE VIEWPOINT 0.2 ACRES SPECIAL USE Capital Improvement & Planning Opportunities: ■ User -made path down to railroad tracks where visitors cross and access beach Maintenance Considerations: ■ Remove the user -made path to railroad tracks and install signs to indicate no railroad crossing. OLYMPIC VIEW OPEN SPACE 0.49 ACRES OPEN SPACE Capital Improvement & Planning Opportunities: ■ Site analyses could determine degree of potential park development. Gap mapping of park facilities could help determine need for this site as a future park (beyond its value as preserved open space). Maintenance Considerations: ■ None noted. PINE RIDGE PARK 26.47 ACRES OPEN SPACE Capital Improvement & Planning Opportunities: ■ Nature play area could be added. Maintenance Considerations: ■ Increase servicing interval for portable toilet, especially after busy summer weekends. ■ Laminated root rot may be present. Conduct forest management study to inform near -term management actions and guide restoration or reforestation activities. ■ Consider paving the parking lot and adding more defined parking areas with ADA parking space. Amenities: ■ Parking ■ Trash receptacles ■ View point Amenities: ■ No public access ■ Natural area - undeveloped Amenities: ■ Benches ■ Dog waste bag dispensers ■ Old growth forest ■ Parking area (gravel) 0 ■ Portable toilet ■ Trash receptacles ■ Tool box (for outdoor preschool) ■ Walking trails ■ Wetlands T 0 A d a O ti N T O 1 N N O N LO O a r d E z Q 146 Packet Pg. 295 8.1.b EdI11011dS 2022 PRO RICHARD F. ANWAY PARK 0.17 ACRES SPECIAL USE Capital Improvement & Planning Opportunities: ■ Remove ATM - no longer in service. Maintenance Considerations: ■ Heavy use during ferry wait times. Continue to monitor trash collection and restroom cleaning needs. SEAVIEW RESERVOIR 1.31 ACRES OPEN SPACE Amenities: ■ Dog waste bag dispenser ■ Landscape plantings ■ Newspaper boxes ■ Pet area Capital Improvement & Planning Opportunities: ■ If park facility distribution indicates a need for a more developed park site at this public works location, coordinate with physical limitations to consider how much could safely be added to this open space site. Maintenance Considerations: ■ None noted. ■ Picnic table ■ Public art ■ Restrooms ■ Trash & recycling receptacles ■ Vending machines Amenities: ■ Open grass field with perimeter shade trees ■ Contains underground water tank. SHELL CREEK Amenities: 1.42 ACRES OPEN SPACE ■ No developed public access. ■ Forested natural area. Capital Improvement & Planning Opportunities: ■ Open space properties owned by the City should be evaluated for any opportunities for public access, depending on extent of wetlands and other sensitive environmental areas. Where feasible, natural trails could be developed or wildlife viewing locations to offer some appreciation for the preservation of Edmonds' natural environments. Maintenance Considerations: ■ Invasive plant species control. c 0 .y a� a O I- N O N N O N LO Cn O W a r E t M .r a DRAFT 147 Packet Pg. 296 DRAFT 8.1.b STAMM OVERLOOK PARK 0.36 ACRES SPECIAL USE Capital Improvement & Planning Opportunities: ■ No ADA-designated parking space. Consider need to upgrade accommodation. Maintenance Considerations: ■ None noted SUNSET AVENUE OVERLOOK 1.14 ACRES SPECIAL USE Capital Improvement & Planning Opportunities: ■ None noted Maintenance Considerations: ■ Keep roses well -trimmed where they intrude on pedestrian paths. UNDERWATER DIVE PARK 27 ACRES SPECIAL USE Description: ■ Scuba diving park located north of the ferry landing and accessed from Brackett's Landing — North, designated as a marine preserve and sanctuary. ■ Area not owned or maintained by City; Leased from WA Department of Natural Resources. ■ Surface facilities including parking, restrooms, showers, changing area, foot wash, charts and maps are available at Brackett's Landing North Park. Amenities: ■ Little library ■ Benches ■ Parking (5 spaces) ■ Drinking fountain ■ Trash receptacle ■ View point Amenities: ■ Trash receptacles ■ Dog waste bag ■ Walking path dispensers ■ View corridor ■ Interpretive signs ■ Benches .r Amenities: ■ Man-made reef structures ■ Sunken De Lion Dry ■ Bruce Higgins Dock Underwater Trails ■ Sunken vessels Photo credit: Annie Crawley 0 A a� a O ti N O N N O N 41 O W a m E t M a 148 Packet Pg. 297 8.1.b EdmondS 2022 PRO VETERANS PLAZA 0.15 ACRES SPECIAL USE Capital Improvement & Planning Opportunities: ■ None noted Maintenance Considerations: ■ Some pavers are uneven where meeting other pavement edges. Reset uneven areas to avoid tripping hazards and ADA barriers. WHARF STREET 0.12 ACRES OPEN SPACE Capital Improvement & Planning Opportunities: ■ None noted. Maintenance Considerations: ■ Confirm ownership of stairs WILLOW CREEK HATCHERY 1.68 ACRES SPECIAL USE Capital Improvement & Planning Opportunities: ■ None noted Maintenance Considerations: ■ Kiosk roof repairs needed. Amenities: ■ Lighting ■ Memorials ■ Benches ■ Drinking fountain ■ Ornamental plantings ■ Flagpole ■ Paved plaza ■ K9 sculpture ■ Trash receptacles ■ Water feature Amenities: "private beach" ■ No safe access across ■ Viewpoint railroad tracks ■ Wooden stairs signed as Amenities: ■ Boardwalk stream crossing ■ Hatchery pond (seasonal) ■ Indoor classroom ■ Interpretive signs ■ Kiosk ■ Native plant demonstration garden ■ Natural area/wildlife habitat ■ Parking (gravel) ■ Picnic tables ■ Portable restroom ■ Trash & recycling receptacles ■ Walking trails c 0 .y N Q 0 I- N 0 N N O N LO Cn 0 W d r c E t .r r a DRAFT 149 Packet Pg. 298 DRAFT WILLOW CREEK PARK 2.25 ACRES OPEN SPACE Capital Improvement & Planning Opportunities: ■ Adjacent property (if acquired) could allow for developed public access and more recreational opportunities. Maintenance Considerations: ■ Invasive plant species control/management ■ Natural resource/habitat enhancement Amenities: ■ Forested wetland ■ Stream corridor ■ No developed public access c 0 A N Q 0 ti N O N N O N 41 0 W d r C d E t V R a+ a 150 Packet Pg. 299 Edmonds 2022 PRO le1»ALlU1ra.1 �= �• SURVEY A HAW M 111F. t-4.. Fil l.il R SUMMARY ldl• L j d rl r _ O 24 r.. Q O ti N O N N O N N 0 a d E s Q 151 Packet Pg. 300 DRAFT s•1.b City of Edmonds Parks, Recreation & Open Space Plan Survey (2021) To: Angie Feser, Parks, Recreation & Community Services Director From: Steve Duh, Conservation Technix, Inc. Date: September 7, 2021 Re: Edmonds Parks, Recreation & Open Space Plan Survey Community Survey Summary Results Conservation Technix is pleased to present the results of a survey of the general population of the City of Edmonds that assesses residents' recreational needs and priorities. SURVEY METHODOLOGY In close collaboration with City of Edmonds staff, Conservation Technix developed the 15-question survey that was estimated to take less than ten minutes to complete. The City mailed 2,500 surveys to randomly chosen households in Edmonds on May 29, 2021, of which 501 surveys were completed and returned (20% response rate). Online versions of the survey in English, Chinese, Korean and Spanish were posted to the City's website on June 4, 2021. An additional 11449 surveys in English were completed from the general, community -wide online surveys. In addition, two Chinese, five Korean and one Spanish surveys were completed. In all, 1,958 surveys were collected. Information about the survey was provided on the City's website and on the PROS Plan project subpage. It was promoted via multiple in -language social media postings and city email blasts. Printed flyers with QR code links in four languages were made available for distribution by staff for direct outreach to non- English community groups. Also, significant effort was made to promote the survey to all language groups during community events, pop -ups and flyer distribution through cultural based community organizations throughout the summer months. The survey was closed on August 31, 2021, and data were compiled and reviewed. Although households were randomly chosen to receive the mail survey, respondents were not necessarily representative of all City residents. However, age group segmentation shows general alignment with current Census data. The table below shows the age demographics for the mail and online surveys, as well as comparative percentages for Edmonds' population. Under20 <1% <1% <1% 20% 20-34 7.7% 6.5% 6.9% 18% 22% 35-44 11.7% 27.7% 23.3% 12% 15% 45-54 14.9% 20.7% 19.1% 15% 19% 55-64 22.6% 14.8% 17.0% 14% 17% 65 to 74 25.0% 22.0% 22.7% 12% 15% 75 and older 17.9% 0.8% 10.3% 10% 12% Total 100% 100% 100% 100% 100% 152 Packet Pg. 301 8.1.b EdmondS 2022 PRO City of Edmonds Parks, Recreation & Open Space Plan Survey (2021) Page 2 This report includes findings of community opinions based principally on mailed survey responses. Each section also notes key differences between different demographic groups and among responses to the online -only survey, where applicable. Percentages in the report may not add up to 100% due to rounding. DRAFT 153 Packet Pg. 302 DRAFT 8.1.b City of Edmonds Parks, Recreation & Open Space Plan Survey (2021) FULL RESULTS How much do residents value parks and recreation? Virtually all respondents (99%) feel that local parks, recreation options and open space opportunities are important or essential to the quality of life in Edmonds. More than eight in ten respondents feel that they are essential, - while an additional 13% believe that they are important to quality of life, but not essential. Less than 2% of respondents believe parks are "Useful, but not important". Page 3 1. When you think about what contributes to the quality of life in Edmonds, would you say that public parks and recreation opportunities are... Essential to the quality of life here 84% 92% 99% Important, but not really necessary 13% 97% 7% Useful, but not important 2% <1% Not important or don't know <1% <1% No significant differences exist between the survey subgroups (age, children in household, geography); however, online survey respondents indicated stronger responses (-8-10 percentage points higher) that parks and recreation opportunities are essential to quality of life in Edmonds. How often do residents use Edmonds' recreation facilities, parks, and open spaces? ■ Essential to the quality of life here ■ Important, but not really essential ■ Useful, but not necessary ■ Not important Don't know Respondents were asked how often they, or members of their household, visited an Edmonds park, recreation facility, or open space. Respondents tend to visit frequently, with more than half (53%) of respondents to the mail survey visiting at least once a week and another 20% visiting two or more times per month. Only 13% of respondents visit just a few times per year. Very few (3%) did not visit a park last year. 4. Prior to the COVID-19 pandemic, how often did you visit or use Edmonds parks, recreation facilities (such as the Frances Anderson Center) or open space? 50.0% ■ Mail 50% — 38.8% Online 40% 30% 20.0% 0 20% 15.9% . ° 13.7% 13.1% 10% 8.40/-- o,r ■. . 3.2% 1.1% 2.7% 1.1% 0% Everyday At least once Two or more About once a A few times Do not visit Don't know a week times a month over the year facilities / month parks / open spaces 154 Packet Pg. 303 8.1.b EdmondS 2022 PRO City of Edmonds Parks, Recreation & Open Space Plan Survey (2021) Page 4 Online -only survey respondents tended to visit slightly more frequently than mail respondents, with 66% visiting at least once a week and 84% visiting at least once per month. Respondents of households with children visit slightly more frequently than those without children, with participation increasing in correspondence with the number of children in the home. Respondents who live in the southern portion of the city (areas east and west of Esperance) were slightly less likely than respondents elsewhere to use parks and recreation facilities frequently. Why do residents visit parks? Respondents visit local parks and recreation facilities for a variety of reasons. The most popular activities are visiting the beach and waterfront (83%), walking or running (76%), followed by relaxation (61%), playgrounds (41%) and fitness (40%). Approximately one in three respondents visited for community events/concerts (37%), wildlife viewing (36%), dog walking (35%), or family gatherings (34%). Fewer than 7% of respondents visit to use indoor sport courts, fishing or the Underwater Dive Park. Write-in responses included activities such as pickleball, photography and birdwatching. 5. Prior to the COVID-19 pandemic, what would you say are the main reasons your household visited Edmonds parks, recreation facilities or open spaces in the past year? CHECK ALL THAT APPLY. Beach / waterfront 82.9% Walking or running 77.5% Relaxation 60.8% Playgrounds 40.6% Fitness 39.5% Community events / concerts 36.6% Wildlife viewing ' 36.1% Dog walking 34.7% Family gatherings / picnicking 34.4% Recreation programs, classes or camps 001111M 26.4% Swimming 20.1% Bike riding i 19.3% Youth sport programs, including summer... 19.1% Outdoor sport courts 18.1% Sport fields 18.1% Watersports / canoeing / kayaking 10.5% Other . 7.2% Fishing at the pier 6.2% Indoor sport courts 5.3% Underwater Dive Park 3.7% N/A— I didn't use any Edmonds facilities 11.7% 0% 20% 40% 60% 80% 100% DRAFT 155 Packet Pg. 304 DRAFT s•1.b City of Edmonds Parks, Recreation & Open Space Plan Survey (2021) Page 5 With a few exceptions, respondents who responded to the online -only survey visited recreation facilities and parks for similar reasons as respondents to the mail survey in similar percentages. However, slightly more online respondents visited for playgrounds (45%), recreation programs (30%), or youth sport programs and camps (22%). Respondents between 35 and 54 were more likely than other groups to visit for playgrounds, sports fields, outdoor sport courts, swimming and recreation programs. Several activities, including family gatherings, walking or running, beach/waterfront, wildlife viewing, and relaxation were similarly popular with all age groups. Respondents with children in their home were more likely to visit for playgrounds, sport fields, outdoor sport courts, recreation programs, and youth camps than respondents without children. No significant differences were noted in responses between respondents living in different areas of the city. Are residents satisfied with the number and variety of park and recreation options? Majorities of respondents feel that there are enough or more than enough of only a few types of park and recreation options offered by Edmonds, including developed parks with playgrounds, sport fields and picnic areas. In all, respondents feel there are not enough trails, pools and conservation areas — suggesting an existing, latent demand for facilities of these types. Walking and pedestrian trails had the strongest responses that 'not enough' being provided. Respondents have fairly balanced views on the provision of recreation programs, indoor gymnasium space and community events. 2. When it comes to meeting the needs for parks, trails and recreation facilities, would you say there are... Walking / pedestrian trails Pools 30.0% Park conservation areas & open space 35.3% 9.6% Community events (such as the Concerts in the Park) Picnic areas & shelters Bike trails in parks Indoor gymnasium space Sport fields & sport courts Recreation programs (camps & classes) Developed parks with playgrounds 0% 20% 40% 60% 80% 100% ■ Not enough About the right number ■ More than enough ■ Don't Know In general, middle-aged year respondents (those between 35 and 54 years of age) were more likely than respondents over 55 to feel there are not enough recreation programs, walking trails, pools, and developed parks with playgrounds. Respondents with children under 18 in their home were more likely than adult -only householders to feel the City does not have enough bike trails in parks, sport fields and courts, recreation programs and indoor gymnasium space. Respondents living in the southeast area (south of 220th St SW and east of Esperance) noted a higher need for developed parks with playgrounds, recreation programs, indoor gymnasium space and conservation areas. 156 Packet Pg. 305 8.1.b EdmondS 2022 PRO City of Edmonds Page 6 Parks, Recreation & Open Space Plan Survey (2021) How would residents rate the condition of Edmonds' parks and recreation facilities? Respondents were asked to rate the condition of a 3. How would you rate the condition of each of the following parks variety of park and recreation facilities on a scale from or recreation facilities? poor to excellent. Respondents gave overwhelming high marks to the Waterfront parks in downtown Edmonds 9.9%II condition the onwaterfront parks ® o In downtown n Edmonds. Your nearest, local city park % 16.6/0 Majorities of respondents identified their local city park (76%), city playgrounds (63%), trails in parks (55%) and the Frances Anderson Center (56%) as in either excellent or good condition. Of the facilities listed, Yost Pool and sport fields and courts had lower condition ratings, and both of these facilities also had the highest percentage of 'Not Sure/No Opinion' compared to the other facilities. There were no significant variations in Frances Anderson Center 9 M EL 40.6% 21.4% ' M Playgrounds 16.3% I - Trails in parks 29wr 29.0% Yost Pool H-W 19.4% Sport fields &courts A m 0% 20% 40% 60% 80% 100% ■ Excellent ■ Good Fair ■ Poor ■ Not Sure / No Opinion how respondents rated the condition of parks and facilities based on age. Respondents from the southeast area (south of 220th St SW and east of Esperance) noted a higher frequency of 'fair' or 'poor' ratings for 'your nearest local park', playgrounds and trails. Respondents with two or more children in the household were more likely to give higher 'poor' ratings for sport fields and courts. What park and recreation options do residents have a need for? Do they feel their needs are met? The survey asked a question regarding needs for certain park and recreation facilities. A pair of questions asked which park and recreation facilities and amenities the respondent's household has a need for, and then, whether that need is well met, somewhat met, or unmet locally. Of the specific list of amenities provided, 30% of respondents indicated that the highest unmet need is for pedestrian and bike trails (84%) and an aquatic facility or pool (65%). Pluralities of respondents indicated a need for a variety of amenities including: • Indoor fitness & exercise facilities • Community gardens • Upgraded or renovated playgrounds • Outdoor fitness equipment • Off -leash dog areas (dog parks) • Additional picnic shelters for group gatherings • Additional tennis & pickleball courts Respondents indicated only a limited need for basketball courts and sport fields (rectangular, diamond and lighted), and many respondents noted these amenities as being 'very well met' by existing facilities. Overall, strong majorities of respondents feel that their need are either 'very well met' or 'somewhat met' for every recreation amenity listed in the survey. Four facility types were noted as being 'not at all met' by between 20%-30% of respondents; these include community gardens, outdoor fitness equipment, pool, and lighted sport fields. For community gardens and outdoor fitness equipment, there was no significant difference between age groups or households with/without children, indicating an underlying strength in the general sentiment for need. DRAFT 157 Packet Pg. 306 DRAFT 8.1.b City of Edmonds Parks, Recreation & Open Space Plan Survey (2021) Page 7 Respondents between 35 and 44 expressed a greater need for an aquatic or pool facility. Respondents without children under 18 indicated a slightly higher need for a disc golf course. Respondents living in the southeastern portion of the city indicated a higher need for sport fields, indoor fitness facilities, and upgraded playgrounds. Respondents to the random sample mail survey expressed higher levels of need for all listed park amenities and facilities, especially for picnic areas and off -leash dog parks, as compared to the online -only survey. 6/7. Does your household have a need for each of the park and recreation amenities or facilities listed below? Using the same list of items from above, how well are your household's needs met locally for each of the park or recreation facilities? Have Need Community gardens 38.2% � 46.4% Outdoor fitness equipment Aquatic facility / pool Lighted, all-weather turf sport fields Indoor fitness & exercise facilities Additional tennis & pickleball courts All -abilities, inclusive playgrounds Additional basketball courts Pedestrian & bike trails in parks Additional fields for soccer, football & lacrosse Additional fields for baseball / softball 45.4% � 42.4% 50.6% � 1% 65.5% _% 31.3 % 50.9% � 48.8% I Am 45.9% 37.0% 45.0% 26.3 % 19.6% "6.68.9% 84.3% 45.6% 27.5% 42.1% 18.7% Off -leash dog areas (dog parks) ■ 45.0% INEEMPLA 40.9% Upgraded or renovated playgrounds 49.0% 42.7% Additional picnic shelters for group gatherings ' 54.2% 37.6% 0% 25% 50% 75% 100% ■ Not At All Met Somewhat Met ■ Very Well Met What recreation options do residents have a need for? When it comes to recreational programs and activities, respondents expressed a greater need for community events (56%) and program and activities geared toward youth. In particular, respondents had a higher interest in outdoor programs such as environmental education (46%), youth day camps (41%) and youth sport programs (40%). Modest need was indicated for most of the other program options listed, with the exception of e-sport leagues. Respondents between 20 and 44 and those with children in the household were more likely to state a strong interest for outdoor programs, youth sports, teen and youth programs. Consistently high need was noted across all age groups for community events. 158 Packet Pg. 307 8.1.b EdmondS 2022 PRO City of Edmonds Parks, Recreation & Open Space Plan Survey (2021) 9/10. Please indicate if your household has participated or used each of the listed recreation program types in the past two years. Using the same list, indicate if there should be more or less of each available. Community events, such as the Concerts in the Park or outdoor movies Outdoor programs, including Beach Rangers or environmental education Youth programs, such as summer day camps, arts or gymnastics Youth sports programs and camps Adult classes, such as arts, music, fitness or 60.8% wellness Teen activities, such as game nights, trips or 62.3% I camps during school breaks Family programs, such as scavenger hunts Adult sports leagues, such as volleyball, pickleball or softball E-sports leagues 0% 50% 100% ■ More Needed ■ Current Offerings are Adequate ■ Fewer Needed Have Participated 68.9% 34.1 % 40.2 % 37.3% 40.6% 7.8 % 19.3 % 15.7 % 2.2 % Page 8 Respondents were also asked why they do not participate in recreation or sports programs offered by Edmonds. One in three responded that they were not aware of program offerings, suggesting a significant opportunity for the City to improve information and outreach. Between 15% and 20% of respondents cited a lack of desired activities (17%), being too busy (20%) or having age or physical limitations (21%) as the reasons they do not participate. There were no significant differences in responses based on geographic subgroups. 11. If you do not participate in recreation or sports programs offered by Edmonds, what are your reasons? (Check all that apply) N/A — Does not apply to me M 38.6% Not aware of programs 29.3% Age or physical limitations 21.2% Too busy; no time 20.3% Don't have activities I'm interested in — 17.2% Held at inconvenient times 12.9% Do not want to participate 11.8% Need childcare in order to participate 8.6% Too expensive 6.8% Held at inconvenient locations ■ 4.6% Poor quality of programs ' 2.3% Team sport leagues are too small or...' 1.6% Lack of transportation 10.7% 0% 25% 50% Reason Mail Onlin N/A - Does not apply to me 31% 42% Not aware of programs 34% 27% Age or physical limitations 32% 17% Too busy; no time 21% 20% Don't have activities I'm interested in 16% 18% Held at inconvenient times 10% 14% Do not want to participate 13% 11% Need childcare in order to participate 5% 10% Too expensive 6% 7% Held at inconvenient locations 5% 4% Poor quality of programs 2% 2% Team sport leagues are too small or are often cancelled 1% 2% Lack of transportation <1% 1% DRAFT 159 Packet Pg. 308 DRAFT 8.1.b City of Edmonds Parks, Recreation & Open Space Plan Survey (2021) What recreation and park investments would residents prioritize? Page 9 Respondents were asked to rank a list of potential 8. For the following list, indicate how you would rank the priority for recreation, park and open space investments. each (15t priority is highest and 5th priority is lowest). Reorder the list by Respondents to both the mail and online survey dragging each line into your preferred order of preference. ranked the same items as their top three priorities: Mail Online expanding trail 1. Expanding trail opportunities 1. Buying additional land for future parks Opportunities, improving or 2. Improving or upgrading existing parks 2. Improving or upgrading existing parks upgrading existing parks, and buying additional land 3. Buying additional land for future parks 3. Expanding trail opportunities for future parks. Mail 4. Adding new recreational options in existing parks 4. Adding new recreational options in existing parks survey respondents were 5. Expanding recreation classes & camps 5. Expanding recreation classes & camps more strongly supportive of expanding trail opportunities, by Buying additional land for future parks 16.4% 15.5% 14.6% approximately ten percentage points. Respondents in both the Improving or upgrading existing parks 25.7% 27.2% 16.3% mail and online surveys ranked providing recreational programs Expanding trail opportunities 24.8% 22.3% 20.0% M as their lowest priority. There were few differences in Adding new recreational options in existing priorities between subgroups. parks Respondents with children in their Expanding recreation classes & camps home tended to rate improving existing parks as a higher priority than those without children in the home. Respondents did not vary significant in their priorities depending on which part of the city they live in. Investment and revenue priorities ® 23.7% 22.9% 25.4% 0 9..w 12.4% 22.4% 0% 20% 40% 60% 80% 100% ■ 1st ■ 2nd 3rd 4th ■ 5th Respondents were asked to rank a list of potential recreation, park and open space investments that included hypothetical relative costs as indicated by the use of dollar symbols ($) for each system investment. Generally, respondents to both the mail and online survey ranked improving existing parks, completing the Waterfront Walkway near Ebb Tide Condos, and acquiring additional land for conservation and open space as their top priorities. Respondents to the online -only survey ranked building a new aquatic center more favorably than the mail survey respondents. Respondents of different ages prioritized the investment options similarly, with the exception of building a new aquatic center, which was a higher priority for respondents between 35 and 44. Respondents with children in their home tended to rate building a new aquatic center higher than those without children in the home, who were more likely to rate completing the Waterfront Walkway and buying additional conservation lands as higher priorities. Respondents did not vary significantly in their priorities depending on which part of the city they live in, with a couple exceptions. Those living in the southeastern area rated improving existing parkland as a higher priority. Those living in the southwestern area and downtown waterfront were more supportive of buying and expanding the Marsh property. 160 Packet Pg. 309 8.1.b EdmondS 2022 PRO City of Edmonds Parks, Recreation & Open Space Plan Survey (2021) Page 10 13. Next is a list of improvements and facilities that may be considered for the future. Each one would be funded by your tax dollars. For each item, indicate whether you think that type of facilities should be a Top Priority, a High Priority, a Low Priority or Not a Priority at all. Costs are estimated as: $ (somewhat expensive); $$ (moderate); $$$ (very expensive) Highest 1 2. 3. 4. 5. Lowest 6. Improve existing parkland ( $ ) Complete the Waterfront Walkway section on west side of Ebb Tide Condos ( $$ ) Buy additional parks for conservation & open space ( $$ ) Buy additional parkland ($$$ ) Buy & expand the Marsh property toward Woodway ($$$) Build a new aquatic center ( $$$ ) 1. Improve existing parkland ( $ ) 2. Buy additional parks for conservation & open space ( $$ ) 3. Complete the Waterfront Walkway section on west side of Ebb Tide Condos ( $$ ) 4. Build a new aquatic center ( $$$ ) 5. Buy additional parkland ( $$$ ) 6. Buy & expand the Marsh property toward Woodway ($$$) Improve existing parkland ( $ ) 45.8% 16.3q Complete the Waterfront Walkway section on 34.5% 27.3% M west side of Ebb Tide Condos ( $$) Buy additional parks for conservation & open 33.4% 27.1% M space ( $$) Build a new aquatic center ( $$$) 19.3% 24.3% Buy additional parkland ( $$$) 28.8% 32.9% Buy & expand the Marsh property toward 23.0% In 38.2% Woodway ($$$ ) 0% 25% 50% 75% 100% ■ Top Priority ■ High Priority ■ Low Priority ■ Not a Priority Are residents willing to support increased taxes to fund new amenities and experiences? Given a choice between raising taxes to develop an amenity in Edmonds versus not having such a facility in the city, slight majorities supported more taxes for two of five amenities tested: buying additional parks for conservation and open space (64%) and building an aquatic center (53%). Strong majorities were not in favor of increasing taxes to support installing all-weather turf sport fields, developing a bike skills course or providing an off -leash dog park. DRAFT 161 Packet Pg. 310 DRAFT 8.1.b City of Edmonds Parks, Recreation & Open Space Plan Survey (2021) Respondents with children at home were significantly more likely that those without to support increasing taxes for all improvements other than buy additional parks for conservation (which received similarly high support levels). However, and aside from buying additional park for conservation, building an aquatic center was the only other option for which more than half of respondents with children supported raising taxes. Respondents 35 to 44 years of age were somewhat more likely than other age groups to support raising taxes to fund an aquatic center or to install all-weather sport fields. There were no significant differences based on respondents' location of residence. Page 11 12. There may be some park and recreation experiences that are limited or not available in Edmonds but are available in neighboring communities. If it came down to a choice between increasing taxes to develop that facility in Edmonds versus not having that in Edmonds, which would you choose? Buy additional parks for conservation & open space Build an aquatic center Install all-weather sport fields Develop a bike skills course / pump track Provide off -leash dog park(s) 0% 25% 50% 75% 100% ■ Increase Taxes ■ Not in Edmonds How do residents want to hear about Edmonds' parks, facilities, programs and events? The majority of respondents prefer to hear about Edmonds' parks, facilities, and programs through the City website (67%) and the City's newsletter (53%). The Craze recreation program guide (in print and mailed to homes) and direct are also popular sources of information, preferred by a plurality of respondents. These sources were popular with respondents to both the mail and online -only surveys. Fewer than two in five respondents would like to hear about park and recreation opportunities through community event signs (34) social media (e.g., Facebook (33%), Instagram (15%), and Twitter (7%)). However, social media, including Facebook and Instagram, is a significantly more popular source of information for respondents between 35 and 54 and for families with children. The city newsletter, city website and community event signs are preferred at higher rates by older respondents. There were no significant differences in communication preferences among those living in different areas of the city. 14. Please check ALL the ways you would prefer to learn about Edmonds' parks, programs and events. City website 67.2% Update in Edmonds city newsletter 53.1% Craze recreation program guide in... 49.8% Direct email 43.0% Community event signs 34.0% Facebook 32.8% Craze recreation program guide online... - 25.6% Instagram 14.7% Other 1r 8.1% Write-in responses included the Edmonds News and Edmonds Beacon. Twitter . 7.0% None of these 11.6% 0% 25% 50% 75 % 162 Packet Pg. 311 8.1.b EdmondS 2022 PRO City of Edmonds Parks, Recreation & Open Space Plan Survey (2021) Other Comments Page 12 The survey provided respondents with an opportunity to share their ideas and suggestions via open-ended responses. Over 270 respondents provided written comments related to park visitation and preferred media channels. Common themes from these comments include: • Respondents noted a range of other activities that bring them to Edmonds' parks and facilities. These include photography, being in nature, petanque/bocce, wildlife viewing and pickleball. • Additional media channels noted included My Edmonds News and the Beacon. The full list of write-in comments is available with the Parks, Recreation & Cultural Services Department. DRAFT 163 Packet Pg. 312 DRAFT 8.1.b City of Edmonds Parks, Recreation & Open Space Plan Survey (2021) Demographics Number of children in household Page 13 A majority (75%) of respondents to the mail survey live in households with no children under 18, while about one in five live in a household with either one (11%) or two (10%) children. Less than four percent of respondents live in a household with more than three children. Online -only survey respondents were more likely to live in households with children than respondents to the mail survey. 80% 70% 60% 50% 40% 30% 20% 10% 0% Mail survey responses Online -only survey responses 0 1 2 3 or more 80% 70% 60% 50% 40% 30% 20% 10% 0% 0 1 2 3 or more Age Nearly two-thirds of respondents to the mail survey (65%) were over 55 years of age. Another 15% were 45 to 54 years. Respondents to the online -only survey also were predominately over 55 years old (44%); however, there were more responses from younger respondents with 34% of responses from those 20-44 years, versus 19% in the mail survey. Mail survey responses 30% 25% 20% 15% 10% 5% Online -only survey responses 30% 25% 20% 5% 0% 0% Younger 20 to 34 35 to 44 45 to 54 55 to 64 65 to 74 75 and Younger 20 to 34 35 to 44 45 to 54 55 to 64 65 to 74 75 and than 20 older than 20 older Location of residence Nearly equal percentages of respondents were collected in each of the five geographic areas between the mail and online surveys. The mail survey had six responses from people who indicated that they live outside of city limits. However, a slightly higher portion of online -only respondents (9.5%) do not live in the city. c 0 .y N !Z 0 ti N O N N O N LO 0 W a. �.i C d E t V R ..r r a 164 Packet Pg. 313 8.1.b EdmondS 2022 PRO City of Edmonds Parks, Recreation & Open Space Plan Survey (2021) 30% 25% 20% 15% 10% 5% 0% Mail survey responses ( A) N of ( B) S of 196th ( C) W of 9th (D) S of 220th (E) S of 220th Don't live Caspers St / St SW, N of Ave, S of St SW, W of St SW, E of inside the city Puget Dr 220th St SW, E Caspers St Esperance Esperance limits of of 9th Ave Edmonds Location Map 30% 25% 20% 15% 10% 5% 0% Page 14 Online -only survey responses (A)N of (B)Sof196th (C)Wof9th (D)Sof22Dth(E)Sof220th Don't live Caspers St / St SW, N of Ave, S of St SW, W of St SW, E of inside the city Puget Dr 220th St SW, E Caspers St Esperance Esperance limits of of 9th Ave Edmonds T O A d O ti N O N N O N LO N 0 w IL r c m E z Q DRAFT 165 Packet Pg. 314 DRAFT 8.1.b City of Edmonds Parks, Recreation & Open Space Plan Survey (2021) ATTACHMENT 1. SURVEY INSTRUMENT r Community Survey on Parks and Recreation Fns IYrtV Dear Edmonds Resrdent: The City of Etlmorlds is hginning a Community -led process to update its citywide Recreation, Parks and Open Space Plia n (PROS Plan, for short), We need your hel p to dete rmine how to prioritize projects a nd what we shou Id focus on to keep o u r parks a nd programs thriving for the next 6-10 years, As a n Inilti al step, the City is conducting this short survey to assess the community's recreation needs. we understand that COVID-15 has impacted your a bi lity to participate i n prof rams and visit parks this year, We ask that you consider needs for t he am� futuro as you oval uate rimmation amen Ities, Your opinions a re im porta nt to thQ Clty.The survey has L5 questions and will anlytake a few minutes to comprete, Ilse the OR code to take this survey anIIne at httos.//y ww,survewmonkey.com/r/EdmondsPROS 1 , When you think about what cantriWt�es to the quality of life in Edmonds, would you say that Put4ic parks and recreation opportunities are... ( CHECK ONE OMON ) ❑ Essential to [he quality of life here ❑ Not important In Important, but rat really essential ❑ oon°t know Cl Useful, but not r*cessery 2- when It comes to maeting the needs for parks, trails and recreation facllimm, would you say there are... ( CHECK ONLY ONE BOX IN EACH ROW ) Nara khan L-ujrK AarAthr %jk Juno`rM Mo45naupl 4OIr4iP`4Y! jira"ad"k. .eih rhYRrd'aAi ❑ ❑''I ❑ ❑ w,Ik.iejp.d-l...lra,iF ❑ 0 ❑ ❑ At.1—h u.Iui kt I ❑ ❑ ❑ ❑ spotntm,& omk cm h ❑ 1 ❑ ❑ 11 pink ■.—Y, thelscn ❑ ❑ ❑ 1--1 �rrMllwr pia �amr{ump`id�nesf C[ o ❑ ❑ S&.Nrulrilr*v h lwth■l the C&xkdl in lM Wrkl ❑ ❑ ❑ E] Nwt ❑ ❑ ❑ ❑ 1`❑l 1�1 ❑'1 0 1 0 ❑ ❑ Fnh [t�n�awl~n erraF 6 agen M.xr Fickw would yoLl rate the condition of each of the fpllowing parks or recreation faciitdes? F..[dL.r lead Fah Fw H"5'xFJ lia niun Your nNMv". IC441jtp rW4 I ❑ Lr'� J ❑ ❑ ❑ Woe. ka Lp�ltt k.,. ___..-E , ❑ n ❑ 0 ❑ Fraid—"w.s.u.C+ or ❑ ❑ ❑ ❑ {❑1 3p.alfwft&ea.rls ❑ ❑ 0 0 fnAi�pr 1 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Page 15 166 Packet Pg. 315 8.1.b EdmondS 2022 PRO City of Edmonds Parks, Recreation & Open Space Plan Survey (2021) E Save a stamp Use the QR code and take this survey an line: %Sr cnnri it bar k ,n 1 ha o-ncinierl Rntur n.Reptp pmalnpq prpykf!ai_ Thank ynP In ado rim fqr pariiclpptingl ila,o 4. Prior to the (OVIQ• 14 pandemic, how often did ypu visit pr use Edmonds park$, recreation facilities {Such as"Frarires Anderson Center) or open space? ❑ Everyday ❑ A few thane over the year O At least orle5e a week o Oa not visit facilities 1 parks / open spaces ❑ TWo or more times a month ❑ Don't know ❑ AbOvK 0Xe a mgnxh 5. Prior to the COV10-19 pandemic, what would you say are the main reasons your household visited Edmonds perks, recreation facilities or apen spaces in the past year? { CHECK ALL THAT APPLY } ❑ Fitness O Outdoor sport courts ❑ Playgrounds ❑ Indoor sport courts ❑ Wal king or running ❑ Beach ► waterfront ❑ Bike riding ❑ Underwater hhre Park ❑ ape walking ❑ Waterspws I c:an00ii1q f kayaking ❑ Fatuity gatherings f picnicking ❑ Wildlife viewing ❑ Community events f romerts ❑ Fishing at the pier ❑ Recreation programs, oases or camps p Swimming ❑ Ybuth sport programs, inctuding summer sport camps ❑ Relaxation ❑ $part fields 4 NIA - I didn't use any Edmonds facilities d 4Uler. 6, Please indicate if your household has a need for each of the park and recreation options listed below AND irtdacate VOW Well Yinr neegj ere met lineally today WE '�'`l�P 'Airy+ W off Mr, 50+Nwh1M Mai Mae Ri All ,Art A-Wb-1 Frtnk 3ulers rol VovpY#thr..rrp 0 0 ❑ ❑ ❑ tlprttJdnd ar ri mralcd pl1 V &L06 k I O ❑ M Q hII �Mhrn, nrkrs•,e p4Wmnib 0 () a01z P*Aa PW-D W-r Trails'"paib 0 0 ❑ ❑ ❑ YdEif 6lrbm AL ftwow Imums 0 ❑ a 0 Outdwr rflrw$s aWKrnrnt 0 O ❑ ❑ ❑ on.rast`"". (datrutrl 0 C) ❑ ❑ Q {ammur qV Wdrm 0 0 ❑ ❑ ❑ AAdeldrWbmkrrbahtaurt% 0 O 13 ❑ Q bOtlhsenal tonne S pretlrtwH causes ❑ ❑ ❑ AAdarow ll"fine cocain. f&VtkbH l lYrgy V ❑ ❑ ❑ Aiilau r,.l rrrkh ire hrxlull� x,illull 0 0 ❑ ❑ ❑ 1 l�tlaU, as weallrr#lurfoA ruHAi 0 ❑ ❑ ❑ Page 16 DRAFT Packet Pg. 316 DRAFT s•1.b City of Edmonds Parks, Recreation & Open Space Plan Survey (2021) Community Survey on Park & Recreation Preferences T. For the fo I laws ng list, indicate haw you would rank the priority for each l ost priority is highest and 5th priority is lawmstj. Wrk each ranking number only once. aeled ash prL4apyararanr�, �NL681 g1ieh14�LCweL plimRy iem Zrrd Will 4Ih Slfa pgilt hn+ep/ 1IN Akhn$ mw rrnra6gna1 op4ons in erbllnl Part ❑ ❑ ❑ ❑ ❑ ❑ piiynig+ikinl nal ►,nd lbr fWurr puM1s ❑ ❑ ❑ ❑ ❑ F .IunriinR Sr��Op�nrdrnhall ❑ ❑ ❑ ❑ ❑ �7 f0 ❑ iinpg4ing or vpUadu ahft Erb ❑ ❑ ❑ ❑ ❑ ❑ F-r4—iuyl.a Mlvn Are &rarer ❑ ❑ 1 ❑ ❑ ❑ ❑ a. please indicate if your hlvusetwid him uartieivated or uwd each of the fisted recreation program VAns in the past two years AND indicate if there should be more or less of each available. FlewvmpnniSq Citd j Shwldlhertbemartu1r�orth1F;V" used in 1hr part Z ymn? dT*eHrkyor pfnnm anllrbh? Ted I#6 H1ax iirrant !lr}e-d-�rd Pr irde9oed Farar Mredd AWIt{1asM.suar a a aft rnrSK� Irin!214�4Pr WRWn LJ ❑ ❑ AdukA*eL5*Atpe1.wdFdwkeybdt*hLrhakOrvhbal 0 ❑ ❑ [ epoYlsbaples Wh RWann.euShskwmnMr drrfamq%" W 6WrWks f } 0 ❑ ❑ 0 0 ❑ ❑ Vou7h,porb ROVanrs and aarrrps {� Q ❑ ❑ ❑ YavrLadlNlhK woh atgnaN wyMRe, muse awnrs durrj schwa anaFs 0 I �❑ ❑ (MAftr Mfkia^"S lni hrdml pf hMnar'S he fllHra MW9,l mi.n,I u,,, Coe Avwi."e~is, ivCh,s Lh4{mwum rr thip P4 vk w aardgtr maneL {0 kJ }{ } 0 0 ❑ �4 ❑ ❑ Fam4r POPJ'a.eyih asxmTpei 7�inG ❑ 9. If you do not pSltic inedl In recreation or sports programs offered by Edroends, what are your reasons? lPleasew check al I that apply-} ❑ NIA - D m rKL apply to mp O Team wort teagsjes are tav small or are often ranizelled ❑ Age or physicat limitations ❑ Need chii&dre in ardor ka Pdrlicipate ❑ Hat aware Of Programs 0 Do not want ro Participate ❑ Ek3n't have activities I'm interested in l3 Tea busy; no time ❑ Poor quality of programs 0 Lack of transportatlen ❑ Head at inconvenient iierom ❑ Tao expensive i7 Held at inconvenient locations 14. Them nney be same park and recreation eYptrienres &mt are limiv-d or not availahle In Edmands but are available iri nolghboring oommuriWes. If it opine down to a Choice between inereasirrg taxes to deirelop that facllity In Edmonds versus rat having that in Edmonds, which would you choose? kin Tr Jlarl Fn edMWN% •r.44M atl l"60 epai7 pjo* Q ❑ "4-yd A pakfa.;nnray*Irpn&pp" SpaC! 1.1 ❑ nvvWe 01 Irash by pwrL(sl ❑ 6UNd*h III 1C"NO ��Q--jj LJ ❑ V""p0 ttlea WIs Sorwaf C'7rna trA* ❑ ❑ Page 17 168 Packet Pg. 317 8.1.b EdmondS 2022 PRO City of Edmonds Parks, Recreation & Open Space Plan Survey (2021) 11. Next is a list of improvements and facilities that may be considered for the future, Each One Would be funded by your tax dollars. For each item, indicate whether you think that type of facilities should Iye a Top Priority, a High Priori ty, a Low Priority or Not a Priority at all. Grits are esti mated as. 5 {somewhat expensive}: $$ (mderateI; $ (+naryt%Wnslwe - r" wNq tw NM • PFkrhy 6..r.ddrk��+.l�rsa�9sssl ❑ ❑ ❑ ❑ hm..r—hllqtOa'U.diS1 0 0 ❑ rdirtmnl jwk% for ccnsmikl &opm Lpma IS51 ❑ ❑ ❑ Q — -I-1 — I__1 CDnyi.te ow YrriurFPwt Ye&%w w fan on+ k std■ or No 7W{mdoa{SS1 &.F w wap,nu.i,e n;.�.h p�vP.ey,owru;:mdw�iS$$ I ❑ U I❑-t Lj ❑ a i-1— I U &'w A I�igwek Comm t,41 ❑ ❑ ❑ 1 1 12, (Meese check ALL the ways you would prefer to learn about Edmonds' parks, prasrams and everlts, ❑ City website ❑ 1wiltter ❑ ilpaam� in Edm6nds city newr !,t tmr ❑ 1rlsta"M ❑ GRAZE recrekation program ,gu Ida mailed to Nm- * C3 direct *mail ❑ CRAZE recreation program guide ontine only ❑ Community event signs ❑ Fa€eboak 0 Nome of these ❑ Other; The folIuvnng questions help us understand whether we have a cross-section of the community responding to this surveyr it's important that. you provide a response to each question. 13. How many children under ago 18 live in your housetwldF ❑ 0 ❑ 2 ❑ 1 Cl 3 or more 14_ What is your ar? ❑ 5to-unger than 20 ❑ 55 to 64 ❑ 20 Lo 34 ❑ 65 ai%d 74 ❑ 35 to 41 ❑ 75 and ateler ❑ 45 to 54 15. In which smtfun of Edmonds 6o you Him? C....- B 0 l A 1 N of Caspers 5k J Puget Dr � ❑ ( 8 ) S of 196uh St SWI N of 220th 5t SW, E of 9th Ave ❑ ( C 1 W of 4th Ave. 5 at Caspers St ❑ l U 15 of 220th St SW, W of Esprrame ❑ I; E 15 of 22pth 5t 5W. E of Esperur"tce ❑ 0on't live inside the city limits of Edmonds E Thank you for taking ttie time to compk o ttlis sur M I Your input will hula tuldrthe dredapment or the Edmonds Rod*, Rucroutim&OPa i,ace flan Q � Tir1w this imrvo+r onilno with thtr att to-do Or at: hhtt :llwww.wrrav_mgdL1� S2M fir 112ndsPROs Lain nnurr ahcv! I:dmorltl5 pvky, trail i„ d pTWams and Stay Irlf4rrPvd ab4Lti C 4k, the Parks, Rgcmagan & Open Space plan pr „p it hMK:lfadrnandswa sov 0 ,r Ths City of r mond5. . wing the Services 9t a awsk.kaol Reim wfi0 spe6olims.n pars and n[reidon v4wirtp ryfal4 rablm ypur Ronrp4Md FwwM' In tl1* M`5144�d r4#wmryR�Y EnwloPlr FddrfFFad bp= gn5ery�d�, Te[finlx In{ P780R8S5 06M ii, CA W%3 Page 18 DRAFT 169 Packet Pg. 318 DRAFT s•1.b a O w a m u a c m Q. O Ca c 0 r m L u Y L Q. N N O N C O A N w Q O ti N O N N O N O w d r C d E t V R a+ a Packet Pg. 319 Mimi. APPENDIX C ONLINE MEETIN SUMMARY #1 Il O 2) d r+ Q O ti N O N N O N N 0 w a d E s Q 171 Packet Pg. 320 DRAFT s•1.b City of Edmonds PROS Plan Community meeting summary Date: 7/22/2021 Time: 6:30-7:30 p.m. Location: Virtual Meeting The City of Edmonds Parks, Recreation and Cultural Services (PRCS) team hosted the first community meeting for the PROS Plan update using Zoom on July 22, 2021. The Edmonds PRCS team promoted the meeting through City communication channels, email, and social media. Meeting information was provided in simplified Chinese, English, Korean and Spanish. The Edmonds PRCS team also promoted the event to community -based partners. 20 community members participated in the meeting. A list of attendees and participants is included in Appendix A. The purpose of this meeting was to engage the public in the process of creating the Edmonds Parks, Recreation & Open Space (PROS) Plan. The project team provided live interpretation for members of the Chinese-, Korean-, and Spanish-speaking communities. Tammy Leigh DeMent, facilitator, started the meeting by introducing the project, welcoming attendees, and providing instructions for asking questions and participating in Chinese, English, Korean, and Spanish. The project team gave a brief plan overview, highlighted previous city and community plans, summarized upcoming community engagement opportunities, and outlined the planning timeline. They then engaged the group in multiple polling and discussion sessions. Project Overview Angie Feser, Edmonds Director of Parks, Recreation & Cultural Services (PRCS) provided the PROS Plan overview. She introduced Edmonds PROS Plan as a 6-year guide for helping the City manage and improve its parks, recreation programs, and other outdoor experiences. The PROS Plan looks to the future and will establish goals, identify specific projects and ideas on how to implement projects. Angie shared the PROS Plan will explore the City's strengths, areas for parks improvement, and how the City aspires to meet the community's needs for park and recreation today and into the future. She added that the plan will build upon Edmonds' tradition of community -based planning, including the Community Cultural Plan, Climate Action Plan, Transportation Plan, and the Highway 99 Plan. The planning timeline spans about 9 months, with a draft of the updated PROS Plan before the end of 2021 and City Council review in early 2022. The PRCS team is engaging the Edmonds community through a survey in four languages, tonight's virtual meeting (also in four languages), attendance at local events (like the Uptown Farmers Market) to share information, and through group discussions with recreation program users and City partners. Angie shared parks facts as context setting for the constraints and aspirations of the PROS Plan. Highlights include: 172 Packet Pg. 321 8.1.b EdmondS 2022 PRO • Edmonds provides 47 parks across the city, with over 230 acres of parks and open space • It operates numerous sport fields and sport courts, and • The City manages over 4 miles of trails, including a one -mile trail along the waterfront • The City has 6 waterfront beaches and a fishing pier • Before the pandemic, the City accommodated over 8,000 users in its recreation programs; and • The City has multiple facilities for use or rent, including the Anderson Center, Waterfront Center and park picnic shelters • The City offers amazing recreational activities and places that Enhance the Quality of Life & Livability in Edmonds. This ranges from community events, to playgrounds, to open spaces and trails. It also includes Yost Pool, recreation programs, picnic and sport areas, and the Underwater (SCUBA) Park. Angie acknowledged that the COVID-19 pandemic has impacted how people use parks and participate in programs and activities. She emphasized that the PRCS team is using this time to plan improvements for the future and that the planning process is just beginning. This meeting is not about decision -making, but rather for community input. The feedback gathered during the meeting will add to the information gleaned from the community survey. Poll No. 1: COVID-19 has had an impact on how we recreate. Park usage increased over the past year. What are you excited about doing more of? 60% 50% 40% 30% 20% 0% Exercising Activities at the Community Playing Summer camps Spending time Anderson Center events and organized sports with friends and festivals family outdoors Community Survey Angie shared that the City launched a community survey in June and so far, more than 1,500 people have responded. She encouraged participants to take the survey on the website. (Note: the survey will close August 27) edmondswa.gov/government/departments/parks recreation cultural services Survey highlights: 99 percent of respondents said parks and recreation are either essential or important to the quality of life in Edmonds. • Going to the beach or waterfront and walking or running are the top reasons for visiting city parks. 2 DRAFT 173 Packet Pg. 322 DRAFT 8.1.b • Survey respondents visit Edmonds parks and open space frequently, with 81 percent visiting parks and facilities monthly and about two-thirds visiting weekly. • Priorities include improving existing parks, completing the waterfront walkway and other trail connections, and buying additional open space lands. • High -demand amenities include community events, trails, community gardens, and a pool. Poll No. 2: Survey results to date show a strong interest in making improvements to existing parks. Select your LOP three parks where you think the City should focus additional improvements. 80% 70% 60% 50% 40% 30% 20% 10% 0% Mathay Ballinger Marina Beach Park Pine Street Park Sierra Park Yost Memorial Park Park Question and Answer Session One Tammy Leigh invited participants to share their feedback on parks they currently use and opportunities for improvements. Below is a summary of comments. A full list of comments and questions is in Appendix B. Comment highlights: • Provide context for the cost of programming vs. location improvements so that people taking the survey can better understand the funding decision -making process. • Explain why only five parks are included in the polling question for priority projects. (Angie explained that including all of Edmonds parks in a poll was not possible so the focus remained on five parks currently identified for improvements.). • Add parks and open space to the SR 99 corridor. • Invest in areas outside of the "bowl". • Add bike related activities in parks such as a pump track and a skills course. • Provide activities for age groups other than young children, specifically for teens and older adults • Consider bathroom facilities at parks. • Acquire forested areas threatened by development and add open space throughout the city. 3 174 Packet Pg. 323 8.1.b EdmondS 2022 PRO • Manage invasive plants. • Evaluate use levels of facilities for organized sports such as Pine St Park which has a little -used baseball field. • Make improvements at Marina Beach Park such as more kayak and paddleboard launch sites, fewer restrictions for kayaking and paddle boarding, more accessible parking spaces, relocation of portable bathroom facilities, and more beach volleyball. • Make improvements at Mathay Ballinger Park including more picnic areas, seating, ADA access, and parking improvements. Poll No. 3: We also heard interest in the City acquiring more conservation lands and open space. What types of conservation lands should the City prioritize acquiring? 45% 40% 35% 30% 25% 20% 15% 10% 5% 0% Forested uplands Freshwater Lake Ballinger Saltwater beaches & Wetlands & creeksides access waterfront marshlands Poll No. 4: The City offers many community events. Survey results showed strong interest in events. What types of events should the city focus on? • 82% - Smaller, more intimate events, such as outdoor movies, uptown evening market, Hazel Miller Plaza summer concerts • 18% - Big events such as 4th of July parade and fireworks, Edmonds Classic Car Show, farmers markets Poll No. 5: With COVID restrictions being lifted and 'normal' is coming back, does your household have a need for summertime day camps, childcare and camps during school holidays? • 46% - No • 36% - Yes • 15%- Not sure 4 DRAFT 175 Packet Pg. 324 DRAFT s•1.b Question and Answer Session Two Tammy Leigh encouraged participants to share thoughts and ideas for the future of Edmonds parks. Comment highlights: Add more parks, services, and facilities in the SR 99 corridor and the south end of the city. Pass ordinances that prohibit use of parks for non -park purposes. Funding recommendations include: o Provide more funding to parks and recreation programs that serve larger populations. o Continue funding Yost Pool o Use Washington State Health disparities data and mapping along with resources from the Municipal Research and Services Centre of Washington to identify locations where capital investment will provide health benefits to the most people. o Reference the Washington State Recreation and Conservation Plan for equity -based goals. Expand the Edmonds Stewards program. Park site recommendations include: o Improve Hummingbird Park. o Provide better access to the waterfront, specifically near the Ebb Tide condominiums, and make it ADA accessible. o Include bicycle features and access at parks. o Build skate parks in other areas of the city outside of the "bowl." o Divert stormwater from the sound. Community engagement should include representation from each area of the City with a focus on reaching underserved communities. Questions: • Does the City have funding for future park improvements? • When will the City update the PROS webpage? • How long will Marina Park be closed for renovation? What's Next? Angie concluded the meeting with a summary of how attendees can stay involved or contact the Edmonds PRCS team through email at PROSPlan@edmondswa.gov. She reminded attendees to fill out the online survey and share it with friends, family, and networks. Finally, Angie announced the City will hold another community meeting in the fall to share the draft plan. She encouraged participants to check the website and keep an eye on social media for the meeting date. 5 176 Packet Pg. 325 8.1.b EdmondS 2022 PRO APPENDIX A: Meeting attendees and participants 20 community members participated in the meeting. Community Members ProjectTeam— Alison Alfonzo Pence Shannon Burley, Deputy Director of the Edmonds Parks, Recreation & Cultural Services Linda Coburn Angie Feser,Director of the Edmonds Parks, Recreation & Cultural Services Mindy Woods, Human Services Manager for the Edmonds Parks, Recreation & Cultural Services Rebecca Elmore-Yalch _ Scott Burns, PRR, Inc. Greg Ferguson Tammy Leigh DeMent, PRR, Inc. Kelsey Foster (City of Edmonds) Eunji Hamnett, Korean Language Interpreter, PRR, Inc. Lora Hein Yiran Huang, Chinese Language Interpreter, PRR, Inc. Bruce Higgins Daniel Ruiz, Spanish Language Interpreter, PRR, Inc. Nikki Okimoto Glaros Laura Van Wert, PRR, Inc. Zack Ott Laurie Rose (City of Edmonds) Joe Scordino Natalie Seitz Mauri Shuler Jessica Smith Roger Pence Chris Ziobro Barry Rick Sean DRAFT 177 Packet Pg. 326 DRAFT 8.1.b PAGE LEFT INTENTIONALLY BLANK a O w a m u a c m Q. O Ca 0 L u Y L Q. N N O N C O A N w Q O ti N O N N O N O w d r C d E t V R a+ a Packet Pg. 327 Edmonds 2022 PRO N APPENDIX D ONLINE MEETIN SUMMARY #2 _ o_ T d r+ Q O ti N O N N O N N 0 a d E s Q 179 Packet Pg. 328 DRAFT s•1.b City of Edmonds PROS Plan Community meeting summary Date: 10/16/21 Time: 1:00 PM — 2:00 PM Location: Virtual meeting The second community meeting was held using Zoom on October 16, 2021. Attendance included 40 public attendees, 2 elected officials and 11 City and consultant representatives of the Edmonds Park, Recreation and Cultural Services team, Conservation Technix, PRR, and interpreters Nancy Johnson (Sno-Isle Sierra Club) Angie Feser, Director of the Edmonds Parks, Recreation David Orr Rose LeSmith Rachel Maxwell Bryan Roehr & Cultural Services Shannon Burley, Deputy Director of the Edmonds Parks, Recreation & Cultural Services Steve Duh, Project Manager, Conservation Technix Laura LaBissoniere Miller, Facilitator, PRR Scott Burns, Technical Support, PRR Ms. J. Song, Korean Language Interpreter, PRR Barbara Steller Marjie Fields Yingwen Robertson, Chinese Language Interpreter, PRR Sonja Miranda (LMN) Daniel Ruiz, Spanish Language Interpreter, PRR Barbara Rood Lizzy Buechel, Notetaker, PRR Scott Urquhart Judi Gladstone Vivian Olson Janet Phillips Alina Rossano Teresa Wippel Jeanett Quintanilla Robert White Bill Shirey Michael Cuzzetto Laura Wag Barry Ehrlich Chrissy Roberts Mardee Austin Sharene Bainbridge Bill Derry Richard Kuehn Jack McHenry 180 Packet Pg. 329 8.1.b EdmondS 2022 PRO Susan Paine Susie Schaefer Nora Carlson Roger Pence Gayla Shoemake Patricia ONeill Laurie Sorensen Lora Hein Nathan Sugg Catherine JGY Lynne Kan The City of Edmonds hosted this meeting to report back to community members who have offered input and to discuss priorities for the City's Parks, Recreation & Open Space (PROS) Plan. This included live interpretation for members of the Chinese-, Korean-, and Spanish-speaking communities. The project team gave a brief project overview, highlighting survey results, a summary of community engagement, public outreach, and timeline for completing the plan. The project team then engaged the group in multiple polling and discussion sessions to gather input on priorities for the plan. Laura LaBissoniere Miller, Facilitator, started the meeting by introducing the project, welcoming attendees, sharing the meeting agenda, and providing instructions about how to participate, including live language interpretation options. Laura shared that the City was recording the meeting and introduced Angie. Project Overview Angie Feser, Director of Parks, Recreation & Cultural Services for the City of Edmonds, introduced Project Consultant Steve Duh of Conservation Technix, who provided the Edmonds PROS plan overview. • What is the PROS Plan? o The Edmonds Parks Recreation and Open Space (PROS) Plan is a 6-year guide for helping the City manage and improve its parks, recreation programs and other outdoor experiences. The Plan looks to the future and will establish goals, identify specific projects and ideas on how to implement projects for the next 6 to 10 years. • At the core, the PROS Plan is guided by a few basic questions: o What are the City's strengths and what areas can see improvement? o How will the City meet today's park and recreation needs and the futures? • What will the City focus on? o An assessment of Edmonds' parks and open space will help the PROS plan weigh project priorities. The PROS plan is the foundations for pursuing state grants and will help the City stay eligible for other grants that could help pay for some improvements in the plan. o Community involvement, including outreach from people in Edmonds who speak languages other than English, will also guide investments and shape the PROS plan. • Community feedback gathered through: o A Community -wide survey with 1,958 responses. o A virtual community meeting in July with 20 participants. 2 DRAFT 181 Packet Pg. 330 DRAFT s•1.b o Ongoing updates through the City's website and social media outlets. • What have we heard so far? 0 99% of respondents shared that parks and recreation spaces are essential or important to their personal wellbeing. 0 81% of respondents shared that they visit parks/recreation and open spaces at least a couple times per month. • Why do people visit Edmonds parks? In order of what was heard most: Beach / waterfront - Walking or running - Relaxatioln - Playground5 Fitness Community events / concerts Wildlife viewing Dog walking Family gatherings / picnicking Recreation prograrns, classes or camps 0 20";- 4V G 60 ,'.. BQli, • What are the amenities at parks and recreational spaces that interest people the most? Listed in order of top preferences: o Pedestrian and bike trails in parks o Indoor fitness and exercise facilities o Community gardens o Upgraded or renovated playgrounds and play structures o Outdoor fitness equipment • What improvements should the City focus on? Listed in order of priorities from the community: o Connecting gaps in trail system, expand trail connections o Improve or upgrade existing parklands o Buy more conservation and open space lands o Build an aquatic center o Improve restroom facilities • What recreational activities and existing programs are of the highest interest to people? Listed in order of preference: o Community events, such as outdoor movies, Hazel Miller Plaza summer concerts o Outdoor programs, including Beach Rangers or environmental education o Youth programs, such as summer day camps, arts or gymnastics o Youth sports programs and camps Ica 182 Packet Pg. 331 8.1.b EdmondS 2022 PRO Presentation Part One Focus areas • The City of Edmonds heard community interest to focus investments in south and southeast Edmonds. • The City of Edmonds followed up on this priority and analyzed how far different residential areas in Edmonds are to parks, recreational spaces, or open spaces. This analysis map shows areas in proximity to developed city parks; the areas in red are within a ten-minute walking distance, while areas in white depict a further walk to get to an outdoor recreational space. lopnd [:Jc4urvt� -4 moo YAM tihei b I'i r f; 5M nbed b �q M crtr aWkz 4— Sr— A sowb ► rMnrq r,.t� VI~ WjA sr +tl Or , 4 O .y N Q 0 N 0 N N O N 0 W a. C d E t V R a DRAFT 183 Packet Pg. 332 DRAFT s•1.b The City created a second analysis map to identify the proximity between residential neighborhoods and trails, as well as parks. This map analysis offered evidence that the south, southeast and south parts of a Edmonds lack adequate recreational spaces and trails. N O a L"Ond 0I-AY4� U IM Eft "4r*9 4 pax + Q r. 7R-Wir ftur e:n lmwmi8 aupP 6Pma d uouw r'r-m i 17-01S o AxdWV 9K^ 8poe7# CEunry pL'k# Q rCA,O raP.ysP.o.asP.o.u�.1,� r I .ri- «S ray ck P&MC EaJF spaW p-A-M I O W5Jor$t[w65 � .N :i L J a N N 7 O a- N O N N N dg�t.{ ., 0 f d 1= t V R r a 5 184 Packet Pg. 333 8.1.b EdmondS 2022 PRO Poll No. 1: Over the next 6 —10 years, in what parts of Edmonds should the City prioritize additional park and open space investments? Select up to three. 900 0 81% 81% 80% 70% 60% 54% 50% 42% 40% 30% 20% 15% 10% ■0% North Downtown Highway 99 Southeast Southwest Edmonds corridor Edmonds Edmonds * This poll is to share quick thoughts, further discussion is welcome during Q/A. Poll No. 2: If you had to pick only one improvement to Edmonds' park system, which of the following would you choose? Choose one. 35% 30% 25% 20% 20% 17% 17% 15% 13% 10% 1 1 1 . 30% 5% 3% 0% ■ 0% Playground Improved Improved Picnic Shade for Bike skills/ Community updates restrooms maintenance amenities playgrounds pump track gardens We would also like to hear from you. Tell us what parks you visit and how you would like to see them improved. What do you like about the parks? What is missing? Are parks easy to access? What do they need? What could be better? c 0 .y N O I- N O N N O N LO Cn O W d r C d E t V R r a DRAFT 185 Packet Pg. 334 DRAFT s•1.b Q&A: • We are in great need for new skateparks in the area, the ones in Edmonds and Lynndale are out of date. o The City is installing a new skatepark as part of the Civic Park Project • There are no poll answer options for increasing the NATURAL habitat- for example the tree canopy. Instead, the options are all structural. Children are in greater need of NATURE to interact with than they are paved and constructed, human made facilities. o The objective for this question is to ask about physical improvements, but there will be other questions/polls to address the need for additional open space. • Expand Yost Pool operations. • More trees especially with benches. Note climate change will mean hotter temperatures • Current Edmonds and Lynndale skateparks are not worth fixing, they need replacement. o Lynndale Skate Park is part of the Lynnwood Park system. Civic Park is being re -developed (the old park has been removed and a new one being built). • Underwater dive park curation • Will the City try to buy the UNOCAL property when it becomes available and turn it into a park and not use it for development? • What is the status of the UNOCAL property purchase? Land is at a premium. City needs to purchase. o I believe you are referring to the Chevron property by the marsh. The City secured the first right of refusal for acquisition of this property — the City is considering acquiring that property. There are other options for other state agencies to buy that land and lease it to the city. Options are being explored around that property. • Increased accessibility to current parks. • 1 have had young people mention they would like mountain biking area. • Better trail maintenance at Yost. • Please remember that SW County Park also serves Edmonds' residents. • Return to natural habitat, increased accessibility, stewardship of current trails to help reduce off -trail traffic. • Would like to see better irrigation monitoring overall. Most parks with grassy areas seem to always have very squishy, overwatered lawn areas. Seems to me that watering could be reduced (or use better technology to water smarter) in many areas (saving money and making grassy areas useful/less muddy). • More park benches in a covered area for the occasional rain shower. • 1 am concerned about the conservation needs of parks. There are erosion problems, especially in Yost and Maplewood parks. These are the "headwaters" of Shell and Northstram creeks. Consequently, both these creeks have serious erosion problems and sediment flows in the creeks. I'd like to see more emphasis on use of Open Space in the PROS plan. • Improvements are needed in upgrading the natural environments children especially and all other ages as well have opportunity to engage with and interact within close proximity of where they live in a predominantly built environment. • Functional toilets: Porta-toilets are better than nothing at all. • Make and maintain the dive park. • It would be great to have mountain bike locations and educating the public about where mountain biking is safe/permitted. Example, there is a lot of mountain biking activity on small trails in Yost Park and people are unclear as to whether this is a permissible activity. • Possible ILA with County for Esperance Park (to make better picnic benches and art corridor and electric outlets). Possible ILA with Ballinger Park to install amenities that Edmonds residents have better access to on Edmonds side of the Mountain Lake Terrace Park around the lake. • Would very much like to see the Unocal property purchased as a park. • Lynndale skatepark needs improvement — at least filling cracks. They have grown over the years making it difficult and dangerous. 186 Packet Pg. 335 8.1.b EdmondS 2022 PRO 1 live next to the main City Park on 3rd Ave S. Both the entry drive and the exit drive are badly in need of repaving. They are also too narrow to be safe for both pedestrians and automobiles and the many vehicles from the city maintenance yard that use these roads daily. Is there a plan to address this need? • Community engagement in maintaining parks. Amenities near Lake Ballinger launch • Could the city purchase the UNOCAL Property as a City park? • Love the improvements to the Esperance Park in southeast area that is NOT Edmonds. 1 would like to see a redesign of the South Brackett's Landing area to be more useable and feature more drought tolerant, native plants. When will Maplewood Park get some much -needed attention? It encourages some pretty shady behavior since it is mostly hidden and open after dark, the gate is never closed. Bike trails for kids, better signage to increase usage, attention to those way to tall and not healthy trees. Presentation Part Two The City heard a strong interest for additional community events. The City currently offers a range of community events, including large and medium sized events, and smaller neighborhood events like concerts in local parks. Additional events will require additional staff, maintenance, and partners. We would like to learn more about the events you'd like to see. We want to hear your thoughts: what type of events should the city focus on? Please feel free to use CIA to offer other ideas. Poll No. 3: We heard interest in additional community events. What types of events should the City focus on? 45% 41% 40% 35% 30% 25% 25% 20% 16% 15% 13% 10% 6% 5% 0% Big Events(festivals Medium Events Small Keep Existing Mix Other suggestions and markets) (movies) Neighborhood -park Events * Other suggestions: Change the events focus to (use Q&A to offer ideas) E:1 DRAFT 187 Packet Pg. 336 DRAFT s•1.b Q&A: • Isn't Taste run by the Chamber not the City? o Chamber manages the Taste with the City as a partner. We are asking if the Edmonds community would like more of these events. If so, those events could be provided by the City or other organizations. • Cultural celebrations near international districts 1 could hear Taste Edmonds from my house. It was awful. Events in venues outside of the Bowl, please. • 1 think it is appropriate for other organizations to host and manage large events. More opportunities for neighborhood nature walks (small, quiet gatherings of an educational nature) "forest bathing" or "forest therapy' for example, bird and plant identification and understanding. Having partners like the Chamber and ECA or private companies if there are more events More environmental awareness - events or demonstration areas. Inclusion of indigenous populations. Tasting tours of different restaurants (maybe with one ticket for all). • For local events, use the opportunity to share information and education on environmental issues since the Climate Crisis is upon us--- to have compost options available. Events not in bowl, in local neighborhoods. Large events in the Bowl are not really for locals anymore. No events in the streets or right of ways. Educational events for wildlife. • Encourage the permitting to change from fireworks shows to drone shows for 4th of July possibly partnered with live music. Now we will move on to aquatics and the need for a pool replacement. Yost pool is around 50 years old and nearing the end of its life. A 2009 feasibility study of Yost pool suggested the need for its replacement. There is strong support to replace Yost pool, which offers questions to consider. For example, should the pool be: • A large, regional pool? • A small, neighborhood pool? • Should the pool be indoor or outdoor? Each option listed above has different requirements for staffing, maintenance, and associated development costs. For example, a local scale, outdoor pool is seasonal, and offers limited use in summer months. Even as a limited option, there are high costs. For example, constructing something like this would cost around $4 — 6 million. A year-round, local scale, indoor pool, in comparison, might cost around $15 — 20 million, and might not be able to accommodate all activities and community desires. A large, outdoor pool that serves regionally would be seasonal, and might cost around $10 —12 million. An indoor, regional aquatic center - kind of like the one in Lynwood — might cost around $30 — 40 million. Accordingly, we are interested to learn more about community preferences for the Yost pool replacement. We 188 Packet Pg. 337 8.1.b EdmondS 2022 PRO Poll No. 4: If the City were to replace Yost Pool with a new aquatics facility, what should be the focus for a new facility? 45% 40% 39% 36% ■35% 30% 25% 20% 18% 15% 10% 6% 5% 0% Local -scale pool, outdoor Local -scale pool, indoor Regional -scale, outdoor Regional -scale, indoor Q&A: • Yost pool should be for locals, and funding should come mainly from verdant. It should be free for all. • Lynnwood Pool is already so close. Yost should differ from that. • Pools, fountains, other water features will become increasingly essential as hotter weather during the summer becomes more prevalent with climate change. • Aquatics is a perfect opportunity to partner with other cities and agencies in SW county. Edmonds needn't go it alone. • We need a "no pool" option to reflect that as a low priority. We have much more serious needs. • The Yost site pool is best suited for outdoors. Stay within that footprint. • With wonderful indoor pool facilities close by in MLT and Lynnwood, I like an offering similar to our Yost Park offering (outdoor summer pool in the trees). • If regional scale/outdoor - it could have traditional use in the summer, but then have winter use in the summer as well if used as Nordic -style hot/cold therapeutic baths. Extremely popular, but very few facilities in this area. https://www.scandinave.com/whistler/en/baths/ . • replacement of pool in other location of Yost would allow for more trails and natural areas. • The local -scale outdoor pool at Yost Park is the gem of Edmonds. • What about both: local indoor and outdoor pools? Another important priority to Edmonds community members are trails and trail connections. Opportunities for outdoor running, and other outdoor recreation activities are also of interest. There is a community -wide desire to expand the trail system in Edmonds. Currently, the City is planning for bike lane improvements, including how to providing safe routes with signs and maps. 10 DRAFT 189 Packet Pg. 338 DRAFT Poll No. 5: What do you see as the most important options for improving trails in Edmonds? (Select all that apply): 50% 45% 40% 35% 30% 25% 20% 15% 10% 31% 0% — Improve signage and Improve maintenance of trails information existing trails 46% 40% 37% Build new trails in Acquire and build new Use right-of-way and All options existing trail corridors sidewalks parks/openspace What other ideas do you have to improve trail connections across Edmonds? M The interurban trail is not connected with Edmonds through the intersection with 104 — this should be a high priority to complete so it's connected. Improved safety is important. While proximity to parks and open space is important, the quality of resource should be a consideration in your level of service analysis. For example, I don't think it's right to consider a 10-acre athletic field comparable to parks located within the "Bowl"; I hope that is also a consideration in your level of service analysis, which was not quite drawn out during your presentation. In regard to the pool: money is not infinite, and I think that available funding should be allocated to address the quality of services offered. The City should prioritize communities that are fundamentally underserved. In terms of events: all events happen within the "Bowl". I would like to see an expansion of the Uptown Market to feature more food vendors, specifically, fruit and vegetable vendors. I found this missing from the public market. • Use un-opened street rights of way • Access to the trails and knowing where they are is important. I am sure there are more in the city than I am aware of. • More public paths between neighborhoods. Trails that are for walking rather than biking • Complete the "missing link" in front of the Ebbtide! 11 190 Packet Pg. 339 8.1.b EdmondS 2022 PRO Try to offer many trails to be inclusive and accessible. • Agree with the comment about eliminating fireworks shows in the city, especially in proximity to the shoreline and parks. They pollute, degrade air quality, frighten animals and those with PTSD and leave garbage that then gets washed into waterways. They also create major traffic snarls and idling cars are another environmental degradation, not to mention being a fire hazard. Needed a 'lighting needs on the walking paths' question- Ballinger neighborhood and the walking area around the Playfields near OVD between (NE Edmonds)? Many people do or would walk there late in the evening. In the winter it is dark and not as safe The Edmonds section of the Interurban Trail does not reflect Edmonds' beauty. Also building safe connections for bikes to access light rail is huge. It would be nice to see the emphasis on trail improvements to accommodate kids safely having fun on their bikes. Also for older kids making trails for mountain type bikers. Away from cars, not on the streets. Maplewood would be great for this. 1 agree about connecting Edmonds to the interurban trail • 1 am concerned about taking away road space in existing streets. Congestion such as might be experienced if trails are put on the existing Highway 4. Purchasing land for bike trails is necessary rather than taking existing land to share bike and car trails Permitted usage for existing trails needs to be clarified. Lots of our wooded trails are used being utilized by mountain and motorized bikes and in many cases it is hazardous to hikers/walkers due to trail size. I don't believe they are supposed to be used this purpose but there is not signage informing users/ enforcement of rules. o Currently, the city code does not disallow the use of bikes in the parks; so we are unable to post signs or rules about prohibited usage that doesn't exist. In order for us to change that, the city code would need to be changed; then we could move forward with different signage. Overall, the code does not state that bikes are not allowed in parks. "HERE, HERE" for the Interurban trail improvements - bummed that it is closed during light rail development in Lynnwood area, but all for public transportation, Work with County and neighboring cities to repair and build new interconnections. This will increase access and improve safety. I would like to see the Balinger side improved to coincide with the great work that the city of MLT is doing for upgrade at the main park area. • 1 would like to see the Balinger side improved to coincide with the great work that the city of MLT is doing for upgrade at the main park area. Important to provide connections to existing trails. Trails should be accessible to walkers and bikers, without having to drive to a parking facility to get on the trail. Safety for walking is a concern. Any lighting in the city, especially in proximity to parks, needs to be Dark Skies compliant, especially to reduce intrusion into wildlife habitat and interference with bird migration and provide someplace with darkest skies for viewing the night sky. Better access to Meadowdale Park. The signage can be confusing and direct people down Norma Beach Rd if they miss it. My comment is about safety in Yost Park. Last week, I went for a walk in Yost Park, no cars around, felt a little scary b/c it was just me in park. I walked fast because no one was there; it was a little scary. Are you guys thinking about maybe a phone or cameras in the park for people? I want to clarify that I went to the Yost Park in the day 1:00 pm. and I were the only person there. It will be great to see police around - safety is my priority. o Yost Park is not lit with streetlights or other lights, although park hours are from 8 am — dusk, so it technically closes at dusk and in the evenings when it does get darker. If there are specific improvements that would make you feel more comfortable the PRCS would like to have that 12 DRAFT 191 Packet Pg. 340 DRAFT s•1.b conversation. We would be willing to include additional improvements to make the park feel safer. Maybe we can get in touch following this conversation. There are lots of other concerns around safety in Yost Park, so this will be important for city to address. We need to preserve trees, especially in watersheds. 1 think the top priority is for acquisition especially in SE Edmonds and the marsh. Please remember the wisdom of Joni Mitchell - DO NOT pave paradise and put up a parking lot. Also agree with all the first caller had to say. I loved the Uptown Market; however, I was disappointed that there were few to no produce vendors/ aka FARMERS. Would love to see community gardens with options for sharing produce in neighborhood markets such as this. 1 would like to see more work on connecting/way finding to Lake Ballinger. Edmonds should continue to rely on Ballinger as a resource for the southeastern part of the city. HOORAY for MORE TREES! Does the park collaborate with the Edmonds Tree Board? With the south part of Edmonds needing more parks (we are in a parks desert), the city should look for partnering opportunities. One is coming up with the affordable housing project with the Lutheran church. I'd like to see the city work with the church to develop a park on some of their property so that housing project can be integrated with the rest of the neighborhood through a playground that is used by the entire neighborhood More youth -oriented activities in parks like skateboarding and parkour. More park staff at the parks to maintain and help community. Provide grants and build more partnerships with grassroots and community organizations to host events, improve access to parks and recreation, help with safety, etc. Grassroots and community organizations can help local governments better understand community needs and how to engage them. Need to reduce light pollution. I have a headlamp for some of the times I am out after dark. When looking at pools for 4-40 million!!! Skateparks are low maintenance. If designed correctly by proper skatepark builder they will be a timeless addition to the city that has draw from out other local communities. MILT and Lynwood do not have parks). Brier is terrible as well. We have a huge hole in this dept. Please see Calivera (Lake Stevens) skate park and Torgeson Nnorth Bend) as great examples of timeless design and construction. See MLTskatepark.org my personal website for skatepark advocacy. thank you The local parks are not patrolled, and they are not closed at night. I live next to Maplewood and it is very busy after hours and not in a good way. • Is there a reason not to make Maplewood Park walk-in only/ driveway designed to obstruct vehicles to avoid the problems happening there after hours? o We are aware of neighbors' concerns of Maplewood Park around safety, security and after-hours activities in the park. We are aware and in communication with police department to request for additional sweeps and drive-throughs in the park. There is always a consideration of including a gate in the park, however this would require maintenance staff to lock and unlock gate, and we don't currently have the staff to do this. 1 heard "free camping." Did I hear that wrong? o We do not have camping or campsites in any of our parks; we do not provide camping in our parks — that is not an option. o The section of the presentation refers to youth summer camps and to programming, rather than camping outside. Are there any plans around community gardens? o Edmonds PRCS received a wonderful donation from Shirly Johnson Property, There has been some discussions in the past about this site being used for a community garden. The Park will need to go through master planning process for engaged community. 13 192 Packet Pg. 341 8.1.b EdmondS 2022 PRO o In addition, we are seeing in PROS plans responses for community gardens —that will require additional research into finding potential locations • Is the Park Department considering climate impacts in its planning? o Yes, in several ways. One as simple as plant material and design — shifting to plant material that don't require additives, etc. being aware of species that we are using, considering species that require less water, etc. o In addition, parks provide benefits to help with climate change as well. Le. tree canopies provide shade, ecological benefits for water and air • Will the permitting be different for events that will be allowed at Civic Park when it is completed? o Civic Park was designed in conjunction with several large festival producers; things like fireworks show and Taste of Edmonds. The park has been designed to accommodate larger festivals, and the expectation is that they will return to Civic Park. • The Parks Dept needs to include ways to incorporate climate mitigation and adaptation into the planning. Examples: preserve and increase tree canopy and restore the Edmonds Marsh, which will reduce flooding on Hwy 104. • Regarding the question on climate change, do you have a plan to increase the tree canopy both in the parks and open spaces? o We don't necessarily have a plan specific to X amount of trees per park or increasing tree canopies. But we do utilize our parks for tree and vegetation planting. There is a considerable amount of tree planting every year within parks department. We complete tree planting during the restoration of park sites. • More outreach and volunteerism solicited for park and marsh maintenance. The supervision may mean it isn't even a cost savings but makes the community more vested in our natural spaces. I want to ditto an earlier commenter who said that outreach and education on being good stewards of the earth would be a great focus for our park in our park spaces- passive methods not so expensive. Also, where can we put water collection tanks to minimize amounts of stormwater going into our creeks? o This is something that we have started to do and are looking for more opportunities for partnership. • Lynndale as I understand it was a collaboration between Lynnwood and Edmonds? Great to hear about already planned replacement of Civic Park. Who is the designer? This is a huge problem when cities do not consult skateboarders and people who use them when designing. You may be just making another park that will have little use due to poor design. This is the most unfortunate part of skateboard park development. I have links to preferred designers on my site. www.Mltskatepark.org. — Grindline, Dreamworks, Evergreen. • Water usage needs to be considered in all new plantings and landscaping. • Since Civic Park will include many features to enhance the space for all to enjoy, how can you continue to have fireworks there when they cause noise and mess that impacts all who live nearby? I highly recommend partnering with the chamber to offer drone or laser shows. Since we are the first designated Creative District, I would like to see us do something new, creative and special in our community for the 4th of July celebrations. • The current Edmonds Marsh will need lots of help ($) readjusting to salt water and clean up of invasive species. Can the plan include potential connectivity to the UNOCAL property? • The concern about safety in Yost is regarding unleashed dogs - not just for people but for leashed dogs too. • Needs to include safety for the other beings (wildlife) with whom we share this area, the ones who came before us who are being increasingly driven from their original homes. We need contiguous wildlife habitat that provides safe habitat for native species of all kinds, including places protected from human and other invasive intrusion. Other comments for engagement: 14 DRAFT 193 Packet Pg. 342 DRAFT s•1.b Zoom is really not an effective way to reach all of our folks. It requires a fast internet connection, as well as a device. Phoning in leaves the presentation sight unseen. So, these meetings are only truly accessible to those with means and not the general community. o Due to COVID, we can have limited in person engagement around this plan (attending night market); we will continue to look for opportunities around this plan as it is safe to do so. Is it possible for individuals, other than those attending today, to give feedback about specific parks? I'm thinking specific input on specific parks might be valuable to the department o We encourage questions and comments to continue after the meeting ends. We encourage you to ask your neighbors to share feedback as well. Time to do some in -person events again also, with appropriate precautions, of course. Doing Zoom -only is not adequate. o Edmonds' current policy does not allow in person meetings; we would obviously prefer to do this in person but are unable to do so. Do have a timeline associated with project — adoption by February to be eligible for state funding for the next 3 years. Additional comments are welcome. The team is always available to email directly to the PROS plan email address and parks dept. is always available for conversations via phone call, or email. I hope there will be virtual opportunities to attend. Some people wouldn't attend an in- person event. What's Next? Visit city website; continued conversations with city council and planning board; draft PROS Plan by year end; please visit website to share additional comments. The survey links have been posted in the Chat for this meeting. You can access the survey directly from those links or use your phone to scan the QR code shown on the screen. If you have anything else you would like to share, please email the Edmonds team at PROSPlan@edmondswa.gov and someone will respond directly to you. 15 194 Packet Pg. 343 Edmonds 2022 PRO i d ill,'-++�+�a-i 1 Ti Fij W"M LDE 195 Packet Pg. 344 DRAFT s•1.b CONSERVATION T E C H H I x STAKEHOLDER DISCUSSION NOTES Project Name: Edmonds PROS Plan Update Location: Zoom Video Conference Notes by: Steve Duh, Conservation Technix Participant: Greg Ferguson, Edmonds Stewards program Jenna Nand, business owner, Chamber board member Bill Derry, resident, retired planner, People for Puget Sound board chair Subject: Stakeholder Group Discussion (#1) PURPOSE Project No.: Proj-# 21-138PLN Interview Date: August 17, 2021 Time: 12:30 pm Angie Feser, Director, Edmonds Parks, Recreation & Cultural Services Shannon Burley, Assistant Director, Edmonds Parks, Recreation & Cultural Services Steve Duh, Conservation Technix To discuss current interests and future needs related to Edmonds' parks and recreation opportunities. The meeting took place on August 17, 2021, via a Zoom video conference from 12:30 pm — 2:00 pm. DISCUSSION The discussion began with brief introductions and an overview of the City's PROS Plan update process. A set of questions were used to initiate the discussion and explore ideas about local parks and recreation needs. What Participants Value about Edmonds' Parks and Recreation • Growing up and playing at Mathay Ballinger Park • Waterfront and beach public space — great democratic space, everyone can enjoy the view and the water (e.g., walk the marina, picnic by the sea) • Waterfront, especially daytime low tide • There are more visitors coming to Edmonds, which is good for merchants. Edmonds has the best people and public space, which equals charm • There is frequent music and at different scales (small, solo performer events and large concerts in City Park and on Main Street). • It is critical for kids to play outside and have natural space • Access to two county parks — chapter 2 of the 2016 PROS Plan notes per capita acreage and level of service. Edmonds is low in open space parks, and service levels might show as better if the city counts the county park in Esperance Interview Notes 1 August 28, 2021 196 Packet Pg. 345 8.1.b EdmondS 2022 PRO Interview Notes (continued Comments on Maintenance • Parks operation staff is doing great, work hard and interact with the public graciously • Parks are well -maintained and clean. Cleanliness is not an issue in the Bowl and north Edmonds. There is a different demographic around Mathay Ballinger Park and Hwy 99, with more of a 'street population' there. Park maintenance and cleanliness is more of an issue in southwest and southeast Edmonds. • Consider starting a business investment district along Hwy 99 to help finance improvements. • Yost Park has been very busy during COVID; parking lot has been full • There are different uses in open spaces versus parks (i.e., encampments). The city should tackle it, so all feel safe to use these spaces. Support and assistance for the unhoused are better than a sweep. (Note: The City is trying to get a social worker to aid in this area.) • Maintenance overall is really good and should continue to be high/highest priority. • Invasive species is an ongoing issue. Sound Salmon Solutions and Edmonds Stewards can help with invasive species control (see 2016 Plan, chapter 4, goal 4) Open Space Needs • Edmonds Marsh is an underused gem; expanding that site is a big habitat opportunity and chance to daylight creek into the Sound. Add a boardwalk and viewing platform • Look at the Unocal property; it might be a surplus opportunity from the company. Consider adding it to Edmonds' park system • There is not a lot of open space left in the city. One opportunity is to open street rights -of -way, Consider opportunities for temporary or permanent improvements, such as basketball, tennis, trails. There is a fair amount of unopened ROW in southeast Edmonds • The forest parcel across from Yost Park might be subdivided and would be a good candidate to buy it and maintain as tree canopy (Shell Creek). Recreation Opportunities & Needs • At Mathay Ballinger, add exercise equipment — play equipment for adults. More open to all ages and abilities, especially seniors • Sport leagues are well -organized for active sports, politically strong and can take care of themselves • There is a need for extended trails and natural trails — connect waterfront, Meadowdale, Marsh, Yost • The 2016 Plan has a reference to climate change. Make parks easier to access on foot, attempt to lessen the impact of vehicular access. Also, watch for water rise at waterfront sites; add more tree cover • Would like to see more flowering trees along streets and more trees along Hwy 99. More trees and shade will help with the impact of high temperatures on the street and sidewalk. Add more shade, benches and hydration stations Recreation Programs • Yoga on beach or in parks. Hainsworth Park has outdoor yoga • Focus on youth, elderly and disabled communities, with focus on public health Interview Notes August 28, 2021 DRAFT 197 Packet Pg. 346 DRAFT s•1.b Interview Notes (continued Project ideas • Acquire more park and open space lands (south and east Edmonds are most deficient). • Focus more on Hwy 99, which is not recognizable as Edmonds (i.e., art, trees, look, feel). There should be more equity in park investments. Hwy 99 generates more tax revenue than the Bowl; harder to fund projects in area like Hwy 99. • The Marsh property offers opportunities for trees and habitat value; might be easier to find outside resources fund a project like the Marsh than Hwy 99 area projects. • Develop more space for pollinators and re -wilding. Consider a wildlife crossing on 76th. Plant more trees and plants. • Concern about dog park near Puget Sound and with urine and waste going into the Sound. It is a bacterial 'hotspot' • Look for opportunities for an east/west trail from Hwy 99 to the ferry, something safe and separated -- End of Notes -- Interview Notes 3 August 28, 2021 198 Packet Pg. 347 8.1.b EdmondS 2022 PRO CONSERVATION T E C H N I x STAKEHOLDER DISCUSSION NOTES Project Name: Edmonds PROS Plan Update Location: Zoom Video Conference Notes by: Steve Duh, Conservation Technix Participant: Ken Cooper, Edmonds Boys & Girls Club, Executive Director Heather Damron, Edmonds moms group Alison Pence, Rotary, Diversity Commission Tia Scace, Edmonds Garden Club Subject: Stakeholder Group Discussion (#2) PURPOSE Project No.: Proj-# 21-138PLN Interview Date: August 19, 2021 Time: 10:00 am Ashley Song, Arts Commission Matt Finch, ESD Facility Manager Angie Feser, Director, Edmonds Parks, Recreation & Cultural Services Shannon Burley, Assistant Director, Edmonds Parks, Recreation & Cultural Services Steve Duh, Conservation Technix To discuss current interests and future needs related to Edmonds' parks and recreation opportunities. The meeting took place on August 19, 2021, via a Zoom video conference from 10:00 am —11:30 am. DISCUSSION The discussion began with brief introductions and an overview of the City's PROS Plan update process. A set of questions were used to initiate the discussion and explore ideas about local parks and recreation needs. What Participants Value about Edmonds' Parks and Recreation • Walking the waterfront, several parks have different things to offer (i.e., variety, active, passive, sunset, water) • For the Boys & Girls Club, we take our biking club to Yost Park and use City Park for the splash pad. Appreciate rule change for dogs in parks • Value the greenspace. As a parent, I appreciate the playgrounds, but gravitate toward the trails. At Sierra Park, would prefer to see nature area, rather than playground equipment • Always try to hike forested park on walks • There are a lot of trees that offer environmental benefits • Would like to see more open space and more public art in parks Interview Notes 1 August 28, 2021 DRAFT 199 Packet Pg. 348 DRAFT s•1.b Interview Notes (continued Comments on Maintenance • Maintenance is great. There is not a lot of litter and no damage to trails • City Park is packed daily; Pine Street Park is used heavily • City Park is clean, busy. With all the events, the clean-up is great • The pier walkway has a lot of seaweed and is slippery at times • Focus on areas that aren't just in higher economic areas • There are never enough staff to manage plants. Volunteers are great, but more is needed to remove invasives Recreation Needs • Make sure all parks are accessible. • At Marina Park, the ADA parking is closest to the water, but the porta potties are near the off -leash area and far from these parking stalls. Move the logs for room for porta potties closer in • At Mathay Ballinger, there is one ADA stall, and visitors can't really get to the features in the park from there (e.g., picnic table, porta potty, play area) • More effort on conservation (i.e., climate change) — would like to see less grass/lawn (incl the related watering, fertilizing & resources) and more regionally appropriate plants • Need more open space and parks • There is really nothing in the southeast portion of the city, especially in multi -family areas with no open space to walk to • There is a demand for athletic fields — need both, open space and fields for active use • ESD worked more with the city in the past building turf fields at Woodway and with Lynnwood for Meadowdale fields • If there were to be an aquatic center, maybe find a site along Hwy 99, rather than in the Bowl • Walking and biking paths across the city and to/from school. • Collaborate with ESD regarding improvements that might help accommodate field trips or walking to school. (ESD noted that there are likely no major construction in Edmonds in the next ten years.) • Connect a trail east/west to the Interurban Trail • Add a food garden or more community gardens; Garden Club gets requests for more pea patches Future needs • More open fields and more athletic fields • Maintain what we have • The Boys & Girls Club is always searching for space for recreation programs • Keep a strong focus on tree canopy • Moon shot idea — walkable recreation within five minutes for all residents. This might be a challenge in the south and southeast. Difficult to walk to Mathay Ballinger Park— no direct route, dangerous traffic, no safe pedestrian route • More green for everyone and closer to Hwy 99 • Conserve open space and expand on it with more restoration; improve access to nature and wildlife. During COVID, really appreciate having things to see and do (i.e., trees, birds, wildlife, etc.) Interview Notes 2 August 28, 2021 200 Packet Pg. 349 8.1.b EdmondS 2022 PRO Interview Notes (continued Communication • Consider translating more city materials and information, but it may need in -person translation in the various dialects. The focus tends to be on the main dialect (i.e., Mandarin). Personal, direct outreach should be expanded, but the city may need to have people of color conducting the outreach • Hwy 99 area needs more access to social and health services -- End of,'Votes -- Interview Notes August 28, 2021 DRAFT 201 Packet Pg. 350 DRAFT CONSERVATION T E C H H I x STAKEHOLDER DISCUSSION NOTES Project Name: Edmonds Parks, Recreation & Open Space Plan Project No.: Proj-# 21-138PLN Location: Phone Calls & Zoom Conferences Interview Sept. 3, 9, 10, & 28, Times: varied Dates: 2021 Notes by: Jean Akers, Conservation Technix Participant: Angela Harris, Port of Edmonds Matt Finch, Director of Facility Operations, Commissioner Edmonds School District Natalie Seitz, Resident, Equity advocate Jean Akers, Conservation Technix Kirsten Paust, Resident, Pool advocate Subject: Stakeholder One-on-one Interviews PURPOSE To discuss current issues, opportunities and needs for park and recreation amenities. The interviews took place individually from September 3`d to 28th via phone call or Zoom engagement. DISCUSSION Each interview began with a brief introduction and overview of the City's Parks, Recreation and Open Space (PROS) Plan update process. The interviewee was asked to briefly describe their role and relationship to Edmonds' parks and recreation provision. A set of questions were then used to guide the discussion and elicit ideas about the park system and local recreation needs. Agency or Individual Roles • The Port of Edmonds values its partnership with City Parks & Recreation; the relationship and communications are good. • The Port owns land adjacent to several city -owned park and open space lands and coordinates with access and amenities, where feasible. • Edmonds School District (ESD) goes beyond the City of Edmonds with its boundaries including Woodway, Lynnwood, Mountlake Terrace and Esperance. • The City Parks & Recreation and ESD have collaborated on sports fields implementation projects in the past and are interested in continuing to partner on capital projects that can benefit the community. • ESD actively supports community events by offering rental of is facilities and parking areas to support festivals and programming. • Advocating for equity and inclusion of the South Edmonds and SR 99 communities to provide more park and recreation facilities in underserved areas. • Advocating for better management and future upgrades and improvements at Yost Pool. Interview Notes 1 September 29, 2021 202 Packet Pg. 351 8.1.b EdmondS 2022 PRO Interview Notes (continued) Value/Rating of Parks • Port Commissioners noted that parks were generally in average to good condition and had numerous volunteer activities engaged in work projects. • More promotion could be coordinated to spread the word about community events. • Waterfront Center is amazing. • ESD wants to reconnect parks leadership with their Capital Partnership Program that works informally to coordinate community -related improvements through needs assessments. • Park facilities are good. • South Edmonds and the SR 99 community are lacking in sufficient park facilities and should take a more upfront priority in creating a more equitable park system. Concerns or Issues • Restrooms at the fishing pier need an upgrade. They're too dark and have bad night lighting. • Restrooms near the ferry dock & underwater park needs major upgrade/renovation. • City park sports fields have drainage issue in right field in the spring. • Increased walkability and safe routes to school & parks. • Capital investments have been mostly focused on downtown and waterfront leaving the South Edmonds and SR 99 community underserved in park and trail facilities. • Current gap in Interurban Trail makes for a dangerous connection. Connect gaps to create more regional trail value. • Create a durable process using an equity -based matrix and review/evaluate maintenance allocations to ensure equity in park care. • Reinforce the public health role of parks in the community. • SR 99 & South Edmonds communities have higher temperatures due to more urban development (and away from waterfront) and could benefit from more green spaces and tree canopy. • Spur trail between Mathay Ballinger Park and Interurban Trail needs to be repaved. • Avoid consuming Mathay Ballinger Park with a future SWM basin, reducing its footprint for possible future recreational amenities. • In gap analysis, add service areas for all park & rec amenities, not just neighborhood and community parks. • Address access to programming. • What's the future plan for Yost Pool? Aquatic programs are big value to community & need to be preserved into the future. • Yost Pool had a great summer swimming program run by the YMCA but the switch to Cascade Swim Club has limited the public access to the pool. • Review and evaluate concessionaire terms and agreements to ensure community -based programming value. • Yost Park had unlimited access for YMCA programming that affected park capacity and public use of Yost Park. Was there any review of park carrying capacity? Traffic study for effect of programming? • Sunset corridor may be impacted by railroad expansion of third rail line. How can trail access be protected? • Older kids are not well -served except at the skate park. More recreational opportunities are needed like zip -lines, BMX tracks, BIG swings, etc. Interview Notes September 29, 2021 DRAFT 203 Packet Pg. 352 DRAFT s•1.b Interview Notes (continued Project ideas • Parks map would be good to make information more accessible. • Promotion of Edmonds parks could include other providers (county, school & other lands) as useful resources in their park information. • Future daylighting of Willow Creek could be an opportunity for more partnering and coordination between Port and City Parks. • A community recreation center (better than Yost). • Improved access & boardwalk along the east side of Edmonds Marsh. • Enhanced interpretive programs around the hatchery • More sports fields for games and practices are needed • More arts, cultural and environmental activities • More soccer and mountain biking • A Park Steward program could represent park efforts and solidify volunteer activities • Enhance walkability to the waterfront from residential areas. • Potential expansion of former Woodway HS campus could involve additional sports fields, lighting or a future school site. • City could benefit from a sports complex that provides tournament capacity to draw more economic activity. • An "opportunity fund" for SR 99 could help with resources and acquisitions to address current inequities. • Parks could provide meeting spaces that could be rented/reserved by small businesses and individuals since library only allows public uses. Snohomish (Willis Tucker) provides private reservable meeting space as a good service to the community. This space could be combined with the City's future satellite office along SR 99. • Add a bike tool station on the Interurban Trail. • Rework 77 to Trail so it's safer. • Add restrooms and a drinking fountain to Mathay Ballinger Park. • Enhance landscaping along utility corridor for better aesthetics. • Upgrade infrastructure at Yost Pool. • Marina Beach Park OLA could be improved by the removal of some of the older agility equipment. Key Priorities • Collaborate on Port's waterfront project to help create a seamless boardwalk experience. • Consideration of an inter -local agreement between parks and ESD to help facilitate partnerships and capital project resources and implementation. ESD has an ILA with Lynnwood where Lynnwood contributes to elementary school construction to enlarge the gym to be able to accommodate more community -based programming. • Safe routes to parks and schools through enhanced walkability in the community. • Lighting for Woodway Campus synthetic fields to extend available play time throughout the year. • Add a "pocket park" classification to address an inequity in park definitions. Address the disparity between park plan classifications and city code definitions. • Provide more park amenities in SR 99 & South Edmonds communities. • The 'International District' along SR 99 deserves more city investment and attention: tree plantings, connected green spaces, pedestrian -friendly amenities. (See Shoreline as an example.) • Yost Pool upgrades. Interview Notes 3 September 29, 2021 204 Packet Pg. 353 8.1.b EdmondS 2022 PRO Interview Notes (continued) • Completion of Civic Park. • Balance resources to invest across the City. nthar Cnmmantc • The Port will be moving its administration building (current structure to be removed) with a major rework of the waterfront boardwalk. The project will create some small open space(s) along the promenade. • ESD is facing capacity issues at Sherwood & West Gate Elementary Schools while Edmonds Elementary School has declining enrollment. A 5-10 year plan for elementary school replacement in Edmonds could be an opportunity to partner with Parks & Recreation. • Partnering with ESD for a future aquatic center is feasible. • Could there be a partnership with Mountlake Terrace to allow some development of the west side of Ballinger Park to provide for Edmonds' residential park needs? Could Edmonds lease part of that parkland for developing more active park facilities, like sports fields? • "Edmonds Moms", a Facebook group, has over 7,000 members and could be a resource for parks & rec communications. • "Edmonds Dogs" is another local interest group to be considered in communications about projects and programming. • Informal volunteer group in Yost Park has been trimming blackberries and clearing overgrown vegetation along trails. Could this be a human resource that gets expanded into a "Friends of Parks" 501.3.c entity? -- End of Notes -- Interview Notes September 29, 2021 DRAFT 205 Packet Pg. 354 DRAFT CONSERVATION T E C H H I x STAKEHOLDER DISCUSSION NOTES Project Name: Edmonds Parks, Recreation & Open Space Plan Project No.: Proj-# 21-138PLN Location: Zoom Video Conference Interview Date: Oct. 14, 2021 Times: 11:00am Notes by: Jean Akers, Conservation Technix Participant: Joomi Kim, Executive Director Jean Akers, Conservation Technix Korean Community Services Center Subject: Stakeholder Interview PURPOSE To discuss current issues, opportunities and needs for park and recreation amenities. The interview took place on October 141h via Zoom video conference. DISCUSSION The discussion began with a brief introduction and overview of the City's Parks, Recreation and Open Space (PROS) Plan update process. Joomi Kim was asked to briefly describe her role and organization and its relationship to Edmonds' parks and recreation provision. A set of questions were then used to guide the discussion and elicit ideas about the park system and local recreation needs. Agency Perspectives • The Korean Community Services Center (KCSC) provides a variety of social, financial, legal, counseling and linguistic services for the Korean -speaking population in the Puget Sound Region. Up until now it has had little if any relationship with the City of Edmonds and its provision of parks and recreation. • Many of the people KCSC serves are not connected to recreation programming or the use of park facilities due to language barriers. • KCSC is advocating for equity and inclusion of the South Edmonds and SR 99 communities to provide more park and recreation facilities in underserved areas. Value/Rating of Parks • The City's parks are beautiful but not as essential as needed social services. • Walking trails and safe walking environments are important. Walking in green spaces is better than heavily urban. • Waterfront Center is very nice but KCSC clientele are not likely to use it due to discomfort with language barrier. Interview Notes 1 October 14, 2021 206 Packet Pg. 355 8.1.b EdmondS 2022 PRO Interview Notes (continued) Concerns or Issues • Heavy investment in waterfront & downtown has left underserved areas of Edmonds without adequate facilities and services. • Distance from waterfront and its amenities can be an additional barrier for KCSC community. SR 99 corridor needs more focus & attention. • The City (and Parks & Rec) is not engaged with its Korean community. • Affordable housing is in short supply. High-rise residential housing could provide needed affordable living and a small community center could be part of the project. • City does not currently place many park and recreation resources in non -white, diverse resident populations. Project ideas • A small (or large) community center located along SR 99 corridor could help provide much -needed services and access to recreation programming. • KCSC is ready to provide Korean translators for a variety of recreation programs. They run lots of programs but need more space and are willing to help City with translation. • KCSC runs a number of "wisdom" classes where life skills are taught such as photography, flower arranging, knitting, computer use, Yoga, and how to use a smartphone. They have limited space and could expand their programming to collaborate with Edmonds' recreation programming and provide the teachers (Korean -speaking). Help create better walking environment in SR 99 & South Edmonds communities. Key Priorities • Somewhere near SR 99 corridor, a multi -cultural community center is needed. The center should provide reservable meeting space, conference/auditorium space, commercial kitchen, game room, gym, after school programs and maybe an indoor pool. Other Comments • Look at the land surrounding the Burlington Coat Factory. Is there an opportunity to acquire some space for a community center? • As an example of type of needed facility: the Snohomish Senior Association meets one to three times a week and likes to prepare their own meals (needs a kitchen) have an indoor gathering space, play some simple games (ping pong, Mah Jong, etc). -- End of Notes -- Interview Notes October 14, 2021 DRAFT 207 Packet Pg. 356 DRAFT 8.1.b PAGE LEFT INTENTIONALLY BLANK a O w a m u a c m Q. O Ca 0 L u Y L Q. N N O N C O A N w Q O ti N O N N O N O w d r C d E t V R a+ a 208 Packet Pg. 357 a.� )may I� .f` 1. ,d 3f a' fir' �',.i: yr; 's. F. #+ �.} , f•� r ' N Mi 1 DRAFT s•1.b The following summaries from recognized park and recreation resources provide background on national, state and local park and recreation trends. Examining current recreation trends may inform potential park and recreation improvements and opportunities to enhance programs and services. 2020 NRPA Agency Performance Review The 2020 National Recreation and Park Association (NRPA) Agency Performance Review summarizes the key findings from their Park Metrics benchmarking tool and is intended to assist park and recreation professionals in effectively managing and planning their operating resources and capital facilities. The report offers a comprehensive collection of park- and recreation -related benchmarks and insights to inform professionals, key stakeholders, and the public about the state of the park and recreation industry. The 2020 NRPA Agency Performance Review contains data from 1,053 unique park and recreation agencies across the United States as reported between 2017 and 2019. Key Findings and Characteristics Park facilities and operations vary greatly across the nation.. The typical agency participating in the NRPA park metric survey serves a jurisdiction of approximately 42,500 people, but population size varies widely across all responding jurisdictions. The typical park and recreation agency has jurisdiction over 20 parks comprising over 430 acres. Park facilities also have a range of service levels in terms of acres of parkland per population and residents per park. These metrics are categorized by the agency's population size. Park Facilities Nearly all (96%) of park and recreation agencies operate parks and related facilities. The typical park and recreation agency has: ■ One park for every 2,281 residents ■ 9.9 acres of park land for every 1,000 residents in its jurisdiction ■ 11 miles of trails for walking, hiking, running and/or biking 210 Packet Pg. 359 8.1.b EdfI ONS 2022 PRO Figure F1. Median Residents per Park Based On Population Size 7,000 5,908 6,000 5,000 4,000 2 889 3,000 2,281 1,963 2,523 2,000 1,300 1,000 0 °0 �. ti ore Figure F2. Acres of Parkland per 1,000 Residents based on Population Size 14 12 10.9 12 g,g 9.6 10 8.9 7.7 8 6 4 2 0 . ae °o 'Ly°O o� A large majority of park and recreation agencies provide playgrounds (93.9%) and basketball courts (86.5%) in their portfolio of outdoor assets. Most agencies offer community and/or recreation centers (60%) while two in five offer senior centers. The typical park and recreation agency that manages or maintains trails for walking, hiking, running and/or biking has 11.0 miles of trails. Agencies serving more than 250,000 residents have a median of 84.5 miles of trails under their care. Park and recreation agencies often take on responsibilities beyond their core functions of operating parks and providing recreational programs. Other responsibilities may include tourist attractions, golf courses, outdoor amphitheaters, indoor swim facilities, farmer's markets, indoor sports complexes, campgrounds, performing arts centers, stadiums/ arenas/racetracks, fairgrounds and/or marinas. Programming Nearly all (93%) of park and recreation agencies provide recreation programs and services. More than eight in ten agencies provide themed special events (88% of agencies), team sports (87%), social recreation events (87%), youth summer camps (83%), fitness enhancement classes (82%), and health and wellness education (81%). Staffing Park and recreation employees are responsible for operations and maintenance, programming and administration. The typical park and recreation agency has: ■ 41.9 full-time equivalent staff (FTEs) on payroll ■ 8.1 FTEs on staff for every 10,000 residents in its jurisdiction ■ Median FTE counts also positively correlate with the number of acres maintained, the number of parks maintained, operating expenditures, and the population served. For example, agencies that serve populations between 20,000 and 49,999 residents employ an average of 27.3 FTE, while agencies that serve 50,000 to 99,000 people employ an average of 60 FTE. Figure F3. Park and Recreation Agency Staffing: Full -Time Equivalents (By Jurisdiction Population) 350.0 300.0 LL 250.0 200.0 v 150.0 z 10.0 c N 50.0 . 0.0 - �e5 00 PAP roc °& v ti ota Jurisdiction Population Q DRAFT 211 Packet Pg. 360 DRAFT s•1.b Another way of comparing agency staffing across different park and recreation agencies examines number of staff per 10,000 residents. These comparative numbers hold fairly steady across population sizes with the median for all agencies at 8.1 FTEs. Figure K Park and Recreation Agency FTEs Per10,000 Residents 10 9 LL g 0 7 v 6 E 5 z 4 m 3 1 0 `ey o00 �o° C°a o00 °°o 'L sec Lo. bo , 9y, gyp, y°o PAP tirac °°o °°o o°p a� �Se ti°• y°• o°' wr � ti ore Jurisdiction Population Capital and Operating Expenses For capital expenses, the typical park agency: ■ Dedicates about 55% to renovation projects and 32% to new development projects. ■ Plans to spend about $5,000,000 million on capital expenditures over the next five years. ■ For operations, the typical park agency spends: ■ $4.3 million per year on total operating expenses ■ $7,000 on annual operating expenses per acre of park and non -park sites managed by the agency ■ $81.00 on annual operating expenses per capita ■ $97,000 in annual operating expenditures per employee ■ 54% of the annual operating budget on personnel costs, 38% on operating expenses, and 5% on capital expenses not included in the agency's capital improvement plan (CIP) ■ 44% of its operating budget on park management and maintenance, 43% on recreation, and 13% on other activities Agency Funding The typical park and recreation agency: ■ Derives 60% of their operating expenditures from general fund tax support, 26% from generated revenues, 11% from dedicated taxes or levies, and 5% from grants, sponsorships and other sources ■ Generates $21.00 in revenue annually for each resident in the jurisdiction 2020 State of the Industry Report Recreation Management magazine's 2020 Report on the State of the Managed Recreation Industry summarizes the opinions and information provided by a wide range of professionals (with an average 22.3 years of experience) working in the recreation, sports, and fitness industry. Given the emerging COVID-19 pandemic, Recreation Management also conducted a supplemental survey in May 2020 to learn about both the impacts to the industry and what mitigation steps organizations were taking in response. Partnerships The 2020 report indicated that most (89%) recreation, sports, and fitness facility owners form partnerships with other organizations as a means of expanding their reach, offering additional programming opportunities or as a way to share resources and increase funding. Local schools are shown as the most common partner (64%) for all facility types. Youth -serving organizations (Ys, JCC, Boys & Girls Clubs) and park and recreation organizations were the most likely to report that they had partnered with outside organizations, at 100% and 95% respectively. Revenue Outlook In January 2020, half of respondents expected revenues to increase in both 2020 and 2021. Survey respondents from urban communities are more optimistic about revenue increases as compared to rural respondents. In last year's report, parks respondents had reported increases in their average operating expenditures with operating costs that grew by 14% between fiscal year 2019 and 2019. Respondents generally expected their operating expenses to continue to increase between 2019 and 2021, with camps expecting a 10% increase, recreation centers at 8%, and parks at 6%. 212 Packet Pg. 361 8.1.b MOW 2022 PRO Relative to costs and revenues, few facilities covered by the survey reported that they cover more than 75 percent of their operating costs via revenue. The percentage recovered varied with type of organization with the average percentage of costs recovered for all respondents hovering near 50% and private for -profit organizations achieving the highest cost recovery rates. For parks, the cost recovery rate remained steady at 44%. Over the past decades, public parks and recreation departments and districts have faced a growing expectation that facilities can be run like businesses. Many local facilities are expected to recover much of their operating costs via revenues. While this is the business model of for -profit facilities like health clubs, it is a relatively recent development for publicly owned facilities, which have typically been subsidized via tax dollars and other funding sources. Most recreation providers (81%) have been taking actions to reduce expenditures. Cost recovery actions typically involve reduction in expenses with improving energy efficiency as the most common action (51% of respondents). Increased fees and staffing cost reductions and putting off construction or renovation plans were reported as other common methods for reducing operating costs. As of May 2020, nearly 90% of respondents anticipated that total revenues would decline in 2020 due to the COVID-19 pandemic. Most anticipated a revenue drop of 30-50%, though one in seven expected a decline of more than 50%. In general, respondents are split on when they expect that revenues will begin to recover - 44% believe revenues will begin to rebound in 2021 while 40% expect further revenue declines. Facility Use The majority of respondents reported an increase in use of their recreational facilities as of January 2020. Looking forward, more than half of respondents (53%), including 60-65% of parks and recreation centers, were expecting to see further increases in the number of people using their facilities over the next two years. In 2020, 22% of respondents said they were planning to add more staff at their facilities, 75% were planning to maintain existing staffing levels, and 3% were planning to reduce staffing. The May 2020 survey found, however, that nearly half of responding organizations had laid off or furloughed staff due to the impacts of COVID-19 and nearly two-thirds had suspended hiring plans. Facilities and Improvements Respondents from parks were more likely than other respondents to include: park shelters (83.3% of park respondents had shelters); playgrounds (82.7%); park restroom structures (79%); open spaces (73.9%); outdoor sports courts (71.9%); bike trails (48.3%); outdoor aquatic facilities (42.1%); dog parks (40.4%); skateparks (39.9%); fitness trails and outdoor fitness equipment (34.5%); disc golf courses (33.7%); splash play areas (33.3%); community gardens (32.3%); golf courses (29.2%); bike and BMX parks (14.2%); and ice rinks (13.9%). Over the past seven years, the percentage of respondents who indicate that they have plans for construction, whether new facilities or additions or renovations to their existing facilities, has grown steadily, from 62.7 percent in 2013 to 72.9 percent in 2020. Construction budgets have also risen. The average amount respondents were planning to spend on their construction plans was up 10.8% in 2020, after an 18.4% increase in 2019.On average, respondents to the 2020 survey were planning to spend $5.6 million on construction. A majority of park respondents (54%) reported plans to add features at their facilities and were also the most likely to be planning to construct new facilities in the next three years (39%). The top 10 planned features for all facility types include: 1. Splash play areas (25.4% of those with plans to add features were planning to add splash play) 2. Playgrounds (20.3%) 3. Park shelters (17.3%) 4. Dog parks (17.1%) 5. Park restrooms (16.1%) 6. Synthetic turf sports fields (14.8%) 7. Walking and hiking trails (14.8%) 8. Fitness trails and outdoor fitness equipment (14.8%) 9. Disc golf courses (12.9%) 10. Outdoor sports courts (11.3%) The COVID-19 pandemic is having a significant impact on construction plans. As of May 2020, over one-third (34%) of respondents had put construction on hold due to the impacts of the pandemic, rising costs, and supply shortages. DRAFT 213 Packet Pg. 362 DRAFT s•1.b Programming Nearly all respondents (97%) offer programming of some kind. The top 10 most commonly offered programs include: holiday events and other special events (provided by 65.3% of respondents); educational programs (59%); group exercise programs (58.8%); fitness programs (57.6%); day camps and summer camps (57.3%); youth sports teams (55.2%); mind - body balance programs such as yoga and tai chi (51.2%); adult sports teams (46%); arts and crafts programs (45.8%); and programs for active older adults (45.4%). Respondents from community centers, parks and health clubs were the most likely to report that they had plans to add programs at their facilities over the next few years. The ten most commonly planned program additions were: 1. Fitness programs (24% of those who have plans to add programs) 2. Group exercise programs (22.4%) 3. Teen programs (22%) 4. Environmental education (21.8%) 5. Day camps and summer camps (20.9%) 6. Mind -body balance programs (20.5%) 7. Programs for active older adults (18.1%) 8. Special needs programs (17.9%) 9. Holidays and other special events (17.4%) 10. Arts and crafts (17%) Addressing the COVID-19 pandemic required many respondents to either put programs or services on hold (82%) or cut programs or services entirely (34%). Additionally, many respondents have had to rethink their programming portfolios. Two-thirds of respondents (67%) had added online fitness and wellness programming as of May 2020, 39% were involved in programs to address food insecurity, and one in four was involved in programs to provide educational support to out -of -school children. General Challenges In January 2020, facility managers were asked about the challenges they anticipated impacting their facilities in the future. Generally, overall budgets are the top concern for most respondents including their ability to support equipment and facility maintenance needs (58%) and staffing (54%). Marketing, safety/ risk management, and creating new and innovative programming also remain continuing challenges for facility managers. Facility managers also report that environmental and conservation issues (13%) and social equity and access (10%) are posing increasing challenges. However, as of May 2020, many respondents concerns had shifted to addressing the COVID-19 pandemic impacts described in the sections above. 2020 Outdoor Participation Report Overall Participation According to the 2020 Outdoor Participation Report, published by the Outdoor Foundation, just over half of Americans ages 6 and older participated in outdoor recreation at least once in 2019, the highest participation rate in five years. This increase was not universal, however, and there was significant variation in participation between age, gender, and racial groups. Despite the overall increase in the percentage of Americans engaging in outdoor recreation, the total number of recreational outings declined in 2019. Outdoor participants went on a total of 10.9 billion outdoor outings in 2019 — a 12% drop from the 2012 high-water mark of 12.4 billion outings. In addition, the number of outings per participant declined 17% in the past five years, from 85 outings per participant in 2014 to 71 in 2019. This drop mirrors a decline in the total number of outings per participant. Each year for over a decade, participants have engaged less often in outdoor activities. As a result, the percentage of `casual' participants in outdoor recreation (i.e. those who participate one to 11 times per year) has grown by about 4% over the past 15 years, which the percentage of `core' participants (i.e. weekly participants) has declined. 214 Packet Pg. 363 8.1.b EdmondS 2022 PRO Figure F5. Frequency of Outdoor Outings: Trending Over Many Years Casual (1 to 11 times) 28.2% 27.9% Moderate (12 to 51 times) 32.5% 31.8% Core (52+times) 39.3% 40.4% Running, jogging and trail running in the most popular outdoor activity by levels of participation, as shown in the chart below, followed by fishing, hiking biking and camping. Figure F6. Most Popular Outdoor Activities by Participants, Nationwide Running, jogging & trail running Freshwater, saltwater & flyfishing Hiking Road biking, mountain biking & BMX Car, backyard & RV camping 0.0% 5.0% 10.0% 15.0% 20.0% Youth Participation Declines the youngest participants, children 6 to 17, were outdoors far less than in previous years.lheir average outings fell from a high of 91 in 2012 to just 77 per child in 2019. Youth participation declined across the board in 2019, with the biggest declines seen in girls aged 18 to 24 (-5%) and boys ages 13 to 17 (-4%). Households with children, however, continue to drive growth in participation. Adults with children had much higher outdoor recreation participation rates (57%) than adults without children (44.4%). Female Participation Continues to Grow In 2019, women made up 46% of participants in outdoor recreation while men made up 53.8%, representing the smallest gender gap measured in the report's history. Women's participation has increased from 43% of all participants in 2009 to 46% in 2019. 28.4% 31.7% 32.6% 33.1% 32.5% 32.6% 38.5% 35.8% 34.9% Diversity Gap Remains Despite increases in participation, Black/African American and Hispanic Americans continue to be significantly underrepresented in outdoor recreation. Hispanics made up 11.6% of outdoor recreation participants, a 35 percent shortfall relative to their proportion of the population ages 6 and over (17.9%). Similarly, Black/African Americans represented 12.4% of the U.S. population ages 6 and over in 2019, but just 9.4 percent of outdoor participants, a 24 percent participation deficit. Black youth were the least likely to participate in outdoor recreation as compared to Asian, Hispanic, and Caucasian youth — signaling a potential future gap in outdoor participants. However, those Black and Hispanic Americans who do participate in outdoor recreation do so frequently — more often, on average, than members of other racial groups. In 2019, 62% of Asian Americans participated in outdoor recreation, followed by 53% of White, 48% of Hispanic, and 40% of Black/African Americans. Impacts of COVID-19 An August 2020 report from the Outdoor Industry Association indicated that COVID-19 impacted recreation participation in April, May and June as Americans flocked to outdoor recreation amid COVID restrictions. Americans took up new activities in significant numbers with the biggest gains in running, cycling, and hiking given that these activities were widely considered the safest activities during pandemic shutdowns.'Ihe hardest hit activity segments during COVID shutdowns were team sports (down 69%) and racquet sports (down 55%). Reviewing just April, May and June 2020, participation rates for day hiking rose more than any other activity, up 8.4%. DRAFT 215 Packet Pg. 364 DRAFT s•1.b 2020 Sports, Fitness, and Leisure Activities Topline Participation Report Prepared by a partnership of the Sports and Fitness Industry Association (SFIA) and the Physical Activity Council (PAC), this February 2020 participation report summarizes levels of activity and identifies key trends in sports, fitness, and recreation in the US. The report is based on over 18,000 online interviews of a nationwide sample that provides a high degree of statistical accuracy using strict quotas for gender, age, income, region, and ethnicity. The study looked at 122 different team and individual sports and outdoor activities. Compared to 2014, eight million more Americans were casually active in 2019 indicating a positive movement toward an increasingly active population. Sports that made great strides in the last six years include trail running, cardio tennis, BMX biking, and day hiking. Over the last year, only 2.1 million additional people reported participating in an activity that raises their heart rate for more than 30 minutes. Participation in active high calorie activities has remained flat for the last four years. The percentage of people reporting no physical activity during the past year declined to 27% in 2019 - its lowest point in six years — continuing an increasing trend in activity. Rates of inactivity continue to be linked to household income levels, with lower income households having higher rates of inactivity. However, in 2019, households across the income spectrum saw declines in inactivity. Figure F7. Total Participation Rate by Activity Category Fitness Sports Outdoor Sports Individual Sports Team Sports - Water Sports Racquet Sports Winter Sports Fitness sports continue to be the most popular activity type for the 5th consecutive year. Other sports activities, including individual sports, racquet sports, and water sports have seen a modest decline in participation since 2018. Team sports experienced a slight increase in participation, driven by the increasing popularity of basketball and outdoor soccer. While racquet sports lost about 2% of participants since 2018, mostly due to declines in squash and badminton participation, the rising popularity of pickleball and cardio tennis may reverse this declining trend. When asked which activities they aspire to do, all age -groups and income levels tend to show interest in outdoor activities like fishing, camping, hiking, biking, bicycling, and swimming. Younger age groups are more interested in participating in team sports, such as soccer, basketball and volleyball, while older adults are more likely to aspire to individual activities like swimming for fitness, bird/nature viewing, and canoeing. Physical education (PE) participation shows 96% of 6 to 12-year old youth and 82% of 13-17 year olds participated in PE in 2019. While younger children were more likely to participate in PE, older youth had higher average days of participation. Children were more than twice as likely to be inactive if they did not attend PE. Overall, all ages saw an increase in PE 2019. Participation in PE is thought to lead to an increase of active healthy lifestyles in adulthood. Figure F8. Sports with the highest 5-year increase in participation Trail Running Hiking (Day) Rowing Machine Kayaking (Recreational) Aquatic Exercise 216 Packet Pg. 365 8.1.b MOW 2022 PRO Figure F9. 5-Year Change in Outdoor Sports Participation 190 160% 130% 100% 76% 70% 56% 52% 40% 33% o 24% 20% 17% 13% 12% 9% o 10% 4/0 2% 2% 1% .. . . . . -20% - -9% -12% -13% -14% -24% -50% J W on uo on o0 w w on on on nn L C `LL.- O i0 L O O. N L =p C N bq O w 3 N c m s u ° `t v oo p v N o m 3 y o c m � E 7 -o O O b (0 3 \ bn on cc s m c a 3 a)V �^ 'aC `w m �' z O ro c c v Y m m ao m O '^ m O _2 O F C C o Y O O V N Y Z o L Y Y 'gyp O bD C m C L N C O m F O O W LL T Z C u O in � C L T U u co Americans Engagement with Parks Survey This annual study from the National Park and Recreation Association (NRPA) probes Americans' usage of parks, the key reasons that drive their use, and the greatest challenges preventing greater usage. Each year, the study examines the importance of public parks in Americans' lives, including how parks compare to other services and offerings of local governments. The survey of 1,000 American adults looks at frequency and drivers of parks/recreation facilities visits and the barriers to that prevent greater enjoyment. Survey respondents also indicate the importance of park and recreation plays in their decisions at the voting booth and their level of support for greater funding. In 2020, NRPA conducted a shorter -than -typical Engagement survey because of the dynamic nature of life during the COVID-19 pandemic.'Ihe 2020 Study focused on the impacts of the COVID-19 pandemic on park and recreation usage, whether residents see public parks as an essential public service, and whether people vote for political leaders based on their support for parks and recreation funding. Key findings include: ■ Eighty-two percent of U.S. adults agree that parks and recreation is essential. ■ Seventy-seven percent of survey respondents indicate that having a high -quality park, playground, public open space or recreation center nearby is an important factor in deciding where they want to live. ■ U.S. residents visit local park and recreation facilities more than twice a month on average. ■ Three in five U.S. residents — more than 190 million people — visited a park, trail, public open space or other recreation facility at least once during the first three months of the pandemic (mid -March through mid -June 2020). Impacts of the COVID-19 Pandemic According to the Americans Engagement with Parks report, "In many communities across the nation, parks, trails and other public open spaces have been crucial resources available to people seeking a brief respite from the public health crisis. As businesses shut down operations during the spring, many parks and trails remained open, providing people with opportunities to safely enjoy outdoor physical T c 0 A a O ti N T 0 N N 0 N LO W O W a r c am E z Q DRAFT 217 Packet Pg. 366 DRAFT activity with its many attendant physical and mental health benefits. According to NRPA Parks Snapshot Survey data (nrpa.org/ ParksSnapshot), 83 percent of park and recreation agencies kept some/all of their parks open during the initial wave of COVID-19 infections in April 2020, while 93 percent did the same with some/all of their trail networks. Consequently, people flocked to their local parks, trails and other public open spaces. Three in five U.S. residents — more than 190 million people — visited a park, trail, public open space or other recreation facility at least once during the first three months of the pandemic — from mid -March through mid June 2020. Parks and recreation usage was particularly strong among GenZers, Millenials, Gen Xers, parents, people who identify as Hispanic/ Latinx and those who identify as nonwhite. As has been the case with virtually every aspect of life, the COVID-19 pandemic has altered the frequency with which most people engage with their local park and recreation amenities. Still, slightly more than half of people have been visiting parks, trails and other public open space amenities as often — if not more often — since the start of the pandemic than they had during the same period in 2019. Twenty-seven percent of U.S. residents report that their use of parks, trails and other public open spaces increased during the first three months of the pandemic relative to the same period in 2019. A quarter of survey respondents indicates their parks and recreation usage during the period from mid - March to mid- June 2020 matched that of the same three months in 2019. Forty-eight percent of people report that their usage of parks, trails and public open spaces declined during the early months of the pandemic." Washington State Recreation and Conservation Plan The 2018-2022 Recreation and Conservation Plan for Washington State provides a strategic direction to help assure the effective and adequate provision of outdoor recreation and conservation to meet the needs of Washington State residents. The plan identifies the following five near and long-term priority areas and establishes specific actions within each priority to help meet the outdoor recreation and conservation needs within the state: 1. Sustain and Grow the Legacy of Parks, Trails, and Conservation Lands 2. Improve Equity of Parks, Trails, and Conservation Lands Meet the Needs of Youth 4. Plan for Culturally Relevant Parks and Trails to Meet Changing Demographics 5. Assert Recreation and Conservation as a Vital Public Service Sustain & Grow the Legacy A wealth of existing recreation and conservation areas and facilities should be kept open, safe, and enjoyable for all. Some modifications to meet the interests of today's population may be needed at some facilities. Sustaining existing areas while expanding and building new facilities to keep up with a growing population is one of the five priority goals. Improve Equity The National Recreation and Park Association's position on social equity states: "Our nation's public parks and recreation services should be equally accessible and available to all people regardless of income level, ethnicity, gender, ability, or age. Public parks, recreation services and recreation programs including the maintenance, safety, and accessibility of parks and facilities, should be provided on an equitable basis to all citizens of communities served by public agencies." The Washington plan restates that equity goal for all its citizens. Improving equity is also a strategy for improving a community's health. Current statewide participation rates in outdoor activities were surveyed as part of the plan. 218 Packet Pg. 367 8.1.b MOW 2022 PRO Figure F10. Participation Rates for Washington Residents in Outdoor Activi- a:.. Walking 94% Nature activities 89% Leisure activities at parks 82% Swimming 68% Sightseeing activities 67% Hiking 61% Outdoor sports 48% Water -based activities (freshwater) 46% Camping 45% Trending activities 33% Snow and ice activities 30% Bicycling 28% Get Youth Outside Washington State youth participate in outdoor activities to a greater extent than youth nationally. Park and recreation providers are urged to offer a variety of outdoor activities for youth and to support youth programs. Most youth are walking, playing at a park, trying new or trending activities, fishing in freshwater, exploring nature, and riding bikes. Other activities of interest to youth are activities in freshwater such as boating and paddling, fishing in saltwater, and target shooting, hiking, outdoor sports, and riding off -road vehicles. Figure F11. Youth Participation Rates for Washington Residents in Outdoor Activities Walking 88% Leisure in parks 78% Trending activities 77% Fishing in freshwater 77% Nature -based activities 75% Bicycling 74% Freshwater -based activities* 66% Target shooting 62% Hiking 57% Outdoor sports 57% Off -road vehicle riding 57% Fishing in saltwater 53% *(not swimming) Plan for Culturally Relevant parks and Trails to Meet Changing Demographics Washington's population is expected to grow by 2 million people by 2040 leading to more congestion and competition for recreation resources. Between 2010-2040, the percent of people of color are expected to increase from 27 percent to 44 percent. With the cultural change in the population, preferred recreational activities also will change. By 2030, more than one of every five Washingtonians will be 65 years old or older. By 2040, there will be more seniors than youth. Park and recreation providers should be prepared to create new and diverse opportunities and accommodate the active senior population. Assert Recreation and Conservation as a Vital Public Service the plan recognizes that outdoor recreation contributes to a strong economy and is a public investment like other public services and infrastructure. The report cites the Outdoor Industry Association and other economic studies that reinforce the importance of park and recreation services locally, regionally and statewide. 2019 Special Report on Paddlesports & Safety In 2019, the Outdoor Foundation produced a report focused on paddlesports data based on a participation survey (over 20,000 online interviews with a nationwide sample of individuals and households). In 2018, 22.9 million Americans (approximately 7.4% of the population) participated in paddle sports. This represents an increase of more than 4 million participants since the study began in 2010.Over the last five years, there continues to be an increase in paddlesports popularity among outdoor enthusiasts, with significant portions of the nationwide growth occurring in the Pacific region. Recreational kayaking continues to grow in popularity but may be driving some of the decline in canoeing. "Ihe popularity of stand-up paddling has soared, increasing by 1.5 million participants over the past five years, though it does not have nearly as high a participation rate as either recreational kayaking or canoeing. DRAFT 219 Packet Pg. 368 DRAFT s•1.b Most paddlers are Caucasian, other racial and ethnic groups are largely under -represented. However, Caucasian participation has remained relatively flat while participation by people identifying as Hispanic or Black/African American has grown by 0.5% to 1% per year since 2013. 71his growth has led to more than 773,000 new Hispanic paddlers in just six years, signaling the importance and potential of engaging minority groups in paddlesports. One in eight paddlers have been participating in the sport for 21 years or more. However, many participants — between thirty and sixty percent, depending on the discipline — tried a paddlesport for the first time in 2018. Such high levels of first-time participation may produce longer term growth in paddling, assuming participants continue to enjoy the sport. Among adult paddlers, most participate for excitement and adventure, for exercise, or to be close to nature. Kayakers, rafters, canoers and stand-up paddlers often enjoy, or would be willing to try, other paddlesports. Many also enjoy similar outdoor "crossover" activities such as hiking, camping, walking, and nature viewing. 220 Packet Pg. 369 rl 4 Edmonds 2022 PRO APPENDIX G IMPLEMENTA TACTICS 8.1.b 2`■ Packet Pg. 370 DRAFT 8.1.b LOCAL FUNDING OPTIONS The City of Edmonds possesses a range of local funding tools that could be accessed for the benefit of growing, developing and maintaining its parks and recreation program. The sources listed below represent likely potential sources, but some also may be dedicated for numerous other local purposes which limit applicability and usage. "Therefore, discussions with City leadership are critical to assess the political landscape to modify or expand the use of existing City revenue sources in favor of park and recreation programs. Councilmanic Bonds Councilmanic bonds may be sold by cities without public vote. The bonds, both principal and interest, are retired with payments from existing city revenue or new general tax revenue, such as additional sales tax or real estate excise tax. The state constitution has set a Excess Levy — One Year Only Cities and counties that are levying their statutory maximum rate can ask the voters, at any special election date, to raise their rate for one year (RCW 84.52.052). As this action increases revenue for one- year at a time it is wise to request this type of funding for one-time uses only. Regular Property Tax - Lid Lift Cities are authorized to impose ad valorem taxes upon real and personal property. A city's maximum levy rate for general purposes is $3.375 per $1,000 of assessed valuation. Limitations on annual increases in tax collections, coupled with changes in property value, causes levy rates to rise or fall; however, in no case may they rise above statutory limits. Once the rate is established each year, it may not be raised without the approval of a majority of the voters. Receiving voter approval is known as a lid lift. A lid lift may be permanent, or may be for a specific purpose and time maximum debt limit for councilmanic bonds of 11/z% of period. the value of taxable property in the city. General Obligation Bond For the purposes of funding capital projects, such as land acquisitions or facility construction, cities and counties have the authority to borrow money by selling bonds. Voter -approved general obligation bonds may be sold only after receiving a 60 percent majority vote at a general or special election. If approved, an excess property tax is levied each year for the life of the bond to pay both principal and interest. The state constitution (Article VIII, Section 6) limits total debt to 5% of the total assessed value of property in the jurisdiction. A levy lid lift is an instrument for increasing property tax levies for operating and/or capital purposes. Taxing districts with a tax rate that is less than their statutory maximum rate may ask the voters to "lift" the levy lid by increasing the tax rate to some amount equal to or less than their statutory maximum rate. A simple majority vote of citizenry is required. Cities and counties have two "lift" options available to them: Single-year/basic or Multi -year. Single -year: The single -year lift does not mean that the lift goes away after one year; it can be for any amount of time, including permanently, unless the proceeds will be used for debt service on bonds, in which case the maximum time period is nine years. Districts may permanently increase the levy but must use language in the ballot title expressly stating that future levies will increase as allowed by chapter 84.55 RCW. After the initial "lift" in the first year, the district's levy in future 222 Packet Pg. 371 8.1.b MOW 2022 PRO years is subject to the 101 percent lid in chapter 84.55 RCW. This is the maximum amount it can increase without returning to the voters for another lid lift. The election to implement a single -year lift may take place on any election date listed in RCW 29A.04.321. Multi -year: The multi -year lift allows the levy lid to be "bumped up" each year for up to a maximum of six years. At the end of the specified period, the levy in the final period may be designated as the basis for the calculation of all future levy increases (in other words, be made permanent) if expressly stated in the ballot title. The levy in future years would then be subject to the 101 percent lid in chapter 84.55 RCW. In a multi -year lift, the lift for the first year must state the new tax rate for that year. For the ensuing years, the lift may be a dollar amount, a percentage increase tied to an index, or a percentage amount set by some other method. The amounts do not need to be the same for each year. If the amount of the increase for a particular year would require a tax rate that is above the maximum tax rate, the assessor will levy only the maximum amount allowed by law. The election to implement a multi -year lift must be either the August primary or the November general election. The single -year lift allows supplanting of expenditures within the lift period; the multi -year left does not, and the purpose for the lift must be specifically identified in the election materials. For both single- and multi -year lifts, when the lift expires the base for future levies will revert to what the dollar amount would have been if no lift had ever been done. The total regular levy rate of senior taxing districts (counties and cities) and junior taxing districts (fire districts, library districts, etc.) may not exceed $5.9011,000 AV. If this limit is exceeded, levies are reduced or eliminated in the following order until the total tax rate is at $5.90. Parks & Recreation Districts (up to $0.60) Parks & Recreation Service Areas (up to $0.60) Cultural Arts, Stadiums & Convention Districts (up to $0.25) Flood Control Zone Districts (up to $0.50) Hospital Districts (up to $0.25) Metropolitan Parks Districts (up to $0.25) All other districts not otherwise mentioned 4. Metropolitan Park Districts formed after January 1, 2002 or after (up to $0.50) 5. Fire Districts (up to $0.25) 6. Fire Districts (remaining $0.50) Regional Fire Protection Service Authorities (up to $0.50) Library Districts (up to $0.50) Hospital Districts (up to $0.50) Metropolitan Parks Districts formed before January 1, 2002 (up to $0.50) Sales Tax Paid by the consumer, sales tax is a percentage of the retail price paid for specific classifications of goods and services within the State of Washington. Governing bodies of cities and counties may impose sales taxes within their boundaries at a rate set by state statute and local ordinances, subject to referendum. Until the 1990 Legislative Session, the maximum possible total sales tax rate paid by purchasers in cities was 8.1 percent. This broke down as follows: state, 6.5 cents on the dollar; counties, 0.15 cents; cities, 0.85 cents; and transit districts, a maximum of 0.6 cents (raised to 0.9 cents in 2000). Since then multiple sales options were authorized. Those applicable to Parks and Recreation include: counties may ask voters to approve a sales tax of up to 0.3 percent, which is shared with cities. At least one-third of the revenue must be used for criminal justice purposes. Counties and cities may also form public facilities districts, and these districts may ask the voters to approve a sales tax of up to 0.2 percent. The proceeds may be used for financing, designing, acquisition, construction, equipping, operating, maintaining, remodeling, repairing, and reequipping its public facilities. Revenue may be used to fund any essential county and municipal service. If a jurisdiction is going to change a sales tax rate or levy a new sales tax, it must pass an ordinance to that effect and submit it to the Department of Revenue at least 75 days before the effective date. The effective date must be the first day of a quarter: January 1, April 1, July 1 or October 1. T c .2 d a O ti N T 0 N N 0 N LO Cn O W IL c m E z Q DRAFT 223 Packet Pg. 372 DRAFT s•1.b Business and Occupation Tax Business and occupation (B&O) taxes are excise taxes levied on different classes of business to raise revenue. Taxes are levied as a percentage of the gross receipts of a business, less some deductions. Businesses are put in different classes such as manufacturing, wholesaling, retailing, and services. Within each class, the rate must be the same, but it may differ among classes. Cities can impose this tax for the first time or raise rates following referendum procedure. B&O taxes are limited to a maximum tax rate that can be imposed by a city's legislative body at 0.2 percent (0.002), but grandfathered in any higher rates that existed on January 1,1982. Any city may levy a rate higher than 0.2 percent, if it is approved by a majority of voters (RCW 35.21.711). Beginning January 1, 2008, cities that levy the B&O tax must allow for allocation and apportionment, as set out in RCW 35.102.130. Admissions Tax An admissions tax is a use tax for entertainment. Both cities and counties may impose this tax through legislative action. Cities and/or counties may levy an admission tax in an amount no greater than five percent of the admission charge, as is authorized by statute (cities: RCW 35.21.280; counties: RCW 35.57.100). This tax can be levied on admission charges (including season tickets) to places such as theaters, dance halls, circuses, clubs that have cover charges, observation towers, stadiums, and any other activity where an admission charge is made to enter the facility. If a city imposes an admissions tax, the county may not levy a tax within city boundaries. The statutes provide an exception for admission to elementary or secondary school activities. Generally, certain events sponsored by nonprofits are exempted from the tax; however, this is not a requirement. Counties also exempt any public facility of a public facility district for which admission is imposed. There are no statutory restrictions on the use of revenue. Impact Fees Development impact fees are charges placed on new development in unimproved areas to help pay for various public facilities that serve new development or for other impacts associated with such development. Both cities and counties may impose this tax through legislative action. Counties that plan under the GMA, and cities, may impose impact fees on residential and commercial development activity to help pay for certain public facility improvements, including parks, open space, and recreation facilities identified in the county's capital facilities plan. The improvements financed from impact fees must be reasonably related to the new development and must reasonably benefit the new development. The fees must be spent or encumbered within ten years of collection. Real Estate Excise Tax Excise tax levied on all sales of real estate, measured by the full selling price, including the amount of any liens, mortgages, and other debts given to secure the purchase. Both cities and counties may impose this tax through legislative action. Counties and cities may levy a quarter percent tax (REET 1); a second quarter percent tax (REET 2) is authorized. First quarter percent REET (REET 1) must be spent on capital projects listed in the city's capital facilities plan element of their comprehensive plan. Capital projects include planning, acquisition, construction, reconstruction, repair, replacement, rehabilitation, or improvement of parks, recreational facilities, and trails. The second quarter percent REET (REET 2) must also be spent on capital projects, which includes planning, construction, reconstruction, repair, rehabilitation, or improvement of parts. Acquisition of land for parks is not a permitted use of REET 2. Both REET 1 and REET 2 may be used to make loan and debt service payments on projects that are a permitted use of these funds. The City of Edmonds currently assesses both REETs and uses this funding for a variety of capital project needs. 224 Packet Pg. 373 8.1.b MOM 2022 PRO Lodging Tax The lodging tax is a user fee for hotel/motel occupation. Both cities and counties may impose this tax through legislative action. Cities and/or counties may impose a "basic" two percent tax under RCW` 67.28.180 on all charges for furnishing lodging at hotels, motels and similar establishments for a continuous period of less than one month. This tax is taken as a credit against the 6.5 percent state sales tax, so that the total tax that a patron pays in retail sales tax and hotel -motel tax combined is equal to the retail sales tax in the jurisdiction. In addition, jurisdictions may levy an additional tax of up to two percent, or a total rate of four percent, under RCW 67.28.181(1). This is not credited against the state sales tax. Therefore, if this tax is levied, the total tax on the lodging bill will increase by two percent. If both a city and the county are levying this tax, the county must allow a credit for any tax levied by a city so that no two taxes are levied on the same taxable event. These revenues must be used solely for paying for tourism promotion and for the acquisition and/ or operating of tourism -related facilities. "Tourism" is defined as economic activity resulting from tourists, which may include sales of overnight lodging, meals, tours, gifts, or souvenirs; there is no requirement that a tourist must stay overnight. Conservation Futures Tax (Snohomish Counties) The Conservation Futures Tax (CFT) is provided for in Chapter 84.34 of the Revised Code of Washington. Snohomish County imposes a Conservation Futures levy at a rate of $0.0625 per $1,000 assessed value for the purpose of acquiring open space lands, including green spaces, greenbelts, wildlife habitat and trail rights -of -way proposed for preservation for public use by either the county or the cities within the county. Funds are allocated annually, and cities within the county, citizen groups and citizens may apply for funds through the county's process. The CFT program for each county provides grants to cities to support open space priorities in local plans. FEDERAL & STATE GRANTS AND CONSERVATION PROGRAMS Rivers, Trails and Conservation Assistance Program The Rivers, Trails and Conservation Assistance Program, also known as the Rivers &Trails Program or RTCA, is a technical assistance resource for communities administered by the National Park Service and federal government agencies so they can conserve rivers, preserve open space and develop trails and greenways. The RTCA program implements the natural resource conservation and outdoor recreation mission of NPS in communities across America. Community Development Block Grants These funds are intended to develop viable urban communities by providing decent housing and a suitable living environment, and by expanding economic opportunities, principally for low and moderate income persons. Snohomish County, in partnership with 18 cities and towns within the county through an interlocal agreement, receives CDBG funds on an entitlement basis as an Urban County Consortium. The county administers this funding on behalf of the consortium through the Snohomish County Office of Housing and Community Development (OHCD). CDBG funds can be used for a wide variety of projects, services, facilities and infrastructure. North American Wetlands Conservation Act Grants Program The North American Wetlands Conservation Act of 1989 provides matching grants to organizations and individuals who have developed partnerships to carry out wetland conservation projects in the United States, Canada, and Mexico for the benefit of wetlands - associated migratory birds and other wildlife. Two competitive grants programs exist (Standard and a Small Grants Program) and require that grant requests be matched by partner contributions at no less than a 1-to-1 ratio. Funds from U.S. Federal sources may contribute toward a project, but are not eligible as match. DRAFT 225 Packet Pg. 374 DRAFT s•1.b The Standard Grants Program supports projects in Canada, the United States, and Mexico that involve long-term protection, restoration, and/or enhancement of wetlands and associated uplands habitats. The Small Grants Program operates only in the United States; it supports the same type of projects and adheres to the same selection criteria and administrative guidelines as the U.S. Standard Grants Program. However, project activities are usually smaller in scope and involve fewer project dollars. Grant requests may not exceed $75,000, and funding priority is given to grantees or partners new to the Act's Grants Program. Recreation and Conservation Office Grant Programs The Recreation and Conservation Office was created in 1964 as part of the Marine Recreation Land Act. The RCO grants money to state and local agencies, generally on a matching basis, to acquire, develop, and enhance wildlife habitat and outdoor recreation properties. Some money is also distributed for planning grants. RCO grant programs utilize funds from various sources. Historically, these have included the Federal Land and Water Conservation Fund, state bonds, Initiative 215 monies (derived from unreclaimed marine fuel taxes), off -road vehicle funds, Youth Athletic Facilities Account and the Washington Wildlife and Recreation Program. Aquatic Lands Enhancement Account (ALEA) This program, managed through the RCO, provides matching grants to state and local agencies to protect and enhance salmon habitat and to provide public access and recreation opportunities on aquatic lands. In 1998, DNR refocused the ALEA program to emphasize salmon habitat preservation and enhancement. However, the program is still open to traditional water access proposals. Any project must be located on navigable portions of waterways. ALEA funds are derived from the leasing of state-owned aquatic lands and from the sale of harvest rights for shellfish and other aquatic resources. Washington Wildlife & Recreation Program (WWRP) The RCO is a state office that allocates funds to local and state agencies for the acquisition and development of wildlife habitat and outdoor recreation properties. Funding sources managed by the RCO include the Washington Wildlife and Recreation Program. The WWRP is divided into Habitat Conservation and Outdoor Recreation Accounts; these are further divided into several project categories. Cities, counties and other local sponsors may apply for funding in urban wildlife habitat, local parks, trails and water access categories. Funds for local agencies are awarded on a matching basis. Grant applications are evaluated once each year, and the State Legislature must authorize funding for the WWRP project lists. Land and Water Conservation Fund The Land and Water Conservation Fund (LWCF) provides grants to buy land and develop public outdoor facilities, including parks, trails and wildlife lands. Grant recipients must provide at least 50% matching funds in either cash or in -kind contributions. Grant program revenue is from a portion of Federal revenue derived from sale or lease of off -shore oil and gas resources. National Recreational Trails Program The National Recreational Trails Program (NRTP) provides funds to maintain trails and facilities that provide a backcountry experience for a range of activities including hiking, mountain biking, horseback riding, motorcycling, and snowmobiling. Eligible projects include the maintenance and re-routing of recreational trails, development of trail -side and trail -head facilities, and operation of environmental education and trail safety programs. A local match of 20% is required. This program is funded through Federal gasoline taxes attributed to recreational non - highway uses. Youth Athletic Facilities (YAF) Program The YAF provides grants to develop, equip, maintain, and improve youth and community athletic facilities. Cities, counties, and qualified non-profit organizations may apply for funding, and grant recipients must provide at least 50% matching funds in either cash or in -kind contributions. 226 Packet Pg. 375 8.1.b EdmondS 2022 PRO Puget Sound Acquisition and Restoration Fund Grants are awarded by the Salmon Recovery Funding Board for acquisition or restoration of lands directly correlating to salmon habitat protection or recovery. Projects must demonstrate a direct benefit to fish habitat. "There is no match requirement for design -only projects; acquisition and restoration projects require a 15% match.lhe funding source includes the sale of state general obligation bonds, the federal Pacific Coastal Salmon Recovery Fund and the state Puget Sound Acquisition and Restoration Fund. STP Regional Competition - Puget Sound Regional Council Surface Transportation Program (STP) funds are considered the most "flexible" funding source provided through federal transportation funding. Every two years the Puget Sound Regional Council conducts a competitive grant program to award FHWA Surface Transportation Program (STP) and Congestion Mitigation and Air Quality (CMAQ) funds. These funds are awarded at the Regional level by PSRC and at the countywide level by the Infrastructure Coordinating Committee (ICC). The ICC is a standing sub -committee of Snohomish County Tomorrow (SCT) comprised of public works representatives of the cities, the County and the Tulalip Tribe; representatives from the PUD, the Washington State Department of Transportation, Port of Everett, and local transit agencies. For the Countywide STP/CMAQcompetitions, the policy focus is on providing transportation improvements to a center or centers and the corridors that serve them. Centers are defined as regional growth and regional manufacturing/industrial centers, centers as designated through countywide processes, town centers, military bases/facilities and other local centers OTHER METHODS & FUNDING SOURCES Metropolitan Park District Metropolitan park districts may be formed for the purposes of management, control, improvement, maintenance and acquisition of parks, parkways and boulevards. In addition to acquiring and managing their own lands, metropolitan districts may accept and manage park and recreation lands and equipment turned over by any city within the district or by the county. Formation of a metropolitan park district may be initiated in cities of five thousand population or more by city council ordinance, or by petition, and requires majority approval by voters for creation. Park and Recreation District Park and recreation districts may be formed for the purposes of providing leisure -time activities and recreation facilities (parks, playgrounds, pools, golf courses, paths, community centers, arboretums, campgrounds, boat launches, etc.) and must be initiated by petition of at least 15% percent of the registered voters within the proposed district. Upon completion of the petition process and review by county commissioners, a proposition for district formation and election of five district commissioners is submitted to the voters of the proposed district at the next general election. Once formed, park and recreation districts retain the authority to propose a regular property tax levy, annual excess property tax levies and general obligation bonds. All three of these funding types require 60% percent voter approval and 40% percent voter turnout. With voter approval, the district may levy a regular property tax not to exceed sixty cents per thousand dollars of assessed value for up to six consecutive years. Park and Recreation Service Area (PRSA) Purpose to finance, acquire, construct, improve, maintain or operate any park, senior citizen activities center, zoo, aquarium and/or recreation facilities; and to provide higher level of park service. The Northshore Parks and Recreation Service Area, which owns the Northshore Senior Center building, is located east of Edmonds. DRAFT 227 Packet Pg. 376 DRAFT Business Sponsorships/Donations Business sponsorships for programs may be available throughout the year. In -kind contributions are often received, including food, door prizes and equipment/ material. Interagency Agreements State law provides for interagency cooperative efforts between units of government. Joint acquisition, development and/or use of park and open space facilities may be provided between Parks, Public Works and utility providers. Private Grants, Donations & Gifts Many trusts and private foundations provide funding for park, recreation and open space projects. Grants from these sources are typically allocated through a competitive application process and vary dramatically in size based on the financial resources and funding criteria of the organization. Philanthropic giving is another source of project funding. Efforts in this area may involve cash gifts and include donations through other mechanisms such as wills or insurance policies. Community fundraising efforts can also support park, recreation or open space facilities and projects. The Community Foundation of Snohomish County also offers small grants ($500 - $5,000) to qualified non- profit organizations (501(c)(3)) or public agencies such as local government, schools, libraries or parks. ACQUISITION TOOLS & METHODS DIRECT PURCHASE METHODS Market Value Purchase Through a written purchase and sale agreement, the city purchases land at the present market value based on an independent appraisal. Timing, payment of real estate taxes and other contingencies are negotiable. Partial Value Purchase (or Bargain Sale) In a bargain sale, the landowner agrees to sell for less than the property's fair market value. A landowner's decision to proceed with a bargain sale is unique and personal; landowners with a strong sense of civic pride, long community history or concerns about capital gains are possible candidates for this approach. In addition to cash proceeds upon closing, the landowner may be entitled to a charitable income tax deduction based on the difference between the land's fair market value and its sale price. Life Estates & Bequests In the event a landowner wishes to remain on the property for a long period of time or until death, several variations on a sale agreement exist. In a life estate agreement, the landowner may continue to live on the land by donating a remainder interest and retaining a "reserved life estate." Specifically, the landowner donates or sells the property to the city, but reserves the right for the seller or any other named person to continue to live on and use the property. When the owner or other specified person dies or releases his/her life interest, full title and control over the property will be transferred to the city. By donating a remainder interest, the landowner may be eligible for a tax deduction when the gift is made. In a bequest, the landowner designates in a will or trust document that the property is to be transferred to the city upon death. While a life estate offers the city some degree of title control during the life of the landowner, a bequest does not. Unless the intent to bequest is disclosed to and known by the city in advance, no guarantees exist with regard to the condition of the property upon transfer or to any liabilities that may exist. 228 Packet Pg. 377 8.1.b Edf11OW 2022 PRO Gift Deed When a landowner wishes to bequeath their property to a public or private entity upon their death, they can record a gift deed with the county assessors office to insure their stated desire to transfer their property to the targeted beneficiary as part of their estate. the recording of the gift deed usually involves the tacit agreement of the receiving party. Option to Purchase Agreement this is a binding contract between a landowner and the city that would only apply according to the conditions of the option and limits the seller's power to revoke an offer. Once in place and signed, the Option Agreement may be triggered at a future, specified date or upon the completion of designated conditions. Option Agreements can be made for any time duration and can include all of the language pertinent to closing a property sale. Right of First Refusal In this agreement, the landowner grants the city the first chance to purchase the property once the landowner wishes to sell. the agreement does not establish the sale price for the property, and the landowner is free to refuse to sell it for the price offered by the city. this is the weakest form of agreement between an owner and a prospective buyer. Conservation and/or Access Easements through a conservation easement, a landowner voluntarily agrees to sell or donate certain rights associated with his or her property (often the right to subdivide or develop), and a private organization or public agency agrees to hold the right to enforce the landowner's promise not to exercise those rights. In essence, the rights are forfeited and no longer exist. this is a legal agreement between the landowner and the city that permanently limits uses of the land in order to conserve a portion of the property for public use or protection. The landowner still owns the property, but the use of the land is restricted. Conservation easements may result in an income tax deduction and reduced property taxes and estate taxes. Typically, this approach is used to provide trail corridors where only a small portion of the land is needed or for the strategic protection of natural resources and habitat. through a written purchase and sale agreement, the city purchases land at the present market value based on an independent appraisal. Timing, payment of real estate taxes and other contingencies are negotiable. Park or Open Space Dedication Requirements Local governments have the option to require developers to dedicate land for parks under the State Subdivision Law (Ch. 58.17 RCW) and the State Environmental Policy Act (SEPA) (Ch. 43.21C RCW). Under the subdivision law developers can be required to provide the parks/recreation improvements or pay a fee in lieu of the dedicated land and its improvements. Under the SEPA requirements, land dedication may occur as part of mitigation for a proposed development's impact. LANDOWNER INCENTIVE MEASURES Density Bonuses Density bonuses are a planning tool used to encourage a variety of public land use objectives, usually in urban areas. They offer the incentive of being able to develop at densities beyond current regulations in one area, in return for concessions in another. Density bonuses are applied to a single parcel or development. An example is allowing developers of multi -family units to build at higher densities if they provide a certain number of low-income units or public open space. For density bonuses to work, market forces must support densities at a higher level than current regulations. Transfer of Development Rights The transfer of development rights (TDR) is an incentive -based planning tool that allows land owners to trade the right to develop property to its fullest extent in one area for the right to develop beyond existing regulations in another area. Local governments may establish the specific areas in which development may be limited or restricted and the areas in which development beyond regulation may be allowed. Usually, but not always, the "sending" and "receiving" property are under common ownership. Some programs allow for different ownership, which, in effect, establishes a market for development rights to be bought and sold. DRAFT 229 Packet Pg. 378 DRAFT s•1.b IRC 1031 Exchange If the landowner owns business or investment property, an IRC Section 1031 Exchange can facilitate the exchange of like -kind property solely for business or investment purposes. No capital gain or loss is recognized under Internal Revenue Code Section 1031 (see www.irc.gov for more details). This option may be a useful tool in negotiations with an owner of investment property, especially if the tax savings offset to the owner can translate to a sale price discount for the City. Current (Open Space) Use Taxation Programs Property owners whose current lands are in open space, agricultural, and/or timber uses may have that land valued at their current use rather than their "highest and best" use assessment. This differential assessed value, allowed under the Washington Open Space Taxation Act (Ch.84.34 RCW) helps to preserve private properties as open space, farm or timber lands. If land is converted to other non -open space uses, the land owner is required to pay the difference between the current use annual taxes and highest/best taxes for the previous seven years. When properties are sold to a local government or conservation organization for land conservation/preservation purposes, the required payment of seven years worth of differential tax rates is waived. The amount of this tax liability can be part of the negotiated land acquisition from private to public or quasi -public conservation purposes. Snohomish County has four current use taxation programs that offer this property tax reduction as an incentive to landowners to voluntarily preserve open space, farmland or timber land on their property. OTHER LAND PROTECTION OPTIONS Land Trusts & Conservancies Land trusts are private non-profit organizations that acquire and protect special open spaces and are traditionally not associated with any government agency. Forterra is the regional land trust serving the Edmonds area, and their efforts have led to the conservation of more than 234,000 acres of forests, farms, shorelines, parks and natural areas in the region (www.forterra.org). Other national organizations with local representation include the Nature Conservancy, Trust for Public Land and the Wetlands Conservancy. Regulatory Measures A variety of regulatory measures are available to local agencies and jurisdictions. Available programs and regulations include: Critical Areas Ordinance, Edmonds; State Environmental Policy Act (SEPA); Shorelines Management Program; and Hydraulic Code, Washington State Department of Fisheries and Department of Wildlife. Public/Private Utility Corridors Utility corridors can be managed to maximize protection or enhancement of open space lands. Utilities maintain corridors for provision of services such as electricity, gas, oil, and rail travel. Some utility companies have cooperated with local governments for development of public programs such as parks and trails within utility corridors. 230 Packet Pg. 379 8.1. b E D� Packet Pg. 380 8.2 City Council Agenda Item Meeting Date: 02/1/2022 Enterprise Resource Planning System (ERP) Replacement: Action Items Staff Lead: Megan Menkveld Department: Administrative Services Preparer: Megan Menkveld Background/History The City of Edmonds' financial system, Eden, is a twenty -year -old system that is being phased out by Tyler Technologies. They are instructing customers to begin their search for a new system. The COVID-19 pandemic has created an urgent need for a comprehensive, cloud -based solution to ensure timely and accurate budget preparation as well as maintaining regular finance functions. Employees need to be able to work from home for an indefinite amount of time, as their job allows, to ensure the City stays operable. Staff Recommendation 1. Staff is requesting that City Council authorize the Mayor to execute an agreement for implementation of OpenGov's Budget Suite for a fixed -fee five year SaaS contract of $67,822 per year and a $55,500 one-time implementation fee for a five-year total of $394,610 using ARPA funds. 2. Staff is requesting that City Council waive RFP purchasing requirements for ERP replacement. Narrative Product selection for an ERP system is detailed and complex and requires a significant amount of staff effort across departments. The execution of a RFP takes about six months, and the implementation can take years. Due to limited City staff resources, a contracted project manager is necessary to coordinate and lead the search and then manage the implementation. Due to the urgency placed by the COVID-19 pandemic emergency and other factors, staff recommends waiving RFP requirements for the ERP system(RCW 39.04.280). Instead staff will do its due diligence in making a selection. In order to expedite necessary changes, staff recommends implementing the OpenGov Budget Suite first, which attaches to any ERP system, while the search continues for a full ERP replacement. The budget is touched and seen by potentially hundreds of people, and the Budget Suite addresses access and collaboration issues resulting from the pandemic. It can be deployed at anytime, regardless of ERP. OpenGov's Budget Suite is the only integrated cloud solution for operating budget development, capital and workforce planning, and online budget book creation. This multi -tenant Software -as -a -Service solution connects stakeholders to the budget process, engages them for real-time feedback, accurately forecasts personnel costs, and integrates with the City's current financial system (Eden), resulting in improved outcomes, enhanced internal efficiencies, and more time for strategic planning. The integrated suite aggregates and synchronizes financial and non -financial data providing a means of storing informational documentation pertinent to the budget. The product streamlines and transforms Packet Pg. 381 8.2 the budget process from the initial stages of planning and personnel forecasting on through final publication while enabling collaboration throughout. The OpenGov Reporting and Transparency Platform, part of the Budget Suite, simplifies and streamlines the collection, analysis, and communication of complex information. This solution reduces manual reporting, data scrubbing, and formatting by providing on -demand access to dynamic, interactive reports and dashboards. Simple, self-service tools empower anyone with access to the platform to perform analysis without burdening technical teams, making it easier to discover trends, provide historical context, and find anomalies quickly. OpenGov allows limitless users. Staff will continue with the search for a project manager and ERP system and bring separate recommendations to Council. The total cost for this OpenGov Budget Suite fixed -fee five-year software as a service (SaaS) contract is $67,822 per year and a $55,500 one-time deployment fee for a five-year total of $394,610. Staff proposes utilizing ARPA Funds as it meets the spending criteria, mitigating employee exposure to events like COVID-19, by providing a telework infrastructure, remote access to City Council, and a tool for better communication and public access to the final budget. Attachments: OpenGov Order Form Contract and Statement of Work Council Presentation February 12022 Packet Pg. 382 OpenGov Inc. PO Box41340CZ)OPENGOV San Jose CA 95160 United States Order Number: Q002997 Prepared By: Andrew Kercado Created On: 01/20/2022 Email: akercado@opengov.com Quote Expiration Date: 02/01/2022 Contract Term: 60 Months Subscription Start Date: 02/01/2022 Subscription End Date: 01/31/2027 ICustomer Information Customer: City of Edmonds, WA Contact Name: Dave Turley Bill To/Ship To: 121 Fifth Avenue North, 1 st Floor, Edmonds, Email: dave.turley@edmondswa.wa.us Washington 98020 United States IOrder Details Billing Frequency: Annual Payment Terms: Net 30 SOFTWARE SERVICES: Software Annual Total: $67,822.00 PROFESSIONAL SERVICES: Product / Service Start Date Total Amount Professional Services Deployment - Prepaid 02/01/2022 $55,500.00 Services Total Amount: $55,500.00 Order Form Legal Terms Welcome to OpenGov! Thanks for using our Software Services. This Order Form is entered into between OpenGov, Inc., with its principal place of business at PO Box 41340, San Jose, CA 95160 ("OpenGov"), and you, the entity identified above ("Customer"), as of the Effective Date. This Order Form includes and incorporates the OpenGov Software Services Agreement ("SSA") attached, or if no such SSA is attached, the SSA available at https:Hopengov.com/tenns-of-service and the applicable Statement of Work ("SOW") incorporated herein in the event Professional Services are purchased. The Order Form, SSA and SOW shall hereafter be referred to as the "Agreement". Unless otherwise specified above, fees for the Software Services and Professional Services shall be due and payable, in advance, on the Effective Date. By signing this Agreement, Customer acknowledges that it has reviewed, and agrees to be legally bound by, the OpenGov Terms and Conditions. Each party's acceptance of this Agreement is conditional upon the other's acceptance of the terms in the Agreement to the exclusion of all other terms. City of Edmonds, WA OpenGov, Inc. Signature: Signature: Name: Name: Title: Title: Sign Date: Countersign Date: Billing/Service Periods: Period 1 February 1, 2022 $123,322.00 Period 2 February 1, 2023 $67,822.00 Period 3 February 1, 2024 $67,822.00 Period 4 February 1, 2025 $67,822.00 Period 5 February 1, 2026 $67,822.00 https://opengov.com 11 1 Packet Pg. 383 8.2.a OPENGOV SOFTWARE SERVICES AGREEMENT OPENGOV SOFTWARE SERVICES AGREEMENT This Software Services Agreement (this "Agreement") is entered into by OpenGov, Inc., a Delaware corporation with a principal place of business at 6525 Crown Blvd #41340, San Jose, CA 95160 ("OpenGov") and the customer listed on the signature block below ("Customer"), as of the date of last signature below (the "Effective Date"). This Agreement sets forth the terms under which Customer will be permitted to use OpenGov's hosted software services. DEFINITIONS "Customer Data" means data that is provided by Customer to OpenGov pursuant to this Agreement (for example, by email or through Customer's software systems of record). Customer Data shall not include any confidential personally identifiable information. "Documentation" means the documentation for the Software Services at the Customer Resource Center page found at https:Hopengov.zendesk.com. "Feedback" means suggestions, comments, improvements, ideas, or other feedback or materials regarding the Software Services provided by Customer to OpenGov, including feedback provided through online developer community forums. "Initial Term" means the initial license term specified in number of years on the Order Form, commencing on the Effective Date. "Intellectual Property Rights" means all intellectual property rights including all past, present, and future rights associated with works of authorship, including exclusive exploitation rights, copyrights, and moral rights, trademark and trade name rights and similar rights, trade secret rights, patent rights, and any other proprietary rights in intellectual property of every kind and nature. "Order Form" means OpenGov's Software Services order form that: (a) specifies the Software Services provided by OpenGov; (b) references this Agreement; and (c) is signed by authorized representatives of both parties. "Renewal Term" means each additional renewal period, which shall be for a period of equal duration as the Initial Term, for which this Agreement is extended pursuant to Section 7.2. SOFTWARE SERVICES, SUPPORT AND PROFESSIONAL SERVICES 2.1 Software Services. Subject to the terms and conditions of this Agreement, OpenGov will use commercially reasonable efforts to perform the software services identified in the applicable Order Form entered into by OpenGov and Customer ("Software Services"). 2.2 Support & Service Levels. Customer support is available by email to support@opengov.com or by using the chat messaging functionality of the Software Services, both of which are available during OpenGov's standard business hours. Customer may report issues any time. However, OpenGov will address issues during business hours. OpenGov will provide support for the Software Services in accordance with the Support and Software Service Levels found at https://opengov.com/service-sla, as long as Customer is entitled to receive support under the applicable Order Form and this Agreement. 2.3 Professional Services. (a) If OpenGov or its authorized independent contractors provides professional services to Customer, such as implementation services, then these professional services will be described in a statement of work ("SOW") agreed to by the parties (the "Professional Services"). Unless otherwise specified in the SOW, any pre -paid Professional Services Fees must be utilized within one (1) year from the Effective Date. Any unused pre -paid Professional Services Fees shall be forfeited. (b) Unless the SOW provides otherwise, all reasonable travel expenses, pre -approved by Customer and incurred by OpenGov in performing the professional services will be reimbursed by Customer. Travel expenses Rev. 2018.01_210428 Packet Pg. 384 8.2.a OPENGOV SOFTWARE SERVICES AGREEMENT include cost of coach airfare travel round trip from the individual's location to Customer's location, reasonable hotel accommodations, ground transportation and meals. 3. RESTRICTIONS AND RESPONSIBILITIES 3.1 Restrictions. Customer may not use the Software Services in any manner or for any purpose other than as expressly permitted by the Agreement. Customer shall not, and shall not permit or enable any third party to: (a) use or access any of the Software Services to build a competitive product or service; (b) modify, disassemble, decompile, reverse engineer or otherwise make any derivative use of the Software Services (except to the extent applicable laws specifically prohibit such restriction); (c) sell, license, rent, lease, assign, distribute, display, host, disclose, outsource, copy or otherwise commercially exploit the Software Services; (d) perform or disclose any benchmarking or performance testing of the Software Services; (e) remove any proprietary notices included with the Software Services; (f) use the Software Services in violation of applicable law; or (g) transfer any confidential personally identifiable information to OpenGov or the Software Services platform. 3.2 Responsibilities. Customer shall be responsible for obtaining and maintaining computers and third party software systems of record (such as Customer's ERP systems) needed to connect to, access or otherwise use the Software Services. Customer also shall be responsible for: (a) ensuring that such equipment is compatible with the Software Services, (b) maintaining the security of such equipment, user accounts, passwords and files, and (c) all uses of Customer user accounts by any party other than OpenGov. 4. INTELLECTUAL PROPERTY RIGHTS; LICENSE GRANTS; ACCESS TO CUSTOMER DATA 4.1 Software Services. OpenGov retains all right, title, and interest in the Software Services and all Intellectual Property Rights in the Software Services. The look and feel of the Software Services, including any custom fonts, graphics and button icons, are the property of OpenGov and Customer may not copy, imitate, or use them, in whole or in part, without OpenGov's prior written consent. Subject to Customer's obligations under this Agreement, OpenGov hereby grants to Customer a non-exclusive, royalty -free license during the Term to use the Software Services. 4.2 Customer Data. Customer retains all right, title, and interest in the Customer Data and all Intellectual Property Rights therein. Customer hereby grants to OpenGov a non-exclusive, royalty -free license to, and permit its partners (which include, without limitation the hosting providers of the Software Services) to, use, store, edit and reformat the Customer Data, and to use Customer Data for purposes of sales, marketing, business development, product enhancement, customer service, or for analyzing such data and publicly disclosing such analysis ("Insights"), provided that in all such uses Customer Data is rendered anonymous such that Customer is no longer identifiable. 4.3 Access to Customer Data. Customer may download the Customer Data from the Software Services at any time during the Term, other than during routine software maintenance periods. OpenGov has no obligation to return Customer Data to Customer. 4.4 Feedback. Customer hereby grants to OpenGov a non-exclusive, royalty -free, irrevocable, perpetual, worldwide license to use and incorporate into the Software Services and Documentation Customer's Feedback. OpenGov will exclusively own any improvements or modifications to the Software Services and Documentation based on or derived from any of Customer's Feedback including all Intellectual Property Rights in and to the improvements and modifications. 5. CONFIDENTIALITY 5.1 Each party (the "Receiving Party") agrees not to disclose any Confidential Information of the other party (the "Disclosing Party") without the Disclosing Party's prior written consent, except as provided below. The Receiving Party further agrees: (a) to use and disclose the Confidential Information only in connection with this Agreement; and (b) to protect such Confidential Information using the measures that Receiving Party employs with respect to its own Confidential Information of a similar nature, but in no event with less than reasonable care. Notwithstanding the above, the Receiving Party may disclose Confidential Information to the extent required by law or court order, provided that prior written notice of such required disclosure and an opportunity to oppose or limit disclosure is given to the Disclosing Party. Rev. 2018.01_210428 Packet Pg. 385 8.2.a OPENGOV SOFTWARE SERVICES AGREEMENT 5.2 "Confidential Information" means all confidential business, technical, and financial information of the disclosing party that is marked as "Confidential" or an equivalent designation or that should reasonably be understood to be confidential given the nature of the information and/or the circumstances surrounding the disclosure (including the terms of the applicable Software Agreement). OpenGov's Confidential Information includes, without limitation, the software underlying the Software Services and all Documentation. 5.3 Notwithstanding the foregoing, "Confidential Information" does not include: (a) "Public Data," which is data that the Customer has previously released to the public, would be required to release to the public, upon request, according to applicable federal, state, or local public records laws, or Customer requests OpenGov make available to the public in conjunction with the Software Services. Confidential Information does not include (b) information that has become publicly known through no breach by the receiving party; (c) information that was rightfully received by the Receiving Party from a third party without restriction on use or disclosure; or (d) information independently developed by the Receiving Party without access to the Disclosing Party's Confidential Information. 6. PAYMENT OF FEES 6.1 Fees; Invoicing; Payment; Expenses. (a) Fees. The fees for the Software Services for the Initial Term and any Renewal Term ("Software Services Fees") and the fees for Professional Services ("Professional Services Fees") are set forth in the applicable Order Form. Software Services Fees and Professional Services Fees shall hereafter be referred to as "Fees". Except to the extent otherwise expressly stated in this Agreement or in an Order Form, (i) all obligations to pay Fees are non - cancelable and all payments are non-refundable, (ii) Customer must pay all Fees due under all Order Forms and SOW within thirty (30) days after Customer receives each invoice (invoices are deemed received when OpenGov emails them to Customer's designated billing contact); (iii) the Software Service Fee shall be due annually in advance, and (iv) Customer must make all payments without setoffs, withholdings or deductions of any kind. (b) Annual Software Maintenance Price Adjustment. OpenGov shall increase the Fees payable for the Software Services during any Renewal Term by 5% each year of the Renewal Term. (c) Invoicing and Payment. OpenGov will invoice the Customer according to the Billing Frequency listed on the Order Form. Customer shall pay all invoices according to the Payment Terms listed on the Order Form. (d) Travel Expenses. Unless the SOW provides otherwise, OpenGov will invoice Customer for travel expenses, pre -approved by the Customer, incurred in connection with each SOW as they are incurred. Customer shall pay all such valid invoices within thirty (30) days of receipt of invoice. Each invoice shall include receipts for the travel expenses listed on the invoice. (e) Customer Delays; On Hold Fee I. On Hold Notice. Excluding delays caused by Force Majeure as described in Section 10.5, if OpenGov determines that Customer's personnel or contractors are not completing Customer's responsibilities described in the applicable SOW timely or accurately, OpenGov shall promptly, but in no event more than thirty (30) days from the date of such determination deliver to Customer a notice (an "On Hold Notice") that (A) designates the Professional Services to be provided to the Customer as "On Hold", (B) detail Customer's obligations and responsibilities necessary for OpenGov to continue performing the Professional Services, and (C) specify the Customer shall be invoiced for lost time in production (e.g. delayed or lost revenue resulting from rescheduling work on other projects, delay in receiving milestone payments from Customer, equipment, hosting providers and human resources idle) for a fee equal to 10% of the first year Software Service Fee (the "On Hold Fee"). II. Effects of On Hold Notice. Upon issuing an On Hold Notice, OpenGov shall be entitled, without penalty, to (A) reallocate resources otherwise reserved for the performance of the Professional Services, and (B) stop or caused to be stopped the Professional Services to be provided to the Customer until the Customer has fulfilled its obligations as set forth in the On Hold Notice. OpenGov shall remove the "On Hold" status, only upon Customer's fulfillment of its obligations set out in the On Hold Notice, including payment of the On Hold Rev. 2018.01_210428 Packet Pg. 386 8.2.a OPENGOV SOFTWARE SERVICES AGREEMENT Fee. Upon Customer's fulfillment of its obligations in the On Hold Notice, OpenGov may, in its sole discretion, extend the timeline to complete certain Professional Services up to six (6) weeks, depending on the availability of qualified team resources (OpenGov cannot guarantee that these team resources will be the same as those who were working on the project prior to it being placed On Hold). OpenGov shall bear no liability or otherwise be responsible for delays in the provision of the Professional Services occasioned by Customer's failure to complete Customer's responsibilities or adhere to a Customer schedule which were brought to the attention of the Customer on a timely basis, unless such delays result, directly or indirectly from the failure of OpenGov or its authorized independent contractors to perform the Professional Services in accordance with this Agreement or applicable SOW. 6.2 Consequences of Non -Payment. If Customer fails to make any payments required under any Order Form or SOW, then in addition to any other rights OpenGov may have under this Agreement or applicable law, (a) Customer will owe late interest penalty of 1.5% of the outstanding balance per month, or the maximum rate permitted by law, whichever is lower and (b) If Customer's account remains delinquent (with respect to payment of a valid invoice) for thirty (30) days after receipt of a delinquency notice from OpenGov, which may be provided via email to Customer's designated billing contact, OpenGov may temporarily suspend Customer's access to the Software Service for up to ninety (90) days to pursue good faith negotiations before pursuing termination in accordance with Section 7. Customer will continue to incur and owe all applicable Fees irrespective of any such Service suspension based on such Customer delinquency. 6.3 Taxes. All Fees under this Agreement are exclusive of any applicable sales, value-added, use or other taxes ("Sales Taxes"). Customer is solely responsible for any and all Sales Taxes, not including taxes based solely on OpenGov's net income. If any Sales Taxes related to the Fees under this Agreement are found at any time to be payable, the amount may be billed by OpenGov to, and shall be paid by, Customer. If Customer fails to pay any Sales Taxes, then Customer will be liable for any related penalties or interest, and will indemnify OpenGov for any liability or expense incurred in connection with such Sales Taxes. In the event Customer or the transactions contemplated by the Agreement are exempt from Sales Taxes, Customer agrees to provide OpenGov, as evidence of such tax exempt status, proper exemption certificates or other documentation acceptable to OpenGov. TERM & TERMINATION 7.1 Term. Subject to compliance with all terms and conditions, the term of this Agreement shall commence on the Effective Date and shall continue until the Subscription End Date specified on the Order Form (the "Initial Term") unless sooner terminated pursuant to Section 7.3 below. 7.2 Renewal. This Agreement shall automatically renew for another period of the same duration as the Initial Term (the "Renewal Term" and together with the Initial Term, the "Term"), unless either party notifies the other party of its intent not to renew this Agreement in writing no less than thirty (30) days before the end of the Initial Term. 7.3 Termination. Neither party shall have the right to terminate this Agreement without a legally valid cause. If either party materially breaches any term of this Agreement and fails to cure such breach within thirty (30) days after notice by the non -breaching party (ten (10) days in the case of non-payment), the non -breaching party may terminate this Agreement. 7.4 Effect of Termination. (a) In General. Upon termination pursuant to Section 7.3 or expiration of this Agreement pursuant to Section 7.1: (a) Customer shall pay in full for all Software Services and Professional Services performed up to and including the effective date of termination or expiration, (b) all Software Services provided to Customer hereunder shall immediately terminate; and (c) each party shall return to the other party or, at the other party's option, destroy all Confidential Information of the other party in its possession. (b) Deletion of Customer Data. Unless otherwise requested pursuant to this Section 7.4(b), upon the expiration or termination of this Agreement the Customer Data, excluding any Insights, shall be deleted pursuant to OpenGov's standard data deletion and retention practices. Upon written request, Customer may request deletion of Customer Data, excluding any Insights, prior to the date of termination or expiration of this Agreement. Such Rev. 2018.01_210428 Packet Pg. 387 8.2.a OPENGOV SOFTWARE SERVICES AGREEMENT request must be addressed to "OpenGov Vice President, Customer Success" at OpenGov's address for notice described at Section 10. 7.5 Survival. The following sections of this Agreement shall survive termination: Section 5 (Confidentiality), Section 6 (Payment of Fees), Section 7.4(b) (Deletion of Customer Data), Section 8.3 (Warranty Disclaimer), Section 9 (Limitation of Liability) and Section 10 (Miscellaneous). 8. REPRESENTATIONS AND WARRANTIES; DISCLAIMER 8.1 By OpenGov. (a) General Warranty. OpenGov represents and warrants that: (i) it has all right and authority necessary to enter into and perform this Agreement; and (ii) the Professional Services, if any, will be performed in a professional and workmanlike manner in accordance with the related statement of work and generally prevailing industry standards. For any breach of the Professional Services warranty, Customer's exclusive remedy and OpenGov's entire liability will be the re -performance of the applicable services. If OpenGov is unable to re -perform all such work as warranted, Customer will be entitled to recover all fees paid to OpenGov for the deficient work. Customer must make any claim under the foregoing warranty to OpenGov in writing within ninety (90) days of performance of such work in order to receive such warranty remedies. (b) Software Services Warranty. OpenGov further represents and warrants that for a period of ninety (90) days, the Software Services will perform in all material respects in accordance with the Documentation. The foregoing warranty does not apply to any Software Services that have been used in a manner other than as set forth in the Documentation and authorized under this Agreement. OpenGov does not warrant that the Software Services will be uninterrupted or error -free. Any claim submitted under this Section 8.1(b) must be submitted in writing to OpenGov during the Term. OpenGov's entire liability for any breach of the foregoing warranty is to repair or replace any nonconforming Software Services so that the affected portion of the Software Services operates as warranted or, if OpenGov is unable to do so, terminate the license for such Software Services and refund the pre- paid, unused portion of the Fee for such Software Services. 8.2 By Customer. Customer represents and warrants that (i) it has all right and authority necessary to enter into and perform this Agreement; and (ii) OpenGov's use of the Customer Data pursuant to this Agreement will not infringe, violate or misappropriate the Intellectual Property Rights of any third party. 8.3 Disclaimer. OPENGOV DOES NOT WARRANT THAT THE SOFTWARE SERVICES WILL BE UNINTERRUPTED OR ERROR FREE; NOR DOES IT MAKE ANY WARRANTY AS TO THE RESULTS THAT MAY BE OBTAINED FROM USE OF THE SOFTWARE SERVICES. EXCEPT AS SET FORTH IN THIS SECTION 8, THE SOFTWARE SERVICES ARE PROVIDED "AS IS" AND OPENGOV DISCLAIMS ALL OTHER WARRANTIES, EXPRESS OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, IMPLIED WARRANTIES OF MERCHANTABILITY, TITLE, FITNESS FOR A PARTICULAR PURPOSE, AND NON -INFRINGEMENT. 9. LIMITATION OF LIABILITY 9.1 By Type. NEITHER PARTY, NOR ITS SUPPLIERS, OFFICERS, AFFILIATES, REPRESENTATIVES, CONTRACTORS OR EMPLOYEES, SHALL BE RESPONSIBLE OR LIABLE WITH RESPECT TO ANY SUBJECT MATTER OF THIS AGREEMENT UNDER ANY CONTRACT, NEGLIGENCE, STRICT LIABILITY, OR OTHER THEORY: (A) FOR ERROR OR INTERRUPTION OF USE OR FOR LOSS OR INACCURACY OF DATA OR COST OF PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES OR LOSS OF BUSINESS; (B) FOR ANY INDIRECT, EXEMPLARY, PUNITIVE, INCIDENTAL, SPECIAL, OR CONSEQUENTIAL DAMAGES; OR (C) FOR ANY MATTER BEYOND SUCH PARTY'S REASONABLE CONTROL, EVEN IF SUCH PARTY HAS BEEN ADVISED OF THE POSSIBILITY OF SUCH LOSS OR DAMAGE. 9.2 By Amount. IN NO EVENT SHALL EITHER PARTY'S AGGREGATE, CUMULATIVE LIABILITY FOR ANY CLAIMS ARISING OUT OF OR IN ANY WAY RELATED TO THIS AGREEMENT EXCEED THE FEES PAID BY CUSTOMER TO OPENGOV (OR, IN THE CASE OF CUSTOMER, PAYABLE) FOR THE SOFTWARE SERVICES UNDER THIS AGREEMENT IN THE 12 MONTHS PRIOR TO THE ACT THAT GAVE RISE TO THE LIABILITY. 9.3 Limitation of Liability Exclusions. The limitations of liability set forth in Sections 9.1 and 9.2 above do not apply to, and each party accepts liability to the other for: (a) claims based on either party's intentional breach of its Rev. 2018.01_210428 Packet Pg. 388 8.2.a OPENGOV SOFTWARE SERVICES AGREEMENT obligations set forth in Section 5 (Confidentiality), (b) claims arising out of fraud or willful misconduct by either party and (c) either party's unauthorized use, distribution, or disclosure of the other party's intellectual property. 9.4 No Limitation of Liability by Law. Because some jurisdictions do not allow liability or damages to be limited to the extent set forth above, some of the above limitations may not apply to Customer. 10. MISCELLANEOUS 10.1 Logo Use. OpenGov shall have the right to use and display Customer's logos and trade names for marketing and promotional purposes in connection with OpenGov's website and marketing materials, subject to Customer's trademark usage guidelines provided to OpenGov. 10.2 Notice. Ordinary day-to-day operational communications may be conducted by email, live chat or telephone communications. However, for notices, including legal notices, required by the Agreement (in Sections where the word "notice" appears) the parties must communicate more formally in a writing given by personal delivery, by pre- paid first-class mail or by overnight courier to the address specified in the most recent Order Form (or such other address as may be specified in writing in accordance with this Section). 10.3 Anti -corruption. OpenGov has not offered or provided any bribe, kickback, illegal or improper payment, gift, or thing of value to any Customer personnel in connection with the Agreement, other than reasonable gifts and entertainment provided Customer in the ordinary course of business. If OpenGov become aware of any violation of the above restriction then OpenGov shall promptly notify Customer. 10.4 Injunctive Relief. The parties acknowledge that any breach of the confidentiality provisions or the unauthorized use of a party's intellectual property may result in serious and irreparable injury to the aggrieved party for which damages may not adequately compensate the aggrieved party. The parties agree, therefore, that, in addition to any other remedy that the aggrieved party may have, it shall be entitled to seek equitable injunctive relief without being required to post a bond or other surety or to prove either actual damages or that damages would be an inadequate remedy. 10.5 Force Maieure. Neither party shall be held responsible or liable for any losses arising out of any delay or failure in performance of any part of this Agreement, other than payment obligations, due to any act of god, act of governmental authority, or due to war, riot, labor difficulty, failure of performance by any third -party service, utilities, or equipment provider, or any other cause beyond the reasonable control of the party delayed or prevented from performing. 10.6 Severability; Waiver. If any provision of this Agreement is found to be unenforceable or invalid, that provision will be limited or eliminated to the minimum extent necessary so that this Agreement will otherwise remain in full force and effect and enforceable. Any express waiver or failure to exercise promptly any right under this Agreement will not create a continuing waiver or any expectation of non -enforcement. There are no third -party beneficiaries to this Agreement. 10.7 Assignment. Except as set forth in this Section, neither party shall assign, delegate, or otherwise transfer this Agreement or any of its rights or obligations to a third party without the other party's prior written consent, which consent shall not be unreasonably withheld, conditioned, or delayed. Either party may assign, without such consent but upon written notice, its rights and obligations under this Agreement to: (i) its corporate affiliate; or (ii) any entity that acquires all or substantially all of its capital stock or its assets related to this Agreement, through purchase, merger, consolidation, or otherwise. Any other attempted assignment shall be void. This Agreement shall inure to the benefit of and bind each party's permitted assigns and successors. 10.8 Independent Contractors. No agency, partnership, joint venture, or employment is created as a result of this Agreement and neither party has any authority of any kind to bind the other party in any respect. 10.9 Attorneys' Fees. In any action or proceeding to enforce rights under this Agreement, the prevailing party will be entitled to recover costs and attorneys' fees. 10.10Governing Law and Jurisdiction. This Agreement shall be governed by the laws of the State of California without regard to its conflict of laws provisions. Exclusive jurisdiction for litigation of any dispute, controversy or claim arising out of or in connection with this Agreement shall be only in the Federal or State court with competent Rev. 2018.01_210428 Packet Pg. 389 OPENGOV SOFTWARE SERVICES AGREEMENT 8.2.a jurisdiction located in San Mateo County, California, and the parties hereby submit to the personal jurisdiction and venue therein. 10.11 Complete Agreement. This Agreement is the complete and exclusive statement of the mutual understanding of the parties and supersedes and cancels all previous written and oral agreements, communications, and other understandings relating to the subject matter of this Agreement. No modification of this Agreement will be binding, unless in writing and signed by an authorized representative of each party. [SIGNATURE PAGE TO FOLLOW] Rev. 2018.01_210428 Packet Pg. 390 8.2.a OPENGOV SOFTWARE SERVICES AGREEMENT Signatures Customer: Signature: Name: OPENGOV, INC. Signature: Name: Title: Title: Date: Date: [SIGNATURE PAGE TO OPENGOV SOFTWARE SERVICES AGREEMENT] Rev. 2018.01_210428 Packet Pg. 391 8.2.a (2)OPENGOV Statement of Work City of Edmonds, WA Created by: Ariana Tuckey Creation Date: 01/20/22 Document Number: DD-02316 Version Number: 2 Overview 2 Preamble 2 Methodology 3 Project Initiation 4 Best Practice Review 4 Configuration 4 Validation 4 Deploy 5 Project Completion 5 Project Schedule 5 Roles and Responsibilities 6 Roles and Responsibilities Matrix 6 Governance 8 Regular Communication Components 8 Commitment to Project Direction and Goals 10 Escalation Process 10 Process 10 Escalation Requirements 10 Documentation 11 General Project Commitments 11 Project Scope 12 OpenGov Reporting & Transparency Platform 12 OpenGov Reporting & Transparency Platform Project Deliverables 12 1 Packet Pg. 392 8.2.a Q OPENGOV Project Tasks 12 Initiate 12 Best Practices 13 Configuration 13 Validation 14 Deploy 14 OpenGov Budgeting & Planning 15 Budget & Planning Project Deliverables 15 Project Tasks - Budgeting and Planning 15 Initiate 15 Best Practices 17 Configure 17 Validation 19 Deploy 19 Financial Integration 20 Financial Integration Deliverables 20 Financial Integration Tasks 20 Initiate 20 Configuration 21 Validation 21 Deploy 22 Acceptance 22 Acceptance Process 22 Acceptance Requirements 23 Change Management 23 1. Overview 1.1. Preamble This Statement of Work ("SOW") identifies services that OpenGov, Inc. ("OpenGov" or "we") will perform for City of Edmonds, WA ("Customer" or "you") pursuant to that order for Professional Services entered into between OpenGov and the Customer ("Order Form") which references the Software Services Agreement or other applicable agreement entered into by the parties (the "Agreement"). • Customer's use of the Professional Services are governed by the Agreement and not this SOW. • Upon execution of the Order Form or other documentation referencing the SOW, this 2 Packet Pg. 393 8.2.a Q OPENGOV SOW shall be incorporated by reference into the Agreement. In the event of any inconsistency or conflict between the terms and conditions of this SOW and the Agreement, the terms and conditions of this SOW shall govern with respect to the subject matter of this SOW only. Unless otherwise defined herein, capitalized terms used in this SOW shall have the meaning defined in the Agreement. This SOW may not be modified or amended except in a written agreement signed by a duly authorized representative of each party. openGov will be deployed as is, Customer has access to all functionality available in the current release. Initiation rt Validation> > Deploy Project Completion Initiation Best Practice Review Validation Go Llve Project Completl on Key Activitles: Learn Ing and appl lcation of Best Key Activities: Practices, Hands-on Workshops, Admin Tral ning Key ActMdea: Key Activities: System Key Activkles: Fl naI Introductions, project plan Key Work Products: Document Request Configuratlon Review, In use Acceptance, Transition to review, establish charter Checklists. Solutlon Recommendation, Data Map, user Acceptance Testing, Customer Success and plan timelines Solutlon Document Data ConfIrmatlon, User Key Work Products: Manager and Technical Training Projectt7ocumentatlon Support, Feedback survey Key Work Products: Roles and responsibilities Configuration Key Work products: Data Key Work Products: Project Overview, Project Plan, Key Activities: Applicatlan and Sol utlon Valldatlon, Customer Acceptance, Trgnsltion Charter and Schedule Configuratlon, Initial Data Migration Review Key Wark Products: Solution ConSguratlan. Peer Review, Solution Documernt 2. Methodology OpenGov's deployment methodology, often referred to as the OpenGov Way ("OG Way"), delivers on OpenGov's mission to power more effective and accountable governments.'It is an innovative, modern, and iterative approach that leads our customers to successfully deploy our products and help them successfully achieve their vision. The OG Way differentiates itself in the market by its foundation of customer empowerment. We rely on our years of experience working with governments, leading in governments, and leveraging best practices from the public and private sector in order to coach our customers through the change management needed to leverage our best practices and quality software. This methodology requires a degree of focus and engagement to ensure collaboration between both parties to produce the desired results in a timely manner. We look forward to our partnership and can't wait to show you how The OG Way will improve the way you do business and the services you're able to provide to your citizens! 3 Packet Pg. 394 8.2.a Q OPENGOV Project Initiation During project initiation, we will introduce project resources, review the products and services purchased, finalize project timelines, and conduct the kickoff meeting. Both OpenGov and Customer are responsible for assigning their Project Managers for the project. We will hold a planning meeting to review all project documents OpenGov has received to date. We'll also provide additional worksheets that need to be included. We'll set-up meetings to finalize the project plan and ensure there is a centralized location for these documents to be stored for collaboration. Lastly, we'll determine the date for the larger kickoff meeting and discuss the agenda for this critical meeting. Best Practice Review • OpenGov will provide your team with access to OG University and OpenGov's Resource Center so that you can start learning. • Provided checklists with samples of data and information that we'll need completed. We will obtain all data and integration information at this time in our standard format. • We will review your agency -specific documents to validate your business requirements. • We will then coach you on our best practices by showing you how our tool works in the most effective manner. • Based on our best practices review, we'll make solution recommendations based on our domain expertise. • We'll align with your team based on our understanding of your operating processes based on technical requirements and product functionality. • We'll review all data and integration requirements. A data map will be mutually agreed upon and signed off on by Customer. • We'll present a solution document to be mutually agreed upon prior to starting the configuration. Configuration • We will set-up the base configuration based on the mutually agreed upon solution document. • We will mutually configure the use cases based on the mutually agreed upon solution document. • We will migrate your data based on our mutually agreed upon data map. Validation • Review the completed work performed during configuration. 4 Packet Pg. 395 8.2.a Q OPENGOV • The appropriate members of the Customer project team will confirm that the solution has been configured correctly based on the solution and data mapping documents by testing the use of the solution. • Training will be provided based on the selected package, or as set forth herein. • Any items that were configured or migrated incorrectly based on the data map and solution document will be tracked via an issue log. We will work with your team to identify deployment critical issues that will be worked out prior to launch. If the item is not included in the mutually agreed upon data map and solution document, a mutually agreed upon change order will be discussed as defined in Section 10 Change Management of this SOW. • The exit criteria for this phase is the sign off by the Customer's Project Manager of the configuration based on the mutually agreed upon solution and data map as defined in Section 9 Acceptance of this SOW. Deploy • The solution is usable by Customer. Project Completion • Customer is sent a project acceptance form to sign as defined in Section 9 Acceptance of this SOW. • Customer will be asked to respond to a brief survey to provide feedback about the experience. • Customer is introduced to Customer Support and educated on how to engage with customer support based on Customer's procured package. 3. Project Schedule OpenGov will schedule resources for this project upon signature of the order form. Unless specifically noted, the OpenGov assigned project manager (as identified below or such alternate designated by OpenGov, the "OpenGov Project Manager") will work with Customer Project Manager to develop the project schedule for all requested deliverables under this SOW. OpenGov reserves the right to adjust the schedule based on the availability of OpenGov resources and/or Customer resources, and the timeliness of deliverables provided by the Customer. 5 Packet Pg. 396 8.2.a Q OPENGOV 4. Roles and Responsibilities 4.1. Roles and Responsibilities Matrix OpenGov Role Role Description Executive Sponsor Responsible for ensuring alignment on project value proposition ("ES") and vision. Escalation point for Customer Executive Sponsor to mitigate any risks that the project team cannot resolve. Executive Sponsor attends monthly (or other frequency) executive meetings to review deployment status, documented issue list, status and closure summary. Project Manager Responsible for the delivery of the professional services based ("PM") upon the agreed upon contract and SOW within the budgeted hours and timeframe. Ensures the project is properly forecasted, assigns tasks/resources, and tracks toward project completion. Holds executive steering committee meetings and/or quarterly business reviews as appropriate to ensure project issues are properly escalated and success is achieved. Facilitates the transition to support. Analyst ("IA") Responsible for helping Customer configure OpenGov's product suites as assigned. The Analyst is the primary consultant, guiding Customer through configuration working sessions to put together successful workflows. Subject Matter OpenGov Subject Matter Experts ("SMEs") will engage in Expert ("SME") strategy, design, and execution discussions internally and with Customer during the deployment. The SME has a specific area of expertise, and depending on the scope of the project more than one SME may engage. The SME will not be on all working sessions, but will be involved per the direction of the OpenGov Project Manager. Integration Engineer Responsible for migrations, conversions, and integrations as ("IE") assigned. Responsible for providing clear direction on specifications to ensure proper delivery of migration, conversions, and integrations. Clear data mapping and data validation to be provided with customer sign -offs obtained by the OpenGov Project Manager. Account Executive The Account Executive is responsible for the sales cycle. Aligning 6 Packet Pg. 397 8.2.a Q OPENGOV ("AE") on program vision, value proposition, and contract terms. The Account Executive will facilitate project kickoff along with the OpenGov Project Manager. The Account Executive will be engaged with the customer throughout theirjourney with OpenGov, post -deployment and beyond. Customer Manager The Customer Manager ("CM") is the primary customer ("CM") relationship holder post -Deploy. The "Air Traffic Controller" or "Quarterback" of OpenGov resources with focus on long term success of Customer's partnership with OpenGov. The CM will engage with Customer to discuss adoption strategy and conduct periodic reviews to ensure Customer's key stakeholders understand all OpenGov offerings and how they align to key Customer priorities. The CM will be introduced at deployment kick-off, but will not be an active participant in deployment working sessions. As the deployment approaches closure, the CM's engagement will ramp -up, and the OpenGov Project Manager to CM meeting with Customer will occur prior to Project Completion. Customer Role Role Description Budget Owner ("BO") The Customer Budget Owner commits the funds to the project deployment, assesses the value to the cost (ROI), and approves changes orders. In some cases, the Budget Owner and Executive Sponsor are the same person. Executive Sponsor Responsible for ensuring Customer team is aligned to core ("ES") project value proposition and goals. Able to intervene if the project goes off track, and has ability to make decisions on timeline and budget when decisions are stalled. The Executive Sponsor is not expected to regularly attend deployment working sessions. Executive Sponsors, attend monthly (or other frequency) executive meetings to review deployment status, documented issue list, status and closure summary. Project Manager Serves as the primary contact for OpenGov Project Initiation, ("PM") Best Practice Review, Configuration, Validation, Deploy, Project Completion. Coordinates meetings and schedules. Controls communication between the Customer and OpenGov project teams. Project Lead ("PL") Is an internal SME in the functional area of deployment. Attends working sessions, trainings, and responsible for reviewing E a) .W c 0 U Q c a� E as a as a w U) c .E c a. a� 0 m m .Q L r w L 0 4- 0 r c as E L r c 0 U E L 0 U_ E 0 0 c� c a� Q. 0 c m E ca a Packet Pg. 398 8.2.a Q OPENGOV configurations. Primary OpenGov counterpart will be the Analyst. Data and Responsible for mapping out data infrastructure and validating SystemsLead ("DSL") migration, conversion, integration requirements. Someone who is able to connect OpenGov team with any of Customer's third -party data sources and vendors as needed to fulfill SOW requirements. 5. Governance Project Governance provides the foundation and framework to manage deployments by assessing progress and addressing questions and challenges during the course of deployment. OpenGov follows three guiding principles for governance to maximize the deployment value with our customers: • Regular communication aligned to the agreed upon project plan and timing will occur. OpenGov expects our customers to raise questions or concerns as soon as they arise. OpenGov will do the same, as we can only address items when known. • Executive involvement is expected from both OpenGov and Customer. Not only may Executives be called upon to clarify expectations and/or confusion, but also to steer strategic items to maximize the value through the deployment. • Commitment to the direction outlined in this SOW and critical assessment change orders to ensure they drive value. 5.1. Regular Communication Components s Packet Pg. 399 8.2.a Q OPENGOV Statement Bi-Annually Review of PM, ES, PM, BO. Committee milestones per AE, CM ES commercial agreement, review budget and fiscal matters. Discuss strategic direction from deployment, alignment of OpenGov with Customer's 3-year roadmap, evaluate potential shift in strategy and impact to relationship Executive Sponsor Meeting Monthly / Discuss PM, ES, PM, ES, Bi-Monthly deployment: plus plus - Strategic others as others as impacts: timing, necessary necessary scope, process - Value prop changes, confusion - Project specific: items that need guidance, support and/or clarity Weekly Deployment Updates Weekly Summary of Project Project project actions Team + Team + against project ES(s) ES(s) plan. Risks and achievements highlighted in addition to asks of leadership. E as c 0 r U Q c a� E a� a a w E as U) .E c a. a� 0 U) a) as �L a L c w L 0 0 c as E as L r 0 U E 0 w as E L 0 0 c� c a� Q. 0 c m E ca a Packet Pg. 400 8.2.a Q OPENGOV 5.2. Commitment to Project Direction and Goals This SOW is the direction agreed upon by Customer and OpenGov. Transparency of the plan is paramount for our Customers to attain the value the SOW or any subsequent change order outlines. Should direction of the deployment become disconnected, OpenGov and Customer Project Managers will outline the gaps as they understand them and communicate the gaps to their respective Executive Sponsor(s) (or Project Teams) for discussion and resolution. The communication path for this engagement will be outlined in the kick off meeting, documenting both phone numbers and email. The general path is: OpenGov Project Manager --+ Professional Services Sr. Manager / SVP , Executive Sponsor 6. Escalation Process The purpose of this section is to define the escalation process, should it be needed, to support closing issues that are raised, discussed to move forward with the deployment. OpenGov and Customer agree to raise concerns and follow the escalation process, resource responsibility, and documentation. 6.1. Process • Identification of an issue impeding deployment progress, outcome or capturing the value proposition, that is not acceptable. • Customer or OpenGov Project Manager summarizes the problem statement and impasse. • Customer and OpenGov Project Managers will outline solution, acceptance or schedule Executive review in accordance with SLA as defined in Section 7 General Project Assumptions. • Resolution will be documented and signed off following Executive review in accordance with SLA as defined in Section 7 General Project Assumptions. 6.2. Escalation Requirements • OpenGov and Customer Project Managers will summarize the impasse and recommendation to present at scheduled or ad hoc executive meetings. Unless otherwise noted in this SOW, Customer Project Manager can approve how hours are used, but not where funding is required. 10 Packet Pg. 401 8.2.a Q OPENGOV • Executive Sponsors attend monthly (or other frequency) executive meetings to review deployment status, documented issue list, status, and closure summary. • Steering Committees, where applicable, will be the arbitrator to direction and issue closure. Unless otherwise noted in this SOW, the Customer Executive Sponsor must approve change orders that result in additional cost. • Customer or OpenGov Subject Matter Experts may be requested to provide input to the issue and assist in closure. Both Customer and OpenGov will make best effort to enable those Subject Matter Experts to be available and participate. 6.3. Documentation • Issue Escalation: Problem Statement with clear impact to the deployment and/or engagement. • Acceptance Document: Which will include any change order(s) or other process adjustments required and summary of the resolution. • Notes from Project Meetings, Executive Reviews, and Steering Committee meetings, as appropriate. 7. General Project Commitments OpenGov is excited to work with Customer on the implementation of our OpenGov ERP Cloud. In order to ensure we are able to meet the project timeline and ensure Customer is successful in this implementation, OpenGov asks that Customer abide by the General Assumptions detailed in this SOW. • This SOW is limited to the Implementation of the OpenGov Cloud as defined in the Project Scope. Any additional services or support will be considered out of scope. • Customer will commit and provide access to all necessary stakeholders and subject matter experts, and other key parties whose roles are defined in Section 4.1, necessary to the successful implementation of the OpenGov ERP Cloud as defined in this SOW. • Customer is responsible for internal change management associated with the purchase of new software. • Response Protocol o OpenGov and Customer commit to responding to inquiries, updates, or any other project -related matters in no more than 10 business days throughout the course of this project. If Customer is delayed in its response, Customer acknowledges that: a) the delay may impact the project schedule; and b) any fees for Professional Services due to OpenGov after such delay shall become due and OpenGov may invoice Customer for such prepayment. 11 Packet Pg. 402 8.2.a Q OPENGOV o As set forth in Section 6.1(e) of the Agreement, if extended delays in Customer responsiveness are encountered, OpenGov may opt to put the project into an "On Hold" status, which includes causing OpenGov to stop or cause to be stopped the Professional Services to be provided to the Customer, until the Customer has fulfilled its obligations set forth in the On Hold Notice as described in the Agreement. o The Professional Services will be provided during regular business hours (8am to 6pm Pacific Time) Monday through Friday (holidays excluded). • SOW Expiration: o This SOW is valid for up to 90 days from the Creation Date, or as agreed to in writing by OpenGov and Customer. 8. Project Scope 8.1. OpenGov Reporting & Transparency Platform 8.1.1. OpenGov Reporting & Transparency Platform Project Deliverables OpenGov Cloud based Reporting & Transparency Platform that includes: Reporting & • Stories Transparency • Open Town Hall Platform • Reporting • Dashboards • Transparency Portal 8.1.2. project Tasks The tasks listed below are required for OpenGov and Customer to successfully complete the OpenGov Reporting & Transparency Platform implementation. 8.1.2.1. Initiate Provisioning OpenGov will provision Customer's OpenGov entity and verify Customer R&T Platform has access to all purchased modules. 12 Packet Pg. 403 8.2.a Q OPENGOV OpenGov University Platform Training OpenGov will provide access to OpenGov University online training courses intended to teach users on the basics of the Reporting & Transparency Platform. Stories and OpenGov will build out an example of a Story: Open Town • One standard story based on available templates in OpenGov. Hall Examples OpenGov will build out an example of a topic in Open Town Hall. Initial Data OpenGov will upload any applicable datasets to the OpenGov Platform. Migration • Base Budget File • Historical Budget and Transactions Files, including beginning balances • Budget Reference Year data files OpenGov will accept flat files such as CSV, Text, and/or Excel 8.1.2.2. Best Practices FunctionalityDescription Overview of OpenGov assesses and identifies how best to configure and map data Best Practice to ensure success based on materials provided by Customer. Stories and The Implementation Analyst will conduct a review of the examples Open Town created. Hall Review Solution OpenGov will present a solution document to be mutually agreed upon Document prior to beginning configuration. 8.1.2.3. Configuration Chart of OpenGov will review and give feedback on Customer's general ledger Accounts chart of accounts OpenGov will provide a functional build of the proposed OpenGov Chart of Accounts, and gain sign off on acceptance from Customer. OpenGov will configure OpenGov Chart of Accounts in OpenGov system OpenGov OpenGov will: Reports I • Setup 3 OpenGov reports (Annual, Budget to Actuals, and 13 Packet Pg. 404 8.2.a Q OPENGOV Transactions) 8.1.2.4. Validation 8.1.2.5. Deploy Functionality Description Training OpenGov will review configured story and train Customer on how to: Stories • Create new stories • Update/Maintain current stories • Publish internally and externally Training Open OpenGov will present configured Open Town Hall site and theme. Town Hall OpenGov will train Customer on Open Town Hall functionality Training OpenGov will review configured OpenGov reports. OpenGov OpenGov will train Customer on report: Reports • Configuration • Update/Maintenance • Publishing internally and externally Training OpenGov will review configured Dashboards Dashboards OpenGov will train Customer on Dashboard: • Configuration • Update/Maintenance • Publishing internally and externally Platform OpenGov will review configured COA and uploaded data. Training OpenGov will train Customer on Platform maintenance:: • Users • Uploading data • Maintaining COA Sign Off Customer will sign off that they have: 14 Packet Pg. 405 8.2.a Q OPENGOV • Configured Story • Configured Open Town Hall • Configured OpenGov reports • Been trained on Stories, Open Town Hall, OpenGov reports, Dashboards 8.2. OpenGov Budgeting & Planning 8.2.1. Budget & Planning Project Deliverables OpenGov Budgeting & Planning Suite, includes: Budgeting & • Operating Budget Planning Suite • Workforce Planning • Capital Improvement Project Budgeting • Online Budget Book • Budget Reporting 8.2.2. Project Tasks - Budgeting and Planning The tasks and responsibilities listed below are required for OpenGov and Customer to successfully complete the OpenGov Budgeting and Planning Suite implementation. 8.2.2.1. Initiate Functionality Description Documentation Customer to provide OpenGov: Receipt • Budget export • Examples of the documentation currently provided to department, • Budget schedule, • Management budget reports example OpenGov During the initial phase, OpenGov will provide system training to University administrators. Budget Training will include: Training • How to create 15 Packet Pg. 406 8.2.a Q OPENGOV • a budget • a proposal • a worksheet • add a line item • reselect line items • submit a budget • Reporting overview • Stories overview • Open Town Hall overview • Workforce Planning Overview Budget and OpenGov will build out examples of best practices for budgeting Workforce solutions: Solution Examples Operating • 2 budget instances in OpenGov • 2 proposals for each budget instance (Traditional and OpenGov) • 3 budget reports • Operating Budget Development • Operating Budget Details • Operating Budget Categories • 1 budget story for review Capital • 1 budget instances in OpenGov • 2 proposals • 3 budget reports • Capital Budget Development • Capital Budget Details • Capital Budget Categories • 1 capital story for review Workforce Planning Shell • 4 Standard cost elements • Wages • Insurance • Retirement • Taxes Online Budget OpenGov will build out: Book Examples • Look and feel of Online Budget Book • Best practice templates for: • Table of Contents • Budget message • Introduction • Revenue and Expenditure Assumptions E as c 0 U Q c a� a a w E m U) a� c .E c a. a� 0 U) a� a� �L Q L c w L 0 0 c a� E as L r c 0 U E 0 w L as E L 0 0 c� c a� Q. 0 c a� E �a a 16 Packet Pg. 407 8.2.a Q OPENGOV o Budget Summary o Departmental Information o Debt 8.2.2.2. Best Practices Functionality Description Overview of OpenGov assesses and identifies how best to configure and map data Best Practice to ensure success based on materials provided by Customer. Budget and The Implementation Analyst will conduct a review of the examples Workforce created and work with the customer to confirm a budget format on Solution which to move forward. Online Budget The Implementation Analyst will conduct review of Online Budget Book Book Solution templates and work with Customer to confirm format and approach. Solution OpenGov will present a solution document to be mutually agreed upon Document prior to beginning configuration. 8.2.2.3. Configure Base Budget OpenGov will configure and upload Customer's base budget file into File OpenGov. Budget I Based on the Review and Confirmation phase OpenGov OpenGov will Configuration setup Customer's preferred budget format: Operating • 1 Budget instance • 2 Proposals (Department) • Corresponding worksheets (single, fund, division, or function) • 1 standard budget Story template Capital • 1 Budget instance • 2 Proposals (Department or Project) • Corresponding worksheets (single, fund, division, or function) • 1 standard capital Story template 17 Packet Pg. 408 8.2.a Q OPENGOV Based on the review of the Workforce Planning Shell and with the guidance of the Implementation Analyst, Customer will: • Buildout remaining cost elements • Populate position template • Validate Workforce calculation Budget OpenGov will hold working sessions between the Implementation Configuration Analyst and Customer for the purpose of validating, reviewing, and Working iterating upon draft budget instances. Session will focus on: Sessions • Set up • Structure • Workflow • Useraccess Administrator OpenGov will provide 1, 60-Minute training sessions to enable Budget Customer's Budget Administrators to manage and maintain their Management OpenGov budgets including: Training • User access • Approval workflow • Cloning • Phases • Proposal status Dataset and OpenGov will set up 1 export and dataset view to enable budget reports View Configuration Budget OpenGov will set up 8 budget reports to include: Report(s) Operating • Operating Budget Milestones • Operating Budget Development • Operating Budget Details • Operating Budget Categories Capital • Capital Budget Development • Capital Budget Details • Capital Budget Categories • Capital Plan Report Budget OpenGov will provide 1, 60-Minute training sessions to enable Exports and Customer to own, manage and maintain their OpenGov Budget Data Reporting and Reports including: Training • Exports E as c 0 U Q c a� E as a as a w E as U) c .E c a as 0 U) a� as �L Q L as r c w L 0 4- 0 c as E as L c 0 U E 0 U- 0 L 0 0 c� c a� Q. 0 c m E ca a 18 Packet Pg. 409 8.2.a Q OPENGOV • Dataset views • Reports Online Budget OpenGov will setup 3 OpenGov standard Online Budget Book templates Book chosen from examples defined above. Configuration and Training Once templates are finalized, OpenGov will: Session • Create one Story shell for each department and fund from templates. (Department or fund can be substituted for another template listed above) • Create up to 2 reports for use in the Online Budget Book • Create OpenGov report views and add report tiles to created templates. Administrator training o One 60-Minute session for training: ■ Using and Copying Templates ■ How Datasets and Reports work in Stories ■ How the Online Budget Book works with Transparency Portal ■ Preparing for updating and ongoing use • OpenGov will provide working sessions for OpenGov to consult with Customer on Online Budget Book, scheduled as needed. (Not to exceed more than 10 sessions unless agreed upon by openGov Project Manager and Customer.) Customer administrators will set up additional project story shells and corresponding project users, and admins/users will add content 8.2.2.4. Validation Validation of The OpenGov Project Manager and Analyst will confirm with Configured Customer's Project Lead that all budget proposals are configured Budgets properly based on the agreed upon format. 8.2.2.5. Deploy Internal OpenGov will provide 1, 60-Minute training sessions to enable Budget User Customer's internal users to understand budgeting requirements. 19 Packet Pg. 410 8.2.a Q OPENGOV Training Sign Off Customer will provide written sign off that all Budgets and reports have been configured based on agreed upon formats. 8.3. Financial Integration 8.3.1. Financial Integration Deliverables Financial I OpenGov will work with Customer's IT Staff and Project Team to setup a Integration one way data integration from Tyler Eden to OpenGov 8.3.2. Financial Integration Tasks The tasks listed below are required for OpenGov and Customer to successfully complete the Financial Integrations with OpenGov. 8.3.2.1. initiate Solution OpenGov will review the proposed solution with Customer Review • Functionalities to be Integrated o Actuals (Revenue and Expenses) o Budget • Integration Approach o Database Connect / Agent Install • OpenGov Assumes: o The data will be linked to the Customer's COA. o Integration is unidirectional from the Customer's accounting software into OpenGov. Data Analysis OpenGov will perform the data analysis • To align with the required functionalities • To align with the COA 20 Packet Pg. 411 8.2.a Q OPENGOV 8.3.2.2. Configuration Integration OpenGov will perform the following Setup • Installation of Agent • Database View Deployment • OpenGov Assumes: o OpenGov will require assistance from Customer to understand source system specific customizations and configurations when building the data extract. When OpenGov is not able to access or extract data as per requirements, Customer should provide the data files in CSV format into OpenGov FTP Location. When the source accounting software is hosted by a third party vendor on behalf of Customer, Customer is responsible for brokering OpenGov's access to Customer's data residing at the vendor's premises in accordance with OpenGov's data formatting requirements. Configuration OpenGov will perform the Configuration to and Testing • Extract, Transform (when required) and load the data • Build Reports for the required functionalities • Initial validation of data 8.3.2.3. Validation Data Validation OpenGov team to work with Customer to • Validate the historical data • Validate the current year data • OpenGov Assumes: o Customer will provide data to validate against (PDF Export). Data should be received prior to the start of the integration. o OpenGov will perform the validation for data accuracy for the Integration, workingjointly with Customer team to approve the Financial Integration data. 21 Packet Pg. 412 8.2.a Q OPENGOV 8.3.2.4. FunctionalityDescription Deployment OpenGov will perform the Configuration to and Wrap Up • Schedule the current year data load • Train the administrators • Monitor the data load Sign Off Customer will complete OpenGov-provided sign off document acknowledging • Accuracy of the data for historical years and current year associated with the functionalities • Accuracy Reports associated with the functionalities • Adequately trained on the Integration Functionalities 9. Acceptance 9.1. Acceptance Process All Deliverables require acceptance from the Customer Project Manager(s) following the completion of Deliverables and upon Project Closure. Customer is responsible for conducting any additional review or testing of such Deliverable pursuant to any applicable mutually agreed upon acceptance criteria agreed upon by the parties for such Deliverable. Upon completion of these phases, the OpenGov Project Manager shall notify the Customer Project Manager(s) and provide the necessary documents for review and sign off. The following process will be used for accepting or acknowledging Deliverables and Project Closure: • OpenGov shall submit the completed Deliverables to Customer to review or test against the applicable acceptance criteria. Customer shall notify OpenGov promptly of its acceptance or rejection in accordance with the agreed upon acceptance criteria. • Customer must accept all Deliverables that meet the applicable acceptance criteria. OpenGov Project Manager will provide the Customer Project Manager with the OpenGov Acceptance form to sign off on the Deliverable and project. Once all Deliverables required to meet a particular phase have been accepted or are deemed accepted, the phase shall be deemed complete. 22 Packet Pg. 413 8.2.a Q OPENGOV • Upon completion of the phase or project, OpenGov allows Customer 10 business days to communicate that the particular Deliverable(s) does not meet Customer's requirements. Failure to communicate that the particular Deliverable(s) does not meet Customer's requirements will be deemed as acceptance and any further work provided to remedy Customer's complaint might incur additional cost. • Customer shall provide to OpenGov a written notice detailing the reasons for rejection and the nature of the failure to meet the acceptance criteria. OpenGov shall make best effort to revise the non -conforming Deliverable(s) to meet the acceptance criteria and re -submit it to Customer for further review and testing. • If the acceptance form is not received in accordance with Section 7 General Project Assumptions, the project phase and/or project will be considered accepted and automatically closed. 9.2. Acceptance Requirements • All acceptance milestones and associated review periods will be tracked on the project plan. • The Customer Project Manager will have decision authority to approve/reject all project Deliverables, Phase Acceptance and Project Acceptance. • Any open issues shall receive a response in accordance with Section 7 General Assumptions of this SOW following the Validation Acceptance review, or as mutually agreed upon between the parties, for resolution prior to advancing on in the project. • Both OpenGov and Customer recognize that failure to complete tasks and respond to open issues may have a negative impact on the project. • For any tasks not yet complete, OpenGov and/or Customer will provide sufficient resources to expedite completion of tasks to prevent negatively impacting the project. 10. Change Management This SOW and related efforts are based on the information provided and gathered by OpenGov. Customer acknowledges that changes to the scope may require additional effort or time, resulting in additional cost. Any change to scope must be agreed to in writing or email, by both Customer and OpenGov, and documented as such via a: • Change Order -Work that is added to or deleted from the original scope of this SOW. Depending on the magnitude of the change, it may or may not alter the original contract amount or completion date and be paid for by Customer. Changes might include: 23 Packet Pg. 414 8.2.a Q OPENGOV • Timeline for completion • Sign off process • Cost of change and Invoice timing • Signed by OpenGov and Customer Executives approving funds. Change documentation will be mutually agreed upon as defined in Section 7 General Assumptions of this SOW. Should that not occur, the change will be added to the next Executive Sponsor agenda for closure. Example of changes that might arise during a deployment: • Amending the SOW to correct an error. • Extension of work as the complexity identified exceeds what was expected by Customer or OpenGov. • Change in type of OpenGov resources to support the SOW. 24 Packet Pg. 415 Replacement of Enterprise Resource Planning Software (Eden) Action Items February 1, 2022 Packet Pg. 416 Action Items E 1. Authorize the Mayor to execute an agreement for implementation of OpenGov's Budget Suite for a fixed -fee five-year SaaS N contract of $67,822 per year and a $55,500 one-time implementation fee for a five-year total of $394,610 using ARPA funds a. 2. Waive RFP purchasing requirements for ERP replacement. L 0 N d d N •L Q HRIS Waiver of RFP's Ledgerl Payroll (Employee Utility Billing w Self -Service) N N O N ERP Planning & Implementation (12 months +) L, c� FBudget or Budget Module Planning, Implementation & Training c o te c a� January March May July September December L a c February April June August November 2023 0 U Packet Pg. 417 Action Item 1: Authorize the Mayor to execute an agreement for implementation of OpenGov's Budget Suite for a fixed -fee five-year SaaS contract of $67,822 per year and a $55,500 one-time implementation fee for a five-year total of $394,610 using ARPA funds. Order Form: gnature Required U OPENGOV Oedw N.mbem 00029W Created O.: 01 M022 Q..re Ezpir .D.re: 0201R022 S.bsw:ptio. S... Dam: 02N12022 S.b-Apd.. E.d D.tra 31/ LS027 c.anmg r.rA�oo Cmr.mex: Cdy.f P.dm..ds, LVA NU TarSbrp To: 121 Piah Av North, 3sr Plow, P.dmands, Wwhi.Sm.9&020 Un sm.. ai.2.e. F0D 4,340 sa.3..�cA 9srdo ❑mo-as�m. R_.eed ar: A.drearRncado Email: a6—A.Aopmgovcom C.eeaer Team: MM—t C—. Name: m.e T.aer Email:dave.m.leyg drm.dsra.wa.us o:aw nw>mr. ]rilli.g Feeq.e.ey: A.e.el F..­ Teewe: No 30 S017[lTA1rE SExrTCES. Pmd.ctl5mui� Sdn Dam PadDm A®a1PQ a�d`urm .Fm�,.,m�ar�e4m raa,:Hmt �amas��a�+d+ �ohnma ohrihrzm� rsi,eexm s.rr...a.A.t,..tT.rd: 8 'sn.00 MOl SSLONAE SERVICES: Pmdocr r Ss.s. S—Er 'T.mlAmvmd - rss soo..o s.r.—T.t.rAm.>mt: Sss,soa.m Included in the Agenda Packet Service Agreement: LL Signature Required OPENGOV SOFTWARE SERVICES AGREEMENT This Software Services Agreement (this "Agreement") is entered into by OpenGov. Inc_, a Delaware corporation with a pimp place of business at 6525 Craw. Blvd #4134ft, San Jose, CA 95160 ("OperrGrn!'] and the customer listed on the signature block below (`Customer"), as of the date of last signature below (the "Effective Date'). This Agreement setsfodterms under the teunder which Customer will be permitted to use OpenG-. hosted software services_ 1_ DERNITIONS "Customer Data' means data that is provided by Cuslomer to Openi pursuant to this Agreement (fur example, by email or through Customer's software systems of record). Customer Data shall not include any mnfrdential personally idenhhahle infonrhation_ "Documentation' mems the documentation for the Software Services at the Customer Resource Center page found at htpsJlopergov.zmdesk.com. 'Feedback' means suggestions, comments, improvements, ideas, a other feedback or materials regarding the Software Services provided by Cusioma to OpenGov, including feedback provided through online developer mmmurrifv fomns_ "Initial Tenn` means the ii license term specified in nurnber of years on the Order Form, commenong on the Effective Date. "Intellectual Procertv Riahts" means all intellectual property rights including all past, present, and future rights assoclated with works of authorship, including exclusive exploitation rights, copyrights, and moral rights, tradomark and trade name rights and similar rights, trade secret rights, patent rights, and any other proprietary rights in intellectual property of every kind and nature_ "Order Form" means OpenGov's Software Services order forth that (aj specifies the Software So-- Provided by OpenGov; (b) references this Agreement; and (c) is signed by aulhohzed representatives of both Parties. Statement of Work: For Information OPENGov Statement of Work City of Edmonds, WA Created by: Ariana Tuckey Creation Date:01/20/22 Document Number: DD-02316 Version Number:2 Overview 2 Preamble 2 Methodology 3 Project Initiatlon 4 W a d L O N N �L Q L d W N N O N R ILL C O C d N d L a C 3 O U Packet Pg. 418 Action Item 1: Cost and Budget Billing Frequency: Annual SOFTWARE SERVICES: Product 1 Service Budgeting &Planning Dashboards, Financial Integration, Open Toxin Hall, Operating & Capital Budgetine. Revorhmn & AnaNtics. Stories. Transuarenev. Workforce Plain', Payment Terms: Net 30 Start Date End Date 02/01'2022 01/31/2027 Software Annual Total: Annual Fee BURnglSei-°ice Periods: $67,822.00 Period 1 February 1, 2022 $123,322.00 Period 2 February 1, 2023 $67,822.00 Period 3 February 1, 2024 $67,822.00 $671822.00 Period 4 February 1, 2025 $67,822.00 Period 5 February 1, 2026 $67,822.00 PROFESSIONAL SERVICES: Product 1 Service Start Date Total Amount Professional Services Deployment - Prepaid 02/01/2022 $55,500.00 Services Total Amount: $55,500.00 City of Edmonds ARPA Funds Appropriation Schedule $3949610 for 5-year contract Approved/Requested Spent Approved Account Amount Expenditures Remaining Funds Balance Account A - City Expenditures 750,000 90,474.35 659,526 79,984.54 10,490 Account B - Household Support 4,150,000 1,050,000.00 3,100,000 240,432 809,568 Account C - Business Support 1,125,000 562,006.94 562,993 236,321 325,686 Account D - Nonprofit Support 500,000 420,500.00 79,500 420,500 - Account E - Job Retraining 600,000 600,000.00 - 199,999 400.001 Account F - Green Infrastructure 4,768,099 - 4,768,099 Total Funds 11,893,099 2,722.981 9,170,119 1,177,237 Packet Pg. 419 Action Item 1: ARPA ARPA: American Rescue Plan Act Coronavirus State and Local Fiscal Recovery Funds: A subset of ARPA 2 CFR Part 35 111. Eligible Uses I A. Public Health and Economic Impacts • Purpose is to "Authorize the use of payments from the Fiscal Recovery Funds to respond to the public health emergency with respect to COVID- 19... • Must be in response to the disease itself.. . Packet Pg. 420 Action Item 2: Waive RFP Requirement for ERP Replacement Uniform exemptions to competitive bidding requirements (39.04.280 RCW) 1. Purchases that are clearly and legitimately limited to a single source of supply (Sole Source Vendor): 2. Purchases involving special facilities or market conditions (auction) 3. Surplus Property (surplus property from another government 4. Purchases in the event of an emergency 5. Interlocal Agreements (State standard contracts) 6. Competitive Negotiations Competitive negotiation can be used as an alternative to the competitive bidding procedures for the acquisition of electronic data processing and telecommunications systems; energy saving or energy related equipment or services; or when it is determined in writing that the use of competitive bidding is neither practical nor advantageous to the City. Packet Pg. 421 Next Steps Packet Pg. 422 8.3 City Council Agenda Item Meeting Date: 02/1/2022 Hybrid Meetings Update and Vote to Extend Virtual Meetings Staff Lead: City Council/Administrative Services/IT Department: City Council Preparer: Scott Passey Background/History As COVID continues its' assault on communities everywhere, Edmonds faces the challenge of conducting effective Council meetings where all meeting participants have an equivalent meeting experience that is independent of their location, either in -person or virtual. Council asked staff and fellow councilmembers to explore updates to the current system to produce a better hybrid meeting format for Council and the public. A presentation was given on January 4, 2022, regarding the city's ability and resources to support a hybrid meeting format. Council voted to extend the virtual -only format through the month of January and review at the first meeting in February. Recommendation Receive information regarding hybrid meetings and vote to extend virtual -only meetings. Narrative Staff will provide an update outlining the steps taken since January 4 to support hybrid meetings. Packet Pg. 423