Building Permit (3)Type: DEMO Subtype: RES PRIMARY STRUCTURE I Status: ISSUED
Parcel No: 00463301300400
Subdivision: 004633
Fire Sprinklers:
Valuation: $0.00
Code Edition: 0
Site Address: 9125 240TH ST SW EDMONDS,WA 98026-9022
Lot: 0
Lot Area: Zoning:
Occupancy Type: Construction Type:
No. Stories: 0 # of Dwelling Units: 0
Scope of Work: PACIFIC RIDGE-DRH LLC-DEMO SFR
WA State Contractor L & I #: BDZCOC*902LT
Applied: 8/19/2022
Issued: 9/8/2022
Final:
Expiration Date: 3/8/2023
Issued by: BAC
CONTACTS
NAME TYPE
NAME
ADDRESS T
PHONE EMAIL
APPLICANT
JEFF WEGENER
17921 BOTHELL-EVERETT HWY
(425)219-2087
JLWEGENER@PACIFICRIDGEHOMES.0
100, BOTHELL WA 98012
OM
CONTACT
PACIFIC RIDGE HOMES
17921 BOTHELL-EVERETT HWY
(425)219-2087
JLWegener@pacificridgehomes.com
100, BOTHELL WA 98012
3207 Pacific Ave, Everett WA
CONTRACTOR
BDZ CONSTRUCTION
(425)259-2290
terry@bdzconstruction.com
98201
17921 BOTHELL EVERETT HWY
OWNER
PACIFIC RIDGE -
DRH LLC
100, BOTHELL WA 98012
•' •
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
8/19/22
R22573
PER PERMIT
DEMO - SUB RES BLDG PERMIT FEE
001.000.322.10.000.00
$100.00
$100.00
8/19/22
R22573
DEMO - SUB RES BLDG PLAN
001.000.345.83.000.00
$50.00
$50.00
8/19/22
R22573
REVIEW FEE
DEMO - SUB RES ENG INSP FEE
001.000.341.82.000.00
1 $100.00
$100.00
8/19/22
R22573
DEMO - SUB RES ENG REVIEW FEE
001.000.341.82.000.00
$50.00
$50.00
8/19/22
R22573
TOTALS: $340.00 $340.00
CONDITIONS
CONDITION TYPE
STATUS
NOTES
It is the owner's responsibility to repair/replace all damage of utilities or frontage
DAMAGE TO FRONTAGE
FOR
improvements in City right of Ways or Easements to City Standards caused by or
IMPROVEMENTS
INFORMATION
occurring during the permitted project.
Pre -inspection required. Street to be cleaned of debris. Side sewer must be capped at
DEMOLITION REQUIREMENTS
FOR
property line. Water Service must be disconnected from Water Meter and or hose bib
INFORMATION
with AVB installed. Dump at approved dump site only.
FOR
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
INFORMATION
REQUIREMENTS.
Printed: Thursday, September 08, 2022 3:43:23 PM 1 of 2
Printed: Thursday, September 08, 2022 3:43:23 PM 2 of 2