Approved Bond WorksheetSite Improvement Bond Quantity Worksheet S15 Web date: 04/03/2015
L14 King County
Department of Permitting & Environmental Review
35030 SE Douglas Street, Suite 210
Snoqualmie, Washington 98065-9266 For alternate formats, call 206-296-6600.
206-296-6600 M Relay 711
Project Name: 650 Bell St Edmonds Date: 4/18/2019
Location:
650 Bell St Edmonds
Clearing greater than or equal to 5,000 board feet of timber?
yes X no
If yes,
Forest Practice Permit Number:
(RCW 76.09)
Project No.:
Activity No.:
BLD20181634
Note: All prices include labor, equipment, materials, overhead and
profit. Prices are from RS Means data adjusted for the Seattle area
or from local sources if not included in the IRS Means database.
APPLICANT COPY
RESUB
JUN 17 2019
,, t I6W-f"r�,ly► 50 �d =30Nb��i
/
# 1 v L, ()qU' Z.G a y 33. 33 En!e0 yr
Page 1 of 9 ' 'V AS HOT
it
KC BQ Worksheet_Complete
Unit prices updated: 3/2/2015
Version: 3/2/2015
Report Date: 4/18/2019
Site Improvement Bond Quantity Worksheet S15 Web date: 04/03/2015
Reference #
Unit
Price
Unit
Quanta
# of
Applications
Cost
EROSION/SEDIMENT CONTROL
Number
Backfill & compaction -embankment
ESC-1
$ 6.00
CY
Check dams, 4" minus rock
ESC-2
SWDM 5.4.6.3
$ 80.00
Each
Crushed surfacing 1 1/4" minus
ESC-3
WSDOT 9-03.9(3)
$ 95.00
CY
Ditching
ESC-4
$ 9.00
CY
Excavation -bulk
ESC-5
$ 2.00
CY
Fence, silt
ESC-6
SWDM 5.4.3.1
$ 1.50
LF
275
1
$ 412.50
Fence, Temporary (NGPE)
ESC-7
$ 1.50
LF
50
1
$ 75,00
Hydroseeding
ESC-8
SWDM 5.4.2.4
$ 0.80
SY
Jute Mesh
ESC-9
SWDM 5.4.2.2
$ 3.50
SY
$ -
Mulch, by hand, straw, 3" deep
ESC-10
SWDM 5.4.2.1
$ 2.50
SY
$ -
Mulch, by machine, straw, 2" deep
ESC-11
SWDM 5.4.2.1
$ 2.00
SY
$
Piping, temporary, CPP, 6"
ESC-12
$ 12.00
LF
$ -
Pipin , temporary, CPP, 8"
ESC-13
$ 14.00
LF
$
Piping, temporary, CPP, 12"
ESC-14
$ 18.00
LF
$ -
Plastic covering, 6mm thick, sandbagged
ESC-15
SWDM 5.4.2.3
$ 4.00
SY
$ -
Rip Rap, machine placed; slopes
ESC-16
WSDOT 9-13.1(2)
$ 45.00
CY
$ -
Rock Construction Entrance, 50'x15'x1'
ESC-17
SWDM 5.4.4.1
$ 1,800.00
Each
1
1
$ 1,800.00
Rock Construction Entrance, 100'x15'x1'
ESC-18
SWDM 5.4.4.1
$ 3,200.00
Each
Sediment pond riser assembly
ESC-19
SWDM 5.4.5.2
$ 2,200.00
Each
$ -
Sediment trap, 5' high berm
ESC-20
SWDM 5.4.5.1
$ 19.00
LF
$ -
Sed. trap, 5' high, riprapped spillway berm section
ESC-21
SWDM 5.4.5.1
$ 70.00
LF
$ -
Seeding, by hand
Sodding, 1" deep, level ground
ESC-22
SWDM 5.4.2.4
$ 1.00
SY
$ -
ESC-23
SWDM 5.4.2.5
$ 8.00
SY
$ -
Sodding, 1" deep, sloped ground
ESC-24
SWDM 5.4.2.5
$ 10.00
SY
$ -
TESC Supervisor
ESC-25
$ 110.00
HR
40
1
$ 4,400.00
Water truck, dust control
ESC-26
SWDM 5.4.7
$ 140.00
HR
$ -
WRITE -IN -ITEMS **** see a e 9
Inlet Protection
$ 74.00
Each
5
1
370
ESC SUBTOTAL:
30% CONTINGENCY & MOBILIZATION:
ESC TOTAL:
COLUMN:
Page 2 of 9
KC BQ Works heet_Complete
$ 7,057.50
$ 2,117.25
$ 9,174.75
A
Unit prices updated: 3/2/2015
Version: 3/2/2015
Report Date: 4/18/2019
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right -of -Way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant.
Cost
Quant.
Cost
Quant.
Cost
GENERAL ITEMS
No.
Backfill & Compaction- embankment
GI - 1
$ 6.00
CY
Backfill & Compaction- trench
GI-2
$ 9.00
CY
20
180.00
392
3.528.00
Clear/Remove Brush, by hand
GI-3
$ 1.00
SY
Clearing/Grubbing/Tree Removal
GI-4
$ 10,000.00
Acre
0.2
2.000.00
Excavation - bulk
GI - 5
$ 2.00
CY
150
300.00
Excavation - Trench
GI - 6
$ 5.00
CY
201
100.00
200
1.000.00
Fencing, cedar, 6' hi h
GI - 7
$ 20.00
LF
Fencing, chain link, vinyl coated, 6' high
GI - 8
$ 20.00
LF
Fencing, chain link, gate, vinyl coated, 20'
GI - 9
$ 1,400.00
Each
Fencing, s lit rail, 3' hi h
GI - 10
$ 15.00
LF
Fill & compact - common barrow
GI - 11
$ 25.00
CY
Fill & compact - gravel base
GI - 12
$ 27.00
CY
Fill & compact - screened topsoil
GI - 13
$ 39.00
CY
Gabion, 12" deep, stone filled mesh
GI - 14
$ 65.00
SY
•Gabion, 18" deep. stone filled mesh
GI - 15
$ 90.00
SY
Gabion. 36" deep, stone filled mesh
GI - 16
$ 150.00
SY
,Grading. fine, by hand
GI - 17
$ 2.50
SY
Gradin , fine, with grader
GI - 18
$ 2.00
SY
500
1.000.00
Monuments, T Ion
GI -19
$ 250.00
Each
Sensitive Areas Sin
GI - 20
$ 7.00
Each
Sodding. 1" deep. sloped ground
GI - 21
$ 8.00
SY
Surve in , line & grade
GI - 22
$ 850.00
Da
;Surveying, lot location/lines
GI - 23
$ 1,800.00
Acre
Traffic control crew 2 flaggers)
GI - 24
$ 120.00
HR
40
4,800.00
'Trail, 4" chipped wood
GI - 25
$ 8.00
SY
'Trail, 4" crushed cinder
GI - 26
$ 9.00
SY
Trail. 4" top course
GI - 27
$ 12.00
SY
'Nall, retaining, concrete
GI - 28
$ 55.00
SF
i
291
1,595.00
Wall, rockery
GI - 29
$ 15.00
SF
Page 3 of 9
SUBTOTAL 5,080.00
9,423.00
Unit prices updated: 03/02/2015
"KCC 27A authorizes only one bond reduction. Version: 03/02/2015
KC BQ Worksheet_Complete Report Date: 4/18/2019
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Cost
Quant. Cost
Quant. Cost
ROADIMPROVEMENT
No.
AC Grinding. 4' wide machine < 1000s
RI - 1
$ 30.00
SY
AC Grinding, 4' wide machine 1000-2000
RI-2
$ 16.00
SY
AC Grinding, 4' wide machine > 2000s
RI-3
$ 10.00
SY
AC Removal/Disposal
RI-4
$ 35.00
SY
45
1,575.00
Barricade, type III Permanent 1
RI - 6
1 $ 56.00
LF
Curb & Gutter, rolled
RI - 7
$ 17.00
LF
Curb & Gutter, vertical
RI - 8
$ 12.50
LF
60
750.00
Curb and Gutter, demolition and disposal
RI - 9
$ 18.00
LF
60
1,080.00
Curb, extruded asphalt
RI - 10
$ 5.50
LF
Curb, extruded concrete
RI - 11
$ 7.00
LF
Sawcut, asphalt, 3" de th
RI - 12
$ 1.85
LF
1971
364.45
Sawcut, concrete, per V depth
RI - 13
$ 3.00
LF
Sealant, asphalt
RI - 14
$ 2.00
LF
Shoulder, AC, ( see AC road unit price )
RI - 15
$ -
SY
Shoulder, gravel, 4" thick
RI - 16
$ 15.00
SY
Sidewalk. 4" thick
RI - 17
$ 38.00
SY
28
1.064.00
Sidewalk, 4" thick, demolition and dis osa
RI - 18
$ 32.00
SY
67
2.144.00
Sidewalk, 5" thick
RI - 19
$ 41.00
SY
Sidewalk. 5" thick. demolition and dis osa
RI - 20
$ 40.00
SY
Sign, handicap
RI - 21
$ 85.00
Each
Striping, er stall
RI - 22
$ 7.00
Each
Striping, thermoplastic, for crosswalk
RI - 23
$ 3.00
SF
Striping, 4" reflectorized line
I RI - 24
$ 0.50
LF
j 4491
224.50
Page 4 of 9
SUBTOTAL
6,977.45
224.50
Unit prices updated: 03/02/2015
"KCC 27A authorizes only one bond reduction. Version: 03/02/2015
KC BQ Worksheet_Complete Report Date: 4/18/2019
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing Future Public
Right-of-way Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Cost Quant. Cost
Quant. I Cost
ROAD SURFACING
No.
4" Rock = 2.5 base & 1.5" top course) 9 1/2" Rock= 8" base & 1.5" toP course)
Additional 2.5" Crushed Surfacin
RS - 1
$ 3.60
SY
IHMA 1/2" Overlay, 1.5"
RS - 2
$ 14.00
SY
IHMA 1/2" Overlay 2"
RS - 3
$ 18.00
SY
IHMA Road, 2", 4" rock. First 2500 SY
RS-4
$ 28.00
SY
IHMA Road, 2", 4" rock, Qty. over 2500 SY
RS - 5
$ 21.00
SY
IHMA Road, 3", 9 1/2" Rock, First 2500 SN
RS - 6
$ 42.00
SY
HMA Road, 3". 9 1/2" Rock, Qty Over 250
RS - 7
$ 35.00
SY
Not Used
RS - 8
Not Used
RS - 9
HMA Road, 6" Depth, First 2500 SY
IRS - 10
$ 33.10
SY
55
1.820.50
HMA Road. 6" De th, Qty. Over 2500 SY
IRS -11
$ 30.00
SY
HMA 3/4" or 1", 4" Depth
IRS - 12
$ 20.00
SY
Gravel Road, 4" rock, First 2500 SY
IRS - 13
$ 15.00
SY
Gravel Road, 4" rock, Qty. over 2500 ST
IRS - 14
$ 10.00
SY
PCC Road Add Under Write -Ins w/Desi
IRS - 15
Thickened Edge
IRS - 17
$ 8.60
LF
Page 5 of 9
SUBTOTAL 1,820.50
Unit prices updated: 03/02/2015
"KCC 27A authorizes only one bond reduction. Version: 03/02/2015
KC BQ Worksheet_Complete Report Date: 4/18/2019
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
8 Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Cost
Quant. I Cost
Quant. Cost
DRAINAGE (CPP = Corrugated Plastic Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.
Access Road. R/D
D - 1
$ 21.00
SY
Bollards - fixed
D - 2
$ 240.74
Each
Bollards - removable
D - 3
$ 452.34
Each
(CBs include frame and lid)
CB Tvoe l
D- 4
$ 1.500.00
Each
1
1,500.00
3
4,500.00
CB Type IL
D - 5
$ 1.750.00
Each
CB Type II, 48" diameter
D - 6
$ 2,300.00
Each
for additional depth over 4'
D - 7
$ 480.00
FT
CB Type It. 54" diameter
D - 8
$ 2,500.00
Each
for additional depth over 4'
D - 9
$ 495.00
FT
CB Type II, 60" diameter
D - 10
$ 2,800.00
Each
for additional depth over 4'
D - 11
$ 600.00
FT
CB Type II, 72" diameter
D - 12
$ 3.600.00
Each
for additional depth over 4'
D - 13
$ 850.00
FT
Through -curb Inlet Framework Add
D - 14
$ 400.00
Each
Cleanout. PVC, 4"
D - 15
$ 150.00
Each
Cleanout, PVC, 6"
D - 16
$ 170.00
Each
10
1,700.00
Cleanout, PVC, 8"
D - 17
$ 200.00
Each
Culvert, PVC. 4"
D - 18
$ 10.00
LF
Culvert, PVC, 6"
D - 19
$ 13.00
LF
41
533.00
331
4,303.00
Culvert, PVC, 8"
D - 20
$ 15.00
LF
Culvert, PVC, 12"
D - 21
$ 23.00
LF
Culvert, CMP, 8"
D - 22
$ 19.00
LF
Culvert, CMP, 12"
D - 23
$ 29.00
LF
Culvert, CMP, 15"
D - 24
$ 35.00
LF
Culvert. CMP. 18"
D - 25
$ 41.00
LF
Culvert, CMP, 24"
D - 26
$ 56.00
LF
Culvert, CMP, 30"
D - 27
$ 78.00
LF
Culvert, CMP, 36"
D - 28
$ 130.00
LF
Culvert, CMP, 48"
D - 29
$ 190.00
LF
Culvert, CMP, 60"
D - 30
$ 270.00
LF
Culvert, CMP, 72"
D - 31
$ 350.00
LF
Page 6 of 9
SUBTOTAL
2.033.00
10,503.00
Unit prices updated: 03/02/2015
"KCC 27A authorizes only one bond reduction. Version: 03/02/2015
KC BQ Worksheet_Complete Report Date: 4/18/2019
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
DRAINAGE CONTINUED
Existing
Right-of-way
Future Public
Right of Way
8, Drainage Facilities
Private
Improvements
No.
Unit Price
Unit
Quant.
Cost
Quant.
Cost
Quant.
Cost
Culvert, Concrete, 8"
D - 32
$ 25.00
LF
Culvert, Concrete, 12"
D - 33
$ 36.00
LF
-Culvert, Concrete, 15"
D - 34
$ 42.00
LF
Culvert. Concrete, 18"
D - 35
$ 48.00
LF
Culvert. Concrete. 24"
D - 36
$ 78.00
LF
Culvert, Concrete, 30"
D - 37
$ 125.00
LF
Culvert, Concrete, 36"
D - 38
$ 150.00
LF
Culvert. Concrete. 42"
D - 39
$ 175.00
LF
Culvert, Concrete, 48"
D - 40
$ 205.00
LF
Culvert, CPP, 6"
D - 41
$ 14.00
LF
'Culvert, CPP, 8"
D - 42
$ 16.00
LF
Culvert. CPP, 12"
D - 43
$ 24.00
LF
Culvert, CPP, 15"
D - 44
$ 35.00
LF
Culvert, CPP, 18"
D - 45
$ 41.00
LF
Culvert, CPP, 24"
D - 46
$ 56.00
LF
Culvert, CPP, 30"
D - 47
$ 78.00
LF
Culvert, CPP, 36"
D - 48
$ 130.00
LF
Ditching
D - 49
$ 9.50
CY
Flow Dispersal Trench 1.436 base+
D - 50
$ 28.00
LF
French Drain 3' depth)
D - 51
1 $ 26.00
LF
48
1248
Geotextile, laid in trench, polypropylene
D - 52
$ 3.00
SY
38
114
Mid -tank Access Riser. 48" dia. 6' dee
D - 54
1 $ 2.000.00
Each
Pond Overflow S illwa
D - 55 1
$ 16.00
SY
Restrictor/Oil Separator, 12"
D - 56
$ 1,150.00
Each
Restrictor/Oil Separator, 15"
D - 57
$ 1,350.00
Each
Restrictor/Oil Separator, 18"
D - 58
$ 1,700.00
Each
Riprap, placed
D - 59
$ 42.00
CY
Tank End Reducer 36" diameter
D - 60
$ 1,200.00
Each
Trash Rack, 12"
D - 61
$ 350.00
Each
Trash Rack, 15"
D - 62
$ 410.00
Each
Trash Rack, 18"
D - 63
$ 480.00
Each
Trash Rack, 21"
D - 64
$ 550.00
Each
Page 7 of 9
SUBTOTAL
1362
Unit prices updated: 03/02/2015
"KCC 27A authorizes only one bond reduction Version: 03/02/2015
KC BQ Worksheet_Complete Report Date: 4/18/2019
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Price
Quant. Cost
Quant. Cost
PARKING LOT SURFACING Not To Be Used For Roads Or Shoulders
No.
2" AC, 2" top course rock & 4" borrow
PL - 1
$ 21.00
SY
NA
NA
2" AC, 1.5" top course & 2.5" base cours
PL - 2
$ 28.00
SY
NA
NA
.4" select borrow
PL - 3
$ 5.00
SY
NA
NA
1.5" top course rock & 2.5" base course
PL - 4
$ 14.00
SY
NA
NA
UTILITY POLES & STREET LIGHTING Utility pole relocation costs must be accompanied by Franchise Utility's Cost Estimate
Utilit Poles Relocation
UP-1
Lump Sum
,Street Light Poles w/Luminaires
UP-2
$ 7.500.00 Each
'WRITE -IN -ITEMS
Such as detention/water quality vaults.)
No.
'Washed Rock, 1.5-1.75"
WI - 1
$ 5.00
CY
368
1.840.00
(Pervious Pavers
WI-2
$ 120.00
SY
56
6,720.00
(Remove OHP, Install UGP
WI - 3
$ 5,000.00
LS
[j4
5000
1
5,000.00
INew 1" Water Service/Meter/Connection
WI - 4
$ 1.500.00
LS
6000
INew Gas Services/Connection
WI-51
$ 3,000.00
LS
1
3000
6" Concrete Driveway
WI-6
$ 65.00
SY
27
1755
79
5.135.00
Concrete Stairs
WI-7
$ 50.00
SY
22
1.100.00
WI-8
WI-9
WI-10
SUBTOTAL
SUBTOTAL (SUM ALL PAGES):
30%CONTINGENCY & MOBILIZATION:
GRANDTOTAL:
COLUMN:
Page 8 of 9
B
15,755.00
31,665.95
9,499.79
41,165.74
-- Icljla5
41,307.50
12,392.25
53,699.75
D
Unit prices updated: 03/02/2015
"KCC 27A authorizes only one bond reduction. Version: 03/02/2015
KC BQ Worksheet_Complete Report Date: 4/18/2019
Site Improvement Bond Quantity Worksheet Web date: 04/03/2015
Original bond computations prepared by:
Name: Ben Iddins, PE Date: 4/18/2019
PE Registration Number: 54904 Tel. #: 206-523-0024
Firm Name: Davido Consulting Group, Inc.
Address: 9706 4th Ave NE Suite 300, Seattle, WA 98115 Project No: BLD20181634
Stabilization/Erosion Sediment Control (ESC)
Existing Right -of -Way Improvements
Future Public Right of Way & Drainage Facilities
Private Improvements
Calculated Quantity Completed
Total Right -of Way and/or Site Restoration Bond*/**
(First $7,500 of bond* shall be cash.)
Performance Bond* Amount (A+B+C+D) = TOTAL
Maintenance/Defect Bond* Total
NAME OF PERSON PREPARING BOND* REDUCTION:
FINANCIAL GUARANTEE REQUIREMENTS
PERFORMANCE BOND* MINIMUM BOND* AMOUNT PUBLIC ROAD & DRAINAGE
AMOUNT REQUIRED FOR RECORDING OR MAINTENANCE/DEFECT BOND*
TEMPORARY OCCUPANCY AT
(A) $ 9,174.8 SUBSTANTIAL COMPLETION ***
(B) $ 41,165.7 J
(C) $ -
(D) $ 53,699.8
(A+B) $ 50,340.5
(T) $ 104,040.2
Minimum is $2000.
Tx0.30 $ 31,2 .1
Minimum is $2000.
Date:
(B+C) x
0.25 = $ 10,*4
Minimum is $2000.
* NOTE: The word "bond" as used in this document means a financial guarantee acceptable to King County.
** NOTE: KCC 27A authorizes right of way and site restoration bonds to be combined when both are required.
The restoration requirement shall include the total cost for all TESC as a minimum, not a maximum. In addition, corrective work, both on- and off -site needs to be included.
Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restoration
needs to be reflected in this amount. The 30% contingency and mobilization costs are computed in this quantity.
*** NOTE: Per KCC 27A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes.
REQUIRED BOND* AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY KING COUNTY
Page 9 of 9 Unit prices updated: 03/02/2015
Check out the DDES Web site at www.kin count . ov1 ermits Version: 03/02/2015
KC BQ Worksheet_Complete Report Date: 4/18/2019