ENG2022-0255+City_Application+5.24.2022_12.33.41_PM+2890164RIGHT OF WAY CONSTRUCTION
PERMIT APPLICATION
Complete and submit this Application in accordance with the Submittal
Requirements outlined in Right -of -Way permit Handout E6�.
If any field is not applicable to your project, write "N/A' instead of leaving blank.
All fields required. Incomplete Applications will be denied.
SECTION A
General•
Project Name 1o6384617
Site Address or if no site address use Property Address at NW corner of project area: 633 Walnut St
Associated Permits: BLD PLN ENG X
Owner and Entity Holding Franchise (if applicable)
Name of Company PSE/Infrasource Franchise Ordinance No:
Point of Contact Susan Sid ick
Title SR Permit Specialist
Address 1660 Park lane
city Burlington
State WA
Zip 98233
Phone 425-457-6353
Email susan.sidickapse.com
Contractor and Authorized Agent of Owner
Name of Company
(see note below)
Contractor Contacts During Construction
Primary Name PSE/Infrasource Susan Sidick
Agent Name PSE/Infrasource
Title SR Permit Specialist
Title SR Permit Specialist
Mobile 425-457-6353
Address 1660 Park lane
Email susan.sidick@pse.com
City Burlington
IState WA
Zip 98233
Secondary Name
Phone 425-457-6353
Title SR Permit Specialist
Email susan.sidick@pse.com
Mobile
City of Edmonds Business License No:
Email
State License No: INFRASL871 C2
[N Contractor verifies it is currently bonded
d( Contractor verifies it currently has general liability insurance
NOTE: ECDC18.6o.o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city
engineer.
❑ Multifamily residential ❑ Commercial ❑ City project
❑ Single family residential subdivision EySingle family -other ❑ Industrial
❑ Demo and rebuild or from vacant land?
❑ Other, please specify:
❑ Utility Franchise Work associated with development (check one of the above boxes as welt
❑ Traffic Control Only (no associated development)
❑ Utility Franchise Work (no associated development)
City of Edmonds ROW construction permit Application --Page i of 3 Updated 3/25/2021
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
Install gas service at approx 21' S to 5' N to W N c/1 of Walnut St & 248' E c/l of 6th ave s (1) 3X5 PAVING CUT
(2) �X-q PAVING CUTS ANTICIPATED
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(Number of Months)
Sidewalk 72 hours +
LF
I x
LF
SF
Alley 72 hours +
LF
Ix
I LF
SF
Parking 72 hours +
LF
Ix
I LF
SF
1
SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTIONC.
1. The work in the right of way is on or for the following type of facilities:
❑ telecommunications ❑ cable ❑ power Exgas
❑ water ❑ sewer ❑ storm
Details of • to be Completed
1. Does the utility owner have existing overhead infrastructure in the area of work?
Yes
No
x
2. Will any equipment be added underground or above ground (e.. pedestals, vaults, etc.)?
x
If yes, describe:
3.
Does the proposed work connect a lot or commercial development with utilities that serve more
than one lot or commercial development?
x
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an existing underground common utility stem?
x
5.
Does the work involve proposed additions to an aboveground utility stem? If es:
x
Are the additions for the purpose of serving new commercial development?
x
Are the additions for the purpose of serving a single-family residential subdivision?
x
Details
of • to be Completed
Yes
No
6.
Does your project involve rebuilding or replacing utility equipment which currently serves more
than one lot or commercial development?
If yes, answer the following questions related to project area, i.e. the actual area in which the
x
project is proposed:
6a.
Does your project involve wires/cables/lines? If yes:
x
How many are existing? I I How many are to be added?
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
6b.
Does your project involve poles? If yes:
x
How many poles are existing in the project area?
What is the height of the existing poles?
How many poles are to be removed?
Are additional poles to be laced?
How many? I I What is the height of the additionalpoles?
6c.
Are any poles to be modified/rebuilt/replaced? If yes:
x
How many? I I What is the height of the poles after?
Describe the modification rebuild:
SECTION C
Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Fees. The Applicant is responsible for all permit fees.
APPLICANT SIGNATURE: Susan Sidick
APPLICANT PRINTED NAME: Susan Sidick
APPLICANT TITLE: SR Permit Specialist
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
22