2457_001TSHG---E!@) c• w P o■ w 7■ 0 Geotechnical and Earthquake Engineering Consultants 3213 Eastlake Ave E, Suite B Project No. Page No. Seattle, WA 98102 17-081 1 of 2 Report No. Date / Day of Week Tel: (206) 262-0370 Fax: (206) 262-0374 01 September 16-19 / Mon - Thurs September 24 / Tuesda Project Name Location or Address Vons Bell Street 4-Plex 650 — Bell Street, Edmonds, Washin ton Client City of Edmonds Project No. Weather Vons Bell Street LLC — Charles Von Goedert BLD2019-0904 —60s / Sunny to Light Rain Gen. Contractor Shoring Contractor PanGEO Field Reps. Hardy Development — Rob Hardy Pearson Drilling — Terry Trew Grant Knechtel Spenser Scott As requested, a representative from PanGEO was on site September 16 through 19 and September 24 to observe installation of soldier piles and timber lagging, and back -fill after timber lagging installation. While on site we also observed and monitored the excavation and soils. Soldier Pile Installation. During our site visits, the shoring - contractor, Pearson Drilling, installed 11 I~ _ soldier piles along the south and east walls of the shoring plan (see attached Figure 1, " below). The soldier piles were of varying ' sizes and are detailed further in the installation records at the end of this report. Included are the design tip elevations and the observed field elevations, estimated from the surveyed hub elevations on -site. Also included are general soil conditions encountered daring drilling. 30-inch nominal diameter holes were Photo l— Setting Pile P5,9/18/2019; augered with a Hitachi EX200 excavator looking approximately Gast equipped with an open flight auger, See Photo 1, above. Steel piles were then placed in the drilled holes and holes were then filled with lean -mix concrete from Cadman and pumped into the holes using a Schwing SP 1000 concrete pump. Based on our observations, all piles were installed in general accordance with the project plans, and the minimum design embedment depths were met. 17-081 650 Bell St, Edmonds FK 1 2019.09.16_18&09_24.doex PanGEO, Inc. FIELD REPORT Soldier Pile Laing and Backfill: During our site visit on September 24th, the shoring contractor, Pearson Drilling, installed timber lagging at the shoring walls to the bottom of design excavation elevations along the south and east walls of the shoring plans. The earthwork contractor initially excavated approximately a four -foot lift at a time in each bay, and 4x12 timbers were cut and installed until bottom of excavation was reached at approximately EL 494 feet. No significant sloughing of the cuts was observed during lagging installation, and based on our observations, the temporary cuts remained stable (see Photo 2, right). Photo 2 — Lagging along the South and East shoring walls, 912412019, looking approximately east On -site native material (clean, poorly -graded, sand) was used as backfill behind the lagging as each bay was completed. Based on our observations, the soldier pile shoring walls were properly backfilled and was acceptable in our opinion. Please note, as designed treated 4x12 timbers were to be used as lagging for the shoring wall, but it was confirmed and approved by the project structural engineers to use the provided untreated timbers for this application. Observe and Monitor Excavation and Soils: During our site visits, we observed the temporary cuts above the east shoring wall to the east property line had difficulty retaining shape at a grade of 1H:1V. The near - surface exposed soils generally consisted of clean sand. To provide a safe work area while lagging, the contractor installed plywood and 4x 12 lagging boards, supported by 25-foot long 2-inch pin piles behind the east shoring wall to retain the loose clean sand (see Photo 3 on the right). Attachments Soldier Pile Installations - Figure I Soldier Pile Installation Records — PI thru P1I Signed: Photo 3 — Temporary retaining wall installed on eastern wall, observed 912412019, looking approximately southeast L Reviewed: r 17-081 650 Bell St, Edmonds FR-1 2019.09.16_18&09 24.docx Page 2 of 2 PanGEO, Inc. SDCI #66832i 5-CN Figure 1 Area of temporary retaining wall • Pin Piles Installed 9/16 • Pin Piles Installed 9/17 • Pin Piles Installed 9/18 Soldier Pile Installation Record Project Name Project No. PReNo Date Drilled Weather DRILLING Drilling Contractor Drill Rig Casing 650 Bell St 17-081 P1 9/18/2019 sunny Pearson Pearson EX200 No Diameter Steel Section Ground El_ Design Tip El. Actual Tip EL Drill Time Auger Type 30" nominal W12x45 14.0' hub 505.55 gnd --497.5 484.0 Top 498.0 sod 484 Top 498 11:09 to 11.26 continuous flight solid stem Soil/Water 0 - grey sand, trace gravel 6 - decreasing gravel 14 - BOH 11.26 CONCRETE Placement Time 14:45 to 14:51 Water in hole? No Concrete Type Cadman ProFlo Placement method pump to free tall Concrete Truck # 368 REMARKS beam set to hole bottom 11.26 14.51 grout to 1' beam reset 15-02 J�mGE@[ 1 ■ � • ■ 11 7 ■ O Soldier Pd- a installation Record Project Name Project No. Pile No_ Date Drilled Weather DRILLING Drilftng Contractor Drill Rig Casing 650 @ell St 17-081 P2 9/17/2019 fight rain Pearson Pearson EX200 No Diameter Steel Section Ground El. Design Tip El. Actual Tip EL Driil Time Auger Type 30" nominal W12x45 16.0' hub 507.29 gnd -499.5 484.0 Top 500.0 sod 484 TOP 500 11-18 to 11.45 continuous flight solid stem Soibwater 0 - light brawn sand, trace gravel, iron -oxide staining 4 - grey with decreasing gravel 16 - BOH 11:45 CONCRETE Placement Time 15:09 to 15:14 Water in hole ? No Concrete Type Cadman ProFlo Placement method pump to free fali Concrete Truck # 444 REMARKS beam set to hole bottom 12.26 15:14 grout to 2' 15.30 top off beam reset 15:38 J�anGE@ .......... Soldier Pile Installation Record Project Name Project No. Pile rfo_ Date Drilled Weather DRILLING Dri fing Contractor Drill Rig Casing 650 Belt St 17-081 P3 9/18/2019 cloudy Pearson Pearson EX200 No Diameter Steel Section Ground El_ Design Tip El. Actual Tip El. Drill Time Auger Type 30" nominal W12x45 21.0' hub 508.21 gnd -500.5 481.0 Top 502.0 soil480.5 Top 502 10.33 to 11.05 continuous flight solid stem Soil/Water 0 - grey -brown sand 5 - becomes grey 15 - becomes coarse, trace cobble near bottom 20 - BOht 11:05 CONCRETE Placement Time 14:14 to 14:18 and 14:40 to 14:45 Water in hole ? NO Concrete Type Cadman ProFlo, Placement -method -pump to free_ fall Concrete Truck # 286 and 368 REMARKS beam set to hole bottom 11.45 14:45 grout to 2' 14.52 top off beam reset 15:00 PanGE@ w c•■• w w w r. w Soldier Pile Installation Record Project Name Project No. P-rfe 140. Date Drilled Weather DRILLING Driffing Contractor Drilt Rig Casing 650 Bell St 17-081 P4 9/17/2019 rain Pearson Pearson EX200 No Diameter Steel Section Ground Ef. Design Tip El. Actuat Tip El. Drifl Time Auger Type 30" nominal W12x45 21.0' hub 509.02 gnd -501 481.0 Top 502.0 soil 481 Top: 502 10:34 to 11:10 continuous flight solid stem Soil/Water 0 - light brown sand 5- grey fine sand 16 - sand with trace gravel and cobble 21 - BOH 11:10 CONCRETE Placement Time 14:16 to 14:18 and 15:03 to 15:08 Water in hole ? Concrete Type No Cadman ProFlo Placement method pump to free fall Concrete Truck # 438 and 444 REMARKS beam set to hole bottom 12:19 15.08 grout to -4' 1514 top off beam reset 15:35 r-'anC;E@ c•■.• a a s■ o Soldier Pile Installation Record Project Name Project No. Pile No. Date Drilled Weather DRILLING DriNmg Contractor Drill Rig Casing 650 Bell St 17-081 P 5 9/18/2019 cloudy Pearson Pearson EX200 No Diameter Steel Section ground Et Design Tip El. Actual Tip El. Drat Time Auger Type 30" nominal W12x45 21.0' hub 506.22 gnd -501.5 481.0 Tog 502.0 sail481 Tog 502 7.45 to 8:20 continuous Flight solid stem SO/Water 0 - light grey -brown sand, trace gravel 4 - becomes grey 14 - becomes coarse 18 - increase in gravel 21 - BOH 11:45 CONCRETE Placement Time 14:08 to 14:14 Water in hole ? No Concrete Type Cadman ProFlo Placement method pump to Tree fall Concrete Truck ## 286 REMARKS beam set to hole bottom 9:45 1-4:14 grout to 2' 14.52 top off beam reset 14.26 PmGE@ Soldier Pffe Installation Record Project Name Project No. Pile No. Date Drilled Weather (DRILLING D Ming Contractor Drill Rig Easing 650 Belt St 17-081 P6 9/16/2019 cloudy-- clearing Pearson Pearson EX200 No- Diameter Steel Section Ground B. Design Tip El. Actuat Tip EL Drffl Time Auger Type 30" nominal W12x45 21.0` hub 503.14 gnd —502 481.0 Top 502.0 soil480 Tog 502 9:31 to 10:04 continuous flight solid stem Soil/Water 0 - tan m-f sand scattered gravel 8 - very fettle gravel 12 - grading gray 14 - grading fine to medium 20 -with gravel 22 - BoH 10:04 CONCRETE Placement Time 13.35 to 13:45 Water in hole ? Concrete Type Placement -method No Cadman ProFlo pump to free fail Concrete Truck # 440 REMARKS set beam to hole bottom10:54 reset beam 14:05 P� G . ■ . • ■ w t • s Project Name Project No. Pile NO. Date Drilled Weather DRILLING 650 Bell St 17-081 P7 9/18/2019 cloudy Soldier Pile Installation Record - Diameter 30" nominal Steel Section W12x45 21.0' Ground Efi hub 503.21 gnd -500.5 Design Tip El. 481.0 Top 502.0 Actual Tip El. soil 480.5 Top 502 Drilling Contractor Pearson Drill Time 8:35 to 9:15 Drift Rig Pearson EX200 Auger Type continuous flight solid stem Casing No SoillWater 0- light brown sand iron -oxide staining 6 - becomes grey -brown 10 - becomes grey, trace gravels 15 - sand becomes coarse 20-BOH9:15 CONCRETE Placement Time 14:02 to 14:08 Water in bole ? No Concrete Type- Placement method Cadman ProFla pump to free fall Concrete Truck # 286 REMARKS siight caving at surface during drilling to about 4' below grade beam set to hole bottom 9:39 14:08 grout to 7 beam reset 14:24 I-'an� G c . ■ . • ■ • 'I ■ s Project Name Project No. Pife NO. Date Drilled Weather DRILLING 650 Belt St 17-081 P8 9/16/2019 cloudy Soldier Pile Installation Record Diameter 30" nominal Steel Section W12x45 21.0' Ground El. hub 502.93 gnd --501 Design Tip El. 481.0 Top 502.0 Actual Tip El. sor7 480 Top 502 Drilfirrg Contractor Drill Rig Casing Pearson Drlt Time 8:56 to 09:23 Pearson EX200 Auger Type continuous flight solid stem NO Soil/Water 0 - tan m-f sand scattered gravel 8 - gaming gray 12 - grading fine to medium BoH 21' 09:23 CONCRETE Placement Time 13:28 to 13:34 Water in hole ? NO Concrete Type. Cadman ProFlo Placement -method. pump to free. fact Concrete Truck # 440 REMARKS beam set to hole bottom 10.27 13:34 grout to -5' 43:47 toga off to- -2' beam reset 13:58 FbnGE@ c . ■ • • ■ w v ■ • Soldier Pile Installation Record Project Name Project No. Pile NO. Date Drilled Weather DRILLING Drilling Contractor Drill Rig Casing 650 Befl St 17-081 P9 9/17/2019 fight rain Pearson Pearson EX200 No Diameter Steel Section Ground B. Design Tip EL _ Actual Tip El. DrVH Time Auger Type 30" nominal W12x45 21.0' hub 502.87 gnd --500 481.0 Top 502.0 soil 479 Toly 502 8:20 to 08..52 continuous flight solid stem Sail/Water 0 - brown slightly silty sand 4 - becomes grey -brown 8 - becomes fine 18 - becomes coarse slightly 21- SOff 08.52 gravelly, trace cobbles CONCRETE Placement Time 14:10 to 14:16 Water in hole ? Concrete Type No Cadman ProFlo Placement method pump to tree faif Concrete Truck # 438 REMARKS beam set to hole bottom 9:24 14:16 grout to -2' beam reset 1435 fxmGE@ Soldier Pile installation Record Project fume Project No. Pile No. Date Drilled Weather DRILLING flailing Contractor Drift Rig Casing 650 Bell St 17-081 P10 9/16/2019 cloudy Pearson Pearson EX200 No Diameter Steel Section Ground Ef. Design Tip El. Actual Tip Ef. Drfil Time Auger Type 30" nominal W12x45 21.0' hub 502.84 gnd -499 481.0 Top 502.0 sail 479 Top 5t12 8:10 to 08.45 continuous flight solid stem Soil/Water 0 - tan m-f sand 5 - trace gravel _ 10 - no gravel, grading gray 15 - grading fine to medium 20 - BOH 08:45 CONCRETE Placement Time 13:19 to 13:26 Water in hole ? Concrete Type No Cadman ProFlo Placement method pump to free fait Concrete Truck # 440 REMARKS beam set to hole bottom 11:15 13:26 grout to --4' 13 49 top off beam reset 13:54 "� 1 0 [ 0 ■ w 0 ■ A T ■ O Soldier Pile Installation Record Project Name 650 Bell St Diameter 30" nominal Project No. 17-081 Steel Section W12x45 21.0' Pile No. pit Ground EE hub 503.07 gnd -499.5 Date Drilled 9/17/2019 Design Tip Et. 48t.0 Top 502.0 Weather right rain Actual Tip El. soil 479.5 Top 502 DRILLING Drilling Contractor 'Pearson Dri3 Time 7.45 to 08.52 Drill Rig Pearson EX200 Auger Type continuous flight solid stem Casing N6 SoWWater 0 - brown sand Inc/ cobble and gravel 3 - grey sand 20 - BOH 08:52 CONCRETE Placement Time 14:00 to 14:09 Water in hole? No Concrete Type Cadman ProFlo Placement method pump to free fall Concrete Truck # 438 REMARKS beam set to hole bottorn 9:15 14:09 grout to -2' beam reset 14:32 1 ■ C • ■ I • ■ A T ■ ■