Loading...
2020-0468 Wright Special Insp Agreement SIGNEDSPECIAL INSPECT1 Fsr. 189� Permit #: _BLD2020-0468 Project: Wright Remodel Prior to issuance of a permit, this form must be approval. The completed form must have signna DUTIES AND Special Inspection Firm and Special Inspectors• The Special Inspection firm of MAYES TESTING will perform special inspection for the following types one firm is to be employed): Reinforced Concrete Bolting in Concrete Prestressed Concrete _Shotcrete _Structural Masonry _Structural Steel/Welding _High Strength Bolting All individual inspectors to be employed on this project inspect. If inspection is for work that is not covered by certified, a detailed resume of the inspector and firm mu and the firm are qualified by education and experience t design and specifications. The work shall be inspected for conformance with the and addenda sheets will not be used for inspection, un records shall include: A daily record to be maintained on site, itemizil shall be brought to the immediate attention of tt A weekly report shall be submitted to the City; nonconforming work and resolution of nonconf A final report shall be submitted to the building issued. This report will indicate that inspection approved plans, specifications and approved rev detailed in the final report. N AND TESTING AGREEMENT Humber Lane deted in its entirety and returned to the City for of acknowledgment by all parties. GINEERS, INC. work (separate forms must be submitted if more than Spray applied Fireproofing Control Systems Wood Observation by design professional Retro Fit Anchorage will be WABO certified for the type of work they are to he WABO categories, or the inspector is not WABO ,t be submitted. The resume must show that the inspector perform the work and testing required by the project ns and specifications approved by the City. Revisions they have been approved by the City. Inspection the inspections performed. Any nonconforming work contractor for resolution. tailing the inspections and testing performed, listing any ming items. -partment prior to the Certificate of Occupancy being id testing was completed in conformance with the ions or addenda. Any unresolved discrepancies must be \\edmsvr-userfs\userprof$\ecarter\Desktop\Special Inspections\2020-0468 Wright Nnsigned).&6/18/2020 Contractor: The contractor shall provide the special inspector or a The City approved plan and specifications must be in, inspector and the City inspector. The contractor shall all parties. The special inspection functions are considered to be in and the contractor is responsible for contacting the City poured or other work covered until approval is given by Building Department: The building department shall review any revisions and inspection functions for compliance with the agreement responsible for approving various stages of construction DesisII Professionals: The architect and/or engineer will clearly indicate on th inspection required and shall include a schedule for insl coordinate their revision and addenda process in such a obtained, prior to work shown on the revisions being pe Owner: The project owner, or the architect or engineer acting as agency. A failure of the special inspector or firm to perform in l plans and this document, may void this agreement and In such a case a new special inspector and/or firm woul design and/or construction parties to perform in accord notice being posted on the project until nonconforming I have read and agree to comply with the terms and Owner: 0 ga W ri �,v -� Sig Contractor: Joe Myers Construction, Inc. S Arch./Eng: Jacob Strobl - Strobl Design Special Insp. Mayes Testing Engineers, Inc. Special Insp. Agency MAYES TESTING E ACCEPTED FOR THE CITY OF EDMONDS In cy adequate notification of work requiring inspection. available, at the jobsite for the use of the special intain all daily inspection reports, on site, for review by iddition to the normal inspections performed bythe City Co schedule regular inspections. No concrete shall be the City inspector. addenda. The City inspector will monitor the special ind the approved plans. The City inspector shili be to be covered and for work to proceed. plans and specifications the specific types of special ;ction and testing. The architect and/or engineers will ray as to ensure that all required City approvals are formed in the field. I the owners agent, shall employ the special inspector or :EMENT eping with the requirements of the IBC, the approved e Building Official's approval of the special inspector. need to be proposed for approval. A failure of the Lce with this agreement may result in a STOP WORK ems have been resolved. EDGMENTS itions of this agreement. I ev Date e Date: 06/0 ill /2020 •e Date:06/02/2020 �I 020 6/2/ e Date: � �GINEERS, INC. DIVISION Date: \\edmsvr-userfs\userprof$\ecarter\Desktop\Special Inspections\2020-0468 Wright (unsigned).&0/18/2020