19-015 82nd Townhouses - Bond Quantity Worksheet 2020-11-12 (2)Site Improvement Bond Quantity Worksheet S15 Web date: 04/03/201F
ka King County
Department of Permitting & Environmental Review
35030 SE Douglas Street, Suite 210
Snoqualmie, Washington 98065-9266
206-296-6600 TTY Relay 711
Project Name: Select Homes- Calvary 82nd Townhouses
Location: 21222 82nd Place W
Clearing greater than or equal to 5,000 board feet of timber?
yes
If yes,
Forest Practice Permit Number:
(RCW 76.09)
Page 1 of 9
X no
19-015 82nd Townhouses - Bond Quantity Worksheet 2020-11-12.xlsx
For alternate formats, call 206-296-6600.
Date: 11 /12/2020
Project No.:
Activity No.:
PLN 20200029
Note: All prices include labor, equipment, materials, overhead and
profit. Prices are from RS Means data adjusted for the Seattle area
or from local sources if not included in the RS Means database.
Unit prices updated: 3/2/2015
Version: 3/2/2015
Report Date: 11/12/2020
Site Improvement Bond Quantity Worksheet S15 Web date: 04/03/201F
Reference #
Unit
Price
Unit
Quantity
# of
Applications
Cost
EROSION/SEDIMENT CONTROL
Number
Backfill & compaction -embankment
ESC-1
$ 6.00
CY
Check dams, 4" minus rock
ESC-2
SWDM 5.4.6.3
$ 80.00
Each
Crushed surfacing 1 1/4" minus
ESC-3
WSDOT 9-03.9(3)
$ 95.00
CY
Ditching
ESC-4
$ 9.00
CY
Excavation -bulk
ESC-5
$ 2.00
CY
Fence, silt
ESC-6
SWDM 5.4.3.1
$ 1.50
LF
255
1
383
Fence, Temporary (NGPE)
ESC-7
$ 1.50
LF
Hydroseeding
ESC-8
SWDM 5.4.2.4
$ 0.80
SY
Jute Mesh
ESC-9
SWDM 5.4.2.2
$ 3.50
SY
Mulch, by hand, straw, 3" deep
ESC-10
SWDM 5.4.2.1
$ 2.50
SY
Mulch, by machine, straw, 2" deep
ESC-11
SWDM 5.4.2.1
$ 2.00
SY
Piping, temporary, CPP, 6"
ESC-12
$ 12.00
LF
Piping, temporary, CPP, 8"
ESC-13
$ 14.00
LF
Piping, temporary, CPP, 12"
ESC-14
$ 18.00
LF
Plastic covering, 6mm thick, sandbagged
ESC-15
SWDM 5.4.2.3
$ 4.00
SY
200
1
800
Rip Rap, machine placed; slopes
ESC-16
WSDOT 9-13.1(2)
$ 45.00
CY
Rock Construction Entrance, 50'x15'x1'
ESC-17
SWDM 5.4.4.1
$ 1,800.00
Each
Rock Construction Entrance, 100'x15'x1'
ESC-18
SWDM 5.4.4.1
$ 3,200.00
Each
1
1
3200
Sediment pond riser assembly
ESC-19
SWDM 5.4.5.2
$ 2,200.00
Each
Sediment trap, 5' high berm
ESC-20
SWDM 5.4.5.1
$ 19.00
LF
Sed. trap, 5' high, riprapped spillway berm section
ESC-21
SWDM 5.4.5.1
$ 70.00
LF
Seeding, by hand
Sodding, 1" deep, level ground
ESC-22
SWDM 5.4.2.4
$ 1.00
SY
ESC-23
SWDM 5.4.2.5
$ 8.00
SY
Sodding, 1" deep, sloped ground
ESC-24
SWDM 5.4.2.5
$ 10.00
SY
TESC Supervisor
ESC-25
$ 110.00
HR
20
1
2200
Water truck, dust control
ESC-26
SWDM 5.4.7
$ 140.00
HR
WRITE -IN -ITEMS **** (see page 9)
Catchbasin Protection
$ 150.00
Each
6
1
900
ESC SUBTOTAL:
30% CONTINGENCY & MOBILIZATION:
ESC TOTAL:
C91SA11LT, 1►1
Page 2 of 9
19-015 82nd Townhouses - Bond Quantity Worksheet 2020-11-12.xlsx
$ 7,482.50
$ 2,244.75
$ 9,727.25
A
Unit prices updated: 3/2/2015
Version: 3/2/2015
Report Date: 11/12/2020
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right -of -Way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant.
Cost
Quant.
Cost
Quant.
Cost
GENERAL ITEMS
No.
Backfill & Compaction- embankment
GI - 1
$ 6.00
CY
10
60.00
90
540.00
Backfill & Compaction- trench
GI - 2
$ 9.00
CY
Clear/Remove Brush, by hand
GI - 3
$ 1.00
SY
Clearing/Grubbing/Tree Removal
GI - 4
$10,000.00
Acre
0.26
2,600.00
Excavation - bulk
GI - 5
$ 2.00
CY
50
100.00
750
1,500.00
Excavation - Trench
GI - 6
$ 5.00
CY
Fencing, cedar, 6' high
GI - 7
$ 20.00
LF
Fencing, chain link, vinyl coated, 6' high
GI - 8
$ 20.00
LF
Fencing, chain link, gate, vinyl coated, 20'
GI - 9
$ 1,400.00
Each
Fencing, split rail, 3' high
GI - 10
$ 15.00
LF
Fill & compact - common barrow
GI - 11
$ 25.00
CY
Fill & compact - gravel base
GI - 12
$ 27.00
CY
Fill & compact - screened topsoil
GI - 13
$ 39.00
CY
Gabion, 12" deep, stone filled mesh
GI - 14
$ 65.00
SY
Gabion, 18" deep, stone filled mesh
GI - 15
$ 90.00
SY
Gabion, 36" deep, stone filled mesh
GI - 16
$ 150.00
SY
Grading, fine, by hand
GI - 17
$ 2.50
SY
Grading, fine, with grader
GI - 18
$ 2.00
SY
Monuments, 3' long
GI - 19
$ 250.00
Each
Sensitive Areas Sin
GI - 20
$ 7.00
Each
Sodding, 1" deep, sloped ground
GI - 21
$ 8.00
SY
Surveying, line & grade
GI - 22
$ 850.00
Da
Surveying, lot location/lines
GI - 23
$ 1,800.00
Acre
Traffic control crew 2 flaggers
GI - 24
$ 120.00
HR
Trail, 4" chipped wood
GI - 25
$ 8.00
SY
Trail, 4" crushed cinder
GI - 26
$ 9.00
SY
Trail, 4" top course
GI - 27
$ 12.00
SY
Wall, retaining, concrete
GI - 28
$ 55.00
SF
Wall, rockery
GI - 29
$ 15.00
SF
Page 3 of 9
SUBTOTAL
160.00
4,640.00
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
19-015 82nd Townhouses - Bond Quantity Worksheet 2020-11-12.xlsx Report Date: 11/13/2020
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Cost
Quant.T Cost
Quant. Cost
ROAD IMPROVEMENT
No.
AC Grinding, 4' wide machine < 1000s
RI - 1
$ 30.00
SY
AC Grinding, 4' wide machine 1000-2000
RI - 2
$ 16.00
SY
AC Grinding, 4' wide machine > 2000s
RI - 3
$ 10.00
SY
AC Removal/Disposal
RI - 4
$ 35.00
SY
60
2,100.00
Barricade, type III Permanent
RI - 6
$ 56.00
LF
Curb & Gutter, rolled
RI - 7
$ 17.00
LF
Curb & Gutter, vertical
RI - 8
$ 12.50
LF
90
1,125.00
Curb and Gutter, demolition and disposal
RI - 9
$ 18.00
LF
Curb, extruded asphalt
RI - 10
$ 5.50
LF
Curb, extruded concrete
RI - 11
$ 7.00
LF
205
1,435.00
Sawcut, asphalt, 3" depth
RI - 12
$ 1.85
LF
240
444.00
Sawcut, concrete, per 1" depth
RI - 13
$ 3.00
LF
Sealant, asphalt
RI - 14
$ 2.00
LF
240
480.00
Shoulder, AC, see AC road unit price
RI - 15
$ -
SY
Shoulder, gravel, 4" thick
RI - 16
$ 15.00
SY
Sidewalk, 4" thick
RI - 17
$ 38.00
SY
Sidewalk, 4" thick, demolition and disposa
RI - 18
$ 32.00
SY
Sidewalk, 5" thick
RI - 19
$ 41.00
SY
450
18,450.00
Sidewalk, 5" thick, demolition and disposa
RI - 20
$ 40.00
SY
Sign, handicap
RI - 21
$ 85.00
Each
Striping, per stall
RI - 22
$ 7.00
1 Each
Striping, thermoplastic, for crosswalk
RI - 23
$ 3.00
1 SF
Striping, 4" reflectorized line
RI - 24
$ 0.50
1 LF
Page 4 of 9
SUBTOTAL 22,599.00
00
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
19-015 82nd Townhouses - Bond Quantity Worksheet 2020-11-12.xlsx Report Date: 11/13/2020
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
I Quant. Cost
Quant.T Cost
Quant. Cost
ROAD SURFACING
No.
4" Rock = 2.5 base & 1.5" to course 9 1/2" Rock= 8" base & 1.5" top course
Additional 2.5' Crushed Surfacing
RS - 1
$ 3.60
SY
HMA 1/2" Overlay, 1.5'
RS - 2
$ 14.00
SY
180
2,520.00
HMA 1/2" Overlay 2"
RS - 3
$ 18.00
SY
HMA Road, 2", 4" rock, First 2500 SY
RS - 4
$ 28.00
SY
HMA Road, 2", 4" rock, Qty. over 2500 SY
RS - 5
$ 21.00
SY
HMA Road, 3", 9 1/2" Rock, First 2500 SN
RS - 6
$ 35.00
SY
115
4,025.00
360
12,600.00
HMA Road, 3", 9 1/2" Rock, Qty Over 250
RS - 7
$ 42.00
SY
Not Used
RS - 8
Not Used
RS - 9
HMA Road, 6" Depth, First 2500 SY
RS - 10
$ 33.10
SY
HMA Road, 6" Depth, Qty. Over 2500 SY
RS - 11
$ 30.00
SY
HMA 3/4" or 1", 4" Depth
RS - 12
$ 20.00
SY
Gravel Road, 4" rock, First 2500 SY
RS - 13
$ 15.00
SY
Gravel Road, 4" rock, Qty. over 2500 SY
RS - 14
$ 10.00
SY
PCC Road (Add Under Write -Ins w/Desig
RS - 15
Thickened Edge
IRS - 17
$ 8.60
LF
Page 5 of 9
SUBTOTAL 6,545.00
12,600.00
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
19-015 82nd Townhouses - Bond Quantity Worksheet 2020-11-12.xlsx Report Date: 11/13/2020
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Cost
Quant. Cost
Quant. Cost
DRAINAGE (CPP = Corrugated Plastic Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.
Access Road, R/D
D - 1
$ 21.00
SY
Bollards - fixed
D - 2
$ 240.74
Each
Bollards - removable
D - 3
$ 452.34
Each
* (CBs include frame and lid
CB Type I
D - 4
$ 1,500.00
Each
2
3,000.00
1
1,500.00
CB Type IL
D - 5
$ 1,750.00
Each
CB Type II, 48" diameter
D - 6
$ 2,300.00
Each
for additional depth over 4'
D - 7
$ 480.00
FT
CB Type II, 54" diameter
D - 8
$ 2,500.00
Each
1
2,500.00
for additional depth over 4'
D - 9
$ 495.00
FT
2
990.00
CB Type II, 60" diameter
D - 10
$ 2,800.00
Each
for additional depth over 4'
D - 11
$ 600.00
FT
CB Type II, 72" diameter
D - 12
$ 3,600.00
Each
for additional depth over 4'
D - 13
$ 850.00
FT
Through -curb Inlet Framework Add
D - 14
$ 400.00
Each
Cleanout, PVC, 4"
D - 15
$ 150.00
Each
Cleanout, PVC, 6"
D - 16
$ 170.00
Each
1
170.00
Cleanout, PVC, 8"
D - 17
$ 200.00
Each
Culvert, PVC, 4"
D - 18
$ 10.00
LF
Culvert, PVC, 6"
D - 19
$ 13.00
LF
24
312.00
Culvert, PVC, 8"
D - 20
$ 15.00
LF
Culvert, PVC, 12"
D - 21
$ 23.00
LF
Culvert, CMP, 8"
D - 22
$ 19.00
LF
Culvert, CMP, 12"
D - 23
$ 29.00
LF
Culvert, CMP, 15"
D - 24
$ 35.00
LF
Culvert, CMP, 18"
D - 25
$ 41.00
LF
Culvert, CMP, 24"
D - 26
$ 56.00
LF
Culvert, CMP, 30"
D - 27
$ 78.00
LF
Culvert, CMP, 36"
D - 28
$ 130.00
LF
Culvert, CMP, 48"
D - 29
$ 190.00
LF
Culvert, CMP, 60"
D - 30
$ 270.00
LF
Culvert, CMP, 72"
D - 31
$ 350.00
LF
Page 6 of 9
SUBTOTAL 3,000.00
5,472.00
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
19-015 82nd Townhouses - Bond Quantity Worksheet 2020-11-12.xlsx Report Date: 11/13/2020
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
DRAINAGE CONTINUED
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
No.
Unit Price
Unit
Quant.
Cost
Quant.
Cost
Quant.
Cost
Culvert, Concrete, 8"
D - 32
$ 25.00
LF
Culvert, Concrete, 12"
D - 33
$ 36.00
LF
Culvert, Concrete, 15"
D - 34
$ 42.00
LF
Culvert, Concrete, 18"
D - 35
$ 48.00
LF
Culvert, Concrete, 24"
D - 36
$ 78.00
LF
Culvert, Concrete, 30"
D - 37
$ 125.00
LF
Culvert, Concrete, 36"
D - 38
$ 150.00
LF
Culvert, Concrete, 42"
D - 39
$ 175.00
LF
Culvert, Concrete, 48"
D - 40
$ 205.00
LF
Culvert, CPP, 6"
D - 41
$ 14.00
LF
Culvert, CPP, 8"
D - 42
$ 16.00
LF
20
320
53
848
Culvert, CPP, 12"
D - 43
$ 24.00
LF
32
768
Culvert, CPP, 15"
D - 44
$ 35.00
LF
Culvert, CPP, 18"
D - 45
$ 41.00
LF
Culvert, CPP, 24"
D - 46
$ 56.00
LF
Culvert, CPP, 30"
D - 47
$ 78.00
LF
Culvert, CPP, 36"
D - 48
$ 130.00
LF
Ditching
D - 49
$ 9.50
CY
Flow Dispersal Trench 1,436 base+
D - 50
$ 28.00
LF
French Drain 3' depth
D - 51
$ 26.00
LF
Geotextile, laid in trench, polypropylene
D - 52
$ 3.00
SY
Mid -tank Access Riser, 48" dia, 6' deep
D - 54
$ 2,000.00
Each
Pond Overflow Spillway
D - 55
$ 16.00
SY
Restrictor/Oil Separator, 12"
D - 56
$ 1,150.00
Each
1
1150
Restrictor/Oil Separator, 15"
D - 57
$ 1,350.00
Each
Restrictor/Oil Separator, 18"
D - 58
$ 1,700.00
Each
Riprap, placed
D - 59
$ 42.00
CY
Tank End Reducer 36" diameter
D - 60
$ 1,200.00
Each
Trash Rack, 12"
D - 61
$ 350.00
Each
Trash Rack, 15"
D - 62
$ 410.00
Each
Trash Rack, 18"
D - 63
$ 480.00
Each
Trash Rack, 21"
1 D - 64
$ 550.00
1 Each
Page 7 of 9
. ir.Mr1111
1088
1998
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
19-015 82nd Townhouses - Bond Quantity Worksheet 2020-11-12.xlsx Report Date: 11/13/2020
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Price
Quant. Cost
Quant. Cost
PARKING LOT SURFACING Not To Be Used For Roads Or Shoulders
No.
2" AC, 2" top course rock & 4" borrow
PL - 1
$ 21.00
SY
NA
NA
2" AC, 1.5' top course & 2.5' base cours
PL - 2
$ 28.00
SY
NA
NA
4" select borrow
PL - 3
$ 5.00
SY
NA
NA
1.5' top course rock & 2.5' base course
PL - 4
$ 14.00
SY
NA
NA
UTILITY POLES & STREET LIGHTING Utility pole relocation costs must be accompanied by Franchise Utility's Cost Estimate
Utility Poles Relocation
UP-1
Lump Sum
Street Light Poles w/Luminaires
UP-2
$ 8,000.00 Each
WRITE -IN -ITEMS
Such as detention/water quality vaults.
No.
Traffic Control
WI-1
$ 1,500.00
Lump
1
1500
Water Service
WI-2
$ 1,200.00
Ea.
4
4800
1-1/2" Water Service Line
WI-3
$ 9.00
LF
140
1260
270
2,430.00
Sewer- 6" Cleanout
W I - 4
$ 170.00
Ea.
1
170
5
850.00
Sewer- 6" PVC
WI-5
$ 25.00
LF
24
600
125
3,125.00
R-Tank Detention System
W 1- 6
$31,000.00
Lump
1
31,000.00
Mailbox CBU
W 1 - 7
$ 1,800.00
Ea.
1
1800
WI-8
WI-9
WI-10
SUBTOTAL
SUBTOTAL (SUM ALL PAGES):
30%CONTINGENCY & MOBILIZATION:
GRANDTOTAL:
COLUMN:
Page 8 of 9
10,130.00
43,522.00
13,056.60
56,578.60
B
C
37,405.00
63,550.00
19,065.00
82,615.00
D
Unit prices updated: 03/02/2015
*KCC 27A authorizes only one bond reduction. Version: 03/02/2015
19-015 82nd Townhouses - Bond Quantity Worksheet 2020-11-12.xlsx Report Date: 11/13/2020
Site Improvement Bond Quantity Worksheet Web date: 04/03/2015
Original bond computations prepared by:
Name: Rob Long, PE Date: 11/12/2020
PE Registration Number: 36508 Tel. #: (425) 678-6960
Firm Name: RAM Engineering, Inc.
Address: 16531 13th Ave W, Suite A108 Lynnwood WA 98037 Project No: PLN 20200029
Stabilization/Erosion Sediment Control (ESC)
Existing Right -of -Way Improvements
Future Public Right of Way & Drainage Facilities
Private Improvements
Calculated Quantity Completed
Total Right -of Way and/or Site Restoration Bond*/**
(First $7,500 of bond* shall be cash.
Performance Bond* Amount (A+B+C+D) = TOTAL
Maintenance/Defect Bond* Total
NAME OF PERSON PREPARING BOND* REDUCTION:
FINANCIAL GUARANTEE REQUIREMENTS
PERFORMANCE BOND*
AMOUNT
(A)
$
9,727.3
(B)
$
56,578.6
(C)
$
-
(D)
$
82,615.0
(A+B) $ 66,305.9
(T) $ 148,920.9
Minimum is $2000.
Rob Long, PE
MINIMUM BOND* AMOUNT
REQUIRED FOR RECORDING OR
TEMPORARY OCCUPANCY AT
SUBSTANTIAL COMPLETION ***
T x 0.30 $ 44,676.3
Minimum is $2000.
Date:
PUBLIC ROAD & DRAINAGE
MAINTENANCE/DEFECT BOND*
(B+C) x
0.25 = $ 14,144.7
Minimum is $2000.
11 /12/2020
* NOTE: The word "bond" as used in this document means a financial guarantee acceptable to King County.
** NOTE: KCC 27A authorizes right of way and site restoration bonds to be combined when both are required.
The restoration requirement shall include the total cost for all TESC as a minimum, not a maximum. In addition, corrective work, both on- and off -site needs to be included.
Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restoration
needs to be reflected in this amount. The 30% contingency and mobilization costs are computed in this quantity.
*** NOTE: Per KCC 27A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes.
REQUIRED BOND* AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY KING COUNTY
Page 9 of 9 Unit prices updated: 03/02/2015
Check out the DDES Web site at www.kingcounty.poy/permits Version: 03/02/2015
19-015 82nd Townhouses - Bond Quantity Worksheet 2020-11-12.xlsx Report Date:11/12/2020