Loading...
ENG2022-0370 ROW PERMITOF WAY EUC PERMIT o PERMIT NU M City of Edmonds AveRIGHT N, Edmonds WA 98020 1 1 1 www.cityofedmonds.gov / i �r�c. 1890 Description: COMCAST-MAINTENANCE SPLICES ON 218TH AND 88TH 84TH ISSUED: 08/24/2022 Address: 8822 217TH ST SW EDMONDS WA 98026-7850 EXPIRES: 02/24/2023 Permit Type: RIGHT OF WAY EUC Permit Subtype: MINOR Parcel Number: 00602600001900 CONTACTS NAME TYPE NAME ADDRESS PHONE APPLICANT OWEN SHACKEET 410 VALLEY AVE NW, PUYALLUP WA 98371 (253)341-9318 CONTACT CABLECOM LLC 19910 NORTHCREEK PARKWAY N„ BOTHELL WA 98011 (360)454-3163 CONTRACTOR CABLECOM LLC 20021 120TH AVE NE, SUITE 101, BOTHELL WA 98011 (360)863-2628 OWNER CASEY P & KELLY H CAMPBELL 8822 217TH ST SW, EDMONDS WA 98026 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $40.00 RIGHT OF WAY MINOR - EUC PERMIT FEE $110.00 $110.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW 08/24/2022 RELEASED BY DATE Printed: Wednesday, August 24, 2022 2:41:49 PM 1 of 2 oe e n,y RIGHT OF WAY EUC PERMIT PERMIT NU�M City of Edmonds Ad 98020 ENG2022-031 www.cityofedmonds.gov / i CONDITIONS CONDITION TYPE NOTES ALERT RESIDENTS ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS REQUIREMENTS. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS www.mybuildingpermit.com POTHOLING VERIFY CLEAR BORE CROSSINGS. RESTORE LANDSCAPE Restore landscape to like or better conditions Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on SOUND AND NOISE weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTIONS INSPECTION TYPE DATE RESULT NOTES COMPLETE A-1 JOB START X-2 ENGINEERING FINAL" Printed: Wednesday, August 24, 2022 2:41:49 PM 2 of 2 RECEIVED OF EVA,10 J U L 19 2022 ` RIGHT OF WAY CONSTRUCTION PERMIT APPLICATION CITY OF EDMONDS DEVELOPMENT Complete and submit this Application in accordance with the Submittal SERVICES DEPARTMENT INc. 100 Requirements outlined in Right -of -Way permit Handout E6.,�. If any field is not applicable to your project, write "N/A" instead of leaving blank. All fields required. Incomplete Applications will be denied. SECTION A General Info Project Name COMCAST - JB0000994815 EDMONDS 2 Site Address or if no site address use Property Address at NW corner of project area: 8822 217TH ST SW, EDMONDS 98026 Associated Permits: BLD PLN ENG • applicable) Name of CompanyCOMCAST CABLE HOLDING Franchise Ordinance No: Point of Contact OWEN SHACKETT Title PERMIT COORDINATOR Address410 VALLEY AVE NW City PUYALLUP State WA Zip 98371 Phone253-341-9318 Email OWEN SHACKETT@CABLE.COMCAST.COM Contractor and Authorized Agent of Owner (see note below) Name of CompanyCABLECOM LLC Contractor Contacts During Construction Primary Name CABLECOM LLC - MICHAEL FINCH Agent Name SUNSHINE CRABBS Title CONSTRUCTION SUPERVISOR Title PERMIT COORDINATOR Mobile 360-965-5085 Address 19910 NORTHCREEK PARKWAY NORTH, SUITE 100 Email MICHAEL.FINCH@CABLECOMLLC. NET City BOTHELL State WA Zip 98011 Secondary Name Phone 360-454-3163 Title Email SUNSHINE.CRABBS@CABLECOMLLC. NET Mobile City of Edmonds Business License No: N R - 021818 Email State License No: CABLEL*971 DP V Contractor verifies it is currently bonded Contractor verifies it currently has general liability insurance NOTE: ECDC18.6o.02o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. ❑ Multifamily residential ❑ Commercial ❑ City project ❑ Single family residential subdivision ❑ Single family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? ❑ Other, please specify: ❑ Utility Franchise Work associated with development (check one of the above boxes as well) ❑ Traffic Control Only (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 Utility Franchise Work (no associated development) Project Description Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) 8822 217TH ST SW, 8909 218TH ST SW 21802 87th PI W, 8623 218TH ST SW 8505 218TH ST SW, 8415 218TH ST SW TV U NEW EZCJT . RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF x LF SF Alley 72 hours + LF x LF SF Parking 72 hours + LF JxJ LF SF SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTIONC. 1. The work in the right of way is on or for the following type of facilities: ❑ telecommunications d cable ❑ power ❑ gas ❑ water ❑ sewer ❑ storm Details of Work to be Completed 1. Does the utility owner have existin overhead infrastructure in the area of work? Yes No 2. Will any equipment be added underground or above ground (e.g. pedestals, vaults, etc.)? If yes, describe: ONE 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? X 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existingunderground common utilitysystem? X 5. Does the work involve proposed additions to an aboveground utility system? If es: Are the additions for the purpose of serving new commercial development? Are the additions for the purpose of serving a single-family residential subdivision? Details of Work to be Completed Yes No 6. 1Does your project involve rebuilding or replacing utility equipment which currently serves more X than one lot or commercial development? City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 If yes, answer the following questions related to project area, i.e. the actual area in which the project is proposed: 6a. Does your project involve wires/cables/lines? If yes: How many are existing? I I How many are to be added? 6b. Does your project involve poles? If yes: How many poles are existing in the project area? What is the height of the existing poles? How many poles are to be removed? Are additionalpoles to be laced? How many? I I What is the height of the additionalpoles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: How many? I I What is the height of the poles after? Describe the modification rebuild: SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. APPLICANT SIGNATURE: APPLICANT PRINTED NAME: Sunshine Crabbs APPLICANT TITLE: PERMIT COORDINATOR NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE 06/23/2022 City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 =DULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM ROUTE OVERVIEW Completed By: LEN ENRIQUEZ Address: 8822 217TH ST SW, EDMONDS 98026 Completion Date: 6/23/2022 Right of Way Footages: COMCAST Job Type: Select New Aerial Coax: Overlash Coax: New UG Fiber: New Aerial Fiber: Overlash Fiber: Existing UG Fiber: Empty Conduit Only: New UG Coax: Existing UG Coax: Are Additional Pages Needed: No Job Subtype: Select Survey Scope: Post -Sale Project Manager: Select Source System: JB0000994815 Legend New Ped ❑ Pole New Vault ❑v Lock Box Existing U/G Footage Existing Aerial Text Box New U/G Callout Arrow New Aerial New Tap Interior Path Footage Break Phase Identifier Fiber Splice Point Power Supply Storage Loop Hard Surface Cut Riser R Abandoned Cable I Provide Clear Construction Details Text ❑1 PS O MAINTENANCE SPLICE AT EXISTING AERIAL AND GROUND CASES AT THE FOLLOWING LOCATIONS: 6 LOCATIONS 8822 217TH ST SW, 8909 218TH ST SW 21802 87th PI W, 8623 218TH ST SW 8505 218TH ST SW, 8415 218TH ST SW NO NEW EQUIPMENT ALL EXISTING. RECEIVED J U L 19 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT �W a m 216th st SYJ I i I Fi ` �� ::■�illl: 222nd St SW 2201 - 215th St SW 215th PI sw I _M r_� 1 8822 217TH ST SW AERIAL 2 8909 218TH ST SW AERIAL 3 21802 87th PI W GROUND 4 8623 218TH ST SW AERIAL 5 8505 218TH ST SW AERIAL 6 8415 218TH ST SW AERIAL 221 st PI SW Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per city standards that is caused or occurs during the permitted project. loth St sw ENGINEERING DIVISION APPROVED AS NOTED 111 08/24/2022 VV AS B U I LT COVER Completed By: LEN ENRIQUEZ N S Completion Date: 6/23/2022 Address: 8822 217TH ST SW, EDMONDS 98026 I, 1�a COMCAST Job Type: Select Job Subtype: Select Footages Entered On Right of Way, Private Exterior, and Private Interior tabs. Footages are summarized on Survey Rollup tab. Survey Scope: Post -Sale Project Manager: _ Are Additional Pages Needed: No Select Source System: JB0000994815 Legend Walnut st New Ped ❑ Pole New Vault ❑v Lock Box API Existing U/G Footage 150' til•.�-:: s, Existing Aerial Text Box Text = New U/G Callout Arrow New Aerial { New Tap Interior Path 0 Footage Break Phase Identifier )„t, P' s.v Fiber Splice Point 04 Power Supply Ps Co Hard Surface Cut O Storage Loop ® Riser Abandoned Cable Provide Clear Construction Details MAINTENANCE SPLICE AT EXISTING AERIAL AND GROUND CASES AT THE FOLLOWING LOCATIONS: 6 LOCATIONS 8822 217TH ST SW, 8909 218TH ST SW 21802 87th PI W, 8623 218TH ST SW 8505 218TH ST SW, 8415 218TH ST SW NO NEW EQUIPMENT ALL EXISTING. � q;1 epwry�'r a E,jnionds tt•,t, 1 a c r z 4 :T'le st iw RECEIVED 3 J U L 19 2022 � U T CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Z!W PI SW :f its V 1 9W a -A:. ,} w r z,ar. �e sw ' S sl sN T � — - _ _ — —•_ — — — — _� 220th_S.tSW._._ — t Jr, P sw B � .:1aPlsw N � ►y � y Espwanc: Patk I u�•n stsry Q - Y ))<I^ St S'N I n Rc•l;irtL.ary Palo ))<r•, r, Sys I a C u..- tit Z a t r — - Q < m p. 212th S I See Y a )lf,r' 1 1 1 A I I II 1 IntannbalTral Park A ? BUFFER DATA LONGITUDINAL BUFFER SPACE = B SPEED (MPH) 25 30 35 40 45 50 55 60 65 70 LENGTH (feet) 155 200 250 305 360 425 495 570 645 730 TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = R HOST VEHICLE WEIGHT 9,900 TO 22,000 Ibs. HOST VEHICLE WEIGHT > 22,000 Ibs. < 45 MPH 45-55 MPH > 55 MPH < 45 MPH 45-55 MPH > 55 MPH 100' 123' 172' 74' 100' 150' PROTECTIVE VEHICLE (WORK VEHICLE) = R NO SPECIFIED DISTANCE REQUIRED X - - X X X 48" 48" ONE LANE . • ROAD AHEAD 48" 48" 48" W20-4 48„ W20-7A ROAD BE WORK PREPARED AHEAD TO STOP 48" 48" W20-1 W20-713 W20-71B (OPTIONAL IF 40 MPH OR LESS) LEGEND 6/4 FLAGGING STATION b TEMPORARY SIGN LOCATION CHANNELIZING DEVICES L PROTECTIVE VEHICLE THIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIAL REV DESCRIPTION DATE DESIGN: 0 ISSUE FOR PERMIT 07/07/2022 DRAWN BY: DOM APPROVED: APPROVED: APPROVED: 50' TO 300' SIGN SPACING = X (1) RURAL HIGHWAYS 60 / 65 MPH 800' +/- RURAL ROADS 45 / 55 MPH 500' +/- RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH 350' +/- RURAL ROADS, URBAN ARTERIALS, RESIDENTIAL & BUSINESS DISTRICTS 25 / 30 MPH 200' +/- (2) URBAN STREETS 25 MPH OR LESS 100' +/- (2) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE (1) I NTERSECTONS AND DRIVEWAYS. (2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. 50' TO 100' 5070 100' 6 DEVICE 6 DEVICE MI I R B MIN. WORK ®®® AREACA 101 i Rg x x � W20-7A x ONE LANE ROAD AHEAD X 48" W20-4 W20-7A X X W20-713 (OPTIONAL IF 40 MPH OR LESS) 48" BE PREPARED TO STOP 48" 48" W20-713 ONE LANE ROAD AHEAD 48" W20-4 X _ I _ X 218TH ST SW BE PREPARED W20-7B (OPTIONAL IF 40 MPH OR LESS) TO STOP 48" W20-7B ROAD WORK TES CITY OF EDMONDS DEVELOPMENT 48" 1LL SIGNS ARE BLACK ON ORANGE. SERVICES DEPARTMENT W �ON SV G3IAO2Jdd 2y EXTENDING THE CHANNELIZING DEVICE TAPER ACROSS NOISIAIG ONIb33NION�]SHOULDER IS RECOMMENDED. 3. NIGHT WORK REQUIRES ADDITIONAL ROADWAY LIGHTING AT ONE -LANE, TWO-WAY TRAFFIC CONTROL (WSDOT TC1) FLAGGINTIONA DETAILETHESTANDARDSPECIFICATIONS FOR ADDITIONAL DETAILS. WITH FLAGGERS 4. SEE SPECIAL PROVISIONS FOR WORK HOUR RESTRICTIONS. NOT TO SCALE 48" ROAD WORK AHEAD 48" W20-1 CHANNELIZATION DEVICE SPACING (FEET) MPH TAPER TANGENT 50/65 10 TO 20 80 35/45 10 TO 20 60 25/30 10 TO 20 40 RECEIVED JUL 19 2022 IMPORTANT NOTICE Section # 4216/4217 of the Government Code requires a Dig Alert Identification Number to be issued before a "Permit to Excavate" will be valid For your Dig Alert I.D. CALL TOLL FREE 48 HOURS BEFORE YOU DIG UNDERGROUND SERVICE ALERT 1-800-227-2600 217TH ST SW, 218TH ST SW, 87TH PL W, EDMONDS, WA TRAFFIC CONTROL - 21802 87TH PL W PROJ#: JB994815-HOUSING SWAP CONSTRUCTION TYPE: MAINTENANCE SYSTEM: EDMONDS NODE: TC-3 SHEET: 3 OF 6 Table 6E-1. Stopping Sight Distance as a Function of Speed Speed* Distance 20 mph 115 feet 25 mph 155 feet 30 mph 200 feet 35 mph 250 feet 40 mph 305 feet 45 mph 360 feet 50 mph 425 feet 55 mph 495 feet 60 mph 570 feet 65 mph 645 feet 70 mph 730 feet 75 mph 820 feet Posted speed, off-peak 85th-percentile speed prior to work starting, or the anticipated operating speed NOTE: INSTALL TEMPORARY NO PARKING SIGNS 48 HOURS PRIOR TO START OF WORK. ACCESS TO DRIVEWAYS WILL BE GIVEN AT ALL TIME DURING CONSTRUCTION ALL LANES SHOULD BE A MINIMUM OF 10' IN WIDTH AS MEASURED TO THE NEAR FACE OF THE CHANNELIZING DEVICES. Figure 61-1-6. Shoulder Work with Minor Encroachment (TA-6) Ov3HV NUOM T avow A n �IaoM avow aN3 T THIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIAL DESIGN: REV DESCRIPTION DATE DRAWN BY: DOM 0 ISSUE FOR PERMIT 07/07/2022 APPROVED APPROVED APPROVED 88TH AVE W II V t Typical Application 6 Table 61-1-2. Meaning of Symbols on Typical Application Diagrams ® Arrow board Shadow vehicle 000 Arrow board support or trailer (shown facing down) Sign (shown facing left) j END ROAD WORK �� Changeable message sign or support trailer ® Surveyor Channelizing device 0 Temporary barrier ® Crash cushion ® Temporary barrier with warning light Direction of temporary traffic detour Traffic or pedestrian signal Direction of traffic ® Truck -mounted attenuator IIIIII—� Flagger 0 Type 3 barricade Note: See Tables 6H-2 and High-level warning device (Flag tree) 6H-3 for the meaning g Warning light of the symbols and/or letter codes used in 0 Longitudinal channelizing device this figure. Work space Luminaire Pavement markings that should be removed for along-tce;rm project Work vehicle Work vehicle Truck -mounted attenuator (optional) Table 61-1-3. Meaning of Letter Codes on Typical Application Diagrams Road Type Distance Between Signs** A B C Urban (low speed)* 100 feet 100 feet 100 feet Urban (high speed)* 350 feet 350 feet 350 feet Rural 500 feet 500 feet 500 feet Expressway / Freeway 1,000 feet 1,500 feet 2,640 feet Buffer space Speed category to be determined by highway agency (optional) " The column headings A, B, and C are the dimensions shown in Figures 6H-1 through 6H-46. The A dimension is the distance from the transition or point of restriction to the first sign. The B dimension is the distance between the first and second signs. The C dimension is the distance between the second and third signs. (The "first sign" is the sign in a three -sign series that is closest to the TTC zone. The "third sign" is the sign that is furthest upstream from the TTC zone.) IMPORTANT NOTICE Section # 4216/4217 of the Government Code requires a Dig Alert Identification Number to be issued before a "Permit to Excavate" will be valid For your Dig Alert I.D. CALL TOLL FREE 48 HOURS BEFORE YOU DIG UNDERGROUND SERVICE ALERT 1-800-227-2600 Table 61-1-4. Formulas for Determining Taper Length Speed (S) Taper Length (L) in feet WS2 40 mph or less L = 60 45 mph or more L = WS Where: L = taper length in feet W = width of offset in feet S = posted speed limit, or off-peak 85th-percentile speed prior to work starting, or the anticipated operating speed in mph RECEIVED J U L 19 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT 217TH ST SW, 218TH ST SW, 87TH PL W, EDMONDS, WA TRAFFIC CONTROL - 8822 217TH ST SW PROJ#: JB994815-HOUSING SWAP CONSTRUCTION TYPE: MAINTENANCE SYSTEM: EDMONDS NODE: TC-1 SHEET: 1 OF 6 Table 6E-1. Stopping Sight Distance as a Function of Speed Speed* Distance 20 mph 115 feet 25 mph 155 feet 30 mph 200 feet 35 mph 250 feet 40 mph 305 feet 45 mph 360 feet 50 mph 425 feet 55 mph 495 feet 60 mph 570 feet 65 mph 645 feet 70 mph 730 feet 75 mph 820 feet Posted speed, off-peak 85th-percentile speed prior to work starting, or the anticipated operating speed NOTE: INSTALL TEMPORARY NO PARKING SIGNS 48 HOURS PRIOR TO START OF WORK. ACCESS TO DRIVEWAYS WILL BE GIVEN AT ALL TIME DURING CONSTRUCTION ALL LANES SHOULD BE A MINIMUM OF 10' IN WIDTH AS MEASURED TO THE NEAR FACE OF THE CHANNELIZING DEVICES. Figure 61-1-6. Shoulder Work with Minor Encroachment (TA-6) OV3H`d )i Ti OM O`d08 #<EEEE�_ THIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIAL DESIGN: REV DESCRIPTION DATE DRAWN BY: DOM 0 ISSUE FOR PERMIT 07/07/2022 APPROVED APPROVED APPROVED /A MOM OdO8 ON] 1 .11. 92ND AVE W K Typi, IMPORTANT NOTICE Section # 4216/4217 of the Government Code requires a Dig Alert Identification Number to be issued before a "Permit to Excavate" will be valid For your Dig Alert I.D. CALL TOLL FREE 48 HOURS BEFORE YOU DIG UNDERGROUND SERVICE ALERT 1-800-227-2600 Table 61-1-2. Meaning of Symbols on Typical Application Diagrams ® Arrow board Shadow vehicle 000 Arrow board support or trailer (shown facing down) Sign (shown facing left) Changeable message sign or support trailer ® Surveyor Channelizing device 0 Temporary barrier ® Crash cushion ® Temporary barrier with warning light Direction of temporary traffic detour Traffic or pedestrian signal Direction of traffic ® Truck -mounted attenuator IIIIII—� Flagger 0 Type 3 barricade High-level warning device (Flag tree) Warning light 0 Longitudinal channelizing device Work space Luminaire Pavement markings that should be removed for along-tce;rm project Work vehicle Table 61-1-3. Meaning of Letter Codes on Typical Application Diagrams Road Type Distance Between Signs** A B C Urban (low speed)* 100 feet 100 feet 100 feet Urban (high speed)* 350 feet 350 feet 350 feet Rural 500 feet 500 feet 500 feet Expressway / Freeway 1,000 feet 1,500 feet 2,640 feet Speed category to be determined by highway agency " The column headings A, B, and C are the dimensions shown in Figures 6H-1 through 6H-46. The A dimension is the distance from the transition or point of restriction to the first sign. The B dimension is the distance between the first and second signs. The C dimension is the distance between the second and third signs. (The "first sign" is the sign in a three -sign series that is closest to the TTC zone. The "third sign" is the sign that is furthest upstream from the TTC zone.) Table 61-1-4. Formulas for Determining Taper Length Speed (S) Taper Length (L) in feet WS2 40 mph or less L = 60 45 mph or more L = WS Where: L = taper length in feet W = width of offset in feet S = posted speed limit, or off-peak 85th-percentile speed prior to work starting, or the anticipated operating speed in mph RECEIVED J U L 19 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT 217TH ST SW, 218TH ST SW, 87TH PL W, EDMONDS, WA TRAFFIC CONTROL - 8909 218TH ST SW PROJ#: JB994815-HOUSING SWAP CONSTRUCTION TYPE: MAINTENANCE SYSTEM: EDMONDS NODE: TC-2 SHEET: 2 OF 6 Table 6E-1. Stopping Sight Distance as a Function of Speed Speed* Distance 20 mph 115 feet 25 mph 155 feet 30 mph 200 feet 35 mph 250 feet 40 mph 305 feet 45 mph 360 feet 50 mph 425 feet 55 mph 495 feet 60 mph 570 feet 65 mph 645 feet 70 mph 730 feet 75 mph 820 feet Posted speed, off-peak 85th-percentile speed prior to work starting, or the anticipated operating speed NOTE: INSTALL TEMPORARY NO PARKING SIGNS 48 HOURS PRIOR TO START OF WORK. ACCESS TO DRIVEWAYS WILL BE GIVEN AT ALL TIME DURING CONSTRUCTION ALL LANES SHOULD BE A MINIMUM OF 10' IN WIDTH AS MEASURED TO THE NEAR FACE OF THE CHANNELIZING DEVICES. Figure 61-1-6. Shoulder Work with Minor Encroachment (TA-6) V T THIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIAL DESIGN: REV DESCRIPTION DATE DRAWN BY: DOM 0 ISSUE FOR PERMIT 07/07/2022 APPROVED APPROVED APPROVED A MOM av0a aN3 T 87TH PL W II U t 86TH PL W Typical Application 6 1 END ROAD WORK Note: See Tables 6H-2 and 6H-3 for the meaning of the symbols and/or letter codes used in this figure. Work vehicle Truck -mounted attenuator (optional) Table 61-1-2. Meaning of Symbols on Typical Application Diagrams ® Arrow board Shadow vehicle 000 Arrow board support or trailer (shown facing down) Sign (shown facing left) Changeable message sign or support trailer ® Surveyor Channelizing device 0 Temporary barrier ® Crash cushion ® Temporary barrier with warning light Direction of temporary traffic detour Traffic or pedestrian signal Direction of traffic ® Truck -mounted attenuator IIIIII—� Flagger Type 3 barricade High-level warning device (Flag tree) Warning light 0 Longitudinal channelizing device Work space Luminaire Pavement markings that should be removed for along-tce;rm project Work vehicle Table 61-1-3. Meaning of Letter Codes on Typical Application Diagrams Road Type Distance Between Signs** A B C Urban (low speed)* 100 feet 100 feet 100 feet Urban (high speed)* 350 feet 350 feet 350 feet Rural 500 feet 500 feet 500 feet Expressway / Freeway 1,000 feet 1,500 feet 2,640 feet Buffer space Speed category to be determined by highway agency (optional) " The column headings A, B, and C are the dimensions shown in Figures 6H-1 through 6H-46. The A dimension is the distance from the transition or point of restriction to the first sign. The B dimension is the distance between the first and second signs. The C dimension is the distance between the second and third signs. (The "first sign" is the sign in a three -sign series that is closest to the TTC zone. The "third sign" is the sign that is furthest upstream from the TTC zone.) 1/3 L 1 A ROAD j WORK AHEAD IMPORTANT NOTICE Section # 4216/4217 of the Government Code requires a Dig Alert Identification Number to be issued before a "Permit to Excavate" will be valid For your Dig Alert I.D. CALL TOLL FREE 48 HOURS BEFORE YOU DIG UNDERGROUND SERVICE ALERT 1-800-227-2600 Table 61-1-4. Formulas for Determining Taper Length Speed (S) Taper Length (L) in feet WS2 40 mph or less L = 60 45 mph or more L = WS Where: L = taper length in feet W = width of offset in feet S = posted speed limit, or off-peak 85th-percentile speed prior to work starting, or the anticipated operating speed in mph RECEIVED JUL 19 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT 217TH ST SW, 218TH ST SW, 87TH PL W, EDMONDS, WA TRAFFIC CONTROL - 8623 218TH ST SW PROJ#: JB994815-HOUSING SWAP CONSTRUCTION TYPE: MAINTENANCE SYSTEM: EDMONDS NODE: TC-4 SHEET: 4 OF 6 Table 6E-1. Stopping Sight Distance as a Function of Speed Speed* Distance 20 mph 115 feet 25 mph 155 feet 30 mph 200 feet 35 mph 250 feet 40 mph 305 feet 45 mph 360 feet 50 mph 425 feet 55 mph 495 feet 60 mph 570 feet 65 mph 645 feet 70 mph 730 feet 75 mph 820 feet Posted speed, off-peak 85th-percentile speed prior to work starting, or the anticipated operating speed NOTE: INSTALL TEMPORARY NO PARKING SIGNS 48 HOURS PRIOR TO START OF WORK. ACCESS TO DRIVEWAYS WILL BE GIVEN AT ALL TIME DURING CONSTRUCTION ALL LANES SHOULD BE A MINIMUM OF 10' IN WIDTH AS MEASURED TO THE NEAR FACE OF THE CHANNELIZING DEVICES. THIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIAL DESIGN: REV DESCRIPTION DATE DRAWN BY: DOM 0 ISSUE FOR PERMIT 07/07/2022 APPROVED APPROVED APPROVED Figure 6H-6. Shoulder Work with Minor Encroachment (TA-6) aV3HV AHOM>7T r aVoa A N8oM avo8 aN3 85TH PL W i 00 N l 10ft MIN.I 0 i 84TH AVE W Typical Application 6 i END ROAD WORK Note: See Tables 6H-2 and 6H-3 for the meaning of the symbols and/or letter codes used in this figure. Work vehicle Truck -mounted attenuator (optional) Table 61-1-2. Meaning of Symbols on Typical Application Diagrams ® Arrow board Shadow vehicle 000 Arrow board support or trailer (shown facing down) Sign (shown facing left) Changeable message sign or support trailer ® Surveyor Channelizing device 0 Temporary barrier ® Crash cushion ® Temporary barrier with warning light Direction of temporary traffic detour Traffic or pedestrian signal Direction of traffic ® Truck -mounted attenuator IIIIII _* Flagger 0 Type 3 barricade High-level warning device (Flag tree) Warning light 0 Longitudinal channelizing device Work space Luminaire Pavement markings that should be removed for along-tce;rm project Work vehicle Table 61-1-3. Meaning of Letter Codes on Typical Application Diagrams Road Type Distance Between Signs** A B C Urban (low speed)* 100 feet 100 feet 100 feet Urban (high speed)* 350 feet 350 feet 350 feet Rural 500 feet 500 feet 500 feet Expressway / Freeway 1,000 feet 1,500 feet 2,640 feet Buffer space Speed category to be determined by highway agency (optional) " The column headings A, B, and l C are the dimensions shown in Figures 6H-1 through 6H-46. The A dimension is the distance from the transition or point of restriction to the first sign. The B dimension is the distance between the first and second signs. The C dimension is the distance between the second and third signs. (The "first sign" is the sign in a three -sign series that is closest to the TTC zone. The "third sign" is the sign that is furthest upstream from the TTC zone.) 1/3 L A ROAD i 7 WORK AHEAD IMPORTANT NOTICE Section # 4216/4217 of the Government Code requires a Dig Alert Identification Number to be issued before a "Permit to Excavate" will be valid For your Dig Alert I.D. CALL TOLL FREE 48 HOURS BEFORE YOU DIG UNDERGROUND SERVICE ALERT 1-800-227-2600 Table 61-1-4. Formulas for Determining Taper Length Speed (S) Taper Length (L) in feet WS2 40 mph or less L = 60 45 mph or more L = WS Where: L = taper length in feet W = width of offset in feet S = posted speed limit, or off-peak 85th-percentile speed prior to work starting, or the anticipated operating speed in mph RECEIVED J U L 19 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT 217TH ST SW, 218TH ST SW, 87TH PL W, EDMONDS, WA TRAFFIC CONTROL - 8505 218TH ST SW PROJ#: JB994815-HOUSING SWAP CONSTRUCTION TYPE: MAINTENANCE SYSTEM: EDMONDS NODE: TC-5 SHEET: 5 OF 6 BUFFER DATA LONGITUDINAL BUFFER SPACE = B SPEED (MPH) 25 30 35 40 45 50 55 60 65 70 LENGTH (feet) 155 200 250 305 360 425 495 570 645 730 TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = R HOST VEHICLE WEIGHT 9,900 TO 22,000 Ibs. HOST VEHICLE WEIGHT > 22,000 Ibs. < 45 MPH 45-55 MPH > 55 MPH < 45 MPH 45-55 MPH > 55 MPH 100' 123' 172' 74' 100' 150' PROTECTIVE VEHICLE (WORK VEHICLE) = R NO SPECIFIED DISTANCE REQUIRED 00 b � r a a X X ONE LANE\ ROAD AHEAD 48" 48" W20-4 ROAD WORK AHEAD 48" W20-1 LEGEND 4i4 FLAGGING STATION a TEMPORARY SIGN LOCATION CHANNELIZING DEVICES PROTECTIVE VEHICLE X X 48" 48" 48" W20-7A BE PREPARED \O STOP W20-7B W20-713 (OPTIONAL IF 40 MPH OR LESS) THIS IS A COMCAST DOCUMENT, PROPRIETARY & CONFIDENTIAL REV DESCRIPTION DATE DESIGN: 0 ISSUE FOR PERMIT 07/07/2022 DRAWN BY: DOM APPROVED: APPROVED: APPROVED: SIGN SPACING = X (1) RURAL HIGHWAYS 60 / 65 MPH 800' +/- RURAL ROADS 45 / 55 MPH 500' +/- RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH 350' +/- RURAL ROADS, URBAN ARTERIALS, 25 / 30 MPH RESIDENTIAL & BUSINESS DISTRICTS 200' +/- (2) URBAN STREETS 25 MPH OR LESS 100' +/- (2) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE (1) I NTERSECTONS AND DRIVEWAYS. (2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. 50' TO 100' 6 DEVICE MIN. 50' TO 300' AREA M 5070 100' 6 DEVICE B _ _ MIN. _ / 48" 48" W20-7A X _ I - X 218TH ST SW ONE -LANE, TWO-WAY TRAFFIC CONTROL (WSDOT TC1) WITH FLAGGERS NOT TO SCALE IMPORTANT NOTICE Section # 4216/4217 of the Government Code requires a Dig Alert Identification Number to be issued before a "Permit to Excavate" will be valid For your Dig Alert I.D. CALL TOLL FREE 48 HOURS BEFORE YOU DIG UNDERGROUND SERVICE ALERT 1-800-227-2600 W20-713 (OPTIONAL IF 40 MPH OR LESS) 48" BE PREPARED TO STOP 48" 48" W20-7B ONE LANE ROAD AHEAD 48" W20-4 X - I - X 48" ROAD WORK AHEAD 48" W20-1 CHANNELIZATION DEVICE SPACING (FEET) MPH TAPER TANGENT 50/65 10 TO 20 80 35/45 10 TO 20 60 25/30 10 TO 20 40 RECEIVED JUL 19 2022 NOTES CITY OF EDMONDS DEVELOPMENT 1 - ALL SIGNS ARE BLACK ON ORANGE. SERVICES DEPARTMENT 2. EXTENDING THE CHANNELIZING DEVICE TAPER ACROSS SHOULDER IS RECOMMENDED. 3. NIGHT WORK REQUIRES ADDITIONAL ROADWAY LIGHTING AT FLAGGING STATIONS. SEE THE STANDARD SPECIFICATIONS FOR ADDITIONAL DETAILS. 4. SEE SPECIAL PROVISIONS FOR WORK HOUR RESTRICTIONS. 217TH ST SW, 218TH ST SW, 87TH PL W, EDMONDS, WA TRAFFIC CONTROL - 8415 218TH ST SW PROJ#: JB994815-HOUSING SWAP CONSTRUCTION TYPE: MAINTENANCE SYSTEM: EDMONDS NODE: TC-6 SHEET: 6 OF 6 RECEIVED J U L 19 2022 CITY OF EDMONDS CITY OF EDMONDS M BuildingPermitxom DEVELOPMENT SERVICES DEPARTMENT Right -Off- ":Ay ;Npiieation #1171025 - COMCAST - JB0000994815 - EDMONDS 2 Applicant First Name Last Name Company Name OWEN SHACKEET COMCAST Number Street Apartment or Suite Number E-mail Address 410 VALLEY AVE NW OWEN SHACKETT@CABLE.COMCAST. City State Zip Phone Number Extension PUYALLUP WA 98371 (253) 341-9318 Contractor Company Name Cablecom LLC Number Street Apartment or Suite Number 19910 NORTH CREEK PARKWAY NORTH 100 City State Zip Phone Number Extension BOTHELL WA 98011 (360) 863-2628 (360) 454-3163 State License Number License Expiration Date UBI # E-mail Address CABLEL*971 DP 8/21/2023 FD99RSS79 SNOHOMISH.PERM ITTING@CABLECO Project Location Number Street Floor Number Suite or Room Number 8822 217TH ST SW City Zip Code County Parcel Number EDMONDS 98026 00602600001900 Associated Building Permit Number Tenant Name Additional Information (i.e. equipment location or special instructions)_ Work Location Property Owner First Name Last Name or Company Name Casey P & Kelly H Campbell Number Street Apartment or Suite Number 8822 217TH ST SW City State Zip EDMONDS WA 98026 Certification Statement - The applicant states: I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work requires a licensed contractor to perform the work, the information will be provided prior to permit issuance. Date Submitted: 7/11/2022 Submitted By: OWEN SHACKEET Page 1 of 2 i CITY OF EDMONDS MyBuildingPermit.com Right -of -Way Application #1171025 - COMCAST - JB0000994815 - EDMONDS 2 Project Contact Company CABLECOM LLC Name: Name: SUNSHINE CRABBS Email: SUNSHINE.CRABBS@CABLECOMLLC.NET Address: 19910 NORTHCREEK Phone (360) 454-3163 PARKWAY N, 100 #: BOTHELL WA 98011 Project Type Activity Type Scope of Work Utility Purveyor Utility Work No Disturbance of Surface Project Name: COMCAST - JB0000994815 - EDMONDS 2 MAINTENANCE SPLICE AT EXISTING AERIAL AND GROUND CASES AT THE Description of FOLLOWING LOCATIONS: 6 LOCATIONS 8822 217TH ST SW, 8909 218TH ST SW 21802 Work: 87th PI W, 8623 218TH ST SW 8505 218TH ST SW, 8415 218TH ST SW NO NEW EQUIPMENT ALL EXISTING. Project Details Project Information Job Number JB0000994815 Page 2 of 2