Loading...
ENG2022-0329 ROW PERMITOF WAY EUC PERMIT o PERMIT NU M City of Edmonds AveRIGHT N, Edmonds WA •:0• www.cityofedmonds.gov �r�c. l 89O Description: PUD-REPLACE BO CAPACITOR BANK ISSUED: 08/11/2022 Address: 112 12TH AVE N EDMONDS WA 98020-2928 EXP I RES: 02/11/2023 Permit Type: RIGHT OF WAY EUC Permit Subtype: MINOR Parcel Number: 00423000003900 CONTACTS NAME TYPE NAME ADDRESS PHONE APPLICANT MOE NAVE PO BOX 1107, EVERETT WA 98206 (425)783-5681 CONTACT SNOHOMISH COUNTY PUD PO BOX 1107, EVERETT WA 98206 (425)783-5681 CONTRACTOR SNOHOMISH COUNTY PUD PO BOX 1107, EVERETT WA 98206 (425)783-4353 OWNER JIANLI & YUAN ZI MING DU 112 12TH AVE N, EDMONDS WA 98020 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $40.00 RIGHT OF WAY MINOR - EUC PERMIT FEE $110.00 $110.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW 08/11/2022 RELEASED BY DATE Printed: Thursday, August 11, 2022 8:54:16 AM 1 of 2 oe e n,y RIGHT OF WAY EUC PERMIT PERMIT NUM City of Edmonds Ad • Edmonds WA 98020ENG2022-03 CONDITIONS CONDITION TYPE NOTES ALERT RESIDENTS ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS REQUIREMENTS. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS www.mybuildingpermit.com POTHOLING VERIFY CLEAR BORE CROSSINGS. RESTORE LANDSCAPE Restore landscape to like or better conditions Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on SOUND AND NOISE weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTIONS INSPECTION TYPE DATE RESULT NOTES COMPLETE A-1 JOB START X-2 ENGINEERING FINAL" E-7 TRAFFIC CTRL Printed: Thursday, August 11, 2022 8:54:16 AM 2 of 2 of EpMOtio� RECEIVED RIGHT OF WAY CONSTRUCTION J U N 23 2022 PERMIT APPLICATION Complete and submit this Application in accordance with the Submittal CITY OF EDMONDS /'Vc. is') Requirements outlined in Right -of -Way permit Handout E6�. DEVELOPMENT SERVICES DEPARTMENT If any field is not applicable to your project, write "N/A' instead of leaving blank. All fields required. Incomplete Applications will be denied. SECTION A General • Project Name Replace Capacitor Bank on Pole PLI 933 Site Address or if no site address use Property Address at NW corner of project area: 111 12th Ave N Associated Permits: BLD PLN ENG Owner and Entity Holding Name of Company PUD No 1 Of Snohomish County Franchise Ordinance No: N/A Point of Contact Goerge Dell Title Design Engineer Address PO Box 1107 City Everett State WA zip 98206 Phone 425-382-3916 Email jointuse@snopud.com Contractor and Authorized Agent of Owner Name of Company Same as Above (see note below) Contractor Contacts During Construction Primary Name Agent Name Title Title Mobile Address Email City State Zip Secondary Name Phone Title Email Mobile City of Edmonds Business License No: Email State License No: 313-005-741 Contractor verifies it is currently bonded Contractor verifies it currently has general liability insurance NOTE: ECDC 18.6o. o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. ❑ Multifamily residential ❑ Commercial ❑ City project ❑ Single family residential subdivision ❑ Single family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? ❑ Other, please specify: ❑ Utility Franchise Work associated with development (check one of the above boxes as welt ❑ Traffic Control Only (no associated development) m Utility Franchise Work (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) PUD to replace existing bad order capacitor bank on PUD pole. This is maintenance work. Work will not impact other communications lines or PUD wires along the road. Work to be conducted on overhead equipment with bucket truck, no excavation required. No tree trimming required, sidewalk closure, or disturbance of the surface. Work to be done between the hours of 9am and 3pm and will take approximately 4 hours. RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF I x LF SF Alley 72 hours + LF Ix I LF SF Parking 72 hours + LF Ix I LF SF SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. 1. The work in the right of way is on or for the following type of facilities: ❑ telecommunications ❑ cable ® power ❑ gas ❑ water ❑ sewer ❑ storm Details of Work to be Completed 1. Does the utility owner have existing overhead infrastructure in the area of work? Yes X No 2. Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)? x If yes, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? X 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility stem? X 5. Does the work involve proposed additions to an aboveground utility stem? If es: X Are the additions for the purpose of serving new commercial development? Are the additions for the purpose of serving a single-family residential subdivision? Details of Work to be Completed Yes No 6. Does your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial development? X If yes, answer the following questions related to project area, i.e. the actual area in which the project is proposed: 6a. Does your project involve wires/cables/lines? If yes: X How many are existing? I I How many are to be added? City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 6b. Does your project involve poles? If yes: X How many poles are existing in the project area? What is the height of the existing poles? How many poles are to be removed? Are additional poles to be laced? How many? I I What is the height of the additionalpoles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: X How many? I I What is the height of the poles after? Describe the modification rebuild: SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. APPLICANT SIGNATURE: 4PTY-04 DATE: 6/23/2022 APPLICANT PRINTED NAME: APPLICANT TITLE: Design Engineer NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 p O PUBLIC UTILITY DISTRICT NO.1 OF SNOHOMISH COUNTY SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM LOCATION 111 12TH AVE N EDMONDS LYNNWOODAREA POLE NO. 933 SE1/4S 24 T 27 R 3 DATE 6/21/22 ORDER 100097278 REASON FOR WORK REPLACE CAPACITOR BANK ENGINEER GR DELL OPERATION 0030 SP&P PROJECT 22-027 DRAFTER U.G. NO. SCALE NOTED APPROVED & DATE PRINTED DATE WORK COMPLETED FOREMAN FEES REQ'D ❑ YES ■ NO PRIMARY OVERHEAD ❑ RESIDENTIAL ❑ COMMERCIAL LEO NO. ENGR'S TEL. # 425-783-8544 ENGR'S CELL # 425-382-3916 '@$ '=$ SECONDARY OVERHEAD NESC VIOLATIONS BASIC FEE S ■ NO ❑ YES (SEE NOTES) @3 '=$ PERMITS (DATE GRANTED) METER/CONV. POLE S ❑ TREE TRIM PRIMARY UNDERGROUND ❑ STATE ❑ RESIDENTIAL ❑ COUNTY ❑ COMMERCIAL ■ CITY BASIC FEE S ❑ LEU NO. EASEMENTS La I=$ ❑ REQUIRED ■ NOT REQUIRED SECONDARY UNDERGROUND BASIC FEE S @$ '=S DATE RELEASED UNDERGROUND PLAT FOREIGN CONTACTS ❑ JPN# BASIC FEE S q FT.@S '=S ❑ JOINT TRENCH ZIPLY & CATV ❑ JOINT BORE ZIPLY & CATV STREET LIGHTING q FT.0 _$ ❑ POLE STENCILINGFROM WORK IN RIGHT OF WAY TO ❑ PRIMARY TAKE OFF POLE ❑ SECONDARY q FT.@S '=$ PRE—CONST. REQUIRMENTS ❑ TREE TRIM ❑ PUD LOCATOR MISCELLANEOUS FEES ❑ BACKHOE ■ FLAGGING VAULT ❑ ONE CALL DATE PERMIT S No S STREET LIGHTING S ❑ YES ■ NO S M&R AS -BUILT GIS TOTAL DUE S DATE PAID GIS QC M&R RECEIPT NO. GIS Ph JOINT USE SERVICE ORDER NO. LOCATION MAP PAGE 454-H5 I Fr.FNn: O EXISTING POLE X EXISTING POLE -TO BE REMOVED • NEW POLE NEW POLE TO REPLACE EXISTING POLE DATE SUBSTATION MAPLEWOOD CIRCUIT NO. 12-346 PHASE 1.2.3 SCHEMATIC NTS BEFORE MAIN ST 15 10 N 12-2566 z NO CAP #4593 L-B 450 KVAR 2/13 TO FIVE CORNERS CKT 12-1283 AFTER MAIN ST 15 10 N � NO 2566 CAP # L-B 300 KVAR 2/13 TO FIVE CORNERS CKT 12-1283 CONSTRUCTION NOTES: 0 PL 1933 RECEIVED J U N 23 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT REFER TO T&D GUIDELINE 4-12-2.0 FOR PROPER DISCHARGE AND HANDLING INFO RMV EXISTING 450 KVAR FIXED CAP BANK #4593 INSTL NEW 300 KVAR FIXED CAP BANK #____ AND INSTL PER (12F615, DB0108) FUSE AT 15A PER T&D 4-12-2.0 (E1015) MAPLEWOOD CKT 12-346 MAPLEWOOD CKT 12-346 N PLAN VIEW 1" = 100' O YA-12 33 75-391386 1208 112 / 1212 n MAIN ST CD 272957 933 MPL W 15-17561 CAP 4593 2 L-B 2/12 SL-114716-G 00 346 SL-104227-G 00 Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. 931 W 10-342409 L-B 2/11 SL-114711-G ENGINEERING DIVISION APPROVED AS NOTED %U Uio✓U,44p 08/04/2022 SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM WORK IN UNPAINTED SHOULDER (MAINTAINING TWO-WAY TRAFFIC, 35 MPH OR LESS) W20-1 ROAD WORK AHEAD f x b ROAD O R = NARROWS < > x P- W1-4R LLJ N 11 J LLi ry O $ V) z m OQ Z O� CV J CO 12TH AVE N O O� of O� O ENGINEERING DIVISION O APPROVED AS NOTED O fill LVIL,ir 1.44t 08/04/2022 O vv O O � RECEIVED Ol J U N 23 2022 b CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT 0 0 0 0 O O O O O O m _0 N J TRAFFIC CONTROL INSPECTION SHALL BE REQUIRED WHENEVER WORK ZONE IS SET UP I P-r_pr\In. GENERAL NOTES: 1. ALL SIGNS AND SPACING SHALL CONFORM TO THE MUTCD. 2. NOTIFY LOCAL EMERGENCY SERVICES OF CLOSURE TIMES AND DATES (OPTIONAL). 3. SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROAD CONDITIONS. 4. PROTECTIVE VEHICLE RECOMMENDED -MAY BE A WORK TRUCK. 5. ALL SIGNS MINIMUM 48" X 48", UNLESS OTHERWISE SPECIFIED. 6. CHANNELIZATION DEVICES ARE 28" REFLECTIVE CONES. SEE TABLE 1 FOR SPACING DISTANCES. 7. ALL SPACING MAY BE ADJUSTED TO ACCOMODATE AT -GRADE INTERSECTIONS AND/OR DRIVEWAYS. BUFFER DATA LONGITUDINAL BUFFER SPACE = B SPEED (MPH) 25 30 35 40 45 50 55 60 65 70 LENGTH (FEET) 155 200 250 305 360 425 495 570 645 730 O CHANNELIZING DEVICE PORTABLE SIGN AND SUPPORT �® WORIT VEHICLE WITH FLASHING LIGWORK AREA s x W1-4L x ROAD i WORK AHEAD W20-1 MINIMUM LANE CLOSURE TAPER LENGTH = L (FEET) LANE WIDTH POSTED SPEED (MPH) (FEET) 25 1 30 35 40 45 50 55 60 65 70 10 105 1 150 205 270 450 500 550 - - - 11 115 1 165 225 295 495 550 605 660 - - 12 125 1180 245 320 540 600 660 720 780 840 TABLE 1 CHANNELIZATION DEVICE SPACING (FEET) MPH TAPER TANGENT 50-70 40 80 35-45 30 60 25-30 20 40 SIGN SPACING = X FREEWAYS & EXPRESSWAYS 55-70 MPH 1500'± RURAL HIGHWAYS 60-65 MPH 800'± RURAL ROADS 45-55 MPH 500'± RURAL ROADS & URBAN ARTERIALS 35-40 MPH 350'± RURAL ROADS & URBAN ARTERIALS RESIDENTIAL & BUSINESS DISTRICTS 25-30 MPH 200'± (2) URBAN STREETS 25 MPH OR LESS 100'± (2) (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT -GRADE INTERSECTIONS AND DRIVEWAYS. (2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. RECEIVED J U N 23 2022 CITY OF EDMONDS CITY OF EDMONDS M BuildingPermit.com DEVELOPMENT SERVICES DEPARTMENT Right-of-`."!w;; ° NN!?cwtion #1163470-100097278 - Replace Capacitor Applicant First Name Last Name Company Name Moe Nave Snohomish County PUD Number Street Apartment or Suite Number E-mail Address PO Box 1107 jointuse@snopud.com City State Zip Phone Number Extension Everett WA 98206 (425) 783-5681 Contractor Company Name Owner Number Street Apartment or Suite Number City State Zip Phone Number Extension State License Number License Expiration Date UBI # E-mail Address Project Location Number Street Floor Number Suite or Room Number 112 12TH AVE N City Zip Code County Parcel Number EDMONDS 98020 00423000003900 Associated Building Permit Number Tenant Name Additional Information (i.e. equipment location or special instructions)_ Work Location Property Owner First Name Last Name or Company Name Jianli & Yuan Zi Ming Du Number Street Apartment or Suite Number 112 12TH AVE N City State Zip EDMONDS WA 98020 Certification Statement - The applicant states: I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work requires a licensed contractor to perform the work, the information will be provided prior to permit issuance. Date Submitted: 6/23/2022 Submitted By: Moe Nave Page 1 of 2 CITY OF EDMONDS MyBuildingPermit.com Right -of -Way Application #1163470 - 100097278 - Replace Capacitor Project Contact Company Name: Snohomish County PUD Name: Moe Nave Email: jointuse@snopud.com Address: PO Box 1107 Phone #: (425) 783-5681 Everett WA 98206 Project Type Activity Type Scope of Work Utility Purveyor Utility Work No Disturbance of Surface Project Name: 100097278 - Replace Capacitor PUD will replace existing bad order capacitor bank on PUD pole. Work will not impact Description of communication lines or PUD wires along the road. Work to be conducted on overhead Work: equipment with bucket truck, no excavation required. No sidewalk closure or disturbance of surface. Work to be done between hours of 9am -3pm and will take approx 4 hours. Project Details Project Information Job Number 100097278 Page 2 of 2