Geotechnical and Earthquake Engineering Consultants
3213 Eastlake Ave E, Suite B
Project No.
Page No.
Seattle, WA 98102
17-081
1 of 2
Report No.
Date / Day of Week
Tel: (206) 262-0370 Fax: (206) 262-0374
01
September 16-19 / Mon - Thurs
September 24 / Tuesda
Project Name
Location or Address
Vons Bell Street 4-Plex
650 — Bell Street, Edmonds, Washin ton
Client
City of Edmonds Project No.
Weather
Vons Bell Street LLC — Charles Von Goedert
BLD2019-0904
—60s / Sunny to Light Rain
Gen. Contractor
Shoring Contractor
PanGEO Field Reps.
Hardy Development — Rob Hardy
Pearson Drilling — Terry Trew
Grant Knechtel
Spenser Scott
As requested, a representative from PanGEO was on site September 16 through 19 and September 24 to
observe installation of soldier piles and timber lagging, and back -fill after timber lagging installation. While
on site we also observed and monitored the excavation and soils.
Soldier Pile Installation.
During our site visits, the shoring -
contractor, Pearson Drilling, installed 11 I~ _
soldier piles along the south and east walls
of the shoring plan (see attached Figure 1, "
below). The soldier piles were of varying '
sizes and are detailed further in the
installation records at the end of this report.
Included are the design tip elevations and
the observed field elevations, estimated
from the surveyed hub elevations on -site.
Also included are general soil conditions
encountered daring drilling.
30-inch nominal diameter holes were Photo l— Setting Pile P5,9/18/2019;
augered with a Hitachi EX200 excavator looking approximately Gast
equipped with an open flight auger, See Photo 1, above. Steel piles were then placed in the drilled holes and
holes were then filled with lean -mix concrete from Cadman and pumped into the holes using a Schwing
SP 1000 concrete pump.
Based on our observations, all piles were installed in general accordance with the project plans, and the
minimum design embedment depths were met.
17-081 650 Bell St, Edmonds FK 1 2019.09.16_18&09_24.doex PanGEO, Inc.
FIELD REPORT
Soldier Pile Laing and Backfill:
During our site visit on September 24th, the shoring
contractor, Pearson Drilling, installed timber lagging at
the shoring walls to the bottom of design excavation
elevations along the south and east walls of the shoring
plans. The earthwork contractor initially excavated
approximately a four -foot lift at a time in each bay, and
4x12 timbers were cut and installed until bottom of
excavation was reached at approximately EL 494 feet.
No significant sloughing of the cuts was observed during
lagging installation, and based on our observations, the
temporary cuts remained stable (see Photo 2, right).
Photo 2 — Lagging along the South and East shoring walls,
912412019, looking approximately east
On -site native material (clean, poorly -graded, sand) was used as backfill behind the lagging as each bay was
completed. Based on our observations, the soldier pile shoring walls were properly backfilled and was
acceptable in our opinion.
Please note, as designed treated 4x12 timbers were to be used as lagging for the shoring wall, but it was
confirmed and approved by the project structural engineers to use the provided untreated timbers for this
application.
Observe and Monitor Excavation and Soils:
During our site visits, we observed the temporary cuts
above the east shoring wall to the east property line had
difficulty retaining shape at a grade of 1H:1V. The near -
surface exposed soils generally consisted of clean sand.
To provide a safe work area while lagging, the contractor
installed plywood and 4x 12 lagging boards, supported by
25-foot long 2-inch pin piles behind the east shoring wall
to retain the loose clean sand (see Photo 3 on the right).
Attachments
Soldier Pile Installations - Figure I
Soldier Pile Installation Records — PI thru P1I
Signed:
Photo 3 — Temporary retaining wall installed on eastern wall,
observed 912412019, looking approximately southeast
L
Reviewed:
r
17-081 650 Bell St, Edmonds FR-1 2019.09.16_18&09 24.docx Page 2 of 2 PanGEO, Inc.
SDCI #66832i 5-CN
Figure 1
Area of temporary
retaining wall
• Pin Piles Installed 9/16
• Pin Piles Installed 9/17
• Pin Piles Installed 9/18
Soldier Pile Installation Record
Project Name
Project No.
PReNo
Date Drilled
Weather
DRILLING
Drilling Contractor
Drill Rig
Casing
650 Bell St
17-081
P1
9/18/2019
sunny
Pearson
Pearson EX200
No
Diameter
Steel Section
Ground El_
Design Tip El.
Actual Tip EL
Drill Time
Auger Type
30" nominal
W12x45 14.0'
hub 505.55 gnd --497.5
484.0 Top 498.0
sod 484 Top 498
11:09 to 11.26
continuous flight solid stem
Soil/Water
0 - grey sand, trace gravel
6 - decreasing gravel
14 - BOH 11.26
CONCRETE
Placement Time
14:45 to 14:51
Water in hole?
No
Concrete Type
Cadman ProFlo
Placement method
pump to free tall
Concrete Truck #
368
REMARKS
beam set to hole bottom 11.26
14.51 grout to 1'
beam reset 15-02
J�mGE@[ 1 ■ � • ■ 11 7 ■ O
Soldier Pd- a installation Record
Project Name
Project No.
Pile No_
Date Drilled
Weather
DRILLING
Drilftng Contractor
Drill Rig
Casing
650 @ell St
17-081
P2
9/17/2019
fight rain
Pearson
Pearson EX200
No
Diameter
Steel Section
Ground El.
Design Tip El.
Actual Tip EL
Driil Time
Auger Type
30" nominal
W12x45 16.0'
hub 507.29 gnd -499.5
484.0 Top 500.0
sod 484 TOP 500
11-18 to 11.45
continuous flight solid stem
Soibwater
0 - light brawn sand, trace gravel, iron -oxide staining
4 - grey with decreasing gravel
16 - BOH 11:45
CONCRETE
Placement Time
15:09 to 15:14
Water in hole ?
No
Concrete Type
Cadman ProFlo
Placement method
pump to free fali
Concrete Truck #
444
REMARKS
beam set to hole bottom 12.26
15:14 grout to 2'
15.30 top off
beam reset 15:38
J�anGE@
..........
Soldier Pile Installation Record
Project Name
Project No.
Pile rfo_
Date Drilled
Weather
DRILLING
Dri fing Contractor
Drill Rig
Casing
650 Belt St
17-081
P3
9/18/2019
cloudy
Pearson
Pearson EX200
No
Diameter
Steel Section
Ground El_
Design Tip El.
Actual Tip El.
Drill Time
Auger Type
30" nominal
W12x45 21.0'
hub 508.21 gnd -500.5
481.0 Top 502.0
soil480.5 Top 502
10.33 to 11.05
continuous flight solid stem
Soil/Water
0 - grey -brown sand
5 - becomes grey
15 - becomes coarse, trace cobble near bottom
20 - BOht 11:05
CONCRETE
Placement Time
14:14 to 14:18 and 14:40 to 14:45
Water in hole ?
NO
Concrete Type
Cadman ProFlo,
Placement -method
-pump to free_ fall
Concrete Truck #
286 and 368
REMARKS
beam set to hole bottom 11.45
14:45 grout to 2'
14.52 top off
beam reset 15:00
PanGE@
w c•■• w w w r. w
Soldier Pile Installation Record
Project Name
Project No.
P-rfe 140.
Date Drilled
Weather
DRILLING
Driffing Contractor
Drilt Rig
Casing
650 Bell St
17-081
P4
9/17/2019
rain
Pearson
Pearson EX200
No
Diameter
Steel Section
Ground Ef.
Design Tip El.
Actuat Tip El.
Drifl Time
Auger Type
30" nominal
W12x45 21.0'
hub 509.02 gnd -501
481.0 Top 502.0
soil 481 Top: 502
10:34 to 11:10
continuous flight solid stem
Soil/Water
0 - light brown sand
5- grey fine sand
16 - sand with trace gravel and cobble
21 - BOH 11:10
CONCRETE
Placement Time
14:16 to 14:18 and 15:03 to 15:08
Water in hole ?
Concrete Type
No
Cadman ProFlo
Placement method
pump to free fall
Concrete Truck # 438 and 444
REMARKS beam set to hole bottom 12:19
15.08 grout to -4'
1514 top off
beam reset 15:35
r-'anC;E@
c•■.• a a s■ o
Soldier Pile Installation Record
Project Name
Project No.
Pile No.
Date Drilled
Weather
DRILLING
DriNmg Contractor
Drill Rig
Casing
650 Bell St
17-081
P 5
9/18/2019
cloudy
Pearson
Pearson EX200
No
Diameter
Steel Section
ground Et
Design Tip El.
Actual Tip El.
Drat Time
Auger Type
30" nominal
W12x45 21.0'
hub 506.22 gnd -501.5
481.0 Tog 502.0
sail481 Tog 502
7.45 to 8:20
continuous Flight solid stem
SO/Water
0 - light grey -brown sand, trace gravel
4 - becomes grey
14 - becomes coarse
18 - increase in gravel
21 - BOH 11:45
CONCRETE
Placement Time
14:08 to 14:14
Water in hole ?
No
Concrete Type
Cadman ProFlo
Placement method
pump to Tree fall
Concrete Truck ##
286
REMARKS
beam set to hole bottom 9:45
1-4:14 grout to 2'
14.52 top off
beam reset 14.26
PmGE@
Soldier Pffe Installation Record
Project Name
Project No.
Pile No.
Date Drilled
Weather
(DRILLING
D Ming Contractor
Drill Rig
Easing
650 Belt St
17-081
P6
9/16/2019
cloudy-- clearing
Pearson
Pearson EX200
No-
Diameter
Steel Section
Ground B.
Design Tip El.
Actuat Tip EL
Drffl Time
Auger Type
30" nominal
W12x45 21.0`
hub 503.14 gnd —502
481.0 Top 502.0
soil480 Tog 502
9:31 to 10:04
continuous flight solid stem
Soil/Water
0 - tan m-f sand scattered gravel
8 - very fettle gravel
12 - grading gray
14 - grading fine to medium
20 -with gravel
22 - BoH 10:04
CONCRETE
Placement Time
13.35 to 13:45
Water in hole ?
Concrete Type
Placement -method
No
Cadman ProFlo
pump to free fail
Concrete Truck #
440
REMARKS
set beam to hole bottom10:54
reset beam 14:05
P�
G . ■ . • ■ w t • s
Project Name
Project No.
Pile NO.
Date Drilled
Weather
DRILLING
650 Bell St
17-081
P7
9/18/2019
cloudy
Soldier Pile Installation Record -
Diameter 30" nominal
Steel Section W12x45 21.0'
Ground Efi hub 503.21 gnd -500.5
Design Tip El. 481.0 Top 502.0
Actual Tip El. soil 480.5 Top 502
Drilling Contractor Pearson Drill Time 8:35 to 9:15
Drift Rig Pearson EX200 Auger Type continuous flight solid stem
Casing No
SoillWater 0- light brown sand iron -oxide staining
6 - becomes grey -brown
10 - becomes grey, trace gravels
15 - sand becomes coarse
20-BOH9:15
CONCRETE
Placement Time
14:02 to 14:08
Water in bole ?
No
Concrete Type-
Placement method
Cadman ProFla
pump to free fall
Concrete Truck #
286
REMARKS
siight caving at surface during drilling to about 4' below grade
beam set to hole bottom 9:39
14:08 grout to 7
beam reset 14:24
I-'an�
G c . ■ . • ■ • 'I ■ s
Project Name
Project No.
Pife NO.
Date Drilled
Weather
DRILLING
650 Belt St
17-081
P8
9/16/2019
cloudy
Soldier Pile Installation Record
Diameter
30" nominal
Steel Section
W12x45 21.0'
Ground El.
hub 502.93 gnd --501
Design Tip El.
481.0 Top 502.0
Actual Tip El.
sor7 480 Top 502
Drilfirrg Contractor
Drill Rig
Casing
Pearson Drlt Time 8:56 to 09:23
Pearson EX200 Auger Type continuous flight solid stem
NO
Soil/Water
0 - tan m-f sand scattered gravel
8 - gaming gray
12 - grading fine to medium
BoH 21' 09:23
CONCRETE
Placement Time
13:28 to 13:34
Water in hole ?
NO
Concrete Type.
Cadman ProFlo
Placement -method.
pump to free. fact
Concrete Truck #
440
REMARKS
beam set to hole bottom 10.27
13:34 grout to -5'
43:47 toga off to- -2'
beam reset 13:58
FbnGE@ c . ■ • • ■ w v ■ •
Soldier Pile Installation Record
Project Name
Project No.
Pile NO.
Date Drilled
Weather
DRILLING
Drilling Contractor
Drill Rig
Casing
650 Befl St
17-081
P9
9/17/2019
fight rain
Pearson
Pearson EX200
No
Diameter
Steel Section
Ground B.
Design Tip EL
_ Actual Tip El.
DrVH Time
Auger Type
30" nominal
W12x45 21.0'
hub 502.87 gnd --500
481.0 Top 502.0
soil 479 Toly 502
8:20 to 08..52
continuous flight solid stem
Sail/Water
0 - brown slightly silty sand
4 - becomes grey -brown
8 - becomes fine
18 - becomes coarse slightly
21- SOff 08.52
gravelly, trace cobbles
CONCRETE
Placement Time
14:10 to 14:16
Water in hole ?
Concrete Type
No
Cadman ProFlo
Placement method
pump to tree faif
Concrete Truck #
438
REMARKS
beam set to hole bottom 9:24
14:16 grout to -2'
beam reset 1435
fxmGE@
Soldier Pile installation Record
Project fume
Project No.
Pile No.
Date Drilled
Weather
DRILLING
flailing Contractor
Drift Rig
Casing
650 Bell St
17-081
P10
9/16/2019
cloudy
Pearson
Pearson EX200
No
Diameter
Steel Section
Ground Ef.
Design Tip El.
Actual Tip Ef.
Drfil Time
Auger Type
30" nominal
W12x45 21.0'
hub 502.84 gnd -499
481.0 Top 502.0
sail 479 Top 5t12
8:10 to 08.45
continuous flight solid stem
Soil/Water
0 - tan m-f sand
5 - trace gravel
_
10 - no gravel, grading gray
15 - grading fine to medium
20 - BOH 08:45
CONCRETE
Placement Time
13:19 to 13:26
Water in hole ?
Concrete Type
No
Cadman ProFlo
Placement method
pump to free fait
Concrete Truck #
440
REMARKS
beam set to hole bottom 11:15
13:26 grout to --4'
13 49 top off
beam reset 13:54
"�
1 0 [ 0 ■ w 0 ■ A T ■ O
Soldier Pile Installation Record
Project Name
650 Bell St
Diameter
30" nominal
Project No.
17-081
Steel Section
W12x45 21.0'
Pile No.
pit
Ground EE
hub 503.07 gnd -499.5
Date Drilled
9/17/2019
Design Tip Et.
48t.0 Top 502.0
Weather
right rain
Actual Tip El.
soil 479.5 Top 502
DRILLING
Drilling Contractor
'Pearson
Dri3 Time
7.45 to 08.52
Drill Rig
Pearson EX200
Auger Type
continuous flight solid stem
Casing
N6
SoWWater
0 - brown sand Inc/ cobble and gravel
3 - grey sand
20 - BOH 08:52
CONCRETE
Placement Time
14:00 to 14:09
Water in hole?
No
Concrete Type
Cadman ProFlo
Placement method
pump to free fall
Concrete Truck #
438
REMARKS
beam set to hole bottorn 9:15
14:09 grout to -2'
beam reset 14:32