ENG2022-0255+Site_Plan+5.24.2022_12.33.53_PM+2890165Job #:
Date:
Jurisdiction:
ROW Permit:
Est. Start Date:
Est. Duration:
106384617
2/7122
EDMONDS
Yes
6/13/22
1 Day (8 Hours)
Puget Sound Energy Gas Pre -Inspect Form
Address:
City / Zip:
Customer:
PM / Inspector:
633 WALNUT ST #DADU
EDMONDS, 98020
LORA TOLLEFSON 425-773-9302
Nayeli Torres -Garcia 206-556-5066
Job Description
Project Scope:
FROM 6" STW MAIN ON WALNUT ST, INSTALL APPROX. 127' (50'STUB/77'EXT) OF 1-1/8" PE SCAT SVC AND SET A250
New Construction:
MSA 0/F/R.
Construction Method
All Scat / Trenchless
PLAT Map:
163.066 APPROX 1400 SQ FT
WORK ZONE
N
633 #DADU
633 1-118" PE
P/L
PLANTERS STRIP
Water Main
-
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - - - -
PARKING STRIP
SEWER
Ao
_ ..................................
-----------------------------
-- - - - - - - -
- - - - - - - - -
C/L
m
WALNUT ST
CD
T
STORMWATER
♦
♦
PARKING STRIP
6"
STW IP 21'S 2187-1960
CONCRETESIDEWALK
u
3 POWERPOLE
2L
Work
Location
Size of Cut
Surface Type
21'
SOUTH
of CL
WALNUT ST
&
248'
EAST
of CL
6TH AVE S
3 X 5 X 2
A
5'
NORTH
of CL
WALNUT ST
&
248'
EAST
of CL
6TH AVE S
3 X 3 X 2
A
16'
NORTH
of CL
WALNUT ST
&
248'
EAST
of CL
6TH AVE S
3 X 3 X 2
A
of CL
&
of CL
of CL
&
of CL
Service Information
Street Information
Job Type
Diameter:
1-1/8" PE
Flaggers #:
0
Arterial:
No
New Residential Svc
EFV:
1-1/8" - 2600 - 9999144
Police #:
0
TCP:
Yes
Tie -In Fitting
Meter:
A250
I
I
I
Speed Limit:
30
No Parks #:
6
Steel -1" Sery x 1/8" PE Outlet (MOP) - 125
9997039
Meter Loc:
01 - OFR
Trolley Lines:
No
Mtr Hoods #:
0
Del Press:
16" W.C.
Traffic Signal:
Bus Stop:
No
SNO YRD - Snohomish
Bollards:
2.5" #
4" #
ADA Ramps #:1
0
1 Route #'s: