APPROVED BLD2022-0891+Transportation_Impact_Form+7.7.2022_11.33.16_PM+2976031RECEIVED
Jul 08 2022 A C
CITY OF EDMONDS�
DEVELOPMENT SERV
DEPARTMENT
PERMITTING & DEVELOPMENT
ENGINEERING
DIVISION
121 5th Avenue N
P: 425.771.0220
APPENDIX A
BLD2022-0891 Page 1 of 2
Transportation Impact Analysis
Worksheet
Name of Proposed Project: 186 SUNSET AVE
Owner/Applicant
Dale G Sutton
Name
22912 A Highway 99
Street/Mailing Address
Edmonds WA 98026
City State Zip
Telephone: 425-672-6800
Applicant Contact Person:
Dale G Sutton
Name
22912 A Highway 99
Street/Mailing Address
Edmonds WA 98026
City
State Zip
Telephone: 425-672-6800
Traffic Engineer who prepared the Traffic Impact Analysis (if applicable):
Firm Name
Telephone:
1. PROJECT DESCRIPTION
Contact Name
E-mail:
a. Location - Street address: 186 Sunset Ave, Edmonds, WA 98020
(Attach a vicinity map and site plan.)
b. Specify existing land use: Shopping Center with shops and
restaurants.
c. Specify proposed type and size of development: Lease 2350 SF of Retail in
the shopping center (# of residential units and/or square footage of building)
d. Date construction will begin and be completed: No Construction
e. Define proposed access locations: Off Highway 104, Corner of Sunset
Ave and W Dayton St
HANDOUT UPDATED 03.24.2021
APPENDIX A
Page 2 of 2
£ Define proposed sight distance at site egress locations:
blocks away, stop light on corner
Visible from several
2. MITIGATION RECOMMENDATIONS
State recommended measures and fees required to mitigate project specific traffic impacts.
Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified
in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC
18.82.130.
❑ CHANGE IN USE
Fee for prior use shall be based on fee established at the time the prior use was permitted. If
the previous use was permitted prior to the adoption of Ordinance 3516 (effective date:
09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used.
Units in
ITE Land Use Category Per Unit square feet,
Fee Rate # of dwelling,
vfp, etc.
New Use $ X
Prior Use $ X =
New Use Fee: $ - Prior Use Fee: $
❑ NEW DEVELOPMENT
Units in
ITE Land Use Category Per Unit square feet,
Fee Rate # of dwelling,
v , etc.
New Use $ X
l NO CHANGE SHOPPING CENTER TO SHOPPING CENTER
❑ INDEPENDENT FEE CALCULATION
MITIGATION FEE RECOMMENDATION:
$
INDEPENDENT FEE CALCULATION: $240.00 (+ consultant fee)
$
TOTAL TRANSPORTATION IMPACT FEE
$
7/21 /2022
City of Edm�ivision Approval Date
' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.
HANDOUT UPDATED 03.24.2021