Loading...
Engineering Permit Form_1OF WAY PERMIT PERMITNUMBER, City of Edmonds EdmondsRIGHT 98020 1 171 www.cityofedmonds.gov Description: SAMORA- REMOVAL OF RETAINING WALL IN ROW ISSUED: 08/29/2022 Address: 7330 172ND ST SW EDMONDS WA 98026-5121 EXPIRES: 08/24/2023 rmit Type: RIGHT OF WAY Permit Subtype: RESIDENTIAL Parcel Number: 00513100013909 i NAME TYPE NAME ADDRESS PHONE APPLICANT JONELLE CORNWELL 24301 7TH PL W, BOTHELL WA 98021 (206)494-4695 CONTACT DREAMSCAPES LANDSCAPE & 24301 7TH PL W, BOTHELL WA 98021 (206)494-4695 DESIGN LLC CONTRACTOR DREAMSCAPES LANDSCAPE AND 24301 7TH PL W, SNOHOMISH WA 98021 (360)485-7532 DESIGN OWNER AMY M & MICHAEL A SAMORA 7330 172ND ST SW, EDMONDS WA 98026 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE CHARGED PER PERMIT $40.00 $40.00 RIGHT OF WAY STANDARD PERMIT FEE $330.00 $330.00 • REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED INDEMNITY The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. RELEASED BY THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW DATE Printed: Monday, August 29, 2022 8:02:05 AM 1 of 2 KIRRMF WAY PERMIT PERMIT NUMBER City of Edmonds •:• •ENG2022-0137 www.cityofedmonds.gov• • CONDITIONS CONDITION TYPE ALERT RESIDENTS ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS REQUIREMENTS. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS www.mybuildingpermit.com RESTORE LANDSCAPE Restore landscape to like or better conditions Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND AND NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTIONS INSPECTION TYPE DATE RESULT COMPLETE X-2 ENGINEERING FINAL** A-1 TESC AND MOBILIZE Printed: Monday, August 29, 2022 8:02:05 AM 2 of 2