Loading...
ENG2022-0417 ROW PERMITRIGHT OF WAY MINOR PERMIT PERMIT NUMBER City of Edmonds ...0i 1 1 www.cityofedmonds.gov Description: DRIVEWAY REPLACEMENT WITH PAVERS ON PRIVATE PROPERTY ISSUED: 08/12/2022 Address: 508 2ND AVE N EDMONDS WA 98020-3106 EXPIRES: 02/08/2023 Permit Type: RIGHTOF WAY MINOR Permit Subtype: RESIDENTIAL Parcel Number: 27032400205000 NAME TYPE NAME ADDRESS PHONE APPLICANT KEITH SINGLETON 508 SECOND AVE N, EDMONDS UN 98020 (808)652-9779 CONTACT KEITH SINGLETON 508 SECOND AVE N, EDMONDS UN 98020 (808)652-9779 CONTRACTOR RIOS BRICK PAVERS GC LLC 44834 22824 NE UNION HILL RD, REDMOND WA 98053 (425)891-4685 OWNER JANA & SINGLETON MICH 508 2ND AVE N, EDMONDS WA 98020 DOMBROWSKI FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $40.00 RIGHT OF WAY MINOR PERMIT FEE $110.00 $110.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW ENGINEERING DIVISION ���... ,�� .... "DTED RELEASED B 0 18/12/2022 DATE Printed: Friday, August 12, 2022 2:04:05 PM 1 of 2 WAY MINOR .UM PERMIT PERMIT NUMBER City of Edmonds ...• •ENG2022-0417 www.cityofedmonds. ov/425.771.0220 CONDITIONS CONDITION TYPE It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS REQUIREMENTS. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS www.mybuildingpermit.com RESTORE LANDSCAPE Restore landscape to like or better conditions Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND AND NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTION TYPE DATE RESULT NOTES COMPLETE E-5 DRIVEWAY SLOPE X-2 ENGINEERING FINAL" Printed: Friday, August 12, 2022 2:04:05 PM 2 of 2 Lti�y of EDA404O� RIGHT OF WAY CONSTRUCTION PERMIT APPLICATION Complete and submit this Application in accordance with the Submittal l'vc. Ise0 Requirements outlined in Right -of -Way permit Handout E63. If any field is not applicable to your project, write "N/A" instead of leaving blank. All fields required. Incomplete Applications will be denied. SECTION A General• Project Name N/A Site Address or if no site address use Property Address at NW corner of project area: 508 2nd Ave N, Edmonds, WA 98020 Associated Permits: BLD PLN ENG • • • .• .• - Name of Company N/A Franchise Ordinance No: Point of Contact Keiith/Jana Sincileton Title Property Owner Address 508 2nd Ave N City Edmonds state VVA zip 98020 Phone 808 652 9779 Email keith singleton@msn.com Contractor and Authorized Agent of Owner Name of Company Rios Pavers (see note below) Contractor Contacts During Construction Primary Name Mauricio Roch, Agent Name Mauricio Rocha Title CEO Title CEO Mobile 425 891 4686 Address 22824 NE Union Hill RD Email City Redmond I State WA Zip 98053 Secondary Name Phone 425 8914685 Title Email riosbrick avers.mr mails rKobile City of Edmonds Business License No: Pending (applied on on 8/10/ ail riosbrickpavers.mr@gmail.com State License No: RIOSBBP830MB/UBO 604 138 780 p X Contractor verifies it is currently bonded dC Contractor verifies it currently has general liability insurance NOTE: ECDC 18.6o.02o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. ❑ Multifamily residential ❑ Commercial ❑ City project EDSingle family residential subdivision ❑ Single family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? ❑ Other, please specify: ❑ Utility Franchise Work associated with development (check one of the above boxes as well) ❑ Traffic Control Only (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 ❑ Utility Franchise Work (no associated development) Project Description Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) Replace broken street adjacent concrete (23 ft by 6 ft) with pavers, consistent with driveway. Replace driveway (21 ft by 23 ft). Remove broken concrete and install replacement pavers throughout. It is repair/replacement. The existina savers and concrete are removed and add dirt/stone and then new savers. RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF JxJ LF SF N/A Alley 72 hours + LF JxJ F SF N/A Parking 72 hours + LF JxJ LF I SF N/A SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. 1. The work in the right of way is on or for the following type of facilities: ❑ telecommunications ❑ cable ❑ power ❑ gas ❑ water ❑ sewer ❑ storm 1. CompletedDetails of Work to be Does the utility owner have existin overhead infrastructure in the area of work? • 2. Will any equipment be added underground or above ground (e.g. pedestals, vaults, etc.)? If yes, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility system? 5. Does the work involve proposed additions to an aboveground utility system? If es: Are the additions for the purpose of serving new commercial development? Are the additions for the purpose of serving a single-family residential subdivision? Details of • to be Completed ®i 6. Does your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial development? City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 If yes, answer the following questions related to project area, i.e. the actual area in which the project is proposed: 6a. Does your project involve wires/cables/lines? If yes: How many are existing? I I How many are to be added? 6b. Does your project involve poles? If yes: How many poles are existing in the project area? What is the height of the existing poles? How many poles are to be removed? Are additional poles to be laced? How many? I I What is the height of the additionalpoles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: How many? What is the height of the poles after? Describe the modification rebuild: SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this applica 'on. Fees. The Applicant is responsible for all permit fees APPLICANT SIGNATURE: DATE: 8/11 /22 APPLICANT PRINTED NAME: Keith and Jana Singleton/Rios Brick Pavers (M. Rocha) APPLICANT TITLE: Herneowners/Gentracter NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 s_Sal I JF I 1 REPLACING DRIVEWAY WITH PAVERS - APPROX 750 SF ENGINEERING DIVISION SEPARATE ENCROACHMENT " A" K10TED Applicant shall repair/replace all damage to frontage PERMIT SHALL BE REQUIRED18/12/2022 utilities or IF REPLACING APPROACH IN - iv improvements in City right-of-way ROW WITH PAVERS- MEETING OR EXCEEDING per city standards that is caused or 2000 SF OF NEW AND/OR occurs during the permitted project. REPLACED IMPERVIOUS SURFACES SHALL REQUIRE STORMWATER MAXIMUM DRIVEWAY SLOPE MANAGEMENT ALLOWED 14% OWNER/CONTRACTOR IS RESPONSIBLE FOR OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING EROSION CONTROL AND DRAINAGE ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY UTILITIES MAY REQUIRE A SEPERATE PERMIT. SIGN SPACING = X (1) RURAL ROADS & URBAN ARTERIALS 35 140 MPH 350't RURAL ROADS, URBAN ARTERIALS, 25 130 MPH 200't (2) RESIDENTIAL & BUSINESS DISTRICTS URBAN STREETS 25 MPH OR LESS 1001t (2) (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERSECTIONS AND DRIVEWAYS. (2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. MINIMUM SHOULDER TAPER LENGTH = Ll3 (feet) SHOULDER Posted Speed (mph) WIDTH (feet) 25 30 35 40 45 50 55 60 65 70 8' 40 40 60 90 - - - - - - 10' 40 60 90 90 USE A 3 DEVICES TAPER FOR SHOULDERS LESS THEN 8' BUFFER DATA LONGITUDINAL BUFFER SPACE = B SPEED (MPH) 25 30 35 40 45 50 55 60 65 70 LENGTH (feet) 155 200 250 305 360 425 495 570 645 730 TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = R HOST VEHICLE WEIGHT 9,900 TO 22,000 lbs. HOST VEHICLE WEIGHT > 22,000 lbs. < 45 MPH 45-55 MPH > 55 MPH < 45 MPH 45-55 MPH > 55 MPH 100, 123' 172' 74' 100, 150' PROTECTIVE VEHICLE (WORK VEHICLE) = R NO SPECIFIED DISTANCE REQUIRED CHANNELIZATION DEVICE SPACING feet MPH TAPER TANGENT 35/40 30 60 25/30 20 40 O 9 b 4 ® ® �¢ WORK AREA X X L/3 B R 50, ROAD 48 41ENGINEERING DIVISION WORK SHOULDER AHEAD WORK "")TED 48' W20-1 W21-5 18/12/2022 NOTES LEGEND 1. DEVICE SPACING FOR THE DOWNSTREAM TAPER SHALL BE 20'(FT). K TEMPORARY SIGN LOCATION SHOULDER CLOSURE - LOW SPEED 2. ALL SIGNS ARE BLACK ON ORANGE. O CHANNELIZING DEVICES (40 MPH OR LESS) PROTECTIVE VEHICLE NOT TO SCALE FILE NAME S:\Desi n R P& SW-SOndardsl2-Plan Sheet Libra 101-Published PSL\ TC Work Zone Traffic Control\ TC-5 Shoulder Closure - Low Speed 40 MP or Less)\TC-5.dgn Plot 1 TIME 2,59,41 PM —Tr FED.AID PROJ.NO. AmokRux Rv DATE 1/212018 Y�/� PLOTTED BY Ilddslf WAS �I/ TCS� DESIGNED BY Joe xo..ER ENTERED BY Washington State .... CHECKED BY coxTRnm x iounox xo. Department of Transportation oR PROJ. ENGR. re DATE TRAFFIC CONTROL PLAN REGIONAL ADM. REVISION DATE BY