Loading...
Permit_BLD2022-1194CITY OF EDMONDS Mechanical Permit My6uildingPermitxom Permit Information Permit Number RI ngn7q-1 1 QA Issued Date 9/8/2022 Expiration Date 3/7/2023 Job Address 20514 78TH PL W Fee Paid $105.00 EDMONDS, 98026 Order Confirmation 1171713 Floor Related Permit# Suite Application ID 1199272 Contact Information Contact Name Karen Matheney Contractor WASHINGTON ENERGY SVCS CO Phone Number (206) 378-6648 LLC Property Owner Colleen Loucks LNI License# WASHIES851 NS Address 20514 78th PI W EDMONDS, WA Phone# (206) 378-6648 City Bus. License # N R-026522 Property Owner Phone Tenant Name Job Description A (Single Family Residential) (Repair or Replacement) Mechanical project involving ( 1 Appliance Vent Only) 1 st floor Conditions - Post Permit on site. Do not cover until inspected. Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. Certification Statement - The applicant states: I certify that I am the owner of this property or the owner's authorized agent, including an appropriately licensed contractor. I have furnished true and correct information. I will comply with all provisions of law and ordinances governing this type of construction work, whether specific herein or not. By submitting this application I give the jurisdiction permission to enter the property to perform inspections. I understand that failure to comply with the above may result in revocation of the permit. Applicant: Karen Matheney Page 1 of 2 t of EDAf 0 1;�_-o CITY OF EDMONDS Mechanical Permit My6uildingPermitxom Permit Information Permit Number RI n9n99_11Ad Issued Date 9/8/2022 Expiration Date 3/7/2023 Job Address 20514 78TH PL W Fee Paid $105.00 EDMONDS, 98026 Order Confirmation 1171713 Floor Related Permit# Suite Application ID 1199272 Inspections Inspection IVR Inspector Date Inspection IVR Inspector Date Gas Test/Pipe Mech Rough -in Mechanical Final Inspection Scheduling The issuance of this permit in no way constitutes approval from any other agencies having regulatory authority over the facility and this construction activity. It is the responsibility of the property owner to obtain any and all such required approvals. Page 2 of 2