EMAIL Chain Floor beam changeFrom: Sonny Taulbee <swtaulbee@gmail.com>
Sent: Friday, July 23, 20219:24 AM
To: Carter, Eric
Subject: Fwd: Wright Residence
Follow Up Flag: Follow up
Flag Status: Flagged
Sent from my iPhone
Begin forwarded message:
From: Sonny Taulbee <swtaulbee@gmail.com>
Date: July 23, 2021 at 6:51:50 AM PDT
To: Joe Meyer<Joemyersconstruction@comcast.net>
Subject: Fwd: Wright Residence
Sent from my iPhone
Begin forwarded message:
From: Sarah Olson <solson@ssfengineers.com>
Date: June 28, 2021 at 8:35:43 AM PDT
To: Jacob Strobl <]acob@strobldesign.com>, Sonny Taulbee
<swtaulbee@gmail.com>
Subject: RE: Wright Residence
Yes, these plans look good to me to proceed with.
Sarah Olson, PE
Project Engineer
O 253.888.4973
M 512.944.3821
SWENSON SAY FAGET
STRUCTURAL ENGINEERING
934 Broadway, Suite 100, Tacoma, WA 98402
ssfengineers.com
[;1 r'1 Vf
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, is for the sole use of the
intended recipient and may contain confidential, proprietary, and/or privileged information, as well as
content subject to copyright and other intellectual property laws. If you are not the intended recipient,
you may not disclose, use, copy, or distribute this e-mail message or its attachments. If you believe you
have received this e-mail message in error, please contact the sender by reply e-mail, immediately
delete this e-mail and destroy any copies. Prior to use of this e-mail message or its attachments, the
intended recipient agrees to the terms of use outlined on the Swenson Say Faget copyright link:
http://ssfengineers.com/media release/ Any such use indicates acceptance by the recipient of the above
statements and conditions of permitted use without exception.
From: Jacob Strobl <lacob@strobldesign.com>
Sent: Friday, June 25, 2021 11:48 AM
To: Sarah Olson <solson@ssfengineers.com>; Sonny Taulbee
<swtaulbee@gmail.com>
Subject: Fwd: Wright Residence
Hi Sarah,
Do the attached structural drawings look good? I know we are waiting
on these to be stamped by this city but these should be good for the
contractor to proceed with correct?
Thanks,
Jacob
STROBL DESIGN LLC
206.661.3622
strobldesiizn.com
Begin forwarded message:
From: Jacob Strobl <jacob@strobldesign.com>
Date: June 22, 2021 at 7:05:12 AM PDT
To: Sarah Olson <solson@ssfengineers.com>
Subject: Re: Wright Residence
Hi Sarah,
Please see the attached updated Wright drawings. Let
me know if you have any additional revisions before you
stamp these.
Thanks,
Jacob
STROBL DESIGN
206.661.3622
strobldesign.com
On Fri, Jun 18, 2021 at 11:23 AM Sarah Olson
<solson@ssfengineers.com> wrote:
Hi Jacob,
Attached are the redlines for the Wright Residence
with the required beam and footing sizes.
Sarah Olson, PE
Project Engineer
O 253.888.4973
M 512.944.3821
SWENSON SAY FAGET
STRUCTURAL ENGINEERING
934 Broadway, Suite 100, Tacoma, WA 98402
ssfengineers.com
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments,
is for the sole use of the intended recipient and may contain confidential,
proprietary, and/or privileged information, as well as content subject to
copyright and other intellectual property laws. If you are not the intended
recipient, you may not disclose, use, copy, or distribute this e-mail message or
its attachments. If you believe you have received this e-mail message in error,
please contact the sender by reply e-mail, immediately delete this e-mail and
destroy any copies. Prior to use of this e-mail message or its attachments, the
intended recipient agrees to the terms of use outlined on the Swenson Say
Faget copyright link: http://ssfengineers.com/media release/ Any such use
indicates acceptance by the recipient of the above statements and conditions of
permitted use without exception.
From: Jacob Strobl <lacob@strobldesign.com>
Sent: Thursday, June 17, 2021 7:05 AM
To: Sarah Olson <solson@ssfengineers.com>
Subject: Re: Wright Residence
Hi Sarah,
See the attached updated foundation plan for your
review and comment.
Thanks,
Jacob
STROBL DESIGN
206.661.3622
strobldesign.com
On Tue, Jun 8, 2021 at 5:05 PM Sonny Taulbee
<swtaulbee@gmail.com> wrote:
I think we need to replace triple 2 by 10 with beam
and eliminate one
Pier point only a 14 foot span
Ii F B F ,
V-A,
i
—__=¢'
i
i
45' p
i
—T—�— 1— -- wi
DO
io�-sJ • — i�'-so- _
wa
vc
y
T
ij 1
�
n I+ y
5
lu
T= IBATH
CIFM
CF r
NEN
moor+ �
nux •�•
11
r-FM
Sent from my iPhone
On Jun 8, 2021, at 11:27 AM, Sonny
Taulbee <swtaulbee@gmail.com>
wrote:
Yes I will get you that info ASAP
Sent from my iPhone
On Jun 8, 2021, at
8:51 AM, Jacob Strobl
<jacob@strobldesign.
com> wrote:
HI Sonny,
Can you confirm the
sizes and locations of
the existing footings?
If you can markup a
plan and email it back
that would be the
quickest way to get
this resolved.
Thanks,
Jaob
STROBL DESIGN
206.661.3622
strobldesign.com
On Tue, Jun 8, 2021
at 7:58 AM Sarah
Olson
<solson@ssfengineer
s.com> wrote:
Hi Jacob,
Does the strip
footing under the
bearing wall not
exist at any point
along the length of
the basement?
We can absolutely
put in new footings
and beams above, I
just have to know
where the beams
will be located to
accurately size both
the beams and the
footings.
Thanks,
Sarah Olson, PE
Project Engineer
O 253.888.4973
M 512.944.3821
<i mage001.1 pg>
SWENSON SAY FAGET
STRUCTURAL ENGINEERING
934 Broadway, Suite 100, Tacoma, WA 98402
ssfengineers.com
<image002.ipg>
<i mage003.j pg>
CONFIDENTIALITY NOTICE:
This e-mail message,
including any attachments, is
for the sole use of the
intended recipient and may
contain confidential,
proprietary, and/or privileged
information, as well as
content subject to copyright
and other intellectual property
laws. If you are not the
intended recipient, you may
not disclose, use, copy, or
distribute this e-mail message
or its attachments. If you
believe you have received
this e-mail message in error,
please contact the sender by
reply e-mail, immediately
delete this e-mail and destroy
any copies. Prior to use of
this e-mail message or its
attachments, the intended
recipient agrees to the terms
of use outlined on the
Swenson Say Faget copyright
link:
http://ssfengineers.com/media
release/ Any such use
indicates acceptance by the
recipient of the above
statements and conditions of
permitted use without
exception.
From: Jacob Strobl
<jacob@strobldesi�
n.com>
Sent: Wednesday,
May 26, 20214:44
PM
To: Sarah Olson
<solson@ssfenginee
rs.com>
Cc: swtaulbee
<swtaulbee@gmail.c
om>;
joemyersconstructio
<joemyersconstructi
on@comcast.net>
Subject: Wright
Residence
Hi Sarah,
The contractor is in
the middle of
framing and
concrete work and
ran into a conflict.
Can we replace the
callout for the strip
footing at the
Wright basement
with new footings
and beams above?
The strip footing
under this bearing
wall does not exist.
Let us know your
thoughts.
<imageOO4.png>
Thanks,
Jacob
STROBL DESIGN
206.661.3622
strobldesign.com