Loading...
REVIEWED BLD2022-0269+LETTER FROM ENGINEER+3.1.2022_1.28.51_PM+2709767®� SHUTLER CONSULTING ENGINEERS, INC. 12503 Bel -Red Road, Suite 100, Bellevue, WA 98005 * (425) 450-4075 February 25, 2022 Spencer Franks 8732 — 209t1i Place SW Edmonds, WA 98026 Re: Franks Residence Spencer, RECEIVED Mar 02 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT ....,.....,..............................., REVIEWED BY CITY OF EDMONDS! BUILDING DEPARTMENT BLD2022-0269 Per our conversation, you intend to perform some structural work at your house. The following will be done. 1. A center post and beam will be replaced by a new steel beam along with new posts at each end of the beam. See the attached structural drawings for the needed work. The existing foundations will be verified in the field. Additional work may be needed when the existing foundation sizes are determined. 2. A non -bearing wall in a corner of the house will be modified. This is structurally acceptable since the wall is parallel to the floor joists and does not provide support. If you have any questions or need additional information, please give me a call. Sincerely, JQhri Headland, PE SE Prlifcipal • The following documentation shall be available on ' site for the building inspector: 1 ❑ COE APPROVED ARCHITECTURAL PLAN SET '. ■ 1 ❑ COE APPROVED STRUCTURAL PLAN SET ; ❑ COE REVIEWED CALCULATION PACKET ❑ ENERGY CREDIT WORKSHEET '. ❑ SITE PLAN 1 ❑ CIVIL PLAN ! ❑X Working plan sheets ■ ❑ 1 ■ ; ■ CITY OF EDMONDS BUILDING DEPARTMENT 2021 ; w ♦e04fF-`�`r 37757 � ..............................................- REVIEWED ' J� BY CITY OF EDMONDS: BUILDING DEPARTMENT 7)W. X ALL WORK SUBJECT APPROVED TO FIELD PLANS MUST BE INSPECTION FOR ON JOB SITE CODE COMPLIANCE