Building Permit (3)Type: SOLAR Subtype: SOLAR RESIDENTIAL I Status: ISSUED
Parcel No: 27032500107000 Site Address: 21412 96TH AVE W EDMONDS,WA 98020-3961
Subdivision: 004965, KELLOGG SUPPLEMENTAL PLAT OF EDMONDS Lot: 0
Fire Sprinklers: Lot Area: Zoning:
Valuation: $0.00 Occupancy Type: Construction Type:
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0
Scope of Work: SOLAR
Applied: 8/31/2022
Issued: 9/2/2022
Final:
Expiration Date: 3/1/2023
Issued by: NED
I WA State Contractor L & I #: REVOLES7831-2 I
CONTACTS
NAME TYPE
NAME
ADDRESS
PHONE
EMAIL
APPLICANT
BETH MORIN
9981 190TH ST SUITE K,
(708)995-1643
PERMITS.WA@REVOLUTIONSOLAR.0
MOKENA IL 60448
OM
CONTACT
REVOLUTION ENERGY
9981 190TH ST SUITE K,
(708)995-1643
permits.wa@revolutionsolar.com
SYSTEMS INC
MOKENA IL 60448
REVOLUTION ENERGY
9981 190TH ST SUITE K,
PERMITS.WA@REVOLUTIONSOLAR.0
CONTRACTOR
(708)995-1643
SYSTEMS INC
MOKENA IL 60448
OM
OWNER
LESLIE K BROWN
21412 96TH AVE W, EDMONDS
(530)386-7032
WA 98020
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
9/2/22
R22855
PER PERMIT
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$6.50
9/2/22
R22855
SOLAR - SUB RES BLDG PERMIT FEE
001.000.322.10.000.00
$60.00
$60.00
9/2/22
R22855
SOLAR - SUB RES FIRE INSP FEE
001.000.342.40.000.00
$60.00
$60.00
9/2/22
R22855
TOTALS: $166.50
$166.50
CONDITION TYPE
STATUS
NOTES
Printed: Friday, September 02, 2022 11:26:07 AM 1 of 2
SOLARPerCity mit
-
• • •
•: i 1
www.edmondswa.gov22
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
Installation, use and maintenance of equipment and components shall be per
EQUIPMENT USAGE
FOR
manufacturer's specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufacture's installation instructions on site for Building Inspector.
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
The issuance of this permit in no way constitutes approval from any other agencies
REGULATING AGENCIES
FOR
having regulatory authority over the facility and this construction activity. It is the
INFORMATION
responsibility of the property owner to obtain any and all such required approvals.
INSPECTIONS - Schedule Online at https://inspection.mybuildingpermit.com
INSPECTIONTYPE INSPECTOR COMPLETED RESULT
NOTES
X-1 FIRE FINAL
X-3 BUILDING FINAL"
Printed: Friday, September 02, 2022 11:26:07 AM 2 of 2