Loading...
Building Permit (3)Type: SIGN Subtype: SIGN - WALL OR GENERAL I Status: ISSUED Parcel No: 27032300104200 Site Address: 220 RAILROAD AVE EDMONDS,WA 98020-4133 Subdivision: 007245, TOWN OF EDMONDS WATERFRONT, SP AFN 9807230161 Lot: 0 Fire Sprinklers: Lot Area: Zoning: CW Valuation: $0.00 Occupancy Type: Construction Type: Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Scope of Work: WATERFRONT CENTER - TOTEM POLE WA State Contractor L & I #: Applied: 8/29/2022 Issued: 9/7/2022 Final: Expiration Date: 3/6/2023 Issued by: NED CONTACTS AM 0 NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT PHILIP LOVELL 7425 BRAEMAR DRIVE, (425)787-1306 PBLOVELL@COMCAST.NET EDMONDS WA 98026 CONTACT PHILIP LOVELL 7425 BRAEMAR DRIVE, (425)787-1306 pblovell@comcast.net EDMONDS WA 98026 CONTRACTOR OWNER 250 5TH AVE N, EDMONDS WA OWNER EDMONDS CITY OF 98020-3146 FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT# CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 8/29/22 R22781 PER PERMIT COMMERCIAL STATE SURCHARGE 001.000.237.150 $25.00 $25.00 8/29/22 R22781 SIGN - BLDG PERMIT FEE 001.000.322.10.000.00 $55.00 $55.00 8/29/22 R22781 SIGN - ENG INSP FEE 001.000.341.82.000.00 $55.00 $55.00 8/29/22 R22781 SIGN - ENG REVIEW FEE 001.000.341.82.000.00 $25.00 $25.00 8/29/22 R22781 SIGN - PLAN REVIEW FEE 001.000.345.83.000.00 $30.00 $30.00 8/29/22 R22781 TOTALS: $230.00 $230.00 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Wednesday, September 07, 2022 10:52:26 AM 1 of 2 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. FOR 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS INFORMATION result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. Printed: Wednesday, September 07, 2022 10:52:26 AM 2 of 2