Loading...
EMAIL Chain Floor beam changeFrom: Sonny Taulbee <swtaulbee@gmail.com> Sent: Friday, July 23, 20219:24 AM To: Carter, Eric Subject: Fwd: Wright Residence Follow Up Flag: Follow up Flag Status: Flagged Sent from my iPhone Begin forwarded message: From: Sonny Taulbee <swtaulbee@gmail.com> Date: July 23, 2021 at 6:51:50 AM PDT To: Joe Meyer<Joemyersconstruction@comcast.net> Subject: Fwd: Wright Residence Sent from my iPhone Begin forwarded message: From: Sarah Olson <solson@ssfengineers.com> Date: June 28, 2021 at 8:35:43 AM PDT To: Jacob Strobl <]acob@strobldesign.com>, Sonny Taulbee <swtaulbee@gmail.com> Subject: RE: Wright Residence Yes, these plans look good to me to proceed with. Sarah Olson, PE Project Engineer O 253.888.4973 M 512.944.3821 SWENSON SAY FAGET STRUCTURAL ENGINEERING 934 Broadway, Suite 100, Tacoma, WA 98402 ssfengineers.com [;1 r'1 Vf CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, is for the sole use of the intended recipient and may contain confidential, proprietary, and/or privileged information, as well as content subject to copyright and other intellectual property laws. If you are not the intended recipient, you may not disclose, use, copy, or distribute this e-mail message or its attachments. If you believe you have received this e-mail message in error, please contact the sender by reply e-mail, immediately delete this e-mail and destroy any copies. Prior to use of this e-mail message or its attachments, the intended recipient agrees to the terms of use outlined on the Swenson Say Faget copyright link: http://ssfengineers.com/media release/ Any such use indicates acceptance by the recipient of the above statements and conditions of permitted use without exception. From: Jacob Strobl <lacob@strobldesign.com> Sent: Friday, June 25, 2021 11:48 AM To: Sarah Olson <solson@ssfengineers.com>; Sonny Taulbee <swtaulbee@gmail.com> Subject: Fwd: Wright Residence Hi Sarah, Do the attached structural drawings look good? I know we are waiting on these to be stamped by this city but these should be good for the contractor to proceed with correct? Thanks, Jacob STROBL DESIGN LLC 206.661.3622 strobldesiizn.com Begin forwarded message: From: Jacob Strobl <jacob@strobldesign.com> Date: June 22, 2021 at 7:05:12 AM PDT To: Sarah Olson <solson@ssfengineers.com> Subject: Re: Wright Residence Hi Sarah, Please see the attached updated Wright drawings. Let me know if you have any additional revisions before you stamp these. Thanks, Jacob STROBL DESIGN 206.661.3622 strobldesign.com On Fri, Jun 18, 2021 at 11:23 AM Sarah Olson <solson@ssfengineers.com> wrote: Hi Jacob, Attached are the redlines for the Wright Residence with the required beam and footing sizes. Sarah Olson, PE Project Engineer O 253.888.4973 M 512.944.3821 SWENSON SAY FAGET STRUCTURAL ENGINEERING 934 Broadway, Suite 100, Tacoma, WA 98402 ssfengineers.com CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, is for the sole use of the intended recipient and may contain confidential, proprietary, and/or privileged information, as well as content subject to copyright and other intellectual property laws. If you are not the intended recipient, you may not disclose, use, copy, or distribute this e-mail message or its attachments. If you believe you have received this e-mail message in error, please contact the sender by reply e-mail, immediately delete this e-mail and destroy any copies. Prior to use of this e-mail message or its attachments, the intended recipient agrees to the terms of use outlined on the Swenson Say Faget copyright link: http://ssfengineers.com/media release/ Any such use indicates acceptance by the recipient of the above statements and conditions of permitted use without exception. From: Jacob Strobl <lacob@strobldesign.com> Sent: Thursday, June 17, 2021 7:05 AM To: Sarah Olson <solson@ssfengineers.com> Subject: Re: Wright Residence Hi Sarah, See the attached updated foundation plan for your review and comment. Thanks, Jacob STROBL DESIGN 206.661.3622 strobldesign.com On Tue, Jun 8, 2021 at 5:05 PM Sonny Taulbee <swtaulbee@gmail.com> wrote: I think we need to replace triple 2 by 10 with beam and eliminate one Pier point only a 14 foot span Ii F B F , V-A, i —__=¢' i i 45' p i —T—�— 1— -- wi DO io�-sJ • — i�'-so- _ wa vc y T ij 1 � n I+ y 5 lu T= IBATH CIFM CF r NEN moor+ � nux •�• 11 r-FM Sent from my iPhone On Jun 8, 2021, at 11:27 AM, Sonny Taulbee <swtaulbee@gmail.com> wrote: Yes I will get you that info ASAP Sent from my iPhone On Jun 8, 2021, at 8:51 AM, Jacob Strobl <jacob@strobldesign. com> wrote: HI Sonny, Can you confirm the sizes and locations of the existing footings? If you can markup a plan and email it back that would be the quickest way to get this resolved. Thanks, Jaob STROBL DESIGN 206.661.3622 strobldesign.com On Tue, Jun 8, 2021 at 7:58 AM Sarah Olson <solson@ssfengineer s.com> wrote: Hi Jacob, Does the strip footing under the bearing wall not exist at any point along the length of the basement? We can absolutely put in new footings and beams above, I just have to know where the beams will be located to accurately size both the beams and the footings. Thanks, Sarah Olson, PE Project Engineer O 253.888.4973 M 512.944.3821 <i mage001.1 pg> SWENSON SAY FAGET STRUCTURAL ENGINEERING 934 Broadway, Suite 100, Tacoma, WA 98402 ssfengineers.com <image002.ipg> <i mage003.j pg> CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, is for the sole use of the intended recipient and may contain confidential, proprietary, and/or privileged information, as well as content subject to copyright and other intellectual property laws. If you are not the intended recipient, you may not disclose, use, copy, or distribute this e-mail message or its attachments. If you believe you have received this e-mail message in error, please contact the sender by reply e-mail, immediately delete this e-mail and destroy any copies. Prior to use of this e-mail message or its attachments, the intended recipient agrees to the terms of use outlined on the Swenson Say Faget copyright link: http://ssfengineers.com/media release/ Any such use indicates acceptance by the recipient of the above statements and conditions of permitted use without exception. From: Jacob Strobl <jacob@strobldesi� n.com> Sent: Wednesday, May 26, 20214:44 PM To: Sarah Olson <solson@ssfenginee rs.com> Cc: swtaulbee <swtaulbee@gmail.c om>; joemyersconstructio <joemyersconstructi on@comcast.net> Subject: Wright Residence Hi Sarah, The contractor is in the middle of framing and concrete work and ran into a conflict. Can we replace the callout for the strip footing at the Wright basement with new footings and beams above? The strip footing under this bearing wall does not exist. Let us know your thoughts. <imageOO4.png> Thanks, Jacob STROBL DESIGN 206.661.3622 strobldesign.com