Loading...
ENG CORRECTION NOTICE 8.15.2022CITY OF EDMONDS of ED410 CORRECTION NOTICE ENGINEERING DIVISION (425) 771-0220 City Website: www.edmondswa.gov �St. 1890 BLD2022-0497 DATE: August 15, 2022 PERMIT NUMBER: ENG2019-0112 OWNER: Wayne Malmberg SITE CONTACT: Wayne Malmberg ADDRESS: 1001 Olympic Ave. TYPE OF INSPECTION: FINAL INSPECTION ❑ WORK DESCRIBED BELOW HAS BEEN INSPECTED AND APPROVED ❑ APPROVED PLANS AND PERMIT JOB CARD MUST BE AVAILABLE TO INSPECTOR ON SITE ® CORRECTIONS LISTED BELOW MUST BE MADE BEFORE WORK CAN BE APPROVED AND/OR THE NEXT PHASE OF WORK IS STARTED. ® RECALL FOR INSPECTION ❑ REINSPECTION FEE MUST BE PAID PRIOR TO NEXT INSPECTION REQUEST. ❑ STOP WORK UNTIL AUTHORIZED TO CONTINUE BY CITY INSPECTOR 1. Prior to receiving final construction approval from the Engineering Division, the connection of the water service line to the meter setter shall be exposed for inspection. 2. Water service line tracer wire shall be brought into the meter box. 3. Install a 12" cast iron lamphole cover with 1/2" hex bolts and a pick hole with a 2' concrete leveling collar on the sewer clean out at the property line. 4. A stormwater covenant shall be recorded against the property. Please follow this link Stormwater Covenant for the document. Once it is filled out, signed, and, notarized email it to en ing eeringpermitsgedmondswa.gov for approval prior to recording. Once it is approved by the city, take it to Snohomish County to get it recorded. Email a copy of the recorded document back to the city. 5. Please provide a project asbuilt that shows all new utilities, water, sewer, storm, gas, power, cable, etc. Provide all rim and pipe elevations. 6. Provide any photos of the stormwater infiltration trenches that were installed without inspections. THE ACTIONS OR CORRECTIONSINDICATED ABOVE ARE REQUIRED TO BE CORRECTED BY: Prior to final approval OR PENALTIES MAY BE APPLIED. FOR INSPECTION SCHEDULE THROUGH mybuildingpermit.com Inspector: Jeff Whatmore Date: 8/15/2022 Page 2 of 2