Loading...
APPROVED STM Stormwater Report 01-19-2021BLD2019-1553 IEC10 INSIGHT ENGINEERING CO. RESUB Jan 21 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Applicant: Gregory Hoy & Midori Oka 2630 77t" Ave SE Unit A515 Mercer Island, WA 98040 STORMWATER SITE PLAN For Hoy Residence Prepared for The City of Edmonds 121 5th Ave N Edmonds, WA 98020 425-771-0220 Project Site Location: 8051 184" St SW Edmonds, WA -98026 APPLIES WITH APPLICABLE CITY STROMWATER CODE Contact: IECO P.O. Box 1478 Everett, WA98206 425-303-9363 Tax Id: 27041800103800 IECO Project: 19-1023 Certified Erosion and Sedimentation Control Lead: To be named by contractor Stormwater Site Plan Prepared By: Ryan J. Korte Stormwater Site Plan Preparation Date: November 15, 2019 Revised Date: January 19, 2021 Approximate Construction Date: January 1, 2021 P.O Box 1478 Everett, WA 98206 • P: 425.303.9363 info@insightengineering.net 01 /21 /2021 TABLE OF CONTENTS 1.0 Executive Summary................................................................................................................3 1.1 Minimum Requirements Summary..............................................................................................7 2.0 Existing Conditions.................................................................................................................9 3.0 Offsite Analysis.....................................................................................................................14 3.1 Upstream Analysis.....................................................................................................................14 3.2 Downstream Analysis................................................................................................................14 4.0 Developed Conditions..........................................................................................................18 5.0 Site Hydraulic Analysis.........................................................................................................20 5.1 Existing Basin Summary............................................................................................................20 5.2 Developed Basin Summary ........................................................................................................20 6.0 Appendix...............................................................................................................................21 Figures Figure1 - Vicinity Map.................................................................................................................6 Figure2 - Soil Map......................................................................................................................10 Figure3 - Downstream Analysis Map 1....................................................................................16 Figure 4 - Downstream Analysis Map 2....................................................................................17 Insight Engineering Co. - Stormwater Site Plan 11/15/19 -1- Acronyms and Abbreviations BLA Boundary Line Adjustment BMP Best Management Practices DOE Department of Ecology ECDC Edmonds Community Development Code EDDS Engineering Design and Development Standards ESC Erosion and Sediment Control IECO Insight Engineering Company MR Minimum Requirement SWPPP Stormwater Pollution Prevention Plan SWMMWW Stormwater Management Manual for Western Washington TESC Temporary Erosion and Sediment Control WWHM Western Washington Hydrology Model Insight Engineering Co. - Stormwater Site Plan 11/15/19 -2- 1.0 Executive Summary The proposed project Hoy Residence is located at 8051 184th St SW, Edmonds, Washington. More generally, the site is in Section 18, Township 27 North, and Range 4 East of the Willamette Meridian in Snohomish County, Washington. Please refer to the Vicinity Map attached later in the section. This project is subject to the City of Edmond's 2017 requirements and the requirements defined in DOE's 2014 SWMMWW. The site area is 0.38 acres. The site is currently undeveloped and exists as lawn and large evergreen trees. The site contains one drainage basin that slopes moderately to the north. Please refer to the downstream analysis map for more details. There are no critical areas located on the site. Per NRCS survey of Snohomish County, the project site contains Alderwood soils that have a hydrologic classification of Type "C". Please refer to the soils map and descriptions attached later in this report for more details. The project site is zoned as RS-10. The proposal is to construct a new single-family home, garage, and ADU with a total roof area of 4,895 SF. Access to the site will be through an access easement to the south connecting to 184th St SW. The total proposed hard surface area will be 8,625 SF. Per Figure 3.1, (Flow Chart for Determining Requirements for Development) from the 2017 Edmonds Stormwater Addendum, Minimum requirements # 1 through 9 shall apply for this project. See section 1.1 for Minimum Requirements Summary included later in this report. Flow control requirements are exempt as the proposed development will increase the site's peak discharge by 0.03 CFS which is less than the 0.1 CFS threshold (using hourly timesteps) requiring flow control. MR #6 water quality is exempt as the total PGHS is only 3,100 SF which is less than the threshold of 5,000 SF. Insight Engineering Co. - Stormwater Site Plan 11/15/19 -3- Per ECDC 18.30.060.D.5.d Minimum Requirement #5: On -site Stormwater Management, the following roof BMPs must be considered in the following order: Full Dispersion or Full Infiltration, Rain Gardens or Bioretention, Downspout Dispersion Systems, Perforated Stub -out Connections, and Detention Vaults or Pipes. Full infiltration was the first BMP deemed feasible and will be implemented using permeable pavement per BMP T5.15 and an infiltration trench per BMP T5.10A. A bubble -up catch basin has been provided to allow for overflow from the infiltration trench. Overflow will drain to the north to continue its natural drainage pathway. The infiltration trench will store and fully infiltrate stormwater to continue its natural drainage pathway, therefore, no runoff is expected to leave the site. Please refer to Appendix A for tables detailing BMP feasibility. According to the Underground Injection Control (UIC) program: Chapter 173-218 WAC, the proposed infiltration trench must be registered as a UIC. Per ECDC 18.30.060.D.5.d Minimum Requirement #5: On -site Stormwater Management, the BMPs for other hard surfaces must be considered in the following order: Full Dispersion, Permeable Pavement or Rain Gardens, Sheet Flow Dispersion, Detention Vault or Pipe. Permeable Pavement was the first BMP deemed feasible and will be implemented per BMP T5.15 for the driveway area. The patio areas will be collected via yard drains and conveyed to the infiltration trench. Please refer to Appendix A for tables detailing BMP feasibility. The roof drains and patio yard drains will drain to the infiltration trench. The driveway area will be paved using permeable pavement. Post -Construction Soil Quality and Depth BMP T.5.13 is proposed to provide onsite stormwater management for the pervious areas of the site. Insight Engineering Co. - Stormwater Site Plan 11/15/19 -4- Flow Chart for Determining Requirements for Development. Ducs the project result in 2,000 square feet, or greater, of new plus replaced hard surface area? OR Dees the land disturbing activity total 7,000 square feet or greater? Yes No Minimum requirements No. I through 5 apply Minimum requirement No. 2 applies Next Question Dues the project add 5,000 square feet or more of new plus replaced hard surfaces? OR Convert 0.75 acres or more of vegetation to lawn or landscaped areas? OR Convert 2.5 acres or more of native vegetat ion to pasture? No Yes Is this a road related project` 111 Minimum Requirements ii pply to the new and replaced hard surfaces and converted vegetation areas_ All Minimum Requiren-iunts apply to the new hard surfaces and converted vegetation areas. Yes Insight Engineering Co. - Stormwater Site Plan Yee Does the project add 5,000 square feet or H more of new hard surfaces' Yes Dc) new hard surfaces add 50%car more to the existing hard surtacc�, within the project limits? No No I No additional I requirements. 11/15/19 -5- FIGURE]. VICINITYMAP Taken from Snazzy Maps INSIGHT ENGINEERING CO. P.O. Box 1478Everett, WA98206 425-303-9363, 425-303-9362 f. Info@insightengineering.net Insight Engineering Co. - Stormwater Site Plan Figure 1 -Vicinity May Hoy Residence Edmonds, Washington SCALE: DATE 1/21/21 JOB#: 19-1023 NTS BY FILE NAME: RJK 19-1023/doc/Stormwater Site Plan 11/15/19 1.1 Minimum Requirements Summary MR : Minimum Requirement SWPPP : Stormwater Pollution Prevention Plan MR #1 Stormwater Site Plan Narrative: The Stormwater Site Plan preparation follows the City of Edmonds 2017 requirements and in accordance with DOE's 2014 SWMMWW. Refer to the executive summary within Section 1.0. MR #2 SWPPP Narrative: A SWPPP has been included in the Appendix A under Section 6. MR #3 Water Pollution Source Control for New Development: No source control pollutants pertain to the proposed single-family project; therefore, no BMPs are required for the project. MR #4 Preservation of Natural Drainage Systems and Outfalls: The runoff from the site will be fully infiltrated, therefore no runoff is anticipated to leave the site. The downstream public channel should not experience any future flooding problems. MR #5 Onsite Stormwater Management: Per ECDC 18.30.060.D.5.d Minimum Requirement #5: On -site Stormwater Management, the following roof BMPs must be considered in the following order: Full Dispersion or Full Infiltration, Rain Gardens or Bioretention, Downspout Dispersion Systems, Perforated Stub -out Connections, and Detention Vaults or Pipes. Full infiltration was the first BMP deemed feasible and will be implemented using permeable pavement per BMP T5.15 and an infiltration trench per BMP T5.10A. A bubble -up catch basin has been provided to allow for overflow from the infiltration trench. Overflow will drain to the north to continue its natural drainage pathway. The infiltration trench will store and fully infiltrate Stormwater to continue its natural drainage pathway, therefore, no runoff is expected to leave the site. Please refer to Appendix A for tables detailing BMP feasibility. According to the Underground Injection Control (UIC) program: Chapter 173-218 WAC, the proposed infiltration trench must be registered as a UIC. Insight Engineering Co. - Stormwater Site Plan 11/15/19 -7- Per ECDC 18.30.060.D.5.d Minimum Requirement #5: On -site Stormwater Management, the BMPs for other hard surfaces must be considered in the following order: Full Dispersion, Permeable Pavement or Rain Gardens, Sheet Flow Dispersion, Detention Vault or Pipe. Permeable Pavement was the first BMP deemed feasible and will be implemented per BMP T5.15 for the driveway area. The patio areas will be collected via yard drains and conveyed to the infiltration trench. Please refer to Appendix A for tables detailing BMP feasibility. The roof drains and patio yard drains will drain to the infiltration trench. The driveway area will be paved using permeable pavement. Post -Construction Soil Quality and Depth BMP T.5.13 is proposed to provide onsite stormwater management for the pervious areas of the site. MR #6 Runoff Treatment: MR #6 water quality is exempt as the total PGHS is only 3,100 SF which is less than the threshold of 5,000 SF. MR #7 Flow Control:. Flow control requirements are exempt as the proposed development will increase the site's peak discharge by 0.03 CFS which is less than the 0.1 CFS threshold (using hourly timesteps) requiring flow control. MR #8 Wetlands protection: There are no wetlands present on site and the site will not discharge to a wetland area. MR #9 Operations and Maintenance: An Operations and Maintenance Manual is provided under the Appendix E. Insight Engineering Co. - Stormwater Site Plan 11/15/19 2.0 Existing Conditions The proposed project Hoy Residence is located at 8051 184th St SW, Edmonds, Washington. More generally, the site is in Section 18, Township 27 North, and Range 4 East of the Willamette Meridian in Snohomish County, Washington. The site area is 0.38 acres. The site is currently undeveloped and exists as lawn and large evergreen trees. The site contains one drainage basin that slopes moderately to the north. Please refer to the downstream analysis map for more details. There are no critical areas located on the site. Per NRCS survey of Snohomish County, the project site contains Alderwood soils that have a hydrologic classification of Type "C". Please refer to the soils map and descriptions attached later in this report for more details. Insight Engineering Co. - Stormwater Site Plan 11/15/19 -9- FIGURE 2. SOIL MAP f I 1 • e , i 4 SOILS LEGEND 5— Alderwood-Urban land complex, 2 to 8 percent slopes 6— Alderwood-Urban land complex, 8 to 15 percent slopes Figure 2 - Soil May 03Mf Hoy Residence Edmonds, Washington ISIGHT ENGINEERING CO. SCALE: DATE: 1/21/21 JOB#: 19-1023 NONE P.O. Box 1478 Everett, WA 98206 FILE NAME: 425-303-9363, 425-303-9362 f. Info@insightengineering.net BY.719-1023/ doc/Stormwater Site Plan Insight Engineering Co. - Stormwater Site Plan 11/15/19 -10- Snohomish County Area, Washington 5—Alderwood-Urban land complex, 2 to 8 percent slopes Map Unit Setting • National map unit symbol: 2hz9 • Elevation: 50 to 800 feet • Mean annual precipitation: 25 to 60 inches • Mean annual air temperature: 48 to 52 degrees F • Frost -free period: 180 to 220 days • Farmland classification: Not prime farmland Map Unit Composition • Alderwood and similar soils: 60 percent • Urban land: 25 percent • Minor components: 15 percent • Estimates are based on observations, descriptions, and transects of the mapunit. Description of Alderwood Setting • Landform: Till plains • Parent material: Basal till Typical profile • HI - 0 to 7 inches: gravelly ashy sandy loam • H2 - 7 to 35 inches: very gravelly ashy sandy loam • H3 - 35 to 60 inches: gravelly sandy loam Properties and qualities • Slope: 2 to 8 percent • Depth to restrictive feature: 20 to 40 inches to densic material • Natural drainage class: Moderately well drained • Capacity of the most limiting layer to transmit water (Ksat): Very low to moderately low (0.00 to 0.06 in/hr) • Depth to water table: About 18 to 36 inches • Frequency of flooding: None • Frequency of ponding: None • Available water storage in profile: Low (about 3.0 inches) Interpretive groups • Land capability classification (irrigated): None specified • Land capability classification (nonirrigated): 4s • Hydrologic Soil Group: B • Forage suitability group: Limited Depth Soils (G002XN302WA) • Hydric soil rating: No Minor Components Mckenna • Percent of map unit: 5 percent • Landform: Depressions • Hydric soil rating: Yes Insight Engineering Co. - Stormwater Site Plan 11/15/19 -11- Norma, undrained • Percent of map unit: 5 percent • Landform: Depressions • Hydric soil rating: Yes Terric medisaprists, undrained • Percent of map unit: 5 percent • Landform: Depressions • Hydric soil rating: Yes 6—Alderwood-Urban land complex, 8 to 15 percent slopes Map Unit Setting • National map unit symbol: 2hzn • Elevation: 50 to 800 feet • Mean annual precipitation: 25 to 60 inches • Mean annual air temperature: 48 to 52 degrees F • Frost -free period: 180 to 220 days • Farmland classification: Not prime farmland Map Unit Composition • Alderwood and similar soils: 60 percent • Urban land: 25 percent • Minor components: 5 percent • Estimates are based on observations, descriptions, and transects of the mapunit. Description of Alderwood Setting • Landform: Till plains • Parent material: Basal till Typical profile • HI - 0 to 7 inches: gravelly ashy sandy loam • H2 - 7 to 35 inches: very gravelly ashy sandy loam • H3 - 35 to 60 inches: gravelly sandy loam Properties and qualities • Slope: 8 to 15 percent • Depth to restrictive feature: 20 to 40 inches to densic material • Natural drainage class: Moderately well drained • Capacity of the most limiting layer to transmit water (Ksat): Very low to moderately low (0.00 to 0.06 in/hr) • Depth to water table: About 18 to 36 inches • Frequency of flooding: None • Frequency of ponding: None • Available water storage in profile: Low (about 3.0 inches) Interpretive groups • Land capability classification (irrigated): None specified • Land capability classification (nonirrigated): 4s • Hydrologic Soil Group: B • Forage suitability group: Limited Depth Soils (G002XN302WA) Insight Engineering Co. - Stormwater Site Plan 11/15/19 -12- • Hydric soil rating: No Minor Components Norma, undrained • Percent of map unit: 5 percent • Landform: Drainageways • Hydric soil rating: Yes Insight Engineering Co. - Stormwater Site Plan 11/15/19 -13- 3.0 Offsite Analysis A site reconnaissance was performed by Brian Kalab of Insight Engineering on October 28, 2019 to verify the downstream flow paths and observe any drainage problems downstream of the site. The sky was partly cloudy with a temperature of 40 degrees. The site area is 0.38 acres. The site is currently undeveloped and exists as lawn and large evergreen trees. The site contains one drainage basin that slopes moderately to the north. 3.1 Upstream Analysis Based on the site reconnaissance and the topographic survey of the site, the upstream flows appear to be minimal. Refer to the Downstream Analysis Map attached in the next page for more details. 3.2 Downstream Analysis The existing site drains to the north to follow the contour of the site and flows through the neighboring properties at the addresses of 8117 182nd St SW, 8115 182nd St SW, 18218 801h Ave W, and 18208 80th Ave W. The flow path flows towards structures and over lawn area on all four properties as well as runs over driveways on 18218 and 18208 80th Ave W. The flow path from the site to the drainage system along 80th Ave W is about 370 ft. The runoff flows north on 80th Ave for about 220 ft through a series of 12" concrete pipes. Along the west side of 80th Ave the flow travels north through a large grassy area for about 50-feet to a catch basin. The flow then travels via 12-inch concrete pipe to flow north for 120-feet then continues north 225-feet through a grass ditch. The flow then transitions back into a 12-inch concrete pipe for another 240-feet north. The flow then turns east along 180th St SW and flows for approximately 625-feet through a series of grass ditches and 12-inch concrete pipes. The flow then crosses beneath Olympic View Dr via an 18 in concrete pipe for about 40-feet. The 18-inch pipe then outlets to a ditch that flows 275-feet to Perrinville Creek. Perrinville Creek flows north unrestricted for about a mile from the site to discharge into the Puget Sound. Insight Engineering Co. - Stormwater Site Plan 11/15/19 -14- This is where the downstream analysis was concluded. There did not appear to be any restrictions or erosional problems downstream of the site. In the developed state, the runoff from the driveway will infiltrate into the ground and will follow the natural drainage pathway. Runoff from the roof and patios will be collected into the infiltration trench located to the north of the proposed home. The proposed grading will not cause any changes to the direction of the flow path because it will continue to cause the stormwater to flow to the north. A bubble -up catch basin has been provided to allow for overflow from the infiltration trench. Overflow will drain to the north to continue its natural drainage pathway. The infiltration trench will store and fully infiltrate stormwater to continue its natural drainage pathway, therefore, no runoff is expected to leave the site. Insight Engineering Co. - Stormwater Site Plan 11/15/19 -15- FIGURE 3. DOWNSTREAM ANALYSIS MAP 1 [MI mmffr3 INSIGHT ENGINEERING CO P.O. Box 1478 Everett, WA 98206 425-303-9363, 425-303-9362 f. Info@insightengineering.net A Map taken from City of Edmonds GIs Figure 3 - Downstream Analysis Map Hoy Residence Edmonds, Washington ISCALE:DATE: 1/21/21 JOB #: 19-1023 ONE I I I I FILE NAME: BY: RJK 19-1023/doc/Stormwater Site Plan Insight Engineering Co. - Stormwater Site Plan 11/15/19 -16- FIGURE 4. DOWNSTREAM ANALYSIS MAP 2 IEC INSIGHT ENGINEERING CO P.O. Box 1478 Everett, WA 98206 425-303-9363, 425-303-9362 f. Info@insightengineering.net Map taken from City of Edmonds GIS Figure 4 - Downstream Analysis Map Hoy Residence Edmonds, Washington ISCALE:DATE: 1/21/21 JOB #: 19-1023 ONE I I I I FILE NAME: BY: RJK 19-1023/doc/Stormwater Site Plan Insight Engineering Co. - Stormwater Site Plan 11/15/19 -17- 4.0 Developed Conditions The proposed project Hoy Residence is located at 8051 184th St SW, Edmonds, Washington. More generally, the site is in Section 18, Township 27 North, and Range 4 East of the Willamette Meridian in Snohomish County, Washington. Per NRCS survey of Snohomish County, the project site contains Alderwood soils that have a hydrologic classification of Type «C„ The project site is zoned as RS-10. The proposal is to construct a new single-family home, garage, and ADU with a total roof area of 4,895 SF. Access to the site will be through an access easement to the south connecting to 184th St SW. Per ECDC 18.30.060.D.5.d Minimum Requirement #5: On -site Stormwater Management, the following roof BMPs must be considered in the following order: Full Dispersion or Full Infiltration, Rain Gardens or Bioretention, Downspout Dispersion Systems, Perforated Stub -out Connections, and Detention Vaults or Pipes. Full infiltration was the first BMP deemed feasible and will be implemented using permeable pavement per BMP T5.15 and an infiltration trench per BMP T5.10A. A bubble -up catch basin has been provided to allow for overflow from the infiltration trench. Overflow will drain to the north to continue its natural drainage pathway. The infiltration trench will store and fully infiltrate stormwater to continue its natural drainage pathway, therefore, no runoff is expected to leave the site. Please refer to Appendix A for tables detailing BMP feasibility. According to the Underground Injection Control (UIC) program: Chapter 173-218 WAC, the proposed infiltration trench must be registered as a UIC. Per ECDC 18.30.060.D.5.d Minimum Requirement #5: On -site Stormwater Management, the BMP's for other hard surfaces must be considered in the following order: Full Dispersion, Permeable Pavement or Rain Gardens, Sheet Flow Dispersion, Detention Vault or Pipe. Permeable Pavement was the first BMP deemed feasible and will be implemented per BMP T5.15 for the Insight Engineering Co. - Stormwater Site Plan 11/15/19 -18- driveway area. The patio areas will be collected via yard drains and conveyed to the infiltration trench. Please refer to Appendix A for tables detailing BMP feasibility. Insight Engineering Co. - Stormwater Site Plan 11/15/19 -19- 5.0 Site Hydraulic Conditions Per NRCS survey of Snohomish County, the project site contains Alderwood soils that have a hydrologic classification of Type "C". Site Area = 0.36 Acres (15,602 SF) Clearing Limit = 0.38 Acres (16,402 SF) 5.1 Existing Basin Summary Site Area = 0.36 Acres Clearing Limit = 0.38 Acres The entire existing basin was modeled as forested. Refer to the Existing Basin Map and the following pages for more details. 5.2 Developed Basin Summary Site Area Clearing Limit Impervious: = 0.36 Acres = 0.38 Acres Roof Area = 0.11 Acres (4,895 SF) Driveway (Onsite) = 0.05 Acres (2,300 SF) Driveway (Offsite) = 0.02 Acres ( 800 SF) PatioiWalkway = 0.02 Acres ( 630 SF) Total Impervious = 0.20 Acres (8,625 SF) Pervious: Pervious Area (Lawn) = 0.38 - 0.20 = 0.18 Acres Refer to the Developed Basin Map and the following pages for more details. Insight Engineering Co. - Stormwater Site Plan 11/15/19 -20- nrnpSHED SET REM W/CAP 1.0'(S) \ / OF CORNER ON PROPERTY / � UNE 0.70'(5) OF FENCE SSMH RIM=34Z46 IE 6• RCP(N)=340.28 FENCE 0.3'(S) _ AFN1 202007290684 5' IE 6• RCP(S)�340.38 AT CORNER M _W 101.31' — � I ---- 20" o r � 26F I IZ • ,6• / SHED 22 F 20" ` / 22• / 26• \ 30• I I / F I \ 12• I I l F \ / 3 26 16• I I/ 14• 36 16" F yl 28 26" F I I \ 27041800103800 28- 1I 26" I F I 14" 270418DO104100 I ROCKER' 26" \ xl ! F $ 16" \ / F / IO• 14• I F a d F N88'39'16' 12.77' X �11 FOUNDRE84R NO .4'OF CALC'D OSRION . N08'S5138 E 20.22'—, Y II 30.00' ' ACCESS EASEMENT 30.00' OFFSET 1.0'(N) OF CORNER ON PROPERTY UNE 'O.60'(N) OF FENCE 20' / •I r�1�✓V I I Nn4 G034•E / I / F "346 / F 26• 28- 4 \ \ F \ 16' NC \ 12 \ 10 F \ L \ 12- \ 5 12X I FENCE 1.2'(W) &� \ 0.9'(N) OF CORNER I / 6 27041600104000 \ 18041 —I Ins RMW W/CAP OFFSET 1'(W) ON PROPERTY UNE. 0.35'(W) OF FENCE COR. FENCE COR. 0.6'(W) & 0. 1'(N) OF CORNER EX. BASIN AREA (0.38 AQ / FENCE NNT. 0. 1'(E) OF PRO)UNE c r � SCALE: I" _ 0 1 20 EXISTING BASIN MAP 20' PU8L1c sEME— FASNi AFN/ 1877056 SHED / SEF O R4R 111 1.0'(1) \ </\/\/// RERAR W/CAP OFFSET 1'(W) OF CORNER ON PROPERTY / 1.9' LINE 0.70'(S) OF FENCE \ \ �� / I ON PROPERLY LINE 0. COR OF FENCE COR. FENCE COR. SSMN RIM=347.46 / \ CL 0.6'(W) k 0.1'(N) OF CORNER IE 6: RCP(N)=340.28 FENCE 0.3'(S) l AFN/ 202007290684 5' IE 6' RCP(S)�340.38 AT CORNER — — 101.71'- — 00• I bt SHED l I 4 Mu 'is �S a CL BSBL SF SF \ a sF" I MW 3KX ° d �ada CL u / a FM 11 V DV BASIN AREA I I i 17S (0.38 AQ Mu �/ II / I rw I I I \ 27041800103800 AR At J17• .0' BSBL 27041800104100 \ FI I PL \\ o ASTOMREA ` v I OF PR LINE (E) E r rrrrrl Fr r 1124' rrrrrrrrrrrr rrrrrrrrrrrrrrrr�l I� \ a r rr / rrrrrrrrr 7r r rrrrr ` rrrrrrr rrrrrrrrrr� r rr r r rrrrrrrrrrr - MOMET S ff.W rrr�r� rrrrrrrrr I r rr rrrrrrrr -- \ FFF r rr -r rrrrrr�r rrrrrrF7FFFF rrrrrr II rr r rrrrr rrr _ — — rr rrrr rI rr rrrr ` I 1 =r ° r�r rrr — — �r �FFFrrr��r /� L rrrrrrrr I 3 rr rrrrr ° ,D�. r rr rrrrrr — r r r r rmr — — — — — — ° "a'° I rr r rrr A rrrrrrrrrr r rrrrrrrrF- rrrrrr d JD x 2O rP rrrr�rr�r / ACCESS EASEMENT rr rr rrrrrrrrrrrrr I Mu LL rrrr rrrrrrrrrrrrr 1.1 N88'38'18'E r r r AT CORNER JO' HW'N OLOCR WAI FENCE NO OFFSET I.0'(N) OF RE1.2'(W) \ 0.9'(N) OF CORNER — — — — FOUNREM/ I 0.4'(S) OF CALC'D CORNER ON POSRION PROPERTY LINE \ SO' '0.60'(N) OF FENCE I — 20 2' I SCALE: 1" — 20' I ENT RANCE NCENI ENTRA6 "-02'59 E 27041800104000 � � I 0 10 20 3.68' TRENCH DAM MP.) /8041 I �N"-28i 5 54w , I 1 DE VEL OPED BASIN MAP 6.0 Appendix A. Minimum Requirement #5 Bmp Feasibility C. Stormwater Pollution Prevention Plan D. Geotech Report E. Operation & Maintenance Manual Insight Engineering Co. - Stormwater Site Plan 11/15/19 -21- A. MINIMUM REQUIREMENT #5 BMP FEASIBILITY Roof BMPs (List #1) Per ECDC 18.30.060.D.5.d Minimum Requirement #5 BMP Feasibility BMP Feasibility Conditions T5.30 Full Dispersion Infeasible Full Dispersion is infeasible because of the required flow path and preserved vegetation area could not be achieved. T5.10A Downspout Feasible Downspout Full Infiltration has been considered Full Infiltration and deemed feasible. Permeable pavers and an infiltration trench will both be used to infiltrate roof runoff. T5.IOB Downspout NA Dispersion T5.IOC Perforated N/A Stub -out Connections Detention Pipe or Vault N/A Other Hard Surface BMPs (List #1) Per ECDC 18.30.060.D.5.d Minimum Requirement #5 BMP Feasibility BMP Feasibility Conditions T5.30 Full Dispersion Infeasible Full Dispersion is infeasible because of the lack of preserved vegetated could not be achieved for this MR zoned project. Permeable Pavement or Feasible Permeable Pavement has been considered feasible Rain Gardens and will be used for hard surfaces. T5.12 Sheet Flow N/A Dispersion Detention Pipe or Vault N/A Insight Engineering Co. - Stormwater Site Plan 11/15/19 -22- Insight Engineering Co. - Stormwater Site Plan 11/15/19 -23- WWH? PROJECT General Model Information Project Name: Hoy Residence Site Name: Hoy Residence Site Address: XX 81 st Ave W City: Edmonds Report Date: 11 /14/2019 MGS Region: Puget East Data Start: 1901 /10/1 Data End: 2058/09/30 Timestep: Hourly DOT Data Number03 Version Date: 2018/03/08 Version: 4.2.14 POC Thresholds Low Flow Threshold for POC1: 50 Percent of the 2 Year High Flow Threshold for POC1: 50 Year Hoy Residence 11/14/2019 3:08:45 PM Page 2 Landuse Basin Data Predeveloped Land Use Predeveloped Bypass: No GroundWater: No Pervious Land Use acre C, Forest, Mod 0.38 Pervious Total 0.38 Impervious Land Use acre Impervious Total 0 Basin Total 0.38 Element Flows To: Surface Interflow Groundwater Hoy Residence 11/14/2019 3:08:45 PM Page 3 Mitigated Land Use Roof/Patios Bypass: No GroundWater: No Pervious Land Use acre Pervious Total 0 Impervious Land Use acre ROOF TOPS FLAT 0.11 SIDEWALKS FLAT 0.02 Impervious Total 0.13 Basin Total 0.13 Element Flows To: Surface Interflow Groundwater Gravel Trench Bed 1 Gravel Trench Bed 1 Hoy Residence 11/14/2019 3:08:45 PM Page 4 Driveway Bypass: No Impervious Land Use acre DRIVEWAYS MOD LAT 0.07 Element Flows To: Outlet 1 Outlet 2 Permeable Pavement 1 Hoy Residence 11/14/2019 3:08:45 PM Page 5 Lawn Bypass: Yes GroundWater: No Pervious Land Use acre C, Lawn, Mod 0.18 Pervious Total 0.18 Impervious Land Use acre Impervious Total 0 Basin Total 0.18 Element Flows To: Surface Interflow Groundwater Hoy Residence 11/14/2019 3:08:45 PM Page 6 Routing Elements Predeveloped Routing Hoy Residence 11/14/2019 3:08:45 PM Page 7 Mitigated Routing Gravel Trench Bed 1 Bottom Length: Bottom Width: Trench bottom slope 1: Trench Left side slope 0: Trench right side slope 2: Material thickness of first layer: Pour Space of material for first layer: Material thickness of second layer: Pour Space of material for second layer Material thickness of third layer: Pour Space of material for third layer: Infiltration On Infiltration rate: Infiltration safety factor: Total Volume Infiltrated (ac-ft.): Total Volume Through Riser (ac-ft.): Total Volume Through Facility (ac-ft.): Percent Infiltrated: Total Precip Applied to Facility: Total Evap From Facility: Discharge Structure Riser Height: 0 ft. Riser Diameter: 0 in. Element Flows To: Outlet 1 Outlet 2 80.00 ft. 12.00 ft. 0 To 1 0 To 1 0 To 1 3.5 0.3 0 0 0 0 0.35 1 49.327 0 49.327 100 0 0 Gravel Trench Bed Hydraulic Table Stage(feet) Area(ac.) Volume(ac-%) Discharge(cfs) Infilt(cfs) 0.0000 0.022 0.000 0.000 0.000 0.0389 0.022 0.000 0.000 0.007 0.0778 0.022 0.000 0.000 0.007 0.1167 0.022 0.000 0.000 0.007 0.1556 0.022 0.001 0.000 0.007 0.1944 0.022 0.001 0.000 0.007 0.2333 0.022 0.001 0.000 0.007 0.2722 0.022 0.001 0.000 0.007 0.3111 0.022 0.002 0.000 0.007 0.3500 0.022 0.002 0.000 0.007 0.3889 0.022 0.002 0.000 0.007 0.4278 0.022 0.002 0.000 0.007 0.4667 0.022 0.003 0.000 0.007 0.5056 0.022 0.003 0.000 0.007 0.5444 0.022 0.003 0.000 0.007 0.5833 0.022 0.003 0.000 0.007 0.6222 0.022 0.004 0.000 0.007 0.6611 0.022 0.004 0.000 0.007 0.7000 0.022 0.004 0.000 0.007 0.7389 0.022 0.004 0.000 0.007 0.7778 0.022 0.005 0.000 0.007 0.8167 0.022 0.005 0.000 0.007 0.8556 0.022 0.005 0.000 0.007 0.8944 0.022 0.005 0.000 0.007 Hoy Residence 11/14/2019 3:08:45 PM Page 8 0.9333 0.022 0.006 0.000 0.007 0.9722 0.022 0.006 0.000 0.007 1.0111 0.022 0.006 0.000 0.007 1.0500 0.022 0.006 0.000 0.007 1.0889 0.022 0.007 0.000 0.007 1.1278 0.022 0.007 0.000 0.007 1.1667 0.022 0.007 0.000 0.007 1.2056 0.022 0.008 0.000 0.007 1.2444 0.022 0.008 0.000 0.007 1.2833 0.022 0.008 0.000 0.007 1.3222 0.022 0.008 0.000 0.007 1.3611 0.022 0.009 0.000 0.007 1.4000 0.022 0.009 0.000 0.007 1.4389 0.022 0.009 0.000 0.007 1.4778 0.022 0.009 0.000 0.007 1.5167 0.022 0.010 0.000 0.007 1.5556 0.022 0.010 0.000 0.007 1.5944 0.022 0.010 0.000 0.007 1.6333 0.022 0.010 0.000 0.007 1.6722 0.022 0.011 0.000 0.007 1.7111 0.022 0.011 0.000 0.007 1.7500 0.022 0.011 0.000 0.007 1.7889 0.022 0.011 0.000 0.007 1.8278 0.022 0.012 0.000 0.007 1.8667 0.022 0.012 0.000 0.007 1.9056 0.022 0.012 0.000 0.007 1.9444 0.022 0.012 0.000 0.007 1.9833 0.022 0.013 0.000 0.007 2.0222 0.022 0.013 0.000 0.007 2.0611 0.022 0.013 0.000 0.007 2.1000 0.022 0.013 0.000 0.007 2.1389 0.022 0.014 0.000 0.007 2.1778 0.022 0.014 0.000 0.007 2.2167 0.022 0.014 0.000 0.007 2.2556 0.022 0.014 0.000 0.007 2.2944 0.022 0.015 0.000 0.007 2.3333 0.022 0.015 0.000 0.007 2.3722 0.022 0.015 0.000 0.007 2.4111 0.022 0.015 0.000 0.007 2.4500 0.022 0.016 0.000 0.007 2.4889 0.022 0.016 0.000 0.007 2.5278 0.022 0.016 0.000 0.007 2.5667 0.022 0.017 0.000 0.007 2.6056 0.022 0.017 0.000 0.007 2.6444 0.022 0.017 0.000 0.007 2.6833 0.022 0.017 0.000 0.007 2.7222 0.022 0.018 0.000 0.007 2.7611 0.022 0.018 0.000 0.007 2.8000 0.022 0.018 0.000 0.007 2.8389 0.022 0.018 0.000 0.007 2.8778 0.022 0.019 0.000 0.007 2.9167 0.022 0.019 0.000 0.007 2.9556 0.022 0.019 0.000 0.007 2.9944 0.022 0.019 0.000 0.007 3.0333 0.022 0.020 0.000 0.007 3.0722 0.022 0.020 0.000 0.007 3.1111 0.022 0.020 0.000 0.007 3.1500 0.022 0.020 0.000 0.007 Hoy Residence 11/14/2019 3:08:45 PM Page 9 3.1889 0.022 0.021 0.000 0.007 3.2278 0.022 0.021 0.000 0.007 3.2667 0.022 0.021 0.000 0.007 3.3056 0.022 0.021 0.000 0.007 3.3444 0.022 0.022 0.000 0.007 3.3833 0.022 0.022 0.000 0.007 3.4222 0.022 0.022 0.000 0.007 3.4611 0.022 0.022 0.000 0.007 3.5000 0.022 0.023 0.000 0.007 Hoy Residence 11/14/2019 3:08:45 PM Page 10 Permeable Pavement 1 Pavement Area:0.0712 acre.Pavement Length:62.00 ft. Pavement Width: 50.00 ft. Pavement slope 1:0.02 To 1 Pavement thickness: 0.334 Pour Space of Pavement: 0.12 Material thickness of second layer: 2.5 Pour Space of material for second layer: 0.03 Material thickness of third layer: 0 Pour Space of material for third layer: 0 Infiltration On Infiltration rate: 0.35 Infiltration safety factor: 1 Total Volume Infiltrated (ac-ft.): 52.21 Total Volume Through Riser (ac-ft.): 0 Total Volume Through Facility (ac-ft.): 52.21 Percent Infiltrated: 100 Total Precip Applied to Facility: 0 Total Evap From Facility: 1.737 Element Flows To: Outlet 1 Outlet 2 Permeable Pavement Hydraulic Table Stage(feet) Area(ac.) Volume(ac-ft.) Discharge(cfs) Infilt(cfs) 0.0000 0.071 0.000 0.000 0.000 0.0315 0.071 0.000 0.000 0.025 0.0630 0.071 0.000 0.000 0.025 0.0945 0.071 0.000 0.000 0.025 0.1260 0.071 0.000 0.000 0.025 0.1574 0.071 0.000 0.000 0.025 0.1889 0.071 0.000 0.000 0.025 0.2204 0.071 0.000 0.000 0.025 0.2519 0.071 0.000 0.000 0.025 0.2834 0.071 0.000 0.000 0.025 0.3149 0.071 0.000 0.000 0.025 0.3464 0.071 0.000 0.000 0.025 0.3779 0.071 0.000 0.000 0.025 0.4094 0.071 0.000 0.000 0.025 0.4408 0.071 0.000 0.000 0.025 0.4723 0.071 0.001 0.000 0.025 0.5038 0.071 0.001 0.000 0.025 0.5353 0.071 0.001 0.000 0.025 0.5668 0.071 0.001 0.000 0.025 0.5983 0.071 0.001 0.000 0.025 0.6298 0.071 0.001 0.000 0.025 0.6613 0.071 0.001 0.000 0.025 0.6928 0.071 0.001 0.000 0.025 0.7242 0.071 0.001 0.000 0.025 0.7557 0.071 0.001 0.000 0.025 0.7872 0.071 0.001 0.000 0.025 0.8187 0.071 0.001 0.000 0.025 0.8502 0.071 0.001 0.000 0.025 0.8817 0.071 0.001 0.000 0.025 0.9132 0.071 0.002 0.000 0.025 0.9447 0.071 0.002 0.000 0.025 Hoy Residence 11/14/2019 3:08:45 PM Page 11 0.9762 0.071 0.002 0.000 0.025 1.0076 0.071 0.002 0.000 0.025 1.0391 0.071 0.002 0.000 0.025 1.0706 0.071 0.002 0.000 0.025 1.1021 0.071 0.002 0.000 0.025 1.1336 0.071 0.002 0.000 0.025 1.1651 0.071 0.002 0.000 0.025 1.1966 0.071 0.002 0.000 0.025 1.2281 0.071 0.002 0.000 0.025 1.2596 0.071 0.002 0.000 0.025 1.2910 0.071 0.002 0.000 0.025 1.3225 0.071 0.002 0.000 0.025 1.3540 0.071 0.002 0.000 0.025 1.3855 0.071 0.003 0.000 0.025 1.4170 0.071 0.003 0.000 0.025 1.4485 0.071 0.003 0.000 0.025 1.4800 0.071 0.003 0.000 0.025 1.5115 0.071 0.003 0.000 0.025 1.5430 0.071 0.003 0.000 0.025 1.5744 0.071 0.003 0.000 0.025 1.6059 0.071 0.003 0.000 0.025 1.6374 0.071 0.003 0.000 0.025 1.6689 0.071 0.003 0.000 0.025 1.7004 0.071 0.003 0.000 0.025 1.7319 0.071 0.003 0.000 0.025 1.7634 0.071 0.003 0.000 0.025 1.7949 0.071 0.003 0.000 0.025 1.8264 0.071 0.003 0.000 0.025 1.8578 0.071 0.004 0.000 0.025 1.8893 0.071 0.004 0.000 0.025 1.9208 0.071 0.004 0.000 0.025 1.9523 0.071 0.004 0.000 0.025 1.9838 0.071 0.004 0.000 0.025 2.0153 0.071 0.004 0.000 0.025 2.0468 0.071 0.004 0.000 0.025 2.0783 0.071 0.004 0.000 0.025 2.1098 0.071 0.004 0.000 0.025 2.1412 0.071 0.004 0.000 0.025 2.1727 0.071 0.004 0.000 0.025 2.2042 0.071 0.004 0.000 0.025 2.2357 0.071 0.004 0.000 0.025 2.2672 0.071 0.004 0.000 0.025 2.2987 0.071 0.004 0.000 0.025 2.3302 0.071 0.005 0.000 0.025 2.3617 0.071 0.005 0.000 0.025 2.3932 0.071 0.005 0.000 0.025 2.4246 0.071 0.005 0.000 0.025 2.4561 0.071 0.005 0.000 0.025 2.4876 0.071 0.005 0.000 0.025 2.5191 0.071 0.005 0.000 0.025 2.5506 0.071 0.005 0.000 0.025 2.5821 0.071 0.006 0.000 0.025 2.6136 0.071 0.006 0.000 0.025 2.6451 0.071 0.006 0.000 0.025 2.6766 0.071 0.006 0.000 0.025 2.7080 0.071 0.007 0.000 0.025 2.7395 0.071 0.007 0.000 0.025 2.7710 0.071 0.007 0.000 0.025 Hoy Residence 11/14/2019 3:08:45 PM Page 12 2.8025 0.071 0.008 0.000 2.8340 0.071 0.008 0.000 0.025 0.025 Hoy Residence 11/14/2019 3:08:45 PM Page 13 Analysis Results POC 1 0 to 100 + Predeveloped Predeveloped Landuse Totals for POC #1 Total Pervious Area: 0.38 Total Impervious Area: 0 Mitigated Landuse Totals for POC #1 Total Pervious Area: 0.18 Total Impervious Area: 0.271166 0 -1 os , z x Mitigated Flow Frequency Method: Log Pearson Type III 17B Flow Frequency Return Periods for Predeveloped. POC #1 Return Period Flow(cfs) 2 year 0.006482 5 year 0.010763 10 year 0.013192 25 year 0.015726 50 year 0.017257 100 year 0.01853 Flow Frequency Return Periods for Mitigated. POC #1 Return Period Flow(cfs) 2 year 0.007958 5 year 0.014221 10 year 0.019762 25 year 0.02863 50 year 0.036781 100 year 0.046424 Annual Peaks Annual Peaks for Predeveloped and Mitigated. POC #1 Year Predeveloped Mitigated 1902 0.009 0.007 1903 0.003 0.003 1904 0.008 0.019 1905 0.003 0.004 1906 0.001 0.003 1907 0.010 0.012 1908 0.006 0.007 1909 0.007 0.008 1910 0.012 0.014 1911 0.006 0.007 Cumulative Pro6a6ility 0 000, e m 20 ao so TO ao , ob " eea i o Hoy Residence 11/14/2019 3:08:45 PM Page 14 1912 0.024 0.039 1913 0.009 0.007 1914 0.002 0.033 1915 0.003 0.004 1916 0.005 0.007 1917 0.002 0.003 1918 0.006 0.006 1919 0.004 0.004 1920 0.006 0.007 1921 0.006 0.006 1922 0.007 0.010 1923 0.006 0.009 1924 0.003 0.003 1925 0.003 0.004 1926 0.005 0.006 1927 0.007 0.006 1928 0.005 0.007 1929 0.011 0.013 1930 0.006 0.006 1931 0.006 0.006 1932 0.004 0.007 1933 0.005 0.007 1934 0.015 0.020 1935 0.005 0.005 1936 0.008 0.008 1937 0.008 0.015 1938 0.007 0.006 1939 0.000 0.003 1940 0.005 0.011 1941 0.006 0.006 1942 0.008 0.013 1943 0.003 0.010 1944 0.009 0.023 1945 0.006 0.007 1946 0.006 0.009 1947 0.004 0.004 1948 0.013 0.012 1949 0.011 0.012 1950 0.006 0.005 1951 0.007 0.006 1952 0.022 0.035 1953 0.018 0.030 1954 0.005 0.007 1955 0.004 0.005 1956 0.003 0.003 1957 0.007 0.006 1958 0.018 0.019 1959 0.011 0.014 1960 0.004 0.005 1961 0.011 0.031 1962 0.005 0.007 1963 0.002 0.004 1964 0.005 0.030 1965 0.013 0.013 1966 0.002 0.005 1967 0.005 0.012 1968 0.007 0.006 1969 0.005 0.007 Hoy Residence 11/14/2019 3:09:08 PM Page 15 1970 0.008 0.013 1971 0.014 0.014 1972 0.009 0.055 1973 0.010 0.013 1974 0.007 0.010 1975 0.016 0.027 1976 0.006 0.016 1977 0.004 0.003 1978 0.012 0.016 1979 0.003 0.009 1980 0.006 0.011 1981 0.006 0.008 1982 0.004 0.006 1983 0.010 0.012 1984 0.003 0.010 1985 0.006 0.013 1986 0.005 0.006 1987 0.010 0.015 1988 0.008 0.006 1989 0.006 0.005 1990 0.008 0.007 1991 0.006 0.009 1992 0.009 0.012 1993 0.007 0.006 1994 0.013 0.011 1995 0.003 0.003 1996 0.015 0.013 1997 0.007 0.006 1998 0.006 0.010 1999 0.000 0.001 2000 0.005 0.010 2001 0.003 0.004 2002 0.012 0.024 2003 0.007 0.007 2004 0.008 0.009 2005 0.011 0.019 2006 0.004 0.005 2007 0.005 0.011 2008 0.006 0.006 2009 0.004 0.005 2010 0.003 0.006 2011 0.004 0.004 2012 0.006 0.011 2013 0.005 0.008 2014 0.003 0.004 2015 0.014 0.036 2016 0.002 0.003 2017 0.011 0.011 2018 0.020 0.021 2019 0.022 0.027 2020 0.007 0.015 2021 0.009 0.012 2022 0.003 0.011 2023 0.007 0.010 2024 0.027 0.047 2025 0.005 0.005 2026 0.010 0.010 2027 0.004 0.009 Hoy Residence 11/14/2019 3:09:08 PM Page 16 2028 0.002 0.003 2029 0.007 0.007 2030 0.015 0.015 2031 0.004 0.003 2032 0.003 0.004 2033 0.003 0.003 2034 0.004 0.005 2035 0.016 0.015 2036 0.008 0.009 2037 0.001 0.004 2038 0.010 0.014 2039 0.001 0.002 2040 0.003 0.006 2041 0.004 0.007 2042 0.017 0.018 2043 0.007 0.010 2044 0.010 0.009 2045 0.006 0.008 2046 0.007 0.007 2047 0.005 0.005 2048 0.006 0.006 2049 0.006 0.009 2050 0.004 0.006 2051 0.006 0.018 2052 0.004 0.005 2053 0.006 0.006 2054 0.012 0.029 2055 0.002 0.005 2056 0.002 0.004 2057 0.004 0.004 2058 0.005 0.005 Ranked Annual Peaks Ranked Annual Peaks for Predeveloped and Rank Predeveloped Mitigated 1 0.0273 0.0545 2 0.0244 0.0473 3 0.0223 0.0392 4 0.0217 0.0364 5 0.0203 0.0354 6 0.0180 0.0325 7 0.0179 0.0314 8 0.0169 0.0303 9 0.0162 0.0302 10 0.0156 0.0285 11 0.0154 0.0272 12 0.0151 0.0269 13 0.0147 0.0244 14 0.0143 0.0234 15 0.0136 0.0206 16 0.0131 0.0204 17 0.0129 0.0193 18 0.0129 0.0190 19 0.0123 0.0188 20 0.0123 0.0185 21 0.0120 0.0180 22 0.0118 0.0163 23 0.0113 0.0160 Mitigated. POC #1 Hoy Residence 11/14/2019 3:09:08 PM Page 17 24 0.0112 0.0152 25 0.0112 0.0152 26 0.0110 0.0151 27 0.0107 0.0146 28 0.0107 0.0146 29 0.0105 0.0142 30 0.0103 0.0141 31 0.0102 0.0139 32 0.0101 0.0135 33 0.0099 0.0135 34 0.0098 0.0135 35 0.0095 0.0132 36 0.0095 0.0128 37 0.0089 0.0127 38 0.0089 0.0127 39 0.0088 0.0127 40 0.0085 0.0124 41 0.0085 0.0123 42 0.0084 0.0123 43 0.0083 0.0122 44 0.0083 0.0117 45 0.0082 0.0117 46 0.0078 0.0115 47 0.0078 0.0113 48 0.0076 0.0112 49 0.0076 0.0111 50 0.0075 0.0110 51 0.0074 0.0106 52 0.0074 0.0105 53 0.0073 0.0105 54 0.0071 0.0105 55 0.0071 0.0104 56 0.0070 0.0102 57 0.0070 0.0101 58 0.0069 0.0101 59 0.0069 0.0100 60 0.0068 0.0098 61 0.0068 0.0096 62 0.0068 0.0096 63 0.0068 0.0093 64 0.0067 0.0093 65 0.0067 0.0091 66 0.0066 0.0091 67 0.0065 0.0090 68 0.0064 0.0087 69 0.0063 0.0087 70 0.0063 0.0085 71 0.0063 0.0085 72 0.0062 0.0084 73 0.0062 0.0079 74 0.0062 0.0078 75 0.0062 0.0078 76 0.0061 0.0076 77 0.0060 0.0075 78 0.0060 0.0075 79 0.0060 0.0075 80 0.0060 0.0074 81 0.0059 0.0074 Hoy Residence 11/14/2019 3:09:08 PM Page 18 82 0.0059 0.0073 83 0.0059 0.0073 84 0.0059 0.0073 85 0.0059 0.0073 86 0.0058 0.0071 87 0.0058 0.0071 88 0.0057 0.0071 89 0.0056 0.0068 90 0.0056 0.0067 91 0.0056 0.0067 92 0.0055 0.0067 93 0.0055 0.0067 94 0.0054 0.0066 95 0.0053 0.0065 96 0.0053 0.0064 97 0.0052 0.0064 98 0.0051 0.0063 99 0.0051 0.0063 100 0.0050 0.0063 101 0.0050 0.0063 102 0.0049 0.0062 103 0.0049 0.0062 104 0.0048 0.0060 105 0.0048 0.0060 106 0.0048 0.0060 107 0.0046 0.0060 108 0.0046 0.0059 109 0.0045 0.0058 110 0.0045 0.0057 111 0.0044 0.0057 112 0.0044 0.0057 113 0.0043 0.0056 114 0.0043 0.0056 115 0.0042 0.0056 116 0.0042 0.0056 117 0.0041 0.0054 118 0.0040 0.0054 119 0.0040 0.0054 120 0.0040 0.0053 121 0.0039 0.0052 122 0.0038 0.0051 123 0.0038 0.0051 124 0.0037 0.0050 125 0.0037 0.0048 126 0.0037 0.0047 127 0.0037 0.0047 128 0.0034 0.0046 129 0.0033 0.0045 130 0.0033 0.0045 131 0.0032 0.0045 132 0.0031 0.0044 133 0.0031 0.0043 134 0.0031 0.0043 135 0.0031 0.0043 136 0.0030 0.0042 137 0.0029 0.0041 138 0.0029 0.0040 139 0.0029 0.0039 Hoy Residence 11/14/2019 3:09:08 PM Page 19 140 0.0028 0.0039 141 0.0028 0.0038 142 0.0027 0.0036 143 0.0026 0.0036 144 0.0026 0.0035 145 0.0025 0.0034 146 0.0024 0.0034 147 0.0024 0.0033 148 0.0024 0.0033 149 0.0023 0.0033 150 0.0022 0.0033 151 0.0020 0.0032 152 0.0017 0.0032 153 0.0013 0.0031 154 0.0013 0.0029 155 0.0005 0.0029 156 0.0003 0.0023 157 0.0001 0.0015 Hoy Residence 11/14/2019 3:09:08 PM Page 20 Duration Flows Flow(cfs) Predev Mit Percentage Pass/Fail 0.0032 12741 8274 64 Pass 0.0034 11578 7286 62 Pass 0.0035 10528 6433 61 Pass 0.0037 9599 5685 59 Pass 0.0038 8785 5083 57 Pass 0.0039 8068 4551 56 Pass 0.0041 7430 4042 54 Pass 0.0042 6845 3609 52 Pass 0.0044 6296 3253 51 Pass 0.0045 5809 2941 50 Pass 0.0047 5329 2649 49 Pass 0.0048 4899 2382 48 Pass 0.0049 4511 2157 47 Pass 0.0051 4167 1946 46 Pass 0.0052 3845 1768 45 Pass 0.0054 3545 1629 45 Pass 0.0055 3273 1496 45 Pass 0.0056 3026 1368 45 Pass 0.0058 2803 1261 44 Pass 0.0059 2615 1176 44 Pass 0.0061 2443 1093 44 Pass 0.0062 2290 1029 44 Pass 0.0064 2118 961 45 Pass 0.0065 1985 896 45 Pass 0.0066 1868 837 44 Pass 0.0068 1762 764 43 Pass 0.0069 1652 715 43 Pass 0.0071 1562 657 42 Pass 0.0072 1478 609 41 Pass 0.0073 1393 558 40 Pass 0.0075 1324 522 39 Pass 0.0076 1243 496 39 Pass 0.0078 1172 461 39 Pass 0.0079 1119 425 37 Pass 0.0081 1053 394 37 Pass 0.0082 1000 369 36 Pass 0.0083 953 347 36 Pass 0.0085 901 324 35 Pass 0.0086 868 300 34 Pass 0.0088 833 283 33 Pass 0.0089 799 266 33 Pass 0.0090 774 251 32 Pass 0.0092 740 239 32 Pass 0.0093 717 223 31 Pass 0.0095 688 212 30 Pass 0.0096 658 202 30 Pass 0.0098 630 195 30 Pass 0.0099 598 188 31 Pass 0.0100 565 180 31 Pass 0.0102 539 170 31 Pass 0.0103 513 158 30 Pass 0.0105 487 148 30 Pass 0.0106 465 139 29 Pass 0.0107 447 134 29 Pass Hoy Residence 11/14/2019 3:09:08 PM Page 21 0.0109 435 131 30 Pass 0.0110 413 126 30 Pass 0.0112 402 121 30 Pass 0.0113 375 119 31 Pass 0.0115 360 112 31 Pass 0.0116 343 108 31 Pass 0.0117 326 101 30 Pass 0.0119 310 98 31 Pass 0.0120 292 94 32 Pass 0.0122 279 92 32 Pass 0.0123 264 89 33 Pass 0.0124 254 85 33 Pass 0.0126 237 85 35 Pass 0.0127 225 82 36 Pass 0.0129 216 77 35 Pass 0.0130 203 72 35 Pass 0.0132 185 71 38 Pass 0.0133 176 68 38 Pass 0.0134 166 65 39 Pass 0.0136 156 60 38 Pass 0.0137 140 60 42 Pass 0.0139 128 60 46 Pass 0.0140 120 59 49 Pass 0.0141 112 57 50 Pass 0.0143 99 54 54 Pass 0.0144 95 54 56 Pass 0.0146 85 54 63 Pass 0.0147 79 52 65 Pass 0.0149 77 51 66 Pass 0.0150 73 50 68 Pass 0.0151 66 49 74 Pass 0.0153 61 45 73 Pass 0.0154 54 43 79 Pass 0.0156 47 43 91 Pass 0.0157 44 42 95 Pass 0.0158 39 40 102 Pass 0.0160 36 38 105 Pass 0.0161 34 38 111 Faii 0.0163 31 38 122 Fail 0.0164 29 36 124 Fail 0.0165 27 36 133 Fail 0.0167 27 35 129 Fail 0.0168 25 34 136 Fail 0.0170 21 32 152 Fail 0.0171 21 32 152 Fail 0.0173 19 32 168 Fail The development has an increase in flow durations from 1 /2 Predeveloped 2 year flow to the 2 year flow or more than a 10% increase from the 2 year to the 50 year flow. Hoy Residence 11/14/2019 3:09:08 PM Page 22 Water Quality Water Quality BMP Flow and Volume for POC #1 On-line facility volume: 0 acre-feet On-line facility target flow: 0 cfs. Adjusted for 15 min: 0 cfs. Off-line facility target flow: 0 cfs. Adjusted for 15 min: 0 cfs. Hoy Residence 11/14/2019 3:09:08 PM Page 23 LID Report LID Technique Usedfor Total Volume Volume Infiltration Cumulative Percent Waterfluality Percent Comment Treatment? Needs Through Volume Volume Volume Water Quality Treatment Facility (ac-ft) Infiltration Infiltrated Treated (ac-ft) (ac-ft) Credit Gravel Trench Bed 1 PQC ❑ 44.89 ❑ 100.00 Permeable Pavement 1 POC ❑ 47.51 ❑ 100.00 Total Volume Infiltrated 92.40 0.00 0.00 100.00 0.00 0% No Treat. Credit ❑uration Compliance with LI❑ Analysis Standard 8% oft-yrto 50% of Result = 2 yr Failed Hoy Residence 11/14/2019 3:09:08 PM Page 24 Model Default Modifications Total of 0 changes have been made. PERLND Changes No PERLND changes have been made. IMPLND Changes No IMPLND changes have been made. Hoy Residence 11/14/2019 3:09:25 PM Page 25 Appendix Predeveloped Schematic ter,, lPredevelopec 0.38ac Hoy Residence 11/14/2019 3:09:25 PM Page 26 Mitigated Schematic 0 Hoy Residence 11/14/2019 3:09:34 PM Page 27 C. STORMWATER POLLUTION PREVENTION PLAN This Stormwater Pollution Prevention Plan (SWPPP) has been prepared as part of the Construction stormwater permit requirements for the project Hoy Residence located at 8051 184th St SW, Edmonds, Washington. Itis located in Section 18, Township 27 North, and Range 4 East of the Willamette Meridian in Snohomish County, Washington. The site area is 0.38 acres. The site is currently undeveloped and exists as lawn and large evergreen trees. The site contains one drainage basin that slopes moderately to the north. Please refer to the downstream analysis map for more details. There are no critical areas located on the site. Per NRCS survey of Snohomish County, the project site contains Alderwood soils that have a hydrologic classification of Type "C". Please refer to the soils map and descriptions attached later in this report for more details. The site area is 0.36 acres. The site is currently undeveloped and exists as lawn and large evergreen trees. The site contains one drainage basin that slopes moderately to the north. Please refer to the downstream analysis map for more details. There are no critical areas located on the site. Per NRCS survey of Snohomish County, the project site contains Alderwood soils that have a hydrologic classification of Type "C". Please refer to the soils map and descriptions attached later in this report for more details. The project site is zoned as RS-10. The proposal is to construct a new single-family home, garage, and ADU with a total roof area of 4,895 SF. Access to the site will be through an access easement to the south connecting to 184th St SW. The total proposed hard surface area will be 8,625 SF. The roof drains and patio yard drains will drain infiltration trench. The driveway area will be paved using permeable pavement. Post -Construction Soil Quality and Depth BMP T.5.13 is proposed to provide onsite stormwater management for the pervious areas of the site. The purpose of this SWPPP is to describe the proposed construction activities and all temporary and permanent erosion and sediment control (TESC) measures, pollution prevention measures, inspection/monitoring activities, and recordkeeping that will be implemented during the proposed construction project. The objectives of the SWPPP are to: Insight Engineering Co. - Stormwater Site Plan 11/15/19 -24- 1. Implement Best Management Practices (BMPs) to prevent erosion and sedimentation, and to identify, reduce, eliminate or prevent stormwater contamination and water pollution from construction activity. 2. Prevent violations of surface water quality, ground water quality, or sediment management standards. 3. Prevent, during the construction phase, adverse water quality impacts including impacts on beneficial uses of the receiving water by controlling peak flow rates and volumes of stormwater runoff at the Permittee's outfalls and downstream of the outfalls. This SWPPP was prepared using the Ecology SWPPP Template. This SWPPP was prepared based on the requirements set forth in the Construction Stormwater General Permit and in the Stormwater Management Manual for Western Washington (SWMMWW 2005). The 13 BMP Elements Element #1— Mark Clearing Limits To protect adjacent properties and to reduce the area of soil exposed to construction, the limits of construction will be clearly marked before land -disturbing activities begin. Element #2 — Establish Construction Access Construction access or activities occurring on unpaved areas shall be minimized, yet where necessary, access points shall be stabilized to minimize the tracking of sediment onto public roads, and wheel washing, street sweeping, and street cleaning shall be employed to prevent sediment from entering state waters. Install the temporary construction entrance, according to the approved construction plans, prior to any clearing or grading activities. Maintain until the access road is paved. Element #3 — Control Flow Rates In order to protect the properties and waterways downstream of the project site, stormwater discharges from the site will be controlled. In general, discharge rates of stormwater from the site will be controlled where increases in impervious area or soil compaction during construction could lead to downstream erosion, or where necessary to meet local agency stormwater discharge requirements. Element #4 — Install Sediment Controls Install silt fencing, according to the approved plans, prior to any clearing or grading activities. Maintain until all construction activities are completed. Install catch basin filters, according to the approved construction plans, as catch basins become operable. Maintain until all construction activities are completed. Insight Engineering Co. - Stormwater Site Plan 11/15/19 -25- Element #5 — Stabilize Soils Exposed and un-worked soils shall be stabilized with the application of effective BMPs to prevent erosion throughout the life of the project. Apply temporary hydro -seed to exposed and un-worked soils, according to the approved construction plans, as needed to prevent erosion during site grading. Apply permanent hydro -seed to areas at final grade as site grading is completed. Apply mulching to exposed and un-worked soils, according to the approved construction plans, as needed to prevent erosion during site grading. Maintain until site grading is completed and permanent hydro -seed is applied. Cover stockpiles with plastic sheeting, according to the approved construction plans, as needed to prevent erosion during site grading. Maintain until stockpiles are removed from site. Element #6 — Protect Slopes All cut and fill slopes will be designed, constructed, and protected in a manner than minimizes erosion. The following specific BMPs will be used to protect slopes for this project. Element #7 — Protect Drain Inlets All storm drain inlets and culverts made operable during construction shall be protected to prevent unfiltered or untreated water from entering the drainage conveyance system. However, the first priority is to keep all access roads clean of sediment and keep street wash water separate from entering storm drains until treatment can be provided. Element #8 — Stabilize Channels and Outlets Where site runoff is to be conveyed in channels, or discharged to a stream or some other natural drainage point, efforts will be taken to prevent downstream erosion. Element #9 — Control Pollutants All pollutants, including waste materials and demolition debris, that occur onsite shall be handled and disposed of in a manner that does not cause contamination of stormwater. Good housekeeping and preventative measures will be taken to ensure that the site will be kept clean, well organized, and free of debris. Element #10 — Control Dewatering There will be no dewatering expected as part of this proposal. If it occurs, Baker tanks will be used for dewatering. Element #11— Maintain BMPs All temporary and permanent erosion and sediment control BMPs shall be maintained and repaired as needed to assure continued performance of their intended function. Maintenance and repair shall be conducted in accordance with each particular BMP's specifications. Visual monitoring of the BMPs will be conducted at least once every calendar week and within 24 hours of any rainfall event that causes a discharge from the site. If the site becomes inactive, and is temporarily stabilized, the inspection frequency will be reduced to once every month. All Insight Engineering Co. - Stormwater Site Plan 11/15/19 -26- temporary erosion and sediment control BMPs shall be removed within 30 days after the final site stabilization is achieved or after the temporary BMPs are no longer needed. Trapped sediment shall be removed or stabilized on site. Disturbed soil resulting from removal of BMPs or vegetation shall be permanently stabilized. Element #12 — Manage the Proiect Erosion and sediment control BMPs for this project have been designed based on the following principles: Design the project to fit the existing topography, soils, and drainage patterns; Emphasize erosion control rather than sediment control; Minimize the extent and duration of the area exposed; Keep runoff velocities low; Retain sediment on site; Thoroughly monitor site and maintain all ESC measures and Schedule major earthwork during the dry season. The SWPPP shall be modified as necessary to include additional or modified BMPs designed to correct problems identified. Revisions to the SWPPP shall be completed within seven (7) days following the inspection. Element #13 — Protect On -site Stormwater Management BMPs for Runoff from Roofs and Other Hard Surfaces On -site stormwater management BMPs used for runoff from roofs and other hard surfaces include: full dispersion, roof downspout full infiltration or dispersion systems, perforated stubout connections, rain gardens, bioretention systems, permeable pavement, sheetflow dispersion, and concentrated flow dispersion. The areas on the site to be used for these BMPs shall be protected from siltation and compaction during construction by sequencing the construction in a fashion to install these BMPs at the latter part of the construction grading operations, by excluding equipment from the BMPS and the associated areas, and by using the erosion and sedimentation control BMPs listed below. Additional requirements for protecting these BMPs during the construction process, testing functionality, and restoring functionality are needed at the final stage of the construction process. Relevant BMPs BMP C102: Buffer Zone BMP C 103: High Visibility Fence BMP C200: Interceptor Dike and Swale BMP C201: Grass -lined Channels BMP C207: Check Dams BMP C208: Triangular Silt Dike BMP C231: Brush Barrier BMP Insight Engineering Co. - Stormwater Site Plan 11/15/19 -27- C233: Silt Fence BMP C234: Vegetated Strip Insight Engineering Co. - Stormwater Site Plan 11/15/19 -28- D. GEOTECH REPORT Insight Engineering Co. - Stormwater Site Plan 11/15/19 -29- COBALT GEOSCIENCES April 27, 2019 Mr. Paul King Paul.judgeandassociates ogmail.com RE: Stormwater Feasibility Evaluation Proposed Single -Family Residence 8045 —184th Street SW Parcel No. 270418o0103800 Edmonds, Washington Dear Mr. King, Cobalt Geosciences, LLC P.O. Box 82243 Kenmore, Washington 98028 In accordance with your authorization, Cobalt Geosciences, LLC has prepared this letter to discuss the results of our stormwater feasibility evaluation at the referenced site. The purpose of our evaluation was to determine the feasibility of utilizing infiltration devices for stormwater runoff management. Site and Project Description The site is located at 8045 — 184th Street SW in Edmonds, Washington. The site consists of one nearly rectangular shaped parcel with a total area of about 0.46 acres. The property consists of an undeveloped parcel surrounded on all sides by residential properties. There is an access easement near the southwest corner of the property. The site is nearly level to slightly undulating and vegetated with grasses, ferns, bushes/shrubs, and sparse evergreen and deciduous trees. The project includes construction will include a new multi -story residence with garage and crawlspace area. Stormwater management may include dispersion, detention, or infiltration facilities depending on feasibility. Area Geology The Geologic Map of Edmonds East and West Quadrangle indicates that the site is near the contacts between Vashon Glacial Till and Vashon Advance Outwash. Vashon Glacial Till is typically characterized by an unsorted, non -stratified mixture of clay, silt, sand, gravel, cobbles and boulders in variable quantities. These materials are typically dense and relatively impermeable. The poor sorting reflects the mixing of the materials as these sediments were overridden and incorporated by the glacial ice. Vashon Advance Outwash consists of glacially consolidated sand and gravel with variable amounts of silt deposited in front of the advancing glaciers approximately 15,000 years ago. These deposits are commonly overlain by Vashon Glacial Till. www.cobaltgeo.com (2o6) 331-1097 April 27, 2019 Page 2 of 3 Stormwater Feasibility Evaluation Soil & Groundwater Conditions As part of our evaluation, we excavated and sampled two hand borings up to 8 feet below grade. Figure 1 shows the general location of the hand borings. Exploration logs are attached at the end of this letter report. Both hand borings encountered approximately 6 inches of grass and topsoil underlain by approximately 3.5 to 4.5 feet of loose to medium dense, silty -fine to medium grained sand with gravel (Weathered Glacial Till). This layer was underlain by dense, silty -fine to medium grained sand trace to with gravel (Glacial Till?), which continued to the termination depths of the hand borings. Groundwater not encountered in the hand borings. Groundwater is not anticipated to be present within at least 12 inches of the bottom of the infiltration trenches excavated up to a depth of 4 feet below grade. Stormwater Management Feasibility We understand that stormwater runoff will flow into infiltration trenches within the property at two or more locations. We performed an in situ infiltration test in HB-1 at a depth of 3 feet below grade. Following testing and application of correction factors for site variability (0.33), testing (0.5), and influent control (0.9), the infiltration rate was determined to be 0.35 inches per hour. This is just above the minimum that the Washington State Department of Ecology considers feasible. We recommend that the bottom of the trenches be situated within native soils consistent with those described on the attached logs. We recommend a maximum trench/system depth of 4 feet below grade. Local loosening of the native soils may be required up to 2 feet below the bottom of system elevations. We recommend locating systems at least 40 feet apart and at least io feet from property lines. We should be on site to confirm soil conditions and provide additional recommendations if necessary. Erosion and Sediment Control Erosion and sediment control (ESQ is used to reduce the transportation of eroded sediment to wetlands, streams, lakes, drainage systems, and adjacent properties. Erosion and sediment control measures should be implemented, and these measures should be in general accordance with local regulations. At a minimum, the following basic recommendations should be incorporated into the design of the erosion and sediment control features for the site: • Schedule the soil, foundation, utility, and other work requiring excavation or the disturbance of the site soils, to take place during the dry season (generally May through September). However, provided precautions are taken using Best Management Practices (BMP's), grading activities can be completed during the wet season (generally October through April). • All site work should be completed and stabilized as quickly as possible. • Additional perimeter erosion and sediment control features may be required to reduce the possibility of sediment entering the surface water. This may include additional silt fences, silt fences with a higher Apparent Opening Size (AOS), construction of a berm, or other filtration systems. www.cobaltgeo.com (206) 331-1097 April 27, 2019 Page 3 of 3 Stormwater Feasibility Evaluation • Any runoff generated by dewatering discharge should be treated through construction of a sediment trap if there is sufficient space. If space is limited other filtration methods will need to be incorporated. Closure The information presented herein is based upon professional interpretation utilizing standard practices and a degree of conservatism deemed proper for this project. We emphasize that this report is valid for this project as outlined above and for the current site conditions, and should not be used for any other site Sincerely, Cobalt Geosciences, LLC H0NYy�! 44 WASy���d 54896 /. Exp. 6-26-2020 Phil Haberman, PE, LG, LEG Principal PH/sc www.cobaltgeo.com (2o6) 331-1097 HB-i N 9 Approximate Hand Boring Location A ised Single -Family Residence 8045 -184th Street SW Edmonds, Washington SITE PLAN FIGURE i Cobalt Geosciences, LLC P.O. Box 82243 Kenmore, WA 98028 (206) 331-1097 www.cobaltgeo.com cobaltgeo ft ail.com Unified Soil Classification System (USCS) MAJOR DIVISIONS SYMBOL TYPICAL DESCRIPTION GW Clean Gravels Well -graded gravels, gravels, gravel -sand mixtures, little or no fines Gravels (more than 50% (less than 5% _ GP fines) Poorly graded gravels, gravel -sand mixtures, little or no fines COARSE GRAINED SOILS of coarse fraction retained on No. 4 sieve) GM Gravels with Fines (more than 12% GC fines) Silty gravels, gravel -sand -silt mixtures Clayey gravels, gravel -sand -clay mixtures (more than 50% retained on ;°e sw Clean Sands Well -graded sands, gravelly sands, little or no fines No. 200 sieve) Sands (50% or more of coarse fraction (less than 5% SP fines) Poorly graded sand, gravelly sands, little or no fines passes the No. 4 sieve) sM Sands with Fines Silty sands, sand -silt mixtures (more than 12% sc fines) Clayey sands, sand -clay mixtures ML Inorganic silts of low to medium plasticity, sandy silts, gravelly silts, FINE GRAINED SOILS (50% or more Silts and Clays (liquid limit less than 50) Inorganic cL or clayey silts with slight plasticity Inorganic clays of low to medium plasticity, gravelly clays, sandy clays silty clays, lean clays oL Organic Organic silts and organic silty clays of low plasticity passes the MH Inorganic silts, micaceous or diatomaceous fine sands or silty soils, No. 200 sieve) Silts and Clays (liquid limit 50 or more) Inorganic CH elastic silt Inorganic clays of medium to high plasticity, sandy fat clay, or gravelly fat clay OH Organic Organic clays of medium to high plasticity, organic silts HIGHLY ORGANIC SOILS primarily organic matter, dark in color, PT and organic odor Peat, humus, swamp soils with high organic content (ASTM D4427) 1 Classification of Soil Constituents 1 MAJOR constituents compose more than 50 percent, by weight, of the soil. Major constituents are capitalized (i.e., SAND). Minor constituents compose 12 to 50 percent of the soil and precede the major constituents (i.e., silty SAND). Minor constituents preceded by "slightly" compose 5 to 12 percent of the soil (i.e., slightly silty SAND). Trace constituents compose o to 5 percent of the soil (i.e., slightly silty SAND, trace gravel). Relative Density (Coarse Grained Soils) Consistency (Fine Grained Soils) N, SPT, Relative N, SPT, Relative Blows/FT Density Blows/FT Consistency 0-4 Very loose Under 2 Very soft 4 -10 Loose 2-4 Soft 10 - 30 Medium dense 4-8 Medium stiff 30 - 50 Dense 8 -15 Stiff Over 50 Very dense 15 - 30 Very stiff Over 3o Hard Grain Size Definitions Description Sieve Number and/or Size Fines <#200 (0.08 mm) Sand -Fine #200 to #40 (0.08 to 0.4 mm) -Medium #40 to #10 (0.4 to 2 MM) -Coarse #10 to #4 (2 to 5 mm) Gravel -Fine #4 to 3/4 inch (5 to 19 mm) -Coarse 3/4 to 3 inches (19 to 76 mm) Cobbles 3 to 12 inches (75 to 305 mm) Boulders >12 inches (305 mm) Moisture Content Definitions Dry Absence of moisture, dusty, dry to the touch Moist Damp but no visible water Wet Visible free water, from below water table Cobalt Geosciences, LLC P.O. Box 82243 Kenmore, WA98028 Soil Classification Chart Figure C1 (206) 331-1097 _ www.cobalt eg o.com cobaltgeo(d-) gmail.com Log of Hand Boring HB-1 Date: April 23, 2019 Depth: 8' Initial Groundwater: N/A Contractor: Elevation: N/A Sample Type: Grab Method: Hand Auger Logged By: PH Checked By: SC Final Groundwater: N/A U) J o 4 Moisture Content (%) Plastic Liquid _ > U - E N Limit Limit o Material Description 0 ? o SPT N-Value G 0 10 20 30 40 50 Vegetation/Topsoil --- _ ---- -- --- SM --------------------------------------------- Loose to medium dense, silty -fine to medium grained sand with gravel, dark yellowish brown to yellowish brown, moist. (Weathered Glacial Till) —2 —3 —4 ---- -- -- SM --------------------------------------------- Dense, silty -fine to medium grained sand, yellowish brown to grayish brown, moist. (Glacial Till?) —b —7 End of Hand Boring 8' —9 — 10 Cobalt Geosciences, LLC Proposed Residence Hand P.O. Box 82243 COBALT8045 - 184th Street SW Boring (2o6) 331- 097 8028 GEOSCIENCES Edmonds, Washington Log www.cobaltgeo.com cobaltgeo ftmail.com Log of Hand Boring HB-2 Date: April 23, 2019 Depth: 6' Initial Groundwater: N/A Contractor: Elevation: N/A Sample Type: Grab Method: Hand Auger Logged By: PH Checked By: SC Final Groundwater: N/A U) J o 4 Moisture Content (%) Plastic Liquid _ > U - E N Limit Limit o Material Description 0 ? o SPT N-Value G 0 10 20 30 40 5 Vegetation/Topsoil ---- - 1 ---- -- --- SM -------------------------------------------- Loose to medium dense, silty -fine to medium grained sand with gravel and cobbles, dark yellowish brown to yellowish brown, moist. (Weathered Glacial Till) —2 —3 SM Dense, silty fine to medium grained sand yellowish brown to grayish brown, moist. (Glacial Till?) —5 End of Hand Boring 6' —7 —8 —9 — 10 Cobalt Geosciences, LLC Proposed Residence Hand P.O. Box 82243 COBALT8045 - 184th Street SW Boring (2o6) 331- 097 8028 GEOSCIENCES Edmonds, Washington Log www.cobaltgeo.com cobaltgeo ftmail.com E. OPERATION & MAINTENANCE MANUAL Insight Engineering Co. - Stormwater Site Plan 11/15/19 -30- No. 2 — Infiltration Maintenance Defect Conditions When Maintenance Is Results Expected When Component Needed Maintenance Is Performed General Trash & Debris See "Detention Ponds" (No. 1). See "Detention Ponds" (No. 1). Poisonous/Noxious See "Detention Ponds" (No. 1). See "Detention Ponds" Vegetation (No. 1). Contaminants and See "Detention Ponds" (No. 1). See "Detention Ponds" Pollution (No. 1). Rodent Holes See "Detention Ponds" (No. 1). See "Detention Ponds" (No. 1) Storage Area Sediment Water ponding in infiltration pond after Sediment is removed rainfall ceases and appropriate time and/or facility is cleaned allowed for infiltration. Treatment basins so that infiltration system should infiltrate Water Quality Design Storm works according to Volume within 48 hours, and empty within design. 24 hours after cessation of most rain events. (A percolation test pit or test of facility indicates facility is only working at 90% of its designed capabilities. Test every 2 to 5 years. If two inches or more sediment is present, remove). Filter Bags (if Filled with Sediment and debris fill bag more than 1/2 Filter bag is replaced or applicable) Sediment and full. system is redesigned. Debris Rock Filters Sediment and By visual inspection, little or no water flows Gravel in rock filter is Debris through filter during heavy rain storms. replaced. Side Slopes of Erosion See "Detention Ponds" (No. 1). See "Detention Ponds" Pond (No. 1). Emergency Tree Growth See "Detention Ponds" (No. 1). See "Detention Ponds" Overflow Spillway (No. 1). and Berms over 4 feet in height. Piping See "Detention Ponds" (No. 1). See "Detention Ponds" (No. 1). Emergency Rock Missing See "Detention Ponds" (No. 1). See "Detention Ponds" Overflow Spillway (No. 1). Erosion See "Detention Ponds" (No. 1). See "Detention Ponds" (No. 1). Pre -settling Facility or sump 6" or designed sediment trap depth of Sediment is removed. Ponds and Vaults filled with Sediment sediment. and/or debris Volume V — Runoff Treatment BMPs — December 2014 4-35 No. 5 — Catch Basins Maintenance Defect Conditions When Maintenance is Needed Results Expected When Component Maintenance is performed General Trash & Trash or debris which is located immediately No Trash or debris located Debris in front of the catch basin opening or is immediately in front of blocking inletting capacity of the basin by catch basin or on grate more than 10%. opening. Trash or debris (in the basin) that exceeds 60 No trash or debris in the percent of the sump depth as measured from catch basin. the bottom of basin to invert of the lowest pipe into or out of the basin, but in no case less than a minimum of six inches clearance from the debris surface to the invert of the lowest pipe. Trash or debris in any inlet or outlet pipe Inlet and outlet pipes free blocking more than 1/3 of its height. of trash or debris. Dead animals or vegetation that could No dead animals or generate odors that could cause complaints vegetation present within or dangerous gases (e.g., methane). the catch basin. Sediment Sediment (in the basin) that exceeds 60 No sediment in the catch percent of the sump depth as measured from basin the bottom of basin to invert of the lowest pipe into or out of the basin, but in no case less than a minimum of 6 inches clearance from the sediment surface to the invert of the lowest pipe. Structure Top slab has holes larger than 2 square Top slab is free of holes Damage to inches or cracks wider than 1/4 inch and cracks. Frame and/or Top Slab (Intent is to make sure no material is running into basin). Frame not sitting flush on top slab, i.e., Frame is sitting flush on separation of more than 3/4 inch of the frame the riser rings or top slab from the top slab. Frame not securely and firmly attached. attached Fractures or Maintenance person judges that structure is Basin replaced or repaired Cracks in unsound. to design standards. Basin Walls/ Bottom Grout fillet has separated or cracked wider Pipe is regrouted and than 1/2 inch and longer than 1 foot at the secure at basin wall. joint of any inlet/outlet pipe or any evidence of soil particles entering catch basin through cracks. Settlement/ If failure of basin has created a safety, Basin replaced or repaired Misalignment function, or design problem. to design standards. Vegetation Vegetation growing across and blocking more No vegetation blocking than 10% of the basin opening. opening to basin. Vegetation growing in inlet/outlet pipe joints No vegetation or root that is more than six inches tall and less than growth present. six inches apart. Contamination See "Detention Ponds" (No. 1). No pollution present. and Pollution Volume V — Runoff Treatment BMPs — December 2014 4-38 No. 5 — Catch Basins Maintenance Defect Conditions When Maintenance is Needed Results Expected When Component Maintenance is performed Catch Basin Cover Not in Cover is missing or only partially in place. Catch basin cover is Cover Place Any open catch basin requires maintenance. closed Locking Mechanism cannot be opened by one Mechanism opens with Mechanism maintenance person with proper tools. Bolts proper tools. Not Working into frame have less than 1/2 inch of thread. Cover Difficult One maintenance person cannot remove lid Cover can be removed by to Remove after applying normal lifting pressure. one maintenance person. (Intent is keep cover from sealing off access to maintenance.) Ladder Ladder Rungs Ladder is unsafe due to missing rungs, not Ladder meets design Unsafe securely attached to basin wall, standards and allows misalignment, rust, cracks, or sharp edges. maintenance person safe access. Metal Grates Grate opening Grate with opening wider than 7/8 inch. Grate opening meets (If Applicable) Unsafe design standards. Trash and Trash and debris that is blocking more than Grate free of trash and Debris 20% of grate surface inletting capacity. debris. Damaged or Grate missing or broken member(s) of the Grate is in place and Missing. grate. meets design standards. No. 6 — Debris Barriers (e.g., Trash Racks) Maintenance Defect Condition When Maintenance is Results Expected When Components Needed Maintenance is Performed General Trash and Trash or debris that is plugging more Barrier cleared to design flow Debris than 20% of the openings in the barrier. capacity. Metal Damaged/ Bars are bent out of shape more than 3 Bars in place with no bends more Missing inches. than 3/4 inch. Bars. Bars are missing or entire barrier Bars in place according to design. missing. Bars are loose and rust is causing 50% Barrier replaced or repaired to deterioration to any part of barrier. design standards. Inlet/Outlet Debris barrier missing or not attached to Barrier firmly attached to pipe Pipe pipe Volume V — Runoff Treatment BMPs — December 2014 4-39 No. 22 - Maintenance Standards and Procedures for Permeable Pavement. Note that the inspection and routine maintenance frequencies listed below are recommended by Ecology. They do not supersede or replace the municipal stormwater permit requirements for inspection frequency required of municipal stormwater permittees for "stormwater treatment and flow control BMPs/facilities." Recommended Frequency a Component Condition when Maintenance is Needed Action Needed Inspection Routine (Standards) (Procedures) Maintenance Surface/Wearing Course Permeable A, S Runoff from adjacent pervious areas deposits soil, mulch or . Clean deposited soil or other materials from permeable pavement or other adjacent surfacing Pavements, all sediment on paving . Check if surface elevation of planted area is too high, or slopes towards pavement, and can be regraded (prior to regrading, protect permeable pavement by covering with temporary plastic and secure covering in place) • Mulch and/or plant all exposed soils that may erode to pavement surface Porous asphalt or A or B None (routine maintenance) Clean surface debris from pavement surface using one or a combination of the following methods: pervious concrete . Remove sediment, debris, trash, vegetation, and other debris deposited onto pavement (rakes and leaf blowers can be used for removing leaves) • Vacuum/sweep permeable paving installation using: o Walk -behind vacuum (sidewalks) o High efficiency regenerative air or vacuum sweeper (roadways, parking lots) o ShopVac or brush brooms (small areas) • Hand held pressure washer or power washer with rotating brushes Follow equipment manufacturer guidelines for when equipment is most effective for cleaning permeable pavement. Dry weather is more effective for some equipment. Ab Surface is clogged: . Review the overall performance of the facility (note that small clogged areas may not reduce overall performance of facility) Ponding on surface or water flows off the permeable . Test the surface infiltration rate using ASTM C1701 as a corrective maintenance indicator. Perform one test per installation, pavement surface during a rain event (does not infiltrate) up to 2,500 square feet. Perform an additional test for each additional 2,500 square feet up to 15,000 square feet total. Above 15,000 square feet, add one test for every 10,000 square feet. • If the results indicate an infiltration rate of 10 inches per hour or less, then perform corrective maintenance to restore permeability. To clean clogged pavement surfaces, use one or combination of the following methods: • Combined pressure wash and vacuum system calibrated to not dislodge wearing course aggregate. • Hand held pressure washer or power washer with rotating brushes • Pure vacuum sweepers Note: If the annual/biannual routine maintenance standard to clean the pavement surface is conducted using equipment from the list above, corrective maintenance may not be needed. A Sediment present at the surface of the pavement . Assess the overall performance of the pavement system during a rain event. If water runs off the pavement and/or there is ponding then see above. • Determine source of sediment loading and evaluate whether or not the source can be reduced/eliminated. If the source cannot be addressed, consider increasing frequency of routine cleaning (e.g., twice per year instead of once per year). Summer Moss growth inhibits infiltration or poses slip safety hazard . Sidewalks: Use a stiff broom to remove moss in the summer when it is dry • Parking lots and roadways: Pressure wash, vacuum sweep, or use a combination of the two for cleaning moss from pavement surface. May require stiff broom or power brush in areas of heavy moss. A Major cracks or trip hazards and concrete spalling and . Fill potholes or small cracks with patching mixes raveling . Large cracks and settlement may require cutting and replacing the pavement section. Replace in -kind where feasible. Replacing porous asphalt with conventional asphalt is acceptable if it is a small percentage of the total facility area and does not impact the overall facility function. • Take appropriate precautions during pavement repair and replacement efforts to prevent clogging of adjacent porous materials a Frequency: A= Annually; B= Biannually (twice per year); S = Perform inspections after major storm events (24-hour storm event with a 10-year or greater recurrence interval). b Inspection should occur during storm event. Volume V — Runoff Treatment BMPs — December 2014 4-60 No. 22 (continued) - Maintenance Standards and Procedures for Permeable Pavement. Recommended Frequency a Component Condition when Maintenance is Needed Action Needed Inspection Routine (Standards) (Procedures) Maintenance Surface/Wearing Course (cont'd) Interlocking concrete A or B None (routine maintenance) Clean pavement surface using one or a combination of the following methods: paver blocks and . Remove sediment, debris, trash, vegetation, and other debris deposited onto pavement (rakes and leaf blowers can be used aggregate pavers for removing leaves) • Vacuum/sweep permeable paving installation using: o Walk -behind vacuum (sidewalks) o High efficiency regenerative air or vacuum sweeper (roadways, parking lots) o ShopVac or brush brooms (small areas) • Note: Vacuum settings may have to be adjusted to prevent excess uptake of aggregate from paver openings or joints. Vacuum surface openings in dry weather to remove dry, encrusted sediment. A b Surface is clogged: . Review the overall performance of the facility (note that small clogged areas may not reduce overall performance of facility) Ponding on surface or water flows off the permeable . Test the surface infiltration rate using ASTM C1701 as a corrective maintenance indicator. Perform one test per installation, pavement surface during a rain event (does not infiltrate)] up to 2,500 square feet. Perform an additional test for each additional 2,500 square feet up to 15,000 square feet total. Above 15,000 square feet, add one test for every 10,000 square feet. • If the results indicate an infiltration rate of 10 inches per hour or less, then perform corrective maintenance to restore permeability. • Clogging is usually an issue in the upper 2 to 3 centimeters of aggregate. Remove the upper layer of encrusted sediment, and fines, and/or vegetation from openings and joints between the pavers by mechanical means and/or suction equipment (e.g., pure vacuum sweeper). • Replace aggregate in paver cells, joints, or openings per manufacturer's recommendations A Sediment present at the surface of the pavement . Assess the overall performance of the pavement system during a rain event. If water runs off the pavement and/or there is ponding, then see above. • Determine source of sediment loading and evaluate whether or not the source can be reduced/eliminated. If the source cannot be addressed, consider increasing frequency of routine cleaning (e.g., twice per year instead of once per year). Summer Moss growth inhibits infiltration or poses slip safety hazard . Sidewalks: Use a stiff broom to remove moss in the summer when it is dry • Parking lots and roadways: Vacuum sweep or stiff broom/power brush for cleaning moss from pavement surface A Paver block missing or damaged Remove individual damaged paver blocks by hand and replace or repair per manufacturer's recommendations A Loss of aggregate material between paver blocks Refill per manufacturer's recommendations for interlocking paver sections A Settlement of surface May require resetting Open -celled paving A or B None (routine maintenance) . Remove sediment, debris, trash, vegetation, and other debris deposited onto pavement (rakes and leaf blowers can be used grid with gravel for removing leaves) • Follow equipment manufacturer guidelines for cleaning surface. A b Aggregate is clogged: • Use vacuum truck to remove and replace top course aggregate Ponding on surface or water flows off the permeable . Replace aggregate in paving grid per manufacturer's recommendations pavement surface during a rain event (does not infiltrate)] A Paving grid missing or damaged . Remove pins, pry up grid segments, and replace gravel • Replace grid segments where three or more adjacent rings are broken or damaged • Follow manufacturer guidelines for repairing surface. A Settlement of surface May require resetting A Loss of aggregate material in paving grid Replenish aggregate material by spreading gravel with a rake (gravel level should be maintained at the same level as the plastic rings or no more than 1/4 inch above the top of rings). See manufacturer's recommendations. A Weeds present . Manually remove weeds • Presence of weeds may indicate that too many fines are present (refer to Actions Needed under "Aggregate is clogged" to address this issue) a Frequency: A= Annually; B= Biannually (twice per year); S = Perform inspections after major storm events (24-hour storm event with a 10-year or greater recurrence interval). b Inspection should occur during storm event. Volume V — Runoff Treatment BMPs — December 2014 4-61 No. 22 (continued) - Maintenance Standards and Procedures for Permeable Pavement. Recommended Frequency a Component Condition when Maintenance is Needed Action Needed Inspection Routine (Standards) (Procedures) Maintenance Surface/Wearing Course (cont'd) Open -celled paving A or B None (routine maintenance) . Remove sediment, debris, trash, vegetation, and other debris deposited onto pavement (rakes and leaf blowers can be used grid with grass for removing leaves) • Follow equipment manufacturer guidelines for cleaning surface. A b Aggregate is clogged: . Rehabilitate per manufacturer's recommendations. Ponding on surface or water flows off the permeable pavement surface during a rain event (does not infiltrate)] A Paving grid missing or damaged . Remove pins, pry up grid segments, and replace grass • Replace grid segments where three or more adjacent rings are broken or damaged • Follow manufacturer guidelines for repairing surface. A Settlement of surface . May require resetting A Poor grass coverage in paving grid . Restore growing medium, reseed or plant, aerate, and/or amend vegetated area as needed • Traffic loading may be inhibiting grass growth; reconsider traffic loading if feasible As needed None (routine maintenance) . Use a mulch mower to mow grass A None (routine maintenance) • Sprinkle a thin layer of compost on top of grass surface (1/2" top dressing) and sweep it in • Do not use fertilizer A Weeds present . Manually remove weeds • Mow, torch, or inoculate and replace with preferred vegetation Inlets/Outlets/Pipes Inlet/outlet pipe A Pipe is damaged Repair/replace A Pipe is clogged Remove roots or debris Underdrain pipe Clean pipe as Clean orifice at least Plant roots, sediment or debris reducing capacity of . Jet clean or rotary cut debris/roots from underdrain(s) needed biannually (may underdrain (may cause prolonged drawdown period) . If underdrains are equipped with a flow restrictor (e.g., orifice) to attenuate flows, the orifice must be cleaned regularly need more frequent cleaning during wet season) Raised subsurface Clean pipe as Clean orifice at least Plant roots, sediment or debris reducing capacity of . Jet clean or rotary cut debris/roots from underdrain(s) overflow pipe needed biannually (may underdrain . If underdrains are equipped with a flow restrictor (e.g., orifice) to attenuate flows, the orifice must be cleaned regularly need more frequent cleaning during wet season) Outlet structure A, S Sediment, vegetation, or debris reducing capacity of outlet . Clear the blockage structure . Identify the source of the blockage and take actions to prevent future blockages a Frequency: A= Annually; B= Biannually (twice per year); S = Perform inspections after major storm events (24-hour storm event with a 10-year or greater recurrence interval). b Inspection should occur during storm event. Volume V — Runoff Treatment BMPs — December 2014 4-62 No. 22 (continued) - Maintenance Standards and Procedures for Permeable Pavement. Recommended Frequency a Component Condition when Maintenance is Needed Action Needed Inspection Routine (Standards) (Procedures) Maintenance Inlets/Outlets/Pipes (cont'd) Overflow B Native soil is exposed or other signs of erosion damage are Repair erosion and stabilize surface present at discharge point Aggregate Storage Reservoir Observation port A, S Water remains in the storage aggregate longer than If immediate cause of extended ponding is not identified, schedule investigation of subsurface materials or other potential anticipated by design after the end of a storm causes of system failure. Vegetation Adjacent large shrubs As needed Vegetation related fallout clogs or will potentially clog voids . Sweep leaf litter and sediment to prevent surface clogging and ponding or trees . Prevent large root systems from damaging subsurface structural components Once in May and Vegetation growing beyond facility edge onto sidewalks, Edging and trimming of planted areas to control groundcovers and shrubs from overreaching the sidewalks, paths and street Once in September paths, and street edge edge improves appearance and reduces clogging of permeable pavements by leaf litter, mulch and soil. Leaves, needles, and In fall (October to Accumulation of organic debris and leaf litter Use leaf blower or vacuum to blow or remove leaves, evergreen needles, and debris (i.e., flowers, blossoms) off of and away organic debris December) after leaf from permeable pavement drop (1-3 times, depending on canopy cover) a Frequency: A= Annually; B= Biannually (twice per year); S = Perform inspections after major storm events (24-hour storm event with a 10-year or greater recurrence interval). b Inspection should occur during storm event. Volume V — Runoff Treatment BMPs — December 2014 4-63