Permit #: _BLD2020-0468
Project: Wright Remodel
Prior to issuance of a permit, this form must be
approval. The completed form must have signna
DUTIES AND
Special Inspection Firm and Special Inspectors•
The Special Inspection firm of MAYES TESTING
will perform special inspection for the following types
one firm is to be employed):
Reinforced Concrete
Bolting in Concrete
Prestressed Concrete
_Shotcrete
_Structural Masonry
_Structural Steel/Welding
_High Strength Bolting
All individual inspectors to be employed on this project
inspect. If inspection is for work that is not covered by
certified, a detailed resume of the inspector and firm mu
and the firm are qualified by education and experience t
design and specifications.
The work shall be inspected for conformance with the
and addenda sheets will not be used for inspection, un
records shall include:
A daily record to be maintained on site, itemizil
shall be brought to the immediate attention of tt
A weekly report shall be submitted to the City;
nonconforming work and resolution of nonconf
A final report shall be submitted to the building
issued. This report will indicate that inspection
approved plans, specifications and approved rev
detailed in the final report.
N AND TESTING AGREEMENT
Humber Lane
deted in its entirety and returned to the City for
of acknowledgment by all parties.
GINEERS, INC.
work (separate forms must be submitted if more than
Spray applied Fireproofing
Control Systems
Wood
Observation by design professional
Retro Fit Anchorage
will be WABO certified for the type of work they are to
he WABO categories, or the inspector is not WABO
,t be submitted. The resume must show that the inspector
perform the work and testing required by the project
ns and specifications approved by the City. Revisions
they have been approved by the City. Inspection
the inspections performed. Any nonconforming work
contractor for resolution.
tailing the inspections and testing performed, listing any
ming items.
-partment prior to the Certificate of Occupancy being
id testing was completed in conformance with the
ions or addenda. Any unresolved discrepancies must be
\\edmsvr-userfs\userprof$\ecarter\Desktop\Special Inspections\2020-0468 Wright Nnsigned).&6/18/2020
Contractor:
The contractor shall provide the special inspector or a
The City approved plan and specifications must be in,
inspector and the City inspector. The contractor shall
all parties.
The special inspection functions are considered to be in
and the contractor is responsible for contacting the City
poured or other work covered until approval is given by
Building Department:
The building department shall review any revisions and
inspection functions for compliance with the agreement
responsible for approving various stages of construction
DesisII Professionals:
The architect and/or engineer will clearly indicate on th
inspection required and shall include a schedule for insl
coordinate their revision and addenda process in such a
obtained, prior to work shown on the revisions being pe
Owner:
The project owner, or the architect or engineer acting as
agency.
A failure of the special inspector or firm to perform in l
plans and this document, may void this agreement and
In such a case a new special inspector and/or firm woul
design and/or construction parties to perform in accord
notice being posted on the project until nonconforming
I have read and agree to comply with the terms and
Owner: 0 ga W ri �,v -� Sig
Contractor: Joe Myers Construction, Inc. S
Arch./Eng: Jacob Strobl - Strobl Design
Special Insp. Mayes Testing Engineers, Inc.
Special Insp. Agency MAYES TESTING E
ACCEPTED FOR THE CITY OF EDMONDS
In
cy adequate notification of work requiring inspection.
available, at the jobsite for the use of the special
intain all daily inspection reports, on site, for review by
iddition to the normal inspections performed bythe City
Co schedule regular inspections. No concrete shall be
the City inspector.
addenda. The City inspector will monitor the special
ind the approved plans. The City inspector shili be
to be covered and for work to proceed.
plans and specifications the specific types of special
;ction and testing. The architect and/or engineers will
ray as to ensure that all required City approvals are
formed in the field.
I
the owners agent, shall employ the special inspector or
:EMENT
eping with the requirements of the IBC, the approved
e Building Official's approval of the special inspector.
need to be proposed for approval. A failure of the
Lce with this agreement may result in a STOP WORK
ems have been resolved.
EDGMENTS
itions of this agreement.
I
ev Date
e Date: 06/0 ill /2020